Cranbourne–Pakenham Growth Area The South Eastern Growth Area Plan and Ministerial Directions were originally prepared in 1990. These apply to the City of Casey and Shire of Cardinia and suburbs such as Cranbourne, Pakenham and Officer. Between 1996–99, this growth area yielded some 43 per cent of all residential development in growth areas across Melbourne. Casey is the fastest-growing municipality in the metropolitan area, with development on a large number of fronts. Based on current rates of development, Casey has some 20 years supply of serviced and serviceable residential land available for development. It is forecast that, in future, this growth area will continue to provide the greatest number of greenfield sites, especially as opportunities diminish for residential development elsewhere in the eastern metropolitan area. Development in Pakenham has been slow compared to that in other growth areas. It is expected to proceed gradually, according to demand. Planning around Officer will need to address the consolidation of fragmented patterns of land ownership, and provides an opportunity for best practice design that is oriented to public transport. Pakenham’s future development is affected by the construction of a freeway bypass to the south. The Government is committed to extending the rail corridor from Cranbourne to Cranbourne East to service new residential areas, however, funding is not currently available. Casey City Council is reviewing its Municipal Strategic Statement, and proposes an extensive bus network to link activity centres. Part of this growth area, particularly south of Officer and Pakenham, is located in the Westernport catchment. The natural drainage systems to Western Port have been extensively modified, and the once extensive wetlands of the Koo-wee-rup Swamp replaced by highly productive, intensive agriculture. The man-made drainage system is highly efficient and, hence, stormwater carrying sediments, nutrients and other pollutants is quickly transferred from the growth area to the bay. Appropriate controls must be put in place to ensure that stormwater and ground water entering the Westernport catchment does not have a detrimental effect on this internationally recognised environment. Similarly, there is a need to protect valuable habitat and areas of landscape significance located in the southern foothills of the Dandenong Ranges. Strategic actions The rezoning of some land designated as future urban, at Cranbourne West and remote from rail services, will be deferred; it will be reassessed as part of the growth area review. The further urban expansion of Cranbourne into the Westernport catchment will be prevented. Stringent environmental standards for development will be applied, to minimise the impact of development in the Westernport catchment. The long-term option for a regional airport located south east of Cranbourne will be safeguarded. The long-term potential for urban development opportunities between Pakenham and Bunyip will be maintained by preventing further fragmentation of land holdings. The potential for major public transport-oriented development at Officer and West Pakenham, focused on the existing rail facilities, will be investigated. The long-term potential for new rail stations at Lynbrook and Cranbourne East will be investigated. The possibility of utilising recycled water and on-site treatment systems to minimise the impact on Western Port will be investigated – this may also help in developing sustainable industries. Page 28 Draft Implementation Plan 2
Transcript
Page 1: Cranbourne–Pakenham Growth Area - Planning · 2018. 1. 15. · Narre Warren Cranbourne Existing urban development Future urban Residential zone Business/Industrial zone Potential

Cranbourne–PakenhamGrowth AreaThe South Eastern Growth Area Plan and MinisterialDirections were originally prepared in 1990. These apply tothe City of Casey and Shire of Cardinia and suburbs such asCranbourne, Pakenham and Officer.

Between 1996–99, this growth area yielded some 43 percent of all residential development in growth areas acrossMelbourne. Casey is the fastest-growing municipality in themetropolitan area, with development on a large number offronts. Based on current rates of development, Casey hassome 20 years supply of serviced and serviceable residentialland available for development. It is forecast that, in future,this growth area will continue to provide the greatestnumber of greenfield sites, especially as opportunitiesdiminish for residential development elsewhere in theeastern metropolitan area.

Development in Pakenham has been slow compared to thatin other growth areas. It is expected to proceed gradually,according to demand. Planning around Officer will need toaddress the consolidation of fragmented patterns of landownership, and provides an opportunity for best practicedesign that is oriented to public transport. Pakenham’sfuture development is affected by the construction of afreeway bypass to the south.

The Government is committed to extending the rail corridorfrom Cranbourne to Cranbourne East to service newresidential areas, however, funding is not currently available.Casey City Council is reviewing its Municipal StrategicStatement, and proposes an extensive bus network to linkactivity centres.

Part of this growth area, particularly south of Officer and Pakenham, is located in the Westernport catchment. The natural drainage systems to Western Port have beenextensively modified, and the once extensive wetlands of the Koo-wee-rup Swamp replaced by highly productive,intensive agriculture. The man-made drainage system ishighly efficient and, hence, stormwater carrying sediments,nutrients and other pollutants is quickly transferred fromthe growth area to the bay. Appropriate controls must beput in place to ensure that stormwater and ground waterentering the Westernport catchment does not have adetrimental effect on this internationally recognisedenvironment.

Similarly, there is a need to protect valuable habitat andareas of landscape significance located in the southernfoothills of the Dandenong Ranges.

Strategic actions • The rezoning of some land designated as future urban,

at Cranbourne West and remote from rail services, willbe deferred; it will be reassessed as part of the growtharea review.

• The further urban expansion of Cranbourne into theWesternport catchment will be prevented.

• Stringent environmental standards for development willbe applied, to minimise the impact of development inthe Westernport catchment.

• The long-term option for a regional airport locatedsouth east of Cranbourne will be safeguarded.

• The long-term potential for urban developmentopportunities between Pakenham and Bunyip will bemaintained by preventing further fragmentation of landholdings.

• The potential for major public transport-orienteddevelopment at Officer and West Pakenham, focused on the existing rail facilities, will be investigated.

• The long-term potential for new rail stations at Lynbrookand Cranbourne East will be investigated.

• The possibility of utilising recycled water and on-sitetreatment systems to minimise the impact on WesternPort will be investigated – this may also help indeveloping sustainable industries.

Page 28 Draft Implementation Plan 2

Page 2: Cranbourne–Pakenham Growth Area - Planning · 2018. 1. 15. · Narre Warren Cranbourne Existing urban development Future urban Residential zone Business/Industrial zone Potential

Growth Areas Page 29

Officer

Pakenham

Dandenong

Narre Warren

Cranbourne

Existing urban development

Future urban

Residential zone

Business/Industrial zone

Potential for urban developmentto be re-examined

Rail

Road

Freeway under construction

Proposed freeway

Urban growth boundary

Principal Activity Centre

Major Activity Centre

Potential public transport oriented centre

Potential new rail station

Figure 8. Cranbourne-Pakenham growth area

Short term

Medium term

Long term

Non forecast

Housing Melbourne 2000Forecast Development

0 2.5 5kmNORTH

Page 3: Cranbourne–Pakenham Growth Area - Planning · 2018. 1. 15. · Narre Warren Cranbourne Existing urban development Future urban Residential zone Business/Industrial zone Potential

Caroline SpringsThe review of the area between Melton township andCaroline Springs will follow the review of the Werribee and Hume growth areas.

Between 1996–99, Melton, including Caroline Springs,yielded some 9 per cent of fringe area development inMelbourne.

Strategic actions• The long-term development options provided by the rail

corridor and freeway between Melton township andCaroline Springs will be maintained.

• The use of high-quality recycled water from the WesternTreatment Plant will be investigated, to augment limitedwater supply at Melton.

• The Outer Western Integrated Transport Strategy willprovide a framework for transport planning andprovision.

Page 30 Draft Implementation Plan 2

Page 4: Cranbourne–Pakenham Growth Area - Planning · 2018. 1. 15. · Narre Warren Cranbourne Existing urban development Future urban Residential zone Business/Industrial zone Potential

Growth Areas Page 31

Deer Park

Ardeer

Ravenhall

CarolineSpringsRockbank

Syndenham

Melton

Refocus new growthto public transportorientated centres

0 2.5 5kmNORTH

Existing urban development

Future Urban

Residential zone

Business/Industrial zone

Proposed major industrial area

Potential for urban developmentto be re-examined

Rail

Road

Proposed freeway

Urban growth boundary

Principal Activity Centre

Major Activity Centre

Potential new rail station

Figure 9. Caroline Springs growth area

Short term

Medium term

Long term

Non forecast

Housing Melbourne 2000Forecast Development


Recommended