Community Update Crystal City Potomac Yard Transitway Construction & Proposed Operations Department of Environmental Services Transportation Division October 2015
Transcript
Page 1: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Community Update

Crystal City Potomac Yard Transitway

Construction & Proposed Operations

Department of Environmental Services – Transportation Division

October 2015

Page 2: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Meeting Overview

• Purpose– Present and solicit feedback:

• Revised concept plan for Crystal Drive

• Revised proposal for Transitway operations

– Inform about Transitway construction status

2

Page 3: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

3

Agenda

• Welcome and meeting overview

• Updates– Project history

– Summary of community concerns

– Alternatives for Crystal Drive

– Proposed Transitway operations

– Construction update

• Next steps– Paving of Crystal Drive: October

– Request to advertise Transitway ordinance: November

Page 4: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Project History

• Transitway project based on extensive,

community-based planning process – Crystal City Sector Plan, adopted 2010: More

than 90 public meetings held during four-year

period

– After Sector Plan adoption, additional

community engagement during Transitway

design and construction (more than 15 meetings)

• Project documents made available

online after community feedback 4

Page 5: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Summary of Community Concerns

5

Page 6: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Community Concerns

Feedback received about proposed ordinance through meetings with community and stakeholders:

– July 14, 2015 (community)

– September 2, 2015 (stakeholders)

– October 5, 2015 (stakeholders)

– October 8, 2015 (community)

Proposed ordinance has been revised to incorporate public input

6

Page 7: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Community Concerns

Topic Community Concern County

Action

1. Project and

ordinance

background

Lack of clarity about the history/background of

the Transitway project and the proposed

ordinance

2. Hours of

transit

dedication

Proposed peak period bus-only lane hours are

longer than what is initially needed

• Original proposal: 5 to 10 am, 3 to 8 pm

3. Access to

bus-only lane

Unclear about who has access to the peak

period bus-only lane and when

7

Page 8: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Community Concerns

Topic Community Concern County

Action

4. Right-hand

turns

• Unclear when drivers may enter the bus-only

lane to make a right turn

• Disparity between proposed ordinance and

Crystal Drive striping plan

5. Center

lane on

Crystal Drive

There is a need for a center left-turn lane

6. Truck

deliveries

Where will trucks be allowed to park to make

deliveries along Crystal Drive? Currently, they

park in the traffic lane.

8

Page 9: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Community Concerns

Topic Community Concern County

Action

7. Bike riders • New bus-only lane may push bike riders from

the road to the sidewalk

• Removal of northbound bike lane on Crystal

Drive

8. Paving and

striping of

Crystal Drive

When and how will Crystal Drive be repaved and

restriped? What will it look like?

9. Education,

enforcement,

and

evaluation

• What is the communications and outreach

plan for Transitway operations?

• How will the Transitway ordinance be

enforced?

• How will Transitway be monitored/evaluated?

9

Page 10: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Crystal Drive Alternatives

10

Page 11: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Concepts - Crystal Drive

11

New street configuration will be introduced after paving

Page 12: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

12

N

Crystal Drive Bicycle Data

Bike Counter Locations

Page 13: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Crystal Drive Bicycle Data

13

No. of days = 22

Avg. daily total = 271

Page 14: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Crystal Drive Bicycle Data

14

Page 15: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Options for Crystal Drive

West side of Crystal Drive - Convert some parking spots

near 23rd Street to morning loading/delivery zone

15AM PEAK HOUR PM PEAK HOUR

Metered

Parking

Loading Zone

3AM – 10AM

Page 16: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Options for Crystal Drive

West side of Crystal Drive - Convert parking spots mid-block

between 20th and 23rd Streets to morning loading/delivery zone

16AM PEAK HOUR PM PEAK HOUR

Metered

Parking

Loading Zone

3AM – 10AM

Page 17: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Options for Crystal Drive

Curbside Management

17AM PEAK HOUR PM PEAK HOUR

Metered

Parking

Zipcar

Disabled

Parking

Page 18: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Options for Crystal Drive

Options for morning loading/delivery zones

18

AM PEAK HOUR

PM PEAK HOUR

Metered

Parking

Zipcar

Disabled

Parking

Loading Zone

3AM – 10AM

Page 19: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Proposed Transitway Operations

19

Page 20: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Proposed Operations

• Hours for bus-only lane– Revised proposal from 10 hours per day to

6.5 hours per day

• 6:00 – 9:00 a.m. (morning rush hour)

• 3:30 – 7:00 p.m. (evening rush hour)

– Based on traffic capacity analysis and peak-

frequency transit operations: Metroway, ART,

and VRE

20

Page 21: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Proposed Operations

21

Page 22: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Proposed Operations

• Right turns at intersections and driveways

– Propose revising ordinance text:

• Give right turn access to bus-only lane within 100 feet

of intersections and driveways

– Ordinance will better match proposed lane

marking plan

– Based on right turning volumes, 100 feet

provides adequate capacity

22

Page 23: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Right Turn Volumes

Northbound right turn volumes from Crystal Drive

– At 18th Street = 10 vehicles/hour

– At 20th Street = 40 vehicles/hour

– At 23rd Street = 176 vehicles/hour.

23

Right turns

in peak hour

Turn lane

length

Westbound N Fairfax Dr at N Glebe Rd 420 veh/hr 150 ft

Eastbound Lee Highway at N Veitch St 325 veh/hr 140 ft

Southbound Fort Myer Dr at Wilson Blvd 375 veh/hr 100 ft

Northbound S. Quincy St at Campbell Ave 309 veh/hr 100 ft

Northbound Joyce St at Army Navy Dr 298 veh/hr 130 ft

Comparable intersections in Arlington:

Page 24: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

24

New Bike Signage

New signs in three locations:

• Curbside on Crystal Drive facing east

as riders come off Mt. Vernon trail at

the water park

• Mid-block crosswalk just north of the

water park, facing north

• Two mounted back-to-back just south

of the Mt. Vernon trail, adjacent to

new Transitway station at 18th Street

Page 25: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Communications & Outreach

Broad-based outreach for Transitway operations

• For at least two months leading up to Transitway opening and continuing after opening

• Activities to include:– Partnering with Crystal City Civic Association and BID

– Website, social media

– E-newsletters

– Flyers and brochures

– Postcard mailing

– Street teams at neighborhood events

– Commuter Stores

– Arlington Transportation Partners outreach to businesses, residential properties

25

Page 26: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Enforcement

• Arlington Police will assist in the

Transitway education program and

work with the community to make this

partnership a success.– Officers will be educated to observe and

correct improper behavior.

– Increased enforcement will be triggered when

bus drivers report that their on-time

performance is off due to bus lane violators.

26

Page 27: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Evaluation

County will actively monitor Transitway operations through:

– Traffic counts (pedestrians, cyclists, vehicles)• 24hr. mid-block counts

• Permanent count stations

– Transit metrics - Bus ridership, on-time performance

– Parking occupancy data

– CCTV traffic monitoring at signalized intersections

County will provide updates at Crystal City BID quarterly transportation briefings

27

Page 28: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Construction Update

28

Page 29: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Paving/Striping of Crystal Drive

– Milling and paving between 15th and 26th

Streets will begin Friday, October 9

– Paving will last for several weeks, weather

permitting

• May be performed at night in selected areas to

reduce traffic impacts

• Some lanes will be closed to traffic during this

work

29

Page 30: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Transitway Construction

Schedule update: Construction activities expected to

continue through fall and into winter

• New transit lanes in Potomac Yard nearing completion

• Traffic signs and station signage being installed

• Testing LED signs and other equipment that will

support the Transitway

• Construction resumed at several station locations

where unforeseen utilities, poor soils and underground

obstructions had slowed work

30

Page 31: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Next Steps

31

Page 32: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Next Steps

• Milling and paving of Crystal Drive– Start date: Oct. 9

– Work will begin on 15th Street and head south

toward 26th Street

• Restriping, new lane configuration on

Crystal Drive– Start date: After completion of paving,

weather permitting

32

Page 33: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Next Steps

• Transitway ordinance:– Request to Advertise: November

– Board Action: December

• Transitway construction:– Expected to continue through fall and into

winter

33

Page 34: Crystal Drive Restriping and Repaving - September 2015arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/19/... · 2015-10-09 · October 2015. Meeting Overview •Purpose ...

Thank you!