1
R. Corsini – CLIC Project Meeting CTF3 Update
CTF3 UpdateR. Corsini for the CTF3 Team
1
2
R. Corsini – CLIC Project Meeting CTF3 Update
Conclusions
• 2nd run of 2013 not very lucky:• Problem with CALIFES cathode plug-in• TWTs availability (from 2 ½ to 2, to 1…) – hope to be solved • Delays in hardware components (in dogleg and feed-forward exp.)• Some issues on klystron availability, operation manpower, infrastructure)
• However, good progresses in stability, repeatability, operational software, optics & procedures (not covered here)…
• Future schedule agreed upon, hardware problems on the way to be solved - will restart fast after the short Christmas break, all ready for an exciting 2014!
From December 2013
Project Meeting
3
R. Corsini – CLIC Project Meeting CTF3 Update
• CALIFES: Fast successful repair, during winter short shut-down
• TWTs: 1 New one, from new supplier, 2 repaired. Now we have 3 fully operational + one spare. Ordering a second one from Poland. All 3 are working stably since January.
• Dogleg experiment: all hardware installed – start scheduled in summer
• Feed-forward experiment: amplifiers expected for Easter, all other hardware ready (will also receive two new phase monitors during 2014 – can start with present one only, and monitor phase in PETSs)
• Klystron availability: very good progress
• Operation manpower – still a bottleneck, but…
An exciting 2014 has started!
Status of last year issues
4
R. Corsini – CLIC Project Meeting CTF3 Update
30 Jan first beam from gun
17 Feb first beam in spectrometer 10 (3 GHz)18 Feb first 3 GHz beam in CR, first 1.5 GHz beam in linac19 Feb first CALIFES beam21 Feb first 1.5 GHz beam to CR
24 Feb first combination 4 beam (1.5 GHz with phase switches)26 Feb 14 A (factor 4) extracted from CR27 Feb first beam in CLEX (uncombined)
4 Mar first beam (3 GHz) to – and through – DL5 Mar full combination factor 2 in DL (7 A)
13 Mar beam (uncombined) end of TBL / 3 GHz factor 4 optimized, 16 A
19 Mar first drive beam to TBTS for Uppsala beam tests (factors 1 to 4)21 Mar first factor 8 recombination ~ 20 A25 Mar good factor 8, ~ 25 A ~1% stability
9 Apr transport to TBTS, > 20 A
Run 1 – summary until now
5
R. Corsini – CLIC Project Meeting CTF3 Update
Status – 26 A in CR (factor 8)
6
R. Corsini – CLIC Project Meeting CTF3 Update
Status – 26 A in CR (factor 8)
7
R. Corsini – CLIC Project Meeting CTF3 Update
Status ~ 23 A through TBTS
8
R. Corsini – CLIC Project Meeting CTF3 Update
Stability – Feedbacks
• Gun current feedback (plus flattening on request)• RF compression system temperature (local + global)• Local RF phase feedback on each klystron• Injector feedback (MKS 2 and 3)• RF amplitude flattening feedback • Beam loading feed-back (MKS 5 to 15)• TWTs feeback (extension of injector feedback)• Energy feedback + energy flattening feedback (MKS15)• Flattening of BPR 475…
A. Andersson, A. Dubrowski, T. Persson, P. Skowronski, L. Malina, D. Gamba…
9
R. Corsini – CLIC Project Meeting CTF3 Update
energy flattening feedback (MKS15)
BPR 475 flattening feedback
Trips MKS02 & MKS 15
Disable MKS15 loading fb and inj. fb
Stop energy flattening and BPR 475
D. Gamba
10
R. Corsini – CLIC Project Meeting CTF3 Update
Emittance & optics – TL2• Still large Hor emittance• Vert emittance small • Suspect error in MTV 253 scan
(calibration?)• Stable Twiss parameters &
optics in TL2
P. Skowronski, T. Persson
11
R. Corsini – CLIC Project Meeting CTF3 Update
Stripline Drive Beam BPM in TBL (CERN-LAPP)
Cavity Main Beam BPM in CALIFES/TBTS (CERN-JAI at Royal Holloway)
Electro-optic bunch profile monitor in CALIFES(CERN-Dundee University)
2013 GoalsR. Pan, T. Lefebre
F. Cullinan, J. Towner,W. Farabolini, M. Wendt…
CTF3 as diagnostics test bed
12
R. Corsini – CLIC Project Meeting CTF3 Update CALIFES
F. Burkart, O. Stein, W. Farabolini
Diamond beam loss detectors
13
R. Corsini – CLIC Project Meeting CTF3 Update CALIFES - bunch length compression
• CALIFES bunch length measured with streak camera, between 3 and 6 ps rms
W. Farabolini, T. Lefebe, S. Mazzoni
14
R. Corsini – CLIC Project Meeting CTF3 Update
TBTS• 22-23 A through PETS (factor 8)• Up to 60 MW produced – halfway with On-Off
mechanism• Yesterday: about 50 MW in structure, no breakdowns
• Ongoing studies on DB deceleration, coupling etc…
W. Farabolini, J.L. Navarro,N. Vitoratou, V. Ziemann, J. Oegren
15
R. Corsini – CLIC Project Meeting CTF3 Update
TBTS – multipolar componentsW. Farabolini
Unfocused beamthrough structure,No RF
Zero crossing,Positive slope
Zero crossing,Negative slope
Positive crest
Negative crest
16
R. Corsini – CLIC Project Meeting CTF3 Update
first beam from gun beam in linacbeam in CALIFES
16 A in CR – factor 4
7 A in DL factor 2
25 A in CR factor 8
Today
23 A in CLEXfactor 8
CTF3 Schedule 2014
17
R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Schedule 2014
Installation TBM / Maintenance klystrons
18
R. Corsini – CLIC Project Meeting CTF3 Update TBM Installation
D. Gudkov, G. Riddone, H. Mainaud …