3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Update on CTF3 installation and planning
L. Rinolfi
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Photo injector tests for PHIN
TL2
D FFD
D F D
D F D D F D
D F D
DF DF DF DF DF DF DF DF DF
D F D
F DF D
D FFFDD
D F DD F D
D F DD F D D F DD F D
D F DD F D
DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF
D F DD F D
F DF DF DF D
Drive Beam AcceleratorDL
DL = Delay Loop (factor 2)
CR
CR = Combiner Ring (factor 4)
CLEX
Injector with thermionic gun
30 GHz production(PETS line)
and Test Stand for CLIC structures
CTF3 layout
TL1
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Installation into the Injector, Drive Beam Linac, Delay Loop, Transfer Line TL1 and Combiner Ring => OK
Installation of the Transfer Line TL2 connected to the Combiner Ring for the end of June 2008 but:
- Indian dipole magnets ?
- Power supplies for dipolar correctors ?
Installation into CLEX (Phase 0) will be finished for the end of June 2008 but:
- Laser for CALIFES ?
Conclusion of the 2nd meeting
Magnetic measurements finished today
Next slide
See K. Elsener talk
- Strong request from CARE to finalize the test as deliverable for EU-FP6-JRA-PHIN Meeting with R. Aleksan (CARE coordinator)
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Power supplies for correctors
75 power supplies have been ordered (including spares)
67 power supplies should still be installed (due to delay from company)12 power supplies should arrive at CERN next week
Then batch of 20 power supplies should be delivered at CERN every 2 weeks => all power supplies at CERN ~ mid August 2008
All power supplies (TL2 and CLEX) operational for end of August 2008
Information provided by L. De Oliveira AB/PO to the TIC meeting yesterday
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
RF deflectors in CR
Klystrons
3 GHz40 MW
3 GHz
30 MW
3 GHz
Gun
SHB2SHB1
PB2 B1A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12
LIPS BOC BOC
A13 A14
40 MW
3 GHz
LIPS
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
A17 A18
50 Hz 10 Hz50 Hz50 Hz 50 Hz 10 Hz 50 Hz 50 Hz 50 Hz50 Hz
SHB3
TDS SICA
BOCLIPS LIPS LIPS
40 MW
MKS 02
MKS 03
MKS 05
MKS 06
MKS 07
MKS 11
MKS 12
MKS 13
MKS 14
MKS 15
TWT 01
TWT 02
TWT 03
Photo-injector
CTF2
20 MW
1.5 GHz
50 Hz
MKL 02
1 RF deflector
RF deflectors2 RF deflectors
Combiner Ring
40 kW1.5 GHz
BW 200 MHz LIPS
Delay Loop
PHIN RF gun in CTF2
1 RF deflector
RF deflector in CLEX
CLEX
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Combiner Ring
In order to cure the vertical instabilities, two new (3 GHz) RF deflectors (in Al)
have been designed by LNF (Frascati) and are under construction.
RF deflectors CR. HDS 0150 & CR.HDS 1050
Beam current
V- BPM
H- BPM
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
RF deflectors
RF power tests to be planned at CERN
Information provided yesterday by A. Ghigo / LNF
All cells are ready to be assembled
All feedthrough are expected end of June at Frascati
Low level RF tests in July at Frascati
Trieste is in shut-down with all klystrons until October 2008 => No RF power tests in Trieste (same as PSI)
Installation into the Combiner Ring => 2 weeks shut-down in October
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Transfer Line TL2
SH
C 0
120
SH
D 0
110
QF
G 0
140
QD
G 0
160
QF
H 0
210
QF
H 0
180
QF
L 0
270
QD
L 0
280
QD
H 0
220
QF
H 0
230
QD
H 0
330
QF
H 0
350
QD
H 0
370
QD
L 0
430
QF
L 0
450
QD
L 0
470
QFL 0530QDL 0550
QFL 0570QFL 0620QDL 0650
QFL 0680
QFL 0730QDL 0750
QFL 0770
QD
D 0
820
QF
D 0
840
XLC 0580
XLC 0720
XLA 0630XLA 0670
BH
H 0
200
BH
G 0
500
BH
H 0
600
BH
H 0
700
BH
G 0
800
BV
A 0
300
BV
B 0
400
Magnets
Dipoles (Horizontal) 5
Dipoles (Vertical) 2
Quadrupoles 27Sextupoles 4
Correctors 12
Instrumentation
BPM 6 WCM 1
BPI 6 MTV 1
BPR 1
Vacuum
VPI 9
VVS 2
Combiner Ring
CLEX
e-
SL
V 0
255
Collimator
2008/2009 shut-down
KH
C 0
250
Tail Clipper
October 2008 ?
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
CTF3 - DL - CR - TL2 Schedule
Apr May J unWk 14 15 16 17 18 19 20 21 22 23 24 25 26
Mo 31 7 14 21 28 5 12 19 26 2 9 16 23
Tu
We
Th
Fr
Sa
Su
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CR under access control
CR closed with keys for
Hardware tests
CTF3
SHUTDOW
N
Ascen
Whit.
J eune G.
CTF3 stop
Machine open
Beam in Combiner Ring with beam extraction to the CC dump only
Open Days
Start with beam in DL + CR Connect TL2 line to CR
Installation RF deflector in CR+ BI in CRM line
+ Tail clipper into TL2 + PETS into TBTS
During this period the Combiner Ring and CLEX will work with independent access control
Combiner Ring and CLEX will remain under access control altogether
Tests PO and CO forTL2 line
RF network conditioning MKS 12 to 14 + MKL 02
(MKS 11 and MKS 15 down)
Beam in PETS
Start TL2 line with beam
CR with beam
CR open with control access
https://edms.cern.ch/document/862088/
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
CTF3 - DL - CR - TL2 Schedule
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Oct Nov Dec
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CR under access control
CR closed with keys for
Hardware tests
CTF3
SHUTDOW
N
J eune G.
CTF3 stop
Machine open
Installation RF deflector in CR+ BI in CRM line
+ PETS into TBTS
Combiner Ring and CLEX will remain under access control altogether
Tests PO and CO forTL2 line
Start TL2 line with beam
CR with beam
CR open with control access
Combiner Ring and CLEX will remain under access control altogether
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
TL2
Two-BeamTest Stand
(TBTS)
Test Beam Line (TBL) decelerator
Space reserved for Instrumentation Test Beam
line (ITB)
RF gun
CALIFES
Drive Beame-
e-
Probe beam
e-
e-
Space re
serve
d for 1
6 PETS
CLEX Layout
TL2 '
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
1) TL2, TL2' Installation of dumps
Alignment finished yesterday
Some vacuum chambers remains to be installed
CLEX status
2) CALIFES => see F. Peauger talk
RF gun with water leak => See K. Elsener talk
Alignment done
RF wave guides still foreseen to be at CERN next week
3) TBL => see S. Doebert talk
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
TBTS
R. Ruber
Foreseen
in O
ctober
2008
Foreseen
in 2009
End of June
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
CTF3 - CLEX Schedule 2008
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Oct Nov Dec
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CLEX under access control
CLEX with beam
CLEX closed with keys for Hardware tests
CTF3
SHUTDOW
N
CTF3 stop
Machine open
Start beam for CALIFES
RF conditioning for CALIFES
CLEX under access control for
Laser tests
Photo-cathodes production
Installation RF deflector in CR+ PETS into TBTS
J eune G.
During this period => No installations in CLEX
PO & CO
During this period => No installations in CLEX
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Work into CTF2
A single klystron MKS 14 shared with RF reflectors into the Combiner Ring and the RF deflector of CALIFES
MKS 14 klystron would be used to test the 2 new Al RF deflectors coming from LNF before connecting wave guides to the PHIN RF gun ? ?
Courtesy K. Elsener
RF gun for PHIN
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
CTF3 - CTF2 Schedule 2008
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Oct Nov Dec
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CTF2 with 30 GHz or
beam
CTF2 closed with keys for Hardware tests
CTF3
SHUTDOW
N
J eune G.
CTF3 stop
Machine open
Beam for PHIN tests
or30GHz tests
Beam in PETS +DL + CR + CLEX
Beam in PETS
Beam in DL + CR + CLEX
CTF2 open with access control
3rd CTF3 Committee meeting L. Rinolfi 19th June 2008
Installation of the Transfer Line TL2 will be finished and connected to the Combiner Ring for the 7 July 2008 without the Tail Clipper.
Conclusion
Installation into CLEX (Phase 0) will be finished for the 14 July 2008
CALIFES RF gun ? Laser energy ?
Delay on correctors power supplies.
Installation into CTF2 (for PHIN) will depend upon the CALIFES RF gun and RF wave guides.
Tests of RF deflectors ?
Tests with beam foreseen for October 2008.
Holidays period !!!