+ All Categories
Home > Documents > DAMS IN PORTUGAL · 2017. 1. 31. · Feiticeiro Douro Sabor 3491 45 30,8 30 86 Reversible...

DAMS IN PORTUGAL · 2017. 1. 31. · Feiticeiro Douro Sabor 3491 45 30,8 30 86 Reversible...

Date post: 31-Jan-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
17
DAMS IN PORTUGAL José Rocha Afonso Head of Dam Safety Division Secretary General of CNPGB (PTCOLD) [email protected] BRIEF OVERVIEW CNPGB(PTCOLD) and APA ROLES
Transcript
  • DAMS IN PORTUGAL

    José Rocha Afonso

    Head of Dam Safety Division

    Secretary General of CNPGB (PTCOLD)

    [email protected]

    BRIEF OVERVIEW

    CNPGB(PTCOLD) and APA ROLES

  • PORTUGUESE NACIONAL COMMITTEE ON LARGE DAMS

    CNPGB/PTCOLD is the Commission that is in charge of the Portuguese representation at the

    International Commission on Large Dams (ICOLD)

    The permanent representation of Portugal in ICOLD dates to 1948. The National Portuguese

    Committee (CNPGB) was created by a Decree of March 21, 1952

    � The CNPGB is chaired by the President of the PORTUGUESE

    ENVIRONMENT AGENCY (APA)

    � Its members are appointed by order of the Minister of Environment,

    acting on a proposal from the Committee, which proposes individuals

    with a relevant activity in the field of large dams

  • PTCOLD SITE http://cnpgb.apambiente.pt/

  • The Portuguese Committee on large Dams hosts the Website of the ICOLD EUROPEAN CLUB, and has been doing it since

    2004, when its proposal and development of the site occurred.

    The aim of this Website, from the very beginning, independently of its simple layout, is to help improve the role of the

    Club, particularly by displaying:

    • objectives;• activities from the Working Groups;• Club Symposia and its contents;• European safety legislation;• texts or reports, discussion material, position papers, other activities, etc.• links to other projects;• other proposals from the Club members.

    All of the Presidencies of the Club have helped improve the contents of the site.

    At the former Presidency, in 2016, EUROPEAN ICOLD CLUB MANIFESTO ON DAMS AND RESERVOIRS was launched and is

    now displayed at the front page of the website.

    The new President, Jean Jacques Fry, started activity in 2017 and has already introduced new ideas, such as the “Letters

    from the Presidency”, “Eucold News” and the “share space” for working groups.

    ICOLD EUROPEAN CLUB SITE

    The EUROPEAN CLUB site is easily accessed through the main ICOLD site, within the “REGIONAL CLUBS” label.

  • http://cnpgb.apambiente.pt/IcoldClub/index.htmICOLD EUROPEAN CLUB SITE

  • ICOLD EUROPEAN CLUB SITE

  • PORTUGAL

    RELIEF AQUIFERS

    MAIN CHARACTERISTICS

    RAINFALL

  • 88

    SPI Standardized Precipitation

    Index

    Extreme

    Severe

    Main Droughtsin Portugal:

    GREEN PAPERFROM THE COMMISSIO N TO

    THE COUNCIL, THE EUROPEAN

    PARLIAMENT, THE EUROPEAN

    ECONOMIC AND SOCIAL

    COMMITTEE AND

    THECOMMITTEE OF THE

    REGIONS

    • 1944/45• 1953/54• 1975/76• 1981/83• 1992/93• 2004/2005

    PORTUGAL

    DROUGHTS

  • IBERIAN SHARED RIVER BASINS

    Iberian water basins occupy 64% of the mainland territory

  • 10

    PORTUGUESE LARGE DAMS

    V ≥ 100.000 m3

    “MEDIUM SIZE"

    “LARGE DAMS”:

    h ≥ 15 m

    15 m > h ≥ 10 m ʌ V ≥ 1 hm3

    SA

    FE

    TY

    RE

    GU

    LAT

    ION

    S

  • LARGE DAMS: MAIN PURPOSES

  • France

    Germany

    Italy

    Spain

    Sweden

    Austria

    Greece

    0

    3

    4

    5

    6

    7

    8

    9

    10

    0 10 20 30 40 50 60 70

    Exploitable hydropower potential (%)(1)

    Hydro capacity built since 1975 (GW)

    Exploitable hydropower potential vs. Hydropower cap acity built since 1975

    (1) Total Hydropower installed capacity / Theoretical Hydropower potential (2) Source: MEI; DGGE; REN

    Target for 2020

    Finland1

    2

    Portugal

    Portugal

    54% of exploitable potential

    Define a new target for Hydropower in 2020

    PNBEPH 2007

  • NEW HYDROPOWER DAMS

    Hydropower dams recently built(last 3 years) - EDP

    Hydropower dams on which constructionis now starting - IBERDROLA

    Baixo Sabor / Feiticeiro

    Alto Ceira

    Ribeiradio / Ermida

    Basin

    Area

    Dam

    Height

    Reservoir

    Volume

    Installed

    Power

    Annual

    GenerationType

    Km2 m hm

    3 MW GWh

    Foz Tua Douro Tua 3822 108 310 234 340 Reversible

    Fridão Douro Tâmega 2630 97 195 163 299

    Alto Tâmega Douro Tâmega 1557 115 96 90 114 Reversible

    Gouvães Douro Tâmega 100 32 13 112 153 Reversible

    Daivões Douro Tâmega 1984 75 66 109 148 Reversible

    Baixo Sabor Douro Sabor 3447 123 1095 140 358 Reversible

    Feiticeiro Douro Sabor 3491 45 30,8 30 86 Reversible

    Ribeiradio Vouga Vouga 945 83 136,4 71,6 139*

    Ermida Vouga Vouga 965 35 3,86 7 *

    Alto Ceira Mondego Ceira 34,5 41 1,6 ** **

    Dam Basin River

  • ALQUEVA DAM

    ALQUEVA MULTIPURPOSE SCHEME

  • NEW DAMS

    ALTO CEIRA

    RIBEIRADIO

    FOZ TUA

    BAIXO SABOR

    ERMIDA

    S. PEDRO

    VEIGUINHAS

    Hydropower

    Hydropower

    Hydropower

    HydropowerDam Safety

    Public Water Supply

    Irrigation

    Alqueva Multipurpose Scheme

    Hydropower

    FEITICEIRO

    Hydropower

  • APA – AUTHORITY ON DAM SAFETY

    • DESIGN APPROVAL• APPROVAL OF SURVEILLANCE PLANS, 1ST FILLING PLANS, OPERATING

    SAFETY RULES

    • AUTHORITY INSPECTIONS:− SCHEDULED− OWNER´S REQUEST− EXCEPTIONAL AND EMERGENCY SITUATIONS

    • SUPPORT FROM LNEC (CLASS I DAMS)• INTERACTION WITH OWNERS• DIRECT ACTION, IN CASE OF OWNER´S FAILURE TO ACT• LEGAL ACTION• LAUNCHING OF SPECIFIC SAFETY EVALUATION PROGRAMS• COORDINATION WITH REGIONAL AUTHORITIES• COOPERATION WITH AUTHORITY OF CIVIL DEFENSE, CONCERNING

    EMERGENCY PLANNING;

    • MANAGEMENT OF SAFETY DATABASES• PROVIDING DAM SAFETY COURSES

  • MERCI POUR VOTRE ATTENTION

    José Rocha Afonso

    Head of Dam Safety Division

    Secretary General of CNPGB (PTCOLD)

    [email protected]


Recommended