901 - ADM Construction
001 Project Agreement
100 Contract 901 Award
Open Cut Box
210
220
230
240
250
260 Open Cut Box ABWF / E&M
Cavern
310 Access Shaft ELS & Pump Test
320 Excavate Access Shaft
340 Cavern and SIL Platform
350 P-Way and TRIP
Excavate Open Cut Box & Baseslab
ISL Underpinning
Open Cut Box Construction
Rem. D-wall (affected by ADD) & PumpTest
D-wall (not affected by ADD)
201520142012 20132010 2011ACT
ID
ACTIVITY
DESCRIPTION
SOUTH ISLAND LINE (EAST)
Contract 901 - Admiralty Integrated Station and SCL Enabling Works
Dy
an
mic
Te
st
Te
st
Ru
nn
ing
Tri
al
Ru
nn
ing
RevisionDate Checked Approved
Prog. No. : SCL\O\00\PPD\N30\2261\B
17Feb11 For Reference KL
3 Jun 11 For Reference KL
C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 901 Summary Programme (Block Shifted and ADD omitted).xls 09/06/2011
Page 3 of 6
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
902 - Nam Fung Tunnel & Vent. Bdgs
100 Project Agreement
110 Contract 902 Award
Telegraph Bay Barging Point
210
220 Ext. DSD Barging Point Modification
230
Hong Kong Park Ventilation Bdg
310 LCSD Reprovision Works at HKB
320
330 HKB Construction
340 D&B Tunnel from HKB to ADM (260m)
Nam Fung Portal Ventilation Bdg
410 NFP Excavation
420 NFP Construction
Nam Fung Tunnel
510 Initial Drive (70m)
520
530
540
550
560
Transition Box
610 Piers A1 to A12 sub-structure
620
630
640
650
660
2011
Piers A1 to A5 super-structure (902 toclose access opening for P-way)
P-way delivery via access opeing intoNam Fung Tunnel
HKB Shaft Excavation
Access to Piers A12 provided toContract 903
Tunnel drive up to Wan Chai Gap(1525m)
Tunnel drive from Wan Chai Gap toMagazine Gap (898m)
Tunnel drive from Magazine Gap to HKB(493m)
P-way & TRIP
201520142012 2013
Tunnel Lining / Invert / Vent Duct /Drainage
Barging Point Site Area Access
P-way (FST) & TRIP
Piers A1 to A12 super-structure (exceptaccess opening for P-way)
Barging Point Operational
ACT
ID
ACTIVITY
DESCRIPTION
SOUTH ISLAND LINE (EAST)
Contract 902 - Nam Fung Tunnel and Ventilation Buildings
RevisionDate Checked Approved
Prog. No. : SCL\O\00\PPD\N30\2262\B
Dyan
mic
Test
Test
Ru
nn
ing
Tri
al R
un
nin
g
17Feb2011 For Reference KL
BS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWF
P-Way (FST) A5 to A12P-Way (FST) A5 to A12P-Way (FST) A5 to A12P-Way (FST) A5 to A123June2011 For Reference KL
C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 902 Summary Programme (block shifted).xls 07/06/2011
Page 4 of 6
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
903 - Nam Fung to Ap Lei Chau
100 Project Agreement
110 Contract 903 Award
Viaduct from Transition Box to OCP
210
OCP Station
310
320
Viaduct from OCP to WCH
410
WCH Station
510
520
530
540 All Remaining Works in Nullah Sections
550 Station & Viaduct above Completed Nullah Deck
Viaduct from WCH to Aberdeen Channel
610
Viaduct across Aberdeen Channel
710
ACT
ID
ACTIVITY
DESCRIPTION
Station Super-Structure
Viaduct Sub-Structure and Super-Structure
2011 2012
- New Nullah Wall- Divert Utilities / Prepare for 1st Dry Season
2013 2015
Viaduct Sub-Structure and Super-Structure
Viaduct Sub-Structure and Super-Structure
2014
New Nullah Wall in Existing Traffic DeckLocations
- All Work in Nullah Sections- Prepare for NLSR & PSR Traffic Diversions
Viaduct Sub-Structure and Super-Structure
Station Sub-Structure
2nd
Dry
Season
1st Dry
Season
SOUTH ISLAND LINE (EAST)
Contract 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts
and Aberdeen Channel Bridge
Dyan
mic
Test
Test
Ru
nn
ing
Tri
al R
un
nin
g
Dyan
mic
Test
P-W
ay
& T
RIP
P-W
ay &
TR
IPP
-Way &
TR
IP
P-W
ay
& T
RIP
P-W
ay
(T/O
) &
TR
IP
P-W
ay &
TR
IP
RevisionDate Checked Approved
Prog. No. : SCL\O\00\PPD\N30\2263\B
17Feb11 For Reference KL
3 Jun 11 For Reference KL
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A O N D
100
110
210
220
230
240
310
320
330
340
410
420
440
410
420
430
440
450
510
520
530
540
550
560
610
S
2015
SOH Station Contruction
Adit Excavatoin
Tunnel Lining / Invert / Vent Duct /
Drainage
P-Way Access
Entrance A & B
P-Way Access
Cavern Excavation
End Plant Building Construction
P-way & TRIP
Site Clerance, Demo. Habor Mission
School & Prepare Access
20132011
904 - Lei Tung Station, South Horizons
Station and Tunnels
C&C Tunnel Construction
Entrance A & B
Station Lining / Structure
ACT
ID
20142012ACTIVITY
DESCRIPTION
South Horizons Station
P-Way Access (Station Track Level
Access before Structure Completes)
Lee Wing Street Vent. Bldg.
Ventilation Building Structure
Design Approval / Portal Formation
From LET towards Ap Lei Chau Drive
From Adit towards SOH
TTM Stages upto Start of Station / End
Plant Building Construction
P-Way & TRIP
Project Agreement
Contract 904 Award
C&C Tunnel (ACB to LET)
Lei Tung Station
HEC Cable Diversion at Ap Lei Chau
Drive
P-Way Access
From Adit towards LET
Excavate Rock Slope for End Plant
Building
D&B Tunnels (LET to SOH)
SOUTH ISLAND LINE (EAST)
Contract 904 - Lei Tung Station, South Horizons Station and Tunnels
Dy
an
mic
Te
st
Te
st
Ru
nn
ing
Tri
al R
un
nin
g
BS / ABWF
BS / ABWF
BS / ABWF
RevisionDate Checked Approved
Prog. No. : SCL\O\00\PPD\N30\2264\B
17 Feb 11 For Refence KL
3 Jun 11 For RefenceKL
C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shif ted)\904 Summary Programme (block shif ted).xls 07/06/2011
Page 6 of 6
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
110 Mobilization
120 Blasting Permit
210 Retaining Structures
220 Excavation
230 Piling
310 Excavation
410 Excavation
420 Piling
510 Retaining Structures
520 Excavation
530 Piling
610 Mobilization
710 Pile Caps & Footings
720 Car Park Levels & Depot Columns
730 Roof
740 Track Area BS & ABWF
810 Pile Caps & Footings
820 Depot Columns
830 Roof
840 Track Area BS & ABWF
910 Pile Caps & Footings
920 Depot Columns
930 Roof
940 Track Area BS & ABWF
1010 Pile Caps & Footings
1020 Depot Columns
1030 Roof
1040 Track Area BS & ABWF
2012 2013 2014 20152011
Fan Area to Grid 20
Activity
Description
Act
ID
Preliminary
Stabling Area
P-Way Infrastructure Area
907 SITE FORMATION
908 DEPOT CONSTRUCTION
Stabling Area
Preliminary
Fan Area to Grid 20
Maintenance Rolling Stock Building
P-Way Infrastructure Area
Maintenance Rolling Stock Building
ApprovedDate Revision Checked
Prog. No. : SIL/O/00/PPD/N30/2265 B
17 Feb 11 For reference KLSOUTH ISLAND LINE (EAST)
Contract 907 - Wong Chuk Hang Depot Site Formation and Piling
Contract 908 - Wong Chuk Hang Depot Superstructure
Test
Ru
nn
ing
Tri
al R
un
nin
g
Dyan
mic
Test
P-Way Access
P-Way Access
P-Way Access
P-Way Access
Access to 908 Available
Contract Award
Contract Award
Access to 908 Available
Access to 908 Available
Access to 908 Available
P-W
ay &
TR
IP
P-W
ay &
TR
IP
03 Jun 11 For reference KL
C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 907 & 908 Summary Prog (block shifted).xls 07/06/2011
South Island Line (East)
Environmental Permit No. EP-407/2010 - Submission Schedule
EP Clause Nos. Submissions Submission Dates
1.11 Commencement date of construction no later than 1 month prior to commencement of construction 25 May 2011 (*)
1.14 Commencement date of operation no later than 2 months prior to commencement of operation 4Q 2015
2.1 & 2.2 Employment of IEC & ET no later than 1 month before commencement of construction 06 Apr 2011 (*)
2.3 Employment of Qualified Ecologist no later than 1 month before commencement of construction 06 Apr 2011 (*)
2.4 Employment of Certified Arborist no later than 1 month before commencement of construction 06 Apr 2011 (*)
2.5Management organization of main construction
companiesno later than 2 weeks before commencement of construction 09 Jun 2011 (*)
2.6Construction programme & EP submission
scheduleno later than 2 weeks before commencement of construction 10 Jun 2011 (*)
2.7 Set up of Community Liaison Group no later than 1 month before commencement of construction 20 Apr 2011 (*)
2.8 Updated EM&A Manual no later than 1 month before commencement of construction 16 May 2011 (*)
2.9 Construction noise mitigation measures plan no later than 1 month before commencement of construction
C903: 25 May 2011 (*)
C907: 7 Jun 2011 (*)
C904: Jun 2011
2.11Construction & demolition materials
management plan for barging pointsno later than 2 weeks before commencement of construction 10 Jun 2011 (*)
2.13 (a ) Ecological planting & landscape plan no later than 1 month before commencement of site clearance works 18 Apr 2011 (*)
2.13 (b )As built drawings of ecological planting &
landscape worksno later than 1 month
after completion of planting works (at WCH
nullah)1Q 2014
2.13 (c )Final monitoring report of ecological planting &
landscape worksno later than 1 month
after completion of the 3-year post planting
care and maintenance period1Q 2017
2.14 (a )Detailed transplanting baseline survey report for
plant species of conservation interestno later than 1 month before commencement of site clearance works 06 Apr 2011 (*)
2.14 (b )Transplantation proposal for plant species of
conservation interestno later than 1 month before commencement of transplantation
H. cordata: 9 Jun 2011(*)
A. sinensis: Jun 2011
2.14 (c )As built drawings of transplanting works for
plant species of conservation interestno later than 1 month after completion of transplanting works 3Q 2011
2.15 Tree protection plan no later than 1 month before commencement of site clearance works 06 Apr 2011 (*)
2.16(a ) Silt curtain plan no later than 1 month before commencement of marine-based
construction works30 May 2011 (*)
2.19 Operational groundborne noise review plan no later than 1 month after completion of corresponding parts of
tunnel excavation1Q 2013
2.20Operational groundborne noise mitigation
measures planno later than 1 month prior to installtion of rail tracks 3Q 2013
2.21As built drawings for operational groundborne
noise mitigation measuresno later than 1 month after completion of tracks installation 1Q 2015
2.23As built drawings for operational airborne noise
mitigation measures on viaduct sectionno later than 1 month
after completion of noise mitigation measures
installation on viaduct section4Q 2014
2.24 Noise performance test report no later than 1 month prior to commencement of operation 4Q 2015
2.25 Fixed plant noise audit report no later than 1 month prior to commencement of operation 4Q 2015
2.26 Visual & landscape plan no later than 1 month before commencement of corresponding parts
of landscpae works1Q 2014
3.3 Baseline monitoring report no later than 2 weeks before commencement of construction 10 Jun 2011 (*)
3.4 Monthly EM&A reports within 2 weeks after the end of the reporting month Aug 2011 (first report)
4.2 Internet address of EM&A and project data within 1 month after commencement of construction Jul 2011
Note: Submission to EPD made on date marked with (*). Other dates are tentative only subject to the construction progress.
Timeframe to EPD