+ All Categories
Home > Documents > DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf ·...

DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf ·...

Date post: 06-Apr-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
24
REVISION ATER PROPOSAL #1 DATED: FEBRUARY 10, 2017 PLANS HAVE BEEN REVISED TO ELIMINATE AND REPLACE THE WIRELESS COMMUNICATION SYSTEM WITH A FIBER OPTIC BACKBONE SYSTEM. THE FOLLOWING SHEETS HAVE BEEN MODIFIED: 1, 2,47, 49, 50, 52, 53, 312, 365, 368, 445-449, 451 AND 452. THE FOLLOWING SHEETS HAVE BEEN ADDED TO THE PROJECT: 53A, 443A, 443B, AND SHEETS 452A-452D. ALL SHEETS ASSOCIATED WITH THIS REVISION INCLUDE A SUFFIX OF "RAP1" IN THE SHEET NUMBER DESIGNATION.
Transcript
Page 1: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

REVISION ATER PROPOSAL #1 DATED: FEBRUARY 10, 2017

PLANS HAVE BEEN REVISED TO ELIMINATE AND REPLACE THE WIRELESS COMMUNICATION SYSTEM WITH A FIBER OPTIC BACKBONE SYSTEM. THE FOLLOWING SHEETS HAVE BEEN MODIFIED: 1, 2,47, 49, 50, 52, 53, 312, 365, 368, 445-449, 451 AND 452. THE FOLLOWING SHEETS HAVE BEEN ADDED TO THE PROJECT: 53A, 443A, 443B, AND SHEETS 452A-452D. ALL SHEETS ASSOCIATED WITH THIS REVISION INCLUDE A SUFFIX OF "RAP1" IN THE SHEET NUMBER DESIGNATION.

n34wpb
Polygon
Page 2: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised
Page 3: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

1

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

1 34

13

13

2,641.9

2,650

8.1

From Supplemental Schedule*

* SEE SUPPLEMENTAL ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUIT SCHEDULE

47 RAP1

Page 4: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

1

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.

1

49 RAP1

Page 5: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

1A

DD

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.

1

50 RAP1

Page 6: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

1

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.

1

* * *

11

385

635

635

52 RAP1

Page 7: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

NE

W

SH

EE

T:

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

SUMMARY OF QUANTITIES1

1

53A RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

52525.11-QTY.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 8: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.

1

*

1

*

1

53 RAP1

309

Page 9: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

1

SEE SHEET 443B RAP1 FOR NEW EQUIPMENT

312 RAP1

ITS

PB

Page 10: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

1

SEE SHEET 443B RAP1 FOR NEW EQUIPMENT

365 RAP1

ITS

PB

Page 11: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

10

2-

02-

17

CONSTRUCTION NOTES:

3.

2.

1.

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

1

113

ITS DEVICES SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.

COMMUNICATIONS TO ITS DEVICES 93-N-X-16.2-CCTV-X-5 AND 93-N-16.2-VSL-D-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING

PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC

COMMUNICATIONS INTERCONNECT PLAN.

THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE SPLICE VAULT AS INDICATED IN THE FIBER OPTIC SPLICE TABLES AND

ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.

THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT AT STA 3847+48, LT. THE SPLICE

368 RAP1

Page 12: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

pb

pb

pb pb

pb

pb

pbpb

pb

pb

its

s vf

mp

cb

cb

cb

cb

cb

cbcb

cb

cb

cb

cb

cb

f&a

cb

f&a

bnd

post

.4"

"14

"grooved shoulders"

caution

motorcycles use

w.w.f.

.4"

"14

beam guardrail

bnd

.4"

"14

"grooved shoulders"

caution

motorcycles use

w.w.f.

10' atv trail

.4"

"14

beam guardrail

PSS

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/3/2017

SD

R

PR

OC

ES

SE

D

14633H-ITS1.dgn 134314633H

20 20 40

20

1756 1757 1758 1759 1760 1761

3758 3759 3760 3761 3762 3763 3764

GRID

I-93 SOUTHBOUND

I-93 NORTHBOUND

CONSTRUCTION NOTES:

1

10

2-

02-

17

1 93-S-14.4-VSL-D-5

93-S-X-14.4-CCTV-A-5

3.

2.

1.

NE

W

SH

EE

T

1

443A RAP1

ITS DEVICES SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.

COMMUNICATIONS TO ITS DEVICES 93-S-X-14.4-CCTV-X-5 AND 93-S-14.4-VSL-D-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING

PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC

OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN.

THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE PATCH PANEL AND THE SPLICE VAULT AS INDICATED IN THE FIBER

SALEM-MANCHESTER 14633F AND 14633I CONSTRUCTION PLANS AT THIS LOCATION.)

(NOTE: THE LOCATION OF THIS SPLICE VAULT HAS BEEN FIELD ADJUSTED, AND AS SUCH DOES NOT REFLECT THE INFRASTRUCTURE SHOWN ON THE

ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.

THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT AT STA 3761+65, LT. THE SPLICE

Page 13: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

mh

s

mh

s

pb

mp

pb

Appr

ox.

Exist. L

AROW

HH

pb

pb

pb

pb

CC

pb

pb

pb pb

PB

PB

pbpb

pb

pb

pb

pb

pb

di

cb

pb

pb

mp

vp

pb

di

cb

di

di

cb

cb

cb

cb

cb

cb

cb

cbc

b

cb

cb

cb

cb

cb

cb

bnd

bnd

s vf

mp

20" d.i.

water

413

414

3808

3809

3810

3807

622

623

624

625

ITS

PB

HH

pb

pb

pb

pb

CC

pb

pb

pb pb

PB

PB

pbpb

pb

pb

pb

pb

pb

di

cb

pb

pb

mp

vp

pb

di

cb

di

di

cb

cb

cb

cb

cb

cb

cb

cbc

b

cb

cb

cb

cb

cb

cb

bnd

bnd

s vf

5' c.l.f.

20" d.i.

water

Appr

ox.

Exist. L

AROW

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-ITS2.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

20 20 40

25

23

22

24

21

GRID

I-93 SOUTHBOUND

CONSTRUCTION NOTES:

10

2-

02-

17

1

RO

UT

E 28 (

RO

CKI

NG

HA

M

RO

AD)

7.

6.

5.

4.

3.

2.

1.

93-S-X-15.3-CCTV-A-5

NE

W

SH

EE

T

INSTALL 3-CONDUCTOR #8 AWG CABLE FROM THE 40 AMP BREAKER TO THE POWER PANEL AT THE NEW ITS HUB CABINET AT STA 623+90, RT 55'.

THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW 40 AMP BREAKER AT THE EXISTING ITS METER PEDESTAL AT STA 624+05, RT 60'.

OPTIC SPLICE TABLES AND THE COMMUNICATIONS INTERCONNECT PLAN.

THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE SPLICE VAULT AND THE PATCH PANELS AS INDICATED IN THE FIBER

SHALL BE CONSIDERED FIBERS #13-#24.

THE CONTRACTOR SHALL INSTALL A PARALLEL 12-STRAND FIBER OPTIC CABLE FROM THE SPLICE VAULT TO THE NEW HUB CABINET. THIS CABLE

SHALL BE CONSIDERED FIBERS #1-#12.

FROM THE CCTV EQUIPMENT CABINET TO THE SPLICE VAULT AND RE-INSTALL FROM THE SPLICE VAULT TO THE NEW HUB CABINET. THIS CABLE

EXISTING ITS EQUIPMENT CABINET AT STA 624+38, RT 72'. THE CONTRACTOR SHALL PULL BACK THE EXISTING 12-STRAND FIBER OPTIC CABLE

THE CONTRACTOR SHALL INTERCEPT THE EXISTING FIBER OPTIC CONDUIT RUN BETWEEN THE EXISTING SPLICE VAULT AT STA 622+56 AND THE

LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.

COMMUNICATIONS TO ITS DEVICES 93-S-X-15.3-CCTV-X-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING ITS DEVICES SHALL BE

PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC

SEE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN FOR SPLICING DETAILS.

THE CONTRACTOR SHALL MODIFY THE SPLICES IN THE EXISTING SPLICE ENCLOSURE AT SPLICE VAULT #21 AT STA 622+56.

1

443B RAP1

Page 14: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

Approx. Exist. LAROWbnd

post

cb

cb

.6"

"16

3875 3876 3877 3878 3879 3880

B-10B-10

LAROWLAROW

FOD

ITS

ITS 5453

5251

2

bndpost

cb

cb

15"rcp

15"rcp

.6"

"16

Approx. Exist. LAROW

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-CCTV16.7_S.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

20 20 40

GRID

I-93 NORTHBOUND

CCTV 93 16.7_S

PROPOSED REMARKS

LEGEND

SOLAR PANEL ARRAY

CONSTRUCTION NOTES:

6.

5.

4.

3.

2.

1.

10

2-

02-

17

RE

MO

VE

WI

RE

LE

SS

CO

MM

UNI

CA

TI

ON

S

AN

TE

NN

A

CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.

FOR ALL EQUIPMENT AT THE ITS DEVICE.

CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4102 TO PROVIDE NECESSARY POWER

SPLICE ENCLOSURE SPLICING DETAILS.

CONCRETE FIBER OPTIC SPLICE VAULT AT STA 3877+89, LT 42' FOR FIBER OPTIC DROP CABLE. SEE COMMUNICATIONS INTERCONNECT PLAN FOR

CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE GROUND MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48"

CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.

CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 16.7_S.

CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE GROUND MOUNTED ITS EQUIPMENT CABINET DETAILS.

11

1

445 RAP1

Page 15: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

Approx. Exist. LAROW

L87

GAZOULIS, RUBY L.

GAZOULIS, EARL G.

Approx. Exist. LAROW

post

bnd

bnd

di

beam guardrail

beam guardrail

double beam guardrail

manchester"

entering

"city line

londonderry"

"town line

3890

3891

3892 3893

3894 3895

1887 1888 1889 1890 1891 1892 1893

B-3ITS

ITS PB

ITS

ITS PB FOD56

57

58

59

post

bnd

bnd

di

6" cmp

6" c

mp

beam guardrail

beam guardrail

s.a.c.

double beam guardrail

6" bcpcmp

6" bcpcmp

12"cmp

6" bcpcmp

6" bcpcmp

manchester"

entering

"city line

outcrop

ledge

ledge

londonderry"

"town line

Approx. Exist. LAROW

L87

GAZOULIS, RUBY L.

GAZOULIS, EARL G.

Approx. Exist. LAROW

PFO

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-CCTV17.0_N.dgn 134314633H

20 20 40

CCTV 93 17.0_N

GRID

I-93 SOUTHBOUND

I-93 NORTHBOUND

CONSTRUCTION NOTES:

6.

5.

4.

3.

2.

1.T

OW

N

OF

LO

ND

ON

DE

RR

Y

CI

TY

OF

MA

NC

HE

ST

ER

PROPOSED REMARKS

LEGEND

SOLAR PANEL ARRAY1

1

CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.

FOR ALL EQUIPMENT AT THE ITS DEVICE.

CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4103 TO PROVIDE NECESSARY POWER

COMMUNICATIONS INTERCONNECT PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.

CONCRETE FIBER OPTIC SPLICE VAULT AT STA 3896+59, LT 42' FOR FIBER OPTIC DROP CABLE (SHARED WITH CCTV CCTV 93 17.2_N). SEE

CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE GROUND MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48"

CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.

CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 17.0_N.

CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE POLE MOUNTED ITS EQUIPMENT CABINET DETAILS.

1

10

2-

02-

17

RE

MO

VE

WI

RE

LE

SS

CO

MM

UNI

CA

TI

ON

S

AN

TE

NN

A

446 RAP1

Page 16: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

Approx. Exist. L.A.R.O.W.

Approx. Exist. LAROW

Approx. Exist. LAROW

post

post

post

cb

cb

beam guardrail

.2""17

1908 1909

1907 1906 1905 1904

1903

PBITSITS

PB

FOD

65

66

67

64

post

post

post

cb

cb

24"rcp

beam guardrail

6" bcpcmp

6" bcpcmp

.2""17

Approx. Exist. LAROW

Approx. Exist. LAROW

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-CCTV17.2_N.dgn 134314633H

20 20 40

GRI

D

CCTV 93 17.2_N

I-93 NORTHBOUND

CONSTRUCTION NOTES:

6.

5.

4.

3.

2.

1.

1

PROPOSED REMARKS

LEGEND

SOLAR PANEL ARRAY1

10

2-

02-

17

RE

MO

VE

WI

RE

LE

SS

CO

MM

UNI

CA

TI

ON

S

AN

TE

NN

A

1

CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.

FOR ALL EQUIPMENT AT THE ITS DEVICE.

CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4104 TO PROVIDE NECESSARY POWER

INTERCONNECT PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.

FIBER OPTIC SPLICE VAULT AT STA 3896+59, LT 42' FOR FIBER OPTIC DROP CABLE (SHARED WITH CCTV 93 17.0_N). SEE COMMUNICATIONS

CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE POLE MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48" CONCRETE

CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.

CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 17.2_N.

CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE POLE MOUNTED ITS EQUIPMENT CABINET DETAILS.

447 RAP1

Page 17: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

$CCTV5$

VSLS 93 17.8_S

CCTV 93 17.8_S

GRI

D

I-93 SOUTHBOUND

CONSTRUCTION NOTES:

6.

5.

4.

3.

2.

1.

I-93 SOUTHBOUND

EASEMENT

UTILITY

1

1

10

2-

02-

17

RE

MO

VE

WI

RE

LE

SS

CO

MM

UNI

CA

TI

ON

S

AN

TE

NN

A

1

PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.

DROP CABLE. SEE COMMUNICATIONS INTERCONNECT

VAULT AT STA 3936+00, LT 42' FOR FIBER OPTIC

48"x96"x48" CONCRETE FIBER OPTIC SPLICE

EQUIPMENT CABINET TO THE PROPOSED

CONDUIT FROM THE GROUND MOUNTED ITS

CONTRACTOR SHALL PROVIDE A 3-INCH PVC

UNDER ITEM 677.6302.

THE DISCONNECT PEDESTAL SHALL BE PAID FOR

SHALL INCLUDE A 40 AMP SERVICE DISCONNECT.

EQUIPMENT CABINET. THE DISCONNECT PEDESTAL

20 FEET AWAY FROM THE GROUND MOUNTED ITS

PEDESTAL WITH A METER BYPASS NOT MORE THAN

CONTRACTOR SHALL PROVIDE A DISCONNECT

SUBSIDIARY TO ITEM 677.6301.

REQUIRED BY THE UTILITY COMPANY SHALL BE

SERVICE CHARGES, AND ACCESSORY EQUIPMENT

PEDESTAL BRANCH CIRCUIT BREAKERS, UTILITY

SHALL BE SPARE. ALL COSTS FOR THE METER

AMP BRANCH CIRCUIT BREAKERS, ONE OF WHICH

WITH A 100 AMP MAIN DISCONNECT AND TWO 50

CONTRACTOR SHALL PROVIDE A METER PEDESTAL

INTERNAL CONNECTIONS BETWEEN EQUIPMENT.

SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND

CONTRACTOR SHALL REFER TO THE COMMUNICATIONS

DETAIL.

FOR THE BREAKAWAY CABLE DISCONNECT SYSTEM

CONTRACTOR SHALL REFER TO THE VSLS DETAILS

EQUIPMENT CABINET DETAILS.

CABINET DETAILS FOR THE GROUND MOUNTED ITS

CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT

DELETED LEGEND

448 RAP1

42

808

3937 3936 3935

154+00

153+00

30"

RC

P

24" PP

VS FFOD

VS F

FOD

ITS

MP

PB

PB

PB

PB

PB

PB86

85 84 79

80

81 82 83

88

8789

7

8

6" underdrain

15" rcp

6" underdrain

42

808

24.02 Ac.±

7172/1129

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-CCTV17.8_S.dgn 134314633H

20 20 40

W 252

EASE.

post

EASE.

EASE.

-1

M4

UNDETERMINED

OWNER

Approx. Exist. LAROW

#

831

post

shoulder"

"groovedq-24

3929 3928 3927

MP

FOD

MPPB

PB

77

76

75

74

post

to

wer

cell

shoulder"

"groovedq-24

EASE.

NOTE:

M5 & M6 NOW p/o M4

FORMER PARCELS

-1

M4

UNDETERMINED

OWNER

Approx. Exist. LAROW

#

831

0.14 Ac.±

#

EASE.

Page 18: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

Approx. Exist. L.

A.R.

O.

W.

Exist. L.

A.

R.

O.

W.

Approx.

ip

cb

cb

cb

di

di

cb

w

g

di

cb

mh

mb

di

mh

s

md

mp

pb

an

an

an

mh

s

aband.

aband.

1962-130-07

2000-069-022000-069

2000-069-03

2000-069-04

w

g

its

s

v

f its

FO

D

FO

Dpb

pb

pb

pb

sv31

aband.

aband.

aband.

M23

&

DO

ROT

HY E.

PA

UL F. III

RULE,

DA

VI

D E. Jr.

LA

RO

CHELLE,

ip

md

md

md

md

md

cb

di

di

w

g

mb

cb

cb

di

cb

cb

mh

di

FO

D

FO

Dpb

pb

light

&trans

26/57

psnh

net

&t

57/432/50/

pub ser co.

net

&t

50•

56 432

psnh

432e

304

305

306307 308 309

310

B2

B3

B4

B39-

B02

B39-

B01

B40-B01

B40-B02

FO

D

VS

F

3970

3971

3973

1966

1967

1968

1969

1970

PB

92

11

95

94

103

93

91

12

ip

md

md

md

md

md

cb

di

di

w

g

mb

cb

cb

di

cb

cb

mh

di

maples

1' c.

red oak

.5' c.

cmp12"

cmp12

"

rcp

15"

24"rcp

light

&trans

26/57

psnh

net

&t

57/432/50/

pub ser co.

net

&t

50•

56 432

psnh

432e

pool

a.g.

deck

pool

12"rcp

6'c.l.f.

15"rcp

cmp 12"

6" und.

6" und.

18"rcp

18"rcp

6" und.

M23

&

DO

ROT

HY E.

PA

UL F. III

RULE,

DA

VI

D E. Jr.

LA

RO

CHELLE,

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

SCALE IN FEET

0

DATE PLOTTED VHB PROJECT NO.

52525.112/16/2017

SD

R

PR

OC

ES

SE

D

14633H-CCTV18.4_M.dgn 134314633H

20 20 40

92

11

95

94

103

93

91

12

AND FIBER OPTIC HUB CABINET.

CONNECTIONS FOR THE CCTV

PULL BOX AND RE-ROUTE POWER

NEW CONDUIT TO EXISTING

CONTRACTOR SHALL INSTALL

INSTALL NEW PULL BOX.

EXISTING POWER CONDUIT AND

CONTRACTOR SHALL INTERCEPT

GRI

D

I-93 S

OUT

HB

OU

ND

CCTV 93 18.4_M

CONSTRUCTION NOTES:

BODWELL ROAD

I-93

NORT

HB

OU

ND

02-

02-

17

1R

EM

OV

E

WI

RE

LE

SS

CO

MM

UNI

CA

TI

ON

S

AN

TE

NN

A

1

1

1

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

DELETED LEGEND

449 RAP1

EQUIPMENT SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.

COMMINICATIONS TO (CCTV 93 18.4_M AND CCTV 293 1.4_S) MAY BE INTERRUPTED. UPON RECEIVING APPROVAL FROM THE TMC, THE EXISTING

PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC

ETHERNET SWITCH AND PATCH PANEL AS SHOWN IN THE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN.

THE CONTRACTOR SHALL SUPPLY ADDITIONAL PATCH CORDS AS REQUIRED AT THE EXISTING EQUIPMENT CABINET TO MAKE CONNECTIONS BETWEEN

STATE.

FIBER OPTIC CABLE SHALL BE DISTURBED OR DAMAGED. ANY DAMAGE SHALL BE REPLACED/REPAIRED BY THE CONTRACTOR AT NO COST TO THE

ONLY THE STRANDS OF THE EXISTING FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. NO OTHER STRANDS OF THE EXISTING

NUMBER OF SPLICES AS SHOWN IN THE CONTRACT PLANS.

THE CONTRACTOR SHALL REPLACE/UPGRADE THE EXISTING SPLICE ENCLOSURE WITH ADDITIONAL SPLICE TRAYS AS REQUIRED TO HANDLE THE

SEE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN FOR SPLICE DETAILS.

SPLICE ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.

THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT 12 AT STA 1968+13, LT. THE

93 18.4_M. POWER SHALL NOT BE DISCONNECTED FOR MORE THAN EIGHT (8) HOURS.

CONTRACTOR SHALL CONTACT TMC ONE (1) HOUR PRIOR TO DISCONNECTING POWER TO EXISTING FIBER OPTIC HUB CABINET AND EXISTING CCTV

POWER CABLES TO RECONNECT THE CCTV AND FIBER OPTIC HUB CABINET TO POWER.

AFTER NEW POWER CABLES HAVE BEEN INSTALLED, CONTRACTOR SHALL DISCONNECT EXISTING POWER CABLES AT METER PEDESTAL AND ATTACH NEW

CONDUIT INSTALLED UNDER SLOPE PROTECTION SHALL BE A MINIMUM OF 30 INCHES BELOW SLOPE PROTECTION SURFACE.

TO THE EXISTING ITS DEVICES.

PULL BOX FOR POLE MOUNTED CCTV CABINET FOR ITS POWER RECONNECTION PRIOR TO BRIDGE AND WIDENING WORK THAT WOULD INTERRUPT POWER

CONTRACTOR SHALL PROVIDE PVC CONDUIT AND 18 INCH PULL BOX SYSTEM FROM THE GROUND MOUNTED FIBER OPTIC HUB CABINET AND ELECTRIC

CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.

Page 19: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

GROUND

NOT TO SCALE

BREAKERS

CIRCUIT

CABINET

UPS

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

TVSS

POE

POLE

CCTV

GROUND

BREAKERS

CIRCUIT

CABINET

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

POLE

CCTV

NOT TO SCALE

CABINET

STORAGE

BATTERY

FOR CCTV 93 17.0_N

EQUIPMENT CABINET DIAGRAM

POLE MOUNTED ITS

NOT TO SCALE

FOR CCTV 93 17.2_N

EQUIPMENT CABINET DIAGRAM

POLE MOUNTED ITS

GROUND

BREAKERS

CIRCUIT

CABINET

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

POLE

CCTV

CABINET

STORAGE

BATTERY

PANEL

PATCH

LEGEND:

FOR CCTV 93 16.7_S

EQUIPMENT CABINET DIAGRAM

GROUND MOUNTED ITS

(1 OF 2)

SYSTEM DIAGRAM

COMMUNICATIONS

CABINET

STORAGE

BATTERY

GROUND

NOT TO SCALE

BREAKERS

CIRCUIT

CABINET

UPS

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

(BOTTOM)

VSLS MEDIAN

(TOP)

VSLS MEDIAN

(BOTTOM)

VSLS RIGHT

(TOP)

VSLS RIGHT

BOX

PULL

POLE

CCTV

FOR CCTV 93 16.2_N

EQUIPMENT CABINET DIAGRAM

GROUND MOUNTED ITS

CABLE

FIBER OPTIC

SINGLE MODE

12 STRAND

TRANSFORMER

W/ STEPDOWN

PEDESTAL

DISCONNECT

FOR VSLS

POWER SERVICE

120 / 240 VAC

10

2-

02-

17

1

1

1

1

1 1

1

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

STA 3878+00

CABLE TO SV2 @

FIBER OPTIC

@ STA 1894+25

CABLE TO SV60

FIBER OPTIC

- 4.9GHz MICROWAVE ANTENNA

- TRANSIENT VOLTAGE AND SURGE SUPPRESSORTVSS

- POWER OVER ETHERNETPOE

- RADIO UNITRU

- UNINTERRUPTIBLE POWER SUPPLYUPS

- MEGABITS PER SECONDMBPS

- GIGABITS PER SECONDGBPS

- ETHERNET CABLEETH.

- DYNAMIC MESSAGE SIGNDMS

- CLOSED CIRCUIT TELEVISIONCCTV

- 12 STRAND SINGLE MODE FIBER OPTIC CABLE12F

1

1 DELETED LEGEND

451 RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-ITSCOMM1.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 20: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

SYSTEM DIAGRAM

FIBER OPTIC

10

2-

02-

17

- VARIABLE SPEED LIMIT SIGNVSLS

- TRANSPORTATION MANAGEMENT CENTERTMC

- SPLICE VAULTSV

- PATCH PANELPP

- MILE MARKERMM

- MEDIA CONVERTER (FIBER-TO-ETHERNET)MC

- MEGABIT PER SECONDMBPS

- INTELLIGENT TRANSPORTATION SYSTEMITS

- GIGABIT PER SECONDGBPS

- CATEGORY 6 ETHERNET CABLEETH.

- ETHERNET SWITCHES

- DYNAMIC MESSAGE SIGNDMS

- CLOSED CIRCUIT TELEVISIONCCTV

- 192 STRAND SINGLE MODE FIBER OPTIC CABLE192F

- 24 STRAND SINGLE MODE FIBER OPTIC CABLE24F

- 12 STRAND SINGLE MODE FIBER OPTIC CABLE12F

- 2 STRANDS OF SINGLE MODE FIBER OPTIC CABLE2F

(BODWELL ROAD)

STA 1968+25, LT 67'

HUB CABINET 5 @

(ROUTE 3A)

TO HUB CABINET 3 @ MM 25.8(TO BE BUILT UNDER 14633I)

TO HUB CABINET @ MM 13.6

- PROPOSED ITEMS

- EXISTING ITEMS

- SPLICE

- PP CONNECTOR POSITION

NOTES: LEGEND:

1 GBPS

FIBER ES

ETH.

100 MBPS

FIBER ES

100 MBPS

FIBER ES 2F

2F

100 MBPS

FIBER ES

1 GBPS

FIBER ES

ETH.

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

ETH.

1 GBPS

FIBER ES

100 MBPS

FIBER ES

ETH.

1 GBPS

FIBER ES

2F

2F 2F 2F 2F 2F 2F

2F

2F

CCTV 93 16.7_S

LT 59'

STA 3877+89,

ITS CABINET @

CCTV 93 17.0_N

STA 1890+15, RT 48'

ITS CABINET @

CCTV 93 17.2_N

STA 1906+00, RT 48'

ITS CABINET @

100 MBPS

FIBER ES

100 MBPS

FIBER ES2F 2F

2F

2F2F

14633D)

(TO BE BUILT UNDER

HUB CABINET

93-S-X-11.5-CCTV-X-5

EXISTING VSL 415/416

CCTV 93 16.2_N

1848+99, LT 52'

ITS CABINET @ STA

FIBER OPTIC INTERCONNECT PLAN

93 17.8_S

CCTV 93 17.8_S/VSLS

3936+02, LT 62'

ITS CABINET @ STA

CCTV 93 19.5_M

RT 32'

STA 14605+75,

ITS CABINET @

(CANDIA ROAD)

MM 20.6

HUB CABINET 4 @

VSL 93 19.6

MM 19.8

ITS CABINET @

NE

W

SH

EE

T:

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

NORTH OF STONEHENGE ROAD

93-S-14.4-VSL-D-5

93-S-X-14.4-CCTV-A-5

3761+46, LT 63'

ITS CABINET @ STA

(ROCKINGHAM ROAD)

55'

STA 623+90, RT

NEW HUB CABINET @

(FORMERLY CCTV 8)

93-S-X-15.3-CCTV-A-5

3806+68, LT 77'

ITS CABINET @ STA

PANEL POSITIONS AND MAKE PROPOSED CONNECTIONS AS SHOWN IN THIS PLAN.

3. AT EXISTING CABINETS, RE-ARRANGE THE EXISTING ETHERNET PATCH CORD CONNECTIONS TO PATCH

ALL THE UNUSED PATCH PANEL CONNECTOR POSITIONS SHALL BE PIGTAIL CONNECTED FOR FUTURE USE.2

SEE COMMUNICATIONS INTERCONNECT PLAN AND FIBER OPTIC SPLICE TABLES FOR ADDITIONAL DETAILS.1.

1

452A RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

52525.11-COMINT.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 21: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

INTERCONNECT PLAN

COMMUNICATIONS

10

2-

02-

17

288F

CUT & CAP

1-4, 9-12

100 MBPS

FIBER ES

1 GBPS

FIBER ES

18 17 16 15 14 132021222324 19 5 4101112 7 3 2 1689

18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7 1

7-85-6

288F

CUT & CAP

1-4, 9-12

CUT & CAP

3-4, 15-16CUT & CAP

1-4, 9-12

1-4,7-288

CUT & CAP

1-4, 9-12

CUT & CAP

1-4, 9-12

1-4,7-288

100 MBPS

FIBER ES 100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

100 MBPS

FIBER ES

(BODWELL ROAD)

HUB CABINET 5 @ STA 1968+25, LT 67'

NE

W

SH

EE

T:

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

COMMUNICATIONS INTERCONNECT PLAN

PP

1 GBPS

FIBER ES

18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7

24F

1

100 MBPS

FIBER ES

ETH.

18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7 1

(CCTV 93 18.4 M - BUILT UNDER 10418Z)

EXISTING ITS CABINET @ MM 18.4

12F

5-6 5-6

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12 (TYP.)

PIGTAILS

288F288F288F

288F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12 (TYP.)

PIGTAILS

12F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12 (TYP.)

PIGTAILS

12F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12 (TYP.)

PIGTAILS

12F

7-8

7-8

7-8 5-6

12F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

(TYP.)

PIGTAILS

12F

PP

1 2 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12

12F

12F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

UNTERMINATED

9-12 (TYP.)

PIGTAILS

12F

PP

1 2 3 4 5 6 987

1 2 3 4 5 6 1110987 12

12F

7-8

5-6

5-6

5-6 5-6

5-6

3UNTERMINATED

3-6, 9-12

5-6

5-6

5-6

12F

5-6

7-8

7-8

5-6

5-6

5-6

7-8

24F

5-6

5-6

CAP

&

CUT

9-12

1-4,

CAP

&

CUT

9-12

1-4,

1-4, 7-12 1-4, 7-2881-4, 7-12

PP

UNTERMINATED

13-24

5-67-8

5-6

1-4

9-12

1-2, 9-10

11-12

3-8,

5-6

1-2, 7-8

3-4

3-4

100 MBPS

FIBER ES

5-12

1-2,

5-12

1-2,

5-12

1-2,17-24

13-14,

13-288

3-4,

13-288

3-4,

7-8

15-20,

288F

288F

CUT & CAP

5-12

CUT & CAP

21-24

1-2, 9-14,

CUT & CAP

9-12

CUT & CAP

1-4, 9-12CUT & CAP

1-4, 9-12

CUT & CAP

13-288

EXISTING VSL 415/416

CCTV 93 16.2_N

ITS CABINET @ STA 1848+99, LT 52'

CCTV 93 16.7_S

ITS CABINET @ STA 3877+89, LT 59'

CCTV 93 17.8_S/VSLS 93 17.8_S

ITS CABINET @ STA 3936+02, LT 62'

CCTV 93 17.0_N

ITS CABINET @ STA 1890+15, RT 48'

CCTV 93 17.2_N

ITS CABINET @ STA 1906+00, RT 48'

UNTERMINATED

9-12

CCTV 93 19.5_M

32', ISLAND POND RD

ITS CABINET @ STA 14605+75, RT

(EXIT 5)

ROCKINGHAM ROAD

SV 21 @ STA 622+56

SV 20 @ STA 3761+65

SV 13 @ STA 3847+48 SV 2 @ STA 3878+00

(FORMERLY CCTV 8)

93-S-X-15.3-CCTV-A-5

ITS CABINET @ STA 3806+68, LT 77'

(ROCKINGHAM ROAD)

NEW HUB CABINET @ STA 623+90, RT 55'

NORTH OF STONEHENGE ROAD

93-S-14.4-VSL-D-5

93-S-X-14.4-CCTV-A-5

ITS CABINET @ STA 3761+46, LT 63'

CUT & CAP

1-8

(14633I)

TO BE SPLICED BY OTHER

SV 4 @ STA 3896+61

7-288

1-4,

7-288

1-4,

SV 60 @ STA 1894+25

SV 7 @ STA 3936+00 SV 12 @ STA 1968+13 SV 102 @ STA 14607+76

SV @ HUB 6

100 MBPS

FIBER ES

1

452B RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

52525.11-FIBER.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 22: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

FIBER OPTIC CABLE SPLICE TABLES

10

2-

02-

17

(1 OF 2)

SPLICE TABLES

FIBER OPTIC

NE

W

SH

EE

T:

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

OF THE PROPOSED WORK.

PRIOR TO WORKING AT ANY LOCATION WITH LIT FIBER OPTIC CABLE, THE CONTRACTOR SHALL NOTIFY THE TMC AT LEAST 48 HOURS IN ADVANCE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.

INDICATED AS THROUGH SHALL PASS THROUGH THE SPLICE ENCLOSURE WITHOUT CUTTING. ANY DAMAGE TO THE FIBER OPTIC CABLES SHALL BE

ONLY THE STRANDS OF THE EXISTING AND PROPOSED FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. ALL FIBER STRANDS

NOTES:

2.

1.

1

452C RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

52525.11-SPLICE1.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 23: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

FIBER OPTIC CABLE SPLICE TABLES

10

2-

02-

17

(2 OF 2)

SPLICE TABLES

FIBER OPTIC

NE

W

SH

EE

T:

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

OF THE PROPOSED WORK.

PRIOR TO WORKING AT ANY LOCATION WITH LIT FIBER OPTIC CABLE, THE CONTRACTOR SHALL NOTIFY THE TMC AT LEAST 48 HOURS IN ADVANCE

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.

INDICATED AS THROUGH SHALL PASS THROUGH THE SPLICE ENCLOSURE WITHOUT CUTTING. ANY DAMAGE TO THE FIBER OPTIC CABLES SHALL BE

ONLY THE STRANDS OF THE EXISTING AND PROPOSED FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. ALL FIBER STRANDS

NOTES:

2.

1.

1

452D RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

52525.11-SPLICE2.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H

Page 24: DATED: FEBRUARY PLANS HAVE BEEN REVISED TO ELIMINATE …gis.dot.nh.gov/plan/14633H.POP.pdf · 2018-03-03 · revision ater proposal #1 dated: february 10, 2017 plans have been revised

GROUND

NOT TO SCALE

VSLS 93 17.8_S

FOR CCTV 93 17.8_S &

EQUIPMENT CABINET DIAGRAM

GROUND MOUNTED ITS

BREAKERS

CIRCUIT

CABINET

UPS

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

(BOTTOM)

VSLS MEDIAN

(TOP)

VSLS MEDIAN

(BOTTOM)

VSLS RIGHT

(TOP)

VSLS RIGHT

BOX

PULL

POLE

CCTV

PEDESTAL

DISCONNECT

GROUND

BREAKERS

CIRCUIT

CABINET

SWITCH

ETHERNET

FIBER

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

POLE

CCTV

NOT TO SCALE

CABINET

STORAGE

BATTERY

(2 OF 2)

SYSTEM DIAGRAM

COMMUNICATIONS

BREAKERS

CIRCUIT

CABINET

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

POLE

CCTV

NOT TO SCALE

BACKBONE CABLE

CABLE FROM I-93

MODE FIBER OPTIC

12-STRAND SINGLE

PULLBOX

ELECTRIC

RURU

400' TOWER

TO

4.9GHZ

FOR CCTV 93 18.4_M

EQUIPMENT CABINET DIAGRAM

EXISTING POLE MOUNTED ITS

FOR CCTV 93 19.5_M

EQUIPMENT CABINET DIAGRAM

POLE MOUNTED ITS

GROUND

UPS

GPS

POWER

SWITCH

ETHERNET

POE

CMM4

CCTV 293 1.4_S

FROM

4.9GHZ

ANTENNA

GPS

10

2-

02-

17

BREAKERS

CIRCUIT

CABINET

TVSS

INJECTOR

POWER

PANEL

PATCH

TVSS

POE

POLE

CCTV

NOT TO SCALE

BACKBONE CABLE

CABLE FROM I-93

MODE FIBER OPTIC

12-STRAND SINGLE

RURU

400' TOWER

TO

4.9GHZ

GROUND

UPS

GPS

POWER

SWITCH

ETHERNET

POE

CMM4

CCTV 293 1.4_S

FROM

4.9GHZ

ANTENNA

GPS

GROUND

BREAKERS

CIRCUIT

CABINET

TVSSPANEL

PATCH

NOT TO SCALE

FOR NEW HUB CABINET AT ROCKINGHAM RD (EXIT 5)

EQUIPMENT CABINET DIAGRAM

GROUND MOUNTED ITS

UPS

1 GBPS

SWITCH

ETHERNET

FIBER

ETH.

POWER SOURCE

120 VAC

DISCONNECT

SERVICE

WITH NEW

PEDETAL

DISCONNECT

EXISTING

1 1

11

1

AD

D

FI

BE

R

OP

TI

C

CO

MM

UNI

CA

TI

ON

S

SY

ST

EM

STA 3936+00

CABLE TO SV7 @

FIBER OPTIC

SINGLE MODE

12-STRAND

14607+76

TO SV102 @ STA

BACKBONE CABLE

CABLE FROM I-93

MODE FIBER OPTIC

12-STRAND SINGLE

ETH.

100 MBPS

SWITCH

ETHERNET

FIBER

EQUIPMENT CABINET FOR ...

EXISTING POLE MOUNTED ITS

452 RAP1

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

DGN

STATE OF NEW HAMPSHIRE

NE

W

DE

SI

GN

DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN

CL

D

EG

D

MD

S

- 1/

9/

20

14

6/

26/

20

15

DATE PLOTTED VHB PROJECT NO.

52525.112/2/2017

SD

R

PR

OC

ES

SE

D

14633H-ITSCOMM2.dgn 1343

MD

S

EG

D

CL

D

6/

26/

20

15

1/

9/

20

14

-

14633H


Recommended