H.M. Government’s whole sector approach to implementation of digital, collaborative working
David PhilpBIM Task GroupHead of BIM
Open BIM / COBie Field TrailsIndustry Feedback
2
Construction Sector:a time of change
"Tempori Parendum"- Be prepared for your time
BIM, Procurement through computer readable data
Drop 2BLooking good!
Level 2 training industry towards good quality consistent data transactions
Built Environment enters aDigital Revolution
Government strategyCollaborative 3D BIM with all project and asset information, documentation and data being electronic
By 2016 a staged plan will be published with mandated milestones showing measurable progress at the end of each year.
Keep it simple; our hypothesis is:BIMGovernment as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information
What is COBie
“a common language”
9 | WWW.BENTLEY.COM
What is COBie?
Information Exchange to facilitate Digital transactions
10
COBie UK 2012
COBie is formal schema that helps organise information about new and existing facilities. It is general enough that it can be used to document both Buildings and Infrastructure assets. It is simple enough that it can be transmitted using a spread-sheet. It is means of sharing structured information
Purpose
COBie
PIM to AIM
13 | WWW.BENTLEY.COM
Data Procurement
Right amount of information at the right time
AIM (COBie is key)
Allows data transactions at all tiersWith simplicity!
BIM does not = correct information
16 | WWW.BENTLEY.COM
Answer ‘English Questions’
PAS 1192:2 – Data Tranactions
This is how we currentlypopulate the
CAFM systems
To help automate the process between Capex and Opex
Where's that Maintenance
manualfor the hand drier
And the page you want is probably
missing anyway
Better asset management
InteroperabilityLots of ways for the supply chain
to get there.One format many
routes
IFC
Manual input
Export tools
ProprietarySoftware
COBie: Reusability, Many client Use cases!
Data Hierarchy / Use Cases
StrategicSummary HMT
Portfolio Planning Depts
Asset Asset / Portfolio Depts
Full Atomic Detail
Asset & Systems Operations
Level of Detail Description Consumer
COST
IFC
COBie
Data
22
A key component of Level 2 BIM maturity
Level 2: process and deliverables
What a client needs to make decisions
The purposes that the information might be used for .The information (reports etc) to inform decisions and purposes
The data
The drawing content that conveys information
Hierarchy of Information and the Work Stages
WISDOM
KNOWLEDGE
INFORMATION
DATA
26 | WWW.BENTLEY.COM
How are the PLQ’s linked to data?
Energy Analysis Requirements Humidity RequirementEnergy Analysis Requirements Radiant Heating RequirementEnergy Analysis Requirements Air Circulation RequirementEnergy Analysis Requirements Ventilation RequirementEnergy Analysis Requirements Temperature Range RequirementEnergy Analysis Requirements Energy Performance BasisEnergy Analysis Requirements HVAC Performance Basis
PLQ’s at Stage 02
How are the PLQ’s answered?
What is the data?
27
BIM Level 2Practically applied
Thank You
Have a look at our web-sitewww.bimtaskgroup.org
Follow us on Twitter @BIMgcs
Questions?