    BHARAT HEAVY ELECTRICAL LIMITED Enquiry No. :

    UNIT'S ADDRESS: Due Date : _____________

    UNIT'S PHONE NOS. 09-976

    CONTACT PERSON'S NAME/DESIGN./PHONE Date : Sept 1st, 2009

    NO./E-MAIL (FROM PURCHASE DEP'T.)

    NOTE:-

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENT VENDOR TOSPECIFY / CONFIRM OFFERED BYVENDORDEVIATIONS( IF ANY)

    REMARKS

    1.0 PURPOSE & WORK PIECE MATERIAL

    1.1 DRILLING OF TUBE SHEETS FOR HEAT EXCHANGERS WITH BTA

    SYSTEM

    vendor to confirm

    2.0 Traverse range

    2.1 Longitudinal Travel of column (X Axis): 3000 MM Vendor to confirm

    2.2 Vertical head travel (Y axis): 3000 MM Vendor to confirm

    2.3 Horizontal Spindle head travel (Z1 & Z2 axis): 600 mm Vendor to confirm

    2.4 Boza holder travel by hydraulic: 500 mm Vendor to confirm

    2.5 Total horizontal travel (Z1 & Z2 axis): 1100 mm Vendor to confirm

    3.0 Axis Rapid traverse

    3.1 Rapid traverse of X Axis : 10000 mm/minute Vendor to confirm

    3.2 Rapid traverse of Y Axis : 10000 mm/minute Vendor to confirm

    3.3 Rapid traverse of Z1 & Z2 Axis : 10000 mm/minute Vendor to confirm

    4.0 Working feed rates

    4.1 Feed rate (X axis) : infinitely adjustable : 1 to 4000 mm/minute Vendor to confirm

    4.2 Feed rate (Y axis) : infinitely adjustable :1 to 4000 mm/minute Vendor to confirm

    4.3 Feed rate (Z1, Z2 axis) : infinitely adjustable : 1 to 4000 mm/minute Vendor to confirm

    5.0 Working range

    5.1 Distance between surface worktable and lower spindle (main spindle) Vendor to specify

    5.2 Working range of the main spindle max. (lower) Vendor to specify

    5.3 Working range of the upper spindle min. Vendor to specify

    5.4 Working range of the upper spindle max. Vendor to specify

    5.5 Min.Centre distance between the Spindle axisVendor to specify

    5.6 Max.Centre distance between the Spindle axis Vendor to specify

    5.7 Vertical adjustable stroke of the Spindle axis: 150 mm Vendor to confirm

    6.0 Drilling Spindles

    6.1 No of Drilling Spindles : TWO Vendor to confirm

    6.2 Spindle motors power Vendor to specify

    6.3

    BTA Drilling capacity Min : 15 mm

    Vendor to confirm and

    specify minimum dia that

    can be drilled

    6.4

    BTA Drilling capacity Max : 25 mm

    Vendor to confirm and

    specify maximum dia

    that can be drilled

    6.5 Each Spindle torque Vendor to specify

    6.6 Drilling thrust on Z1,Z2 axis Vendor to specify

    TELEPHONE NOS.: TELEPHONE NOS.:

    SCOPE: SUPPLY, ERECTION & COMMISSIONING OF DEEP HOLE DRILLING MACHINE with BTA System-1 SET.

    3. The offer and all documents enclosed with offer should be in English language only.

    ADDRESS OF THE INDIAN AGENT

    FAX NOS.:

    Supplier Qtn. No.:

    E-MAIL ADDRESS :

    FAX NOS.:

    E-MAIL ADDRESS :

    ADDRESS OF THE SUPPLIER

    1. Vendor must submit complete information against clause no. 58 The offer meeting this clause would only be processed.

    2. Inadequate / incomplete, ambiguous, or unsustainable information against any of the clauses of the specifications/requirements shall be treated asnon-compliance.

    SPECIFICATION CUM COMPLIANCE CERTIFICATE FOR DEEP HOLE DRILLING MACHINE - ONE SET

    Page 1 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    2/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    6.7 Spindle Speeds infinitely Variable : 1 to 3500 RPM Vendor to confirm

    6.8 No of gear shiftings Vendor to specify

    6.9 Spindle nose taper Vendor to specify

    6.10 Spindle bearings to be specified Vendor to specify

    7.0 MOTOR AND DRIVE SYSTEM FOR SPINDLES

    7.1

    Motors: Motors for spindles: Make: Fanuc/Siemens /ABB/Indramat . Details of

    Model, Type etc. to be submitted by Vendor. Motors should be totally protected

    from dust and pressurised mist coolant. Protection details like type of standard etc

    with catalogues should be provided with offer. The type and capacity of spindle

    motors and drives should be similar type and capacity.

    Vendor to confirm

    7.2 Drives: Spindle drives shall be AC digital of make Fanuc/Siemens /ABB/Indramat .

    Details of model, Type etc. to be submitted by Vendor.Vendor to confirm

    7.3 The Spindle motors and drives should be similar type and capacity.Vendor to confirm

    7.4Feed back devices: Rotary encoders, Make: Heidenhain (Details to be submitted by

    the vendor)

    vendor to confirm

    7.5

    Machine should be capable of operating in dual parameters in single hole i.e.

    - slow rate in stainless steel cladding

    -high rate in alloy forging

    Vendor to specify

    8.0 Boza

    8.1 Automatic stroke of the boza: 50 mm Vendor to confirm

    8.2 Stroke of boza holder through hydraulic cylinder : 500 mm Vendor to confirm

    8.3 Clamping of boza holder Vendor to confirm

    9.1 Hydraulic power pack

    9.2 Make and model of power pack Vendor to specify

    9.3 Clamping of X, Y, Z1, Z2 and Boza Holders by hydraulic Vendor to specify

    9.4 Pump type, discharge with pressure Vendor to specify

    9.5

    Chiller for power pack

    Vendor to specify

    9.6 Gear shifting by hydraulic Vendor to confirm

    10.0 Position Accuracies as per ISO 230-2

    10.1 X-axis Column travel : 0.03/3000 mm Vendor to confirm

    10.2 Y-axis Vertical head travel: 0.02/3000 mm Vendor to confirm

    10.3 Z1&Z2 Horizontal Spindle Travel: 0.02/1100 mm Vendor to confirm

    11.0 Repeatability as per ISO 230-2

    11.1 X-axis Column travel : 0.015/3000 mm Vendor to confirm

    11.2 Y-axis Vertical head travel: 0.015/3000 mm Vendor to confirm

    11.3 Z1&Z2 Horizontal Spindle Travel: 0.015/1100 mm Vendor to confirm

    12.0 Accuracy Paramaters

    12.1 Hole accuracy: +/- 0.02 mm Vendor to confirm

    12.2 Pitch accuracy between holes: 0.04 mm Vendor to confirm

    12.3 Hole diameter quality: IT 9 Vendor to confirm

    12.4 Hole straightness: 0.18 / 400 mm Vendor to confirm

    12.5 Quality of drill surface with BTA system: Ra2 Vendor to confirm

    13.0 X-axis

    13.1 Drive mechanism shall be Rack with double pinion Vendor to confirm

    13.2

    Hydrostatic lift shall be provided

    Vendor to specify

    13.3 Hydrostatic lift motor & Pump make, model, type, discharge with pressureVendor to specify

    13.4 Telescopic covers for bed shall be provided on either side of the saddle Vendor to confirm

    14.0 Y-axis

    14.1 Drive mechanism shall be ball screw with double preloaded nuts Vendor to confirm

    14.2Balancing of Cross slide (by Hydraulic or Counter weight)

    Vendor to specify

    Page 2 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    3/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    14.3If the balancing is done by counter weight,specify one of the following system

    (Chains with sprockets or Ropes with pulleies)

    Vendor to specify

    14.4 Protective cover for ballscrew shall be provided Vendor to confirm

    15.0 Z1 &Z2 -axis

    15.1 Drive mechanism shall be ballScrew with double preloaded nuts Vendor to confirm

    15.2 Protective cover for ballscrew shall be provided Vendor to confirm

    16.0 FEED AND DRIVE SYSTEM FOR X,Y,Z1and Z2

    16.1Motors: Feed motors with brake for X,Y,Z1& Z2, axes shall be AC servo with

    inbuilt encoders. (Details of model, type etc. to be submitted).Vendor to confirm

    16.2Drives:The Feed drives for X,Y,Z1and Z2 shall be digital type of make Siemens

    or Fanuc (Details of model, type etc. to be submitted).Vendor to confirm

    16.3 The Feed motors and drives for X,Y,Z1 and Z2 should be similar type and capacity. Vendor to confirm

    17.0 FEED BACK SYSTEM

    17.1Feed back system for X, Y axes: Heidenhain linear scales with pressurised

    compressed air cleaning (Details to be submitted by the vendor)

    Vendor to confirm

    17.2Feed back system for Z1 and Z2 axes: Heidenhain Rotary Encoders (Details to

    be submitted by the vendor)Vendor to confirm

    18.0 Boza Holder

    18.1 Boza holder travel shall be hydraulic Vendor to confirm

    18.2Suitability to accommodate brazed BTA bits from 15mm to 25 mm with multi

    start(4) external threadingspecify with details

    18.3Holding arrangements of pipe should be made to accommodate dia 14, 17, 18, 20,

    22 & 23 mmspecify with details

    18.4 OD of carbide bush guiding BTA should be dia 25mm and dia 40 mm specify with details

    19.0 Steady rest

    19.1Steady rest between boza holder and Spindle slide shall be provided 1 no for each

    Spindle Vendor to confirm

    20.0 Geometrical test chart for similar machine shall be submitted along with offer Vendor to confirm

    21.0 Pitch Adjustment

    21.1 Interlocks shall be provided for on / off of the pitch adjustment motor Vendor to confirm

    21.2Safety shall be provided to protect the over loading of the mechanism while coming

    closerVendor to confirm

    22.0 COOLANT SYSTEM

    22.1 No of coolant stations:Two Vendor to confirm

    22.2 Each pump discharge shall infinitely variable & controled at operator panel Vendor to confirm

    22.3 Min.Discharge at min RPM: 20LPM Vendor to confirm

    22.4 Max.Discharge at max RPM: 200 LPM Vendor to confirm

    22.5 Pump Pressure: 70 Kg/sq.cm Vendor to confirm

    22.6 Coolant Sytem should contain the following :

    22.6.1 All tanks shall have Min &Max oil level indication through float switches Vendor to confirm

    22.6.2 Pressure relief valves and DC Valves Vendor to confirm

    22.6.3

    Two inlet connections shall be provided for bottom Spindle unit

    Vendor to confirm

    22.6.4 Coolant specification Vendor to specify

    22.6.5

    No of coolant tanks, size and coolant quantity

    Vendor to specify

    22.6.6

    Mud pump discharge shall be 500 LPM constant

    Vendor to confirm

    Page 3 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    4/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    22.6.7 Inter locks shall be provided to protect over flow of the coolant oil from tanks Vendor to confirm

    22.6.8 Filtering Unit shall be provided Vendor to confirm

    22.8.9 Filtering level to be specified in microns Vendor to specify

    22.6.10 Filtering capacity 700 LPM Vendor to confirm

    22.6.11

    In case of filter failure over flow connection back to the tank shall be provided

    Vendor to confirm

    22.6.12Filter paper size to be specified

    Vendor to specify

    22.6.13 Collection of cutting oil from the machine to mud tank to be specified Vendor to specify

    22.6.14 Chiller for the coolant oil shall be quoted as an option Vendor to specify

    22.6.15 Magnetic filter shall be provided to arrest the chips to the mudtank Vendor to confirm

    22.7 MOTOR AND DRIVE SYSTEM FOR COOLANT APPLICATION

    22.7.1Motors : Make: Fanuc/Siemens /ABB/Indramat. Details of Model, Type etc. to be

    submitted by Vendor.

    Vendor to confirm

    22.7.2Drives : Digital AC Drives Make:Fanuc/Siemens /ABB/Indramat . Details of

    Model, Type etc. to be submitted by Vendor.

    Vendor to confirm

    22.7.3 The coolant motors and drives should be similar type and capacity. Vendor to confirm

    23.0 CHIP CONVEYOR: Chip conveyor to be quoted as an optional

    vendor to quote and

    furnish details

    24.0SEMI AUTOMATIC CENTRIFUGE To be quoted as an optional

    vendor to quote and

    furnish details

    25.0Lubrication Unit Centralised lubrication unit for all axes slides, ball screw nuts,

    linear way bearings and other elements with metering units (flow control valve)

    Vendor to confirm

    26.0 Items not included in the scope to be specified by the Vendor vendor to furnish

    27.0 OPERATOR'S PANEL:

    27.1

    Operator's panel having complete CNC and machine control system with TFT

    colour monitor. All switches on the Operator's panel should be within reach of

    operator of average height (Indian) for convenient, efficient & safe operation. All

    displays/indications should also be conveniently placed accordingly. Layout

    showing complete details of the panel should be submitted. Panels should be

    totally protected from dust and pressurised mist coolant. Protection details like type

    of standard etc. with catalogues should be provided with offer.

    Vendor to confirm

    28.0 AIR CONDITIONERS

    28.1

    Air Conditioners with Dehumidifiers of suitable / sufficient capacity to be provided

    for all Electrical / Electronic Panels / Cabinets including Operators Panel

    considering specified ambient conditions. The air conditioners should work in the

    environment of dust and mist coolant with minimum maintenance. Detailed

    specifications of make and type should be submitted.

    vendor to specify

    29.0 CNC SYSTEM AND FEATURES

    29.1 Make : SIEMENS/FANUC Vendor to confirm

    29.2 Type vendor to specify

    29.3 Model vendor to specify

    29.4 Details of Standard features. List to be submitted. vendor to furnish

    29.5 Details of optional features, recommended by vendor, to be submitted. vendor to furnish

    29.6

    The system should have full alphanumeric keyboard, TFT color display(10.4" or

    more), additional draw-out type Querty Key Board and mouse in suitable

    enclosure, RS232C serial interfaces, parallel interface for printer, COM port for

    telediagnostics, network ready with LAN, electronic hand wheels for all axes, USB

    drive with memory stick(4GB) unit for data input/output, hard disk of sufficient

    capacity (Largest size available at the time of order shall be supplied), graphic

    simulation and preinstalled system software & other required software's etc.(Details

    should be submitted by Vendor)

    Vendor to confirm

    29.7

    Separate pages in the system should be provided for handling of tool blunt / tool

    breakage. This should facilitate entry of set current and display of actual current for

    spindle rotation and Z -feed.

    Vendor to specify

    30.0 TOOL MONITOR SYSTEM

    Page 4 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    5/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    30.1Tool monitoring system to handle tool blunt/tool breakage. (Integral with CNC

    system or external)

    Vendor to specify

    31.0 MANUAL CONTROL :

    31.1

    Complete manual control of machine with required control elements that include

    potentiometers for spindle speed variation, potentiometers for manual feed

    variation,potentiometers for coolant regulation, Speed range selector switch, mode

    selector switch, Z-axes selector switch, Push buttons for Boza slide forward and

    backward, Push buttons for drilling slide forward and backward,Push button for

    chip conveyor on and off,Emergency stop switch, Push button with lamps for

    drilling motor on and off,Push button with lamps for spindle rotaion on and off,

    Push button with lamps for blower motors of drilling motor on and off, Push botton

    with lamp for coolant pump on and off, Push button with lamp for coolant valve

    open and close, cycle start push button(after emergency stop of spindle the drill

    cycle will be repleated with this button), and display elements (DRO) for spindle

    rotaion,spindle feed and alarm lamps for Emergency stop feed, Emergency stop

    drilling motor, Emergency stop for Boza, Gear box lueoil low Etc.Apart from above

    switches / keys should be provided for selection of required axis,

    axis direction, cutting feed, spindle rpm, spindle feed, drilling feed and

    spindle rpm , display of axis position values etc, for manual operation.

    Diagram/ Sketches for switches/ keys provided on operators pendant to

    be submitted.

    Vendor to specify

    32.0 UPS SYSTEM

    32.1UPS of 30 minutes for CNC system with inbuilt cooling and charge status display

    (Battery charging /discharging time should be specified by vendor)

    vendor to confirm

    33.0 HAND HELD UNIT:

    33.1

    Standard hand held unit with Emergency stop switch,Z-Axes selection switch, Push

    buttons for drilling slide forward and backward, Pusubuttons for X and Y axes

    selection ,Electronic hand wheel to move the machine in Plus and Minus

    directions This shall be alongwith sufficient length of interfacing cable.

    vendor to confirm

    34.0 DIAGNOSTIC SYSTEM:

    34.1 TELE-DIAGNOSTIC SERVICE :

    34.1.1

    Tele-diagnostic service should be provided through International telephone lines

    along with required Hardware / Software package for the supplied CNC system for

    remote diagnosis and correction of the problems in both CNC System and PLC of

    the machine. This should be provided free of charge for the guarantee period.

    Terms and conditions for the service after guarantee period should be informed by

    vendor. Subsequently, it should be possible to use other platforms, such as Internet

    or ISDN, subject to their availability in future at any event, Alarm controlled

    notification by e-mail in event of fault. The system shall have facility for storing

    and generating monthly report of alarms occurring on the machine during the

    period

    vendor to confirm

    34.2 FAULT DIAGNOSTIC SYSTEM:

    34.2.1

    Supplier's own diagnostic system with required hardware and software should be

    supplied and installed on the CNC system. This should include customised auto-

    diagnostic system with supporting hardware and software which shows detailed

    cause and remedy for the fault on the display with full video diagnostic help for

    faults related to mechanical and electrical maintenance. PG/PC laptop unit with

    required software supplied along with the machine for debugging and diagnostic

    purpose of PLC system.

    vendor to confirm

    35.0 AMBIENT CONDITIONS & THERMAL STABILITY :

    35.1

    Total machine should work trouble free and efficiently under following operating

    conditions. Power Supply: Voltage: 415 V +10% / -15% Frequency:50Hz 3%

    No. of phases = 3

    Ambient Conditions: Temperature = 5 to 45 degree celsius

    Relative Humidity = 95% max.

    (Confirm that machine is suitable for above and details of provisions on the

    machine for the same should be furnished)

    Vendor to specify

    35.2

    Weather conditions are tropical, Atmosphere may be dust laden during some part of

    the year. Machine shall be kept in the normal shop floor condition. Max.

    temperature variation is 25 deg Celsius in 24 hours.

    Vendor to specify

    Page 5 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    6/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    35.3

    Thermal Stability of the complete machine keeping in view specified Ambient

    Conditions and accuracy requirements of BHEL components and trouble free

    operation of the machine should be ensured by vendor.

    (Confirm that machine is suitable for above and details of provisions on the

    machine for the same should be furnished)

    Vendor to specify

    35.4

    The machine including attachments & accessories should be suitable for 24 hrs.

    continuous operation to its full capacity for 24 hour a day and 7 days a week

    throughout. Vendor to ensure and confirm the same.

    Vendor to specify

    36.0 ELECTRICAL SYSTEM :

    36.1

    415V + 10% / -15%, 50HZ +/-3%, 3 Phase AC (3 wire system with out neutral)

    Power Supply Voltage will be provided by BHEL at a single point near the

    machine, as per layout recommended by Vendor. All types of cables, connections,

    circuit breakers etc. required for connecting BHEL's power supply point to

    different parts of the machine/control cabinets, shall be the responsibility of vendor.

    Requirement of grounding/earthing with required material details is to be informed

    by vendor well in advance so that same could be incorporated during construction

    of foundation.

    Vendor to specify

    36.2 Tropicalisation: All electrical / electronic equipment shall be tropicalized Vendor to confirm

    36.3

    All electrical & electronic control cabinets & panels should be twin panel(two

    layres) and totally protected from dust and pressurised mist coolant. Details like

    type make etc. shall be provided with catalogues.

    Vendor to specify

    36.4

    All electrical and electronic panels including operator's panel should be provided

    with fluorescent lamps for sufficient illumination and power receptacles of

    220Volts, 5/15 Amp AC. All adapters/receptacles should have compatibility with

    Indian equivalents.

    Vendor to specify

    36.5 Motors shall conform to IEC or Indian Standards Vendor to confirm

    36.6

    All cables moving with traversing axes should be installed in caterpillar / Drag

    chain. Additionally, all the cable trays required for laying of cables should be

    included in the offer.

    Vendor to specify

    36.7 In-cycle hour counter with reset facility. Vendor to specify

    37.0 MACHINE LIGHTS:

    37.1Machine Lights for sufficient illumination of complete working area on both sides

    of operator's platform should be provided for clear visibility.

    Vendor to specify

    37.2A magnetic base portable spot light with sufficiently long cable should also beprovided.

    Vendor to specify

    37.3Any lights required in the foundation/ pit area shall also be foreseen and supplied

    by the vendor.

    Vendor to specify

    37.4 Flashing / rotary type End of Cutting and Program Stop Light. Vendor to specify

    38.0 SERVO VOLTAGE STABILIZER WITH SAFETY ENCLOSURE

    38.1

    Indian make Oil / Air Cooled servo Controlled Voltage Stabilizer suitable for

    complete machine, its drives, controls, PLC etc. with no undesirable Harmonics in

    the stabiliser output.

    Vendor to specify

    38.2 Make (To be specified by indentor as per the practice of units.) Vendor to specify

    38.3 Model and Rating vendor to specify

    38.4

    Spares Package for the Voltage Stabiliser for 2 years working should also be

    offered with item wise list.

    vendor to confirm

    38.5 Catalogue of the Voltage Stabiliser shall be submitted with the offer. vendor to confirm

    39.0 ULTRA ISOLATION TRANSFORMER WITH SAFETY ENCLOSURE

    39.1Indian make Ultra Isolation Transformer suitable for complete machine , its drives,

    controls, PLC etc. shall be supplied

    vendor to confirm

    39.2 Make vendor to specify

    39.3 Model and Rating vendor to specify

    39.4Spares Package for the Ultra Isolation Transformer for 2 years working should also

    be offered.

    vendor to specify

    39.5 Catalogue of the Ultra Isolation Transformer shall be submitted with the offer. vendor to specify

    40.0 SWITCH GEAR

    40.1All the switch gear items should be high standard and quality. Technical details like

    make, type etc. shall be provided.

    Vendor to specify and

    confirm

    Page 6 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    7/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    41.0 CABLES

    41.1All the motor, control and feed back cables should be high quality and oil

    resistant.Technical details like make, type etc. shall be provided.

    specify & confirm

    41.2All the power , motor, control and feed back cables shall be provided with high

    quality flexible conduits.Details like make, type etc. shall be provided.

    Vendor to specify and

    confirm

    42.0SAFETY ARRANGEMENTS:

    42.1Following safety features in addition to other standard safety features should be

    provided on the machine:

    Vendor

    42.2

    Machine should have adequate and reliable safety interlocks / devices to avoid

    damage to the machine, work piece and the operator due to the malfunctioning or

    mistakes.

    vendor to confirm

    42.3A detailed list of all alarms / indications provided on machine should be submitted

    by the supplier.

    vendor to furnish

    42.4

    All the pipes, cables etc. on the machine should be well supported and protected.

    These should not create any hindrance to machine operator's movement for

    effective use of machine.

    vendor to confirm

    42.5All the rotating parts used on machine should be statically & dynamically balanced

    to avoid undue vibrations.

    vendor to confirm

    42.6

    Emergency Switches at suitable locations as per International Norms should be

    provided.

    vendor to confirm

    42.7 Oil & water pipe lines should not run with electrical cable in the same trench. VENDOR TO NOTE

    43.0 ENVIRONMENTAL PERFORMANCE OF THE MACHINE :

    43.1 The Machine shall conform to following factors related to environment : vendor to confirm

    43.2

    Maximum noise level shall be 75 dB(A) at normal load condition, 1 meter away

    from the machine with correction factor for back ground noise, if necessary. This

    will be measured as per international standards like DIN 45635-16. Supplier to

    demonstrate compliance to noise level, if so required.

    vendor to confirm

    43.3There shall not be any emissions from the machine except fumes of cutting fluid

    during machining.

    vendor to confirm

    43.4

    There should not be any effluent from the machine. In case there are any effluents

    from the machine, requisite effluent treatment plant or pollution control device

    should be built into the machine by the supplier.

    vendor to confirm

    43.5 No hazardous chemicals shall be required to be used in the machine. vendor to confirm

    43.6If any safety / environmental protection enclosure is required it should be built in

    the machine by the vendor.

    vendor to confirm

    43.7Paint of the machine should be oil / coolant resistant and should not peel off and

    mix up with coolant.

    vendor to confirm

    43.8Suitable arrangement for recovery of oil mist as per ISO 14001 and OHSAS 18001 specify with details

    44.0 LEVELING & ANCHORING SYSTEM

    44.1Complete anchoring system including foundation bolts, anchoring materials,

    fixators, leveling shoes etc should be supplied

    vendor to confirm

    45.0 TOOLS FOR ERECTION, OPERATION & MAINTENANCE :

    45.1

    Special tools and equipment required for erection of the machine shall be brought

    by the vendor. Necessary tools like Torque Wrench, Spanners, Keys, grease guns

    etc. for operation and maintenance of the machine should be supplied. List of such

    tools should be submitted with offer

    vendor to confirm

    45.2 Test mandrel for checking run-out/taper & alignment should be supplied vendor to confirm

    46.0 SPARES:

    46.1

    Itemized breakup of mechanical, hydraulic, electrical and electronic spares used on

    the machine in sufficient quantity as per recommendation of Vendor for 2 years of

    trouble free operation on three shifts continuous running basis should be offered by

    vendor. The list to include the following in addition to recommended spares (Unit

    price of each item of spare should be offered)

    vendor to confirm

    46.2

    Mechanical & Hydraulic Spares: All types of Pumps, Valves, Pressure Switches,

    Transducers, Flow Switches, Filters, Seals, O-rings, Hydraulic Hoses etc. Note : 2

    sets of O-rings & seals shall be supplied along with the eqipment

    specify & confirm

    Page 7 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    8/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    46.3

    Electrical /Electronic Spares: All types of Relays (1no each type),

    Contactors(1no each type), Proximity Switches (2nos each type), Push Buttons,

    Indicating Lamps, Semiconductor Fuses, Special Fuses, Circuit Breakers, Main

    Power Switch(1 no), Encoders (1no each type), Scanning Heads for Linear Scales

    (1no each type), MMC module (1 no), NCU module(1no), Operator's panel with

    Display Unit(1no), Floppy Disk Unit(1no), I/O Cards for PLC(1no each), Servo

    Motors for Feed (1no),Drive for feed(1no), Spindle motor(1no),Spindle drive

    (1no),Coolant motor(1no) and coolant drive(1no).

    specify & confirm

    46.4

    All types of spares for total machine and accessories should be available for at least

    ten years after supply of the machine. If machine or control is likely to become

    obsolete in this period, the vendor should inform BHEL sufficiently in advance and

    provide drawings of parts / Details of spares and suppliers to enable BHEL to

    procure them in advance if required.

    vendor to confirm

    46.5

    Vendor to confirm that complete list of spares for machine and accessories, along

    with specification / type / model, and name & address of the spare supplier shall be

    furnished along with documentation to be supplied with the machine

    vendor to confirm

    47.0DOCUMENTATION : Five sets of following documents (Hard copies) in

    English language should be supplied along with the machine

    47.1 Operating manuals of Machine vendor to confirm

    47.2

    Detailed Maintenance manual of machine with all drawings of machine

    assemblies/sub-assemblies/parts including Electrical / Pneumatic/ Coolant /Hydraulic circuit diagrams. All Assembly / Sub Assembly Drawings shall be

    supplied with part list also.

    vendor to confirm

    47.3Catalogues, O&M Manuals of all bought out items including drawings, wherever

    applicable.

    vendor to confirm

    47.4

    Operating Manuals, Maintenance Manuals & Catalogues for all the bought out

    items that include Voltage Stabilizer, Isolation Transformer, Air-Compressor and

    all supplied Accessories.

    47.5 PLC program print-outs with comments in English for each function.

    47.6Complete back-up of hard disk on GHOST CD and supply of spare hard disc with

    fully loaded data after commissioning the machine.

    47.7One additional set of all the above documentation on CD ROM, wherever possible. vendor to confirm

    47.8 Detailed specification of all rubber items and hydraulic/lube fittings vendor to confirm

    47.9Complete Master list of parts used in the machine shall be submitted by the vendor. vendor to confirm

    49.0 FOUNDATION :

    49.1

    Vendor shall submit the preliminary layout drawing for getting BHELs approval

    within one month from the date of Letter of Intent (LOI) / P.O. whichever is earlier.

    Soil condition data will be furnished by BHEL along with the approval. Complete

    Foundation Design including details viz. static / dynamic load details etc. and Final

    Layout drawings shall be submitted by the supplier within three months after

    getting BHELs approval. The layout should consist of all reqirements pertaining to

    complete machine including space requirement for Voltage Stabilizer, Isolation

    Transformer, Air compressor, Chip Bin & any other accessories. BHEL shall

    construct complete foundation for the machine under supervision of supplier and at

    suppliers responsibility. Vendor should arrange equipments required for the

    testing of foundation, if required by the vendor. The vendor shall also indicate

    detailed specifications of grouting compound and Grouting procedure etc. for

    foundation bolts of the machine.

    vendor to confirm

    50.0 ERECTION & COMMISSIONING

    50.1

    Supplier to take full responsibility for carrying out the erection, start up, testing of

    machine, its control & all types of other supplied equipment , machining of test

    pieces etc. Service requirement like power, air & water shall be provided by

    BHEL at only one point to be indicated by supplier in their foundation/layout

    drawings. Other requirements like crane and helping personnel shall also be

    provided by BHEL. Details of these requirements should be informed by vendor in

    advance.

    vendor to confirm

    50.2

    Successful proving of BHEL components by the supplier shall be considered as

    part of commissioning. All tests, as mentioned at clause 19 (Machine Acceptance)

    shall form part of the commissioning activity.

    vendor to confirm

    Page 8 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    9/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    50.3Tools, instruments and other necessary equipment required to carry out all above

    activities should be brought by the supplier.

    vendor to confirm

    50.4Commissioning spares, required for commissioning of the machine within

    stipulated time, shall be brought by the supplier on returnable basis.

    vendor to confirm

    50.5 Schedule of Erection and Commissioning shall be submitted with the offer. vendor to confirm

    50.6

    All Cover Plates required for the machine and its peripherals including pits, if any,

    shall be supplied and installed by the vendor. The plates should be sourced from

    India.

    vendor to confirm

    50.7

    Portion, if any, of the machine, accessories and other supplied items where paint

    has rubbed off or peeled during transit or errection should be repainted and merged

    with the original surrounding paint by the vendor. For this purpose, the vendor

    should supply sufficient quantity of touch up paint of various colors used.

    vendor to confirm

    50.8Schedule, Charges, duration, terms & conditions for E&C should be furnished in

    detail separately by vendor along with offer.

    vendor to confirm

    51.0MACHINE ACCEPTANCE: (Tests/Activities should be Performed by

    Vendor)

    vendor to confirm

    51.1Tests/Activities should be carried out at suppliers works on the machine

    before dispatch :

    vendor to confirm

    51.2 Geometrical accuracies as per test chart. vendor to confirm

    51.3The machine should be tested for continuous running of 8 hrs. If any break down

    occurs during this test, the test should be repeated for 8 hrs from that time.

    vendor to confirm

    51.4 Demonstration of all features of the machine, control system & accessories vendor to confirm

    51.5 Machining of test piece as per Standard Vendor to supply test piece vendor to confirm

    52.0 INSPECTION:by BHEL Engineers at supplier's works before dispatch.

    53.0

    TRAINING : BHEL Persons should be trained at supplier's Works for

    mutually agreed period in the area of

    (a) CNC Part Programming/ Technology, Use of all CNC Features,

    Programming for Measuring Systems & supplied accessories etc.

    (b) Electrical, Electronic & CNC maintenance for machine & other supplied

    equipments

    (c) Mechanical & Hydraulic maintenance of the machine & other supplied

    equipments

    (d) Operation of the machine & other supplied equipments.

    vendor to specify

    54.0Tests/Activities should be carried out at BHEL works while commissioning

    the machine :

    vendor to confirm

    54.1 Geometrical accuracies as per test chart. vendor to confirm

    54.2 Full load test to demonstrate the maximum power & capacity of the machine. vendor to confirm

    54.3The machine should be tested for continuous running of 8 hrs. If any break down

    occurs during this test, the test should be repeated for 8 hrs from that time.

    vendor to confirm

    54.4Demonstration of all features of the machine, control system & accessories to the

    satisfaction of BHEL for efficient and effective use of the machine

    vendor to confirm

    54.5Machining test piece as per Standard Vendor to arrange Test pieces and tooling for

    its machining.

    vendor to confirm

    54.6 Prove out machining. vendor to confirm

    54.7Two weeks supervision of independent operation of machine by BHEL after job

    prove out

    vendor to confirm

    54.8

    Training of BHEL machine operators in operation of complete machine &

    accessories etc by the supplier's experts / engineers during their stay at BHEL

    works

    vendor to confirm

    54.9Demonstration by actual use of all supplied attachments and accessories to their full

    capacity.

    vendor to confirm

    55.0 PACKING:

    55.1Sea worthy & rigid packing for all items of complete machine, all accessories and

    other supplied items to avoid any damage/loss in transit.

    vendor to confirm

    55.2When machine is dispatched in containers all small loose items shall be suitably

    packed in boxes.

    vendor to confirm

    56.0 GUARANTEE :

    56.1 24 months from the date of acceptance of the machine. vendor to confirm

    56.2Vendor shall provide free sevicing of the machineonce in 6 months during

    guarantee periodvendor to confirm

    57.0 GENERAL :

    57.1 Machine Model vendor to specify

    Page 9 of 10

  • 7/29/2019 deep hole drilling Technical Specification

    10/10

    Sl. NO DESCRIPTION FOR BHEL REQUIREMENTVENDOR TO

    SPECIFY / CONFIRM

    OFFERED BY

    VENDOR

    DEVIATIONS

    ( IF ANY)REMARKS

    57.2 Total connected load (KVA): vendor to specify

    57.3 Floor area required (Length, Width, Height) for complete machine & accessories vendor to specify

    57.4Painting of Machine/Electrical Panels:RAL 6011 Apple Green (Polyurethane Paint) vendor to specify

    57.5 Total weight of the machine vendor to specify

    57.6 Weight of heaviest part of machine vendor to specify

    57.7 Weight of the heaviest assembly and Sub-assembly of the Machine vendor to specify

    57.8 Dimensions of largest part of the machine vendor to specify

    57.9

    Vendor to submit, along with offer, reference list of customers where similar

    machines have been supplied mentioning broad specifications of the supplied

    machine i.e. Model, Drilling Capacity etc.

    Required

    59.0 REFERENCE LIST / QUALIFYING CONDITIONS :

    58.1

    Only those vendors, who have supplied and commissioned atleast one Deep hole Drilling

    Machine of similar ( Drilling Capacity, Drilling Depth, Spindle Drive, Motor Rating, &

    Travel etc.) or higher capacity for similar applications in the past ten years (On the Date

    of Opening of tender) and such machine is working satisfactorily for more than one year,

    after commissioning (On the Date of Opening of tender) should quote. However, if such

    machine(s) has/had been sipplied to BHEL, then such machine should be presently

    working satisfactorily for more than six months after its commissioning and acceptance

    (On the Date of Opening of tender) in BHEL, should quote. The following informationshould be submitted by the vendor about the companies where similar machines have

    been supplied. This is required from all the vendors for qualification of their offer.

    vendor to confirm

    58.2 Name of the customer / company where similar machine is installed.

    58.3 Complete postal address of the customer.

    58.4 Month & Year of commissioning.

    58.5Application for which the machine is supplied with details of accuracies achieved on the

    job.

    58.6 Name and designation of the contact person of the customer.

    58.7 Phone, FAX no. and email address of the contact person of the customer.

    58.8Performance certificate from the customers regarding satisfactory performance of

    machine supplied to them

    58.9BHEL reserves the right to verify the information provided by vendor. In case theinformation provided by vendor is found to be false/incorrect the offer shall be rejected. VENDOR TO NOTE

    FURNISH DETAILS