Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant
Transcript
Page 1: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Delivering Growth in DiamondsJune 2012

LISTEDP R E M I U M

Construction underway of the new Cullinan modular tailings plant

Page 2: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

2

Important Notice

These Presentation Materials do not constitute or form part of any invitation, offer for sale or subscription or any solicitation forany offer to buy or subscribe for any securities in the Company nor shall they or any part of them form the basis of or be reliedupon in any manner or for any purpose whatsoever.

These Presentation Materials must not be used or relied upon for the purpose of making any investment decision or engaging inan investment activity and any decision in connection with a purchase of shares in the Company must be made solely on thebasis of the publicly available information. Accordingly, neither the Company nor its directors makes any representation orwarranty in respect of the contents of the Presentation Materials.

The information contained in the Presentation Materials is subject to amendment, revision and updating in any way without noticeor liability to any party. The presentation materials contain forward-looking statements which involve risk and uncertainties andactual results and developments may differ materially from those expressed or implied by these statements depending on avariety of factors. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of theinformation or opinions contained herein, which have not been independently verified.

The delivery of these Presentation Materials shall not at any time or in any circumstance create any implication that there hasbeen no adverse change, or any event reasonably likely to involve any adverse change, in the condition (financial or otherwise) ofthe Company since the date of these Presentation Materials.

The Presentation Materials are confidential and being supplied to you for your own information and may not be reproduced,further distributed, passed on, or the contents otherwise divulged, directly or indirectly, to any other person (except the recipient’sprofessional advisers) or published, in whole or in part, for any purpose whatsoever. The Presentation Materials may not be usedfor the purpose of an offer or solicitation to subscribe for securities by anyone in any jurisdiction.

Page 3: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Discover Petra Diamonds

• London’s largest quoted diamond mining group (LSE: PDL) – member of the FTSE 250

• Major diamond resource of +300 million carats

• Exceptional organic growth profile – on track to increase production to over 5 Mcts by 2019

• Brownfields expansion – proven operations with long histories of production

• Sustainability at the heart of Petra – securing a long-term future for our assets

3

Page 4: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Proven Track Record – Continuous Growth

4

0.0

0.5

1.0

1.5

2.0

2.5

FY2007

FY2008

FY2009

FY2010

FY2011

FY2012

Gross Production Profile

Strong production growth due to Finsch acquisition

Mcts

Major increase due to higher

volume Cullinan mine

0

50

100

150

200

250

300

350

FY2007

FY2008

FY2009

FY2010

FY2011

FY2012

Gross Revenue Profile

US$ million

Acquisition of Koffiefontein

Recovery in rough diamond prices & sale of 507 ct Cullinan Heritage

Finsch contribution boosts revenue

Decreased revenue due to the economic downturn

Q3 FY 2012

Q3 FY 2012

* The above columns suggesting full year FY 2012 production and revenue levels are for illustrative purposes only and are not market forecasts

* *

Page 5: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

A Diversified Portfolio

• Focus on Africa – source of 60% of the world’s diamonds by value

• Eight producing mines – provides flexibility in terms of portfolio performance

5

LDD sampling campaign currently underway on KX36

Page 6: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Diamond Market – Key Demand Drivers

6

Per capita consumption of key commodities: China relative to the US “steady state”

• Confidence in continued strong demand growth from China

• 5 year economic plan seeks to boost China’s domestic consumption

• Demand driven by urbanisation trend and growing middle class

• Chow Tai Fook: “Demand for mid-quality…diamonds over the next three to five years will be very strong (estimate +30% pa), creating a significant imbalance between supply and demand….We believe that the jewelry market in China is just beginning to take off.” (Rapaport – 1 May 2012)

Luxury purchases:An aspirational ladder as disposable income increases

Source: BofA Merrill Lynch Global Metals and Mining Research Source: Goldman Sachs Research estimates

China is already at 30% of world consumption of luxury handbags

Page 7: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Aim Of Expansion Programmes – Undiluted Ore

7

• Current mining at underground pipe mines taking place in diluted mature caves and low grade remnants

• Expansion programmes will open up fresh block caves, delivering access to undiluted ore in higher grade areas

• Cullinan grade expected to rise from ~34cpht to ~50cpht; Finsch grade expected to rise from ~33cpht to ~47cpht; Koffiefontein grade expected to rise from ~5cpht to ~8cpht

• Substantial higher revenue per tonne leading to increased margins

• Will put less stress on processing system (waste rock is harder & more abrasive than kimberlite)

Block cave mining schematic

Page 8: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Expansion Programmes – Key Milestones

8

FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

PHASE ONEMajor underground development and infrastructure build

PHASE TWOFinalise ore-handing systems;

Large percentage of production starts to come from higher grade areas once access gained to

undiluted ore

Cullinan – shaft sinking and related infrastructure at Cullinan (taking shaft from 580m to 930m)

First access to undiluted ore from FY 2015

New tailings plant – first module to be commissioned H1 FY 2013; ramping tailings up to 4 Mtpa by FY 2014

Cullinan – establish new production level at ~830m

New C-Cut block cave to provide access to undiluted ore

Replace ore-handling system with new system, taking ore direct to new shaft bottom

Finsch – development of Sub Level Caves between 700m to 780m

First access to undiluted ore from FY 2015

Deepening of shaft to 950m

Finsch – new Block 5 cave to provide access to undiluted ore

Related shaft and ore-handling infrastructure in place at 880m

Koffiefontein – development of Sub Level Caves between 560m and 600m

Koffiefontein – new block cave at 690m level provides access to undiluted ore

Kimberley Underground – commissioning of Wesselton main plant; ramp up tonnages to 1 Mtpa

Williamson – enhanced rebuild of existing plant (3 Mtpa); commissioning completed, production now restarted

Decision on longer term phase two expansion (10 Mtpa) FY 2013

FY 2019

+5 Mctpa

Page 9: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Expansion Programmes – FY 2012: A Snapshot

9

Cullinan: Underground development Finsch: Underground development

Williamson: Rebuilt plant Kimberley UG: Plant constructionKoffiefontein: Underground development

Page 10: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Robust Balance Sheet

30 Apr 2012(US$m)

31 Dec 2011(US$m)

Cash and cash equivalents:

Bank 17.5 45.1

Diamond inventories of 332,218 carats (stated at the lower of cost or net realisable value)

34.7 38.1

Total 52.2 83.2

Loans and borrowings:IFC / RMB Debt Facilities - ca. US$79m (US$40m IFC; R300m RMB)* (69.9) (70.5)

RMB Revolving Credit Facility - ca. US$39m (R300m)** undrawn undrawn

FNB Working Credit Facilities - ca.US$23m (R180m)*** (3.0) -

Deferred Cullinan consideration (Al Rajhi) – repaid Q3 FY 2012 - (6.0)

Total (72.9) (76.5)

BEE loans due to Petra 128.7 117.0

Net cash, diamond stock, borrowings and BEE loans due 108.0 123.7

10

* IFC interest charged at US$ 6 month LIBOR + 4.5%; RMB interest charged at South African 3 month JIBAR +4.5%** Interest charged at South African 3 month JIBAR +2.5% *** Interest charged at ca. JIBAR +2.4%

An end April exchange rate of R7.74/$1 (Dec: R8.12/$1) has been used in converting the Rand denominated amounts reflected above

Page 11: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

KX36 – New Kimberlite Discovery

• New discovery in Botswana

• Homogeneous orebody

• Core drilling and micro-diamond sampling campaign indicated:

• Initial modelled (undiluted) diamond grade between 75-180 cpht

• Indications of a reasonably coarse diamond size distribution from MiDAmodelling

• Potential kimberlite tonnage between 28 Mt and 34 Mt to a depth of 516m below surface

• Surface area interpreted to be ~5 ha under 78m of Kalahari overburden

• LDD and bulk sampling campaign commenced in April 2012

• Results expected later in the year

11Calcretized KimberliteWeathered KimberliteFresh Kimberlite

Core Drilling516m

Large Diameter (24”) Drilling

516m

Page 12: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Production & Revenue Portfolio Split

Gross Production

FY 2011: US$221 million FY 2019: ca.US$1.3 billion*

FY 2019 figures are management estimates* Calculated using a 4% real price increase

12

Cullinan 0.9

Williamson 0.6

Koffiefontein 0.05

Kimberley 0.2

Fissures 0.08

Cullinan 2.4

Fissures 0.1

Williamson 0.03

Koffiefontein 0.1

Kimberley 0.06 Finsch 1.9

Cullinan 140.2

Koffiefontein 30.8

Fissures 21.8

Williamson 9.5

Kimberley 18.2 Cullinan 489

Williamson 179 Koffiefontein 85

Kimberley 70

Fissure 52

Finsch 419

Q3 FY 2012: US$91 million

Cullinan 30.6

Koffiefontein 6.4

Kimberley 5.8

Fissures 4.1

Finsch 51.1

FY 2011: 1.1 million carats FY 2019: 5.4 million carats

Cullinan 222,196

Koffiefontein 9,903

Fissures 17,472

Williamson 18,983

Kimberley 10,903

Finsch 343,051

Q3 FY 2012: 622,508 carats

Gross Revenue

Page 13: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Sustainability – At The Heart Of Petra

Investing in education and communities

Mwadui Primary School – owned and operated by Williamson

Promoting biodiversity and progressive rehabilitation

The Williamson Nursery, with the capacity to raise 500,000 seedlings annually

Portable skills workshop at Koffiefontein – Boiler making

Focus on training

Petra cultivates a culture of continuous improvement

Developing our people

Health and safety of employees is top priority for management

Formation of Board level HSSE Committee in FY 2012

Petra striving for zero harm across its operations

Left: Petra’s LTIFR Rate

Health and Safety

Page 14: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Focus & Strategy

14

Core objective to increase production fivefold to +5 Mctpa through organic growth

Increaseoutput

Focused oncash-generative

diamond production Optimise

recoveriesDrive

efficiencies

• Expansion programmes to increase production at each operation

• Utilise resources available including tailings deposits

• Programmes to deepen underground mines to establish new block caves and provide access to undiluted ore

• Focus on “value” as opposed to “volume” production

• Optimise plant processing and security

• Contain costs on a unit basis• Utilise in-house skills, alongside

contractors, to execute capexprogrammes

Steadily growing annual production, with a target of over 5 million carats by FY 2019

Maintaining a culture of effective cost control

Aiming to improve operating margins at each mine over time

Page 15: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Appendix

Page 16: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Capital Structure

16

High Quality Shareholder Base 7 June 2012

Al Rajhi Holdings W.W.L. 13.3%

Saad Investments Company Ltd/AWAL Bank 12.1%

JP Morgan Asset Management Holdings Inc. 7.9%

Capital Group International, Inc. 7.3%

Prudential plc group of companies* 5.1%

Scottish Widows Investment Partnership 5.0%

T. Rowe Price 4.9%

BlackRock Investment (UK) Limited 4.2%

Kames Capital 3.3%

Ignis Investment Services Limited 3.0%

Directors 2.8%

Listing LSE: PDL

Average daily trading volume (shares) – YTD

1.2m

Shares in issue 504m

Free float 72%

Market cap @ 134p (7 June 2012)

£677m

Share Price Chart (1 year)

* of this holding, 25,467,015 shares are held by M&G Investment Funds 3

Page 17: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

The Petra Board

Adonis Pouroulis (41)Non-Executive Chairman

Successful mining entrepreneurFounded Petra Diamonds in 1997 and floated first diamond company on AIMAlong with fellow directors, built Petra into pan-African diamond group with over 3,600 employeesInstrumental in raising funds to help finance and structure early stage mining companies in Africa

Johan Dippenaar (54)CEO

One of South Africa’s most successful diamond entrepreneurs with +20 years’ experience Founded diamond group in 1990 and grew portfolio to three producing mines before listing as Crown Diamonds on ASXMerger with Petra in 2005 – now at helm of London’s largest diamond company

David Abery (49)Finance Director

Extensive experience as Chief Financial Officer in South African and UK business environmentsIn-depth knowledge of London capital marketsIntegral to structuring and deliverance of strategic group corporate development, including acquisitions and joint ventures

Jim Davidson (67)Technical Director

Acknowledged world authority on kimberlite geology and exploration+20 years’ experience in mine managementFormerly Head of Diamond Exploration for Rio Tinto across Southern AfricaAs Technical Director of Crown Diamonds, managed specialist underground fissure mines over a decade

Dr Patrick Bartlett (66)Independent Non-Executive Director

Acknowledged expert on kimberlite geology and design and geotechnical aspects of block cavingFormerly Chief Geologist for De Beers; responsible for all kimberlite mines in South AfricaIn-depth knowledge of several Petra mines, having worked at Finsch, Koffiefontein, Kimberley Underground, plus was geologist at Cullinan between 1983 to 2003Since retiring has been involved in block caving projects for BHP, Anglo and Rio Tinto

Gordon Hamilton (66)Independent Non-Executive Director

Extensive experience as a NED across wide range of businesses, both JSE and LSE listed; chairs Audit Committee for all these companiesFormerly a partner for +30 years at Deloitte & Touche LLP; primarily responsible for multinational and FTSE 100 listed company audits, mainly in mining, oil & gas, and aerospace and defence; headed up Deloitte South Africa desk in LondonServed for 9 years as member of the UK Financial Reporting Review Panel

Dr Omar Kamal (38)Non-Executive Director

Managing Director for Al Rajhi (Petra’s largest shareholder)Co-manages international investments in various asset classes – focus on equities, private equity, real estatePossesses broad expertise and knowledge ranging from past experience as an academic, working in the financial industry and strategy consultant with a global financial services arm

The company is actively seeking the appointment of one or more independent NEDs

17

Page 18: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

An Exceptional Growth Path

18

Cullinan

July 2008

Block Cave

16yr Mine Plan+50yr Potential Life

Williamson

November 2008

Open Pit

17 yr Mine Plan+50yr Potential Life

Kimberley UG

May 2010

Block Cave

11yr Mine Plan+12yr Potential Life

Finsch

Block Cave

18yr Mine Plan+25yr Potential Life

Koffiefontein

July 2007

Front Cave

14yr Mine Plan+20yr Potential Life

September 2011

Petra has acquired the following five diamond mines from De Beers:

Successful track record:• Focus on efficiencies: right-size operation, restructure cost base & empower management• Industry leading team utilises in-house capabilities to execute capex programmes• Focus on ‘value’ as opposed to ‘volume’ production; optimise plant processing & security to

ensure recovery of full spectrum of diamonds• Achieve best rough diamond prices through open tender system

Page 19: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Cullinan – Development Programme

19

Cullinan Mining Schematic

BA5

Rock Shaft

Men & MaterialShaft

Current Shaft Bottom580 Level

630m Level

AUC South and BAW Phase 1

BB1E

830m Level

1073m base of Resource(open ended at depth)

930m Shaft Bottom

Current Infrastructure

Planned Infrastructure

C-CUTPhase 1

2000metres

Current extent of South Decline

16Ha @830 Level

Loading Level

880m Shaft Bottom

CurrentShaft Bottom805 Level

732m Level

Expansion Plan – to take production from +895,000 ctpa to ca. 2.4 Mctpa by FY 2019 (2.0 Mctpa ROM & 0.4 Mctpa tailings)• South Decline to establish

production at 830m and then on to bottom of new shaft at 930m – end FY 2013

• North Decline to create further access to 830m production level – commenced

• Shaft deepening from 580m to 930m to replace the current conveyor belt ore-handling system – mid FY 2015

• Contract for shaft deepening & related infrastructure awarded

• Initial production from new C-Cut cave – FY 2015

• Tailings programme ramp up to treat 4 Mtpa by FY 2014

• Upgrading and streamlining of plant facilities in order to treat 4 Mt underground & 4 Mt tailings –from FY 2015, 4 year programme

North Decline

Page 20: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Finsch – Development Programme

20

Kimberlite Footprint @880m Level:Main pipe: 3.7haPrecursors: 1.5ha

Finsch Mining SchematicExpansion Plan – to take production from ~1.5 Mctpa to just under 2 Mctpa by FY 2018 (1.6 Mctpa ROM & 0.3 Mctpatailings)• Current mining of Block 4 at

630m – FY 2012 to FY 2014

• Access to Sub Level Cave at ~700m – 780m – FY 2013

• Mining from Sub Level Cave – commencing H2 FY 2014

• Deepening of shaft to 950m and ore-handling infrastructure on 880m Level – End FY 2015

• Block Cave planned at 880m – FY 2016 onwards

• Ramp up ROM to 3.5 Mpta –FY 2018

• Treatment of Pre 1979 Tailings – until FY 2015

• Treatment of Post 1979 Tailings – FY 2015 to FY 2020

Vent Shaft

ProductionShaft

630m Level670m Level

780m Level

Shaft Bottom825m

880m Block Cave

950mDecline to 880m

SLC Conveyor

Ore Handling

Sub level Cave

Block 4 Pillars

Block 4 Remaining

Block 5Not in

currentmine plan

Precursor orebody –

not in current

mine plan

Current Infrastructure

Planned Infrastructure880m base of Resource(open ended at depth)

Page 21: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Williamson – Overview

21

Granite BrecciaRVKBoumaShale IslandBVKPK

Geology

205m

LOM Pit Shell

Schematic showing cut-away geology and planned open pit

N1km

Williamson Kimberlite Pipe SchematicExpansion Plan – Key Components

• Stockpile (due to pit shaping activities) of ca. 900,000 t (>50,000 cts)

• Enhanced rebuild of existing plant (3 Mtpa) completed and commissioned; production from main pit restarted – Q3 FY 2012

• Longer term expansion plan to enable a 10 Mtpa operation under review – Decision FY 2013

Page 22: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Koffiefontein – Overview

22

Koffiefontein Kimberlite Pipe SchematicExpansion Plan – to take production to ca. 100,000 ctpa by FY 2017 (90,000 ctpa ROM & 10,000 ctpa tailings)

• Lower than expected ROM production from planned areas supplemented by ore from Ebenhaezer open pit

• Installing new sub-level cave between 560m to 600m Level – FY 2013 to FY 2015

• Installing new block cave at 690m Level –FY 2016

Page 23: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Kimberley Underground – Overview

23

4.5 ha @ 870m Level

0.5 ha @ 845m Level

3.5 ha @ 995m Level

Kimberley Underground Kimberlite Pipes SchematicExpansion Plan – to take production to ca. 120,000 ctpa by FY 2013

• Construction and commissioning of main plant (40,000 tpm) at Wesselton – Q4 FY 2012

• Underground development – FY2012 onwards

• Sampling programme underway to extend mine life – FY 2012 onwards

Page 24: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

24

Financial Year 2012 2013 2014 2015 2016 2017 2018 2019Operation Area

Finsch Existing Block 4 (630 meter Level)‐ Block 4 pillars‐ SLC Block 4 precursor‐ SLC 770 meter Level‐ Block 5 880 meter Level Development tonnes ROM Tonnes (Mt) 2.2  3.2  3.2  3.2  3.5  3.5  3.5  3.5 Tailings Tonnes (Mt) 1.6  2.8  3.5  3.5  3.5  3.0  3.0  3.0 Expansion Capex (US$m) 34.2  107.8  110.4  65.4  29.9  ‐ ‐ ‐Stay‐in‐business Capex (US$m) 4.7  6.6  6.9  6.9  7.1  6.8  6.8  6.9 

Cullinan ROM Tonnes (Mt) 2.4  2.4  2.4  2.6  2.6  2.8  3.2  4.0 Tailings Tonnes (Mt) 1.0  3.0  4.0  4.0  4.0  4.0  4.0  4.0 Expansion Capex (US$m) 60.9  78.5  74.8  52.6  20.7  19.0  19.0  19.0 Stay‐in‐business Capex (US$m) 4.2  8.6  6.9  7.0  6.1  6.1  6.1  6.3 

Williamson ROM Tonnes (Mt) 0.9  5.1  10.0  10.0  10.0  10.0  10.0  10.0 Expansion Capex (US$m) 45.9  35.3  ‐ ‐ ‐ ‐ ‐ ‐Stay‐in‐business Capex (US$m) 4.3  6.2  6.5  6.2  5.9  5.6  5.3  5.0 

Koffiefontein ROM Tonnes (Mt) 0.6  0.8  1.0  1.1  1.2  1.2  1.2  1.2 Tailings Tonnes (Mt) 0.9  0.9  0.7  0.6  0.5  0.5  0.5  0.5 Expansion Capex (US$m) 7.5  8.5  9.2  5.9  8.9  ‐ ‐ ‐Stay‐in‐business Capex (US$m) 4.0  4.2  4.3  2.8  2.6  2.5  2.5  2.4 

Kimberley U/G ROM Tonnes (Mt) 1.1  1.2  1.0  1.0  1.0  1.0  1.0  1.0 Expansion Capex (US$m) 17.9  9.6  7.4  ‐ ‐ ‐ ‐ ‐Stay‐in‐business Capex (US$m) 3.0  2.9  2.4  2.4  2.3  2.3  2.2  1.7 

Fissures ROM Tonnes (Mt) 0.2  0.3  0.3  0.3  0.3  0.3  0.3  0.3 Tailings Tonnes (Mt) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Expansion Capex (US$m) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Stay‐in‐business Capex (US$m) 2.1  2.1  2.1  2.0  1.9  1.9  1.9  1.8 

Petra Diamonds(Gross)

ROM Tonnes (Mt) 7.4  12.9  17.9  18.2  18.6  18.8  19.2  20.0 Expansion Capex (US$m) 166.5  239.7  201.7  123.9  59.5  19.0  19.0  19.0 Stay‐in‐business Capex (US$m) 22.3  30.6  29.1  27.2  25.9  25.2  24.9  24.1 

All monetary values stated in 2011 money terms; ZAR:USD rate used of R6.75 – as published in September 2011 at the time of Petra’s prelim results; will be subject to revision in September 2012

Capex Profile

Page 25: Delivering Growth in Diamonds...Delivering Growth in Diamonds June 2012 LISTED PREMIUM Construction underway of the new Cullinan modular tailings plant 2 Important Notice These Presentation

Further enquiries:Petra Diamonds