+ All Categories
Home > Documents >  · Desi n fees: 5 r cent Hard andscape: 80 per cent (inclusive of 10 per cent lighting) SGft...

 · Desi n fees: 5 r cent Hard andscape: 80 per cent (inclusive of 10 per cent lighting) SGft...

Date post: 13-Sep-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
3
Transcript
Page 1:  · Desi n fees: 5 r cent Hard andscape: 80 per cent (inclusive of 10 per cent lighting) SGft landscape: 1 5 per cent Contractors: Outdoor Space Design (hard landscape); Tim Mackey
Page 2:  · Desi n fees: 5 r cent Hard andscape: 80 per cent (inclusive of 10 per cent lighting) SGft landscape: 1 5 per cent Contractors: Outdoor Space Design (hard landscape); Tim Mackey
Page 3:  · Desi n fees: 5 r cent Hard andscape: 80 per cent (inclusive of 10 per cent lighting) SGft landscape: 1 5 per cent Contractors: Outdoor Space Design (hard landscape); Tim Mackey

Recommended