221
INTEGR DET RATED WATERS BLOCK – M TAILED PR (IWMP- SHED MANAGEM MASAULI, BANI K DISTRICT – BA Submitte Departme Water Res La 1 ROJECT RE -IIIrd, BARA MENT PROGRAM KODAR, SIRAUL ARABANKI (UTT ed to: - ent of Land Dev sources. Luckn and Developme EPORT (D. ABANKI) MME IN KALYAN LI GAUSPUR & D TAR PRADESH) velopment & now (U.P.) nt & Water Re .P.R) NI RIVER WATE DARIYABAD, esources Govern ERSHED, Prepare Bhoomi S Departme & Water nment of U. P. L d By:- Sanrakshan Adh ent of Land Dev Resources, Bar Lucknow hikari velopment rabanki
Transcript
Page 1: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

 

 

INTEGR

DET

RATED WATERSBLOCK – M

    

 

 

 

 

 

 

 

 

 

 

 

TAILED PR(IWMP-

SHED MANAGEMMASAULI, BANI K

DISTRICT – BA

SubmitteDepartmeWater Res

La1 

ROJECT RE-IIIrd, BARAMENT PROGRAMKODAR, SIRAULARABANKI (UTT

ed to: - ent of Land Devsources. Luckn

and Developme

EPORT (D.ABANKI) MME IN KALYANLI GAUSPUR & DTAR PRADESH)

velopment & now (U.P.)

nt & Water Re

.P.R)

NI RIVER WATEDARIYABAD,

esources Govern

ERSHED,

PrepareBhoomi SDepartme& Water

nment of U. P. L

d By:-Sanrakshan Adhent of Land DevResources, Bar

Lucknow

hikari velopment rabanki

Page 2: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

CERTIFICATE

This is to be certified that the proposed Project (IWMP-III) comprising five micro-watersheds of district Barabanki, Uttar Pradesh has

been selected for its sustainable development on watershed basis under Integrated Watershed Management Programme. The land is

physically available for proposed interventions and is not overlapping with any other schemes. It will be developed as per Common

Guidelines for Watershed Development Project-2008, GOI, New Delhi. The significant results will be achieved through proposed

interventions on soil and water conservation, ground water recharge, availability of drinking and irrigation water, agricultural production

systems, live stock, fodder availability, livelihoods of asset less, capacity building, etc. The proposed Detailed Project Report of

IWMP-III, 2010-11 is approved for its implementation.

Soil Conservation Officer IWMP-III Dept. of LDWR, Barabanki, UP Deputy Director LDWR, Barabanki, UP Project Director DRDA, Barabanki, UP

Chief Development Officer Distt.-Barabanki, U.P.

   

Page 3: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

EXECUTIVE SUMMARY 

The  Government  of  India  takes  Integrated  Watershed  Management  Programme  (IWMP)  as  a  key  strategy  for  improving  productivity  and livelihoods  in the rain‐fed and drought‐prone regions. Watershed  is an organic unit  in the natural and ecological systems.  It  is an aggregation of numerous natural resources. The exploitation and utilization of watershed should be a comprehensive development process of all resources that follows  the  principle  of  integrated management  and  allocation.  It  is  the  essential  condition  to  guarantee  the  environmental  protection  and sustainable development in watershed areas. 

The main objectives of the IWMP are to restore the ecological balance by harnessing, conserving and developing degraded natural resources such as soil, vegetative cover and water.  The outcomes are prevention of soil  run‐off,  regeneration of natural vegetation, rain water harvesting and recharging of  the ground water  table.  This enables multi‐cropping and  the  introduction of diverse agro‐based activities, which help  to provide sustainable livelihoods to the people residing in the watershed area.   

IWMP – III, 2010‐11 project  is  located  in the Masauli, Bani Kodar, Sirauli Gauspur & Dariyabad Block of Barabanki District  in the state of Uttar Pradesh. The project area is situated from 26070’19” Latitude North to 26060’20”  North and 81032’28”Longitude East to 81046’36”  East. The average rainfall of  the project area  is 907 mm and  the average maximum  temperature  ranges  from 20  0C  to 42  0C     and average minimum  temperature ranges from 9 0C to 27 0C. 

The project  is a cluster of 05 Micro watersheds. The total project (geographical) area of the micro watershed cluster  is about 7116 ha out of this 3819 ha has been undertaken to be treated under Integrated Watershed Management Program (IWMP‐III) with starting year 2010‐11 

This  project  proposes  to  generate  of  both wage  employment  and  self  employment  opportunities. Wage  employment would  be  created  by engaging people in watershed physical works like construction of earthen bunds, farm bunds, village pond, plantation, etc. Self employment would be created by providing the people with cash support  in the form of direct  livelihood activities  like agriculture, animal husbandry and enterprise development. This will also help in checking of migration. 

It  is also expected that after the  implementation of the proposed activities during IWMP‐III, there would be a conspicuous  increase  in the gross cultivated  area,  cropping  intensity,  food  production,  fodder  production,  fuel  production,  average  income  from  agriculture, milk  production, irrigated area, area under agro‐forestry etc. An increase in overall value of land and a decrease of depth of ground water is expected. A significant amount of employment generation and women benefitting from SHG’s is also expected. 

The proposed watershed area has been  identified by the state department under IWMP project by proper prioritization of different parameters for watershed selection criteria. The SLNA has nominated Bhoomi Sanrakshan Adhikari, Barabanki as P.I.A  for the aforesaid project. The area of watershed  is  proposed  to  be  taken  by  Bhoomi  Sanrakshan  Adhikari,  Department  of  Land  Development  & Water  Resources,  Barabanki,  for Integrated Watershed Management Programme (IWMP‐III) starting from the year 2010‐11. The project will be completed by 2014‐15. 

 

 

Page 4: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

1

Contents S.No.  Particulars  Page Nos. 1.   INTRODUCTION AND PROJECT BACKGROUND  3 1.1  Project Background   3 1.2  Need and scope for Watershed Development Programme  5 1.3  Weightage for the selection of the watershed   5 1.4  Details of ongoing watershed programme  6 2.  GENERAL DESCRIPTION OF PROJECT AREA  7 2.1  Location   7 2.2  Area and Land use  11 2.3  Physiography  14 2.4  Climate  15 3.  BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL  19 3.1  Socio‐Economic Analysis  19 3.2  Land holding pattern  21 3.3  Migration: Pre Project Status  24 3.4  Crop & Productivity  32 3.5  Livestock  36 3.6  Livelihood Status  40 4.  INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT  54 4.1  Project Implementing Agency  54 4.2  Details of formation of User Groups  65 4.3  Details of Self Help Groups  67 4.4  Convergence in IWMP‐I  69 5.  MANAGEMENT / ACTION PLAN  70 5.1  Entry Point Activity (EPA)  70 5.2  Work Phase  71 5.3  Livelihood Action Plan  100 5.4  Production system Action Plan  104 6.  CAPACITY BUILDING PLAN  115 7.  MONITORING AND EVALUTION  117 8.  PHASING OF PROGRAMME AND BUDGETING  118 8.1  Annual Action Plan  118 

Page 5: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

2

S.No.  Particulars  Page Nos. 8.2  Details of Convergence  124 9.  CONSOLIDATION AND WITHDRAWAL STRATEGY  125 10.  EXPECTED PROJECT OUTCOME  126 10.1  Employment generation and checking migration  126 10.2  Other expected outcome  126 11.  MAPS 

(Satellite  Image of  the Project Area, Base Map, Contour Map,   Drainage map, Ground Water Map,   Land use/cover Map, Project Area Map, Slope map,  Soil Map,  Lithology Map & MWSs Map) 

128 

12.  ANNEXURE‐I STRUCTUREWISE COST DETAILS  1 13.  ANNEXURE‐II WDF CONTRIBUTION DETAILS  56 14.  ANNEXURE‐III COST OF WATERSHED WORKS GRAM PANCHAYAT WISE AND MWS WISE   70 

15.  ANNEXURE‐IV PARAMETERS  71 

  

Page 6: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

3

 CHAPTER‐1 INTRODUCTION AND PROJECT BACKGROUND 

 

 1.1: Project Background:   

IWMP‐3rd project is located in Masauli & Dariyabad Block of Barabanki District, U.P. The project is a cluster of   05 Micro watersheds. The total 

project  (geographical) area of  the watershed cluster  is about 8515 ha out of  this 5087 ha has been undertaken  to be  treated under  Integrated 

Watershed Management Program (IWMP‐3rd) with starting year 2010‐11. 

Table 1.1: Basic Project Information: 

 

Sl.No.  Details  Nos.  Area (ha.) 

1  2  3  4 

1  Total  Geographical area and  watersheds in 

the District                                                               

321  383000 

2  Workable  Micro Watersheds  and 

Geographical area 

245  335346 

3  Micro Watersheds already treated by LDWR 

& other agencies 

89  97902 

4  Balance Micro Watersheds/ Geographical 

area for treatment (After IWMP‐3rd) 

156  237444 

 

 

 

Page 7: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

4

Table 1.2:  Approved plan Preliminary Project Report (PPR) by Steering Committee (SC), Govt. of India:  

Year  Project/Phase  IWMP‐3RD 

MWS  Geographical Area/Treatable 

(ha) 

Project  Cost 

Rs. lacs 

PIA  S.C. Meeting Date 

1  2  3  4  5  6  7 

2010‐11  IWMP‐3rd  05  8515/5087  610.44  B.S.A, Land Development & Water Resource, 

Barabanki 

10‐03‐2010 

 

 Table 1.3: Details of Micro Watersheds:  

S.No.    MWS Code     MWS Name  Treatable Area (ha) Name of River/Drain in each MWS 

1  2B2C7d2a  Ambaur  570  Kalyani River 

2  2B2C7d2c  Suryapur Khapraila  814  Kalyani River 

3  2B2C7d2d  Akhberpur Dhanethi  864  Kalyani River 

4  2B2C7g1a  Gajipur  1209  Kalyani River 

5  2B2C7g1b  Mehaura  1630  Kalyani River 

      Total  5087    

      

Page 8: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

5

1.2: Need and scope for Watershed development programme: 

Watershed Development Programme  is prioritized on  the basis of  thirteen parameters namely Poverty  index, Percentage of SC/ST population, Actual wages,  Percentage  of  small  and marginal  farmers,  Ground  water  status, Moisture  Index,  Area  under  rainfed  agriculture,  Drinking  water  situation, Percentage of the degraded land, Productivity potential of the land, Continuity of another watershed that has already been treated, and Cluster approach for the area.   Cluster approach was followed taken  into consideration for micro‐watersheds covering a total geographical area of 8515 ha with a cumulative score of 70.50 (Reference Table given below)‐  

1.4: Weightage for the selection of the watershed: 

Project name Weightage

IWMP-3rd i ii iii iv v vi vii viii ix x xi xii xiii Total

5 5 5 10 3 0 5 7.5 5 10 5 10 0 70.50

 

Weigthage Criteria (for score): 

S.No.  Criteria Maximum 

Score Ranges & Scores 

i  Poverty index (% of poor to population) 

10 Above 80 % (10)  80 to 50 % (7.5)  50 to 20 % (5)  Below 20 % (2.5)  

ii  % of SC/ ST population  10 More than 40 % (10)  20 to 40 % (5)  Less than 20 % (3)   

iii  Actual wages   

5  

Actual wages are significantly lower 

than minimum wages (5)  

Actual wages are equal to or higher than minimum wages (0)  

   

iv  % of small and marginal farmers  10 More than 80 % (10)  50 to 80 % (5)  Less than 50 % (3)   

v  Ground water status   5  Over exploited (5)  Critical (3)  Sub critical (2)  Safe (0)  

Page 9: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

6

S.No.  Criteria Maximum 

Score Ranges & Scores 

vi  Moisture index/  DPAP/ DDP Block 

15  ‐66.7 & below (15) DDP Block  

‐33.3 to ‐66.6 (10) DPAP Block  

0 to ‐33.2 (0) Non DPAP/ DDP Block  

 

vii  Area under rain‐fed agriculture  15 More than 90 % (15)  80 to 90 % (10)  70 to 80% (5)  Below 70 % (Reject)  viii  Drinking water   10  No source (10)  Problematic village 

(7.5)  Partially covered (5)  Fully covered (0)  

ix  Degraded land   

 15 

High – above 20 % (15)  

Medium – 10 to 20 % (10)  

Low‐ less than 10 % of TGA (5)  

 

x  Productivity potential of the land  15 Lands with low production & where productivity can be 

significantly enhanced with reasonable efforts 

(15)  

Lands with moderate 

production & where productivity can be enhanced with reasonable efforts (10) 

Lands with high production & where productivity can be marginally enhanced with reasonable efforts 

(5)  

 

xi  Contiguity to another watershed that has already 

been developed/ treated   

 10

Contiguous to previously treated 

watershed & contiguity within the micro watersheds in the project (10)  

Contiguity within the micro 

watersheds in the project but non contiguous to 

previously treated watershed (5)  

Neither contiguous to previously treated watershed nor 

contiguity within the micro watersheds in 

the project (0)  

 

xii  Cluster approach in the plains (more than one contiguous micro‐

watersheds in the project)  

15 Above 6 micro‐watersheds in cluster (15) 

4 to 6 micro watersheds in cluster (10)  

2 to 4 micro watersheds in cluster 

(5)  

 

xiii  Cluster approach in the hills (more than one contiguous micro‐watersheds in the project)  

15 Above 5 micro‐watersheds in cluster (15)  

3 to 5 micro watersheds in cluster (10)  

2 to 3 micro watersheds in cluster 

(5)  

 

  Total  150  150  90  41  2.5 

 

1.4: Details of ongoing watershed programme:  

Presently, IWMP  is going on in the watershed.  

Page 10: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

7

CHAPTER‐2 

GENERAL DESCRIPTION OF PROJECT AREA  

2.1: Location:  

The  selected watershed  in  the  catchment of Kalyani River  in Barabanki district  (U.P.).  This Watershed  cluster  includes  35  villages of  21 Gram panchayats.  The livelihood of these people is primarily based on rainfed agriculture, animal husbandry, wage labour, goat, sheep and poultry.      

Table 2.1: General Description of the Project Area  

S.No. Name & code 

of MWS Longitude (E)  Latitude (N) 

Gram Panchayat 

 Village Geographical Area of Village Included in 

MWS (ha) 

Distance (km.)of  Important/approach road (Bhitariya to Dariyabad) 

1  2  3  4  5  6  7  8 

1 Ambaur 2B2C7d2a 

81023’34” to 81027’44” 

26051’34” to 26054’2” 

Ambaur Ambaur  591  2 Rasoolpur  63  2 S.Total  654    

Chandawal Chandawal  392  3 Husepur  61  2 S.Total  453    

Suryapur Khapraila 

Suryapur Khapraila  59  3 

Total     1166    

2 Suryapur Khapraila 2B2C7d2c 

81021’2” to 81024’35” 

26051’44” to 26054’11” 

Suryapur Khapraila 

Suryapur Khapraila  205  3 Godari  148  2 S.Total  353    

Ambaur  Ambaur  38  2 Palhari  Palhari  375  2 

Sarai Ka Sthan  Sarai Ka Sthan  159  4 Shah pur  Shah pur  179  5 Akhberpur Dhanethi 

Ingholia  38  6 

Baghoura  Baghoura  126  4 Total     1268    

Page 11: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

8

S.No. Name & code 

of MWS Longitude (E)  Latitude (N) 

Gram Panchayat 

 Village Geographical Area of Village Included in 

MWS (ha) 

Distance (km.)of  Important/approach road (Bhitariya to Dariyabad) 

1  2  3  4  5  6  7  8 

3 Akhberpur Dhanethi  2B2C7d2d 

81018’49” to 81022’21”  

26052’2” to 26054’29” 

Akhberpur Dhanethi 

Akhberpur Dhanethi  306  3 Yakoot Ganj  45  3 Ingholia  37  6 S.Total  388    

Ichaulia  Ichaulia  375  3 Pyarepur Saraiya 

Pyarepur Saraiya  215  4 

Palhari  Palhari  242  2 Sarai Ka Sthan 

    

Sarai Ka Sthan  32  4 Chilauki  177  2 S.Total  209    

Total     1429    

4 Gajipur  

2B2C7g1a 81027’55” to 81028’51”  

26050’52” to 26053’53”  

Ghazipur  Ghazipur  914  2 

Beerkithai 

Akhberpur Mangrauda 

208  4 

Beerkithai  176  5 S.Total  384    

Danapur Kyampur 

Danapur Kyampur  142  4 

Pahrupur Pahrupur  101  3 Inderpur  241  4 S.Total  342    

Mehaura  Mehaura  38  3 Said Khanpur  Said Khanpur  455  4 

Total     2275    

5 Mehaura 2B2C7g1b 

81025’44” to 81028’19” 

26051’16” to 26055’40” 

Mehaura 

Mehaura  349  3 Purejyori  30  6 

Chakmandauli  74  4 S.Total  453   

  

Page 12: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

9

S.No. Name & code 

of MWS Longitude (E)  Latitude (N) 

Gram Panchayat 

 Village Geographical Area of Village Included in 

MWS (ha) 

Distance (km.)of  Important/approach road (Bhitariya to Dariyabad) 

1  2  3  4  5  6  7  8 Beerkithai  Akhberpur 

Mangrauda 42  4 

Ghazipur  Ghazipur  130  2 Hammid Nagar  Hammid Nagar  341  3 

Sisauna Sisauna  177  2 Jariyari  98  3 S.Total  275    

Mahmoodabad  Mahmoodabad  497  3 Said Khanpur  Said Khanpur  102  4 

Saifpur  Saifpur  260  5 Mangrauda  Mangrauda  277  3 

Total     2377                G.Total     8515    

        

   

 

Page 13: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

10  

Page 14: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

11

2.2: Area and Land use:  

Village wise detailed information on type of land is depicted in Table 2.2.    

Table 2.2: Details of land resources in IWMP‐3rd  (Area in ha.) 

S. No.

MWS Name &

Code Gram

Panchayat Village

Cultivated and wasteland area Area details Falling within the projects

Cultivated rainfed

Cultivated irrigated

Uncultivated wasteland/fallow Pvt. Agri. Land

Fore

st

Com

mun

ity

Oth

er

Total

Temp. Permanent Gen SC/ ST OBC Total

1 Ambaur 2B2C7d2a

Ambaur

Ambaur 217 273 93 8 233 175 175 583 0 6 2 591

Rasoolpur 0 62 0 1 25 19 19 62 0 1 0 63

S.Total 217 335 93 9 258 194 194 645 0 7 2 654

Chandawal

Chandawal 130 100 55 107 114 86 86 285 0 28 79 392

Husepur 21 29 9 2 24 18 18 59 0 2 0 61

S.Total 151 129 64 109 138 103 103 344 0 30 79 453 Suryapur Khapraila

Suryapur Khapraila 31 13 14 1 23 17 17 58 0 1 0 59

Total 399 477 171 119 419 314 314 1047 0 38 81 1166

2 Suryapur Khapraila 2B2C7d2c

Suryapur Khapraila

Suryapur Khapraila 130 23 50 2 81 61 61 203 0 2 0 205

Godari 56 60 26 6 57 43 43 142 0 6 0 148

S.Total 186 83 76 8 138 104 104 345 0 8 0 353 Ambaur Ambaur 17 12 8 1 15 11 11 37 0 1 0 38

Palhari Palhari 159 140 68 8 147 110 110 367 0 3 5 375 Sarai Ka

Sthan Sarai Ka

Sthan 77 45 33 4 62 47 47 155 0 4 0 159

Shah pur Shah pur 75 64 35 5 70 52 52 174 0 3 2 179

Page 15: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

12

S. No.

MWS Name &

Code Gram

Panchayat Village

Cultivated and wasteland area Area details Falling within the projects

Cultivated rainfed

Cultivated irrigated

Uncultivated wasteland/fallow Pvt. Agri. Land

Fore

st

Com

mun

ity

Oth

er

Total

Temp. Permanent Gen SC/ ST OBC Total

Akhberpur Dhanethi Ingholia 0 37 0 1 15 11 11 37 0 1 0 38

Baghoura Baghoura 56 43 24 3 49 37 37 123 0 3 0 126

Total 570 424 244 30 495 371 371 1238 0 23 7 1268

3 Akhberpur Dhanethi 2B2C7d2d

Akhberpur Dhanethi

Akhberpur Dhanethi 154 85 62 5 120 90 90 301 0 2 3 306

Yakoot Ganj 0 41 0 4 16 12 12 41 0 4 0 45

Ingholia 14 10 6 7 12 9 9 30 0 7 0 37

S.Total 168 136 68 16 149 112 112 372 0 13 3 388 Ichaulia Ichaulia 107 214 46 8 147 110 110 367 0 2 6 375

Pyarepur Saraiya

Pyarepur Saraiya 63 119 27 6 84 63 63 209 0 6 0 215

Palhari Palhari 144 34 61 3 96 72 72 239 0 0 3 242

Sarai Ka Sthan

Sarai Ka Sthan 13 6 7 6 10 8 8 26 0 6 0 32

Chilauki 113 10 47 7 68 51 51 170 0 7 0 177

S.Total 126 16 54 13 78 59 59 196 0 13 0 209 Total 608 519 256 46 553 415 415 1383 0 34 12 1429

4 Gajipur 2B2C7g1a

Ghazipur Ghazipur 341 407 146 20 358 268 268 894 0 15 5 914 Beerkithai Beerkithai 99 30 39 8 67 50 50 168 0 8 0 176

Akhberpur Mangrauda 0 200 0 8 80 60 60 200 0 8 0 208

S.Total 99 230 39 16 147 110 110 368 0 16 0 384 Danapur Kyampur

Danapur Kyampur 84 18 34 6 54 41 41 136 0 6 0 142

Page 16: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

13

S. No.

MWS Name &

Code Gram

Panchayat Village

Cultivated and wasteland area Area details Falling within the projects

Cultivated rainfed

Cultivated irrigated

Uncultivated wasteland/fallow Pvt. Agri. Land

Fore

st

Com

mun

ity

Oth

er

Total

Temp. Permanent Gen SC/ ST OBC Total

Pahrupur Pahrupur 57 14 24 6 38 29 29 95 0 6 0 101

Inderpur 137 40 56 8 93 70 70 233 0 6 2 241

S.Total 194 54 80 14 131 98 98 328 0 12 2 342 Mehaura Mehaura 18 6 8 6 13 10 10 32 0 6 0 38

Said Khanpur Said Khanpur 110 280 56 9 178 134 134 446 0 3 6 455

Total 846 995 363 71 882 661 661 2204 0 58 13 2275

5 Mehaura 2B2C7g1b

Mehaura Mehaura 219 29 93 8 136 102 102 341 0 4 4 349

Purejyori 14 8 6 2 11 8 8 28 0 2 0 30 Chak-

mandauli 23 31 14 6 27 20 20 68 0 6 0 74

S.Total 256 68 113 16 175 131 131 437 0 12 4 453

Beerkithai Akhberpur Mangrauda 0 41 0 1 16 12 12 41 0 1 0 42

Ghazipur Ghazipur 70 24 30 6 50 37 37 124 0 6 0 130 Hammid Nagar

Hammid Nagar 156 115 64 6 134 101 101 335 0 0 6 341

Sisauna Sisauna 78 60 33 6 68 51 51 171 0 6 0 177

Jariyari 33 47 12 6 37 28 28 92 0 6 0 98

S.Total 111 107 45 12 105 79 79 263 0 12 0 275 Mahmudabad Mahmudabad 198 207 82 10 195 146 146 487 0 5 5 497

Said Khanpur Said Khanpur 52 20 22 8 38 28 28 94 0 8 0 102

Saifpur Saifpur 126 60 64 10 100 75 75 250 0 6 4 260

Page 17: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

14

S. No.

MWS Name &

Code Gram

Panchayat Village

Cultivated and wasteland area Area details Falling within the projects

Cultivated rainfed

Cultivated irrigated

Uncultivated wasteland/fallow Pvt. Agri. Land

Fore

st

Com

mun

ity

Oth

er

Total

Temp. Permanent Gen SC/ ST OBC Total

Mangrauda Mangrauda 172 30 69 6 108 81 81 271 0 1 5 277

Total 1141 672 489 75 921 691 691 2302 0 51 24 2377

G.Total 3564 3087 1523 341

3270

2452 2452 8174 0 204

137 8515

  

2.3: Physiogaphy:  

Spatial distribution of different slope classes was prepared by using of Arc GIS Software. Slope was divided into 04 classes (viz. 0‐0.5, 0.5‐1.0, 1.0‐3.0 & 3.0‐5.0%.(Table 2.3).  

Table 2.3: Slope range in the project area for IWMP‐3rd   

S.No.  Code of MWS  Name of MWS  Slope Range (ha)    

0‐0.5%  0.5‐1%  1‐3%  >3%  Total 

1   2B2C7g1b  Mahaura  821  864  635  62  2382 

2  2B2C7d2a  Ambour  374  423  357  49  1203 

3  2B2C7d2c  Suryapur Khapraila  420  485  323  41  1269 

4  2B2C7d2d  Akbarpur Dhaneti  548  534  321  28  1431 

5  2B2C7g1a  Gajipur  787  901  567  23  2278 

      Total  2950  3207  2203  203  8563    

Page 18: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

15

2.4: Climate: The annual rainfall and the temperature of the district are given in Table 2.4.  Table 2.4: Average monthly rainfall and temperature of the last 05 years at IWMP‐3rd   

Month Annual Rainfall (mm)  Temperature 0C 

2005  2006  2007  2008  2009  Average  Max.  Min. 

January  0.40  4.00  0.40  0.20  1.00  1.20  20  9 February  14.00  21.00  60.80  12.80  2.30  22.18  26  12 March  0.00  0.00  29.80  0.00  1.00  6.16  33  17 April  34.50  0.00  0.00  48.60  16.50  19.92  38  22 May  101.20  60.40  101.20  51.40  20.60  66.96  40  25 June  112.40  21.20  112.00  137.50  90.50  94.72  42  27 July  201.00  148.00  206.10  436.20  240.30  246.32  38  27 

August  115.00  280.00  120.90  505.40  170.50  238.36  32  26 September  140.00  205.00  138.00  308.60  150.80  188.48  32  26 October  40.30  33.60  6.20  23.00  2.40  21.10  32  21 November  0.00  4.10  0.00  2.60  1.00  1.54  28  15 December  1.30  1.10  0.60  0.00  0.80  0.76  23  10 

Total  760.10  778.40  776.00  1526.30  697.70  907.70  Avg. 32  Avg. 19.75  Table 2.5: Flood and Drought Area: 

Sl. No.  MWS  Particulars  No. of villages Periodicity 

Not affected Annual 

Any other           (please specify) 

1  2  3  4  5  6  7 

1  All 05 MWS  Flood  Name(s) of villages  ‐‐‐  ‐‐‐‐  Not affected 

No. of villages  ‐‐‐  ‐‐‐‐ 

Drought  Name(s) of villages  ‐‐‐  ‐‐‐‐  Not affected 

No. of villages  ‐‐‐  ‐‐‐‐ 

Page 19: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

16

Table 2.6: Details of Soil Erosion  

S.No.   MWS Name & 

Code Gram Panchayat   Village 

Water Erosion (ha)  Runoff (mm) 

Average Soil loss (Ton/ha/year) 

Wind Erosion 

Sheet  Rill  Gully  Total 

1 Ambaur 2B2C7d2a 

Ambaur 

Ambaur  189  93  28  310  262  16  0 Rasoolpur  0  0  0  0  0  0  0 S.Total  189  93  28  310          

Chandawal 

Chandawal  113  56  17  185  264  17  0 Husepur  18  9  3  30  261  15  0 S.Total  131  65  19  215          

Suryapur Khapraila 

Suryapur Khapraila  27  14  4  45  264  18  0 

Total  348  171  51  570          

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  113  52  14  180  265  16  0 Godari  52  24  7  82  266  18  0 S.Total  165  76  21  262          

Ambaur  Ambaur  16  7  2  25  262  17  0 Palhari  Palhari  143  66  18  227  262  15  0 

Sarai Ka Sthan  Sarai Ka Sthan  69  32  9  110  266  18  0 Shah pur  Shah pur  69  32  9  110  265  16  0 

Akhberpur Dhanethi 

Ingholia 0  0  0  0  0  0  0 

Baghoura  Baghoura  50  23  6  80  262  18  0 

Total  513  236  65  814          

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  130  65  22  216  262  17  0 

Yakoot Ganj  0  0  0  0  0  0  0 

Ingholia  12  6  2  20  264  16  0 

Page 20: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

17

S.No.   MWS Name & 

Code Gram Panchayat   Village 

Water Erosion (ha)  Runoff (mm) 

Average Soil loss (Ton/ha/year) 

Wind Erosion 

Sheet  Rill  Gully  Total 

S.Total  142  71  24  236          Ichaulia  Ichaulia  92  46  15  153  266  15  0 

Pyarepur Saraiya  Pyarepur Saraiya  54  27  9  90  265  16  0 Palhari  Palhari  123  62  21  205  265  17  0 

Sarai Ka Sthan Sarai Ka Sthan  12  6  2  20  264  16  0 

Chilauki  96  48  16  160  263  18  0 

S.Total  108  54  18  180          

Total  519  260  87  864          

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  297  151  39  487  262  17  0 

Beerkithai 

Akhberpur Mangrauda  0  0  0  0  0  0  0 

Beerkithai  84  43  11  138  264  16  0 

S.Total  84  43  11  138          

Danapur Kyampur  Danapur Kyampur  72  37  9  118  265  15  0 

Pahrupur Pahrupur  49  25  6  81  265  17  0 

Inderpur  118  60  15  193  266  18  0 

S.Total  167  85  21  274          

Mehaura  Mehaura  16  8  2  26  264  18  0 

Said Khanpur  Said Khanpur  101  51  13  166  266  17  0 

Total  737  375  95  1209          

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  197  90  25  312  265  15  0 

Purejyori  13  6  2  20  263  16  0 

Chakmandauli  23  11  3  37  264  18  0 

S.Total  232  107  30  369          

Page 21: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

18

S.No.   MWS Name & 

Code Gram Panchayat   Village 

Water Erosion (ha)  Runoff (mm) 

Average Soil loss (Ton/ha/year) 

Wind Erosion 

Sheet  Rill  Gully  Total 

Beerkithai  Akhberpur Mangrauda  0  0  0  0  0  0  0 

Ghazipur  Ghazipur  63  29  8  100  266  17  0 Hammid Nagar  Hammid Nagar  139  64  18  220  265  18  0 

Sisauna Sisauna  70  32  9  111  262  16  0 

Jariyari  28  13  4  45  263  15  0 

S.Total  98  45  12  156          Mahmoodabad  Mahmoodabad  176  81  22  280  263  18  0 Said Khanpur  Said Khanpur  47  21  6  74  265  17  0 

Saifpur  Saifpur  120  55  15  190  266  16  0 Mangrauda  Mangrauda  152  70  19  241  264  15  0 

Total  1027  473  130  1630             G.Total  3143  1514  430  5087  Avg. 232  Avg. 15    

               

Page 22: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

19

CHAPTER‐3 BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL 

 

3.1: Social‐Economic Analysis:  

IWMP‐3rd watershed project has a total of 12979  household with a population of 64895 (as per base‐line survey) out of which 34347 are male and 30548   female. The sex ratio  is 889 female to 1000 male. There are 3958 BPL families. The detail of population  in each micro‐watershed is given below:‐ Table 3.1: Demographic Features in Project Area 

(All figures in Nos.) 

S.No.   MWS Name & 

 Code  Gram 

 Panchayat  Village 

Total  population 

Male  Female SC/ST 

Total  Male  Female 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  4201  2179  2022  1642  858  784 Rasoolpur  667  355  312  361  193  168 S.Total  4868  2534  2334  2003  1051  952 

Chandawal Chandawal  3383  1815  1568  1376  755  621 Husepur  1049  532  517  206  105  101 S.Total  4432  2347  2085  1582  860  722 

Suryapur Khapraila  Suryapur Khapraila  2402  1197  1205  752  378  374 Total  11702  6078  5624  4337  2289  2048 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila Suryapur Khapraila  0  0  0  0  0  0 

Godari  973  537  436  226  125  101 S.Total  973  537  436  226  125  101 

Ambaur  Ambaur  0  0  0  0  0  0 Palhari  Palhari  0  0  0  0  0  0 

Sarai Ka Sthan  Sarai Ka Sthan  1244  644  600  609  321  288 Shah pur  Shah pur  2211  1191  1020  959  513  446 

Akhberpur Dhanethi  Ingholia  0  0  0  0  0  0 Baghoura  Baghoura  3043  1508  1535  1645  834  811 

Total  7471  3880  3591  3439  1793  1646 

3 Akhberpur Dhanethi  

Akhberpur Dhanethi Akhberpur Dhanethi  2078  1093  985  620  311  309 

Yakoot Ganj  2179  1168  1011  759  411  348 

Page 23: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

20

S.No.   MWS Name & 

 Code  Gram 

 Panchayat  Village 

Total  population 

Male  Female SC/ST 

Total  Male  Female 2B2C7d2d  Ingholia  860  467  393  134  64  70 

S.Total  5117  2728  2389  1513  786  727 Ichaulia  Ichaulia  1754  928  826  223  124  99 

Pyarepur Saraiya  Pyarepur Saraiya  1609  831  778  682  365  317 Palhari  Palhari  4032  2110  1922  1523  822  701 

Sarai Ka Sthan Sarai Ka Sthan  0  0  0  0  0  0 

Chilauki  1037  550  487  154  73  81 S.Total  1037  550  487  154  73  81 

Total  13549  7147  6402  4095  2170  1925 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  0  0  0  0  0  0 

Beerkithai 

Akhberpur Mangrauda  1495  788  707  612  311  301 Beerkithai  2216  1188  1028  974  552  422 S.Total  3711  1976  1735  1586  863  723 

Danapur Kyampur  Danapur Kyampur  2256  1199  1057  1056  584  472 

Pahrupur Pahrupur  1481  793  688  586  308  278 Inderpur  981  528  453  415  227  188 S.Total  2462  1321  1141  1001  535  466 

Mehaura  Mehaura  2296  1265  1031  703  391  312 Said Khanpur  Said Khanpur  0  0  0  0  0  0 

Total  10725  5761  4964  4346  2373  1973 

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  0  0  0  0  0  0 Purejyori  173  95  78  85  50  35 

Chakmandauli  474  247  227  144  70  74 S.Total  647  342  305  229  120  109 

Beerkithai Akhberpur Mangrauda  0  0  0  0  0  0 

Ghazipur  Ghazipur  6764  3625  3139  2651  1410  1241 Hammid Nagar  Hammid Nagar  2083  1082  1001  891  454  437 

Page 24: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

21

S.No.   MWS Name & 

 Code  Gram 

 Panchayat  Village 

Total  population 

Male  Female SC/ST 

Total  Male  Female 

Sisauna Sisauna  953  526  427  427  244  183 Jariyari  659  371  288  136  82  54 S.Total  1612  897  715  563  326  237 

Mahmoodabad  Mahmoodabad  3663  1993  1670  881  468  413 Said Khanpur  Said Khanpur  3139  1654  1485  1100  603  497 

Saifpur  Saifpur  1940  1024  916  642  331  311 Mangrauda  Mangrauda  1600  864  736  533  289  244 

Total  21448  11481  9967  7490  4001  3489    G.Total  64895  34347  30548  23707  12626  11081 

  

3.2: Land Holding Pattern:  The  average  land  holding  is  about  0.51  ha with  lack  of  irrigation  source,  so  it  forces  the majority  of  the  farmers  to migrate  to  ensure  their livelihood. This affects the demographic profile of the watershed directly.   

Table 3.2: Details of land holding pattern (All figures in nos.) 

 

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Type of Farmers  Households BPL  

households Land holding(ha) 

LF  SF  MF  LL  Total  nos  nos  Irrigated  Rainfed  Total 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  34  134  462  210  840  840  256  273  217  490 Rasoolpur  5  21  73  33  132  132  41  62  0  62 S.Total  39  155  535  243  972  972  297  335  217  552 

Chandawal Chandawal  27  108  372  169  676  676  206  100  130  230 Husepur  8  34  115  52  209  209  64  29  21  50 S.Total  35  142  487  221  885  885  270  129  151  280 

Page 25: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

22

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Type of Farmers  Households BPL  

households Land holding(ha) 

LF  SF  MF  LL  Total  nos  nos  Irrigated  Rainfed  Total 

Suryapur Khapraila 

Suryapur Khapraila  19  77  264  120  480  480  147  13  31  44 

Total  93  374  1286  584  2337  2337  714  477  399  876 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  0  0  0  0  0  0  0  23  130  153 Godari  8  31  107  49  195  195  59  60  56  116 S.Total  8  31  107  49  195  195  59  83  186  269 

Ambaur  Ambaur  0  0  0  0  0  0  0  12  17  29 Palhari  Palhari  0  0  0  0  0  0  0  140  159  299 

Sarai Ka Sthan  Sarai Ka Sthan  10  40  137  62  249  249  76  45  77  122 

Shah pur  Shah pur  18  71  243  111  443  443  135  64  75  139 Akhberpur Dhanethi 

Ingholia 0  0  0  0  0  0  0  37  0  37 

Baghoura  Baghoura  24  97  335  152  608  608  186  43  56  99 Total  60  239  822  374  1495  1495  456  424  570  994 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  17  66  229  104  416  416  127  85  154  239 

Yakoot Ganj  17  70  240  109  436  436  133  41  0  41 Ingholia  7  28  95  43  173  173  52  10  14  24 S.Total  41  164  564  256  1025  1025  312  136  168  304 

Ichaulia  Ichaulia  14  56  193  88  351  351  107  214  107  321 Pyarepur Saraiya 

Pyarepur Saraiya 13  51  177  80  321  321  98  119  63  182 

Palhari  Palhari  32  129  444  202  807  807  246  34  144  178 Sarai Ka Sthan  Sarai Ka Sthan  0  0  0  0  0  0  0  6  13  19 

   Chilauki  8  33  114  52  207  207  63  10  113  123    S.Total  8  33  114  52  207  207  63  16  126  142 

Page 26: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

23

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Type of Farmers  Households BPL  

households Land holding(ha) 

LF  SF  MF  LL  Total  nos  nos  Irrigated  Rainfed  Total 

Total     108  433  1492  678  2711  2711  826  519  608  1127 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  0  0  0  0  0  0  0  407  341  748 

Beerkithai 

Akhberpur Mangrauda  12  48  164  75  299  299  91  200  0  200 Beerkithai  18  71  244  111  444  444  135  30  99  129 S.Total  30  119  408  186  743  743  226  230  99  329 

Danapur Kyampur 

Danapur Kyampur  18  72  248  113  451  451  138  18  84  102 

Pahrupur Pahrupur  12  47  163  74  296  296  90  14  57  71 Inderpur  8  31  108  49  196  196  60  40  137  177 S.Total  20  78  271  123  492  492  150  54  194  248 

Mehaura  Mehaura  18  73  253  115  459  459  140  6  18  24 Said Khanpur  Said Khanpur  0  0  0  0  0  0  0  280  110  390 

Total  86  342  1180  537  2145  2145  654  995  846  1841 

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  0  0  0  0  0  0  0  29  219  248 Purejyori  1  6  20  9  36  36  11  8  14  22 

Chakmandauli  4  15  52  25  96  96  29  31  23  54 S.Total  5  21  72  34  132  132  40  68  256  324 

Beerkithai Akhberpur Mangrauda  0  0  0  0  0  0  0  41  0  41 

Ghazipur  Ghazipur  54  216  744  338  1352  1352  413  24  70  94 Hammid Nagar  Hammid Nagar  17  67  229  104  417  417  127  115  156  271 

Sisauna Sisauna  8  30  105  48  191  191  58  60  78  138 Jariyari  5  21  72  33  131  131  40  47  33  80 S.Total  13  51  177  81  322  322  98  107  111  218 

Mahmoodabad  Mahmoodabad  29  117  403  183  732  732  223  207  198  405 Said Khanpur  Said Khanpur  25  100  345  157  627  627  191  20  52  72 

Page 27: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

24

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Type of Farmers  Households BPL  

households Land holding(ha) 

LF  SF  MF  LL  Total  nos  nos  Irrigated  Rainfed  Total 

Saifpur  Saifpur  16  62  213  98  389  389  118  60  126  186 Mangrauda  Mangrauda  13  51  176  80  320  320  98  30  172  202 

Total  172  685  2359  1075  4291  4291  1308  672  1141  1813    G.Total  519  2073  7139  3248  12979  12979  3958  3087  3564  6651 

 

 Migration:  People migrate during summer season to different parts of the state like Lucknow, Kanpur and Delhi as daily wages, agricultural and construction labourers. The details are given below:   

Table 3.3: Details of Migration: Pre Project status (All figures in nos) 

S.N   MWS Name &  Code  

Gram  Panchayat 

 Village Total  

population 

Migration  Migration by Months  Main reason for  

migration 

Occupation during  

migration 

Income during  

migration/ month 

Total  Male  Female UP to  3 

months 

3‐6 months 

More than  

6 months

1 Ambaur 2B2C7d2a 

Ambaur 

Ambaur 4201  84  76  8  42  25  17 

Unemployment 

Labour/Service  3500 

Rasoolpur 667  13  12  1  7  4  3 

Unemployment 

Labour/Service  4000 

S.Total  4868  97  88  9  49  29  19          

Chandawal 

Chandawal 3383  68  61  7  34  20  14 

Unemployment 

Labour/Service  4000 

Husepur 1049  21  19  2  10  6  4 

Unemployment 

Labour/Service  4200 

S.Total  4432  89  80  9  44  27  18          Suryapur Khapraila 

Suryapur Khapraila  2402  48  43  5  24  14  10 

Unemployment 

Labour/Service  3500 

Page 28: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

25

S.N   MWS Name & C d

Gram  Panchayat 

 Village Total  

population Migration  Migration by Months  Main 

reason f

Occupation during  i i

Income during  i i /

Total  Male  Female  UP to   3‐6  More 

Total  11702  234  211  23  117  70  47          

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  0  0  0  0  0  0  0          

Godari 973  19  18  1  10  6  4 

Unemployment 

Labour/Service  4500 

S.Total  973  19  18  1  10  6  4          Ambaur  Ambaur  0  0  0  0  0  0  0          Palhari  Palhari  0  0  0  0  0  0  0          Sarai Ka Sthan 

Sarai Ka Sthan  1244  25  22  3  12  7  5 

Unemployment 

Labour/Service  4800 

Shah pur  Shah pur 2211  44  40  4  22  13  9 

Unemployment 

Labour/Service  5000 

Akhberpur Dhanethi 

Ingholia 0  0  0  0  0  0  0          

Baghoura  Baghoura 3043  61  55  6  30  18  12 

Unemployment 

Labour/Service  5000 

Total  7471  149  134  15  75  45  30          

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  2078  42  37  5  21  12  8 

Unemployment 

Labour/Service  3800 

Yakoot Ganj 2179  44  39  5  22  13  9 

Unemployment 

Labour/Service  3500 

Ingholia 860  17  15  2  9  5  3 

Unemployment 

Labour/Service  3600 

S.Total  5117  103  91  12  52  30  20          

Ichaulia  Ichaulia 1754  35  32  3  18  11  7 

Unemployment 

Labour/Service  4400 

Pyarepur Saraiya 

Pyarepur Saraiya  1609  32  29  3  16  10  6 

Unemployment 

Labour/Service  5000 

Palhari  Palhari 4032  81  73  8  40  24  16 

Unemployment 

Labour/Service  3800 

Sarai Ka  Sarai Ka  0  0  0  0  0  0  0          

Page 29: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

26

S.N   MWS Name & C d

Gram  Panchayat 

 Village Total  

population Migration  Migration by Months  Main 

reason f

Occupation during  i i

Income during  i i /

Total  Male  Female  UP to   3‐6  More Sthan  Sthan 

Chilauki 1037  21  19  2  10  6  4 

Unemployment 

Labour/Service  4500 

S.Total  1037  21  19  2  10  6  4          Total     13549  272  244  28  136  81  53          

4 Gajipur  2B2C7g1a 

Ghazipur  Ghazipur  0  0  0  0  0  0  0          

Beerkithai 

Akhberpur Mangrauda  1495  30  27  3  15  9  6 

Unemployment 

Labour/Service  4000 

Beerkithai 2216  44  40  4  22  13  9 

Unemployment 

Labour/Service  4000 

S.Total  3711  74  67  7  37  22  15          Danapur Kyampur 

Danapur Kyampur  2256  45  41  4  23  14  9 

Unemployment 

Labour/Service  4500 

Pahrupur 

Pahrupur 1481  30  27  3  15  9  6 

Unemployment 

Labour/Service  5000 

Inderpur 981  20  18  2  10  6  4 

Unemployment 

Labour/Service  5000 

S.Total  2462  49  44  5  25  15  10          

Mehaura  Mehaura 2296  46  41  5  23  14  9 

Unemployment 

Labour/Service  4000 

Said Khanpur 

Said Khanpur 0  0  0  0  0  0  0          

Total     10725  215  193  22  107  64  43          

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  0  0  0  0  0  0  0          

Purejyori 173  3  3  0  2  1  1 

Unemployment 

Labour/Service  3500 

Chakmandauli  474  9  9  0  5  3  2 

Unemployment 

Labour/Service  4000 

S.Total  647  13  12  1  6  4  3          

Beerkithai Akhberpur Mangrauda  0  0  0  0  0  0  0          

Page 30: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

27

S.N   MWS Name & C d

Gram  Panchayat 

 Village Total  

population Migration  Migration by Months  Main 

reason f

Occupation during  i i

Income during  i i /

Total  Male  Female  UP to   3‐6  More 

Ghazipur  Ghazipur 6764  135  122  13  68  41  27 

Unemployment 

Labour/Service  4000 

Hammid Nagar 

Hammid Nagar  2083  42  37  5  21  12  8 

Unemployment 

Labour/Service  3500 

Sisauna 

Sisauna 953  19  17  2  10  6  4 

Unemployment 

Labour/Service  3500 

Jariyari 659  13  12  1  7  4  3 

Unemployment 

Labour/Service  4400 

S.Total  1612  32  29  3  16  10  6          Mahmooda

bad Mahmoodab

ad  3663  73  66  7  37  22  15 Unemployment 

Labour/Service  4800 

Said Khanpur 

Said Khanpur 3139  36  32  4  31  19  13 

Unemployment 

Labour/Service  5000 

Saifpur  Saifpur 1940  39  35  4  19  12  8 

Unemployment 

Labour/Service  4200 

Mangrauda  Mangrauda 1600  32  29  3  16  10  6 

Unemployment 

Labour/Service  4500 

Total  21448  429  386  43  214  129  86             G.Total  64895  1298  1168  130  649  389  260          

            

Page 31: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

28

Table 3.4: Details of Village Infrastructure (All figures in nos) 

S. No. 

  MWS Name &  Code  

Gram  Panchayat 

 Village 

Conn

ected Ro

ad 

(Km.) 

  Electricty 

Hou

seho

ld witho

ut 

Access Drinking 

Water 

Education 

PHC 

Veten

ary 

Dispe

nsary 

PO 

Bank

 

Market 

Agro ‐ Ind

ustries 

Qua

ntity of surplus 

milk (Lt.) 

Milk collection Centre 

Aganw

adi Cen

tre 

Other Facility 

P  S  HS 

Union

 

Society 

P Agency 

Other 

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  2  Yes  50  1  1     No  No  No  No  yes  No  54  No  No  No  Yes  1  MNREGA Rasoolpur  2  Yes  30  1        No  No  No  No  yes  No  65  No  No  No  Yes  1  MNREGA 

Chandawal Chandawal  3  Yes  25  1  1     No  No  1  No  yes  No  54  No  No  No  Yes  1  MNREGA Husepur  2  Yes  24  1        No  No  No  No  yes  No  68  No  No  No  Yes  1  MNREGA 

Suryapur Khapraila 

Suryapur Khapraila  3  Yes 

20 1  1     No  No  No  No  yes  No  97  No  No  No  Yes  1  MNREGA 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  3  Yes 

0 1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA 

Godari  2  Yes  5  1        No  No  No  No  yes  No  78  No  No  No  Yes  1  MNREGA Ambaur  Ambaur  2  Yes  0  1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA Palhari  Palhari  2  Yes  25  1        No  No  No  No  yes  No  56  No  No  No  Yes  1  MNREGA 

Sarai Ka Sthan  Sarai Ka Sthan  4  Yes  30  1  1     No  No  No  No  yes  No  42  No  No  No  Yes  1  MNREGA Shah pur  Shah pur  5  Yes  23  1        No  No  No  No  yes  No  52  No  No  No  Yes  1  MNREGA Akhberpur Dhanethi 

Ingholia 5  Yes 

15 1  1     No  No  No  No  yes  No  75  No  No  No  Yes  1  MNREGA 

Baghoura  Baghoura  4  Yes     1        No  No  1  1  yes  No     No  No  No  Yes  1  MNREGA 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  3  Yes 

25 1  1     No  No  No  No  yes  No  55  No  No  No  Yes  1  MNREGA 

Yakoot Ganj  3  Yes  30  1  1     No  No  No  No  yes  No  98  No  No  No  Yes  1  MNREGA Ingholia  5  Yes  0  1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA 

Ichaulia  Ichaulia  3  Yes  9  1  1     No  No  No  No  yes  No  88  No  No  No  Yes  1  MNREGA Pyarepur Saraiya 

Pyarepur Saraiya  4  Yes 

8 1        No  No  No  No  yes  No  78  No  No  No  Yes  1  MNREGA 

Palhari  Palhari  2  Yes  0  1  1     No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA 

Page 32: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

29

S. No. 

  MWS Name &  Code  

Gram  Panchayat 

 Village 

Conn

ected Ro

ad 

(Km.) 

  Electricty 

Hou

seho

ld witho

ut 

Access Drinking 

Water 

Education 

PHC 

Veten

ary 

Dispe

nsary 

PO 

Bank

 

Market 

Agro ‐ Ind

ustries 

Qua

ntity of surplus 

milk (Lt.) 

Milk collection Centre 

Aganw

adi Cen

tre 

Other Facility 

P  S  HS 

Union

 

Society 

P Agency 

Other 

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23 

Sarai Ka Sthan Sarai Ka Sthan  4  Yes  0  1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA 

Chilauki  2  Yes  11  1        No  No  No  No  yes  No  74  No  No  No  Yes  1  MNREGA 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  2  Yes  25  1        No  No  No  No  yes  No  84  No  No  No  Yes  1  MNREGA 

Beerkithai Akhberpur Mangrauda  4  Yes 

21 1        No  No  No  No  yes  No  48  No  No  No  Yes  1  MNREGA 

Beerkithai  5  Yes  22  1        No  No  No  No  yes  No  46  No  No  No  Yes  1  MNREGA Danapur Kyampur 

Danapur Kyampur  4  Yes 

  1        No  No  No  No  yes  No  58  No  No  No  Yes  1  MNREGA 

Pahrupur Pahrupur  3  Yes  29  1        No  No  No  No  yes  No  82  No  No  No  Yes  1  MNREGA Inderpur  4  Yes  23  1        No  No  No  No  yes  No  62  No  No  No  Yes  1  MNREGA 

Mehaura  Mehaura  3  Yes  15  1  1     No  No  No  No  yes  No  42  No  No  No  Yes  1  MNREGA Said Khanpur  Said Khanpur  4  Yes  50  1        No  No  No  No  yes  No  66  No  No  No  Yes  1  MNREGA 

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  3  Yes  0  1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA Purejyori  5  Yes  20  1        No  No  No  No  yes  No  58  No  No  No  Yes  1  MNREGA 

Chakmandauli  4  Yes  30  1        No  No  1  No  yes  No  54  No  No  No  Yes  1  MNREGA Akhberpur Mangrauda 

Akhberpur Mangrauda  4  Yes  0  1  1     No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA 

Ghazipur  Ghazipur  2  Yes  0  1        No  No  No  No  yes  No  0  No  No  No  Yes  1  MNREGA Hammid Nagar  Hammid Nagar  3  Yes  17  1        No  No  1  No  yes  No  78  No  No  No  Yes  1  MNREGA 

Sisauna Sisauna  2  Yes  30  1        No  No  No  No  yes  No  68  No  No  No  Yes  1  MNREGA Jariyari  3  Yes  11  1        No  No  No  No  yes  No  52  No  No  No  Yes  1  MNREGA 

Mahmoodabad  Mahmoodabad  3  Yes  25  1        No  No  No  No  yes  No  56  No  No  No  Yes  1  MNREGA Said Khanpur  Said Khanpur  4  Yes  10  1        No  No  No  No  yes  No  58  No  No  No  Yes  1  MNREGA 

Saifpur  Saifpur  5  Yes  15  1  1     No  No  1  No  yes  No  62  No  No  No  Yes  1  MNREGA Mangrauda  Mangrauda  3  Yes  18  1        No  No  No  No  yes  No  65  No  No  No  Yes  1  MNREGA 

Page 33: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

30

Table 3.5: Soil Texture 

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Area in different Soil Group (ha) Other  Specify Light textured soil 

(sand,Loamy sand) Medium textured soil  (sandy loam, silt loam) 

Heavy textured soil (Clay loam) 

                       

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  77  220  13  ‐‐ Rasoolpur  0  0  0  ‐‐ S.Total  77  220  13  ‐‐ 

Chandawal Chandawal  46  133  6  ‐‐ Husepur  8  21  1  ‐‐ S.Total  54  154  7  ‐‐ 

Suryapur Khapraila 

Suryapur Khapraila 11  32  3  ‐‐ 

Total  142  406  23  ‐‐ 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  46  128  6  ‐‐ Godari  20  59  3  ‐‐ S.Total  66  187  9  ‐‐ 

Ambaur  Ambaur  6  17  2  ‐‐ Palhari  Palhari  56  162  9  ‐‐ 

Sarai Ka Sthan  Sarai Ka Sthan  27  80  3  ‐‐ Shah pur  Shah pur  26  79  5  ‐‐ Akhberpur Dhanethi 

Ingholia 0  0  0  ‐‐ 

Baghoura  Baghoura  18  59  3  ‐‐ Total  199  584  31  ‐‐ 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  52  156  8  ‐‐ Yakoot Ganj  0  0  0  ‐‐ Ingholia  5  14  1  ‐‐ S.Total  57  170  9  ‐‐ 

Ichaulia  Ichaulia  37  111  5  ‐‐ 

Page 34: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

31

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Area in different Soil Group (ha) Other  Specify Light textured soil 

(sand,Loamy sand) Medium textured soil  (sandy loam, silt loam) 

Heavy textured soil (Clay loam) 

                       Pyarepur Saraiya  Pyarepur Saraiya  23  65  2  ‐‐ 

Palhari  Palhari  50  147  8  ‐‐ 

Sarai Ka Sthan Sarai Ka Sthan  6  13  1  ‐‐ 

Chilauki  40  115  5  ‐‐ S.Total  46  128  6  ‐‐ 

Total     212  621  31  ‐‐ 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  120  347  20  ‐‐ 

Beerkithai 

Akhberpur Mangrauda  0  0  0  ‐‐ Beerkithai  33  98  7  ‐‐ S.Total  33  98  7    

Danapur Kyampur  Danapur Kyampur  29  85  4  ‐‐ 

Pahrupur Pahrupur  18  60  3  ‐‐ Inderpur  47  139  7  ‐‐ S.Total  65  199  10  ‐‐ 

Mehaura  Mehaura  6  18  2  ‐‐ Said Khanpur  Said Khanpur  42  119  5  ‐‐ 

Total  295  866  47  ‐‐ 

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  76  223  13  ‐‐ Purejyori  4  14  2  ‐‐ 

Chakmandauli  8  27  2  ‐‐ S.Total  88  264  17  ‐‐ 

Akhberpur Mangrauda 

Akhberpur Mangrauda  0  0  0  ‐‐ 

Ghazipur  Ghazipur  24  72  4  ‐‐ Hammid Nagar  Hammid Nagar  54  156  10  ‐‐ 

Sisauna  Sisauna  27  80  4  ‐‐ 

Page 35: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

32

S.No.   MWS Name & 

 Code  Gram  

Panchayat  Village 

Area in different Soil Group (ha) Other  Specify Light textured soil 

(sand,Loamy sand) Medium textured soil  (sandy loam, silt loam) 

Heavy textured soil (Clay loam) 

                       Jariyari  11  32  3  ‐‐ S.Total  37  112  7  ‐‐ 

Mahmoodabad  Mahmoodabad  71  199  10  ‐‐ Said Khanpur  Said Khanpur  18  54  2  ‐‐ 

Saifpur  Saifpur  46  136  8  ‐‐ Mangrauda  Mangrauda  62  173  6  ‐‐ 

Total  400  1166  65       G.Total  1249  3642  196    

 

3.4: Crops & Productivity:  

Table 3.6: Productivity and Production  

S.No.  Crop  Area   Productivity   Production (Q )     Fodder/Fuel/ 

(ha)  (Q/ha)   Grain/Main product    Other Product.  (Q) 

       Irrigated     Rainfed     Irrigated     Rainfed   Irrigated     Rainfed     Irrigated     Rainfed   

 A     Kharif                           

1  Paddy  2315  980  18.00  8.00  41675  7841  41675  7841 

2  Maize   309  0  12.00  6.00  3704  0  5557  0 

3  Arhar    463  446  9.00  5.00  4167  2228  10419  5569 

4  Jowar/Bajra  0  178  2.50  2.00  0  356  0  713 

5  Til  0  89  0.00  1.50  0  134  0  267 

Page 36: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

33

S.No.  Crop  Area   Productivity   Production (Q )     Fodder/Fuel/ 

(ha)  (Q/ha)   Grain/Main product    Other Product.  (Q) 

       Irrigated     Rainfed     Irrigated     Rainfed   Irrigated     Rainfed     Irrigated     Rainfed   

6  Urd/Moong  0  89  4.00  3.00  0  267  0  535 

    Total    3087  1782        49546  10826  57650  14924 

 B     Rabi                           

1   Wheat    2495  204  18.00  8.00  44906  1632  56133  2040 

2  Lentil  0  68  9.00  5.00  0  340  0  425 

3   Gram    0  68  6.00  4.00  0  272  0  544 

4   Pea    356  45  8.00  5.00  2851  227  1426  113 

5  Mustard  0  68  8.00  4.00  0  272  0  544 

6  Potato  713  0  175.00  75.00  124740  0  0  0 

    Total    3564  453        172498  2742  57559  3666 

 Net Cultivable Area       6651   Cropping Intensity %    160             Table 3.7: Horticulture Status  

S.No.   MWS Name 

&  Code  

Gram Panchayat  Village 

Name of Important horticultural crop Whole Fruit Crop  Scattered Fruit Crop 

Name  Area (ha)Productivity

(q/ha) Production

(q) Name  Nos.

Productivity(q/No) 

Production (q) 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  Mango  4  40.00  160.00  ‐  0  0.00  0.00 Rasoolpur  Mango  1  40.00  40.00  ‐  0  0.00  0.00 

Chandawal Chandawal  Mango  3  40.00  120.00  ‐  0  0.00  0.00 Husepur  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

Suryapur Khapraila 

Suryapur Khapraila _ 

0  0.00  0.00  ‐  0  0.00  0.00 

2  Suryapur  Suryapur  Suryapur Khapraila  Mango  2  40.00  80.00  Ber  5  0.80  5.00 

Page 37: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

34

S.No.   MWS Name 

&  Code  

Gram Panchayat  Village 

Name of Important horticultural crop Whole Fruit Crop  Scattered Fruit Crop 

Name  Area (ha)Productivity

(q/ha) Production

(q) Name  Nos.

Productivity(q/No) 

Production (q) 

Khapraila 2B2C7d2c 

Khapraila  Godari  Mango  1  40.00  40.00  ‐  0  0.00  0.00 Ambaur  Ambaur  _  0  0.00  0.00  ‐  0  0.00  0.00 Palhari  Palhari  Mango  3  40.00  120.00  ‐  0  0.00  0.00 

Sarai Ka Sthan  Sarai Ka Sthan  Banana 1  250.00  250.00  ‐  0  0.00  0.00 Shah pur  Shah pur  Mango  1  40.00  40.00  Ber  5  0.80  5.00 

Akhberpur Dhanethi 

Ingholia Banana

1  250.00  250.00  ‐  0  0.00  0.00 

Baghoura  Baghoura  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  Mango 

3  40.00  120.00  ‐  0  0.00  0.00 

Yakoot Ganj  _  0  0.00  0.00  ‐  0  0.00  0.00 Ingholia  _  0  0.00  0.00  ‐  0  0.00  0.00 

Ichaulia  Ichaulia  Mango  3  40.00  120.00  ‐  0  0.00  0.00 

Pyarepur Saraiya Pyarepur Saraiya Mango 

2  40.00  80.00  ‐  0  0.00  0.00 

Palhari  Palhari  Mango  2  40.00  80.00  ‐  0  0.00  0.00 

Sarai Ka Sthan Sarai Ka Sthan  _  0  0.00  0.00  ‐  0  0.00  0.00 

Chilauki  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  Mango  4  40.00  160.00  Jamun 5  0.50  2.50 

Beerkithai Akhberpur Mangrauda  Mango 

2  40.00  80.00  ‐  0  0.00  0.00 

Beerkithai  Mango  1  40.00  40.00  ‐  0  0.00  0.00 

Danapur Kyampur 

Danapur Kyampur Banana

1  250.00  250.00  ‐  0  0.00  0.00 

Pahrupur Pahrupur  Banana 1  250.00  250.00  ‐  0  0.00  0.00 Inderpur  Mango  2  40.00  80.00  ‐  0  0.00  0.00 

Mehaura  Mehaura  _  0  0.00  0.00  ‐  0  0.00  0.00 

Page 38: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

35

S.No.   MWS Name 

&  Code  

Gram Panchayat  Village 

Name of Important horticultural crop Whole Fruit Crop  Scattered Fruit Crop 

Name  Area (ha)Productivity

(q/ha) Production

(q) Name  Nos.

Productivity(q/No) 

Production (q) 

Said Khanpur  Said Khanpur  Mango  3  40.00  120.00  ‐  0  0.00  0.00 

5 Mehaura 2B2C7g1b 

Mehaura Mehaura  Mango  2  40.00  80.00  ‐  0  0.00  0.00 Purejyori  _  0  0.00  0.00  ‐  0  0.00  0.00 

Chakmandauli  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

Beerkithai Akhberpur Mangrauda 

_ 0  0.00  0.00  ‐  0  0.00  0.00 

Ghazipur  Ghazipur  Banana 1  250.00  250.00  ‐  0  0.00  0.00 Hammid Nagar  Hammid Nagar  Mango  3  40.00  120.00  ‐  0  0.00  0.00 

Sisauna Sisauna  Mango  2  40.00  80.00  ‐  0  0.00  0.00 Jariyari  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

Mahmoodabad  Mahmoodabad  Mango  3  40.00  120.00  ‐  0  0.00  0.00 Said Khanpur  Said Khanpur  Banana 1  250.00  250.00  ‐  0  0.00  0.00 

Saifpur  Saifpur  Mango  2  40.00  80.00  ‐  0  0.00  0.00 Mangrauda  Mangrauda  Mango  2  40.00  80.00  ‐  0  0.00  0.00 

         Total     62     4790.00     15     12.50             

Page 39: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

36

3.5:  Live Stock:  The details of live stock and its productivity are given in Table 3.8 & 3.9.  

 Table 3.8: Details of Livestock Population 

(All figures in Nos.)  

S.N   MWS Name 

&  Code  

Gram Panchayat 

 Village Cow   Buffalo 

Ox/Bull Goat Sheep PiggeriesPoultry 

Desi  Crossed  Desi  Murrah  Broiler  Layers  Total 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  20  12  20  10  0  20  0  0  0  20  20 Rasoolpur  20  12  15  9  2  0  0  0  0  30  30 S.Total  40  24  35  19  2  20  0  0  0  50  50 

Chandawal Chandawal  15  10  15  8  2  25  0  0  0  40  40 Husepur  16  10  19  11  0  0  0  0  0  20  20 S.Total  31  20  34  19  2  25  0  0  0  60  60 

Suryapur Khapraila 

Suryapur Khapraila20  10  20  10  0  0  0  25  0  45  45 

Total  91  54  89  48  4  45  0  25  0  155  155 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila 0  0  0  0  0  0  0  0  0  0  0 Godari  17  12  17  11  4  0  0  0  0  0  0 S.Total  17  12  17  11  4  0  0  0  0  0  0 

Ambaur  Ambaur  0  0  0  0  0  0  0  0  0  0  0 Palhari  Palhari  0  0  0  0  0  0  0  0  0  0  0 

Sarai Ka Sthan  Sarai Ka Sthan  18  13  19  12  0  25  0  0  0  0  0 Shah pur  Shah pur  16  12  19  10  0  20  0  0  0  15  15 Akhberpur Dhanethi 

Ingholia 0  0  0  0  0  0  0  0  0  0  0 

Baghoura  Baghoura  14  10  18  10  0  0  0  0  0  38  38 Total  65  47  73  43  4  45  0  0  0  53  53 

Page 40: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

37

S.N   MWS Name 

& C d

Gram Panchayat 

 Village Cow   Buffalo 

Ox/Bull Goat Sheep PiggeriesPoultry 

Desi  Crossed  Desi  Murrah  Broiler  Layers  Total 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  13  10  17  12  0  0  0  25  0  60  60 

Yakoot Ganj  17  10  19  10  2  25  0  25  0  25  25 Ingholia  18  13  16  10  2  25  0  0  0  42  42 S.Total  48  33  52  32  4  50  0  50  0  127  127 

Ichaulia  Ichaulia  19  14  15  10  0  0  0  22  0  18  18 Pyarepur Saraiya 

Pyarepur Saraiya 20  15  20  10  0  0  0  0  0  30  30 

Palhari  Palhari  18  12  20  10  0  0  0  0  0  20  20 

Sarai Ka Sthan Sarai Ka Sthan  0  0  0  0  0  0  0  0  0  0  0 

Chilauki  20  10  20  10  0  0  0  24  0  23  23 S.Total  20  10  20  10  0  0  0  24  0  23  23 

Total     125  84  127  72  4  50  0  96  0  218  218 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  0  0  0  0  0  0  0  0  0  0  0 

Beerkithai 

Akhberpur Mangrauda  15  10  17  11  0  0  0  26  0  26  26 Beerkithai  18  12  16  11  2  25  0  0  0  38  38 S.Total  33  22  33  22  2  25  0  26  0  64  64 

Danapur Kyampur 

Danapur Kyampur 19  11  15  10  0  0  0  0  0  40  40 

Pahrupur Pahrupur  20  10  17  11  0  0  0  24  0  0  0 Inderpur  19  12  18  10  2  0  0  0  0  18  18 S.Total  39  22  35  21  2  0  0  24  0  18  18 

Mehaura  Mehaura  20  12  19  12  2  0  0  0  0  14  14 Said Khanpur  Said Khanpur  0  0  0  0  0  0  0  0  0  0  0 

Total  111  67  102  65  6  25  0  50  0  136  136 

5 Mehaura 2B2C7g1b 

Mehaura Mehaura  0  0  0  0  0  0  0  0  0  0  0 Purejyori  18  13  20  11  0  30  0  21  0  13  13 

Chakmandauli  17  10  19  10  0  0  0  0  0  0  0 

Page 41: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

38

S.N   MWS Name 

& C d

Gram Panchayat 

 Village Cow   Buffalo 

Ox/Bull Goat Sheep PiggeriesPoultry 

Desi  Crossed  Desi  Murrah  Broiler  Layers  Total S.Total  35  23  39  21  0  30  0  21  0  13  13 

Beerkithai Akhberpur Mangrauda  0  0  0  0  0  0  0  0  0  0  0 

Ghazipur  Ghazipur  18  12  18  12  0  0  0  0  0  0  0 Hammid Nagar  Hammid Nagar  14  9  17  12  0  0  0  0  0  40  40 

Sisauna Sisauna  15  10  16  10  0  0  0  22  0  25  25 Jariyari  20  10  15  8  0  25  0  0  0  20  20 S.Total  35  20  31  18  0  25  0  22  0  45  45 

Mahmoodabad  Mahmoodabad  21  10  16  9  0  0  0  23  0  10  10 Said Khanpur  Said Khanpur  19  12  20  10  0  0  0  22  0  9  9 

Saifpur  Saifpur  18  14  18  10  0  30  0  0  0  13  13 Mangrauda  Mangrauda  19  12  19  12  0  0  0  25  0  14  14 

Total  179  112  178  104  0  85  0  113  0  144  144 

   G.Total  571  364  569 332  18  250  0  284  0  706  706  

Table.3.9: Details of Livestock  Productivity (All figures in Nos.) 

S.No.   MWS Name 

&  Code  

Gram Panchayat   Village 

Milk Production(Liter/day/animal) Goatry  Weight 

Poultry Piggeries  Weight Cows 

Buffalos Broiler  Weight 

Layers 

Desi  Crossed  Desi  Murrah  Kg/goat  Kg/Brl  eggs/day  Kg/Pig 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  1.50  5.50  2.25  8.00  12.00  0.00  8  22 Rasoolpur  1.25  6.00  2.00  7.50  10.00  0.00  12  25 

Chandawal Chandawal  1.00  5.00  2.50  8.00  11.00  0.00  16  20 Husepur  1.50  6.50  1.75  6.50  13.00  0.00  8  24 

Suryapur Khapraila  Suryapur Khapraila  2.00  5.00  2.00  8.50  14.00  0.00  18  21 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila Suryapur Khapraila  1.50  5.50  2.00  5.50  10.00  0.00  0  20 

Godari  1.50  5.50  2.50  7.00  12.00  0.00  0  22 Ambaur  Ambaur  1.25  6.00  1.75  7.50  11.00  0.00  0  23 

Page 42: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

39

S.No.   MWS Name 

&  Code  

Gram Panchayat   Village 

Milk Production(Liter/day/animal) Goatry  Weight 

Poultry Piggeries  Weight Cows 

Buffalos Broiler  Weight 

Layers 

Desi  Crossed  Desi  Murrah  Kg/goat  Kg/Brl  eggs/day  Kg/Pig Palhari  Palhari  1.75  5.00  2.00  7.00  10.00  0.00  0  25 

Sarai Ka Sthan  Sarai Ka Sthan  1.25  6.50  2.25  7.50  15.00  0.00  0  20 Shah pur  Shah pur  1.00  5.00  2.00  8.00  14.00  0.00  6  20 

Akhberpur Dhanethi  Ingholia  1.50  6.50  2.50  6.50  13.00  0.00  0  22 Baghoura  Baghoura  2.00  5.00  1.75  8.50  10.00  0.00  15  22 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi Akhberpur Dhanethi  1.50  5.50  2.00  5.50  12.00  0.00  24  25 

Yakoot Ganj  1.25  6.00  2.50  8.50  11.00  0.00  10  25 Ingholia  1.50  5.50  2.25  7.00  10.00  0.00  16  20 

Ichaulia  Ichaulia  1.25  6.00  2.00  7.50  11.00  0.00  7  24 Pyarepur Saraiya  Pyarepur Saraiya  1.50  5.00  2.50  6.00  13.00  0.00  12  21 

Palhari  Palhari  2.00  6.50  1.75  7.50  14.00  0.00  8  20 

Sarai Ka Sthan Sarai Ka Sthan  1.50  5.00  2.00  8.00  10.00  0.00  0  22 

Chilauki  1.50  5.50  2.00  6.50  12.00  0.00  9  23 

4 Gazipur  2B2C7g1a 

Ghazipur  Ghazipur  1.75  5.00  1.75  5.50  10.00  0.00  0  20 

Beerkithai Akhberpur Mangrauda 

1.25  6.50  2.00  7.00 15.00 

0.00  10  24 Beerkithai  1.00  5.00  2.25  7.50  14.00  0.00  15  21 

Danapur Kyampur  Danapur Kyampur  1.50  5.50  2.00  7.00  12.00  0.00  16  20 

Pahrupur Pahrupur  2.00  5.50  2.50  7.50  11.00  0.00  0  22 Inderpur  1.50  6.00  1.75  8.00  10.00  0.00  7  23 

Mehaura  Mehaura  1.25  5.00  2.00  6.50  15.00  0.00  5  25 Said Khanpur  Said Khanpur  1.00  6.50  1.75  8.50  14.00  0.00  0  20 

5 Mehaura 2B2C7g1b 

Mehaura Mehaura  1.50  5.00  2.00  5.50  13.00  0.00  0  20 Purejyori  2.00  6.50  2.00  8.00  10.00  0.00  5  22 

Chakmandauli  1.50  5.00  2.50  6.50  12.00  0.00  0  22 

Beerkithai  Akhberpur Mangrauda 1.50  5.50  1.75  8.50 

10.00 0.00  0  25 

Page 43: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

40

S.No.   MWS Name 

&  Code  

Gram Panchayat   Village 

Milk Production(Liter/day/animal) Goatry  Weight 

Poultry Piggeries  Weight Cows 

Buffalos Broiler  Weight 

Layers 

Desi  Crossed  Desi  Murrah  Kg/goat  Kg/Brl  eggs/day  Kg/Pig Ghazipur  Ghazipur  1.25  5.50  2.00  5.50  11.00  0.00  0  20 

Hammid Nagar  Hammid Nagar  1.75  6.00  2.25  7.00  13.00  0.00  16  25 

Sisauna Sisauna  1.25  5.00  2.00  7.50  14.00  0.00  10  20 Jariyari  1.00  6.50  2.50  7.00  10.00  0.00  8  20 

Mahmoodabad  Mahmoodabad  1.50  5.00  1.75  7.50  12.00  0.00  4  22 Said Khanpur  Said Khanpur  2.00  6.50  2.00  8.00  13.00  0.00  3  22 

Saifpur  Saifpur  1.50  5.00  2.25  6.50  14.00  0.00  5  25 Mangrauda  Mangrauda  1.50  6.50  2.00  7.00  10.00  0.00  5  20 

         Average/sum  1.48  5.63  2.08  7.18  11.98  0.00  278  22.05  

3.6: Livelihood Status:  The details of livelihood status of landless/assetless people and Present (for Farmers & others) are given below‐ Table 3.10: Details of Livelihood Status of Landless/Assetless people (Pre Project status) 

(income in Rs.) 

S.No   MWS Name 

&  Code  

Gram Panchayat   Village Name of Livelihood Activity 

No.of house hold engaged  Pre  project  Desired 

 Activities 

Expected  Incomefrom desired activites 

SC/ST  Other  Women  Total Avg.  

Income/Yr 

1  2  3  4  5  6  7  8  9  10  11  12 

1 Ambaur 2B2C7d2a 

Ambaur 

Ambaur  Labour  116  84  10  210  19000  A/H &ME  >20‐25% Rasoolpur  Labour  18  13  2  33  21000  A/H &ME  >22‐25% S.Total     134  97  12  243          

Chandawal 

Chandawal  Labour  93  68  8  169  18000  A/H &ME  >25‐28% Husepur  Labour  29  21  2  52  20000  A/H &ME  >22‐24% S.Total     122  89  10  221          

Suryapur Khapraila  Suryapur Khapraila  Labour  66  48  6  120  22000  A/H &ME  >22‐25% Total     322  234  28  584          

Page 44: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

41

S.No   MWS Name 

&  Code  

Gram Panchayat   Village Name of Livelihood Activity 

No.of house hold engaged  Pre  project  Desired 

 Activities 

Expected  Incomefrom desired activites 

SC/ST  Other  Women  Total Avg.  

Income/Yr 

1  2  3  4  5  6  7  8  9  10  11  12 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  Labour  0  0  0  0  0  ‐‐  ‐‐ Godari  Labour  27  20  2  49  18000  A/H &ME  >20‐25% S.Total     27  20  2  49          

Ambaur  Ambaur  Labour  0  0  0  0  0  ‐‐  ‐‐ Palhari  Palhari  Labour  0  0  0  0  0  ‐‐  ‐‐ 

Sarai Ka Sthan  Sarai Ka Sthan  Labour  34  25  3  62  21000  A/H &ME  >22‐24% Shah pur  Shah pur  Labour  61  44  6  111  23000  A/H &ME  >25‐28% 

Akhberpur Dhanethi  Ingholia  Labour  0  0  0  0  0  ‐‐  ‐‐ Baghoura  Baghoura  Labour  84  61  7  152  23000  A/H &ME  >22‐25% 

Total     206  150  18  374          

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  Labour  57  42  5  104  22000  A/H &ME  >20‐25% 

Yakoot Ganj  Labour  60  44  5  109  20000  A/H &ME  >22‐25% Ingholia  Labour  24  17  2  43  18000  A/H &ME  >22‐25% S.Total     141  103  12  256          

Ichaulia  Ichaulia  Labour  48  35  5  88  19000  A/H &ME  >22‐24% Pyarepur Saraiya  Pyarepur Saraiya  Labour  44  32  4  80  19000  A/H &ME  >25‐28% 

Palhari  Palhari  Labour  111  81  10  202  23000  A/H &ME  >25‐28% 

Sarai Ka Sthan     

Sarai Ka Sthan  Labour  0  0  0  0  0  ‐‐  ‐‐ Chilauki  Labour  29  21  2  52  18000  A/H &ME  >22‐25% S.Total     29  21  2  52          

Total        373  272  33  678             

   

Ghazipur  Ghazipur  Labour  0  0  0  0  0  ‐‐  ‐‐ 

Beerkithai Akhberpur Mangrauda  Labour  41  30  4  75  19000  A/H &ME  >20‐25% 

Page 45: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

42

S.No   MWS Name 

&  Code  

Gram Panchayat   Village Name of Livelihood Activity 

No.of house hold engaged  Pre  project  Desired 

 Activities 

Expected  Incomefrom desired activites 

SC/ST  Other  Women  Total Avg.  

Income/Yr 

1  2  3  4  5  6  7  8  9  10  11  12      

     Gajipur  2B2C7g1a 

Beerkithai  Labour  61  44  6  111  20000  A/H &ME  >22‐25% S.Total     102  74  10  186          

Danapur Kyampur  Danapur Kyampur  Labour  62  45  6  113  20000  A/H &ME  >22‐25% 

Pahrupur 

Pahrupur  Labour  41  30  3  74  18000  A/H &ME  >25‐28% Inderpur  Labour  27  20  2  49  18000  A/H &ME  >22‐24% S.Total     68  50  5  123          

Mehaura  Mehaura  Labour  63  46  6  115  21000  A/H &ME  >22‐25% Said Khanpur  Said Khanpur  Labour  0  0  0  0  0  ‐‐  ‐‐ 

Total        295  215  27  537          

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  Labour  0  0  0  0  0  ‐‐  ‐‐ Purejyori  Labour  5  4  0  9  18000  A/H &ME  >22‐25% 

Chakmandauli  Labour  13  10  2  25  18000  A/H &ME  >22‐25% S.Total  18  14  2  34          

Beerkithai Akhberpur Mangrauda  Labour  0  0  0  0  0  ‐‐  ‐‐ 

Ghazipur  Ghazipur  Labour  186  135  17  338  23000  A/H &ME  >22‐25% Hammid Nagar  Hammid Nagar  Labour  57  42  5  104  22000  A/H &ME  >22‐25% 

Sisauna 

Sisauna  Labour  26  19  3  48  18000  A/H &ME  >25‐28% Jariyari  Labour  18  13  2  33  18000  A/H &ME  >22‐24% S.Total  44  32  5  81          

Mahmoodabad  Mahmoodabad  Labour  101  73  9  183  22000  A/H &ME  >22‐25% Said Khanpur  Said Khanpur  Labour  86  63  8  157  22000  A/H &ME  >25‐28% 

Saifpur  Saifpur  Labour  53  39  6  98  19000  A/H &ME  >22‐24% Mangrauda  Mangrauda  Labour  44  32  4  80  19000  A/H &ME  >25‐28% 

Total     589  430  56  1075          

Page 46: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

43

S.No   MWS Name 

&  Code  

Gram Panchayat   Village Name of Livelihood Activity 

No.of house hold engaged  Pre  project  Desired 

 Activities 

Expected  Incomefrom desired activites 

SC/ST  Other  Women  Total Avg.  

Income/Yr 

1  2  3  4  5  6  7  8  9  10  11  12 

   G.Total     1785  1301  162  3248            

Table 3.11: Details of Livelihood Status of Other Farmers (income in Rs.) 

S.No.   MWS Name &  Code  

Gram Panchayat   Village Name Of Livelihood Activity 

No. of Persons engaged  Pre project Average Income 

 Desired Activities 

 Expected Income from 

desired activities 

SC/ST  Other  Women Total 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  Ag & A/H  189  378  63  630  49000  Crop demo, Seed Prod. ME >25‐30% Rasoolpur  Ag & A/H  30  59  10  99  51000  Crop demo, Seed Prod. ME >28‐30% S.Total     219  437  73  729          

Chandawal Chandawal  Ag & A/H  152  304  51  507  48000  Crop demo, Seed Prod. ME >26‐30% Husepur  Ag & A/H  47  94  16  157  50000  Crop demo, Seed Prod. ME >25‐28% S.Total     199  398  66  664          

Suryapur Khapraila 

Suryapur Khapraila  Ag & A/H  108  216  36  360  52000  Crop demo, Seed Prod. ME >28‐30% 

Total     526  1052  175  1753          

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila     0  0  0  0  0       Godari  Ag & A/H  44  88  15  146  48000  Crop demo, Seed Prod. ME >30‐32% S.Total     44  88  15  146          

Ambaur  Ambaur     0  0  0  0  0       Palhari  Palhari     0  0  0  0  0       

Sarai Ka Sthan  Sarai Ka Sthan  Ag & A/H  56  112  19  187  51000  Crop demo, Seed Prod. ME >30‐35% Shah pur  Shah pur  Ag & A/H  100  199  33  332  53000  Crop demo, Seed Prod. ME >30‐32% 

Page 47: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

44

S.No.   MWS Name &  Code  

Gram Panchayat   Village Name Of Livelihood Activity 

No. of Persons engaged  Pre project Average Income 

 Desired Activities 

 Expected Income from 

desired activities 

SC/ST  Other  Women Total 

Akhberpur Dhanethi 

Ingholia    0  0  0  0  0       

Baghoura  Baghoura  Ag & A/H  137  274  46  456  53000  Crop demo, Seed Prod. ME >28‐32% Total     336  673  112  1121          

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  Ag & A/H  94  187  31  312  52000  Crop demo, Seed Prod. ME >25‐30% 

Yakoot Ganj  Ag & A/H  98  196  33  327  50000  Crop demo, Seed Prod. ME >30‐32% Ingholia  Ag & A/H  39  78  13  130  48000  Crop demo, Seed Prod. ME >28‐30% S.Total     231  461  77  769          

Ichaulia  Ichaulia  Ag & A/H  79  158  26  263  49000  Crop demo, Seed Prod. ME >28‐30% Pyarepur Saraiya  Pyarepur Saraiya Ag & A/H  72  145  24  241  49000  Crop demo, Seed Prod. ME >30‐32% 

Palhari  Palhari  Ag & A/H  182  363  61  605  53000  Crop demo, Seed Prod. ME >28‐30% 

Sarai Ka Sthan Sarai Ka Sthan     0  0  0  0  0       

Chilauki  Ag & A/H  47  93  16  155  48000  Crop demo, Seed Prod. ME >30‐32% S.Total     47  93  16  155          

Total        610  1220  203  2033          

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur     0  0  0  0  0       

Beerkithai 

Akhberpur Mangrauda  Ag & A/H  67  134  22  224  49000  Crop demo, Seed Prod. ME >28‐30% Beerkithai  Ag & A/H  100  200  33  333  50000  Crop demo, Seed Prod. ME >30‐32% S.Total     167  334  56  557          

Danapur Kyampur 

Danapur Kyampur  Ag & A/H  101  203  34  338  50000  Crop demo, Seed Prod. ME >30‐32% 

Pahrupur Pahrupur  Ag & A/H  67  133  22  222  48000  Crop demo, Seed Prod. ME >28‐30% Inderpur  Ag & A/H  44  88  15  147  48000  Crop demo, Seed Prod. ME >30‐32% S.Total     111  221  37  369          

Page 48: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

45

S.No.   MWS Name &  Code  

Gram Panchayat   Village Name Of Livelihood Activity 

No. of Persons engaged  Pre project Average Income 

 Desired Activities 

 Expected Income from 

desired activities 

SC/ST  Other  Women Total 

Mehaura  Mehaura  Ag & A/H  103  206  34  344  51000  Crop demo, Seed Prod. ME >30‐32% Said Khanpur  Said Khanpur     0  0  0  0  0       

Total     482  965  161  1608          

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura     0  0  0  0  0       Purejyori  Ag & A/H  8  16  3  27  48000  Crop demo, Seed Prod. ME >28‐30% 

Chakmandauli  Ag & A/H  21  43  7  71  48000  Crop demo, Seed Prod. ME >30‐32% S.Total  29  59  10  98          

Beerkithai Akhberpur Mangrauda     0  0  0  0  0       

Ghazipur  Ghazipur  Ag & A/H  304  608  101  1014  53000  Crop demo, Seed Prod. ME >30‐32% Hammid Nagar  Hammid Nagar  Ag & A/H  94  188  31  313  52000  Crop demo, Seed Prod. ME >30‐32% 

Sisauna Sisauna  Ag & A/H  43  86  14  143  48000  Crop demo, Seed Prod. ME >28‐30% Jariyari  Ag & A/H  29  59  10  98  48000  Crop demo, Seed Prod. ME >30‐32% S.Total  72  145  24  241          

Mahmoodabad  Mahmoodabad  Ag & A/H  165  329  55  549  52000  Crop demo, Seed Prod. ME >30‐32% Said Khanpur  Said Khanpur  Ag & A/H  141  282  47  470  52000  Crop demo, Seed Prod. ME >28‐30% 

Saifpur  Saifpur  Ag & A/H  87  175  29  291  49000  Crop demo, Seed Prod. ME >30‐32% Mangrauda  Mangrauda  Ag & A/H  72  144  24  240  49000  Crop demo, Seed Prod. ME >28‐30% 

Total     965  1930  322  3216             G.Total     2919  5839  973  9731          

  

     

 

Page 49: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

46

Table 3.12: Details of Present Livelihood Status  (Rs. in lacs) 

S.N   MWS Name &  Code  

Gram Panchayat   Village 

Activities

Dairy  Poultry  Goatry  Piggeries Black Smithy 

Carpentry Stitching/ knitting 

Wages 

No. of a

nimals 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  62  1.24  20  0.02  20  0.60  0  0.00  2  0.90  4  1.80  10  1.08  30  3.60 Rasoolpur  56  1.12  30  0.03  0  0.00  0  0.00  4  1.80  5  2.25  6  0.65  25  3.00 S.Total  118  2.36  50  0.05  20  0.60  0  0.00  6  2.70  9  4.05  16  1.73  55  6.60 

Chandawal Chandawal  48  0.96  40  0.04  25  0.75  0  0.00  6  2.70  6  2.70  5  0.54  20  2.40 Husepur  56  1.12  20  0.02  0  0.00  0  0.00  0  0.00  9  4.05  4  0.43  21  2.52 S.Total  104  2.08  60  0.06  25  0.75  0  0.00  6  2.70  15  6.75  9  0.97  41  4.92 

Suryapur Khapraila 

Suryapur Khapraila  60  1.20  45  0.05  0  0.00  25  1.00  3  1.35  7  3.15  3  0.32  20  2.40 

Total  282  5.64  155  0.17  45  1.35  25  1.00  15  6.75  31  13.95  28  3.02  116  13.92 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  5  2.25  9  0.97  26  3.12 Godari  57  1.14  0  0.00  0  0.00  0  0.00  3  1.35  7  3.15  3  0.32  28  3.36 S.Total  57  1.14  0  0.00  0  0.00  0  0.00  3  1.35  12  5.40  12  1.30  54  6.48 

Ambaur  Ambaur  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00 Palhari  Palhari  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  7  3.15  9  0.97  27  3.24 

Sarai Ka Sthan  Sarai Ka Sthan  62  1.24  0  0.00  25  0.75  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00 Shah pur  Shah pur  57  1.14  15  0.02  20  0.60  0  0.00  4  1.80  4  1.80  5  0.54  26  3.12 Akhberpur Dhanethi 

Ingholia 0  0.00  0  0.00  0  0.00  0  0.00  6  2.70  8  3.60  8  0.86  29  3.48 

Baghoura  Baghoura  52  1.04  38  0.04  0  0.00  0  0.00  9  4.05  3  1.35  9  0.97  26  3.12 Total  228  4.56  53  0.06  45  1.35  0  0.00  22  9.90  34  15.30  43  4.64  162  19.44 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi 

Akhberpur Dhanethi  52  1.04  60  0.06  0  0.00  25  1.00  5  2.25  9  4.05  6  0.65  40  4.80 

Yakoot Ganj  56  1.12  25  0.03  25  0.75  25  1.00  3  1.35  3  1.35  11  1.19  30  3.60 Ingholia  57  1.14  42  0.05  25  0.75  0  0.00  4  1.80  7  3.15  8  0.86  30  3.60 

Page 50: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

47

S.N   MWS Name &  Code  

Gram Panchayat   Village 

Activities

Dairy  Poultry  Goatry  Piggeries Black Smithy 

Carpentry Stitching/ knitting 

Wages 

No. of a

nimals 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20 S.Total  165  3.30  127  0.14  50  1.50  50  2.00  12  5.40  19  8.55  25  2.70  100  12.00 

Ichaulia  Ichaulia  58  1.16  18  0.02  0  0.00  22  0.88  3  1.35  9  4.05  7  0.76  30  3.60 Pyarepur Saraiya  Pyarepur Saraiya  65  1.30  30  0.03  0  0.00  0  0.00  5  2.25  8  3.60  6  0.65  35  4.20 

Palhari  Palhari  60  1.20  20  0.02  0  0.00  0  0.00  8  3.60  7  3.15  10  1.08  28  3.36 

Sarai Ka Sthan Sarai Ka Sthan  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00  0  0.00 

Chilauki  60  1.20  23  0.02  0  0.00  24  0.96  7  3.15  6  2.70  10  1.08  30  3.60 S.Total  60  1.20  23  0.02  0  0.00  24  0.96  7  3.15  6  2.70  10  1.08  30  3.60 

Total     408  8.16  218  0.24  50  1.50  96  3.84  35  15.75  49  22.05  58  6.26  223  26.76 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  0  0.00  0  0.00  0  0.00  0  0.00  5  2.25  8  3.60  12  1.30  31  3.72 

Beerkithai 

Akhberpur Mangrauda  53  1.06  26  0.03  0  0.00  26  1.04  5  2.25  4  1.80  8  0.86  20  2.40 Beerkithai  57  1.14  38  0.04  25  0.75  0  0.00  2  0.90  6  2.70  7  0.76  18  2.16 S.Total  110  2.20  64  0.07  25  0.75  26  1.04  7  3.15  10  4.50  15  1.62  38  4.56 

Danapur Kyampur 

Danapur Kyampur 55  1.10  40  0.04  0  0.00  0  0.00  3  1.35  5  2.25  6  0.65  17  2.04 

Pahrupur Pahrupur  58  1.16  0  0.00  0  0.00  24  0.96  5  2.25  4  1.80  8  0.86  14  1.68 Inderpur  59  1.18  18  0.02  0  0.00  0  0.00  4  1.80  6  2.70  20  2.16  13  1.56 S.Total  117  2.34  18  0.02  0  0.00  24  0.96  9  4.05  10  4.50  28  3.02  27  3.24 

Mehaura  Mehaura  63  1.26  14  0.02  0  0.00  0  0.00  3  1.35  9  4.05  8  0.86  15  1.80 Said Khanpur  Said Khanpur  0  0.00  0  0.00  0  0.00  0  0.00  5  2.25  3  1.35  7  0.76  18  2.16 

Total  345  6.90  136  0.15  25  0.75  50  2.00  32  14.40  45  20.25  76  8.21  146  17.52 

5 Mehaura 2B2C7g1b 

Mehaura 

Mehaura  0  0.00  0  0.00  0  0.00  0  0.00  8  3.60  8  3.60  6  0.65  21  2.52 Purejyori  62  1.24  13  0.01  30  0.90  21  0.84  7  3.15  7  3.15  16  1.73  27  3.24 

Chakmandauli  56  1.12  0  0.00  0  0.00  0  0.00  6  2.70  1  0.45  11  1.19  20  2.40 S.Total  118  2.36  13  0.01  30  0.90  21  0.84  21  9.45  16  7.20  33  3.56  68  8.16 

Beerkithai Akhberpur Mangrauda  0  0.00  0  0.00  0  0.00  0  0.00  3  1.35  5  2.25  12  1.30  26  3.12 

Page 51: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

48

S.N   MWS Name &  Code  

Gram Panchayat   Village 

Activities

Dairy  Poultry  Goatry  Piggeries Black Smithy 

Carpentry Stitching/ knitting 

Wages 

No. of a

nimals 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

No 

Avg income 

(per Year) 

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20 Ghazipur  Ghazipur  60  1.20  0  0.00  0  0.00  0  0.00  5  2.25  6  2.70  11  1.19  24  2.88 

Hammid Nagar  Hammid Nagar  52  1.04  40  0.04  0  0.00  0  0.00  8  3.60  7  3.15  16  1.73  23  2.76 

Sisauna Sisauna  51  1.02  25  0.03  0  0.00  22  0.88  7  3.15  8  3.60  10  1.08  26  3.12 Jariyari  53  1.06  20  0.02  25  0.75  0  0.00  9  4.05  7  3.15  12  1.30  20  2.40 S.Total  104  2.08  45  0.05  25  0.75  22  0.88  16  7.20  15  6.75  22  2.38  46  5.52 

Mahmoodabad  Mahmoodabad  56  1.12  10  0.01  0  0.00  23  0.92  10  4.50  9  4.05  13  1.40  21  2.52 Said Khanpur  Said Khanpur  61  1.22  9  0.01  0  0.00  22  0.88  10  4.50  8  3.60  10  1.08  12  1.44 

Saifpur  Saifpur  60  1.20  13  0.01  30  0.90  0  0.00  7  3.15  7  3.15  8  0.86  30  3.60 Mangrauda  Mangrauda  62  1.24  14  0.02  0  0.00  25  1.00  3  1.35  6  2.70  7  0.76  11  1.32 

Total  573  11.46  144  0.16  85  2.55  113  4.52  83  37.35  79  35.55  132  14.26  261  31.32    G.Total  1836  36.72  706  0.76  250  7.50  284  11.36  187  84.15  238  107.10  337  36.40  908  108.96 

  

Table 3.13: Ground Water Status  S.No.    MWS Name & 

 Code  Gram Panchayat   Village  Depth of Ground Water  Table (Below 

Ground level) in Meter No. of Observation 

wells Remarks 

Before Monsoon  After Monsoon 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  6  5  2  ‐‐ Rasoolpur  7  6  1  ‐‐ 

Chandawal Chandawal  6  5  2  ‐‐ Husepur  7  6  1  ‐‐ 

Suryapur Khapraila  Suryapur Khapraila  6  5  3  ‐‐ 

2 Suryapur Khapraila 

Suryapur Khapraila Suryapur Khapraila  6  5  2  ‐‐ 

Godari  7  6  1  ‐‐ 

Page 52: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

49

S.No.    MWS Name &  Code  

Gram Panchayat   Village  Depth of Ground Water  Table (Below Ground level) in Meter 

No. of Observation wells 

Remarks 

Before Monsoon  After Monsoon 2B2C7d2c  Ambaur  Ambaur  7  6  3  ‐‐ 

Palhari  Palhari  6  5  3  ‐‐ Sarai Ka Sthan  Sarai Ka Sthan  7  6  2  ‐‐ 

Shah pur  Shah pur  6  5  1  ‐‐ Akhberpur Dhanethi  Ingholia  7  6  2  ‐‐ 

Baghoura  Baghoura  6  5  3  ‐‐ 

3 Akhberpur Dhanethi  2B2C7d2d 

Akhberpur Dhanethi Akhberpur Dhanethi  7  6  2  ‐‐ 

Yakoot Ganj  6  5  1  ‐‐ Ingholia  6  5  1  ‐‐ 

Ichaulia  Ichaulia  6  5  3  ‐‐ Pyarepur Saraiya  Pyarepur Saraiya  7  6  2  ‐‐ 

Palhari  Palhari  7  6  3  ‐‐ Sarai Ka Sthan  Sarai Ka Sthan  6  5  2  ‐‐ 

   Chilauki  6  5  2  ‐‐ 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  7  6  3  ‐‐ 

Beerkithai Akhberpur Mangrauda  7  6  1  ‐‐ 

Beerkithai  6  5  2  ‐‐ Danapur Kyampur  Danapur Kyampur  7  6  3  ‐‐ 

Pahrupur Pahrupur  6  5  4  ‐‐ Inderpur  7  6  3  ‐‐ 

Mehaura  Mehaura  7  6  1  ‐‐ Said Khanpur  Said Khanpur  8  7  2  ‐‐ 

5 Mehaura 2B2C7g1b 

Mehaura Mehaura  6  5  1  ‐‐ Purejyori  7  6  3  ‐‐ 

Chakmandauli  8  7  2  ‐‐ Beerkithai  Akhberpur Mangrauda  6  5  1  ‐‐ Ghazipur  Ghazipur  7  6  3  ‐‐ 

Page 53: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

50

S.No.    MWS Name &  Code  

Gram Panchayat   Village  Depth of Ground Water  Table (Below Ground level) in Meter 

No. of Observation wells 

Remarks 

Before Monsoon  After Monsoon 

Hammid Nagar  Hammid Nagar  6  5  1  ‐‐ 

Sisauna Sisauna  7  6  4  ‐‐ Jariyari  8  7  2  ‐‐ 

Mahmoodabad  Mahmoodabad  7  6  3  ‐‐ Said Khanpur  Said Khanpur  6  5  3  ‐‐ 

Saifpur  Saifpur  6  5  1  ‐‐ Mangrauda  Mangrauda  7  6  2  ‐‐ 

      Average/Sum     6.61  5.61  87     Table 3.14:Cultivation/ Irrigation Status   

(Area in ha.)  

S.No. Code of MWS 

Name of MWS 

Gross Cultivated Area  Net Cultivated Area (ha) 

Gross Irrigated Area  Net Irrigated Area(ha) 

Rainfed Area (ha) Kharif  Rabi  Zaid  Total  Kharif  Rabi  Zaid  Total 

1  2  3  4  5  6  7  8  9  10  11  12  13  14 1  2B2C7d2a  Ambaur  677  479  200  1355  876  477  399  200  1076  477  399 

2  2B2C7d2c Suryapur Khapraila  709  684  285  1678  994  424  570  285  1279  424  570 

3  2B2C7d2d Akhberpur Dhanethi  823  669  304  1796  1127  519  608  304  1431  519  608 

4  2B2C7g1a  Gajipur  1418  931  423  2772  1841  995  846  423  2264  995  846 5  2B2C7g1b  Mehaura  1243  1255  571  3068  1813  672  1141  571  2384  672  1141       Total  4869  4017  1782  10668  6651  3087  3564  1782  8433  3087  3564 

      

Page 54: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

51

Table 3.15: Irrigation Area (source wise)                                                                                                                                                                                                                                                (Area in ha.) 

S.No.   MWS Name 

&  Code  

Gram  Panchayat 

 Village Canal Area 

State Tube  wells 

Tanks  Open well  Bore wells Lift 

irrigation Others (Specify) 

Total Irrigated  Area 

No. Area No. Area  No.  Area No.  Area  No.  Area No.  Area 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18 

1 Ambaur 2B2C7d2a 

Ambaur Ambaur  69  0  0  0  0  0  0  96  204  0  0  0  0  273 Rasoolpur  16  0  0  0  0  0  0  23  46  0  0  0  0  62 S.Total  85  0  0  0  0  0  0  119  250  0  0  0  0  335 

Chandawal Chandawal  28  0  0  0  0  0  0  41  72  0  0  0  0  100 Husepur  9  0  0  0  0  0  0  10  20  0  0  0  0  29 S.Total  37  0  0  0  0  0  0  51  92  0  0  0  0  129 

Suryapur Khapraila 

Suryapur Khapraila  4  0  0  0  0  0  0  5  9  0  0  0  0  13 

Total  126  0  0  0  0  0  0  175  351  0  0  0  0  477 

2 Suryapur Khapraila 2B2C7d2c 

Suryapur Khapraila 

Suryapur Khapraila  8  0  0  0  0  0  0  8  15  0  0  0  0  23 Godari  20  0  0  0  0  0  0  18  40  0  0  0  0  60 S.Total  28  0  0  0  0  0  0  26  55  0  0  0  0  83 

Ambaur  Ambaur  3  0  0  0  0  0  0  4  9  0  0  0  0  12 Palhari  Palhari  40  0  0  0  0  0  0  45  100  0  0  0  0  140 

Sarai Ka Sthan  Sarai Ka Sthan 15  0  0  0  0  0  0  11  30  0  0  0  0  45 

Shah pur  Shah pur  20  0  0  0  0  0  0  19  44  0  0  0  0  64 Akhberpur Dhanethi 

Ingholia 10  0  0  0  0  0  0  13  27  0  0  0  0  37 

Baghoura  Baghoura  15  0  0  0  0  0  0  11  28  0  0  0  0  43 Total  131  0  0  0  0  0  0  129  293  0  0  0  0  424 

  

  

Akhberpur Dhanethi 

Akhberpur Dhanethi  45  0  0  0  0  0  0  16  40  0  0  0  0  85 

Page 55: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

52

S.No.   MWS Name 

&  Code  

Gram  Panchayat 

 Village Canal Area 

State Tube  wells 

Tanks  Open well  Bore wells Lift 

irrigation Others (Specify) 

Total Irrigated  Area 

No. Area No. Area  No.  Area No.  Area  No.  Area No.  Area 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18 3           

Akhberpur Dhanethi  2B2C7d2d 

          

Yakoot Ganj  0  0  0  0  0  0  0  0  0  0  0  0  0  0 Ingholia  4  0  0  0  0  0  0  2  6  0  0  0  0  10 S.Total  49  0  0  0  0  0  0  18  46  0  0  0  0  95 

Ichaulia  Ichaulia  115  0  0  0  0  0  0  48  99  0  0  0  0  214 Pyarepur Saraiya 

Pyarepur Saraiya  72  0  0  0  0  0  0  21  47  0  0  0  0  119 

Palhari  Palhari  15  0  0  0  0  0  0  8  19  0  0  0  0  34 

Sarai Ka Sthan Sarai Ka Sthan  2  0  0  0  0  0  0  1  4  0  0  0  0  6 

Chilauki  6  0  0  0  0  0  0  2  4  0  0  0  0  10 S.Total  8  0  0  0  0  0  0  3  8  0  0  0  0  16 

Total     259  0  0  0  0  0  0  98  219  0  0  0  0  478 

4 Gajipur  

2B2C7g1a 

Ghazipur  Ghazipur  45  0  0  0  0  0  0  130  362  0  0  0  0  407 

Beerkithai 

Akhberpur Mangrauda  25  0  0  0  0  0  0  85  175  0  0  0  0  200 Beerkithai  3  0  0  0  0  0  0  13  27  0  0  0  0  30 S.Total  28  0  0  0  0  0  0  98  202  0  0  0  0  230 

Danapur Kyampur 

Danapur Kyampur  2  0  0  0  0  0  0  5  16  0  0  0  0  18 

Pahrupur Pahrupur  4  0  0  0  0  0  0  3  10  0  0  0  0  14 Inderpur  5  0  0  0  0  0  0  18  35  0  0  0  0  40 S.Total  9  0  0  0  0  0  0  21  45  0  0  0  0  54 

Mehaura  Mehaura  2  0  0  0  0  0  0  4  4  0  0  0  0  6 Said Khanpur  Said Khanpur  35  0  0  0  0  0  0  150  245  0  0  0  0  280 

Total  121  0  0  0  0  0  0  408  874  0  0  0  0  995 

5 Mehaura 2B2C7g1b 

Mehaura Mehaura  5  0  0  0  0  0  0  10  24  0  0  0  0  29 Purejyori  2  0  0  0  0  0  0  2  6  0  0  0  0  8 

Page 56: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

53

S.No.   MWS Name 

&  Code  

Gram  Panchayat 

 Village Canal Area 

State Tube  wells 

Tanks  Open well  Bore wells Lift 

irrigation Others (Specify) 

Total Irrigated  Area 

No. Area No. Area  No.  Area No.  Area  No.  Area No.  Area 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18 

Chakmandauli  5  0  0  0  0  0  0  10  26  0  0  0  0  31 S.Total  12  0  0  0  0  0  0  22  56  0  0  0  0  68 

Beerkithai Akhberpur Mangrauda  7  0  0  0  0  0  0  14  34  0  0  0  0  41 

Ghazipur  Ghazipur  4  0  0  0  0  0  0  8  20  0  0  0  0  24 

Hammid Nagar  Hammid Nagar 17  0  0  0  0  0  0  30  98  0  0  0  0  115 

Sisauna Sisauna  10  0  0  0  0  0  0  18  50  0  0  0  0  60 Jariyari  6  0  0  0  0  0  0  17  41  0  0  0  0  47 S.Total  16  0  0  0  0  0  0  35  91  0  0  0  0  107 

Mahmoodabad Mahmoodabad23  0  0  0  0  0  0  97  84  0  0  0  0  107 

Said Khanpur  Said Khanpur  4  0  0  0  0  0  0  5  16  0  0  0  0  20 Saifpur  Saifpur  5  0  0  0  0  0  0  8  55  0  0  0  0  60 

Mangrauda  Mangrauda  3  0  0  0  0  0  0  9  27  0  0  0  0  30 Total  91  0  0  0  0  0  0  228  481  0  0  0  0  572 

   G.Total  728  0  0  0  0  0  0  1038 2218  0  0  0  0  2946  

  

  

  

  

Page 57: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

54

CHAPTER‐4 INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 

 4.1: Project Implementing Agency  The  Project  Implementing  Agencies  (PIA)  is  selected  by  state  level  Nodal  Agency  (SLNA)  for  Integrated Watershed Management  Programme 

(IWMP)  in Barabanki District of U.P. The PIA  is responsible for  implementation of Watershed Program.   The PIA for IWMP  in Barabanki District  is 

Bhoomi Sanrakshan Adhikari (BSA), Land Development & Water Resource. 

Table 4.1: Details of Project Implementing Agency (PIA)  

S. No.  Particulars of PIA 

1  2  3 

(i)   Date of selection of PIA  28.05.2010 

(ii)   Type of organization  Line Dept. 

(iii)   Name of organization  Dept. of Land Development & Water Resources  

(iv)   Designation & Address  Deptt of Bhumi Samrakshan Adhikari, Barabanki 

(v)   Telephone/Mo.No.  09839515895 

(vi)   E‐mail  [email protected] 

  

  

   

Page 58: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

55

Table 4.2: Details of Staff at PIA  S. NO.  Name  M/F  Designation  Qualification  Field of Experience & 

Period Roll/Function 

1  2  3  4  5  6  7 

1  Mr. Om Prakash  M  B.S.A  Ag.Engg. Diploma  30  PIA, Watershed management 

2  Mr. Habibullah Khan  M  A.S.C.I  M.Sc. Ag.  30  Soil & Water Conservation 

3  Mr. R.M. Yadav  M  A.S.C.I  B.Sc. Ag.  28  Soil & Water Conservation 

4  Mr. Ajay Prakash Verma  M  D/Man  Inter & Diploma  31  Watershed management 

5  Mr. Ajay Kumar Nigam   M  Accountant  M.Com.  30  Watershed management 

6  Mr. Sushil Kumar Singh  M  "  M.Com.  7  Watershed management 

7  Smt. Archna  F  Tracer  M.A.  7  Watershed management 

8  Mr. Kunwer Jitendra Singh  M  "  M.A.  29  Watershed management 

9  Mr. Sidharth Yadav  M  "  B.A.  7  Watershed management 

10  Mr. K.K. Srivastava  M  Irrigation Supervisor  Intermediate  29  Watershed management 

11  Mr. Pyare Lal Verma  M  "  Intermediate  28  Watershed management 

12  Mr. Ram Lakhan  M  "  Intermediate  29  Watershed management 

13  Mr. Ashok Singh  M  Sinchpal  Intermediate  21  Watershed management 

14  Mr. Kamlesh Kumar  M  "  B.A.  7  Watershed management 

15  Mr. Radha Krishna Tiwari  M  "  M.A.  30  Watershed management 

16  Mr. Deep Singh  M  "  M.A.  29  Watershed management 

  Table 4.3: Details of Watershed Development Team (WDT) 

S. NO.  Name  M/F  Designation  Qualification Field of Experience & 

Period (YEAR) Roll/Function 

1  2  3  4  5  6  7 1  Sri Ram Milan Yadav  M  W.D.T.  B.Sc.Ag  28 Years  Soil conservation 2  Sri Shirish Kumar Singh  M  W.D.T.  B.Sc.Ag  2 Years  Soil conservation 3  Sri Vinod Kumar Mishra  M  W.D.T.  B.A.  2 Years  Social Moblization 

Page 59: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

56

S. NO.  Name  M/F  Designation  Qualification Field of Experience & 

Period (YEAR) Roll/Function 

1  2  3  4  5  6  7 4  Sri Niyaj Ahmad  M  W.D.T.  Civil Engg.Diploma  30 Years  Watershed Management 5  Sri Habibullah khan  M  W.D.T.  B.Sc.Ag  30 Years  Soil conservation 6  Sri K.K.Srivastva  M  W.D.T.  B.A.  20 Years  Watershed Management 7  Sri Shashi Bhusan Shukla  M  W.D.T.  M.A.  25 Years  Watershed Management 8  Sri Kamlesh Kumar  M  W.D.T.  B.A.  6 Years  Watershed Management 9  Sri Deep Singh  M  W.D.T.  M.A.  4 Years  Watershed Management 10  Sri Pyare Lal  M  W.D.T.  Intermediate  20 Years  Watershed Management 11  Sri Kunwar Jitendra Singh  M  W.D.T.  B.A.  30 Years  Watershed Management 12  Sri Durgesh Panday  M  W.D.T.  B.A.  20 Years  Watershed Management 

 Table 4.4: Details of Watershed Committee (WC)  

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

1 2B2C7d2a   2B2C7d2c 

Suryapur Khapraila 

Smt Manju Devi     President  F  SC  MF  GP  Literate 

Rajesh Kumar   Secretary  M  SC  SF  UG  Graduate 

Smt Asha Devi    Member  F  SC  SF  UG  Literate 

 Mayaram   Member  M  SC  LL     Literate 

 Vikram Babu   Member  M  SC  SF  SHG  Literate 

 Raj Kumar    Member  M  SC  SF  UG  Literate 

 Ram Kumar    Member  M  Other  MF  UG  Literate 

 Paridin    Member  M  SC  SF  UG  Literate 

 Satya Narayan    Member  M  Other  SF  UG  Literate 

 Satnam   Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

2  2B2C7d2c  Shahpur  Surendra kumar    President  M  Other  MF  GP  Literate 

 Anirudh  Kumar   Secretary  M  Other  MF  UG  Graduate 

Smt Kalawati    Member  F  SC  SF  UG  Literate 

Page 60: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

57

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

  Ram Raj    Member  M  Other  LL     Literate 

 Sumeshwar    Member  M  SC  SF  UG  Literate 

Smt Vijlesh Kumari    Member  F  Other  SF  SHG  Literate 

 Ram Milan   Member  M  Other  MF  UG  Literate 

 Jagat Narayan    Member  M  Other  MF  UG  Literate 

 Ashok Kumar    Member  M  Other  SF  UG  Literate 

 Radhe Shayam   Member  M  Other  SF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

3 2B2C7d2c  2B2C7d2d 

Saray Ka Asthan 

 Jiyalal    President  M  Other  MF  GP  Literate 

 Delip Kumar   Secretary  M  Other  SF  UG  Graduate 

Smt Sumitra Devi    Member  F  Other  SF  UG  Literate 

  Dhiraj    Member  M  SC  LL     Literate 

Smt Suman Kumari    Member  F  Other  SF  SHG  Literate 

 Gireesh Kumar    Member  M  Other  MF  UG  Literate 

 Bharoi Prashad    Member  M  Other  LF  UG  Literate 

 Ram Prakash    Member  M  Other  MF  UG  Literate 

 Sanjay Kumar Mourya  Member  M  Other  MF  UG  Intermediat 

 Paras Nath    Member  M  SC  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

4  2B2C7d2c    Baghaura 

Smt Ram Rati Verma    President  F  Other  MF  GP  Literate 

 Matti Prashad Verma   Secretary  M  Other  MF  UG  Literate 

Smt Raj Rani    Member  F  Other  SF  UG  Literate 

  Daya Ram    Member  M  Other  LL     Literate 

 Arjun Lal Rawat    Member  M  SC  LL  SHG  Literate 

 Lalla Prashad    Member  M  Other  LF  UG  Literate 

 Amar Singh    Member  M  Other  LF  UG  Literate 

 Guru Mant Singh    Member  M  Other  LF  UG  Literate 

 Mansa Ram   Member  M  SC  SF  UG  Literate 

Page 61: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

58

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

 Sajan Lal    Member  M  SC  SF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

5  2B2C7g1a Danapur Kayampur 

 Abid Ali    President  M  Other  MF  GP  High School 

 Jabir Ali    Secretary  M  Other  MF  UG  High School 

Smt Anwari    Member  F  Other  SF  UG  Literate 

  Rijwan Ahamad   Member  M  Other  LL     Literate 

 Suresh Kumar    Member  M  Other  SF  SHG  Literate 

 Sundar Lal Yadav    Member  M  Other  MF  UG  Literate 

 Suresh Kumar Yadav    Member  M  Other  MF  UG  Literate 

 Hanuman Verma    Member  M  Other  MF  UG  Literate 

 Gyan Chandra   Member  M  SC  SF  UG  Literate 

 Phool Chand    Member  M  SC  SF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

6  2B2C7g1a  Beer Kithai 

 Ram Singh    President  M  Other  MF  GP  High School 

 Ram Brikeh    Secretary  M  Other  MF  UG  High School 

Smt Sangeeta Devi    Member  F  Other  SF  UG  Literate 

  Ram Naresh Prjapati   Member  M  Other  LL     Literate 

 Ram Sevak    Member  M  SC  SF  UG  Literate 

 Sri Ram    Member  M  Other  SF  SHG  Literate 

 Dhirendra Shukla   Member  M  Other  MF  UG  Literate 

 Ram Sajivan    Member  M  Other  MF  UG  Literate 

 Bhagola   Member  M  SC  MF  UG  Literate 

 Amar Singh   Member  M  Other  SF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

7  2B2C7g1a  Pahrupur 

 Ram Bakhs Singh    President  M  Other  MF  GP  Graduate 

Devendra Pratap Singh    Secretary  M  Other  MF  UG  Graduate 

Smt Krishnawati    Member  F  Other  SF  UG  Literate 

  Ram  Shankar   Member  M  SC  LL     Literate 

Page 62: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

59

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

 Ram Ausan    Member  M  SC  SF  UG  Literate 

 Surya Lal     Member  M  SC  SF  SHG  Literate 

 Banshi Lal   Member  M  SC  MF  UG  Literate 

 Ram Suchit    Member  M  Other  MF  UG  Literate 

Dev Chand   Member  M  Other  MF  UG  Literate 

 Chhote Lal   Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

8  2B2C7g1a  Gazipur 

 Rananjai Singh    President  M  Other  LF  GP  Post Graduate 

Shiv Shankar Mishra   Secretary  M  Other  MF  UG  Graduate 

Smt Nisha   Member  F  SC  SF  UG  Literate 

  Awadh Ram   Member  M  SC  LL     Literate 

 Ram Hetu    Member  M  SC  SF  UG  Literate 

 Ram Lakhan    Member  M  Other  MF  UG  Literate 

 Satnam Yadav    Member  M  Other  SF  UG  Literate 

 Sameer Kumar Devedi    Member  M  Other  MF  UG  Intermediat 

Dhani Ram   Member  M  SC  SF  SHG  Literate 

 Awadhesh Kumar    Member  M  SC  SF  SHG  Literate 

 Habibullah Khan  W.D.T.  M             

9  2B2C7g1b  Sisauna 

Shailendra Pratap Singh    President  M  Other  LF  GP  Graduate 

Yogendra Singh   Secretary  M  Other  MF  UG  Intermediat 

Smt Rajwati    Member  F  SC  SF  UG  Literate 

  Amit   Member  M  SC  LL     Literate 

 Ashis    Member  M  Other  SF  SHG  Graduate 

 Rajendra Panday    Member  M  Other  MF  UG  Intermediat 

 Sarvan Yadav    Member  M  Other  SF  UG  Literate 

 Rangai    Member  M  SC  SF  UG  Literate 

Keshav    Member  M  SC  SF  UG  Literate 

 Shabbir    Member  M  Other  SF  UG  Literate 

Page 63: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

60

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

 Habibullah Khan  W.D.T.  M             

10  2B2C7g1b  Mahmoodabad 

Ramchandra   President  M  SC  SF  GP  Literate 

Md Nadeem   Secretary  M  Other  SF  UG  Graduate 

Smt Pravesh Kumari    Member  F  Other  SF  UG  Literate 

 Ram Khelawan   Member  M  SC  LL     Literate 

Raghuraj    Member  M  Other  SF  SHG  Literate 

Md Ishahak    Member  M  Other  SF  SHG  Literate 

 Dinesh    Member  M  SC  SF  UG  Literate 

Md Yakoob     Member  M  Other  MF  UG  Literate 

Ram Prakash Yadav    Member  M  Other  MF  UG  Literate 

 Farid    Member  M  Other  SF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

11  2B2C7g1b  Hameed Nagar 

Smt Meena Kumari   President  F  Other  MF  GP  Literate 

 Ashok Kumar Verma    Secretary  M  Other  MF  UG  High School 

Smt Laxmi Soni    Member  F  Other  SF  UG  Literate 

 Ram Kishor    Member  M  Other  LL     Literate 

Sundar Lal    Member  M  SC  SF  UG  Literate 

 Ram Kumar    Member  M  Other  MF  SHG  Literate 

 Delip Kumar   Member  M  Other  MF  UG  Literate 

 Om Prakash    Member  M  Other  SF  UG  Literate 

 Mohammad Wasi   Member  M  Other  SF  UG  Literate 

 Ranjeet Kumar   Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

12 2B2C7g1b  2B2C7g1a 

Mehaura 

 Ram Sevak   President  M  SC  SF  GP  Literate 

 Shiv Kailash Panday   Secretary  M  Other  LF  UG  Graduate 

Smt Kamala Devi    Member  F  Other  SF  UG  Literate 

 Ram Roop   Member  M  SC  LL     Literate 

 Raghunandan    Member  M  SC  SF  UG  Literate 

Page 64: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

61

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

 Ishwardeen    Member  M  SC  SF  SHG  Literate 

 Satya Dev   Member  M  Other  LF  UG  Literate 

 Puttan    Member  M  Other  MF  UG  Literate 

 Ramanand Verma    Member  M  Other  MF  UG  Literate 

 Shankar    Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

13  2B2C7g1b    Magrauda 

Smt Munni Devi    President  F  SC  SF  GP  Literate 

 Swatantra Kumar Singh   Secretary  M  Other  LF  UG  Graduate 

Smt Madhuri    Member  F  SC  SF  UG  Literate 

 Satya Nam    Member  M  SC  LL     Literate 

 Shiv Nath    Member  M  SC  SF  UG  Literate 

 Daljeet    Member  M  Other  LF  UG  Literate 

 Shalendra Singh   Member  M  Other  LF  UG  Graduate 

 Umesh  Pratap Singh    Member  M  Other  SF  SHG  Graduate 

 Ajay Kumar    Member  M  Other  LF  UG  Literate 

 Hari Prasad    Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

14 2B2C7g1b  2B2C7g1a 

Said Khanpur 

Smt Aneeta Devi    President  F  SC  SF  GP  Literate 

 Ram Naresh    Secretary  M  SC  SF  UG  High School 

Smt Puspa Devi    Member  F  Other  SF  UG  Literate 

 Ram Swaroop   Member  M  Other  LL     Literate 

 Hanuman    Member  M  SC  SF  SHG  Literate 

 Sunil Kumar    Member  M  Other  SF  UG  Intermediat 

 Rajesh Kumar    Member  M  SC  SF  UG  Literate 

 Mahesh Kumar    Member  M  Other  SF  UG  Literate 

Sahaj Ram    Member  M  Other  SF  UG  Literate 

 Shiv Pran   Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

Page 65: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

62

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

15  2B2C7g1b  Saifpur 

Smt Bindumati    President  F  Other  LF  GP  Literate 

 Raj Bahadur    Secretary  M  Other  SF  UG  High School 

Smt Vinita    Member  F  Other  SF  UG  Literate 

 Neeraj    Member  M  Other  LL     Literate 

 Mata Prasad    Member  M  SC  SF  SHG  Literate 

 Jeet Bahadur    Member  M  SC  MF  UG  Literate 

 Brijesh    Member  M  Other  MF  UG  Literate 

 Harischandra   Member  M  Other  LF  UG  Literate 

Maku    Member  M  Other  MF  UG  Literate 

 Parsu Ram   Member  M  Other  MF  UG  Literate 

 Habibullah Khan  W.D.T.  M             

16  2B2C7d2d Akhbarpur Dhanethi 

 Brij Lal    President  M  SC  MF  GP  Literate 

 Ram Saran    Secretary  M  SC  SF  UG  High School 

Smt Geeta Devi    Member  F  SC  SF  UG  Literate 

 Mohammad Amin    Member  M  Other  LL     Literate 

 Manoj Kumar    Member  M  Other  MF  UG  Literate 

 Rama Shankar    Member  M  SC  MF  UG  Literate 

 Kamlesh Kumar    Member  M  SC  SF  UG  Literate 

 Kamta Prasad   Member  M  SC  SF  SHG  Literate 

Guru Saran    Member  M  Other  MF  UG  Literate 

 Shiv Milan    Member  M  SC  SF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M             

17 2B2C7d2d   2B2C7d2c   

Palhari 

Smt Mahjabeen    President  F  Other  LF  GP  Literate 

 Rehan Ahamad    Secretary  M  Other  LF  UG  Graduate 

Smt Rukshana    Member  F  Other  SF  UG  Literate 

 Babadeen   Member  M  SC  LL     Literate 

 Ram Shankar    Member  M  SC  SF  UG  Literate 

 Ram Niwas   Member  M  SC  SF  SHG  Literate 

Page 66: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

63

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 

 Hazi gulam Rasool    Member  M  Other  LF  UG  Literate 

Devkinandan Mishra    Member  M  Other  LF  UG  Literate 

Om Prakash Sharma   Member  M  Other  LF  UG  Literate 

 Ram Shankar vastava   Member  M  Other  SF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M             

18  2B2C7d2d  Ichaulia 

 Kamlesh Kumar Verma    President  M  Other  MF  GP  Literate 

 Shresh Kumar    Secretary  M  Other  MF  UG  Literate 

Smt Ram Dulari    Member  F  Other  SF  UG  Literate 

 Suresh    Member  M  SC  LL     Literate 

 Gyan Singh    Member  M  SC  SF  UG  Literate 

 Ram Sharan    Member  M  Other  MF  SHG  Literate 

 Ajay Singh    Member  M  Other  MF  SHG  Literate 

 Manoj Kumar   Member  M  Other  MF  UG  Literate 

Umesh Chand    Member  M  Other  MF  UG  Literate 

 Bacchan Lal    Member  M  Other  MF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M             

19  2B2C7d2d  Pyarepur Saraiya 

 Daya Ram    President  M  Other  MF  GP  Literate 

 Bichitra    Secretary  M  Other  MF  UG  Literate 

Smt Nankai    Member  F  Other  SF  UG  Literate 

 Devendra Kumar    Member  M  SC  LL     Literate 

Lalta Prasad    Member  M  SC  SF  UG  Literate 

 Basant Lal    Member  M  SC  SF  SHG  Literate 

 Rakesh    Member  M  Other  MF  UG  Literate 

 Kaushal   Member  M  Other  MF  UG  Literate 

Bhagwati Prasad    Member  M  SC  SF  UG  Literate 

 Ram Bharose    Member  M  SC  MF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M             20  2B2C7d2c   Ambaur  Smt Neelam    President  F  SC  MF  GP  High School 

Page 67: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

64

S.No. Code of MWS 

GP  Name  Designation  M/F SC/ST/ Others 

SF/MF/ LF/LL 

UG/SHG / GP / Other 

Educational qualification 

1  2  3  4  5  6  7  8  9  10 2B2C7d2a   Shubhas Kumar    Secretary  M  Other  SF  UG  High School 

Smt Sushma Devi   Member  F  SC  SF  UG  Literate 

Mustkeem    Member  M  Other  SF  UG  Literate 

Ram Kailash    Member  M  SC  LL     Literate 

Shiv Sharan Lal    Member  M  Other  MF  UG  Literate 

 Jagdev Yadav    Member  M  Other  SF  SHG  Literate 

 Purushottam Kumar    Member  M  SC  MF  UG  Graduate 

Mohammad Ismail   Member  M  Other  SF  UG  Literate 

 Girdhari Lal    Member  M  SC  SF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M             

21    2B2C7d2a  Chandawal 

Smt Raj Rani    President  F  SC  LF  GP  Literate 

 Ram Roop    Secretary  M  SC  SF  UG  Literate 

Smt Mithlesh Kumar   Member  F  SC  MF  UG  Literate 

Hem Raj    Member  M  SC  LL     Literate 

Hausla Prasad    Member  M  SC  SF  UG  Literate 

Kamlesh    Member  M  SC  SF  SHG  Literate 

 Sumant Kumar   Member  M  SC  SF  SHG  Literate 

Sohan Lal    Member  M  SC  MF  UG  Literate 

Ram Udit   Member  M  Other  MF  UG  Literate 

 Sandeep Kumar    Member  M  SC  SF  UG  Literate 

 Ram Milan Yadav  W.D.T.  M              

• M‐ Male, F‐ Female, SF‐ Small Farmer, MF‐ Marginal Farmer, LF‐ Large Farmer, LL‐ Landless, GP‐ Gram Panchayat, UG – User Group, SHG‐ Self help group 

    

Page 68: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

65

4.2: User Group (UG)  

User Groups are  formed  to manage an activity or asset  created under  the programme on a  long  term basis. The user groups will  collect user charges from their members, oversee the works, manage the CPRs and benefits. 

Table 4.5: Details of User Groups   S. No. 

WSHD_Code Code of User 

Group Name of Gram 

Pnchyat Total No. of Members 

Name of Bank & Address 

A/c No. & Date 

Upto date saving 

Group Activity 

Status of Agreement 

1   2B2C7g1b  PND01  Mehaura  22 ‐  ‐  ‐  ‐  ‐ 

2   2B2C7g1b  PND02  Mahmoodabad  22 ‐  ‐  ‐  ‐  ‐ 

3   2B2C7g1b  PND03  Sisauna  19 ‐  ‐  ‐  ‐  ‐ 

4   2B2C7g1b  PND04  Sisauna  24 ‐  ‐  ‐  ‐  ‐ 

5   2B2C7g1b  PND05  Sisauna  15 ‐  ‐  ‐  ‐  ‐ 

6   2B2C7g1b  PND06  Hameed Nagar  12 ‐  ‐  ‐  ‐  ‐ 

7   2B2C7g1b  PND07  Hameed Nagar  10 ‐  ‐  ‐  ‐  ‐ 

8   2B2C7g1b  PND08  Saidkhanpur  16 ‐  ‐  ‐  ‐  ‐ 

9   2B2C7g1b  WHB01  Mangrauda  8 ‐  ‐  ‐  ‐  ‐ 

10   2B2C7g1b  WHB02  Mehaura  1 ‐  ‐  ‐  ‐  ‐ 

11   2B2C7g1b  WHB06  Sisauna  2 ‐  ‐  ‐  ‐  ‐ 

12  2B2C7d2a  PND01  Ambour  19 ‐  ‐  ‐  ‐  ‐ 

13  2B2C7d2a  PND02  Chandwal  19 ‐  ‐  ‐  ‐  ‐ 

14  2B2C7d2a  WHB02  Chandwal  5 ‐  ‐  ‐  ‐  ‐ 

15  2B2C7d2a  WHB03  Chandwal  4 ‐  ‐  ‐  ‐  ‐ 

16  2B2C7d2c  PND01  Palhari  20 ‐  ‐  ‐  ‐  ‐ 

17  2B2C7d2c  PND02  Palhari  23 ‐  ‐  ‐  ‐  ‐ 

18  2B2C7d2c  PND03  Baghaura  17 ‐  ‐  ‐  ‐  ‐ 

19  2B2C7d2c  PND04  Baghaura  17 ‐  ‐  ‐  ‐  ‐ 

20  2B2C7d2c  PND05  Shahpur  18 ‐  ‐  ‐  ‐  ‐ 

21  2B2C7d2c  WHB01  Surajpur Khapraila  3 ‐  ‐  ‐  ‐  ‐ 

22  2B2C7d2c  WHB02  Surajpur Khapraila  7 ‐  ‐  ‐  ‐  ‐ 

23  2B2C7d2c  WHB03  Surajpur Khapraila  2 ‐  ‐  ‐  ‐  ‐ 

Page 69: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

66

S. No. 

WSHD_Code Code of User 

Group Name of Gram 

Pnchyat Total No. of Members 

Name of Bank & Address 

A/c No. & Date 

Upto date saving 

Group Activity 

Status of Agreement 

24  2B2C7d2c  WHB04  Surajpur Khapraila  1 ‐  ‐  ‐  ‐  ‐ 

31  2B2C7d2c  WHB05  Surajpur Khapraila  2 ‐  ‐  ‐  ‐  ‐ 

32  2B2C7d2c  WHB06  Surajpur Khapraila  1 ‐  ‐  ‐  ‐  ‐ 

33  2B2C7d2c  WHB07  Surajpur Khapraila  6 ‐  ‐  ‐  ‐  ‐ 

34  2B2C7d2d  PND01  Ichaulia  17 ‐  ‐  ‐  ‐  ‐ 

35  2B2C7d2d  PND02  Ichaulia  12 ‐  ‐  ‐  ‐  ‐ 

36  2B2C7d2d  PND03  Ichaulia  10 ‐  ‐  ‐  ‐  ‐ 

37  2B2C7d2d  PND04  Akbarpur Dhanethi  14 ‐  ‐  ‐  ‐  ‐ 

38  2B2C7d2d  PND05  Akbarpur Dhanethi  10 ‐  ‐  ‐  ‐  ‐ 

39  2B2C7g1a  PND01  Saidkhanpur  15 ‐  ‐  ‐  ‐  ‐ 

40  2B2C7g1a  PND02  Beerkithai  16 ‐  ‐  ‐  ‐  ‐ 

41  2B2C7g1a  PND03  Beerkithai  13 ‐  ‐  ‐  ‐  ‐ 

42  2B2C7g1a  PND04  Danapurkyampur  15 ‐  ‐  ‐  ‐  ‐ 

43  2B2C7g1a  WHB01  Paharu Pur  1 ‐  ‐  ‐  ‐  ‐ 

44  2B2C7g1a  WHB02  Paharu Pur  1 ‐  ‐  ‐  ‐  ‐ 

45  2B2C7g1a  WHB03  Paharu Pur  2 ‐  ‐  ‐  ‐  ‐ 

46  2B2C7g1a  WHB05  Paharu Pur  3 ‐  ‐  ‐  ‐  ‐ 

47  2B2C7g1a  WHB06  Paharu Pur  4 ‐  ‐  ‐  ‐  ‐ 

Page 70: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

67

4.3: Self Help Group (SHG)  

Self help group is motivated homogenous group organized through credit and thrift activities. Self help group especially for women help and uplift their livelihood. Generally self help group formed for the landless/assetless, SC/ST and women. Table 4.6: Details of Self Help Groups 

(ALL FIGURES IN NOS) 

S. No.  Gram Panchayat  Name of SHG 

Date of Constitution

Name of President 

Name of Secretary 

Total No. of Members  Bank/ Address & A/c No 

Group Activity Women SC/ST Others Total

1  Akhberpur Dhanethi 

Kabirdas SHG  14.05.2012  Md. Idrish  Moharram Ali  4  0  7  11  A.G.B. Safderganj 

Goatry 

2  Akhberpur Dhanethi 

Sahaj Seva SHG  31.05.2012  Premlata Sharma 

Beena  11  0  0  11  A.G.B. Safderganj 

Stiching 

3  Ambaur  Jangli Mata SHG  26.12.2011  Rambhajan  Sohan Lal  0  12  0  12  A.G.B. Udhauli  Goatry 

4  Baghaura  Shivshankar SHG 05.06.2012  Saroj Kumar  Satyanam  0  15  0  15  A.G.B. Udhauli  Goatry 

5  Magrauda  Jai Peer Baba SHG 

09.03.2012  Satyanam  Abhishekraj  0  8  3  11  A.G.B. Mahmoodabad

Poultry 

6  Beerkithai  Baba Ballu Das SHG 

02.06.2012  Amit Kumar  Shiv Prakash  0  12  0  12  A.G.B. Said Khanpur 

Goatry 

7  Chandwal  Chandwal SHG           0  0  12  12  A.G.B.  Goatry 

8  Danapur Kyampur 

Kali Laxmi SHG  25.05.2012  Suresh  Rajitram  0  6  5  11  A.G.B. Said Khanpur 

Goatry 

9  Danapur Kyampur 

Baba Nijamuddin SHG 

25.05.2012  Fatima  Reshama  11  0  0  11  A.G.B. Said Khanpur 

Stiching 

10  Ghazipur  Shitla Mata SHG  27.09.2011  Santosh Kumari  Madhuri Shukla 

12  0  0  12  A.G.B. Said Khanpur 

Stiching 

11  Ghazipur  Shri Sakram Veer Baba SHG 

18.05.2012  Ram Titath  Gangaram  0  6  5  11  A.G.B. Said Khanpur 

Goatry 

12  Ghazipur  Ghazipur SHG  13.06.2012  Manoj Kr. Singh  Ramroop  0  10  1  11  A.G.B. Said Khanpur 

Poultry 

13  Ghazipur  Ghazipir Baba SHG 

15.06.2012  Khurshid  Ramhetu  0  10  1  11  A.G.B. Said Khanpur 

Goatry 

14  Hamid Nagar  Peer Baba SHG  12.06.2012  Ram Kumar  Asgar Ali  0  5  6  11  A.G.B. Said Khanpur 

Goatry 

Page 71: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

68

S. No.  Gram Panchayat  Name of SHG 

Date of Constitution

Name of President 

Name of Secretary 

Total No. of Members  Bank/ Address & A/c No 

Group Activity Women SC/ST Others Total

15  Ichaulia  Jind Baba SHG  05.05.2012  Sanjay  Lakshiram  0  15  0  15  A.G.B. Safderganj 

Goatry 

16  Mahmoodabad  Adarsh SHG  17.04.2012  Md. Farid  Vinod Kumar  0  3  8  11  A.G.B. Mahmoodabad

Goatry 

17  Mehaura  Jind Baba SHG  28.11.2011  Ramsuhawan  Mahesh Prasad 

0  3  8  11  A.G.B. Said Khanpur 

Poultry 

18  Palhari  Palhari                 12  12  A.G.B. Palhari  Goatry 

19  Pahrupur  Shri Sai Baba SHG 

13.02.2012  Ram Shankar  Ranjeet Kumar 

0  4  7  11  A.G.B. Said Khanpur 

Goatry 

20  Pyarepur Saraiya  Danushah Baba SHG 

09.05.2012  Arvind Kumar  Manoj Kumar  0  11  0  11  A.G.B. Safderganj 

Goatry 

21  Said Khanpur  Jai Shankar SHG  29.05.2012  Rajit Ram  Pawan Kumar  0  12  0  12  A.G.B. Said Khanpur 

Goatry 

22  Saifpur  Bara Devi SHG  22.05.2012  Parshuram  Raju  0  9  2  11  A.G.B. Mahmoodabad

Goatry 

23  Sarai Ka Sthan  Baba Manna Das SHG 

26.03.2012  Suman Devi  Indu Maurya  11  0  0  11  A.G.B. Palhari  Stiching 

24  Shahpur  Shiv SHG  08.06.2012  Rajendra Prasad Lavkush  0  13  0  13  A.G.B. Palhari  Goatry 

25  Sisauna  Sisauna SHG  28.05.2012  SabbirSuresh  Amit Kumar  0  10  1  11  A.G.B. Mahmoodabad

Goatry 

26  Suryapur Khapraila 

Sai Data SHG  18.10.2011  Rajmati  Radha Devi  11  0  0  11  A.G.B. Udhauli  Stiching 

27  Suryapur Khapraila 

Deena Das SHG  15.11.2011  avadhram  Vikram Babu  0  11  0  11  A.G.B. Udhauli  Poultry 

   Total              60  175  78  313       Before the formation of SHGs, PRA activities & Group discussions (GDs) is organised with the help of women, which came up with the following observations:‐ a) Lack of proper credit facilities due to low intervention of formal financial credit institutions. b) Excessive exploitation of weaker section by money lenders and also Lack of attitude for saving among poor people. c) Lack of Knowledge on credit, thrift activity and banking.  

With a detailed discussion identified  training institutes, NGOs working in the area it was planned to provide capacity building to SHGs to promote livelihood activities with an aim to women empowerment also. 

Page 72: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

69

4.4: Convergence in IWMP‐3rd : Several programmes are running in the areas which are sponsored by State of U.P. & Central Govt of India. Some of them are given below‐  

Table 4.7: List of State/Central Govt. Schemes    

S.No.  Name of Programme  Implementing Agency  Objectives 1  Training Programme  Ag. Department & KVK  Capacity building of the farmers 

2  National Horticulture Mission  Horticulture Department  Increasing  the  area  &  Productivity  of  Products  under  fruits and vegetables 

3  MNREGA  Gram Panchayat  To  provide  100  days  employment  work  to  the  villagers  to avoid migration 

4  Animal Husbandry  U.P. Animal Husbandry Dept.  To improve the productivity of animals. 5  NABARD  Ag. Deparment  Soil & Water conservation & Watershed Development 

 

 Table 4.8: Details of Convergence of IWMP with other Schemes   S. No. 

Code of MWS 

Project Cost (Rs.) 

Treatable  Area (ha.) 

Budget (Rs.) 

Convergence Amt. (Rs.) 

%age  Name of Schemes for Converging with IWMP 

Remarks 

1  All 05 MWS  610.54  5087  341.85  268.70  78.60% 

MNREGA  For Natural resource management (Soil & Water conservation Structures) 

 

Page 73: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

70

CHAPTER‐5 

MANAGEMENT ACTION PLAN  The details of Preparatory Phase, Work Phase and Convergence Planning are described in subsequent sections.  

5.1: Entry Point Activity (EPA): Entry point activities are executed with the consent of stake holders and it helps in winning the confidence of the villagers for moving ahead the other programmes of watershed. .      

Table 5.1: Details of EPA (Rs.  in lacs) 

S.No.  Block  No. of EPA  GP  Name of EPA  Work Location/ Village 

Cost  Remarks       Target  undertaken        No. 

Length (mt.) 

1  Masauli 

9  9 

Inchaulia  1.Soling Work  1  260  Inchaulia  2.41  2B2C7d2d  Akhberpur Dhanethi 

Akhabarpur  2.Soling Work  1  206.50  Akhabarpur  1.74 

   Total           4.15    Shahpur  1.Soling Work  1  210  Shahpur  2.37  2b2C7d2c  

Suryapur Khapraila 

Baghaura  2.Soling Work  1  128  Baghaura  1.54 

   Total           3.91    

2  Dariyabad 

Ambaur  1.Soling Work  1  251  Ambaur  2.74 2B2C7d2a  Ambaur 

Ghazipur 1.Soling Work  1  629.50  Ghazipur  5.65  2B2C7g1a  

Ghazipur 2. Naali  1  24  "  0.15    Total           5.80    

Mehaura  1.Soling Work  1  575  Mehaura  5.30  2B2C7g1b   Mehura Sisauna  1.Soling Work  1  222  Sisauna  2.52 

               7.82    GRAND TOTAL                          24.41     

 

Page 74: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

71

 

5.2 Work Phase:  

Following are the major problems of the watershed:‐  

•    Moisture stress‐Drought conditions 

• Erosion hazard  

• Excess runoff  

• Land degradation 

• Low fertility of soil 

• Ground water depletion/Low ground water table,  poor quality of groundwater 

• Low cropping intensity  

• Lack of technical knowledge 

• Lack of irrigation facilities 

• Low productivity of crops 

• Poor availability of  drinking water for human as well as animals 

• Overgrazing 

• Poor vegetative cover 

• Poor/low productive breeds of miltch animals  

• Lower milk production 

• Lack of feed & fodder availability 

• Non availability of wood/fuel 

• Lack of proper market facilities 

• Lack of educational, transportation, medical & health care facilities 

• Low wages 

• Small land holdings 

• Low income of the households 

• Lack of employment opportunity 

• Migration from the project area  

Page 75: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

72

Watershed Development Activities Proposed:  

The details of the activities of watershed works are given in Table 5.3.  

Table 5.2: Micro Watershed wise details of Watershed Development Activities proposed in IWMP‐3rd:                                                                                                                                                                                     (Cost in Rs) S.No  Particular of Measures/Activities  Unit   2B2C7g1b / Mahaura  2B2C7d2a / Ambour  2B2C7d2c / Suryapur Khapraila          Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                      

    1.1.1 Afforestation  ha                           (a) Block Plantation  ha  236.394 126090  48.333 257790 2.697 129450         (b) Scattered Plantation  ha                       1.1.2 Hortoculture  ha                       1.1.3 Agriculture  ha                       1.1.4 Pasture  ha                       1.1.5 Others  ha                      Sub Total                      1.2  Soil & Moisture Conservation                      

    1.2.1 Straggred trenching  ha                       1.2.2 Countour Bunding  ha  361.21 1697325  132.61 653737 396.39 1740212     1.2.3 Graded Bunding                          1.2.4 Bench Terracing  ha                       1.2.5 Others  ha  44.15 6819947  31.6 2660125 19.22 1669108       (a) Marginal Bund  ha  843.02 5682608  282.65 2095594 315.81 3369406       (b) Peripheral Bund  ha  72.29 536185  39.67 294153 48.01 508488       (c) Submergence Bund  ha                         (d) Check Road Bund  ha                      Sub Total        14736065     5703609    7287214 1.3  Vegetative and Engineering Structure:                      

    1.3.1 Earthen Checks  ha                         (a) Water Harvesting Bund  ha  12.1 842875  4.6 336533 6.16 448943 

Page 76: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

73

S.No  Particular of Measures/Activities  Unit   2B2C7g1b / Mahaura  2B2C7d2a / Ambour  2B2C7d2c / Suryapur Khapraila          Qty  Amt  Qty  Amt  Qty  Amt       (b) Earthen Check Dam  ha                       1.3.2 Brushwood Checks  ha                       1.3.3 Gully Plugs  ha                       1.3.4 Loose bolder  ha                       1.3.5 Gabian structure  ha                       1.3.6 Others  ha                   1.4  Water Harvesting Structure(New Created):                      

    1.4.1 Form Ponds (Treat area/EW)  cum  60.83/60830  4130020  30.69/15347  1040299 25.92/12958  1142400     1.4.2 Check Dams  cum                       1.4.3 Nallah Bunds  cum                       1.4.4 Percolation tanks  cum                       1.4.5 Ground Water recharge structure  cum                       1.4.6 Others  cum                   1.5  Water Harvesting Structure(Renovated):                      

    1.5.1 Form Ponds  cum                       1.5.2 Check Dams  cum                       1.5.3 Nallah Bunds  cum                       1.5.4 Percolation tanks  cum                       1.5.5 Ground Water recharge structure  cum                       1.5.6 Others  cum                      Sub Total        4972895     1376832    1591343    Grand Total        19835050     7338231    9008007 

     

Page 77: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

74

 S.No  Particular of Measures/Activities  Unit  2B2C7d2d / Akbarpur Dhaneti  2B2C7g1a / Gajipur  Total          Qty  Amt  Qty  Amt  Qty  Amt 

1.1  Land Development (Productive use):                          1.1.1 Afforestation  ha                           (a) Block Plantation  ha  6.802  65310 0.735 35310              (b) Scattered Plantation  ha                       1.1.2 Hortoculture  ha                       1.1.3 Agriculture  ha                       1.1.4 Pasture  ha                       1.1.5 Others  ha                      Sub Total                      

1.2  Soil & Moisture Conservation                          1.2.1 Straggred trenching  ha                       1.2.2 Countour Bunding  ha  248.33  1244704 602.25 2263941 1740.79 7599919     1.2.3 Graded Bunding                          1.2.4 Bench Terracing  ha                       1.2.5 Others  ha  7.24  913988 68.66 6117666 170.87 18180834       (a) Marginal Bund  ha  459.42  4572374 462.85 4457333 2363.75 20177315       (b) Peripheral Bund  ha  44.96  462996 17.9 165986 222.83 1967808       (c) Submergence Bund  ha                         (d) Check Road Bund  ha  27.07  447254       27.07 447254    Sub Total        7641316    13004926    48373130 

1.3  Vegetative and Engineering Structure:                          1.3.1 Earthen Checks  ha                         (a) Water Harvesting Bund  ha  1.35  99643 7.79 570554 32 2298548       (b) Earthen Check Dam  ha                       1.3.2 Brushwood Checks  ha                       1.3.3 Gully Plugs  ha                       1.3.4 Loose bolder  ha                       1.3.5 Gabian structure  ha                   

Page 78: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

75

S.No  Particular of Measures/Activities  Unit  2B2C7d2d / Akbarpur Dhaneti  2B2C7g1a / Gajipur  Total          Qty  Amt  Qty  Amt  Qty  Amt     1.3.6 Others  ha                   

1.4  Water Harvesting Structure(New Created):                          1.4.1 Form Ponds (Treat area/EW)  cum  69.45/23151  1727538 49.1/24552  1728289    9768546     1.4.2 Check Dams  cum                       1.4.3 Nallah Bunds  cum                       1.4.4 Percolation tanks  cum                       1.4.5 Ground Water recharge structure  cum                       1.4.6 Others  cum                   

1.5  Water Harvesting Structure(Renovated):                          1.5.1 Form Ponds  cum                       1.5.2 Check Dams  cum                       1.5.3 Nallah Bunds  cum                       1.5.4 Percolation tanks  cum                       1.5.5 Ground Water recharge structure  cum                       1.5.6 Others  cum                      Sub Total        1827181    2298843         Grand Total        9533807    15339079      

   

Page 79: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

76

Table 5.3: Gram Panchayat wise details of Watershed Development Activities proposed in IWMP‐3rd:  

S.No  Particular of Measures/Activities  Unit  Akbarpur Dhanethi  Ambour  Baghaura          Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                      

    1.1.1 Afforestation  ha                           (a) Block Plantation  ha        43.602 232560              (b) Scattered Plantation  ha                       1.1.2 Hortoculture  ha                       1.1.3 Agriculture  ha                       1.1.4 Pasture  ha                       1.1.5 Others  ha                      Sub Total                      1.2  Soil & Moisture Conservation                      

    1.2.1 Straggred trenching  ha                       1.2.2 Countour Bunding  ha  97.62  480738 52.44 255770 31.28 137356     1.2.3 Graded Bunding                          1.2.4 Bench Terracing  ha                       1.2.5 Others  ha        16.91 1435396            (a) Marginal Bund  ha  80.6  802077 136.33 1111214 35.47 378359       (b) Peripheral Bund  ha  11.33  116678 35.7 292369            (c) Submergence Bund  ha                         (d) Check Road Bund  ha  11.2  185156               Sub Total        1584649    3094749    515715 1.3  Vegetative and Engineering Structure:                      

    1.3.1 Earthen Checks  ha                         (a) Water Harvesting Bund  ha                         (b) Earthen Check Dam  ha                       1.3.2 Brushwood Checks  ha                       1.3.3 Gully Plugs  ha                       1.3.4 Loose bolder  ha                   

Page 80: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

77

S.No  Particular of Measures/Activities  Unit  Akbarpur Dhanethi  Ambour  Baghaura          Qty  Amt  Qty  Amt  Qty  Amt 

    1.3.5 Gabian structure  ha                       1.3.6 Others  ha                   1.4  Water Harvesting Structure(New Created):                      

    1.4.1 Form Ponds (Treat area/EW)  cum  10.93/3644  368609 19.12/9558  628284 18.54/9269  691308     1.4.2 Check Dams  cum                       1.4.3 Nallah Bunds  cum                       1.4.4 Percolation tanks  cum                       1.4.5 Ground Water recharge structure  cum                       1.4.6 Others  cum                   1.5  Water Harvesting Structure(Renovated):                      

    1.5.1 Form Ponds  cum                       1.5.2 Check Dams  cum                       1.5.3 Nallah Bunds  cum                       1.5.4 Percolation tanks  cum                       1.5.5 Ground Water recharge structure  cum                       1.5.6 Others  cum                      Sub Total        368609    628284    691308    Grand Total        1953258    3955593    1207023                           1.6  1.6.1 Backyard poultry                      

   1.6.2 Bee keeping  No.                      1.6.3 Blacksmith           10 0.2 10 0.2    1.6.4 Carpentry  No.  5  0.75 4 0.6         1.6.5 Cycle Shop  No.                      1.6.6 Dairy  No.                      1.6.7 Genaral Shop  No.  5  0.5 5 0.5         1.6.8 Goatry (02 Goat/Unit)  No.                      1.6.9 Piggeries (01 pair of Male/Female)  No.        5 1         1.6.10 Tailoring  No.  10  0.6 10 0.6 10 0.6 

Page 81: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

78

S.No  Particular of Measures/Activities  Unit  Akbarpur Dhanethi  Ambour  Baghaura          Qty  Amt  Qty  Amt  Qty  Amt 

               10 0.6         Production System  No.  9  0.72 2 0.16                                1.7  Crop Demonstration                      

   Activity Name                         1.7.1 Kharif‐Arahar  No.  14  0.09632 16 0.11008 10 0.0688    1.7.2 Rabi‐Gram  No.  12  0.31884 24 0.63768         1.7.3 Rabi‐Lentil  No.  15  0.2109 14 0.19684         1.7.4 Kharif‐Moong  No.  12  0.09816 15 0.1227         1.7.5 Rabi‐Mustard  No.  15  0.10815 30 0.2163 8 0.05768    1.7.6 Kharif‐Paddy  No.  14  0.20622       10 0.1473    1.7.7 Kharif‐Urd  No.  12  0.11556 25 0.24075         1.7.8 Rabi‐Wheat  No.  12  0.27456 25 0.572 9 0.20592       No.                   1.8  Seed Distribution                      

   Activity Name                         1.8.1 Kharif‐Arahar  No.  9  0.027 20 0.06 8 0.024    1.8.2 Rabi‐Gram  No.  17  0.2142 23 0.2898 6 0.0756    1.8.3 Rabi‐Lintil  No.  15  0.135 22 0.198         1.8.4 Rabi‐Mustard  No.  15  0.010125 25 0.016875 6 0.00405    1.8.5 Kharif‐Paddy  No.  16  0.064 20 0.08 10 0.04    1.8.6 Rabi‐Wheat  No.  14  0.1155 20 0.165 6 0.0495                                                     1.9  Micro‐Enterprise                      

   Activity Name                         1.9.1 Artificial Insemination Kit (Paravet)                             1.9.2 Dairy  No.        2 0.48         1.9.3 Food Preservation/Processing                      

Page 82: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

79

S.No  Particular of Measures/Activities  Unit  Akbarpur Dhanethi  Ambour  Baghaura          Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.4 Fruit/Juice Shop  No.  2  0.2               1.9.5 Genaral Shop  No.  1  0.2       1 0.1    1.9.6 Irrigation System (Pumpset, Irrigation tube etc.)  No.  1  0.24               1.9.7 Jarsi Bull (Natural Service)  No.        2 0.48         1.9.8 Mini Dal Processor  No.        1 0.24 1 0.24    1.9.9 Mini Flour mill (Aata Chakki)                         1.9.10 Mini Masala Machine (Masala Chakki)                         1.9.11 Mini Mentha Plant                         1.9.12 Mini Oil Expeller                          1.9.13 Mini Rice Polisher                         1.9.14 Murrah "He Buffalo" (Natural Service)                         1.9.15 Vegetable  Shop  No.  2  0.2                                         Grand Total    227  5.404535 330 7.766025 95 1.81285 

 Note : 

1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities

        

Page 83: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

80

S.No  Particular of Measures/Activities  Unit  Beerkithai  Chandwal  Danapurkyampur          Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                      

    1.1.1 Afforestation  ha                           (a) Block Plantation  ha        4.73 25230              (b) Scattered Plantation  ha                       1.1.2 Hortoculture  ha                       1.1.3 Agriculture  ha                       1.1.4 Pasture  ha                       1.1.5 Others  ha                      Sub Total                      1.2  Soil & Moisture Conservation                      

    1.2.1 Straggred trenching  ha                       1.2.2 Countour Bunding  ha  98.43  369975 71.15 350710 86.9 326643     1.2.3 Graded Bunding                          1.2.4 Bench Terracing  ha                       1.2.5 Others  ha        18.97 1597234            (a) Marginal Bund  ha  15.35  147823 177.16 1313477 22.87 220249       (b) Peripheral Bund  ha        12.69 94127            (c) Submergence Bund  ha                         (d) Check Road Bund  ha                      Sub Total        517798    3355548    546892 1.3  Vegetative and Engineering Structure:                      

    1.3.1 Earthen Checks  ha                         (a) Water Harvesting Bund  ha        4.6 336533            (b) Earthen Check Dam  ha                       1.3.2 Brushwood Checks  ha                       1.3.3 Gully Plugs  ha                       1.3.4 Loose bolder  ha                       1.3.5 Gabian structure  ha                       1.3.6 Others  ha                   

Page 84: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

81

S.No  Particular of Measures/Activities  Unit  Beerkithai  Chandwal  Danapurkyampur          Qty  Amt  Qty  Amt  Qty  Amt 1.4  Water Harvesting Structure(New Created):                      

    1.4.1 Form Ponds (Treat area/EW)  cum  16.71/8356  639025 11.58/5790  412015 13.95/6974  480032     1.4.2 Check Dams  cum                       1.4.3 Nallah Bunds  cum                       1.4.4 Percolation tanks  cum                       1.4.5 Ground Water recharge structure  cum                       1.4.6 Others  cum                   1.5  Water Harvesting Structure(Renovated):                      

    1.5.1 Form Ponds  cum                       1.5.2 Check Dams  cum                       1.5.3 Nallah Bunds  cum                       1.5.4 Percolation tanks  cum                       1.5.5 Ground Water recharge structure  cum                       1.5.6 Others  cum                      Sub Total        639025    748548    480032    Grand Total        1156823    4129326    1026924                           1.6  1.6.1 Backyard poultry                      

   1.6.2 Bee keeping  No.                      1.6.3 Blacksmith     15  0.3       10 0.2    1.6.4 Carpentry  No.        4 0.6         1.6.5 Cycle Shop  No.                      1.6.6 Dairy  No.                      1.6.7 Genaral Shop  No.                      1.6.8 Goatry (02 Goat/Unit)  No.                      1.6.9 Piggeries (01 pair of Male/Female)  No.        5 1 2 0.4    1.6.10 Tailoring  No.  10  0.6 10 0.6 9 0.54          10  0.6               Production System  No.              2 0.16 

Page 85: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

82

S.No  Particular of Measures/Activities  Unit  Beerkithai  Chandwal  Danapurkyampur          Qty  Amt  Qty  Amt  Qty  Amt 

                          1.7  Crop Demonstration                      

   Activity Name                         1.7.1 Kharif‐Arahar  No.  10  0.0688 10 0.0688 10 0.0688    1.7.2 Rabi‐Gram  No.  10  0.2657 13 0.34541 6 0.15942    1.7.3 Rabi‐Lentil  No.        10 0.1406 10 0.1406    1.7.4 Kharif‐Moong  No.  10  0.0818 10 0.0818         1.7.5 Rabi‐Mustard  No.  5  0.03605 10 0.0721 10 0.0721    1.7.6 Kharif‐Paddy  No.  10  0.1473 10 0.1473 10 0.1473    1.7.7 Kharif‐Urd  No.        10 0.0963         1.7.8 Rabi‐Wheat  No.  10  0.2288 15 0.3432 6 0.13728       No.                   1.8  Seed Distribution                      

   Activity Name                         1.8.1 Kharif‐Arahar  No.  10  0.03 15 0.045 10 0.03    1.8.2 Rabi‐Gram  No.  7  0.0882 15 0.189 9 0.1134    1.8.3 Rabi‐Lintil  No.  10  0.09 15 0.135         1.8.4 Rabi‐Mustard  No.  10  0.00675 10 0.00675 10 0.00675    1.8.5 Kharif‐Paddy  No.  9  0.036 10 0.04 12 0.048    1.8.6 Rabi‐Wheat  No.  10  0.0825 12 0.099 10 0.0825                                                     1.9  Micro‐Enterprise                      

   Activity Name                         1.9.1 Artificial Insemination Kit (Paravet)                             1.9.2 Dairy  No.  2  0.48               1.9.3 Food Preservation/Processing           2 0.48         1.9.4 Fruit/Juice Shop  No.                      1.9.5 Genaral Shop  No.              2 0.4 

Page 86: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

83

S.No  Particular of Measures/Activities  Unit  Beerkithai  Chandwal  Danapurkyampur          Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.6 Irrigation System (Pumpset, Irrigation tube etc.)  No.                      1.9.7 Jarsi Bull (Natural Service)  No.                      1.9.8 Mini Dal Processor  No.                      1.9.9 Mini Flour mill (Aata Chakki)           1 0.24         1.9.10 Mini Masala Machine (Masala Chakki)                         1.9.11 Mini Mentha Plant                         1.9.12 Mini Oil Expeller                          1.9.13 Mini Rice Polisher                         1.9.14 Murrah "He Buffalo" (Natural Service)                         1.9.15 Vegetable  Shop  No.                                                Grand Total    148  3.1419 187 4.73026 128 2.70615 

  

Note : 1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities

Page 87: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

84

 S.No  Particular of Measures/Activities  Unit  Ghazipur  Hameed Nagar  Ichaulia          Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                      

    1.1.1 Afforestation  ha                           (a) Block Plantation  ha  0.735  35310                    (b) Scattered Plantation  ha                       1.1.2 Hortoculture  ha                       1.1.3 Agriculture  ha                       1.1.4 Pasture  ha                       1.1.5 Others  ha                      Sub Total                      

1.2  Soil & Moisture Conservation                          1.2.1 Straggred trenching  ha                       1.2.2 Countour Bunding  ha  226.15  867257 62.8 295027 119.17 597403     1.2.3 Graded Bunding                          1.2.4 Bench Terracing  ha                       1.2.5 Others  ha  34.9  3172207                  (a) Marginal Bund  ha  310.15  2719471 45.97 309803 169.03 1682387       (b) Peripheral Bund  ha              14.16 145896       (c) Submergence Bund  ha                         (d) Check Road Bund  ha              13.97 230688    Sub Total        6758935    604830    2656374 

1.3  Vegetative and Engineering Structure:                          1.3.1 Earthen Checks  ha                         (a) Water Harvesting Bund  ha                         (b) Earthen Check Dam  ha                       1.3.2 Brushwood Checks  ha                       1.3.3 Gully Plugs  ha                       1.3.4 Loose bolder  ha                   

Page 88: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

85

S.No  Particular of Measures/Activities  Unit  Ghazipur  Hameed Nagar  Ichaulia          Qty  Amt  Qty  Amt  Qty  Amt 

    1.3.5 Gabian structure  ha                       1.3.6 Others  ha                   

1.4  Water Harvesting Structure(New Created):                          1.4.1 Form Ponds (Treat area/EW)  cum        14.9/14900  1014828 58.52/19507  1358929     1.4.2 Check Dams  cum                       1.4.3 Nallah Bunds  cum                       1.4.4 Percolation tanks  cum                       1.4.5 Ground Water recharge structure  cum                       1.4.6 Others  cum                   

1.5  Water Harvesting Structure(Renovated):                          1.5.1 Form Ponds  cum                       1.5.2 Check Dams  cum                       1.5.3 Nallah Bunds  cum                       1.5.4 Percolation tanks  cum                       1.5.5 Ground Water recharge structure  cum                       1.5.6 Others  cum                      Sub Total        0    1014828    1358929    Grand Total        6794245    1619658    4015303                           

1.6  1.6.1 Backyard poultry                         1.6.2 Bee keeping  No.                      1.6.3 Blacksmith     15  0.3       5 0.1    1.6.4 Carpentry  No.                      1.6.5 Cycle Shop  No.  10  1               1.6.6 Dairy  No.  10  1               1.6.7 Genaral Shop  No.  6  0.6 4 0.4 10 1    1.6.8 Goatry (02 Goat/Unit)  No.  5  1.25       2 0.5    1.6.9 Piggeries (01 pair of Male/Female)  No.  5  1       2 0.4    1.6.10 Tailoring  No.  10  0.6 10 0.6 10 0.6 

Page 89: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

86

S.No  Particular of Measures/Activities  Unit  Ghazipur  Hameed Nagar  Ichaulia          Qty  Amt  Qty  Amt  Qty  Amt 

         10  0.6 10 0.6         Production System  No.        10 0.8                                

1.7  Crop Demonstration                         Activity Name                         1.7.1 Kharif‐Arahar  No.  25  0.172 13 0.08944 10 0.0688    1.7.2 Rabi‐Gram  No.  35  0.92995 11 0.29227 8 0.21256    1.7.3 Rabi‐Lentil  No.  21  0.29526 10 0.1406 6 0.08436    1.7.4 Kharif‐Moong  No.  32  0.26176 15 0.1227 10 0.0818    1.7.5 Rabi‐Mustard  No.  36  0.25956 10 0.0721 6 0.04326    1.7.6 Kharif‐Paddy  No.  40  0.5892 16 0.23568 10 0.1473    1.7.7 Kharif‐Urd  No.  22  0.21186 14 0.13482 10 0.0963    1.7.8 Rabi‐Wheat  No.  35  0.8008 10 0.2288 8 0.18304       No.                   

1.8  Seed Distribution                         Activity Name                         1.8.1 Kharif‐Arahar  No.  40  0.12 10 0.03 10 0.03    1.8.2 Rabi‐Gram  No.  41  0.5166 10 0.126 9 0.1134    1.8.3 Rabi‐Lintil  No.  30  0.27 10 0.09 10 0.09    1.8.4 Rabi‐Mustard  No.  35  0.023625 20 0.0135 10 0.00675    1.8.5 Kharif‐Paddy  No.  35  0.14 12 0.048 10 0.04    1.8.6 Rabi‐Wheat  No.  40  0.33 27 0.22275 10 0.0825                                                     

1.9  Micro‐Enterprise                         Activity Name                         1.9.1 Artificial Insemination Kit (Paravet)               2 0.48         1.9.2 Dairy  No.  1  0.24               1.9.3 Food Preservation/Processing                      

Page 90: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

87

S.No  Particular of Measures/Activities  Unit  Ghazipur  Hameed Nagar  Ichaulia          Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.4 Fruit/Juice Shop  No.  4  0.4       3 0.3    1.9.5 Genaral Shop  No.              1 0.2    1.9.6 Irrigation System (Pumpset, Irrigation tube etc.)  No.                      1.9.7 Jarsi Bull (Natural Service)  No.                      1.9.8 Mini Dal Processor  No.  2  0.48               1.9.9 Mini Flour mill (Aata Chakki)     1  0.24               1.9.10 Mini Masala Machine (Masala Chakki)                         1.9.11 Mini Mentha Plant           1 0.24         1.9.12 Mini Oil Expeller      1  0.24               1.9.13 Mini Rice Polisher                         1.9.14 Murrah "He Buffalo" (Natural Service)                         1.9.15 Vegetable  Shop  No.  4  0.4                                         Grand Total    551  13.270615 225 4.96666 160 4.38007 

  

Note : 1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities

Page 91: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

88

 S.No  Particular of Measures/Activities  Unit Mahmoodabad  Mangrauda  Mehaura  Paharu Pur          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                            

    1.1.1 Afforestation  ha                                 (a) Block Plantation  ha        67.473 36000 168.921 90090              (b) Scattered Plantation  ha                             1.1.2 Hortoculture  ha                             1.1.3 Agriculture  ha                             1.1.4 Pasture  ha                             1.1.5 Others  ha                            Sub Total                            1.2  Soil & Moisture Conservation                            

    1.2.1 Straggred trenching  ha                             1.2.2 Countour Bunding  ha  95.25 447579 11.33 53226 54.08 254108 30.74 115560     1.2.3 Graded Bunding                                1.2.4 Bench Terracing  ha                             1.2.5 Others  ha        19.92 3076929 11.99 1851251 34.71 3093427       (a) Marginal Bund  ha  87.06 586936 217.27 1464551 180.82 1218989 142.2 1369413       (b) Peripheral Bund  ha        40.14 297704 32.15 238481 17.9 165986       (c) Submergence Bund  ha                               (d) Check Road Bund  ha                            Sub Total        1034515    4892410    3562829    4744386 1.3  Vegetative and Engineering Structure:                            

    1.3.1 Earthen Checks  ha                               (a) Water Harvesting Bund  ha        1 69528 7.06 492097 7.79 570554       (b) Earthen Check Dam  ha                             1.3.2 Brushwood Checks  ha                             1.3.3 Gully Plugs  ha                             1.3.4 Loose bolder  ha                         

Page 92: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

89

S.No  Particular of Measures/Activities  Unit Mahmoodabad  Mangrauda  Mehaura  Paharu Pur          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

    1.3.5 Gabian structure  ha                             1.3.6 Others  ha                         1.4  Water Harvesting Structure(New Created):                            

    1.4.1 Form Ponds (Treat area/EW)  cum  5.69/5688  406216       17.9/17901  1107816          1.4.2 Check Dams  cum                             1.4.3 Nallah Bunds  cum                             1.4.4 Percolation tanks  cum                             1.4.5 Ground Water recharge structure  cum                             1.4.6 Others  cum                         1.5  Water Harvesting Structure(Renovated):                            

    1.5.1 Form Ponds  cum                             1.5.2 Check Dams  cum                             1.5.3 Nallah Bunds  cum                             1.5.4 Percolation tanks  cum                             1.5.5 Ground Water recharge structure  cum                             1.5.6 Others  cum                            Sub Total        406216    69528    1599913    570554    Grand Total        1440731    4997938    5252832    5314940                                 1.6  1.6.1 Backyard poultry                            

   1.6.2 Bee keeping  No.                            1.6.3 Blacksmith                 10 0.2 15 0.3    1.6.4 Carpentry  No.        3 0.45               1.6.5 Cycle Shop  No.              5 0.5         1.6.6 Dairy  No.                            1.6.7 Genaral Shop  No.  10 1 5 0.5 6 0.6         1.6.8 Goatry (02 Goat/Unit)  No.        2 0.5 5 1.25 5 1.25    1.6.9 Piggeries (01 pair of Male/Female)  No.  4 0.8 3 0.6 5 1         1.6.10 Tailoring  No.  10 0.6 10 0.6 12 0.72      

Page 93: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

90

S.No  Particular of Measures/Activities  Unit Mahmoodabad  Mangrauda  Mehaura  Paharu Pur          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

         10 0.6             10 0.6    Production System  No.                    10 0.8                                 1.7  Crop Demonstration                            

   Activity Name                               1.7.1 Kharif‐Arahar  No.  16 0.11008 18 0.12384 30 0.2064 10 0.0688    1.7.2 Rabi‐Gram  No.  18 0.47826 12 0.31884 20 0.5314 20 0.5314    1.7.3 Rabi‐Lentil  No.  10 0.1406 10 0.1406 20 0.2812 10 0.1406    1.7.4 Kharif‐Moong  No.  15 0.1227 20 0.1636 25 0.2045 10 0.0818    1.7.5 Rabi‐Mustard  No.  15 0.10815 10 0.0721 25 0.18025 10 0.0721    1.7.6 Kharif‐Paddy  No.  12 0.17676 13 0.19149 15 0.22095 10 0.1473    1.7.7 Kharif‐Urd  No.  10 0.0963 10 0.0963 18 0.17334 15 0.14445    1.7.8 Rabi‐Wheat  No.  20 0.4576 15 0.3432 25 0.572 20 0.4576       No.                         1.8  Seed Distribution                            

   Activity Name                               1.8.1 Kharif‐Arahar  No.  20 0.06 16 0.048 15 0.045 25 0.075    1.8.2 Rabi‐Gram  No.  20 0.252 19 0.2394 28 0.3528 15 0.189    1.8.3 Rabi‐Lintil  No.  16 0.144 10 0.09 20 0.18 10 0.09    1.8.4 Rabi‐Mustard  No.  18 0.01215 10 0.00675 30 0.02025 20 0.0135    1.8.5 Kharif‐Paddy  No.  10 0.04 15 0.06 35 0.14 25 0.1    1.8.6 Rabi‐Wheat  No.  20 0.165 16 0.132 25 0.20625 23 0.18975                                                                 1.9  Micro‐Enterprise                            

   Activity Name                               1.9.1 Artificial Insemination Kit (Paravet)                                   1.9.2 Dairy  No.                            1.9.3 Food Preservation/Processing     1 0.24                  

Page 94: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

91

S.No  Particular of Measures/Activities  Unit Mahmoodabad  Mangrauda  Mehaura  Paharu Pur          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.4 Fruit/Juice Shop  No.                            1.9.5 Genaral Shop  No.  2 0.4       1 0.2         1.9.6 Irrigation System (Pumpset, Irrigation tube etc.)  No.        1 0.24 2 0.48 1 0.24    1.9.7 Jarsi Bull (Natural Service)  No.                            1.9.8 Mini Dal Processor  No.                    1 0.24    1.9.9 Mini Flour mill (Aata Chakki)           1 0.24 1 0.24         1.9.10 Mini Masala Machine (Masala Chakki)                 2 0.48         1.9.11 Mini Mentha Plant                               1.9.12 Mini Oil Expeller            1 0.24               1.9.13 Mini Rice Polisher                       2 0.48    1.9.14 Murrah "He Buffalo" (Natural Service)                               1.9.15 Vegetable  Shop  No.  4 0.4 1 0.1                                               Grand Total    261 6.4036 221 5.49612 380 8.98434 267 6.2113 

 Note : 

1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities

  

Page 95: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

92

S.No  Particular of Measures/Activities  Unit Palhari  Saidkhanpur  Saifpur  Sarai Ka Sthan          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                            

    1.1.1 Afforestation  ha                                 (a) Block Plantation  ha  3.101 29790              3.701  35520         (b) Scattered Plantation  ha                             1.1.2 Hortoculture  ha                             1.1.3 Agriculture  ha                             1.1.4 Pasture  ha                             1.1.5 Others  ha                            Sub Total                            1.2  Soil & Moisture Conservation                            

    1.2.1 Straggred trenching  ha                             1.2.2 Countour Bunding  ha  166.32 749638  207.58 807939 69.41 326214 81.04  364422     1.2.3 Graded Bunding                                1.2.4 Bench Terracing  ha                             1.2.5 Others  ha  1.94 243327        1.12 173284 5.3  670661       (a) Marginal Bund  ha  183.63 1889475  109.89 928098 56.77 382634 128.17  1286889       (b) Peripheral Bund  ha  11.71 120595              7.75  79827       (c) Submergence Bund  ha                               (d) Check Road Bund  ha                    1.9  31410    Sub Total        3003035     1736037    882132    2433209 1.3  Vegetative and Engineering Structure:                            

    1.3.1 Earthen Checks  ha                               (a) Water Harvesting Bund  ha                    1.35  99643       (b) Earthen Check Dam  ha                             1.3.2 Brushwood Checks  ha                             1.3.3 Gully Plugs  ha                             1.3.4 Loose bolder  ha                             1.3.5 Gabian structure  ha                             1.3.6 Others  ha                         

Page 96: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

93

S.No  Particular of Measures/Activities  Unit Palhari  Saidkhanpur  Saifpur  Sarai Ka Sthan          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 1.4  Water Harvesting Structure(New Created):                            

    1.4.1 Form Ponds (Treat area/EW)  cum  2.55/1276 232881  25.45/16227  1091024                1.4.2 Check Dams  cum                             1.4.3 Nallah Bunds  cum                             1.4.4 Percolation tanks  cum                             1.4.5 Ground Water recharge structure  cum                             1.4.6 Others  cum                         1.5  Water Harvesting Structure(Renovated):                            

    1.5.1 Form Ponds  cum                             1.5.2 Check Dams  cum                             1.5.3 Nallah Bunds  cum                             1.5.4 Percolation tanks  cum                             1.5.5 Ground Water recharge structure  cum                             1.5.6 Others  cum                            Sub Total        232881     1091024    0    99643    Grand Total        3265706     2827061    882132    2568372                                 1.6  1.6.1 Backyard poultry                            

   1.6.2 Bee keeping  No.                            1.6.3 Blacksmith     10 0.2  12 0.24 10 0.2 10  0.2    1.6.4 Carpentry  No.  5 0.75              8  1.2    1.6.5 Cycle Shop  No.                            1.6.6 Dairy  No.                            1.6.7 Genaral Shop  No.  5 0.5  5 0.5       3  0.3    1.6.8 Goatry (02 Goat/Unit)  No.        5 1.25               1.6.9 Piggeries (01 pair of Male/Female)  No.  5 1        3 0.6         1.6.10 Tailoring  No.  13 0.78  10 0.6 10 0.6 10  0.6          10 0.6        10 0.6         Production System  No.  10 0.8              10  0.8 

Page 97: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

94

S.No  Particular of Measures/Activities  Unit Palhari  Saidkhanpur  Saifpur  Sarai Ka Sthan          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

                                1.7  Crop Demonstration                            

   Activity Name                               1.7.1 Kharif‐Arahar  No.  35 0.2408  20 0.1376 10 0.0688 10  0.0688    1.7.2 Rabi‐Gram  No.  34 0.90338  10 0.2657 12 0.31884 25  0.66425    1.7.3 Rabi‐Lentil  No.  30 0.4218  14 0.19684 10 0.1406 15  0.2109    1.7.4 Kharif‐Moong  No.  28 0.22904  15 0.1227 10 0.0818 10  0.0818    1.7.5 Rabi‐Mustard  No.  26 0.18746  15 0.10815 10 0.0721 15  0.10815    1.7.6 Kharif‐Paddy  No.  22 0.32406  10 0.1473 10 0.1473 11  0.16203    1.7.7 Kharif‐Urd  No.  30 0.2889  10 0.0963 10 0.0963 10  0.0963    1.7.8 Rabi‐Wheat  No.        16 0.36608 10 0.2288 15  0.3432       No.                         1.8  Seed Distribution                            

   Activity Name                               1.8.1 Kharif‐Arahar  No.  27 0.081  18 0.054 20 0.06 10  0.03    1.8.2 Rabi‐Gram  No.  28 0.3528  20 0.252 7 0.0882 25  0.315    1.8.3 Rabi‐Lintil  No.  30 0.27  13 0.117 3 0.027 5  0.045    1.8.4 Rabi‐Mustard  No.  28 0.0189  25 0.016875 20 0.0135 20  0.0135    1.8.5 Kharif‐Paddy  No.  27 0.108  13 0.052 15 0.06 10  0.04    1.8.6 Rabi‐Wheat  No.  25 0.20625  10 0.0825 25 0.20625 30  0.2475                                                                 1.9  Micro‐Enterprise                            

   Activity Name                               1.9.1 Artificial Insemination Kit (Paravet)         2 0.48                      1.9.2 Dairy  No.                            1.9.3 Food Preservation/Processing                               1.9.4 Fruit/Juice Shop  No.        2 0.2               1.9.5 Genaral Shop  No.        2 0.4            

Page 98: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

95

S.No  Particular of Measures/Activities  Unit Palhari  Saidkhanpur  Saifpur  Sarai Ka Sthan          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.6 Irrigation System (Pumpset, Irrigation tube etc.)  No.              1 0.24         1.9.7 Jarsi Bull (Natural Service)  No.  1 0.24              2  0.48    1.9.8 Mini Dal Processor  No.  1 0.24                      1.9.9 Mini Flour mill (Aata Chakki)           1 0.24 2 0.48         1.9.10 Mini Masala Machine (Masala Chakki)                               1.9.11 Mini Mentha Plant                               1.9.12 Mini Oil Expeller                        1  0.24    1.9.13 Mini Rice Polisher                               1.9.14 Murrah "He Buffalo" (Natural Service)     1 0.24                      1.9.15 Vegetable  Shop  No.  3 0.3              5  0.5                                    Grand Total    436 9.76239  246 5.445045 208 4.32949 260  6.74643 

  

Note : 1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities     

Page 99: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

96

 S.No  Particular of Measures/Activities  Unit Shahpur  Sisauna  Surajpur Khapraila Total          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 1.1  Land Development (Productive use):                            

    1.1.1 Afforestation  ha                                 (a) Block Plantation  ha              2.697 129450 294.96  613950         (b) Scattered Plantation  ha                             1.1.2 Hortoculture  ha                             1.1.3 Agriculture  ha                             1.1.4 Pasture  ha                             1.1.5 Others  ha                            Sub Total                            1.2  Soil & Moisture Conservation                            

    1.2.1 Straggred trenching  ha                             1.2.2 Countour Bunding  ha  63.96 280841  20.79 97738 94.35 421775 1740.79  7599919     1.2.3 Graded Bunding                                1.2.4 Bench Terracing  ha                             1.2.5 Others  ha        10.16 1570515 14.93 1296603 170.85  18180834       (a) Marginal Bund  ha  28.91 308386  117.5 791974 118.58 1265110 2363.73  20177315       (b) Peripheral Bund  ha              39.29 416145 222.82  1967808       (c) Submergence Bund  ha                               (d) Check Road Bund  ha                    27.07  447254    Sub Total        589227     2460227    3399633    48373130 1.3  Vegetative and Engineering Structure:                            

    1.3.1 Earthen Checks  ha                               (a) Water Harvesting Bund  ha        4.04 281250 6.16 448943 32  2298548       (b) Earthen Check Dam  ha                             1.3.2 Brushwood Checks  ha                             1.3.3 Gully Plugs  ha                             1.3.4 Loose bolder  ha                         

Page 100: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

97

S.No  Particular of Measures/Activities  Unit Shahpur  Sisauna  Surajpur Khapraila Total          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

    1.3.5 Gabian structure  ha                             1.3.6 Others  ha                         1.4  Water Harvesting Structure(New Created):                            

    1.4.1 Form Ponds (Treat area/EW)  cum  4.83/2414 218211  15.34/15336 1119368          9768546     1.4.2 Check Dams  cum                             1.4.3 Nallah Bunds  cum                             1.4.4 Percolation tanks  cum                             1.4.5 Ground Water recharge structure  cum                             1.4.6 Others  cum                         1.5  Water Harvesting Structure(Renovated):                            

    1.5.1 Form Ponds  cum                             1.5.2 Check Dams  cum                             1.5.3 Nallah Bunds  cum                             1.5.4 Percolation tanks  cum                             1.5.5 Ground Water recharge structure  cum                             1.5.6 Others  cum                            Sub Total        218211     1400618    448943         Grand Total        807438     3860845    3978026                                      1.6  1.6.1 Backyard poultry                            

   1.6.2 Bee keeping  No.                            1.6.3 Blacksmith           15 0.3               1.6.4 Carpentry  No.              8 1.2         1.6.5 Cycle Shop  No.                            1.6.6 Dairy  No.                            1.6.7 Genaral Shop  No.                            1.6.8 Goatry (02 Goat/Unit)  No.              5 1.25         1.6.9 Piggeries (01 pair of Male/Female)  No.        3 0.6               1.6.10 Tailoring  No.  10 0.6  13 0.78 7 0.42      

Page 101: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

98

S.No  Particular of Measures/Activities  Unit Shahpur  Sisauna  Surajpur Khapraila Total          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

                     7 0.42         Production System  No.  8 0.64                                                   1.7  Crop Demonstration                            

   Activity Name                               1.7.1 Kharif‐Arahar  No.  10 0.0688  8 0.05504 16 0.11008         1.7.2 Rabi‐Gram  No.  5 0.13285  8 0.21256 20 0.5314         1.7.3 Rabi‐Lentil  No.        10 0.1406 18 0.25308         1.7.4 Kharif‐Moong  No.  10 0.0818  10 0.0818 10 0.0818         1.7.5 Rabi‐Mustard  No.        10 0.0721 25 0.18025         1.7.6 Kharif‐Paddy  No.  10 0.1473  10 0.1473 10 0.1473         1.7.7 Kharif‐Urd  No.  10 0.0963  5 0.04815 10 0.0963         1.7.8 Rabi‐Wheat  No.  6 0.13728  8 0.18304 20 0.4576            No.                         1.8  Seed Distribution                            

   Activity Name                               1.8.1 Kharif‐Arahar  No.  15 0.045  22 0.066 20 0.06         1.8.2 Rabi‐Gram  No.  3 0.0378  3 0.0378 20 0.252         1.8.3 Rabi‐Lintil  No.  4 0.036  2 0.018 26 0.234         1.8.4 Rabi‐Mustard  No.  20 0.0135  15 0.010125 20 0.0135         1.8.5 Kharif‐Paddy  No.  12 0.048  18 0.072 3 0.012         1.8.6 Rabi‐Wheat  No.  10 0.0825  20 0.165 20 0.165                                                                      1.9  Micro‐Enterprise                            

   Activity Name                               1.9.1 Artificial Insemination Kit (Paravet)                                   1.9.2 Dairy  No.              2 0.48         1.9.3 Food Preservation/Processing                            

Page 102: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

99

S.No  Particular of Measures/Activities  Unit Shahpur  Sisauna  Surajpur Khapraila Total          Qty  Amt  Qty  Amt  Qty  Amt  Qty  Amt 

   1.9.4 Fruit/Juice Shop  No.  4 0.4                      1.9.5 Genaral Shop  No.                            1.9.6 Irrigation System (Pumpset, Irrigation tube etc.) No.        2 0.48               1.9.7 Jarsi Bull (Natural Service)  No.                            1.9.8 Mini Dal Processor  No.              1 0.24         1.9.9 Mini Flour mill (Aata Chakki)                 1 0.24         1.9.10 Mini Masala Machine (Masala Chakki)                               1.9.11 Mini Mentha Plant                               1.9.12 Mini Oil Expeller                                1.9.13 Mini Rice Polisher                               1.9.14 Murrah "He Buffalo" (Natural Service)                               1.9.15 Vegetable  Shop  No.        1 0.1 1 0.1                                         Grand Total    137 2.56713  183 3.569515 270 6.94431      

   

Note : 1. Livelihood - Qty. indicated number of SHG members 2. Crop Demonstration - 0.25 ha area is considered for each beneficiary 3. Seed Distribution - 0.25 ha area is considered for each beneficiary 4. Micro Enterprises - Qty. indicated number of activities

Page 103: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

100

5.3: LIVELIHOOD ACTION PLAN  

Table 5.4: Livelihood Activities for Landless/Assetless People  Amount (Rs) in lacs. 

S.No  Name of GP  Activity Proposed No. of Groups 

No. of Units 

Unit Cost 

Cost of Activity 

SHG Share 

Proposed Amount for Project Fund 

Proposed date for Activity 

(start) 

1  Akbarpur Dhanethi  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Cycle Shop  1 5  0.1 0.5 0 0.5 March       Bee keeping  1 5  0.15 0.75 0 0.75 Dec       Tailoring  1 9  0.08 0.72 0 0.72 March       Sub Total  4 29     2.57 0 2.57   2  Ambaur  Goatry (02 Goat/Unit)  1 15  0.06 0.9 0 0.9 Feb       Bee keeping  1 10  0.15 1.5 0 1.5 Dec       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 March       Genaral Shop  1 3  0.2 0.6 0 0.6 March       Sub Total  4 38     3.6 0 3.6   3  Baghoura  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Piggeries (01 pair of Male/Female)  1 4  0.06 0.24 0 0.24 Feb       Sub Total  2 14     0.84 0 0.84   4  Beerkithai  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Backyard poultry  1 15  0.02 0.3 0 0.3 Feb       Sub Total  3 35     1.5 0 1.5   5  Chandwal  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Genaral Shop  1 5  0.2 1 0 1 March       Bee keeping  1 4  0.15 0.6 0 0.6 Dec       Sub Total  3 19     2.2 0 2.2   6  Danapurkyampur  Goatry (02 Goat/Unit)  1 9  0.06 0.54 0 0.54 Feb       Backyard poultry  1 10  0.02 0.2 0 0.2 Feb       Genaral Shop  1 2  0.2 0.4 0 0.4 March 

Page 104: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

101

S.No  Name of GP  Activity Proposed No. of Groups 

No. of Units 

Unit Cost 

Cost of Activity 

SHG Share 

Proposed Amount for Project Fund 

Proposed date for Activity 

(start) 

      Tailoring  1 2  0.08 0.16 0 0.16 March       Sub Total  4 23     1.3 0 1.3   7  Ghazipur  Dairy  1 5  0.4 1.25 0.75 0.5 Feb       Genaral Shop  1 5  0.2 1 0 1 March       Cycle Shop  1 6  0.1 0.6 0 0.6 Feb       Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Blacksmith  1 10  0.1 1 0 1 March       Carpentry  1 10  0.1 1 0 1 March       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Backyard poultry  1 15  0.02 0.3 0 0.3 Feb       Sub Total  8 71     6.35 0.75 5.6   8  Hameed Nagar  Tailoring  1 10  0.08 0.8 0 0.8 March       Cycle Shop  1 4  0.1 0.4 0 0.4 March       Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Sub Total  4 34     2.4 0 2.4   9  Ichaulia  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Cycle Shop  1 10  0.1 1 0 1 March       Backyard poultry  1 5  0.02 0.1 0 0.1 Feb       Dairy  1 2  0.4 0.5 0.3 0.2 Feb       Genaral Shop  1 2  0.2 0.4 0 0.4 March       Sub Total  5 29     2.6 0.3 2.3   10  Mahmoodabad  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Cycle Shop  1 10  0.1 1 0 1 March       Genaral Shop  1 4  0.2 0.8 0 0.8 March       Sub Total  4 34     3 0 3   11  Mangrauda  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb 

Page 105: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

102

S.No  Name of GP  Activity Proposed No. of Groups 

No. of Units 

Unit Cost 

Cost of Activity 

SHG Share 

Proposed Amount for Project Fund 

Proposed date for Activity 

(start) 

      Bee keeping  1 3  0.15 0.45 0 0.45 Dec       Dairy  1 2  0.4 0.5 0.3 0.2 Feb       Cycle Shop  1 5  0.1 0.5 0 0.5 March       Genaral Shop  1 3  0.2 0.6 0 0.6 March       Sub Total  5 23     2.65 0.3 2.35   12  Mehaura  Goatry (02 Goat/Unit)  1 12  0.06 0.72 0 0.72 March       Backyard poultry  1 10  0.02 0.2 0 0.2 Feb       Blacksmith  1 5  0.1 0.5 0 0.5 March       Dairy  1 5  0.4 1.25 0.75 0.5 Feb       Genaral Shop  1 5  0.2 1 0 1 March       Cycle Shop  1 6  0.1 0.6 0 0.6 March       Sub Total  6 43     4.27 0.75 3.52   13  Paharu Pur  Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Tailoring  1 10  0.08 0.8 0 0.8 March       Dairy  1 5  0.4 1.25 0.75 0.5 Feb       Backyard poultry  1 15  0.02 0.3 0 0.3 Feb       Sub Total  4 40     2.95 0.75 2.2   14  Palhari  Goatry (02 Goat/Unit)  1 13  0.06 0.78 0 0.78 Feb       Bee keeping  1 5  0.15 0.75 0 0.75 Dec       Genaral Shop  1 5  0.2 1 0 1 March       Cycle Shop  1 5  0.1 0.5 0 0.5 March       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Tailoring  1 10  0.08 0.8 0 0.8 March       Backyard poultry  1 10  0.02 0.2 0 0.2 Feb       Sub Total  7 58     4.63 0 4.63   15  Saidkhanpur  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Cycle Shop  1 5  0.1 0.5 0 0.5 March       Dairy  1 5  0.4 1.25 0.75 0.5 Feb 

Page 106: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

103

S.No  Name of GP  Activity Proposed No. of Groups 

No. of Units 

Unit Cost 

Cost of Activity 

SHG Share 

Proposed Amount for Project Fund 

Proposed date for Activity 

(start) 

      Backyard poultry  1 12  0.02 0.24 0 0.24 Feb       Sub Total  4 32     2.59 0.75 1.84   16  Saifpur  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Piggeries (01 pair of Male/Female)  1 10  0.06 0.6 0 0.6 Feb       Backyard poultry  1 10  0.02 0.2 0 0.2 Feb       Genaral Shop  1 3  0.2 0.6 0 0.6 March       Sub Total  4 33     2 0 2   17  Sarai Ka Sthan  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Tailoring  1 10  0.08 0.8 0 0.8 March       Backyard poultry  1 10  0.02 0.2 0 0.2 Feb       Bee keeping  1 8  0.15 1.2 0 1.2 Dec       Cycle Shop  1 3  0.1 0.3 0 0.3 March       Sub Total  5 41     3.1 0 3.1   18  Shahpur  Goatry (02 Goat/Unit)  1 10  0.06 0.6 0 0.6 Feb       Tailoring  1 8  0.08 0.64 0 0.64 March       Sub Total  2 18     1.24 0 1.24   19  Sisauna  Goatry (02 Goat/Unit)  1 13  0.06 0.78 0 0.78 Feb       Genaral Shop  1 3  0.2 0.6 0 0.6 March       Backyard poultry  1 15  0.02 0.3 0 0.3 Feb       Sub Total  3 31     1.68 0 1.68   20  Surajpur Khapraila  Goatry (02 Goat/Unit)  1 7  0.06 0.42 0 0.42 Feb       Piggeries (01 pair of Male/Female)  1 7  0.06 0.42 0 0.42 March       Bee keeping  1 8  0.15 1.2 0 1.2 Dec       Dairy  1 5  0.4 1.25 0.75 0.5 Feb       Sub Total  4 27     3.29 0.75 2.54         Grand Total  85 672     54.76 4.35 50.41   

 

 

Page 107: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

104

5.4: PRODUCTION SYSTEM ACTION PLAN  

Details for Production system & Micro Enterprise based livelihood activities are given below:‐  

Table 5.5: Estimate for Crop Demonstration 

Season  Seed  Sowing time 

Qty  Rate  Amt.  N  P  K Pesticide/ Others 

Total 

kg  Rs/kg Rs  kg Rate Rs/kg 

Rs.  kg Rate Rs/kg 

Rs.  kg Rate Rs/kg 

Rs.  Rs.  Rs. 

 Rabi   

Wheat  Oct to Nov  27.50 30  825.00  52.50 7.60  399.00  32.50 20.50 666.25 16.50 12  198.00 200  2288 

Lintil  Oct to Nov  12.50 72  900.00  5.00  7.60  38.00  15.00 20.50 307.50 5.00  12  60.00  100  1406 

Gram  Oct to Nov  14.00  90  1260.00 0.00  7.60  0.00  44.00  20.50  902.00 16.25  12  195.00 300  2657 

Pea (Vegitable) Oct to Nov  30.00 65  1950.00 10.00 7.60  76.00  12.50 20.50 256.25 10.00 12  120.00 150  2552 

Mustard  Sep to  Oct  1.50  45  67.50  30.00 7.60  228.00  10.00 20.50 205.00 10.00 12  120.00 100  721 

 Kharif   

Paddy  June to July  20.00 20  400.00  37.50 7.60  285.00  15.00 20.50 307.50 15.00 12  180.00 300  1473 

Maize  June to July  22.50 25  562.50  80.00 7.60  608.00  30.00 20.50 615.00 20.00 12  240.00 100  2126 

Arhar  June to July  5.00  60  300.00  3.00  7.60  22.80  10.00 20.50 205.00 5.00  12  60.00  100  688 

Moong  June to July  7.00  70  490.00  3.00  7.60  22.80  10.00 20.50 205.00 0.00  0  0.00  100  818 

Urd  June to July  8.00  70  560.00  5.00  7.60  38.00  10.00 20.50 205.00 5.00  12  60.00  100  963 

 Area of per demonstration = 0.25 ha     

Page 108: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

105

Table 5.6: Gram Panchyat Wise Crop Demonstration/ Seed Distribution/ Production system based Micro Enterprise 

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

1  Akbarpur Dhanethi  Crop Demonstration  Kharif  Arahar  14  688  0.096  0  0.096  Oct To Nov       Crop Demonstration  Kharif  Paddy  14  1473  0.206  0  0.206  Feb To March       Crop Demonstration  Kharif  Moong  12  818  0.098  0  0.098  Oct To Nov       Crop Demonstration  Kharif  Urd  12  963  0.116  0  0.116  Oct To Nov       Crop Demonstration  Rabi  Gram  12  2657  0.319  0  0.319  Oct To Nov       Crop Demonstration  Rabi  Wheat  12  2288  0.275  0  0.275  Oct To Nov       Crop Demonstration  Rabi  Mustard  15  721  0.108  0  0.108  Sep To Oct       Crop Demonstration  Rabi  Lentil  15  1406  0.211  0  0.211  Oct To Nov       Seed Distribution  Kharif   Paddy  16  400  0.064  0  0.064  Aug To Sep       Seed Distribution  Kharif   Arahar  9  300  0.027  0  0.027  Aug To Sep       Seed Distribution  Rabi   Wheat  14  825  0.116  0  0.116  Aug To Sep       Seed Distribution  Rabi   Mustard  15  67.5  0.010  0  0.010  Aug To Sep       Seed Distribution  Rabi   Gram  17  1260  0.214  0  0.214  Aug To Sep       Seed Distribution  Rabi   Lintil  15  900  0.135  0  0.135  Aug To Sep       Micro‐Enterprise     Vegetable  Shop  2  10000  0.200  0  0.200  Sep       Micro‐Enterprise     Genaral Shop  1  20000  0.200  0  0.200  Sep       Micro‐Enterprise     Fruit/Juice Shop  2  10000  0.200  0  0.200  March       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  1  50000  0.500  0.26  0.240  March             Sub Total  198  104766.5  3.095  0.26  2.835    

2  Ambour  Crop Demonstration  Kharif  Arahar  16  688  0.110  0  0.110  Sep To Oct       Crop Demonstration  Kharif  Moong  15  818  0.123  0  0.123  Sep To Oct       Crop Demonstration  Kharif  Urd  25  963  0.241  0  0.241  Sep To Oct       Crop Demonstration  Rabi  Gram  24  2657  0.638  0  0.638  Sep To Oct       Crop Demonstration  Rabi  Lentil  14  1406  0.197  0  0.197  Oct To Nov       Crop Demonstration  Rabi  Wheat  25  2288  0.572  0  0.572  Sep To Oct       Crop Demonstration  Rabi  Mustard  30  721  0.216  0  0.216  Sep To Oct       Seed Distribution  Kharif   Paddy  20  400  0.080  0  0.080  Aug To Sep       Seed Distribution  Kharif   Arahar  20  300  0.060  0  0.060  Aug To Sep       Seed Distribution  Rabi   Wheat  20  825  0.165  0  0.165  Aug To Sep       Seed Distribution  Rabi   Lintil  22  900  0.198  0  0.198  Aug To Sep       Seed Distribution  Rabi   Gram  23  1260  0.290  0  0.290  Aug To Sep       Seed Distribution  Rabi   Mustard  25  67.5  0.017  0  0.017  Aug To Sep       Micro‐Enterprise     Dairy  2  40000  0.800  0.32  0.480  Jan       Micro‐Enterprise     Mini Dal Processor  1  50000  0.500  0.26  0.240  Sep 

Page 109: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

106

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Micro‐Enterprise     Jarsi Bull (Natural Service)  2  30000  0.600  0.12  0.480  Sep             Sub Total  284  133293.5  4.806  0.7  4.106    

3  Baghaura  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Rabi  Wheat  9  2288  0.206  0  0.206  Sep To Oct       Crop Demonstration  Rabi  Mustard  8  721  0.058  0  0.058  Sep To Oct       Seed Distribution  Kharif   Paddy  10  400  0.040  0  0.040  May To June       Seed Distribution  Kharif   Arahar  8  300  0.024  0  0.024  Aug To Sep       Seed Distribution  Rabi   Wheat  6  825  0.050  0  0.050  Aug To Sep       Seed Distribution  Rabi   Mustard  6  67.5  0.004  0  0.004  Aug To Sep       Seed Distribution  Rabi   Gram  6  1260  0.076  0  0.076  Aug To Sep       Micro‐Enterprise     Mini Dal Processor  1  50000  0.500  0.26  0.240  Sep       Micro‐Enterprise     Genaral Shop  1  20000  0.200  0  0.100  Sep             Sub Total  75  78022.5  1.373  0.26  1.013    

4  Beerkithai  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Rabi  Wheat  10  2288  0.229  0  0.229  Oct To Nov       Crop Demonstration  Rabi  Gram  10  2657  0.266  0  0.266  Oct To Nov       Crop Demonstration  Rabi  Mustard  5  721  0.036  0  0.036  Sep To Oct       Seed Distribution  Kharif   Paddy  9  400  0.036  0  0.036  Aug To Sep       Seed Distribution  Kharif   Arahar  10  300  0.030  0  0.030  May To June       Seed Distribution  Rabi   Wheat  10  825  0.083  0  0.083  Aug To Sep       Seed Distribution  Rabi   Lintil  10  900  0.090  0  0.090  Aug To Sep       Seed Distribution  Rabi   Mustard  10  67.5  0.007  0  0.007  Aug To Sep       Seed Distribution  Rabi   Gram  7  1260  0.088  0  0.088  Aug To Sep       Micro‐Enterprise     Dairy  2  40000  0.800  0.32  0.480  Jan             Sub Total  113  52397.5  1.962  0.32  1.642    

5  Chandwal  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  13  2657  0.345  0  0.345  Sep To Oct       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Crop Demonstration  Rabi  Wheat  15  2288  0.343  0  0.343  Sep To Oct 

Page 110: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

107

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Seed Distribution  Kharif   Paddy  10  400  0.040  0  0.040  May To June       Seed Distribution  Kharif   Arahar  15  300  0.045  0  0.045  Aug To Sep       Seed Distribution  Rabi   Wheat  12  825  0.099  0  0.099  Aug To Sep       Seed Distribution  Rabi   Lintil  15  900  0.135  0  0.135  Aug To Sep       Seed Distribution  Rabi   Mustard  10  67.5  0.007  0  0.007  Aug To Sep       Seed Distribution  Rabi   Gram  15  1260  0.189  0  0.189  Aug To Sep       Micro‐Enterprise     Food Preservation/Processing  2  35000  0.700  0.22  0.480  Jan       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep             Sub Total  168  89766.5  2.910  0.38  2.530    

6  Danapurkyampur  Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Crop Demonstration  Rabi  Gram  6  2657  0.159  0  0.159  Oct To Nov       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Rabi  Wheat  6  2288  0.137  0  0.137  Oct To Nov       Seed Distribution  Kharif   Paddy  12  400  0.048  0  0.048  May To June       Seed Distribution  Kharif   Arahar  10  300  0.030  0  0.030  May To June       Seed Distribution  Rabi   Wheat  10  825  0.083  0  0.083  Aug To Sep       Seed Distribution  Rabi   Mustard  10  67.5  0.007  0  0.007  Aug To Sep       Seed Distribution  Rabi   Gram  9  1260  0.113  0  0.113  Aug To Sep       Micro‐Enterprise     Genaral Shop  2  20000  0.400  0  0.400  Sep             Sub Total  105  32085.5  1.406  0  1.406    

7  Ghazipur  Crop Demonstration  Kharif  Arahar  25  688  0.172  0  0.172  Oct To Nov       Crop Demonstration  Kharif  Moong  32  818  0.262  0  0.262  Oct To Nov       Crop Demonstration  Kharif  Paddy  40  1473  0.589  0  0.589  Oct To Nov       Crop Demonstration  Kharif  Urd  22  963  0.212  0  0.212  Oct To Nov       Crop Demonstration  Rabi  Gram  35  2657  0.930  0  0.930  Oct To Nov       Crop Demonstration  Rabi  Lentil  21  1406  0.295  0  0.295  Oct To Nov       Crop Demonstration  Rabi  Mustard  36  721  0.260  0  0.260  Oct To Nov       Crop Demonstration  Rabi  Wheat  35  2288  0.801  0  0.801  Oct To Nov       Seed Distribution  Kharif   Paddy  35  400  0.140  0  0.140  Aug To Sep       Seed Distribution  Kharif   Arahar  40  300  0.120  0  0.120  Aug To Sep       Seed Distribution  Rabi   Wheat  40  825  0.330  0  0.330  Aug To Sep       Seed Distribution  Rabi   Lintil  30  900  0.270  0  0.270  Aug To Sep 

Page 111: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

108

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Seed Distribution  Rabi   Mustard  35  67.5  0.024  0  0.024  Aug To Sep       Seed Distribution  Rabi   Gram  41  1260  0.517  0  0.517  Aug To Sep       Micro‐Enterprise     Vegetable  Shop  4  10000  0.400  0  0.400  Sep       Micro‐Enterprise     Mini Oil Expeller   1  40000  0.400  0.16  0.240  Mar       Micro‐Enterprise     Dairy  1  40000  0.400  0.16  0.240  Jan       Micro‐Enterprise     Mini Dal Processor  2  50000  1.000  0.52  0.480  Sep       Micro‐Enterprise     Fruit/Juice Shop  4  10000  0.400  0  0.400  Sep       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep             Sub Total  480  204766.5  7.921  1  6.921    

8  Hameed Nagar  Crop Demonstration  Kharif  Arahar  13  688  0.089  0  0.089  Oct To Nov       Crop Demonstration  Kharif  Moong  15  818  0.123  0  0.123  Oct To Nov       Crop Demonstration  Kharif  Paddy  16  1473  0.236  0  0.236  Oct To Nov       Crop Demonstration  Kharif  Urd  14  963  0.135  0  0.135  Oct To Nov       Crop Demonstration  Rabi  Gram  11  2657  0.292  0  0.292  Oct To Nov       Crop Demonstration  Rabi  Wheat  10  2288  0.229  0  0.229  Oct To Nov       Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Seed Distribution  Kharif   Paddy  12  400  0.048  0  0.048  Aug To Sep       Seed Distribution  Kharif   Arahar  10  300  0.030  0  0.030  May To June       Seed Distribution  Rabi   Wheat  27  825  0.223  0  0.223  Aug To Sep       Seed Distribution  Rabi   Lintil  10  900  0.090  0  0.090  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Gram  10  1260  0.126  0  0.126  Aug To Sep       Micro‐Enterprise     Artificial Insemination Kit (Paravet)      2  50000  1.000  0.52  0.480  Sep       Micro‐Enterprise     Mini Mentha Plant  1  50000  0.500  0.26  0.240  Sep             Sub Total  191  114766.5  3.347  0.78  2.567    

9  Ichaulia  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  8  2657  0.213  0  0.213  Oct To Nov       Crop Demonstration  Rabi  Wheat  8  2288  0.183  0  0.183  Oct To Nov       Crop Demonstration  Rabi  Mustard  6  721  0.043  0  0.043  Oct To Nov       Crop Demonstration  Rabi  Lentil  6  1406  0.084  0  0.084  Oct To Nov       Seed Distribution  Kharif   Paddy  10  400  0.040  0  0.040  May To June 

Page 112: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

109

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Seed Distribution  Kharif   Arahar  10  300  0.030  0  0.030  May To June       Seed Distribution  Rabi   Wheat  10  825  0.083  0  0.083  Aug To Sep       Seed Distribution  Rabi   Mustard  10  67.5  0.007  0  0.007  Aug To Sep       Seed Distribution  Rabi   Lintil  10  900  0.090  0  0.090  Aug To Sep       Seed Distribution  Rabi   Gram  9  1260  0.113  0  0.113  Aug To Sep       Micro‐Enterprise     Genaral Shop  1  20000  0.200  0  0.200  Sep       Micro‐Enterprise     Fruit/Juice Shop  3  10000  0.300  0  0.300  March             Sub Total  131  44766.5  1.780  0  1.780    10  Mahmoodabad  Crop Demonstration  Kharif  Arahar  16  688  0.110  0  0.110  Oct To Nov 

      Crop Demonstration  Kharif  Moong  15  818  0.123  0  0.123  Oct To Nov       Crop Demonstration  Kharif  Paddy  12  1473  0.177  0  0.177  Oct To Nov       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  18  2657  0.478  0  0.478  Oct To Nov       Crop Demonstration  Rabi  Wheat  20  2288  0.458  0  0.458  Oct To Nov       Crop Demonstration  Rabi  Mustard  15  721  0.108  0  0.108  Oct To Nov       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Seed Distribution  Kharif   Paddy  10  400  0.040  0  0.040  May To June       Seed Distribution  Kharif   Arahar  20  300  0.060  0  0.060  May To June       Seed Distribution  Rabi   Wheat  20  825  0.165  0  0.165  Aug To Sep       Seed Distribution  Rabi   Lintil  16  900  0.144  0  0.144  Aug To Sep       Seed Distribution  Rabi   Mustard  18  67.5  0.012  0  0.012  Aug To Sep       Seed Distribution  Rabi   Gram  20  1260  0.252  0  0.252  Aug To Sep       Micro‐Enterprise     Genaral Shop  2  20000  0.400  0  0.400  Sep       Micro‐Enterprise     Food Preservation/Processing  1  35000  0.350  0.11  0.240  Jan       Micro‐Enterprise     Vegetable  Shop  4  10000  0.400  0  0.400  Sep             Sub Total  227  79766.5  3.514  0.11  3.404    11  Mangrauda  Crop Demonstration  Kharif  Arahar  18  688  0.124  0  0.124  Oct To Nov 

      Crop Demonstration  Kharif  Moong  20  818  0.164  0  0.164  Oct To Nov       Crop Demonstration  Kharif  Paddy  13  1473  0.191  0  0.191  Oct To Nov       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  12  2657  0.319  0  0.319  Oct To Nov       Crop Demonstration  Rabi  Wheat  15  2288  0.343  0  0.343  Oct To Nov       Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Seed Distribution  Kharif   Paddy  15  400  0.060  0  0.060  Aug To Sep 

Page 113: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

110

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Seed Distribution  Kharif   Arahar  16  300  0.048  0  0.048  May To June       Seed Distribution  Rabi   Wheat  16  825  0.132  0  0.132  Aug To Sep       Seed Distribution  Rabi   Mustard  10  67.5  0.007  0  0.007  Aug To Sep       Seed Distribution  Rabi   Gram  19  1260  0.239  0  0.239  Aug To Sep       Seed Distribution  Rabi   Lintil  10  900  0.090  0  0.090  Aug To Sep       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  1  50000  0.500  0.26  0.240  March       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep       Micro‐Enterprise     Mini Oil Expeller   1  40000  0.400  0.16  0.240  Mar       Micro‐Enterprise     Vegetable  Shop  1  10000  0.100  0  0.100  Sep             Sub Total  198  154766.5  3.426  0.58  2.846    12  Mehaura  Crop Demonstration  Kharif  Arahar  30  688  0.206  0  0.206  Sep To Oct 

      Crop Demonstration  Kharif  Moong  25  818  0.205  0  0.205  Sep To Oct       Crop Demonstration  Kharif  Paddy  15  1473  0.221  0  0.221  Sep To Oct       Crop Demonstration  Kharif  Urd  18  963  0.173  0  0.173  Sep To Oct       Crop Demonstration  Rabi  Wheat  25  2288  0.572  0  0.572  Sep To Oct       Crop Demonstration  Rabi  Gram  20  2657  0.531  0  0.531  Sep To Oct       Crop Demonstration  Rabi  Lentil  20  1406  0.281  0  0.281  Sep To Oct       Crop Demonstration  Rabi  Mustard  25  721  0.180  0  0.180  Sep To Oct       Seed Distribution  Rabi   Mustard  30  67.5  0.020  0  0.020  Aug To Sep       Seed Distribution  Rabi   Gram  28  1260  0.353  0  0.353  Aug To Sep       Seed Distribution  Kharif   Paddy  35  400  0.140  0  0.140  Aug To Sep       Seed Distribution  Kharif   Arahar  15  300  0.045  0  0.045  May To June       Seed Distribution  Rabi   Wheat  25  825  0.206  0  0.206  Aug To Sep       Seed Distribution  Rabi   Lintil  20  900  0.180  0  0.180  Aug To Sep       Micro‐Enterprise     Mini Masala Machine (Masala Chakki)  2  25000  0.500  0.02  0.480  March       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  2  50000  1.000  0.52  0.480  March       Micro‐Enterprise     Genaral Shop  1  20000  0.200  0  0.200  Sep             Sub Total  337  149766.5  5.414  0.7  4.714    13  Paharu Pur  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July 

      Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  15  963  0.144  0  0.144  Oct To Nov       Crop Demonstration  Rabi  Gram  20  2657  0.531  0  0.531  Oct To Nov       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov 

Page 114: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

111

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Crop Demonstration  Rabi  Wheat  20  2288  0.458  0  0.458  Oct To Nov       Seed Distribution  Kharif   Paddy  25  400  0.100  0  0.100  May To June       Seed Distribution  Kharif   Arahar  25  300  0.075  0  0.075  May To June       Seed Distribution  Rabi   Wheat  23  825  0.190  0  0.190  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Gram  15  1260  0.189  0  0.189  Aug To Sep       Seed Distribution  Rabi   Lintil  10  900  0.090  0  0.090  Aug To Sep       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  1  50000  0.500  0.26  0.240  March       Micro‐Enterprise     Mini Rice Polisher  2  45000  0.900  0.42  0.480  Sep       Micro‐Enterprise     Mini Dal Processor  1  50000  0.500  0.26  0.240  Sep             Sub Total  227  159766.5  4.201  0.94  3.261    14  Palhari  Crop Demonstration  Kharif  Arahar  35  688  0.241  0  0.241  Oct To Nov 

      Crop Demonstration  Kharif  Moong  28  818  0.229  0  0.229  Oct To Nov       Crop Demonstration  Kharif  Paddy  22  1473  0.324  0  0.324  Oct To Nov       Crop Demonstration  Kharif  Urd  30  963  0.289  0  0.289  Oct To Nov       Crop Demonstration  Rabi  Gram  34  2657  0.903  0  0.903  Oct To Nov       Crop Demonstration  Rabi  Lentil  30  1406  0.422  0  0.422  Oct To Nov       Crop Demonstration  Rabi  Mustard  26  721  0.187  0  0.187  Oct To Nov       Seed Distribution  Kharif   Paddy  27  400  0.108  0  0.108  Aug To Sep       Seed Distribution  Kharif   Arahar  27  300  0.081  0  0.081  Aug To Sep       Seed Distribution  Rabi   Wheat  25  825  0.206  0  0.206  Aug To Sep       Seed Distribution  Rabi   Lintil  30  900  0.270  0  0.270  Aug To Sep       Seed Distribution  Rabi   Mustard  28  67.5  0.019  0  0.019  Aug To Sep       Seed Distribution  Rabi   Gram  28  1260  0.353  0  0.353  Aug To Sep       Micro‐Enterprise     Artificial Insemination Kit (Paravet)      2  50000  1.000  0.52  0.480  Sep       Micro‐Enterprise     Jarsi Bull (Natural Service)  1  30000  0.300  0.06  0.240  Sep       Micro‐Enterprise     Murrah "He Buffalo" (Natural Service)  1  50000  0.500  0.26  0.240  Sep       Micro‐Enterprise     Mini Dal Processor  1  50000  0.500  0.26  0.240  Sep       Micro‐Enterprise     Vegetable  Shop  3  10000  0.300  0  0.300  Sep             Sub Total  378  202478.5  6.232  1.1  5.132    15  Saidkhanpur  Crop Demonstration  Kharif  Arahar  20  688  0.138  0  0.138  Oct To Nov 

      Crop Demonstration  Kharif  Moong  15  818  0.123  0  0.123  Oct To Nov       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March 

Page 115: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

112

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Crop Demonstration  Rabi  Gram  10  2657  0.266  0  0.266  Oct To Nov       Crop Demonstration  Rabi  Lentil  14  1406  0.197  0  0.197  Oct To Nov       Crop Demonstration  Rabi  Mustard  15  721  0.108  0  0.108  Oct To Nov       Crop Demonstration  Rabi  Wheat  16  2288  0.366  0  0.366  Oct To Nov       Seed Distribution  Kharif   Paddy  13  400  0.052  0  0.052  Aug To Sep       Seed Distribution  Kharif   Arahar  18  300  0.054  0  0.054  Aug To Sep       Seed Distribution  Rabi   Wheat  10  825  0.083  0  0.083  Aug To Sep       Seed Distribution  Rabi   Gram  20  1260  0.252  0  0.252  Aug To Sep       Seed Distribution  Rabi   Mustard  25  67.5  0.017  0  0.017  Aug To Sep       Seed Distribution  Rabi   Lintil  13  900  0.117  0  0.117  Aug To Sep       Micro‐Enterprise     Fruit/Juice Shop  2  10000  0.200  0  0.200  March       Micro‐Enterprise     Genaral Shop  2  20000  0.400  0  0.400  Sep       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep             Sub Total  214  84766.5  3.015  0.16  2.855    16  Saifpur  Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July 

      Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  12  2657  0.319  0  0.319  Oct To Nov       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct       Crop Demonstration  Rabi  Wheat  10  2288  0.229  0  0.229  Oct To Nov       Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July       Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Seed Distribution  Kharif   Paddy  15  400  0.060  0  0.060  May To June       Seed Distribution  Kharif   Arahar  20  300  0.060  0  0.060  May To June       Seed Distribution  Rabi   Wheat  25  825  0.206  0  0.206  Aug To Sep       Seed Distribution  Rabi   Lintil  3  900  0.027  0  0.027  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Gram  7  1260  0.088  0  0.088  Aug To Sep       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  1  50000  0.500  0.26  0.240  March       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  2  40000  0.800  0.32  0.480  Sep             Sub Total  175  104766.5  2.909  0.58  2.329    17  Sarai Ka Sthan  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July 

      Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  11  1473  0.162  0  0.162  Oct To Nov       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March 

Page 116: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

113

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Crop Demonstration  Rabi  Gram  25  2657  0.664  0  0.664  Oct To Nov       Crop Demonstration  Rabi  Lentil  15  1406  0.211  0  0.211  Oct To Nov       Crop Demonstration  Rabi  Mustard  15  721  0.108  0  0.108  Oct To Nov       Crop Demonstration  Rabi  Wheat  15  2288  0.343  0  0.343  Oct To Nov       Seed Distribution  Kharif   Paddy  10  400  0.040  0  0.040  May To June       Seed Distribution  Kharif   Arahar  10  300  0.030  0  0.030  May To June       Seed Distribution  Rabi   Wheat  30  825  0.248  0  0.248  Aug To Sep       Seed Distribution  Rabi   Lintil  5  900  0.045  0  0.045  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Gram  25  1260  0.315  0  0.315  Aug To Sep       Micro‐Enterprise     Jarsi Bull (Natural Service)  2  30000  0.600  0.12  0.480  Sep       Micro‐Enterprise     Mini Oil Expeller   1  40000  0.400  0.16  0.240  Mar       Micro‐Enterprise     Vegetable  Shop  5  10000  0.500  0  0.500  Sep             Sub Total  219  94766.5  3.926  0.28  3.646    18  Shahpur  Crop Demonstration  Kharif  Arahar  10  688  0.069  0  0.069  June To July 

      Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Wheat  6  2288  0.137  0  0.137  Oct To Nov       Crop Demonstration  Rabi  Gram  5  2657  0.133  0  0.133  Oct To Nov       Seed Distribution  Kharif   Paddy  12  400  0.048  0  0.048  May To June       Seed Distribution  Kharif   Arahar  15  300  0.045  0  0.045  May To June       Seed Distribution  Rabi   Wheat  10  825  0.083  0  0.083  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Lintil  4  900  0.036  0  0.036  Aug To Sep       Seed Distribution  Rabi   Gram  3  1260  0.038  0  0.038  Aug To Sep       Micro‐Enterprise     Fruit/Juice Shop  4  10000  0.400  0  0.400  March             Sub Total  119  22639.5  1.327  0  1.327    19  Sisauna  Crop Demonstration  Kharif  Arahar  8  688  0.055  0  0.055  Oct To Nov 

      Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  5  963  0.048  0  0.048  Oct To Nov       Crop Demonstration  Rabi  Gram  8  2657  0.213  0  0.213  Oct To Nov       Crop Demonstration  Rabi  Lentil  10  1406  0.141  0  0.141  Oct To Nov       Crop Demonstration  Rabi  Mustard  10  721  0.072  0  0.072  Sep To Oct 

Page 117: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

114

S.No  Name of GP  Activity Proposed  Crop/Seed /Activity (ME etc.) No. of Units 

Unit Cost 

Cost of Activity 

Beneficiary Share 

Proposed Amount for Project Fund 

Proposed date for 

Activity (start) 

      Crop Demonstration  Rabi  Wheat  8  2288  0.183  0  0.183  Oct To Nov       Seed Distribution  Kharif   Paddy  18  400  0.072  0  0.072  May To June       Seed Distribution  Kharif   Arahar  22  300  0.066  0  0.066  May To June       Seed Distribution  Rabi   Wheat  20  825  0.165  0  0.165  Aug To Sep       Seed Distribution  Rabi   Mustard  15  67.5  0.010  0  0.010  Aug To Sep       Seed Distribution  Rabi   Lintil  2  900  0.018  0  0.018  Aug To Sep       Seed Distribution  Rabi   Gram  3  1260  0.038  0  0.038  Aug To Sep       Micro‐Enterprise     Irrigation System (Pumpset, Irrigation tube etc.)  2  50000  1.000  0.52  0.480  March       Micro‐Enterprise     Vegetable  Shop  1  10000  0.100  0  0.100  Sep             Sub Total  152  74766.5  2.410  0.52  1.890    20  Surajpur Khapraila  Crop Demonstration  Kharif  Arahar  16  688  0.110  0  0.110  Oct To Nov 

      Crop Demonstration  Kharif  Moong  10  818  0.082  0  0.082  March To April       Crop Demonstration  Kharif  Paddy  10  1473  0.147  0  0.147  June To July       Crop Demonstration  Kharif  Urd  10  963  0.096  0  0.096  Feb To March       Crop Demonstration  Rabi  Gram  20  2657  0.531  0  0.531  Oct To Nov       Crop Demonstration  Rabi  Lentil  18  1406  0.253  0  0.253  Oct To Nov       Crop Demonstration  Rabi  Mustard  25  721  0.180  0  0.180  Oct To Nov       Crop Demonstration  Rabi  Wheat  20  2288  0.458  0  0.458  Oct To Nov       Seed Distribution  Kharif   Paddy  3  400  0.012  0  0.012  May To June       Seed Distribution  Kharif   Arahar  20  300  0.060  0  0.060  May To June       Seed Distribution  Rabi   Wheat  20  825  0.165  0  0.165  Aug To Sep       Seed Distribution  Rabi   Mustard  20  67.5  0.014  0  0.014  Aug To Sep       Seed Distribution  Rabi   Gram  20  1260  0.252  0  0.252  Aug To Sep       Seed Distribution  Rabi   Lintil  26  900  0.234  0  0.234  Aug To Sep       Micro‐Enterprise     Mini Dal Processor  1  50000  0.500  0.26  0.240  Sep       Micro‐Enterprise     Mini Flour mill (Aata Chakki)  1  40000  0.400  0.16  0.240  Sep       Micro‐Enterprise     Dairy  2  40000  0.800  0.32  0.480  Jan       Micro‐Enterprise     Vegetable  Shop  1  10000  0.100  0  0.100  Sep             Sub Total  243  154766.5  4.394  0.74  3.654                Grand Total  4234  2137648  69.369  9.41  59.859     

  

  

Page 118: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

115

CHAPTER‐6 CAPACITY BUILDING PLAN 

 The capacity building of various stake holders will be given very high priority as the watershed is to be developed in participatory mode. Capacity building initiative plays very important role in human resource development of watershed.  

Table 6.1: List of identified training institutes for capacity building   Sl.  No. 

Name of Training institute 

Address Designation of the Head of 

institute 

Type of Institute 

Area(s) of specialization No. of training assigned 

No. of persons to be trained 

Allocation to be made to the institute 

1  2 3  4 5 6 7 8 9 

1  SIRD Bakshika Talab, Barabanki 

Director General 

State level

Orientation & Implimentation of 

Project 49  2518 

Bakshi ka Talab, Lucknow 

2  CSA Univ of Agri. & Tech. 

Kanpur  Vice Chancellor 

State level Kanpur 

3  UPLDWR Bhoomi Vikas & Jal Sansadhan 

Training Institute Beli Kala, Lucknow 

Dy. Director State level Barabanki 

5  KVK Barabanki Programme Incharge 

District level Barabanki 

6  PIA Barabanki BSA District level  At Village 

6   Other Institutes identified by SLNA

   

Page 119: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

116

Table 6.2: Training to stakeholders on participatory watershed management  Sl. No. 

Client Group  Title of the program / duration / time 

objectives  Coverage / Topics  Training methedology 

Training institutions 

1  2  3  4  5  7  8 

1  WDT  IWMP‐3rd/   Training  Livelihood (Dairy, poultry, piggeries, bee 

keeping, food processing, knitting & micro enterprises 

Skill development 

CSA Univ of Agri. & Tech., Kanpur SIRD, BKT, Lucknow 

2  WC  Upto 3 days /   UPLDWR, Barabanki 

3  SHG  10:00am – 5:00 pm  KVK, Barabanki 

4  UG       

 Table 6.3: Capacity Building Annual Action Plan 

(Rs.  in lacs) 

S.No. Stake holders  

Physical & Financial Planning   Total 

Ist year  IInd year  IIIrd year  IVth  year  Vth year Persons to be trained 

Amt. Persons to be trained 

Amt. Persons to be trained 

Amt. Persons to be trained 

Amt. Persons to be trained 

Amt. Persons to be trained 

Amt. 

   SLNA    1.22 0.31 ‐‐ 0.31  ‐‐ ‐‐ ‐‐ ‐‐ 1.83 

   WCDC    0.76 3.05 ‐‐ 0.76  0.92 ‐‐ ‐‐ 5.49 

1  PIA 16  0.12 16 0.36 16 0.12  16 0.12 16 0.12 80 0.84 

2  WDT 4  0.02 4 0.06 4 0.04  4 0.02 4 0.02 20 0.16 

3  WC 21  0.09 210 2.84 42 0.38  42 0.19 210 0.95 525 4.44 

4  SHG 22  0.17 256 5.76 125 1.88  125 2.81 100 1.5 628 12.11 

5  UG 0  0 200 1.5 100 0.5  100 0.25 100 0.25 500 2.5 

6  Others specify  

265  0.66 185 1.39 120 0.6  105 0.26 90 0.23 765 3.14 

   Total 328  3.05 871 15.26 407 4.58  392 4.57 520 3.06 2518 30.52 

 

Page 120: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

117

CHAPTER‐7 MONITORING AND EVALUATION 

 Monitoring of the project will be done at each stage and dit will be carried out for both process and outcome. Some community members will be trained and will be involved in participatory monitoring of various parameters and processes and the crop yields. The intervention, expenditure and other  information will  be  displayed  in  the micro watershed  through wall writing,  besides  trained  community members,  PIA/DWDU will  also monitor the physical and financial progress of watershed development programme. Frontier technologies viz. GIS and Remote Sensing techniques will be used by  the PIA/DWDU  for monitoring  and evaluation.  The PIA  shall  submit quarterly progress  reports  (countersigned by President of Watershed Committee (WC) to DWDU for further submission to the SLNA. About 1% of the total budget will be used on this activity.  Plan for Evaluation Watershed  development  activities  bring  both  tangible  and  intangible  benefits.  In  order  to  quantity  the  benefits,  impact  analysis  has  been proposed.  Theme It is presumed that as a consequence of watershed development acitivities there will be noticeable change in socio‐economic status of inhabitants, cropping  intensity, ground water recharge, crop diversification, fuel and small timber availability,  livestock composition and milk production etc. These indicators can be gauged over bench mark data both at the beginning and at the end of the project with in the watershed.  Observation The  following  indicators will be  taken  into  account  for quantative  and qualative  assessment.  For  the  purpose, detailed questionnaires will be prepared and field observation will be carried out. 

• Duration of availability of drinking water/irrigation and ground water recharge. • Irrigation frequency and area under irrigation. • Changes in cropping pattern and cropping system in the farmers fields alongwith productivity and incomes. • Soil health. • Satellite monitoring for vegetation cover and other parameters. • Livestock composition and productivity. • Periodic pest and disease monitoring will be done in major crops. • Socio economic aspects including resource inventory. 

 

Page 121: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

118

CHAPTER‐8  

PHASING OF PROGRAMME AND BUDGETING  8.1: Annual Action Plan (AAP)  Physical and financial targets and outlays and year wise breakups are given in Table 8.1.  

Table 8.1: Yearwise financial phasing  (Rs. In lacs) 

S.

Item

1st Year IInd Year IIIrd Year 1Vth Year Vth Year Total

No. (2010-11) (2011-12) (2012-13) (2013-14) (2014-15)

   Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy.

1 Administrative 10% 3.05  0.00  9.16  0.00  16.48  0.00  16.48  0.00  15.87  0.00  61.04   

2 Monitoring 1% 0.00  0.00  1.22  0.00  1.22  0.00  1.22  0.00  2.44  0.00  6.10   

3 Evaluation 1% 0.00  0.00  1.83  0.00  1.07  0.00  1.07  0.00  2.14  0.00  6.10   

4 Entry Point Activity 4% 24.42  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  24.42

5 Institutional and Capacity building 5% 3.05  0.00  15.26  0.00  4.58  0.00  4.58  0.00  3.05  0.00  30.52

6 D.P.R Preparation 1% 6.10  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  6.10

7 Watershed Dev. Works 56% 0.00  0.00  45.77  681.15  96.81  1440.64  96.81  1440.64  102.45  1524.57  341.85 5087.00

8 Livelihood & Income Generating 9% 0.00  0.00  6.10  0.00  15.26  0.00  15.26  0.00  18.31  0.00  54.94

9 Production System development 10% 0.00  0.00  6.10  0.00  17.21  0.00  17.21  0.00  20.51  0.00  61.04

10 Consolidation Phase 3% 0.00  0.00  0.00  0.00  0.00  0.00  0.00  0.00  18.31  0.00  18.31

Total 36.63 85.45 152.64 152.64 183.09    610.44

 

Page 122: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

119

Year wise Physical and Financial Action Plan of  IWMP‐IIIrd  S. No  Physical and Financial targets  Unit  I  Year  II Year  III  Year  IV Year  V Year  Total  Project 

(Fin. in Rs. Lacs)  2010‐11       2011‐12  2012‐13  2013‐14  2014‐15  (Rs. in lacs)    Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin. 

1  Administration        3.05     9.16     16.48     16.48     15.87  0  61.04 

2  Monitoring        0.00     1.22     1.22     1.22     2.44  0  6.10 

3  Evaluation        0.00     1.83     1.07     1.07     2.14  0  6.10 

4  Entry point  activities                                        

(1)   Planned                                        

(a)   No. of Activities  No.                                     

(b)   No. of beneficiaries  No.                                     

(2)   Executed        24.42                          0  24.42 

(c)  No. of Activities  No.                                     

(d)   No. of beneficiaries  No.                                     

5  Institutional & Capacity Building                                        (1)   No. of Persons to be trained        3.05     15.26     4.58     4.58     3.05  0  30.52 

(a)   SLNA level  No.                                     

(b)   District level  ,,                                     

(c)   WDT level  ,,                                     

(d)   WC level  ,,                                     

(e)  SHG/ User Gropus  ,,                                     

Sub Total                                        

6  DPR Preparation  No. of MWS 

6  6.10                          6  6.10 

7  Watershed Development Works                                        

7.1 Land Development                                        

1. Afforestation (on wasteland)   ha         2  0.82  4  1.74  4  1.74  4  1.84  13  6.14 

2. Afforestation (on total land)   ha         0  0.00  0  0.00  0  0.00  0  0.00  0  0.00 

3. Horticulture(on wasteland)   ha                                      

4. Horticulture(on total land)   ha                                      

5. Agriculture (on wasteland)   ha                                      

6. Agriculture(on total land)   ha                                      

7. Pasture (on wasteland)   ha                                      

8. Pasture(on total land)   ha                                      

9. Others (on wasteland)   ha                                      

Page 123: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

120

S. No  Physical and Financial targets  Unit  I  Year  II Year  III  Year  IV Year  V Year  Total  Project (Fin. in Rs. Lacs)  2010‐11       2011‐12  2012‐13  2013‐14  2014‐15  (Rs. in lacs) 

   Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin. 

10. Others (on total land)   ha                                      

   7.2 Soil and Moisture Conservation                                        

1. Field Bunding  ha                                      

2. Countour Bunding   ha         148  6.81  313  14.41  313  14.41  331  15.25  1104  50.88 

3. Check road bund  ha         4  0.60  9  1.27  9  1.27  10  1.34  33  4.47 

4. Marginal bunding  ha         175  13.63  370  28.82  370  28.82  391  30.50  1306  101.77 

5. Periferal Bunding  ha         38  2.63  81  5.57  81  5.57  86  5.90  286  19.68 

6. Others   ha                                      

   7.3 Vegetative and Engineering Structures    

                                   

1. Earthen Check Dams  Cubic meter         21269  10.95  44985  23.17  44985  23.17  47606  24.52  158846  81.81 

   7.4 Water Harvesting Structures (New Created)    

                                   

1. Farm ponds   nos                                      

2. Check dams   nos                                      

   7.5 Water Harvesting Structure (Renovated)    

                                   

1. Farm ponds   nos         2  10.40299  4  21.18175  10  22.53        16  54.11 

2. Check dams   nos                                      

6. Others (WHB)  nos                           44630.50  22.99  44631  22.99 

   7.6 Water Harvesting Structure (Storage Capacity of New Structure)    

                                   

   7.7 Water Harvesting Structure (Storage Capacity of Renovated Structures)    

                                   

   Sub Total        681  45.77  1441  96.81  1441  96.81  1525  102.45  5087  341.85 

8  Livelihood activities through SHG’s                                        

(1) Activity Goatary                                        

(a)   No. of SHG’s  No.        2     8     5     3     18  0.00 

(b)   No. of members  No.  0  0.00  24  1.43  60  3.58  60  3.58  72  4.30  215  12.90 

(2) Activity‐ Back Yard Poultry                                        

(a)   No. of SHG’s  No.        2     9     4     3     18  0.00 

Page 124: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

121

S. No  Physical and Financial targets  Unit  I  Year  II Year  III  Year  IV Year  V Year  Total  Project (Fin. in Rs. Lacs)  2010‐11       2011‐12  2012‐13  2013‐14  2014‐15  (Rs. in lacs) 

   Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin. 

(b)   No. of members  No.  0  0.00  16  0.33  41  0.82  41  0.82  49  0.98  147  2.94 

(5) Piggeries                                        

(a)   No. of SHG’s  No.        1     6     5     2     14    

(b)   No. of members  No.  0  0.00  11  0.69  29  1.72  29  1.72  34  2.06  103  6.18 

(10) Bee keeping                                        

(a)   No. of SHG’s  No.        2     8     5     2     17  0.00 

(b)   No. of members  No.  0  0.00  4  0.62  10  1.54  10  1.54  12  1.85  37  5.55 

(11) Cycle shop                                        

(a)   No. of SHG’s  No.        1     3     2     1     7    

(b)   No. of members  No.  0  0.00  7  0.73  18  1.83  18  1.83  22  2.20  66  6.60 

(12) Tailoring                                        

(a)   No. of SHG’s  No.        1     6     4     3     14    

(b)   No. of members  No.  0  0.00  7  0.59  18  1.47  18  1.47  22  1.76  66  5.28 

(13) Carpentry                                        

(a)   No. of SHG’s  No.        1                       1  0.00 

(b)   No. of members  No.  0  0.00  1  0.11  3  0.28  3  0.28  3  0.33  10  1.00 

(14) Others (specify)                                        

   (a)   No. of SHG’s           2     6     6     7     21    

   (b)   No. of members     0  0.00  8  1.61  20  4.03  20  4.03  24  4.83  73  14.50 

Sub Total  0  0.00  82  6.10  219  15.27  204  15.27  229  18.31  733  54.95 

9  Production system                                        

(1)  Agriculture                                        

(a)   Crop demonstration                                        

(1)   No. of dem.  No.        224     631     631     752     2238  0.00 

(2)   Area  Ha.  0  0.00  56  3.12  158  8.81  158  8.81  188  10.49  560  31.23 

(b)    Seed Production                                        

(1)   No. of dem.  No.        205     579     579     689     2052  0.00 

(2)   Area  Ha.  0  0.00  51  1.24  145  3.50  145  3.50  172  4.17  513  12.41 

(3) Animal husbandry                                        

Page 125: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

122

S. No  Physical and Financial targets  Unit  I  Year  II Year  III  Year  IV Year  V Year  Total  Project (Fin. in Rs. Lacs)  2010‐11       2011‐12  2012‐13  2013‐14  2014‐15  (Rs. in lacs) 

   Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin.  Phy.  Fin. 

(4) Micro Interprises                                        

(a)   No. of units  No.        10     28     28     34     100  0.00 

(b)   No. of beneficiaries  No.  0  0.00  30  1.74  85  4.90  85  4.90  101  5.84  300  17.39 

(c)   Income per year  Rs.      

    

    

    

    

     

Sub Total  0  0.00  576  6.10  1625  17.21  1625  17.21  1936  20.51  5763  61.03 

10  Consolidation & Withdrawal Phase  activities                             18.31  0  18.31 

Grand Total  6  36.63  1339  85.45  3285  152.64  3270  152.64  3689  183.09  11589  610.44 

 

Page 126: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

123

Gram Panchyat wise Financial Requirement : (Rs. in lacs) 

 S.No. 

Name of Gram Panchayat 

Treatable Area (ha) 

Estimated Watershed development Activities (56%)Lakhs 

Livelihood (9%) Lakhs 

Production System & ME (10%) Lakhs 

Total amount in Lakhs 

1  Akbarpur Dhanethi  236 15.86  2.55  2.83  21.24 2  Ambour  335 22.51  3.62  4.02  30.15 3  Baghaura  80 5.38  0.86  0.96  7.20 4  Beerkithai  138 9.27  1.49  1.66  12.42 5  Chandwal  215 14.45  2.32  2.58  19.35 6  Danapurkyampur  118 7.93  1.27  1.42  10.62 7  Ghazipur  587 39.45  6.34  7.04  52.83 8  Hameed Nagar  220 14.78  2.38  2.64  19.80 9  Ichaulia  243 16.33  2.62  2.92  21.87 10  Mahmoodabad  280 18.82  3.02  3.36  25.20 11  Mangrauda  241 16.20  2.60  2.89  21.69 12  Mehaura  395 26.54  4.27  4.74  35.55 13  Paharu Pur  274 18.41  2.96  3.29  24.66 14  Palhari  432 29.03  4.67  5.18  38.88 15  Saidkhanpur  240 16.13  2.59  2.88  21.60 16  Saifpur  190 12.77  2.05  2.28  17.10 17  Sarai Ka Sthan  290 19.49  3.13  3.48  26.10 18  Shahpur  110 7.39  1.19  1.32  9.90 19  Sisauna  156 10.48  1.68  1.87  14.04 20  Surajpur Khapraila  307 20.63  3.32  3.68  27.63    Total  5087  341.85  54.94  61.04  457.83 

Page 127: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

124

Table 8.2: Details of proposed watershed wise Convergence in the project : (Rs. in lacs) 

 

S.No.  MWS Code  Name of MWS  Treatable Area (ha)  Project cost  IWMP Budget  Convergence  %age 

Name of Schemes for Converging with 

IWMP‐3rd 1   2B2C7g1b  Mehaura  1630  198.35 109.54 88.81 81.10 MNREGA 2  2B2C7d2a  Ambaur  570  73.38 38.30 35.08 91.60 MNREGA 3  2B2C7d2c  Suryapur Khapraila  814  90.08 54.70 35.38 64.70 MNREGA 4  2B2C7d2d  Akhberpur Dhanethi  864  95.34 58.06 37.28 64.20 MNREGA 5  2B2C7g1a  Gajipur  1209  153.39 81.24 72.15 88.80 MNREGA 

      Total  5087  610.54 341.85 268.70 78.60 MNREGA   

Page 128: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

125

CHAPTER‐9 CONSOLIDATION AND WITHDRAWAL STRATEGY 

 Success of  the programme depends on various watershed  interventions and  sustainability can only be achieved  through active participation of community.  It will  be  on  capacity  building  and  empowerment  of  stakeholders.  The WC,  SHGs,  UGs  etc. will  be  on  established,  trained  and strengthened  to  continiue  development  after withdraw  of  PIA.  By  building  economic  activities  through  CBOs  community  participation will  be sustained. The PR&D approach alongwith demand driven interventions will reduce dependency on subsidies. Contribution from the community will be  ensured  for  the  entire  acitivities  to  develop  sense  of  belongingness  and  the  contribution will  be  deposited  to  the  account  of watershed development fund (WDF). It will also be strengthening through donations from the individuals and institutions and the CBOs will be trained to run watershed as business model on  sustainable basis. The  tangible economic benefits alongwith empowerment by PIA will empower  the CBOs  to develop and  sustain  the watershed acitivities after withdrawal of  the PIA. Community organization will withdraw  the money  from  the WDF  to maintain the assets created during the implementation phase.  The consolidation phase will also include:‐  

1. To prepare the project completion report. 2. Documentation of success stories. 3. Making films, leaflets, bulletins and the lessons learnt. 4. The expenditure will be done as per the common guidelines for watershed development projects. 5. The completion report will reflect the development on following aspects:‐ 

a. Productivity enhancement. b. Nutritional Security. c. Risk minimization (Integrated farming system, water harvesting and protected cultivation, value addition and improved marketing). d. Profitability. e. Livelihood  security  (skill  enhancement  capacity  building,  increased  employment  in  agriculture  and  allied  enterprises,  reduction  in 

migration etc.).  

 

Page 129: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

126

CHAPTER ‐10 EXPECTED PROJECT OUTCOME 

10.1 Employment Generation and Checking Migration Employment has always been a problem  in  the village. The principal occupations of  the people are dry  land agriculture, animal husbandry and casual  labor work. However, rain fall being very  limited and erratic, agriculture suffers,  i.e. at best they can take only a single crop, which keeps them partially engaged for about 4 months. Lack of fodder makes animal husbandry very difficult too. So, animal husbandry does not keep them engaged full time. Thus the people mainly depend upon casual labor, either in the village itself or outside it.  

The project plans for creation of both wage employment and self employment opportunities. Wage employment would be created by engaging people  in watershed  physical works  like  construction  of  earthen  bunds,  farm  bunds,  village pond,  plantation,  etc.  Self  employment would  be created by providing  the people with  cash  support  in  the  form of direct  livelihood  activities  like  agriculture,  animal husbandry  and enterprise development. It will be help in checking of migration. 

10.2: Other expected outcome 

Table 10.1: Expected Benefits:  

S.No.  Particulars of Items  Unit  Pre Execution  Post Execution 

1  Gross Cultivated area   ha  6651  20‐25% 

2  Cropping Intensity  %  160  20‐25% 

3  Agricultural Production          

a  Food Production  qtls  110738  20‐25% 

i  Cereals     100114  20‐25% 

ii  Pulses      10352  20‐25% 

iii  Oil seed     272  20‐25% 

b  Fodder production  qtls  205387  20‐25% 

i  Dry fodder          114748  20‐25% 

Page 130: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

127

S.No.  Particulars of Items  Unit  Pre Execution  Post Execution 

ii  Green fodder     90639  20‐25% 

c  Fuel production (qtls)  qtls       

i  Arhar+Mustard     16531  20‐25% 

4  Average Income from Agriculture  Rs/ha  29416  20‐25% 

5  Milk Production/per year  Liter  734400  +25 to 30% 

6  Irrigated/Rainfed Area  ha  2946/3564  3083/3427 

7  Additional Area under Agro/Horti/Forestry  ha  ‐  +12 ha 

8  Employment generation Man days  No  100  +25 to 30% 

9  Women Benefitted by SHGs and IGA  No  ‐  +60 

10  Value of land Rs/ha  Rs in lacs  8‐10  +1 to 2 

11  Average ground water table BGL  M  6‐7  ‐1 to 2 

               

Page 131: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

128

           

MAPS 

Page 132: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

129

 

Page 133: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

130

 

Page 134: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

131

Page 135: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

132

Page 136: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

133

Page 137: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

134

Page 138: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

135

Page 139: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

136

Page 140: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

137

Page 141: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

138

Page 142: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

139

Page 143: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

140

Page 144: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

141

Page 145: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

142

Page 146: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

143

Page 147: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

144

Page 148: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

145

PREPARATION OF DPR 

 Detail Project Report of Integrated Watershed Management Programme (IWMP‐IIIrd) has been prepared through base line/ bench Mark survey for physiographic, climate, soil, land use, vegetation, hydrology and socio economic data collection.  PRA exercises have been done to collect primary data.  Secondary  data  have  been  collected  from  Revenue,  Statistics  department,  Statistical Magazine  of  the  district,  department  of  animal Husbandry development etc.  Toposheets on 1:50,000  scale, online high  resolution  satellite  image  and  SRTM data has been used.  Suggestions related to technical & specific inputs were taken from external expert in preparation and drafting of detail project report. 

  S.No.  Name  Designation 

1  Mr. Om Prakash Srivastava  B.S.A 

2.  Mr. V.K. Chaturvedi  J.E 3  Mr. Niyaz Ahmad  J.E 

4  Mr. Ajay Kumar Nigam   Accountant 

5  Mr. Sushil Kumar Singh  Accountant 

6  Mr. Habibullah Khan  A.S.C.I 

7  Mr. R.M. Yadav  A.S.C.I 

8  Mr. Ajay Prakash Verma  D/Man 

9  Smt. Archna  Tracer 

10  Mr. Kunwar Jitendra Singh  Tracer 

11  Mr. Siddharth Yadav  Tracer 

12  Mr. K.K Srivastava  Irrigation Supervisor 

13  Mr. Pyare Lal Verma  Irrigation Supervisor 

14  Mr. Ram Lakhan  Irrigation Supervisor 

15  Mr. Ashok Singh  Sinchpal 

16  Mr. Kamlesh Kumar  Sinchpal 

17  Mr. Radha Krishna Tiwari  Munshi 

18  Mr. Deep Singh  Munshi 

19  Mr. Sanjay Tiwari  Munshi DPR Compiled & Printed By : AIM Geotech (P) Ltd., 13 & 14 LGF, Swaroop Arcade, Kapoorthala, Aliganj, Barabanki – 226024,                                                      Website : www.aimgeotech.com 

 

Page 149: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

0

       

ANNEXURES          

Page 150: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

1

Annexure ‐ I Gram Panchyat/Watershed wise and Structurewise Cost of Watershed  

development activities  Name of Gram Panchayat : Akbarpur Dhanethi 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2d  Akbarpur Dhanethi  CB139  0.45  2.25  0.6  0.81  127  102.9  234        3118  469     3821 

2  2B2C7d2d  Akbarpur Dhanethi  CB130  0.45  2.25  0.6  0.81  150  121.5  276        3680  553     4510 

3  2B2C7d2d  Akbarpur Dhanethi  CB131  0.45  2.25  0.6  0.81  213  172.7  392        5233  787     6411 

4  2B2C7d2d  Akbarpur Dhanethi  CB132  0.45  2.25  0.6  0.81  76  61.4  140        1862  280     2282 

5  2B2C7d2d  Akbarpur Dhanethi  CB133  0.45  2.25  0.6  0.81  149  120.6  274        3654  549     4478 

6  2B2C7d2d  Akbarpur Dhanethi  CB134  0.45  2.25  0.6  0.81  114  92.2  209        2793  420     3422 

7  2B2C7d2d  Akbarpur Dhanethi  CB135  0.45  2.25  0.6  0.81  114  92.4  210        2801  421     3432 

8  2B2C7d2d  Akbarpur Dhanethi  CB136  0.45  2.25  0.6  0.81  131  106.2  241        3218  484     3942 

9  2B2C7d2d  Ingholia  CB116  0.45  2.25  0.6  0.81  241  195.1  443        5912  889     7244 

10  2B2C7d2d  Akbarpur Dhanethi  CB148  0.45  2.25  0.6  0.81  366  296.1  673        8972  1349     10994 

11  2B2C7d2d  Akbarpur Dhanethi  CB187  0.45  2.25  0.6  0.81  177  143.2  326        4340  653     5319 

12  2B2C7d2d  Akbarpur Dhanethi  CB127  0.45  2.25  0.6  0.81  346  280  636        8484  1276     10396 

13  2B2C7d2d  Akbarpur Dhanethi  CB140  0.45  2.25  0.6  0.81  134  108.6  247        3292  495     4034 

14  2B2C7d2d  Akbarpur Dhanethi  CB141  0.45  2.25  0.6  0.81  405  327.8  745        9932  1493     12170 

15  2B2C7d2d  Akbarpur Dhanethi  CB142  0.45  2.25  0.6  0.81  107  86.5  197        2622  394     3213 

16  2B2C7d2d  Akbarpur Dhanethi  CB143  0.45  2.25  0.6  0.81  114  92.1  209        2790  420     3419 

17  2B2C7d2d  Akbarpur Dhanethi  CB144  0.45  2.25  0.6  0.81  194  156.9  357        4754  715     5825 

18  2B2C7d2d  Akbarpur Dhanethi  CB145  0.45  2.25  0.6  0.81  76  61.4  140        1861  280     2281 

19  2B2C7d2d  Akbarpur Dhanethi  CB146  0.45  2.25  0.6  0.81  191  154.5  351        4682  704     5737 

20  2B2C7d2d  Akbarpur Dhanethi  CB147  0.45  2.25  0.6  0.81  160  129.2  294        3915  589     4797 

21  2B2C7d2d  Akbarpur Dhanethi  CB137  0.45  2.25  0.6  0.81  152  123.3  280        3735  562     4577 

22  2B2C7d2c  Ingholia  CB196  0.45  2.25  0.6  0.81  186  150.9  343        4573  688     5604 

23  2B2C7d2d  Ingholia  CB117  0.45  2.25  0.6  0.81  370  299.6  681        9077  1365     11122 

24  2B2C7d2d  Ingholia  CB118  0.45  2.25  0.6  0.81  309  250.1  568        7577  1139     9285 

25  2B2C7d2d  Ingholia  CB119  0.45  2.25  0.6  0.81  195  157.6  358        4776  718     5852 

26  2B2C7d2d  Ingholia  CB120  0.45  2.25  0.6  0.81  196  159.1  361        4820  725     5905 

27  2B2C7d2d  Ingholia  CB121  0.45  2.25  0.6  0.81  202  163.6  372        4956  745     6074 

28  2B2C7d2d  Ingholia  CB122  0.45  2.25  0.6  0.81  278  224.9  511        6814  1025     8350 

29  2B2C7d2c  Ingholia  CB192  0.45  2.25  0.6  0.81  501  406.1  923        12306  1850     15079 

30  2B2C7d2c  Ingholia  CB193  0.45  2.25  0.6  0.81  207  167.6  381        5077  763     6222 

Page 151: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

2

31  2B2C7d2d  Akbarpur Dhanethi  CB129  0.45  2.25  0.6  0.81  144  116.3  264        3523  530     4317 

32  2B2C7d2c  Ingholia  CB195  0.45  2.25  0.6  0.81  301  243.6  554        7380  1110     9044 

33  2B2C7d2d  Akbarpur Dhanethi  CB128  0.45  2.25  0.6  0.81  152  123.5  281        3741  562     4584 

34  2B2C7d2c  Ingholia  CB197  0.45  2.25  0.6  0.81  88  71.4  162        2165  325     2652 

35  2B2C7d2c  Ingholia  CB198  0.45  2.25  0.6  0.81  293  236.9  538        7180  1079     8797 

36  2B2C7d2c  Ingholia  CB199  0.45  2.25  0.6  0.81  88  71.3  162        2159  325     2646 

37  2B2C7d2c  Ingholia  CB200  0.45  2.25  0.6  0.81  85  68.6  156        2079  313     2548 

38  2B2C7d2d  Akbarpur Dhanethi  CB123  0.45  2.25  0.6  0.81  208  168.5  383        5106  768     6257 

39  2B2C7d2d  Akbarpur Dhanethi  CB124  0.45  2.25  0.6  0.81  367  296.9  675        8995  1352     11023 

40  2B2C7d2d  Akbarpur Dhanethi  CB125  0.45  2.25  0.6  0.81  121  98.4  224        2980  448     3652 

41  2B2C7d2d  Akbarpur Dhanethi  CB126  0.45  2.25  0.6  0.81  87  70.5  160        2135  321     2616 

42  2B2C7d2d  Akbarpur Dhanethi  CB138  0.45  2.25  0.6  0.81  169  136.8  311        4145  623     5079 

43  2B2C7d2c  Ingholia  CB194  0.45  2.25  0.6  0.81  233  188.5  428        5712  859     6998 

44  2B2C7d2d  Akbarpur Dhanethi  CB183  0.45  2.25  0.6  0.81  128  104  236        3150  474     3859 

45  2B2C7d2d  Akbarpur Dhanethi  CB169  0.45  2.25  0.6  0.81  304  246  559        7454  1121     9133 

46  2B2C7d2d  Akbarpur Dhanethi  CB171  0.45  2.25  0.6  0.81  180  145.4  331        4407  663     5400 

47  2B2C7d2d  Akbarpur Dhanethi  CB173  0.45  2.25  0.6  0.81  168  135.7  308        4113  618     5040 

48  2B2C7d2d  Akbarpur Dhanethi  CB174  0.45  2.25  0.6  0.81  318  257.3  585        7798  1172     9555 

49  2B2C7d2d  Akbarpur Dhanethi  CB175  0.45  2.25  0.6  0.81  160  130  295        3939  592     4826 

50  2B2C7d2d  Akbarpur Dhanethi  CB186  0.45  2.25  0.6  0.81  808  654.7  1488        19837  2982     24307 

51  2B2C7d2d  Akbarpur Dhanethi  CB149  0.45  2.25  0.6  0.81  163  131.9  300        3997  601     4898 

52  2B2C7d2d  Akbarpur Dhanethi  CB168  0.45  2.25  0.6  0.81  284  229.7  522        6960  1046     8528 

53  2B2C7d2d  Akbarpur Dhanethi  CB184  0.45  2.25  0.6  0.81  202  163.5  372        4954  745     6071 

54  2B2C7d2d  Akbarpur Dhanethi  CB170  0.45  2.25  0.6  0.81  168  135.9  309        4119  619     5047 

55  2B2C7d2d  Akbarpur Dhanethi  CB182  0.45  2.25  0.6  0.81  101  82.1  187        2488  374     3049 

56  2B2C7d2d  Akbarpur Dhanethi  CB181  0.45  2.25  0.6  0.81  189  153.5  349        4650  699     5699 

57  2B2C7d2d  Akbarpur Dhanethi  CB180  0.45  2.25  0.6  0.81  152  123.4  280        3740  562     4582 

58  2B2C7d2d  Akbarpur Dhanethi  CB179  0.45  2.25  0.6  0.81  417  337.4  767        10223  1537     12527 

59  2B2C7d2d  Akbarpur Dhanethi  CB178  0.45  2.25  0.6  0.81  271  219.5  499        6651  1000     8150 

60  2B2C7d2d  Akbarpur Dhanethi  CB177  0.45  2.25  0.6  0.81  153  124  282        3757  565     4604 

61  2B2C7d2d  Akbarpur Dhanethi  CB176  0.45  2.25  0.6  0.81  149  120.3  273        3646  548     4467 

62  2B2C7d2d  Akbarpur Dhanethi  CB185  0.45  2.25  0.6  0.81  147  118.8  270        3601  541     4412 

63  2B2C7d2d  Akbarpur Dhanethi  CB161  0.45  2.25  0.6  0.81  174  141.1  321        4276  643     5240 

64  2B2C7d2d  Akbarpur Dhanethi  CB150  0.45  2.25  0.6  0.81  94  76.4  174        2314  348     2836 

65  2B2C7d2d  Akbarpur Dhanethi  CB151  0.45  2.25  0.6  0.81  151  122.3  278        3707  557     4543 

66  2B2C7d2d  Akbarpur Dhanethi  CB152  0.45  2.25  0.6  0.81  154  124.4  283        3771  567     4620 

67  2B2C7d2d  Akbarpur Dhanethi  CB153  0.45  2.25  0.6  0.81  107  86.8  197        2629  395     3222 

68  2B2C7d2d  Akbarpur Dhanethi  CB154  0.45  2.25  0.6  0.81  111  90.3  205        2736  411     3353 

69  2B2C7d2d  Akbarpur Dhanethi  CB155  0.45  2.25  0.6  0.81  187  151.3  344        4586  689     5619 

70  2B2C7d2d  Akbarpur Dhanethi  CB156  0.45  2.25  0.6  0.81  198  160.1  364        4851  729     5944 

Page 152: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

3

71  2B2C7d2d  Akbarpur Dhanethi  CB157  0.45  2.25  0.6  0.81  125  101.7  231        3080  463     3774 

72  2B2C7d2d  Akbarpur Dhanethi  CB158  0.45  2.25  0.6  0.81  120  97.6  222        2956  444     3623 

73  2B2C7d2d  Akbarpur Dhanethi  CB172  0.45  2.25  0.6  0.81  163  131.9  300        3995  601     4896 

74  2B2C7d2d  Akbarpur Dhanethi  CB160  0.45  2.25  0.6  0.81  89  71.7  163        2173  327     2663 

75  2B2C7d2d  Akbarpur Dhanethi  CB167  0.45  2.25  0.6  0.81  119  96.6  219        2926  440     3585 

76  2B2C7d2d  Akbarpur Dhanethi  CB162  0.45  2.25  0.6  0.81  311  251.6  572        7623  1146     9341 

77  2B2C7d2d  Akbarpur Dhanethi  CB163  0.45  2.25  0.6  0.81  112  91  207        2758  415     3379 

78  2B2C7d2d  Akbarpur Dhanethi  CB164  0.45  2.25  0.6  0.81  105  85.3  194        2584  388     3166 

79  2B2C7d2d  Akbarpur Dhanethi  CB165  0.45  2.25  0.6  0.81  109  88.6  201        2685  404     3290 

80  2B2C7d2d  Akbarpur Dhanethi  CB166  0.45  2.25  0.6  0.81  221  179.4  408        5435  817     6660 

81  2B2C7d2d  Akbarpur Dhanethi  CB159  0.45  2.25  0.6  0.81  360  291.4  662        8830  1328     10820 

82  2B2C7d2d  Akbarpur Dhanethi  CRB05  4.5  6  0.75  3.9375  1245  4903.4  11143        148572  25441     185156 

83  2B2C7d2d  Ingholia  MB115  0.6  3.6  1  2.1  380  797.8  1813        24172  2182     28167 

84  2B2C7d2d  Ingholia  MB114  0.6  3.6  1  2.1  426  894.3  2032        27097  2446     31575 

85  2B2C7d2d  Akbarpur Dhanethi  MB117  0.6  3.6  1  2.1  299  628.5  1428        19043  1719     22191 

86  2B2C7d2d  Akbarpur Dhanethi  MB130  0.6  3.6  1  2.1  484  1015.9  2309        30781  2779     35870 

87  2B2C7d2d  Akbarpur Dhanethi  MB116  0.6  3.6  1  2.1  332  696.4  1583        21102  1905     24590 

88  2B2C7d2d  Akbarpur Dhanethi  MB126  0.6  3.6  1  2.1  285  597.6  1358        18108  1635     21101 

89  2B2C7d2d  Akbarpur Dhanethi  MB134  0.6  3.6  1  2.1  413  866.6  1969        26259  2371     30599 

90  2B2C7d2d  Akbarpur Dhanethi  MB133  0.6  3.6  1  2.1  532  1117.4  2539        33858  3057     39454 

91  2B2C7d2d  Akbarpur Dhanethi  MB132  0.6  3.6  1  2.1  727  1526.8  3470        46263  4177     53910 

92  2B2C7d2d  Akbarpur Dhanethi  MB131  0.6  3.6  1  2.1  1087  2283.4  5189        69187  6247     80623 

93  2B2C7d2d  Akbarpur Dhanethi  MB129  0.6  3.6  1  2.1  146  306.2  696        9279  838     10813 

94  2B2C7d2d  Akbarpur Dhanethi  MB128  0.6  3.6  1  2.1  727  1527.2  3471        46276  4178     53925 

95  2B2C7d2d  Akbarpur Dhanethi  MB127  0.6  3.6  1  2.1  622  1305.6  2967        39559  3572     46098 

96  2B2C7d2d  Akbarpur Dhanethi  MB118  0.6  3.6  1  2.1  332  697.1  1584        21122  1907     24613 

97  2B2C7d2d  Akbarpur Dhanethi  MB125  0.6  3.6  1  2.1  1030  2162.9  4915        65537  5917     76369 

98  2B2C7d2d  Akbarpur Dhanethi  MB124  0.6  3.6  1  2.1  482  1011.3  2298        30642  2767     35707 

99  2B2C7d2d  Akbarpur Dhanethi  MB123  0.6  3.6  1  2.1  162  340  773        10303  930     12006 

100  2B2C7d2d  Akbarpur Dhanethi  MB122  0.6  3.6  1  2.1  359  752.9  1711        22814  2060     26585 

101  2B2C7d2d  Akbarpur Dhanethi  MB121  0.6  3.6  1  2.1  1201  2521.3  5730        76395  6897     89022 

102  2B2C7d2d  Akbarpur Dhanethi  MB120  0.6  3.6  1  2.1  210  440.9  1002        13358  1206     15566 

103  2B2C7d2d  Akbarpur Dhanethi  MB119  0.6  3.6  1  2.1  200  420.9  956        12753  1151     14860 

104  2B2C7d2d  Akbarpur Dhanethi  MB135  0.6  3.6  1  2.1  383  805.3  1830        24400  2203     28433 

105  2B2C7d2d  Akbarpur Dhanethi  PB16  0.6  3.6  1  2.1  422  885.2  2012        26821  2422     31254 

106  2B2C7d2d  Akbarpur Dhanethi  PB17  0.6  3.6  1  2.1  604  1268.5  2883        38436  3470     44790 

107  2B2C7d2d  Akbarpur Dhanethi  PB18  0.6  3.6  1  2.1  171  358.6  815        10865  981     12661 

108  2B2C7d2d  Akbarpur Dhanethi  PB15  0.6  3.6  1  2.1  377  792.3  1800        24006  2167     27973 

Total                       29627  43872.2  99703        1329333  155611  0  1584649 

Details of Water Resources  PLength  PWidth  PDepth                               

Page 153: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

4

109  2B2C7d2d  Akbarpur Dhanethi  PND05                 2763.5  0  2  HMP  147251     80000  238295 

110  2B2C7d2d  Akbarpur Dhanethi  PND04                 881  0  2  HMP  46804     80000  130314 

Total                       0  3644.5  0  4     194055  0  160000  368609 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1953258 

Name of Gram Panchayat : Ambour 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2a  Ambour  CB15  0.45  2.25  0.6  0.81  420  340  773        10301  1549     12622 

2  2B2C7d2a  Ambour  CB07  0.45  2.25  0.6  0.81  140  113.3  257        3433  516     4206 

3  2B2C7d2a  Ambour  CB08  0.45  2.25  0.6  0.81  339  274.9  625        8328  1252     10205 

4  2B2C7d2c  Ambour  CB117  0.45  2.25  0.6  0.81  287  232.2  528        7035  1058     8621 

5  2B2C7d2c  Ambour  CB118  0.45  2.25  0.6  0.81  255  206.8  470        6267  942     7679 

6  2B2C7d2c  Ambour  CB119  0.45  2.25  0.6  0.81  206  166.8  379        5055  760     6194 

7  2B2C7d2a  Ambour  CB09  0.45  2.25  0.6  0.81  232  187.8  427        5691  856     6973 

8  2B2C7d2a  Ambour  CB10  0.45  2.25  0.6  0.81  189  153.4  349        4648  699     5696 

9  2B2C7d2a  Ambour  CB11  0.45  2.25  0.6  0.81  258  209.4  476        6343  954     7773 

10  2B2C7d2a  Ambour  CB12  0.45  2.25  0.6  0.81  220  178.3  405        5403  812     6620 

11  2B2C7d2a  Ambour  CB14  0.45  2.25  0.6  0.81  507  410.9  934        12450  1872     15256 

12  2B2C7d2a  Ambour  CB30  0.45  2.25  0.6  0.81  454  367.4  835        11133  1674     13642 

13  2B2C7d2a  Ambour  CB16  0.45  2.25  0.6  0.81  241  194.9  443        5907  888     7238 

14  2B2C7d2a  Ambour  CB17  0.45  2.25  0.6  0.81  158  127.7  290        3868  582     4740 

15  2B2C7d2a  Ambour  CB26  0.45  2.25  0.6  0.81  397  321.7  731        9748  1466     11945 

16  2B2C7d2a  Ambour  CB20  0.45  2.25  0.6  0.81  226  182.8  415        5537  833     6785 

17  2B2C7d2a  Ambour  CB19  0.45  2.25  0.6  0.81  363  293.8  668        8902  1338     10908 

18  2B2C7d2a  Ambour  CB13  0.45  2.25  0.6  0.81  247  200  454        6059  911     7424 

19  2B2C7d2a  Ambour  CB24  0.45  2.25  0.6  0.81  344  278.8  634        8448  1270     10352 

20  2B2C7d2a  Ambour  CB18  0.45  2.25  0.6  0.81  367  297.3  676        9007  1354     11038 

21  2B2C7d2a  Ambour  CB25  0.45  2.25  0.6  0.81  396  320.6  728        9713  1460     11901 

22  2B2C7d2a  Ambour  CB27  0.45  2.25  0.6  0.81  509  412.7  938        12504  1880     15322 

23  2B2C7d2a  Ambour  CB22  0.45  2.25  0.6  0.81  284  230.4  524        6982  1050     8555 

24  2B2C7d2a  Ambour  CB21  0.45  2.25  0.6  0.81  329  266.7  606        8081  1215     9902 

25  2B2C7d2a  Ambour  CB28  0.45  2.25  0.6  0.81  447  362.2  823        10974  1650     13446 

26  2B2C7d2a  Ambour  CB29  0.45  2.25  0.6  0.81  444  359.5  817        10893  1638     13348 

27  2B2C7d2a  Ambour  CB23  0.45  2.25  0.6  0.81  245  198.7  452        6021  905     7379 

Page 154: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

5

28  2B2C7d2a  Ambour  ECD05  3  15  3  27  71  1916.7  6765        90199  1748     98712 

29  2B2C7d2a  Ambour  ECD01  3  15  3  27  65  1763.3  6224        82982  1609     90815 

30  2B2C7d2a  Ambour  ECD10  3  15  3  27  54  1450.6  5120        68263  1323     74707 

31  2B2C7d2a  Ambour  ECD09  3  15  3  27  45  1204.7  4252        56692  1099     62043 

32  2B2C7d2a  Ambour  ECD08  3  15  3  27  50  1346.7  4753        63376  1228     69357 

33  2B2C7d2a  Ambour  ECD06  3  15  3  27  86  2315.9  8174        108987  2113     119274 

34  2B2C7d2a  Ambour  ECD11  3  15  3  27  64  1732.3  6114        81524  1580     89219 

35  2B2C7d2a  Ambour  ECD04  3  15  3  27  50  1350  4765        63531  1232     69528 

36  2B2C7d2c  Ambour  ECD21  3  15  3  27  64  1739  6138        81837  1586     89561 

37  2B2C7d2c  Ambour  ECD20  3  15  3  27  36  964.1  3403        45371  879     49653 

38  2B2C7d2c  Ambour  ECD19  3  15  3  27  88  2369.8  8364        111521  2162     122047 

39  2B2C7d2c  Ambour  ECD18  3  15  3  27  80  2160  7624        101650  1970     111244 

40  2B2C7d2a  Ambour  ECD03  3  15  3  27  62  1684.1  5944        79252  1536     86732 

41  2B2C7d2a  Ambour  ECD02  3  15  3  27  60  1626.3  5740        76536  1484     83759 

42  2B2C7d2a  Ambour  ECD07  3  15  3  27  69  1850.9  6533        87105  1688     95326 

43  2B2C7d2a  Ambour  ECD12  3  15  3  27  35  941.9  3324        44326  859     48509 

44  2B2C7d2a  Ambour  ECD13  3  15  3  27  54  1454.5  5134        68449  1327     74910 

45  2B2C7d2c  Ambour  MB90  0.6  3.6  1  2.1  605  1271.1  2889        38514  3477     44880 

46  2B2C7d2a  Ambour  MB05  0.6  3.6  1  2.1  606  1272  2891        38541  3480     44912 

47  2B2C7d2c  Ambour  MB88  0.6  3.6  1  2.1  327  686.3  1560        20796  1878     24233 

48  2B2C7d2a  Ambour  MB04  0.6  3.6  1  2.1  431  904.3  2055        27401  2474     31929 

49  2B2C7d2a  Ambour  MB18  0.6  3.6  1  2.1  103  217  493        6574  594     7661 

50  2B2C7d2c  Ambour  MB86  0.6  3.6  1  2.1  446  937.4  2130        28404  2565     33099 

51  2B2C7d2c  Ambour  MB91  0.6  3.6  1  2.1  463  973.3  2212        29490  2663     34365 

52  2B2C7d2c  Ambour  MB84  0.6  3.6  1  2.1  513  1078.3  2451        32673  2950     38075 

53  2B2C7d2c  Ambour  MB89  0.6  3.6  1  2.1  237  497.5  1131        15075  1361     17567 

54  2B2C7d2c  Ambour  MB83  0.6  3.6  1  2.1  370  777.6  1767        23562  2127     27456 

55  2B2C7d2c  Ambour  MB82  0.6  3.6  1  2.1  397  834.2  1896        25277  2282     29455 

56  2B2C7d2a  Ambour  MB19  0.6  3.6  1  2.1  296  622.5  1415        18862  1703     21980 

57  2B2C7d2a  Ambour  MB20  0.6  3.6  1  2.1  391  821.3  1866        24886  2247     28999 

58  2B2C7d2a  Ambour  MB21  0.6  3.6  1  2.1  323  677.9  1541        20541  1855     23937 

59  2B2C7d2a  Ambour  MB01  0.6  3.6  1  2.1  317  665.3  1512        20159  1820     23492 

60  2B2C7d2a  Ambour  MB22  0.6  3.6  1  2.1  416  873  1984        26452  2388     30824 

61  2B2C7d2a  Ambour  MB23  0.6  3.6  1  2.1  612  1285.2  2921        38941  3516     45378 

62  2B2C7d2c  Ambour  MB85  0.6  3.6  1  2.1  393  824.8  1874        24991  2256     29122 

63  2B2C7d2a  Ambour  MB13  0.6  3.6  1  2.1  220  462.5  1051        14015  1265     16331 

64  2B2C7d2a  Ambour  MB06  0.6  3.6  1  2.1  333  698.3  1587        21158  1910     24656 

65  2B2C7d2a  Ambour  MB07  0.6  3.6  1  2.1  307  644.9  1466        19540  1764     22771 

66  2B2C7d2a  Ambour  MB08  0.6  3.6  1  2.1  423  888.6  2019        26926  2431     31376 

67  2B2C7d2a  Ambour  MB09  0.6  3.6  1  2.1  315  661.3  1503        20038  1809     23350 

Page 155: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

6

68  2B2C7d2a  Ambour  MB10  0.6  3.6  1  2.1  275  576.8  1311        17476  1578     20365 

69  2B2C7d2a  Ambour  MB25  0.6  3.6  1  2.1  1067  2240.8  5092        67895  6130     79117 

70  2B2C7d2a  Ambour  MB11  0.6  3.6  1  2.1  462  970.8  2206        29414  2656     34276 

71  2B2C7d2a  Ambour  MB24  0.6  3.6  1  2.1  756  1586.7  3606        48076  4341     56023 

72  2B2C7d2a  Ambour  MB12  0.6  3.6  1  2.1  355  745  1693        22573  2038     26304 

73  2B2C7d2a  Ambour  MB03  0.6  3.6  1  2.1  282  593.1  1348        17971  1623     20941 

74  2B2C7d2c  Ambour  MB87  0.6  3.6  1  2.1  488  1024.3  2328        31038  2802     36168 

75  2B2C7d2a  Ambour  MB02  0.6  3.6  1  2.1  589  1236.5  2810        37467  3383     43660 

76  2B2C7d2c  Ambour  MB92  0.6  3.6  1  2.1  198  415.7  945        12594  1137     14677 

77  2B2C7d2a  Ambour  MB14  0.6  3.6  1  2.1  647  1359.2  3089        41183  3718     47990 

78  2B2C7d2a  Ambour  MB15  0.6  3.6  1  2.1  268  563.3  1280        17067  1541     19888 

79  2B2C7d2a  Ambour  MB16  0.6  3.6  1  2.1  445  933.5  2121        28284  2554     32958 

80  2B2C7d2a  Ambour  MB17  0.6  3.6  1  2.1  310  651.4  1480        19737  1782     22999 

81  2B2C7d2a  Ambour  PB04  0.6  3.6  1  2.1  559  1174.5  2669        35589  3213     41471 

82  2B2C7d2a  Ambour  PB03  0.6  3.6  1  2.1  291  610.9  1388        18509  1671     21568 

83  2B2C7d2a  Ambour  PB02  0.6  3.6  1  2.1  307  644.3  1464        19522  1763     22748 

84  2B2C7d2a  Ambour  PB01  0.6  3.6  1  2.1  339  711.9  1618        21571  1948     25137 

85  2B2C7d2c  Ambour  PB14  0.6  3.6  1  2.1  360  755.2  1716        22882  2066     26664 

86  2B2C7d2c  Ambour  PB13  0.6  3.6  1  2.1  371  780  1773        23634  2134     27541 

87  2B2C7d2c  Ambour  PB15  0.6  3.6  1  2.1  261  547.2  1243        16579  1497     19319 

88  2B2C7d2c  Ambour  PB16  0.6  3.6  1  2.1  254  533  1211        16150  1458     18819 

89  2B2C7d2a  Ambour  PB05  0.6  3.6  1  2.1  1202  2523.5  5735        76463  6904     89102 

Total                       28467  74512  204368        2724822  165559  0  3094749 

Details of Water Resources  PLength  PWidth  PDepth                               

90  2B2C7d2a  Ambour  PND01                 9557.6  0  2  HMP  510032     80000  628284 

Total                       0  9557.6  0  2     510032  0  80000  628284 

Details of Afforestation and Agro forestry                                        

91  2B2C7d2a  Ambour  AFF03              17266                       82890 

92  2B2C7d2a  Ambour  AFF02              20748                       99600 

93  2B2C7d2a  Ambour  AFF01              10433                       50070 

Total                                               232560 

Grand Total                                         3955593 

Name of Gram Panchayat : Baghaura 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2c  Baghaura  CB132  0.45  2.25  0.6  0.81  168  136  309        4122  620     5050 

Page 156: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

7

2  2B2C7d2c  Baghaura  CB121  0.45  2.25  0.6  0.81  367  297.1  675        9003  1354     11031 

3  2B2C7d2c  Baghaura  CB122  0.45  2.25  0.6  0.81  140  113.4  258        3437  517     4212 

4  2B2C7d2c  Baghaura  CB123  0.45  2.25  0.6  0.81  192  155.2  353        4701  707     5761 

5  2B2C7d2c  Baghaura  CB124  0.45  2.25  0.6  0.81  285  231.1  525        7002  1053     8580 

6  2B2C7d2c  Baghaura  CB125  0.45  2.25  0.6  0.81  587  475.8  1081        14415  2167     17664 

7  2B2C7d2c  Baghaura  CB126  0.45  2.25  0.6  0.81  203  164.6  374        4988  750     6112 

8  2B2C7d2c  Baghaura  CB127  0.45  2.25  0.6  0.81  393  318.4  724        9648  1451     11822 

9  2B2C7d2c  Baghaura  CB128  0.45  2.25  0.6  0.81  253  204.8  465        6206  933     7604 

10  2B2C7d2c  Baghaura  CB129  0.45  2.25  0.6  0.81  499  404.5  919        12257  1843     15019 

11  2B2C7d2c  Baghaura  CB130  0.45  2.25  0.6  0.81  446  361.1  821        10940  1645     13406 

12  2B2C7d2c  Baghaura  CB120  0.45  2.25  0.6  0.81  97  79  179        2392  360     2931 

13  2B2C7d2c  Baghaura  CB131  0.45  2.25  0.6  0.81  260  210.8  479        6387  960     7826 

14  2B2C7d2c  Baghaura  CB136  0.45  2.25  0.6  0.81  137  110.9  252        3362  505     4119 

15  2B2C7d2c  Baghaura  CB135  0.45  2.25  0.6  0.81  191  154.4  351        4680  704     5734 

16  2B2C7d2c  Baghaura  CB133  0.45  2.25  0.6  0.81  215  174.3  396        5281  794     6471 

17  2B2C7d2c  Baghaura  CB134  0.45  2.25  0.6  0.81  133  108.1  246        3275  492     4014 

18  2B2C7d2c  Baghaura  MB100  0.6  3.6  1  2.1  300  629.3  1430        19067  1722     22219 

19  2B2C7d2c  Baghaura  MB106  0.6  3.6  1  2.1  301  632.8  1438        19174  1731     22343 

20  2B2C7d2c  Baghaura  MB105  0.6  3.6  1  2.1  175  367.2  834        11126  1005     12965 

21  2B2C7d2c  Baghaura  MB104  0.6  3.6  1  2.1  226  474.6  1079        14381  1298     16759 

22  2B2C7d2c  Baghaura  MB103  0.6  3.6  1  2.1  604  1268  2881        38420  3469     44770 

23  2B2C7d2c  Baghaura  MB96  0.6  3.6  1  2.1  406  852  1936        25817  2331     30084 

24  2B2C7d2c  Baghaura  MB101  0.6  3.6  1  2.1  462  970.8  2206        29414  2656     34276 

25  2B2C7d2c  Baghaura  MB97  0.6  3.6  1  2.1  407  855.2  1943        25913  2340     30195 

26  2B2C7d2c  Baghaura  MB93  0.6  3.6  1  2.1  225  471.7  1072        14292  1290     16655 

27  2B2C7d2c  Baghaura  MB94  0.6  3.6  1  2.1  595  1250.1  2841        37877  3420     44138 

28  2B2C7d2c  Baghaura  MB95  0.6  3.6  1  2.1  101  212  482        6425  580     7487 

29  2B2C7d2c  Baghaura  MB99  0.6  3.6  1  2.1  625  1311.8  2981        39749  3589     46319 

30  2B2C7d2c  Baghaura  MB98  0.6  3.6  1  2.1  385  807.5  1835        24468  2209     28513 

31  2B2C7d2c  Baghaura  MB102  0.6  3.6  1  2.1  292  612.8  1393        18567  1676     21636 

Total                       9670  14415.3  32758        436786  46171  0  515715 

Details of Water Resources  PLength  PWidth  PDepth                               

32  2B2C7d2c  Baghaura  PND04                 3506.5  0  2  HMP  186834     80000  280847 

33  2B2C7d2c  Baghaura  PND03                 5762.1  0  2  HMP  307406     80000  410461 

Total                       0  9268.6  0  4     494240  0  160000  691308 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1207023 

Page 157: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

8

Name of Gram Panchayat : Beerkithai 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7g1a  Beerkithai  CB171  0.45  2.25  0.6  0.81  227  183.6  417        5562  836     6815 

2  2B2C7g1a  Beerkithai  CB160  0.45  2.25  0.6  0.81  240  194.3  442        5888  885     7216 

3  2B2C7g1a  Beerkithai  CB181  0.45  2.25  0.6  0.81  313  253.4  576        7677  1154     9407 

4  2B2C7g1a  Beerkithai  CB180  0.45  2.25  0.6  0.81  346  279.9  636        8481  1275     10392 

5  2B2C7g1a  Beerkithai  CB179  0.45  2.25  0.6  0.81  147  119.2  271        3611  543     4425 

6  2B2C7g1a  Beerkithai  CB178  0.45  2.25  0.6  0.81  224  181.1  412        5487  825     6724 

7  2B2C7g1a  Beerkithai  CB177  0.45  2.25  0.6  0.81  137  111  252        3365  506     4122 

8  2B2C7g1a  Beerkithai  CB176  0.45  2.25  0.6  0.81  584  473.2  1075        14337  2156     17568 

9  2B2C7g1a  Beerkithai  CB175  0.45  2.25  0.6  0.81  249  201.7  458        6112  919     7489 

10  2B2C7g1a  Beerkithai  CB174  0.45  2.25  0.6  0.81  187  151.7  345        4596  691     5632 

11  2B2C7g1a  Beerkithai  CB183  0.45  2.25  0.6  0.81  252  204.2  464        6189  930     7583 

12  2B2C7g1a  Beerkithai  CB172  0.45  2.25  0.6  0.81  203  164.1  373        4972  748     6092 

13  2B2C7g1a  Beerkithai  CB184  0.45  2.25  0.6  0.81  144  116.6  265        3534  531     4330 

14  2B2C7g1a  Beerkithai  CB170  0.45  2.25  0.6  0.81  286  231.8  527        7024  1056     8607 

15  2B2C7g1a  Beerkithai  CB169  0.45  2.25  0.6  0.81  266  215.5  490        6531  982     8003 

16  2B2C7g1a  Beerkithai  CB168  0.45  2.25  0.6  0.81  233  189.1  430        5730  862     7022 

17  2B2C7g1a  Beerkithai  CB167  0.45  2.25  0.6  0.81  556  450.1  1023        13639  2051     16712 

18  2B2C7g1a  Beerkithai  CB166  0.45  2.25  0.6  0.81  286  231.7  526        7019  1055     8601 

19  2B2C7g1a  Beerkithai  CB165  0.45  2.25  0.6  0.81  268  216.7  492        6566  987     8045 

20  2B2C7g1a  Beerkithai  CB164  0.45  2.25  0.6  0.81  283  228.9  520        6936  1043     8499 

21  2B2C7g1a  Beerkithai  CB163  0.45  2.25  0.6  0.81  135  109  248        3303  497     4047 

22  2B2C7g1a  Beerkithai  CB162  0.45  2.25  0.6  0.81  298  241.3  548        7312  1099     8959 

23  2B2C7g1a  Beerkithai  CB161  0.45  2.25  0.6  0.81  555  449.7  1022        13626  2049     16696 

24  2B2C7g1a  Beerkithai  CB173  0.45  2.25  0.6  0.81  206  166.5  378        5046  759     6183 

25  2B2C7g1a  Beerkithai  CB194  0.45  2.25  0.6  0.81  79  63.7  145        1930  290     2365 

26  2B2C7g1a  Beerkithai  CB203  0.45  2.25  0.6  0.81  184  149  339        4516  679     5534 

27  2B2C7g1a  Beerkithai  CB202  0.45  2.25  0.6  0.81  102  82.4  187        2497  375     3060 

28  2B2C7g1a  Beerkithai  CB201  0.45  2.25  0.6  0.81  190  153.9  350        4662  701     5713 

29  2B2C7g1a  Beerkithai  CB200  0.45  2.25  0.6  0.81  152  123.1  280        3731  561     4572 

30  2B2C7g1a  Beerkithai  CB199  0.45  2.25  0.6  0.81  253  205.1  466        6214  934     7615 

31  2B2C7g1a  Beerkithai  CB198  0.45  2.25  0.6  0.81  81  65.9  150        1998  300     2448 

32  2B2C7g1a  Beerkithai  CB197  0.45  2.25  0.6  0.81  80  65.2  148        1975  297     2420 

33  2B2C7g1a  Beerkithai  CB196  0.45  2.25  0.6  0.81  79  64.4  146        1950  293     2389 

34  2B2C7g1a  Beerkithai  CB182  0.45  2.25  0.6  0.81  662  536.1  1218        16244  2442     19905 

35  2B2C7g1a  Beerkithai  CB195  0.45  2.25  0.6  0.81  82  66.1  150        2002  301     2453 

36  2B2C7g1a  Beerkithai  CB193  0.45  2.25  0.6  0.81  557  451.5  1026        13680  2057     16763 

Page 158: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

9

37  2B2C7g1a  Beerkithai  CB192  0.45  2.25  0.6  0.81  183  148.3  337        4495  676     5508 

38  2B2C7g1a  Beerkithai  CB191  0.45  2.25  0.6  0.81  494  399.8  908        12113  1821     14843 

39  2B2C7g1a  Beerkithai  CB190  0.45  2.25  0.6  0.81  289  234.2  532        7097  1067     8696 

40  2B2C7g1a  Beerkithai  CB189  0.45  2.25  0.6  0.81  1042  844.2  1918        25580  3846     31344 

41  2B2C7g1a  Beerkithai  CB188  0.45  2.25  0.6  0.81  398  322.5  733        9770  1469     11972 

42  2B2C7g1a  Beerkithai  CB187  0.45  2.25  0.6  0.81  197  159.4  362        4831  726     5919 

43  2B2C7g1a  Beerkithai  CB186  0.45  2.25  0.6  0.81  278  225  511        6818  1025     8354 

44  2B2C7g1a  Beerkithai  CB185  0.45  2.25  0.6  0.81  297  240.6  547        7290  1096     8933 

45  2B2C7g1a  Beerkithai  MB86  0.6  3.6  1  2.1  440  923.3  2098        27975  2526     32599 

46  2B2C7g1a  Beerkithai  MB83  0.6  3.6  1  2.1  570  1197.9  2722        36295  3277     42294 

47  2B2C7g1a  Beerkithai  MB84  0.6  3.6  1  2.1  409  858.8  1952        26021  2349     30322 

48  2B2C7g1a  Beerkithai  MB85  0.6  3.6  1  2.1  277  581.4  1321        17616  1590     20527 

49  2B2C7g1a  Beerkithai  MB82  0.6  3.6  1  2.1  298  625.4  1421        18949  1711     22081 

Total                       14298  14151.5  32157        428792  56848  0  517798 

Details of Water Resources  PLength  PWidth  PDepth                               

50  2B2C7g1a  Beerkithai  PND03                 2339.6  0  2  HMP  124620     80000  213966 

51  2B2C7g1a  Beerkithai  PND02                 6016.4  0  2  HMP  320985     80000  425059 

Total                       0  8356  0  4     445605  0  160000  639025 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1156823 

Name of Gram Panchayat : Chandwal 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2a  Chandwal  CB31  0.45  2.25  0.6  0.81  79  64  145        1938  291     2374 

2  2B2C7d2a  Chandwal  CB72  0.45  2.25  0.6  0.81  234  189.3  430        5735  862     7027 

3  2B2C7d2a  Chandwal  CB54  0.45  2.25  0.6  0.81  404  327.3  744        9918  1491     12153 

4  2B2C7d2a  Chandwal  CB55  0.45  2.25  0.6  0.81  233  189  429        5727  861     7017 

5  2B2C7d2a  Chandwal  CB56  0.45  2.25  0.6  0.81  109  88.1  200        2669  401     3271 

6  2B2C7d2a  Chandwal  CB57  0.45  2.25  0.6  0.81  371  300.4  683        9102  1369     11154 

7  2B2C7d2a  Chandwal  CB58  0.45  2.25  0.6  0.81  352  285.1  648        8638  1299     10584 

8  2B2C7d2a  Chandwal  CB59  0.45  2.25  0.6  0.81  274  221.7  504        6716  1010     8230 

9  2B2C7d2a  Chandwal  CB60  0.45  2.25  0.6  0.81  110  89.2  203        2703  406     3312 

10  2B2C7d2a  Chandwal  CB52  0.45  2.25  0.6  0.81  139  112.6  256        3412  513     4181 

11  2B2C7d2a  Chandwal  CB62  0.45  2.25  0.6  0.81  403  326  741        9879  1485     12105 

12  2B2C7d2a  Chandwal  CB51  0.45  2.25  0.6  0.81  150  121.8  277        3691  555     4523 

Page 159: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

10

13  2B2C7d2a  Chandwal  CB63  0.45  2.25  0.6  0.81  362  293.1  666        8881  1335     10882 

14  2B2C7d2a  Chandwal  CB65  0.45  2.25  0.6  0.81  455  368.5  837        11165  1679     13681 

15  2B2C7d2a  Chandwal  CB66  0.45  2.25  0.6  0.81  234  189.4  430        5739  863     7032 

16  2B2C7d2a  Chandwal  CB67  0.45  2.25  0.6  0.81  256  207.7  472        6294  946     7712 

17  2B2C7d2a  Chandwal  CB68  0.45  2.25  0.6  0.81  341  276  627        8363  1257     10247 

18  2B2C7d2a  Chandwal  CB69  0.45  2.25  0.6  0.81  400  323.6  735        9806  1474     12015 

19  2B2C7d2a  Chandwal  CB70  0.45  2.25  0.6  0.81  372  301.3  685        9130  1373     11188 

20  2B2C7d2a  Chandwal  CB71  0.45  2.25  0.6  0.81  214  173.6  394        5259  791     6443 

21  2B2C7d2a  Chandwal  CB61  0.45  2.25  0.6  0.81  295  238.9  543        7237  1088     8868 

22  2B2C7d2a  Chandwal  CB42  0.45  2.25  0.6  0.81  277  224.6  510        6805  1023     8339 

23  2B2C7d2a  Chandwal  CB32  0.45  2.25  0.6  0.81  178  144.1  327        4365  656     5348 

24  2B2C7d2a  Chandwal  CB33  0.45  2.25  0.6  0.81  235  190.3  432        5765  867     7063 

25  2B2C7d2a  Chandwal  CB34  0.45  2.25  0.6  0.81  211  170.8  388        5175  778     6341 

26  2B2C7d2a  Chandwal  CB35  0.45  2.25  0.6  0.81  248  200.6  456        6078  914     7448 

27  2B2C7d2a  Chandwal  CB36  0.45  2.25  0.6  0.81  512  414.4  942        12555  1888     15385 

28  2B2C7d2a  Chandwal  CB37  0.45  2.25  0.6  0.81  185  150.1  341        4547  684     5572 

29  2B2C7d2a  Chandwal  CB38  0.45  2.25  0.6  0.81  1208  978.2  2223        29640  4456     36319 

30  2B2C7d2a  Chandwal  CB39  0.45  2.25  0.6  0.81  272  220.3  501        6675  1004     8180 

31  2B2C7d2a  Chandwal  CB53  0.45  2.25  0.6  0.81  343  278.1  632        8426  1267     10325 

32  2B2C7d2a  Chandwal  CB41  0.45  2.25  0.6  0.81  204  165.4  376        5012  754     6142 

33  2B2C7d2a  Chandwal  CB64  0.45  2.25  0.6  0.81  299  241.8  550        7327  1102     8979 

34  2B2C7d2a  Chandwal  CB43  0.45  2.25  0.6  0.81  217  176.1  400        5337  802     6539 

35  2B2C7d2a  Chandwal  CB44  0.45  2.25  0.6  0.81  147  118.7  270        3597  541     4407 

36  2B2C7d2a  Chandwal  CB45  0.45  2.25  0.6  0.81  138  111.8  254        3389  510     4152 

37  2B2C7d2a  Chandwal  CB46  0.45  2.25  0.6  0.81  288  233  530        7061  1062     8652 

38  2B2C7d2a  Chandwal  CB47  0.45  2.25  0.6  0.81  170  137.5  313        4168  627     5107 

39  2B2C7d2a  Chandwal  CB48  0.45  2.25  0.6  0.81  224  181.5  412        5500  827     6739 

40  2B2C7d2a  Chandwal  CB49  0.45  2.25  0.6  0.81  154  124.6  283        3774  567     4625 

41  2B2C7d2a  Chandwal  CB50  0.45  2.25  0.6  0.81  153  124.1  282        3761  565     4608 

42  2B2C7d2a  Chandwal  CB40  0.45  2.25  0.6  0.81  214  173.5  394        5257  790     6441 

43  2B2C7d2a  Chandwal  ECD20  3  15  3  27  56  1504.9  5312        70820  1373     77505 

44  2B2C7d2a  Chandwal  ECD27  3  15  3  27  50  1350  4765        63531  1231     69527 

45  2B2C7d2a  Chandwal  ECD15  3  15  3  27  102  2752.5  9715        129531  2511     141757 

46  2B2C7d2a  Chandwal  ECD16  3  15  3  27  64  1723.4  6083        81101  1572     88756 

47  2B2C7d2a  Chandwal  ECD24  3  15  3  27  40  1080  3812        50825  985     55622 

48  2B2C7d2a  Chandwal  ECD23  3  15  3  27  75  2025  7147        95297  1847     104291 

49  2B2C7d2a  Chandwal  ECD28  3  15  3  27  50  1356.5  4788        63835  1237     69861 

50  2B2C7d2a  Chandwal  ECD22  3  15  3  27  60  1620  5718        76237  1478     83433 

51  2B2C7d2a  Chandwal  ECD25  3  15  3  27  40  1080  3812        50825  985     55622 

52  2B2C7d2a  Chandwal  ECD26  3  15  3  27  40  1080  3812        50825  985     55622 

Page 160: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

11

53  2B2C7d2a  Chandwal  ECD21  3  15  3  27  30  810  2859        38119  739     41717 

54  2B2C7d2a  Hoose Pur  ECD33  3  15  3  27  40  1080  3812        50825  985     55622 

55  2B2C7d2a  Chandwal  ECD19  3  15  3  27  30  810  2859        38119  739     41717 

56  2B2C7d2a  Hoose Pur  ECD32  3  15  3  27  40  1080  3812        50825  985     55622 

57  2B2C7d2a  Chandwal  ECD18  3  15  3  27  50  1350  4765        63531  1232     69528 

58  2B2C7d2a  Hoose Pur  ECD31  3  15  3  27  76  2040.2  7201        96010  1861     105072 

59  2B2C7d2a  Chandwal  ECD17  3  15  3  27  90  2423.6  8554        114053  2211     124817 

60  2B2C7d2a  Hoose Pur  ECD30  3  15  3  27  54  1457.6  5145        68594  1330     75068 

61  2B2C7d2a  Hoose Pur  ECD29  3  15  3  27  69  1859.2  6562        87492  1696     95750 

62  2B2C7d2a  Chandwal  ECD14  3  15  3  27  94  2530.5  8931        119085  2308     130325 

63  2B2C7d2a  Chandwal  MB38  0.6  3.6  1  2.1  447  939.5  2135        28466  2570     33172 

64  2B2C7d2a  Chandwal  MB37  0.6  3.6  1  2.1  235  492.9  1120        14934  1348     17402 

65  2B2C7d2a  Chandwal  MB36  0.6  3.6  1  2.1  381  799.8  1818        24234  2188     28239 

66  2B2C7d2a  Chandwal  MB39  0.6  3.6  1  2.1  1018  2137.7  4858        64772  5848     75478 

67  2B2C7d2a  Hoose Pur  MB77  0.6  3.6  1  2.1  439  922.3  2096        27945  2523     32565 

68  2B2C7d2a  Hoose Pur  MB76  0.6  3.6  1  2.1  192  403.3  916        12220  1103     14239 

69  2B2C7d2a  Hoose Pur  MB78  0.6  3.6  1  2.1  412  866.1  1968        26244  2370     30582 

70  2B2C7d2a  Hoose Pur  MB68  0.6  3.6  1  2.1  83  173.3  394        5250  474     6118 

71  2B2C7d2a  Chandwal  MB26  0.6  3.6  1  2.1  346  726.1  1650        22000  1986     25637 

72  2B2C7d2a  Chandwal  MB27  0.6  3.6  1  2.1  440  923.8  2099        27990  2527     32616 

73  2B2C7d2a  Chandwal  MB28  0.6  3.6  1  2.1  409  858.2  1950        26005  2348     30303 

74  2B2C7d2a  Chandwal  MB29  0.6  3.6  1  2.1  668  1401.9  3186        42478  3835     49500 

75  2B2C7d2a  Chandwal  MB30  0.6  3.6  1  2.1  388  814.1  1850        24666  2227     28743 

76  2B2C7d2a  Hoose Pur  MB71  0.6  3.6  1  2.1  116  243.5  553        7379  666     8599 

77  2B2C7d2a  Chandwal  MB34  0.6  3.6  1  2.1  821  1724.8  3920        52261  4718     60899 

78  2B2C7d2a  Hoose Pur  MB69  0.6  3.6  1  2.1  171  359.5  817        10894  984     12695 

79  2B2C7d2a  Hoose Pur  MB66  0.6  3.6  1  2.1  79  165.7  376        5020  453     5849 

80  2B2C7d2a  Chandwal  MB31  0.6  3.6  1  2.1  260  546.4  1242        16556  1495     19292 

81  2B2C7d2a  Chandwal  MB32  0.6  3.6  1  2.1  321  673.5  1531        20408  1843     23782 

82  2B2C7d2a  Chandwal  MB61  0.6  3.6  1  2.1  184  385.8  877        11689  1055     13621 

83  2B2C7d2a  Chandwal  MB33  0.6  3.6  1  2.1  1060  2225  5056        67416  6087     78559 

84  2B2C7d2a  Hoose Pur  MB75  0.6  3.6  1  2.1  662  1389.8  3158        42112  3802     49072 

85  2B2C7d2a  Chandwal  MB35  0.6  3.6  1  2.1  661  1388.6  3155        42073  3799     49027 

86  2B2C7d2a  Hoose Pur  MB67  0.6  3.6  1  2.1  144  302.8  688        9175  828     10691 

87  2B2C7d2a  Hoose Pur  MB70  0.6  3.6  1  2.1  137  287.8  654        8721  787     10162 

88  2B2C7d2a  Chandwal  MB43  0.6  3.6  1  2.1  313  656.8  1493        19902  1797     23192 

89  2B2C7d2a  Chandwal  MB54  0.6  3.6  1  2.1  290  608.5  1383        18438  1665     21486 

90  2B2C7d2a  Chandwal  MB53  0.6  3.6  1  2.1  205  430  977        13029  1176     15182 

91  2B2C7d2a  Chandwal  MB52  0.6  3.6  1  2.1  117  246  559        7453  673     8685 

92  2B2C7d2a  Chandwal  MB51  0.6  3.6  1  2.1  592  1242.3  2823        37641  3399     43863 

Page 161: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

12

93  2B2C7d2a  Chandwal  MB56  0.6  3.6  1  2.1  296  621.5  1412        18830  1700     21942 

94  2B2C7d2a  Chandwal  MB57  0.6  3.6  1  2.1  487  1022.2  2323        30973  2797     36093 

95  2B2C7d2a  Chandwal  MB50  0.6  3.6  1  2.1  106  222.8  506        6750  609     7865 

96  2B2C7d2a  Chandwal  MB49  0.6  3.6  1  2.1  179  375.5  853        11378  1027     13258 

97  2B2C7d2a  Chandwal  MB48  0.6  3.6  1  2.1  552  1159.9  2636        35146  3173     40955 

98  2B2C7d2a  Hoose Pur  MB72  0.6  3.6  1  2.1  165  346.6  788        10503  948     12240 

99  2B2C7d2a  Chandwal  MB47  0.6  3.6  1  2.1  133  279.6  635        8471  765     9871 

100  2B2C7d2a  Chandwal  MB46  0.6  3.6  1  2.1  136  284.9  647        8632  779     10058 

101  2B2C7d2a  Chandwal  MB63  0.6  3.6  1  2.1  389  816.4  1855        24737  2233     28826 

102  2B2C7d2a  Chandwal  MB44  0.6  3.6  1  2.1  176  369.2  839        11187  1010     13036 

103  2B2C7d2a  Chandwal  MB55  0.6  3.6  1  2.1  166  348.2  791        10549  952     12293 

104  2B2C7d2a  Hoose Pur  MB73  0.6  3.6  1  2.1  57  119.1  271        3608  326     4205 

105  2B2C7d2a  Chandwal  MB65  0.6  3.6  1  2.1  288  605.2  1375        18339  1656     21370 

106  2B2C7d2a  Chandwal  MB64  0.6  3.6  1  2.1  167  351.6  799        10654  962     12415 

107  2B2C7d2a  Chandwal  MB45  0.6  3.6  1  2.1  426  894.3  2032        27098  2447     31577 

108  2B2C7d2a  Chandwal  MB62  0.6  3.6  1  2.1  227  476.6  1083        14441  1304     16828 

109  2B2C7d2a  Hoose Pur  MB74  0.6  3.6  1  2.1  146  307.3  698        9310  841     10849 

110  2B2C7d2a  Chandwal  MB60  0.6  3.6  1  2.1  198  416.3  946        12615  1139     14700 

111  2B2C7d2a  Chandwal  MB59  0.6  3.6  1  2.1  257  540.5  1228        16377  1479     19084 

112  2B2C7d2a  Chandwal  MB58  0.6  3.6  1  2.1  475  998.4  2269        30251  2731     35252 

113  2B2C7d2a  Chandwal  MB40  0.6  3.6  1  2.1  810  1700.8  3865        51533  4653     60051 

114  2B2C7d2a  Chandwal  MB41  0.6  3.6  1  2.1  142  298.8  679        9053  817     10550 

115  2B2C7d2a  Chandwal  MB42  0.6  3.6  1  2.1  147  309  702        9361  845     10909 

116  2B2C7d2a  Chandwal  PB07  0.6  3.6  1  2.1  323  678.2  1541        20550  1855     23947 

117  2B2C7d2a  Chandwal  PB08  0.6  3.6  1  2.1  243  511  1161        15484  1398     18042 

118  2B2C7d2a  Chandwal  PB06  0.6  3.6  1  2.1  703  1476.6  3356        44742  4040     52138 

Total                       31799  80325.8  221521        2953639  180383  0  3355548 

Details of Water Resources  PLength  PWidth  PDepth                               

119  2B2C7d2a  Chandwal  PND02                 5789.6  0  2  HMP  308851     80000  412015 

120  2B2C7d2a  Chandwal  WHB03  3  15  3  27  83  2240.1  1362.3        105419  2043     115368 

121  2B2C7d2a  Chandwal  WHB02  3  15  3  27  84  2266.8  1378.6        106677  2068     116746 

122  2B2C7d2a  Chandwal  WHB01  3  15  3  27  75  2027.5  1233        95413  1850     104419 

Total                       242  12324  3973.9  2     616360  5961  80000  748548 

Details of Afforestation and Agro forestry                                        

123  2B2C7d2a  Chandwal  AFF04              5256                       25230 

Total                                               25230 

Grand Total                                         4129326 

 

Page 162: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

13

Name of Gram Panchayat : Danapurkyampur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7g1a  Danapurkyampur  CB218  0.45  2.25  0.6  0.81  460  372.6  847        11289  1697     13833 

2  2B2C7g1a  Danapurkyampur  CB211  0.45  2.25  0.6  0.81  321  260.3  591        7887  1186     9663 

3  2B2C7g1a  Danapurkyampur  CB224  0.45  2.25  0.6  0.81  368  298.3  678        9038  1359     11075 

4  2B2C7g1a  Danapurkyampur  CB223  0.45  2.25  0.6  0.81  858  695  1579        21057  3166     25802 

5  2B2C7g1a  Danapurkyampur  CB222  0.45  2.25  0.6  0.81  762  617.2  1403        18700  2812     22915 

6  2B2C7g1a  Danapurkyampur  CB221  0.45  2.25  0.6  0.81  388  314.1  714        9518  1431     11663 

7  2B2C7g1a  Danapurkyampur  CB226  0.45  2.25  0.6  0.81  555  449.3  1021        13614  2047     16682 

8  2B2C7g1a  Danapurkyampur  CB219  0.45  2.25  0.6  0.81  841  681.1  1548        20636  3103     25287 

9  2B2C7g1a  Danapurkyampur  CB227  0.45  2.25  0.6  0.81  353  285.5  649        8652  1301     10601 

10  2B2C7g1a  Danapurkyampur  CB217  0.45  2.25  0.6  0.81  533  432  982        13088  1968     16038 

11  2B2C7g1a  Danapurkyampur  CB216  0.45  2.25  0.6  0.81  190  153.6  349        4653  700     5702 

12  2B2C7g1a  Danapurkyampur  CB215  0.45  2.25  0.6  0.81  817  661.4  1503        20041  3013     24557 

13  2B2C7g1a  Danapurkyampur  CB214  0.45  2.25  0.6  0.81  550  445.8  1013        13508  2031     16552 

14  2B2C7g1a  Danapurkyampur  CB213  0.45  2.25  0.6  0.81  316  256.3  582        7766  1168     9516 

15  2B2C7g1a  Danapurkyampur  CB212  0.45  2.25  0.6  0.81  311  252.2  573        7642  1149     9364 

16  2B2C7g1a  Danapurkyampur  CB220  0.45  2.25  0.6  0.81  426  345.5  785        10468  1574     12826 

17  2B2C7g1a  Danapurkyampur  CB204  0.45  2.25  0.6  0.81  123  99.7  227        3021  454     3703 

18  2B2C7g1a  Danapurkyampur  CB228  0.45  2.25  0.6  0.81  221  179  407        5425  816     6647 

19  2B2C7g1a  Danapurkyampur  CB229  0.45  2.25  0.6  0.81  221  179  407        5424  815     6646 

20  2B2C7g1a  Danapurkyampur  CB230  0.45  2.25  0.6  0.81  687  556.1  1264        16850  2533     20647 

21  2B2C7g1a  Danapurkyampur  CB209  0.45  2.25  0.6  0.81  388  313.9  713        9511  1430     11653 

22  2B2C7g1a  Danapurkyampur  CB208  0.45  2.25  0.6  0.81  159  129.1  293        3912  588     4793 

23  2B2C7g1a  Danapurkyampur  CB207  0.45  2.25  0.6  0.81  147  119.2  271        3611  543     4425 

24  2B2C7g1a  Danapurkyampur  CB210  0.45  2.25  0.6  0.81  312  252.7  574        7656  1151     9381 

25  2B2C7g1a  Danapurkyampur  CB206  0.45  2.25  0.6  0.81  133  107.8  245        3266  491     4003 

26  2B2C7g1a  Danapurkyampur  CB225  0.45  2.25  0.6  0.81  297  240.2  546        7278  1094     8918 

27  2B2C7g1a  Danapurkyampur  CB205  0.45  2.25  0.6  0.81  125  101  230        3061  460     3751 

28  2B2C7g1a  Danapurkyampur  MB90  0.6  3.6  1  2.1  758  1592.2  3618        48244  4356     56217 

29  2B2C7g1a  Danapurkyampur  MB89  0.6  3.6  1  2.1  742  1558.6  3542        47226  4264     55032 

30  2B2C7g1a  Danapurkyampur  MB88  0.6  3.6  1  2.1  594  1247.1  2834        37786  3412     44031 

31  2B2C7g1a  Danapurkyampur  MB87  0.6  3.6  1  2.1  339  712.7  1620        21595  1950     25165 

32  2B2C7g1a  Danapurkyampur  MB91  0.6  3.6  1  2.1  537  1127.3  2562        34158  3084     39804 

Total                       13832  15035.8  34170        455581  57146  0  546892 

Details of Water Resources  PLength  PWidth  PDepth                               

33  2B2C7g1a  Danapurkyampur  PND04                 6973.9  0  2  HMP  372123     80000  480032 

Total                       0  6973.9  0  2     372123  0  80000  480032 

Page 163: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

14

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1026924 

Name of Gram Panchayat : Ghazipur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7g1a  Ghazipur  CB54  0.45  2.25  0.6  0.81  142  115.2  262        3490  525     4277 

2  2B2C7g1a  Ghazipur  CB68  0.45  2.25  0.6  0.81  113  91.7  209        2780  418     3407 

3  2B2C7g1a  Ghazipur  CB37  0.45  2.25  0.6  0.81  71  57.7  131        1748  263     2141 

4  2B2C7g1a  Ghazipur  CB36  0.45  2.25  0.6  0.81  288  233.4  530        7071  1063     8664 

5  2B2C7g1a  Ghazipur  CB43  0.45  2.25  0.6  0.81  458  370.8  843        11235  1689     13767 

6  2B2C7g1a  Ghazipur  CB44  0.45  2.25  0.6  0.81  147  119.1  271        3610  543     4424 

7  2B2C7g1a  Ghazipur  CB45  0.45  2.25  0.6  0.81  235  190.6  433        5775  868     7077 

8  2B2C7g1a  Ghazipur  CB46  0.45  2.25  0.6  0.81  302  244.3  555        7402  1113     9070 

9  2B2C7g1a  Ghazipur  CB47  0.45  2.25  0.6  0.81  285  230.8  524        6993  1051     8569 

10  2B2C7g1a  Ghazipur  CB48  0.45  2.25  0.6  0.81  170  138.1  314        4183  629     5126 

11  2B2C7g1a  Ghazipur  CB42  0.45  2.25  0.6  0.81  222  179.6  408        5442  818     6668 

12  2B2C7g1a  Ghazipur  CB50  0.45  2.25  0.6  0.81  324  262.4  596        7952  1196     9743 

13  2B2C7g1a  Ghazipur  CB51  0.45  2.25  0.6  0.81  817  661.6  1503        20046  3014     24563 

14  2B2C7g1a  Ghazipur  CB12  0.45  2.25  0.6  0.81  209  169.2  384        5127  771     6281 

15  2B2C7g1a  Ghazipur  CB53  0.45  2.25  0.6  0.81  826  668.8  1520        20263  3047     24830 

16  2B2C7g1a  Ghazipur  CB13  0.45  2.25  0.6  0.81  333  269.9  613        8178  1230     10021 

17  2B2C7g1a  Ghazipur  CB55  0.45  2.25  0.6  0.81  116  93.6  213        2836  426     3476 

18  2B2C7g1a  Ghazipur  CB56  0.45  2.25  0.6  0.81  552  447.4  1017        13557  2038     16613 

19  2B2C7g1a  Ghazipur  CB57  0.45  2.25  0.6  0.81  256  207.5  472        6289  945     7706 

20  2B2C7g1a  Ghazipur  CB58  0.45  2.25  0.6  0.81  374  303.3  689        9190  1382     11261 

21  2B2C7g1a  Ghazipur  CB60  0.45  2.25  0.6  0.81  323  261.6  595        7927  1192     9714 

22  2B2C7g1a  Ghazipur  CB49  0.45  2.25  0.6  0.81  232  187.7  427        5689  855     6971 

23  2B2C7g1a  Ghazipur  CB62  0.45  2.25  0.6  0.81  464  375.7  854        11382  1711     13948 

24  2B2C7g1a  Ghazipur  CB63  0.45  2.25  0.6  0.81  477  386.4  878        11708  1760     14347 

25  2B2C7g1a  Ghazipur  CB64  0.45  2.25  0.6  0.81  364  294.8  670        8931  1343     10944 

26  2B2C7g1a  Ghazipur  CB65  0.45  2.25  0.6  0.81  127  103  234        3121  469     3824 

27  2B2C7g1a  Ghazipur  CB66  0.45  2.25  0.6  0.81  220  178.4  405        5406  813     6624 

28  2B2C7g1a  Ghazipur  CB67  0.45  2.25  0.6  0.81  207  167.5  381        5076  763     6220 

29  2B2C7g1a  Ghazipur  CB52  0.45  2.25  0.6  0.81  602  487.5  1108        14771  2221     18100 

30  2B2C7g1a  Ghazipur  CB26  0.45  2.25  0.6  0.81  223  180.6  410        5471  823     6704 

Page 164: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

15

31  2B2C7g1a  Ghazipur  CB38  0.45  2.25  0.6  0.81  394  319.1  725        9670  1454     11849 

32  2B2C7g1a  Ghazipur  CB35  0.45  2.25  0.6  0.81  236  191.3  435        5796  871     7102 

33  2B2C7g1a  Ghazipur  CB34  0.45  2.25  0.6  0.81  200  161.7  368        4901  737     6006 

34  2B2C7g1a  Ghazipur  CB39  0.45  2.25  0.6  0.81  108  87.8  200        2660  400     3260 

35  2B2C7g1a  Ghazipur  CB40  0.45  2.25  0.6  0.81  418  338.9  770        10270  1544     12584 

36  2B2C7g1a  Ghazipur  CB41  0.45  2.25  0.6  0.81  95  77.3  176        2342  352     2870 

37  2B2C7g1a  Ghazipur  CB33  0.45  2.25  0.6  0.81  216  175.4  398        5313  799     6510 

38  2B2C7g1a  Ghazipur  CB32  0.45  2.25  0.6  0.81  519  420.5  956        12741  1916     15612 

39  2B2C7g1a  Ghazipur  CB31  0.45  2.25  0.6  0.81  171  138.4  314        4193  630     5137 

40  2B2C7g1a  Ghazipur  CB01  0.45  2.25  0.6  0.81  93  75.5  172        2288  344     2804 

41  2B2C7g1a  Ghazipur  CB30  0.45  2.25  0.6  0.81  276  224  509        6786  1020     8315 

42  2B2C7g1a  Ghazipur  CB29  0.45  2.25  0.6  0.81  283  229.1  521        6940  1043     8505 

43  2B2C7g1a  Ghazipur  CB11  0.45  2.25  0.6  0.81  200  162.3  369        4919  740     6027 

44  2B2C7g1a  Ghazipur  CB27  0.45  2.25  0.6  0.81  322  260.7  592        7898  1187     9678 

45  2B2C7g1a  Ghazipur  CB61  0.45  2.25  0.6  0.81  143  115.6  263        3502  526     4291 

46  2B2C7g1a  Ghazipur  CB25  0.45  2.25  0.6  0.81  195  157.9  359        4783  719     5861 

47  2B2C7g1a  Ghazipur  CB24  0.45  2.25  0.6  0.81  188  152.2  346        4611  693     5651 

48  2B2C7g1a  Ghazipur  CB23  0.45  2.25  0.6  0.81  254  205.9  468        6239  938     7645 

49  2B2C7g1a  Ghazipur  CB22  0.45  2.25  0.6  0.81  550  445.5  1012        13499  2030     16541 

50  2B2C7g1a  Ghazipur  CB21  0.45  2.25  0.6  0.81  455  368.6  838        11169  1679     13686 

51  2B2C7g1a  Ghazipur  CB20  0.45  2.25  0.6  0.81  115  92.9  211        2815  423     3449 

52  2B2C7g1a  Ghazipur  CB19  0.45  2.25  0.6  0.81  250  202.9  461        6148  924     7533 

53  2B2C7g1a  Ghazipur  CB18  0.45  2.25  0.6  0.81  489  396  900        11999  1804     14704 

54  2B2C7g1a  Ghazipur  CB17  0.45  2.25  0.6  0.81  171  138.4  315        4194  631     5140 

55  2B2C7g1a  Ghazipur  CB16  0.45  2.25  0.6  0.81  145  117.1  266        3549  534     4348 

56  2B2C7g1a  Ghazipur  CB15  0.45  2.25  0.6  0.81  148  119.8  272        3630  546     4448 

57  2B2C7g1a  Ghazipur  CB14  0.45  2.25  0.6  0.81  145  117.7  268        3567  536     4371 

58  2B2C7g1a  Ghazipur  CB28  0.45  2.25  0.6  0.81  294  237.8  540        7205  1083     8828 

59   2B2C7g1b  Ghazipur  CB48  0.45  2.25  0.6  0.81  295  239.2  544        7248  1090     8882 

60  2B2C7g1a  Ghazipur  CB87  0.45  2.25  0.6  0.81  380  307.9  700        9330  1403     11433 

61  2B2C7g1a  Ghazipur  CB88  0.45  2.25  0.6  0.81  422  342.1  777        10365  1558     12700 

62  2B2C7g1a  Ghazipur  CB89  0.45  2.25  0.6  0.81  412  333.5  758        10106  1519     12384 

63  2B2C7g1a  Ghazipur  CB10  0.45  2.25  0.6  0.81  245  198.8  452        6025  906     7383 

64   2B2C7g1b  Ghazipur  CB41  0.45  2.25  0.6  0.81  331  268.3  610        8128  1222     9960 

65   2B2C7g1b  Ghazipur  CB42  0.45  2.25  0.6  0.81  183  148.5  337        4500  677     5513 

66  2B2C7g1a  Ghazipur  CB69  0.45  2.25  0.6  0.81  180  145.6  331        4412  663     5406 

67   2B2C7g1b  Ghazipur  CB44  0.45  2.25  0.6  0.81  258  208.9  475        6329  952     7755 

68  2B2C7g1a  Ghazipur  CB59  0.45  2.25  0.6  0.81  173  140.2  319        4249  639     5206 

69  2B2C7g1a  Ghazipur  CB86  0.45  2.25  0.6  0.81  428  346.9  788        10512  1580     12881 

70   2B2C7g1b  Ghazipur  CB47  0.45  2.25  0.6  0.81  266  215.8  490        6539  983     8012 

Page 165: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

16

71   2B2C7g1b  Ghazipur  CB43  0.45  2.25  0.6  0.81  204  165.4  376        5010  753     6140 

72  2B2C7g1a  Ghazipur  CB09  0.45  2.25  0.6  0.81  355  287.6  654        8716  1310     10680 

73  2B2C7g1a  Ghazipur  CB08  0.45  2.25  0.6  0.81  351  284.5  646        8619  1296     10561 

74  2B2C7g1a  Ghazipur  CB07  0.45  2.25  0.6  0.81  349  282.4  642        8556  1286     10485 

75  2B2C7g1a  Ghazipur  CB06  0.45  2.25  0.6  0.81  389  315  716        9546  1435     11697 

76  2B2C7g1a  Ghazipur  CB05  0.45  2.25  0.6  0.81  406  328.6  747        9956  1497     12200 

77  2B2C7g1a  Ghazipur  CB04  0.45  2.25  0.6  0.81  450  364.6  829        11048  1661     13538 

78  2B2C7g1a  Ghazipur  CB03  0.45  2.25  0.6  0.81  395  320  727        9695  1458     11879 

79  2B2C7g1a  Ghazipur  CB02  0.45  2.25  0.6  0.81  534  432.3  982        13097  1969     16049 

80   2B2C7g1b  Ghazipur  CB49  0.45  2.25  0.6  0.81  282  228.4  519        6921  1041     8481 

81   2B2C7g1b  Ghazipur  CB50  0.45  2.25  0.6  0.81  191  155  352        4695  706     5753 

82   2B2C7g1b  Ghazipur  CB46  0.45  2.25  0.6  0.81  262  211.9  481        6419  965     7865 

83  2B2C7g1a  Ghazipur  CB80  0.45  2.25  0.6  0.81  259  209.5  476        6347  954     7777 

84  2B2C7g1a  Ghazipur  CB74  0.45  2.25  0.6  0.81  138  112.1  255        3396  511     4162 

85  2B2C7g1a  Ghazipur  CB72  0.45  2.25  0.6  0.81  144  117  266        3545  533     4344 

86   2B2C7g1b  Ghazipur  CB45  0.45  2.25  0.6  0.81  552  447.3  1017        13554  2038     16609 

87  2B2C7g1a  Ghazipur  CB75  0.45  2.25  0.6  0.81  139  112.6  256        3412  513     4181 

88  2B2C7g1a  Ghazipur  CB76  0.45  2.25  0.6  0.81  178  144  327        4362  656     5345 

89  2B2C7g1a  Ghazipur  CB77  0.45  2.25  0.6  0.81  155  125.8  286        3813  573     4672 

90  2B2C7g1a  Ghazipur  CB78  0.45  2.25  0.6  0.81  93  75.1  171        2276  342     2789 

91  2B2C7g1a  Ghazipur  CB79  0.45  2.25  0.6  0.81  326  264.2  600        8005  1204     9808 

92  2B2C7g1a  Ghazipur  CB73  0.45  2.25  0.6  0.81  130  105.4  240        3194  480     3915 

93  2B2C7g1a  Ghazipur  CB71  0.45  2.25  0.6  0.81  116  94.1  214        2851  429     3493 

94  2B2C7g1a  Ghazipur  CB81  0.45  2.25  0.6  0.81  264  213.9  486        6482  975     7942 

95  2B2C7g1a  Ghazipur  CB82  0.45  2.25  0.6  0.81  89  72.3  164        2191  329     2684 

96  2B2C7g1a  Ghazipur  CB70  0.45  2.25  0.6  0.81  433  350.4  796        10618  1596     13010 

97  2B2C7g1a  Ghazipur  CB84  0.45  2.25  0.6  0.81  429  347.4  789        10525  1582     12897 

98  2B2C7g1a  Ghazipur  CB85  0.45  2.25  0.6  0.81  264  214.2  487        6491  976     7953 

99  2B2C7g1a  Ghazipur  CB83  0.45  2.25  0.6  0.81  831  673.3  1530        20401  3067     24998 

100  2B2C7g1a  Ghazipur  ECD03  3  15  3  27  57  1533.4  5412        72161  1399     78972 

101  2B2C7g1a  Ghazipur  ECD05  3  15  3  27  60  1607.4  5673        75643  1466     82782 

102  2B2C7g1a  Ghazipur  ECD28  3  15  3  27  67  1813.7  6401        85351  1654     93407 

103  2B2C7g1a  Ghazipur  ECD04  3  15  3  27  61  1656.7  5847        77963  1511     85321 

104  2B2C7g1a  Ghazipur  ECD12  3  15  3  27  51  1370.7  4838        64507  1250     70595 

105  2B2C7g1a  Ghazipur  ECD30  3  15  3  27  44  1188.3  4194        55923  1084     61201 

106   2B2C7g1b  Ghazipur  ECD62  3  15  3  27  58  1569.3  5539        73850  1432     80821 

107  2B2C7g1a  Ghazipur  ECD11  3  15  3  27  67  1802.9  6363        84844  1645     92852 

108  2B2C7g1a  Ghazipur  ECD10  3  15  3  27  102  2757.9  9734        129785  2516     142035 

109  2B2C7g1a  Ghazipur  ECD09  3  15  3  27  92  2487  8778        117039  2269     128085 

110  2B2C7g1a  Ghazipur  ECD07  3  15  3  27  96  2598.6  9172        122292  2371     133835 

Page 166: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

17

111  2B2C7g1a  Ghazipur  ECD02  3  15  3  27  52  1398  4934        65789  1275     71998 

112  2B2C7g1a  Ghazipur  ECD01  3  15  3  27  61  1641.3  5793        77238  1497     84528 

113   2B2C7g1b  Ghazipur  ECD63  3  15  3  27  48  1303.8  4602        61356  1189     67147 

114  2B2C7g1a  Ghazipur  ECD31  3  15  3  27  47  1265.4  4466        59549  1154     65170 

115  2B2C7g1a  Ghazipur  ECD26  3  15  3  27  66  1787.8  6310        84136  1631     92077 

116  2B2C7g1a  Ghazipur  ECD20  3  15  3  27  100  2694.1  9509        126785  2458     138752 

117  2B2C7g1a  Ghazipur  ECD08  3  15  3  27  102  2752.5  9715        129534  2511     141760 

118  2B2C7g1a  Ghazipur  ECD18  3  15  3  27  63  1689.8  5964        79522  1541     87028 

119  2B2C7g1a  Ghazipur  ECD06  3  15  3  27  64  1732.5  6115        81530  1580     89225 

120  2B2C7g1a  Ghazipur  ECD23  3  15  3  27  65  1741.8  6148        81967  1589     89704 

121  2B2C7g1a  Ghazipur  ECD21  3  15  3  27  81  2191.2  7734        103117  1999     112850 

122  2B2C7g1a  Ghazipur  ECD16  3  15  3  27  67  1807.8  6381        85077  1649     93107 

123  2B2C7g1a  Ghazipur  ECD25  3  15  3  27  88  2374.1  8379        111726  2166     122271 

124  2B2C7g1a  Ghazipur  ECD13  3  15  3  27  51  1374.4  4851        64678  1254     70783 

125  2B2C7g1a  Ghazipur  ECD22  3  15  3  27  60  1630.4  5754        76726  1487     83968 

126  2B2C7g1a  Ghazipur  ECD27  3  15  3  27  65  1756.2  6199        82648  1602     90449 

127  2B2C7g1a  Ghazipur  ECD29  3  15  3  27  85  2300.7  8120        108273  2099     118492 

128  2B2C7g1a  Ghazipur  ECD19  3  15  3  27  81  2180.1  7695        102596  1989     112280 

129  2B2C7g1a  Ghazipur  ECD17  3  15  3  27  75  2032.2  7173        95637  1854     104663 

130  2B2C7g1a  Ghazipur  ECD15  3  15  3  27  55  1487.4  5250        69998  1357     76604 

131  2B2C7g1a  Ghazipur  ECD14  3  15  3  27  91  2447.9  8640        115199  2233     126072 

132  2B2C7g1a  Ghazipur  ECD24  3  15  3  27  60  1618.8  5714        76182  1477     83373 

133  2B2C7g1a  Ghazipur  MB09  0.6  3.6  1  2.1  336  705.8  1604        21385  1931     24919 

134   2B2C7g1b  Ghazipur  MB89  0.6  3.6  1  2.1  374  785.5  1785        23800  2149     27734 

135   2B2C7g1b  Ghazipur  MB90  0.6  3.6  1  2.1  748  1570.4  3569        47584  4296     55449 

136   2B2C7g1b  Ghazipur  MB91  0.6  3.6  1  2.1  222  465.9  1059        14117  1275     16451 

137   2B2C7g1b  Ghazipur  MB92  0.6  3.6  1  2.1  158  331.6  754        10047  907     11708 

138  2B2C7g1a  Ghazipur  MB01  0.6  3.6  1  2.1  597  1253.1  2848        37968  3428     44244 

139  2B2C7g1a  Ghazipur  MB02  0.6  3.6  1  2.1  237  497.6  1131        15077  1361     17570 

140  2B2C7g1a  Ghazipur  MB03  0.6  3.6  1  2.1  448  940.3  2137        28490  2572     33199 

141  2B2C7g1a  Ghazipur  MB04  0.6  3.6  1  2.1  260  547  1243        16575  1497     19315 

142  2B2C7g1a  Ghazipur  MB05  0.6  3.6  1  2.1  589  1237.3  2812        37490  3385     43687 

143  2B2C7g1a  Ghazipur  MB06  0.6  3.6  1  2.1  691  1450.9  3297        43962  3969     51228 

144  2B2C7g1a  Ghazipur  MB13  0.6  3.6  1  2.1  144  301.7  686        9141  825     10652 

145  2B2C7g1a  Ghazipur  MB08  0.6  3.6  1  2.1  350  735.5  1671        22286  2012     25969 

146  2B2C7g1a  Ghazipur  MB21  0.6  3.6  1  2.1  140  294.4  669        8922  806     10396 

147  2B2C7g1a  Ghazipur  MB10  0.6  3.6  1  2.1  1239  2601.9  5913        78837  7118     91867 

148  2B2C7g1a  Ghazipur  MB11  0.6  3.6  1  2.1  216  453.5  1031        13742  1241     16013 

149  2B2C7g1a  Ghazipur  MB12  0.6  3.6  1  2.1  280  588.9  1338        17843  1611     20792 

150  2B2C7g1a  Ghazipur  MB14  0.6  3.6  1  2.1  198  416.8  947        12630  1140     14717 

Page 167: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

18

151  2B2C7g1a  Ghazipur  MB15  0.6  3.6  1  2.1  314  659.8  1499        19993  1805     23297 

152  2B2C7g1a  Ghazipur  MB16  0.6  3.6  1  2.1  225  472.8  1074        14326  1293     16693 

153  2B2C7g1a  Ghazipur  MB17  0.6  3.6  1  2.1  219  460.6  1047        13956  1260     16264 

154  2B2C7g1a  Ghazipur  MB18  0.6  3.6  1  2.1  279  585.1  1330        17728  1601     20658 

155  2B2C7g1a  Ghazipur  MB19  0.6  3.6  1  2.1  309  648.6  1474        19652  1774     22900 

156  2B2C7g1a  Ghazipur  MB20  0.6  3.6  1  2.1  498  1045.6  2376        31682  2860     36918 

157  2B2C7g1a  Ghazipur  MB07  0.6  3.6  1  2.1  446  936.3  2128        28371  2562     33060 

158  2B2C7g1a  Ghazipur  MB63  0.6  3.6  1  2.1  517  1084.9  2465        32871  2968     38304 

159  2B2C7g1a  Ghazipur  MB56  0.6  3.6  1  2.1  265  556.8  1265        16872  1523     19660 

160   2B2C7g1b  Ghazipur  MB94  0.6  3.6  1  2.1  485  1018.2  2314        30853  2786     35952 

161   2B2C7g1b  Ghazipur  MB93  0.6  3.6  1  2.1  176  370.5  842        11227  1014     13082 

162  2B2C7g1a  Ghazipur  MB68  0.6  3.6  1  2.1  394  826.8  1879        25053  2262     29194 

163  2B2C7g1a  Ghazipur  MB67  0.6  3.6  1  2.1  526  1103.7  2508        33442  3019     38969 

164  2B2C7g1a  Ghazipur  MB66  0.6  3.6  1  2.1  261  549.1  1248        16639  1502     19389 

165   2B2C7g1b  Ghazipur  MB96  0.6  3.6  1  2.1  407  855.6  1944        25925  2341     30210 

166  2B2C7g1a  Ghazipur  MB64  0.6  3.6  1  2.1  268  563.6  1281        17078  1542     19901 

167   2B2C7g1b  Ghazipur  MB97  0.6  3.6  1  2.1  206  431.8  981        13083  1181     15246 

168  2B2C7g1a  Ghazipur  MB62  0.6  3.6  1  2.1  742  1558.9  3543        47235  4265     55042 

169  2B2C7g1a  Ghazipur  MB61  0.6  3.6  1  2.1  748  1570.8  3570        47594  4297     55461 

170  2B2C7g1a  Ghazipur  MB60  0.6  3.6  1  2.1  996  2090.9  4752        63353  5720     73825 

171  2B2C7g1a  Ghazipur  MB59  0.6  3.6  1  2.1  263  552.9  1256        16751  1512     19520 

172  2B2C7g1a  Ghazipur  MB58  0.6  3.6  1  2.1  419  880  2000        26665  2408     31072 

173  2B2C7g1a  Ghazipur  MB35  0.6  3.6  1  2.1  336  705  1602        21362  1929     24892 

174  2B2C7g1a  Ghazipur  MB65  0.6  3.6  1  2.1  619  1299.6  2953        39379  3555     45887 

175   2B2C7g1b  Ghazipur  MB104  0.6  3.6  1  2.1  514  1078.6  2451        32681  2951     38082 

176   2B2C7g1b  Ghazipur  MB112  0.6  3.6  1  2.1  239  502.2  1141        15217  1374     17732 

177   2B2C7g1b  Ghazipur  MB111  0.6  3.6  1  2.1  177  370.9  843        11239  1015     13097 

178   2B2C7g1b  Ghazipur  MB110  0.6  3.6  1  2.1  111  232.5  528        7046  636     8210 

179   2B2C7g1b  Ghazipur  MB109  0.6  3.6  1  2.1  124  260.9  593        7904  714     9211 

180   2B2C7g1b  Ghazipur  MB108  0.6  3.6  1  2.1  591  1242  2822        37633  3398     43852 

181   2B2C7g1b  Ghazipur  MB107  0.6  3.6  1  2.1  701  1473  3347        44631  4030     52008 

182   2B2C7g1b  Ghazipur  MB95  0.6  3.6  1  2.1  373  784.1  1782        23759  2145     27686 

183   2B2C7g1b  Ghazipur  MB105  0.6  3.6  1  2.1  203  426.8  970        12933  1168     15071 

184  2B2C7g1a  Ghazipur  MB55  0.6  3.6  1  2.1  452  949.2  2157        28762  2597     33516 

185   2B2C7g1b  Ghazipur  MB103  0.6  3.6  1  2.1  267  560.6  1274        16986  1534     19794 

186   2B2C7g1b  Ghazipur  MB102  0.6  3.6  1  2.1  221  464.9  1056        14085  1272     16413 

187   2B2C7g1b  Ghazipur  MB101  0.6  3.6  1  2.1  284  596.2  1355        18064  1631     21050 

188   2B2C7g1b  Ghazipur  MB100  0.6  3.6  1  2.1  585  1229.3  2793        37246  3363     43402 

189   2B2C7g1b  Ghazipur  MB99  0.6  3.6  1  2.1  426  894.5  2033        27105  2447     31585 

190   2B2C7g1b  Ghazipur  MB98  0.6  3.6  1  2.1  134  281.4  639        8525  770     9934 

Page 168: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

19

191   2B2C7g1b  Ghazipur  MB106  0.6  3.6  1  2.1  327  687.6  1563        20834  1881     24278 

192  2B2C7g1a  Ghazipur  MB29  0.6  3.6  1  2.1  210  441.7  1004        13385  1208     15597 

193  2B2C7g1a  Ghazipur  MB57  0.6  3.6  1  2.1  616  1293.8  2940        39202  3539     45682 

194   2B2C7g1b  Ghazipur  MB113  0.6  3.6  1  2.1  364  765.1  1739        23182  2093     27014 

195  2B2C7g1a  Ghazipur  MB36  0.6  3.6  1  2.1  430  902  2050        27331  2468     31849 

196  2B2C7g1a  Ghazipur  MB34  0.6  3.6  1  2.1  892  1874  4259        56781  5127     66167 

197  2B2C7g1a  Ghazipur  MB33  0.6  3.6  1  2.1  642  1348.9  3065        40873  3690     47628 

198  2B2C7g1a  Ghazipur  MB32  0.6  3.6  1  2.1  216  453.5  1030        13740  1241     16010 

199  2B2C7g1a  Ghazipur  MB38  0.6  3.6  1  2.1  487  1021.9  2322        30964  2796     36082 

200  2B2C7g1a  Ghazipur  MB30  0.6  3.6  1  2.1  268  563.5  1281        17075  1542     19898 

201  2B2C7g1a  Ghazipur  MB39  0.6  3.6  1  2.1  975  2047.8  4654        62048  5602     72304 

202  2B2C7g1a  Ghazipur  MB28  0.6  3.6  1  2.1  289  607.8  1381        18415  1663     21459 

203  2B2C7g1a  Ghazipur  MB27  0.6  3.6  1  2.1  654  1372.7  3119        41593  3755     48468 

204  2B2C7g1a  Ghazipur  MB26  0.6  3.6  1  2.1  456  958.4  2178        29038  2622     33838 

205  2B2C7g1a  Ghazipur  MB25  0.6  3.6  1  2.1  126  264  600        8000  722     9322 

206  2B2C7g1a  Ghazipur  MB24  0.6  3.6  1  2.1  128  267.8  609        8115  733     9456 

207  2B2C7g1a  Ghazipur  MB23  0.6  3.6  1  2.1  430  902.5  2051        27345  2469     31865 

208  2B2C7g1a  Ghazipur  MB31  0.6  3.6  1  2.1  554  1163.6  2644        35258  3183     41085 

209  2B2C7g1a  Ghazipur  MB46  0.6  3.6  1  2.1  284  596.8  1356        18084  1633     21073 

210  2B2C7g1a  Ghazipur  MB54  0.6  3.6  1  2.1  455  956.5  2174        28981  2617     33772 

211  2B2C7g1a  Ghazipur  MB53  0.6  3.6  1  2.1  570  1197  2720        36268  3275     42263 

212  2B2C7g1a  Ghazipur  MB52  0.6  3.6  1  2.1  136  286.1  650        8668  783     10101 

213  2B2C7g1a  Ghazipur  MB51  0.6  3.6  1  2.1  272  571.2  1298        17308  1563     20169 

214  2B2C7g1a  Ghazipur  MB50  0.6  3.6  1  2.1  652  1368.6  3110        41469  3744     48323 

215  2B2C7g1a  Ghazipur  MB49  0.6  3.6  1  2.1  206  433  984        13119  1184     15287 

216  2B2C7g1a  Ghazipur  MB37  0.6  3.6  1  2.1  487  1022.1  2323        30971  2796     36090 

217  2B2C7g1a  Ghazipur  MB47  0.6  3.6  1  2.1  146  306.3  696        9281  838     10815 

218  2B2C7g1a  Ghazipur  MB22  0.6  3.6  1  2.1  254  533.5  1212        16164  1459     18836 

219  2B2C7g1a  Ghazipur  MB45  0.6  3.6  1  2.1  192  403.2  916        12218  1103     14237 

220  2B2C7g1a  Ghazipur  MB44  0.6  3.6  1  2.1  663  1393.2  3166        42215  3811     49192 

221  2B2C7g1a  Ghazipur  MB43  0.6  3.6  1  2.1  200  420.6  956        12745  1151     14852 

222  2B2C7g1a  Ghazipur  MB42  0.6  3.6  1  2.1  531  1115.6  2535        33804  3052     39391 

223  2B2C7g1a  Ghazipur  MB41  0.6  3.6  1  2.1  367  770.3  1750        23340  2107     27197 

224  2B2C7g1a  Ghazipur  MB40  0.6  3.6  1  2.1  416  874.1  1986        26485  2391     30862 

225  2B2C7g1a  Ghazipur  MB48  0.6  3.6  1  2.1  230  483.2  1098        14640  1322     17060 

Total                       67787  161973.6  445510        5940122  373307  0  6758935 

Details of Water Resources                                        

Total                       0  0  0  0     0  0  0  0 

Details of Afforestation and Agro forestry                                        

226  2B2C7g1a  Ghazipur  AFF03              1261                       6060 

Page 169: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

20

227  2B2C7g1a  Ghazipur  AFF02              1269                       6090 

228  2B2C7g1a  Ghazipur  AFF01              4822                       23160 

Total                                               35310 

Grand Total                                         6794245 

Name of Gram Panchayat : Hameed Nagar 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Hameed Nagar  CB157  0.45  2.25  0.6  0.81  139  112.6  256        3410  513     4179 

2   2B2C7g1b  Hameed Nagar  CB167  0.45  2.25  0.6  0.81  145  117.1  266        3547  533     4346 

3   2B2C7g1b  Hameed Nagar  CB147  0.45  2.25  0.6  0.81  332  269.2  612        8156  1226     9994 

4   2B2C7g1b  Hameed Nagar  CB165  0.45  2.25  0.6  0.81  403  326.2  741        9883  1486     12110 

5   2B2C7g1b  Hameed Nagar  CB164  0.45  2.25  0.6  0.81  344  278.4  633        8434  1268     10336 

6   2B2C7g1b  Hameed Nagar  CB163  0.45  2.25  0.6  0.81  325  263.2  598        7976  1199     9774 

7   2B2C7g1b  Hameed Nagar  CB162  0.45  2.25  0.6  0.81  402  325.7  740        9870  1484     12094 

8   2B2C7g1b  Hameed Nagar  CB161  0.45  2.25  0.6  0.81  333  269.9  613        8177  1229     10019 

9   2B2C7g1b  Hameed Nagar  CB160  0.45  2.25  0.6  0.81  137  110.6  251        3351  504     4106 

10   2B2C7g1b  Hameed Nagar  CB169  0.45  2.25  0.6  0.81  167  135.1  307        4092  615     5014 

11   2B2C7g1b  Hameed Nagar  CB158  0.45  2.25  0.6  0.81  138  111.7  254        3385  509     4148 

12   2B2C7g1b  Hameed Nagar  CB168  0.45  2.25  0.6  0.81  356  288.7  656        8748  1315     10719 

13   2B2C7g1b  Hameed Nagar  CB156  0.45  2.25  0.6  0.81  207  167.9  382        5088  765     6235 

14   2B2C7g1b  Hameed Nagar  CB155  0.45  2.25  0.6  0.81  117  94.5  215        2865  431     3510 

15   2B2C7g1b  Hameed Nagar  CB154  0.45  2.25  0.6  0.81  160  129.4  294        3919  589     4803 

16   2B2C7g1b  Hameed Nagar  CB153  0.45  2.25  0.6  0.81  101  82  186        2485  374     3045 

17   2B2C7g1b  Hameed Nagar  CB152  0.45  2.25  0.6  0.81  293  237.7  540        7201  1083     8824 

18   2B2C7g1b  Hameed Nagar  CB151  0.45  2.25  0.6  0.81  1053  853  1938        25846  3886     31669 

19   2B2C7g1b  Hameed Nagar  CB150  0.45  2.25  0.6  0.81  236  191  434        5787  870     7091 

20   2B2C7g1b  Hameed Nagar  CB149  0.45  2.25  0.6  0.81  240  194.2  441        5884  885     7209 

21   2B2C7g1b  Hameed Nagar  CB148  0.45  2.25  0.6  0.81  121  98  223        2968  446     3637 

22   2B2C7g1b  Hameed Nagar  CB159  0.45  2.25  0.6  0.81  135  109.4  249        3314  498     4061 

23   2B2C7g1b  Hameed Nagar  CB181  0.45  2.25  0.6  0.81  256  207.7  472        6294  946     7712 

24   2B2C7g1b  Hameed Nagar  CB187  0.45  2.25  0.6  0.81  153  123.7  281        3749  564     4593 

25   2B2C7g1b  Hameed Nagar  CB186  0.45  2.25  0.6  0.81  133  107.8  245        3266  491     4003 

26   2B2C7g1b  Hameed Nagar  CB185  0.45  2.25  0.6  0.81  283  229.2  521        6946  1044     8511 

27   2B2C7g1b  Hameed Nagar  CB184  0.45  2.25  0.6  0.81  135  109.2  248        3309  498     4055 

28   2B2C7g1b  Hameed Nagar  CB166  0.45  2.25  0.6  0.81  268  216.9  493        6572  988     8053 

29   2B2C7g1b  Hameed Nagar  CB182  0.45  2.25  0.6  0.81  398  322  732        9757  1467     11956 

Page 170: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

21

30   2B2C7g1b  Hameed Nagar  CB170  0.45  2.25  0.6  0.81  391  316.3  719        9584  1441     11744 

31   2B2C7g1b  Hameed Nagar  CB180  0.45  2.25  0.6  0.81  82  66.5  151        2014  303     2468 

32   2B2C7g1b  Hameed Nagar  CB179  0.45  2.25  0.6  0.81  90  73.2  166        2217  333     2716 

33   2B2C7g1b  Hameed Nagar  CB173  0.45  2.25  0.6  0.81  213  172.7  393        5233  787     6413 

34   2B2C7g1b  Hameed Nagar  CB171  0.45  2.25  0.6  0.81  289  233.9  532        7088  1066     8685 

35   2B2C7g1b  Hameed Nagar  CB183  0.45  2.25  0.6  0.81  261  211.5  481        6409  964     7854 

36   2B2C7g1b  Hameed Nagar  CB172  0.45  2.25  0.6  0.81  254  205.7  467        6232  937     7636 

37   2B2C7g1b  Hameed Nagar  CB178  0.45  2.25  0.6  0.81  116  94.1  214        2851  429     3493 

38   2B2C7g1b  Hameed Nagar  CB174  0.45  2.25  0.6  0.81  204  164.9  375        4996  751     6122 

39   2B2C7g1b  Hameed Nagar  CB175  0.45  2.25  0.6  0.81  120  97.6  222        2957  445     3623 

40   2B2C7g1b  Hameed Nagar  CB176  0.45  2.25  0.6  0.81  149  120.4  274        3648  548     4471 

41   2B2C7g1b  Hameed Nagar  CB177  0.45  2.25  0.6  0.81  133  107.6  245        3261  490     3996 

42   2B2C7g1b  Hameed Nagar  MB181  0.6  3.6  1  2.1  319  670.7  1524        20322  1835     23681 

43   2B2C7g1b  Hameed Nagar  MB179  0.6  3.6  1  2.1  419  880.5  2001        26678  2409     31088 

44   2B2C7g1b  Hameed Nagar  MB180  0.6  3.6  1  2.1  757  1589.3  3612        48157  4348     56117 

45   2B2C7g1b  Hameed Nagar  MB185  0.6  3.6  1  2.1  421  883.9  2009        26783  2418     31210 

46   2B2C7g1b  Hameed Nagar  MB183  0.6  3.6  1  2.1  488  1023.8  2327        31022  2801     36150 

47   2B2C7g1b  Hameed Nagar  MB184  0.6  3.6  1  2.1  89  186.1  423        5639  509     6571 

48   2B2C7g1b  Hameed Nagar  MB178  0.6  3.6  1  2.1  621  1304.7  2965        39532  3569     46066 

49   2B2C7g1b  Hameed Nagar  MB177  0.6  3.6  1  2.1  510  1070.3  2432        32431  2928     37791 

50   2B2C7g1b  Hameed Nagar  MB182  0.6  3.6  1  2.1  555  1164.8  2647        35295  3187     41129 

Total                       13991  16720.5  38000        506628  60204  0  604830 

Details of Water Resources  PLength  PWidth  PDepth                               

51   2B2C7g1b  Hameed Nagar  PND07                 7234.7  0  2  HMP  386086     80000  495042 

52   2B2C7g1b  Hameed Nagar  PND06                 7665.6  0  2  HMP  409103     80000  519786 

Total                       0  14900.3  0  4     795189  0  160000  1014828 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1619658 

Name of Gram Panchayat : Ichaulia 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2d  Ichaulia  CB41  0.45  2.25  0.6  0.81  183  148.3  337        4492  675     5505 

2  2B2C7d2d  Ichaulia  CB48  0.45  2.25  0.6  0.81  202  164  373        4968  747     6088 

3  2B2C7d2d  Ichaulia  CB47  0.45  2.25  0.6  0.81  574  464.8  1056        14084  2118     17258 

4  2B2C7d2d  Ichaulia  CB46  0.45  2.25  0.6  0.81  148  120  273        3635  546     4454 

Page 171: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

22

5  2B2C7d2d  Ichaulia  CB45  0.45  2.25  0.6  0.81  144  117  266        3544  533     4343 

6  2B2C7d2d  Ichaulia  CB44  0.45  2.25  0.6  0.81  146  118.3  269        3584  539     4392 

7  2B2C7d2d  Ichaulia  CB67  0.45  2.25  0.6  0.81  175  141.4  321        4285  644     5250 

8  2B2C7d2d  Ichaulia  CB42  0.45  2.25  0.6  0.81  184  148.7  338        4506  677     5522 

9  2B2C7d2d  Ichaulia  CB51  0.45  2.25  0.6  0.81  108  87.8  200        2661  400     3261 

10  2B2C7d2d  Ichaulia  CB40  0.45  2.25  0.6  0.81  232  187.9  427        5694  856     6977 

11  2B2C7d2d  Ichaulia  CB39  0.45  2.25  0.6  0.81  361  292.5  665        8862  1332     10859 

12  2B2C7d2d  Ichaulia  CB38  0.45  2.25  0.6  0.81  227  183.6  417        5564  837     6817 

13  2B2C7d2d  Ichaulia  CB37  0.45  2.25  0.6  0.81  444  360  818        10908  1640     13365 

14  2B2C7d2d  Ichaulia  CB36  0.45  2.25  0.6  0.81  297  240.3  546        7280  1095     8920 

15  2B2C7d2d  Ichaulia  CB35  0.45  2.25  0.6  0.81  171  138.8  315        4205  632     5152 

16  2B2C7d2d  Ichaulia  CB43  0.45  2.25  0.6  0.81  191  154.4  351        4679  703     5733 

17  2B2C7d2d  Ichaulia  CB57  0.45  2.25  0.6  0.81  214  173.7  395        5264  791     6450 

18  2B2C7d2d  Ichaulia  CB66  0.45  2.25  0.6  0.81  226  183.1  416        5549  834     6799 

19  2B2C7d2d  Ichaulia  CB65  0.45  2.25  0.6  0.81  151  122.5  278        3711  558     4546 

20  2B2C7d2d  Ichaulia  CB64  0.45  2.25  0.6  0.81  140  113.1  257        3427  515     4200 

21  2B2C7d2d  Pyrepur Saraiya  CB95  0.45  2.25  0.6  0.81  237  192  436        5819  875     7129 

22  2B2C7d2d  Ichaulia  CB62  0.45  2.25  0.6  0.81  233  188.6  429        5715  859     7004 

23  2B2C7d2d  Ichaulia  CB60  0.45  2.25  0.6  0.81  479  387.6  881        11744  1766     14391 

24  2B2C7d2d  Ichaulia  CB49  0.45  2.25  0.6  0.81  107  86.3  196        2615  393     3204 

25  2B2C7d2d  Ichaulia  CB58  0.45  2.25  0.6  0.81  202  163.2  371        4946  744     6061 

26  2B2C7d2d  Ichaulia  CB50  0.45  2.25  0.6  0.81  111  90.2  205        2734  411     3350 

27  2B2C7d2d  Ichaulia  CB56  0.45  2.25  0.6  0.81  119  96.2  219        2914  438     3571 

28  2B2C7d2d  Ichaulia  CB55  0.45  2.25  0.6  0.81  465  377  857        11424  1718     13998 

29  2B2C7d2d  Ichaulia  CB54  0.45  2.25  0.6  0.81  230  186  423        5636  847     6906 

30  2B2C7d2d  Ichaulia  CB53  0.45  2.25  0.6  0.81  264  213.6  485        6471  973     7929 

31  2B2C7d2d  Ichaulia  CB52  0.45  2.25  0.6  0.81  179  145.1  330        4397  661     5388 

32  2B2C7d2d  Ichaulia  CB32  0.45  2.25  0.6  0.81  171  138.5  315        4196  631     5141 

33  2B2C7d2d  Ichaulia  CB59  0.45  2.25  0.6  0.81  201  162.7  370        4930  741     6041 

34  2B2C7d2d  Ichaulia  CB07  0.45  2.25  0.6  0.81  95  76.7  174        2324  349     2848 

35  2B2C7d2d  Ichaulia  CB34  0.45  2.25  0.6  0.81  167  135.3  307        4098  616     5021 

36  2B2C7d2d  Ichaulia  CB14  0.45  2.25  0.6  0.81  169  137.3  312        4160  625     5097 

37  2B2C7d2d  Ichaulia  CB13  0.45  2.25  0.6  0.81  187  151.3  344        4585  689     5619 

38  2B2C7d2d  Ichaulia  CB12  0.45  2.25  0.6  0.81  168  136.4  310        4133  621     5065 

39  2B2C7d2d  Ichaulia  CB11  0.45  2.25  0.6  0.81  159  128.8  293        3903  587     4783 

40  2B2C7d2d  Ichaulia  CB10  0.45  2.25  0.6  0.81  138  111.7  254        3385  509     4148 

41  2B2C7d2d  Ichaulia  CB16  0.45  2.25  0.6  0.81  140  113.5  258        3440  517     4215 

42  2B2C7d2d  Ichaulia  CB08  0.45  2.25  0.6  0.81  91  73.5  167        2227  335     2729 

43  2B2C7d2d  Ichaulia  CB17  0.45  2.25  0.6  0.81  125  101  229        3060  460     3749 

44  2B2C7d2d  Ichaulia  CB06  0.45  2.25  0.6  0.81  162  131.3  298        3980  598     4876 

Page 172: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

23

45  2B2C7d2d  Ichaulia  CB05  0.45  2.25  0.6  0.81  85  68.9  156        2086  314     2556 

46  2B2C7d2d  Ichaulia  CB04  0.45  2.25  0.6  0.81  395  320.1  727        9699  1458     11885 

47  2B2C7d2d  Ichaulia  CB03  0.45  2.25  0.6  0.81  397  321.6  731        9744  1465     11941 

48  2B2C7d2d  Ichaulia  CB02  0.45  2.25  0.6  0.81  308  249.9  568        7571  1138     9277 

49  2B2C7d2d  Ichaulia  CB01  0.45  2.25  0.6  0.81  269  217.8  495        6598  992     8085 

50  2B2C7d2d  Ichaulia  CB09  0.45  2.25  0.6  0.81  118  95.7  217        2899  436     3552 

51  2B2C7d2d  Ichaulia  CB24  0.45  2.25  0.6  0.81  123  99.9  227        3027  455     3709 

52  2B2C7d2d  Ichaulia  CB63  0.45  2.25  0.6  0.81  120  97.4  221        2952  444     3617 

53  2B2C7d2d  Ichaulia  CB31  0.45  2.25  0.6  0.81  112  90.9  207        2754  414     3375 

54  2B2C7d2d  Ichaulia  CB30  0.45  2.25  0.6  0.81  105  85.2  194        2581  388     3163 

55  2B2C7d2d  Ichaulia  CB29  0.45  2.25  0.6  0.81  108  87.8  200        2661  400     3261 

56  2B2C7d2d  Ichaulia  CB28  0.45  2.25  0.6  0.81  108  87.4  199        2649  398     3246 

57  2B2C7d2d  Ichaulia  CB27  0.45  2.25  0.6  0.81  112  90.9  206        2753  414     3373 

58  2B2C7d2d  Ichaulia  CB15  0.45  2.25  0.6  0.81  168  136  309        4120  619     5049 

59  2B2C7d2d  Ichaulia  CB25  0.45  2.25  0.6  0.81  130  105.4  239        3193  480     3912 

60  2B2C7d2d  Ichaulia  CB33  0.45  2.25  0.6  0.81  166  134.8  306        4086  614     5006 

61  2B2C7d2d  Ichaulia  CB23  0.45  2.25  0.6  0.81  236  190.8  434        5781  869     7084 

62  2B2C7d2d  Ichaulia  CB22  0.45  2.25  0.6  0.81  199  160.8  365        4872  733     5970 

63  2B2C7d2d  Ichaulia  CB21  0.45  2.25  0.6  0.81  192  155.5  353        4712  708     5773 

64  2B2C7d2d  Ichaulia  CB20  0.45  2.25  0.6  0.81  167  135.4  308        4104  617     5029 

65  2B2C7d2d  Ichaulia  CB19  0.45  2.25  0.6  0.81  210  169.8  386        5145  774     6305 

66  2B2C7d2d  Ichaulia  CB18  0.45  2.25  0.6  0.81  301  243.5  553        7379  1109     9041 

67  2B2C7d2d  Ichaulia  CB26  0.45  2.25  0.6  0.81  117  94.6  215        2867  431     3514 

68  2B2C7d2d  Pyrepur Saraiya  CB82  0.45  2.25  0.6  0.81  176  142.8  324        4325  650     5300 

69  2B2C7d2d  Ichaulia  CB61  0.45  2.25  0.6  0.81  177  143.5  326        4349  654     5328 

70  2B2C7d2d  Pyrepur Saraiya  CB70  0.45  2.25  0.6  0.81  171  138.7  315        4202  632     5149 

71  2B2C7d2d  Pyrepur Saraiya  CB71  0.45  2.25  0.6  0.81  288  233.4  530        7073  1063     8666 

72  2B2C7d2d  Pyrepur Saraiya  CB72  0.45  2.25  0.6  0.81  171  138.8  315        4206  632     5153 

73  2B2C7d2d  Pyrepur Saraiya  CB73  0.45  2.25  0.6  0.81  183  148.3  337        4495  676     5507 

74  2B2C7d2d  Pyrepur Saraiya  CB74  0.45  2.25  0.6  0.81  183  147.8  336        4479  673     5489 

75  2B2C7d2d  Pyrepur Saraiya  CB75  0.45  2.25  0.6  0.81  177  143.7  327        4355  655     5337 

76  2B2C7d2d  Pyrepur Saraiya  CB76  0.45  2.25  0.6  0.81  112  90.8  206        2752  414     3372 

77  2B2C7d2d  Pyrepur Saraiya  CB77  0.45  2.25  0.6  0.81  174  140.7  320        4262  641     5223 

78  2B2C7d2d  Pyrepur Saraiya  CB78  0.45  2.25  0.6  0.81  122  98.7  224        2990  450     3664 

79  2B2C7d2d  Pyrepur Saraiya  CB79  0.45  2.25  0.6  0.81  162  131.6  299        3988  600     4887 

80  2B2C7d2d  Pyrepur Saraiya  CB69  0.45  2.25  0.6  0.81  231  187.5  426        5680  854     6960 

81  2B2C7d2d  Pyrepur Saraiya  CB81  0.45  2.25  0.6  0.81  328  265.6  604        8047  1210     9861 

82  2B2C7d2d  Pyrepur Saraiya  CB68  0.45  2.25  0.6  0.81  189  153.1  348        4639  697     5684 

83  2B2C7d2d  Pyrepur Saraiya  CB83  0.45  2.25  0.6  0.81  177  143.5  326        4347  654     5327 

84  2B2C7d2d  Pyrepur Saraiya  CB84  0.45  2.25  0.6  0.81  341  275.9  627        8360  1257     10244 

Page 173: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

24

85  2B2C7d2d  Pyrepur Saraiya  CB85  0.45  2.25  0.6  0.81  448  363.2  825        11006  1655     13486 

86  2B2C7d2d  Pyrepur Saraiya  CB86  0.45  2.25  0.6  0.81  378  306.5  696        9286  1396     11379 

87  2B2C7d2d  Pyrepur Saraiya  CB87  0.45  2.25  0.6  0.81  276  223.3  507        6766  1017     8290 

88  2B2C7d2d  Pyrepur Saraiya  CB88  0.45  2.25  0.6  0.81  271  219.4  499        6648  999     8146 

89  2B2C7d2d  Pyrepur Saraiya  CB89  0.45  2.25  0.6  0.81  281  227.2  516        6884  1035     8435 

90  2B2C7d2d  Pyrepur Saraiya  CB90  0.45  2.25  0.6  0.81  264  213.9  486        6481  974     7942 

91  2B2C7d2d  Pyrepur Saraiya  CB91  0.45  2.25  0.6  0.81  209  169.5  385        5135  772     6292 

92  2B2C7d2d  Pyrepur Saraiya  CB92  0.45  2.25  0.6  0.81  196  158.9  361        4816  724     5901 

93  2B2C7d2d  Pyrepur Saraiya  CB93  0.45  2.25  0.6  0.81  211  170.8  388        5176  778     6342 

94  2B2C7d2d  Pyrepur Saraiya  CB94  0.45  2.25  0.6  0.81  253  205.3  467        6220  935     7623 

95  2B2C7d2d  Pyrepur Saraiya  CB80  0.45  2.25  0.6  0.81  350  283.8  645        8601  1293     10539 

96  2B2C7d2d  Ichaulia  CRB01  4.5  6  0.75  3.9375  584  2297.5  5221        69616  11921     86758 

97  2B2C7d2d  Pyrepur Saraiya  CRB03  4.5  6  0.75  3.9375  420  1653.3  3757        50095  8578     62430 

98  2B2C7d2d  Pyrepur Saraiya  CRB02  4.5  6  0.75  3.9375  548  2158.3  4905        65396  11198     81500 

99  2B2C7d2d  Ichaulia  MB01  0.6  3.6  1  2.1  176  370.2  841        11217  1013     13071 

100  2B2C7d2d  Ichaulia  MB11  0.6  3.6  1  2.1  323  678.6  1542        20560  1856     23959 

101  2B2C7d2d  Ichaulia  MB12  0.6  3.6  1  2.1  501  1051.1  2389        31850  2876     37114 

102  2B2C7d2d  Ichaulia  MB13  0.6  3.6  1  2.1  355  744.7  1692        22563  2037     26292 

103  2B2C7d2d  Pyrepur Saraiya  MB25  0.6  3.6  1  2.1  174  366.2  832        11097  1002     12931 

104  2B2C7d2d  Pyrepur Saraiya  MB24  0.6  3.6  1  2.1  504  1059.1  2407        32090  2897     37395 

105  2B2C7d2d  Pyrepur Saraiya  MB42  0.6  3.6  1  2.1  734  1541.7  3503        46713  4218     54434 

106  2B2C7d2d  Pyrepur Saraiya  MB43  0.6  3.6  1  2.1  363  761.4  1730        23071  2083     26884 

107  2B2C7d2d  Pyrepur Saraiya  MB44  0.6  3.6  1  2.1  343  719.9  1636        21814  1970     25420 

108  2B2C7d2d  Pyrepur Saraiya  MB45  0.6  3.6  1  2.1  350  734.3  1669        22248  2009     25926 

109  2B2C7d2d  Pyrepur Saraiya  MB46  0.6  3.6  1  2.1  260  546.2  1241        16551  1494     19286 

110  2B2C7d2d  Pyrepur Saraiya  MB22  0.6  3.6  1  2.1  999  2098  4768        63570  5740     74077 

111  2B2C7d2d  Ichaulia  MB08  0.6  3.6  1  2.1  501  1052.3  2391        31885  2879     37155 

112  2B2C7d2d  Pyrepur Saraiya  MB21  0.6  3.6  1  2.1  672  1410.4  3205        42734  3858     49798 

113  2B2C7d2d  Pyrepur Saraiya  MB20  0.6  3.6  1  2.1  493  1035.2  2352        31366  2832     36550 

114  2B2C7d2d  Ichaulia  MB19  0.6  3.6  1  2.1  670  1406.9  3197        42630  3849     49676 

115  2B2C7d2d  Ichaulia  MB18  0.6  3.6  1  2.1  688  1444.7  3283        43776  3952     51011 

116  2B2C7d2d  Ichaulia  MB17  0.6  3.6  1  2.1  741  1557  3538        47176  4259     54974 

117  2B2C7d2d  Ichaulia  MB16  0.6  3.6  1  2.1  783  1644.6  3737        49831  4499     58067 

118  2B2C7d2d  Ichaulia  MB14  0.6  3.6  1  2.1  777  1631.4  3707        49432  4463     57602 

119  2B2C7d2d  Ichaulia  MB04  0.6  3.6  1  2.1  192  402.9  916        12207  1102     14225 

120  2B2C7d2d  Ichaulia  MB03  0.6  3.6  1  2.1  2015  4232.2  9618        128236  11578     149433 

121  2B2C7d2d  Ichaulia  MB02  0.6  3.6  1  2.1  185  387.6  881        11745  1060     13686 

122  2B2C7d2d  Pyrepur Saraiya  MB23  0.6  3.6  1  2.1  931  1954.1  4441        59208  5346     68995 

123  2B2C7d2d  Pyrepur Saraiya  MB31  0.6  3.6  1  2.1  265  556.9  1266        16874  1524     19664 

124  2B2C7d2d  Ichaulia  MB07  0.6  3.6  1  2.1  638  1340.3  3046        40610  3667     47323 

Page 174: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

25

125  2B2C7d2d  Ichaulia  MB06  0.6  3.6  1  2.1  201  421.8  959        12780  1154     14893 

126  2B2C7d2d  Ichaulia  MB05  0.6  3.6  1  2.1  253  531.6  1208        16107  1454     18770 

127  2B2C7d2d  Pyrepur Saraiya  MB33  0.6  3.6  1  2.1  787  1653.6  3758        50103  4524     58384 

128  2B2C7d2d  Pyrepur Saraiya  MB34  0.6  3.6  1  2.1  390  820  1864        24847  2243     28954 

129  2B2C7d2d  Pyrepur Saraiya  MB35  0.6  3.6  1  2.1  282  592.8  1347        17961  1622     20930 

130  2B2C7d2d  Pyrepur Saraiya  MB36  0.6  3.6  1  2.1  349  732.2  1664        22185  2003     25852 

131  2B2C7d2d  Ichaulia  MB10  0.6  3.6  1  2.1  388  814.6  1851        24681  2228     28761 

132  2B2C7d2d  Pyrepur Saraiya  MB32  0.6  3.6  1  2.1  370  776.2  1764        23519  2124     27407 

133  2B2C7d2d  Ichaulia  MB09  0.6  3.6  1  2.1  138  290.6  660        8806  795     10261 

134  2B2C7d2d  Pyrepur Saraiya  MB30  0.6  3.6  1  2.1  259  543.2  1234        16459  1486     19179 

135  2B2C7d2d  Pyrepur Saraiya  MB38  0.6  3.6  1  2.1  308  647.6  1472        19622  1772     22865 

136  2B2C7d2d  Pyrepur Saraiya  MB39  0.6  3.6  1  2.1  334  701  1593        21240  1918     24751 

137  2B2C7d2d  Pyrepur Saraiya  MB40  0.6  3.6  1  2.1  216  453.9  1031        13752  1242     16024 

138  2B2C7d2d  Pyrepur Saraiya  MB41  0.6  3.6  1  2.1  713  1497.5  3403        45375  4097     52875 

139  2B2C7d2d  Pyrepur Saraiya  MB29  0.6  3.6  1  2.1  367  771.3  1753        23370  2110     27233 

140  2B2C7d2d  Pyrepur Saraiya  MB28  0.6  3.6  1  2.1  573  1203  2734        36450  3291     42475 

141  2B2C7d2d  Pyrepur Saraiya  MB37  0.6  3.6  1  2.1  490  1029.6  2340        31198  2817     36355 

142  2B2C7d2d  Ichaulia  MB15  0.6  3.6  1  2.1  820  1722.8  3915        52200  4713     60828 

143  2B2C7d2d  Pyrepur Saraiya  MB26  0.6  3.6  1  2.1  164  343.8  781        10416  940     12137 

144  2B2C7d2d  Pyrepur Saraiya  MB27  0.6  3.6  1  2.1  654  1373.8  3122        41625  3758     48505 

145  2B2C7d2d  Pyrepur Saraiya  PB01  0.6  3.6  1  2.1  472  992  2254        30059  2714     35026 

146  2B2C7d2d  Pyrepur Saraiya  PB02  0.6  3.6  1  2.1  197  413.7  940        12537  1132     14608 

147  2B2C7d2d  Pyrepur Saraiya  PB03  0.6  3.6  1  2.1  500  1049.8  2386        31810  2872     37068 

148  2B2C7d2d  Pyrepur Saraiya  PB04  0.6  3.6  1  2.1  367  770.6  1751        23348  2108     27207 

149  2B2C7d2d  Pyrepur Saraiya  PB06  0.6  3.6  1  2.1  176  370  841        11210  1012     13064 

150  2B2C7d2d  Pyrepur Saraiya  PB05  0.6  3.6  1  2.1  255  535.9  1218        16239  1466     18923 

Total                       46070  73980.2  168116        2241599  246650  0  2656374 

Details of Water Resources  PLength  PWidth  PDepth                               

151  2B2C7d2d  Pyrepur Saraiya  PND03                 1946.5  0  2  HMP  103625     80000  191397 

152  2B2C7d2d  Ichaulia  PND02                 1969.7  0  2  HMP  104877     80000  192743 

153  2B2C7d2d  Ichaulia  PND01                 15590.6  0  2  HMP  832362     80000  974789 

Total                       0  19506.8  0  6     1040864  0  240000  1358929 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         4015303 

   

Page 175: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

26

Name of Gram Panchayat : Mahmoodabad 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Mahmoodabad  CB125  0.45  2.25  0.6  0.81  361  292.8  665        8872  1334     10870 

2   2B2C7g1b  Mahmoodabad  CB133  0.45  2.25  0.6  0.81  506  409.5  931        12408  1865     15204 

3   2B2C7g1b  Mahmoodabad  CB119  0.45  2.25  0.6  0.81  195  157.7  358        4778  718     5854 

4   2B2C7g1b  Mahmoodabad  CB120  0.45  2.25  0.6  0.81  345  279.5  635        8469  1273     10377 

5   2B2C7g1b  Mahmoodabad  CB121  0.45  2.25  0.6  0.81  205  165.8  377        5024  755     6156 

6   2B2C7g1b  Mahmoodabad  CB122  0.45  2.25  0.6  0.81  335  271.6  617        8230  1237     10085 

7   2B2C7g1b  Mahmoodabad  CB117  0.45  2.25  0.6  0.81  351  284.2  646        8611  1295     10552 

8   2B2C7g1b  Mahmoodabad  CB124  0.45  2.25  0.6  0.81  273  220.9  502        6695  1007     8203 

9   2B2C7g1b  Mahmoodabad  CB116  0.45  2.25  0.6  0.81  375  303.4  689        9193  1382     11264 

10   2B2C7g1b  Mahmoodabad  CB126  0.45  2.25  0.6  0.81  230  185.9  422        5633  847     6902 

11   2B2C7g1b  Mahmoodabad  CB127  0.45  2.25  0.6  0.81  331  267.8  609        8114  1220     9943 

12   2B2C7g1b  Mahmoodabad  CB128  0.45  2.25  0.6  0.81  168  136.2  310        4127  621     5058 

13   2B2C7g1b  Mahmoodabad  CB51  0.45  2.25  0.6  0.81  396  320.6  728        9713  1460     11901 

14   2B2C7g1b  Mahmoodabad  CB130  0.45  2.25  0.6  0.81  126  102.2  232        3096  466     3794 

15   2B2C7g1b  Mahmoodabad  CB132  0.45  2.25  0.6  0.81  119  96.6  220        2928  440     3588 

16   2B2C7g1b  Mahmoodabad  CB123  0.45  2.25  0.6  0.81  249  202  459        6120  920     7499 

17   2B2C7g1b  Mahmoodabad  CB59  0.45  2.25  0.6  0.81  142  114.7  261        3475  522     4258 

18   2B2C7g1b  Mahmoodabad  CB52  0.45  2.25  0.6  0.81  91  74.1  168        2244  337     2750 

19   2B2C7g1b  Mahmoodabad  CB53  0.45  2.25  0.6  0.81  123  99.8  227        3025  455     3707 

20   2B2C7g1b  Mahmoodabad  CB54  0.45  2.25  0.6  0.81  373  302.2  687        9158  1377     11222 

21   2B2C7g1b  Mahmoodabad  CB55  0.45  2.25  0.6  0.81  275  222.5  506        6743  1014     8263 

22   2B2C7g1b  Mahmoodabad  CB56  0.45  2.25  0.6  0.81  461  373.4  849        11314  1701     13865 

23   2B2C7g1b  Mahmoodabad  CB118  0.45  2.25  0.6  0.81  185  149.5  340        4531  681     5552 

24   2B2C7g1b  Mahmoodabad  CB58  0.45  2.25  0.6  0.81  174  141.3  321        4283  644     5247 

25   2B2C7g1b  Mahmoodabad  CB131  0.45  2.25  0.6  0.81  116  94  214        2848  428     3490 

26   2B2C7g1b  Mahmoodabad  CB60  0.45  2.25  0.6  0.81  275  222.6  506        6745  1014     8265 

27   2B2C7g1b  Mahmoodabad  CB61  0.45  2.25  0.6  0.81  229  185.6  422        5622  845     6890 

28   2B2C7g1b  Mahmoodabad  CB92  0.45  2.25  0.6  0.81  243  197  448        5968  897     7314 

29   2B2C7g1b  Mahmoodabad  CB113  0.45  2.25  0.6  0.81  120  97.5  222        2955  444     3621 

30   2B2C7g1b  Mahmoodabad  CB114  0.45  2.25  0.6  0.81  120  97.6  222        2957  445     3624 

31   2B2C7g1b  Mahmoodabad  CB115  0.45  2.25  0.6  0.81  308  249.4  567        7557  1136     9260 

32   2B2C7g1b  Mahmoodabad  CB57  0.45  2.25  0.6  0.81  184  149.4  340        4527  681     5547 

33   2B2C7g1b  Mahmoodabad  CB106  0.45  2.25  0.6  0.81  640  518.3  1178        15705  2361     19245 

34   2B2C7g1b  Mahmoodabad  CB98  0.45  2.25  0.6  0.81  262  212.5  483        6438  968     7889 

35   2B2C7g1b  Mahmoodabad  CB99  0.45  2.25  0.6  0.81  207  168  382        5092  766     6239 

36   2B2C7g1b  Mahmoodabad  CB100  0.45  2.25  0.6  0.81  94  75.7  172        2295  345     2812 

Page 176: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

27

37   2B2C7g1b  Mahmoodabad  CB101  0.45  2.25  0.6  0.81  233  188.6  429        5715  859     7003 

38   2B2C7g1b  Mahmoodabad  CB103  0.45  2.25  0.6  0.81  102  82.2  187        2491  375     3053 

39   2B2C7g1b  Mahmoodabad  CB97  0.45  2.25  0.6  0.81  135  109  248        3303  497     4047 

40   2B2C7g1b  Mahmoodabad  CB105  0.45  2.25  0.6  0.81  318  257.3  585        7796  1172     9553 

41   2B2C7g1b  Mahmoodabad  CB102  0.45  2.25  0.6  0.81  266  215.8  490        6539  983     8012 

42   2B2C7g1b  Mahmoodabad  CB107  0.45  2.25  0.6  0.81  373  302.2  687        9157  1377     11221 

43   2B2C7g1b  Mahmoodabad  CB108  0.45  2.25  0.6  0.81  587  475.2  1080        14398  2165     17643 

44   2B2C7g1b  Mahmoodabad  CB109  0.45  2.25  0.6  0.81  124  100.2  228        3037  457     3722 

45   2B2C7g1b  Mahmoodabad  CB110  0.45  2.25  0.6  0.81  180  146.1  332        4426  665     5423 

46   2B2C7g1b  Mahmoodabad  CB111  0.45  2.25  0.6  0.81  190  153.8  349        4659  700     5708 

47   2B2C7g1b  Mahmoodabad  CB112  0.45  2.25  0.6  0.81  542  438.9  997        13297  1999     16293 

48   2B2C7g1b  Mahmoodabad  CB129  0.45  2.25  0.6  0.81  144  116.7  265        3535  531     4332 

49   2B2C7g1b  Mahmoodabad  CB134  0.45  2.25  0.6  0.81  241  195.2  443        5913  889     7245 

50   2B2C7g1b  Mahmoodabad  CB95  0.45  2.25  0.6  0.81  494  400.4  910        12133  1824     14868 

51   2B2C7g1b  Mahmoodabad  CB94  0.45  2.25  0.6  0.81  231  186.9  425        5664  852     6941 

52   2B2C7g1b  Mahmoodabad  CB93  0.45  2.25  0.6  0.81  465  376.8  856        11417  1717     13990 

53   2B2C7g1b  Mahmoodabad  CB138  0.45  2.25  0.6  0.81  225  181.9  413        5513  829     6754 

54   2B2C7g1b  Mahmoodabad  CB137  0.45  2.25  0.6  0.81  262  212.5  483        6437  968     7888 

55   2B2C7g1b  Mahmoodabad  CB136  0.45  2.25  0.6  0.81  176  142.7  324        4324  650     5298 

56   2B2C7g1b  Mahmoodabad  CB135  0.45  2.25  0.6  0.81  168  136.1  309        4123  620     5052 

57   2B2C7g1b  Mahmoodabad  CB104  0.45  2.25  0.6  0.81  156  126.3  287        3827  575     4690 

58   2B2C7g1b  Mahmoodabad  CB96  0.45  2.25  0.6  0.81  84  68.2  155        2067  311     2533 

59   2B2C7g1b  Mahmoodabad  MB141  0.6  3.6  1  2.1  442  927.8  2108        28112  2538     32759 

60   2B2C7g1b  Mahmoodabad  MB140  0.6  3.6  1  2.1  373  784.3  1782        23765  2146     27693 

61   2B2C7g1b  Mahmoodabad  MB136  0.6  3.6  1  2.1  365  766.2  1741        23216  2096     27053 

62   2B2C7g1b  Mahmoodabad  MB137  0.6  3.6  1  2.1  314  659.6  1499        19985  1804     23288 

63   2B2C7g1b  Mahmoodabad  MB138  0.6  3.6  1  2.1  349  732.6  1665        22197  2004     25866 

64   2B2C7g1b  Mahmoodabad  MB133  0.6  3.6  1  2.1  620  1301  2956        39420  3559     45935 

65   2B2C7g1b  Mahmoodabad  MB131  0.6  3.6  1  2.1  779  1635.1  3716        49544  4473     57734 

66   2B2C7g1b  Mahmoodabad  MB127  0.6  3.6  1  2.1  172  362.2  823        10976  991     12790 

67   2B2C7g1b  Mahmoodabad  MB132  0.6  3.6  1  2.1  300  630.8  1433        19112  1726     22271 

68   2B2C7g1b  Mahmoodabad  MB130  0.6  3.6  1  2.1  199  417.1  948        12637  1141     14726 

69   2B2C7g1b  Mahmoodabad  MB142  0.6  3.6  1  2.1  329  691.1  1571        20941  1891     24403 

70   2B2C7g1b  Mahmoodabad  MB122  0.6  3.6  1  2.1  306  642.6  1460        19472  1758     22690 

71   2B2C7g1b  Mahmoodabad  MB123  0.6  3.6  1  2.1  612  1284.2  2918        38913  3513     45344 

72   2B2C7g1b  Mahmoodabad  MB124  0.6  3.6  1  2.1  193  406.2  923        12308  1111     14342 

73   2B2C7g1b  Mahmoodabad  MB126  0.6  3.6  1  2.1  193  405.3  921        12280  1109     14310 

74   2B2C7g1b  Mahmoodabad  MB128  0.6  3.6  1  2.1  73  154.3  351        4674  422     5447 

75   2B2C7g1b  Mahmoodabad  MB129  0.6  3.6  1  2.1  131  275.1  625        8337  753     9714 

76   2B2C7g1b  Mahmoodabad  MB134  0.6  3.6  1  2.1  994  2088.3  4746        63275  5713     73733 

Page 177: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

28

77   2B2C7g1b  Mahmoodabad  MB135  0.6  3.6  1  2.1  319  669.2  1521        20276  1831     23628 

78   2B2C7g1b  Mahmoodabad  MB139  0.6  3.6  1  2.1  310  651.3  1480        19736  1782     22998 

79   2B2C7g1b  Mahmoodabad  MB125  0.6  3.6  1  2.1  542  1138.9  2588        34509  3116     40212 

Total                       22798  28678  65172        868949  100393  0  1034515 

Details of Water Resources  PLength  PWidth  PDepth                               

80   2B2C7g1b  Mahmoodabad  PND02                 5688.1  0  2  HMP  303457     80000  406216 

Total                       0  5688.1  0  2     303457  0  80000  406216 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         1440731 

Name of Gram Panchayat : Mangrauda 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Mangrauda  CB17  0.45  2.25  0.6  0.81  273  220.9  502        6692  1006     8201 

2   2B2C7g1b  Mangrauda  CB12  0.45  2.25  0.6  0.81  310  251.4  571        7617  1145     9333 

3   2B2C7g1b  Mangrauda  CB13  0.45  2.25  0.6  0.81  411  332.9  757        10087  1517     12360 

4   2B2C7g1b  Mangrauda  CB14  0.45  2.25  0.6  0.81  262  212  482        6422  966     7870 

5   2B2C7g1b  Mangrauda  CB15  0.45  2.25  0.6  0.81  254  205.5  467        6226  936     7629 

6   2B2C7g1b  Mangrauda  CB16  0.45  2.25  0.6  0.81  260  211  479        6393  961     7833 

7   2B2C7g1b  Mangrauda  ECD35  3  15  3  27  44  1187.2  4190        55868  1083     61141 

8   2B2C7g1b  Mangrauda  ECD40  3  15  3  27  82  2216.6  7823        104311  2022     114156 

9   2B2C7g1b  Mangrauda  ECD30  3  15  3  27  60  1608.2  5676        75683  1467     82826 

10   2B2C7g1b  Mangrauda  ECD29  3  15  3  27  51  1374.8  4852        64698  1254     70804 

11   2B2C7g1b  Mangrauda  ECD39  3  15  3  27  95  2552.1  9008        120102  2328     131438 

12   2B2C7g1b  Mangrauda  ECD16  3  15  3  27  68  1833.5  6471        86283  1673     94427 

13   2B2C7g1b  Mangrauda  ECD26  3  15  3  27  91  2456.3  8669        115593  2241     126503 

14   2B2C7g1b  Mangrauda  ECD17  3  15  3  27  60  1611  5686        75816  1470     82971 

15   2B2C7g1b  Mangrauda  ECD25  3  15  3  27  61  1646.4  5811        77480  1502     84792 

16   2B2C7g1b  Mangrauda  ECD41  3  15  3  27  57  1544.9  5453        72701  1409     79563 

17   2B2C7g1b  Mangrauda  ECD34  3  15  3  27  53  1440.1  5083        67771  1314     74167 

18   2B2C7g1b  Mangrauda  ECD15  3  15  3  27  124  3348.7  11819        157589  3055     172463 

19   2B2C7g1b  Mangrauda  ECD33  3  15  3  27  54  1455  5136        68474  1327     74937 

20   2B2C7g1b  Mangrauda  ECD32  3  15  3  27  58  1552.5  5480        73062  1416     79958 

21   2B2C7g1b  Mangrauda  ECD28  3  15  3  27  50  1344.5  4745        63272  1226     69243 

22   2B2C7g1b  Mangrauda  ECD38  3  15  3  27  82  2218.4  7830        104400  2024     114254 

23   2B2C7g1b  Mangrauda  ECD36  3  15  3  27  80  2150.4  7590        101196  1962     110748 

Page 178: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

29

24   2B2C7g1b  Mangrauda  ECD18  3  15  3  27  52  1405.1  4959        66125  1282     72366 

25   2B2C7g1b  Mangrauda  ECD45  3  15  3  27  59  1589.8  5611        74814  1450     81876 

26   2B2C7g1b  Mangrauda  ECD19  3  15  3  27  63  1711.9  6042        80561  1562     88164 

27   2B2C7g1b  Mangrauda  ECD20  3  15  3  27  63  1697.1  5990        79865  1548     87403 

28   2B2C7g1b  Mangrauda  ECD44  3  15  3  27  102  2763.4  9754        130048  2521     142323 

29   2B2C7g1b  Mangrauda  ECD31  3  15  3  27  74  1993.9  7037        93832  1819     102688 

30   2B2C7g1b  Mangrauda  ECD37  3  15  3  27  62  1685.7  5950        79330  1538     86818 

31   2B2C7g1b  Mangrauda  ECD27  3  15  3  27  86  2330.6  8226        109677  2126     120029 

32   2B2C7g1b  Mangrauda  ECD14  3  15  3  27  70  1888.3  6665        88864  1723     97251 

33   2B2C7g1b  Mangrauda  ECD43  3  15  3  27  81  2199.1  7762        103491  2006     113259 

34   2B2C7g1b  Mangrauda  ECD42  3  15  3  27  90  2434.3  8592        114560  2221     125372 

35   2B2C7g1b  Mangrauda  ECD22  3  15  3  27  53  1440.1  5083        67769  1314     74166 

36   2B2C7g1b  Mangrauda  ECD23  3  15  3  27  51  1372.5  4844        64592  1252     70688 

37   2B2C7g1b  Mangrauda  ECD24  3  15  3  27  71  1905.2  6725        89660  1738     98123 

38   2B2C7g1b  Mangrauda  ECD21  3  15  3  27  66  1786.6  6306        84076  1630     92012 

39   2B2C7g1b  Mangrauda  MB15  0.6  3.6  1  2.1  393  826.1  1877        25032  2260     29169 

40   2B2C7g1b  Mangrauda  MB14  0.6  3.6  1  2.1  363  761.5  1730        23073  2083     26886 

41   2B2C7g1b  Mangrauda  MB17  0.6  3.6  1  2.1  463  971.6  2208        29438  2658     34304 

42   2B2C7g1b  Mangrauda  MB04  0.6  3.6  1  2.1  392  823.1  1871        24941  2252     29064 

43   2B2C7g1b  Mangrauda  MB16  0.6  3.6  1  2.1  833  1748.5  3973        52980  4783     61736 

44   2B2C7g1b  Mangrauda  MB13  0.6  3.6  1  2.1  287  603.6  1372        18289  1651     21312 

45   2B2C7g1b  Mangrauda  MB12  0.6  3.6  1  2.1  262  550.8  1252        16691  1507     19450 

46   2B2C7g1b  Mangrauda  MB11  0.6  3.6  1  2.1  229  481.7  1095        14595  1318     17007 

47   2B2C7g1b  Mangrauda  MB10  0.6  3.6  1  2.1  208  437.7  995        13263  1198     15456 

48   2B2C7g1b  Mangrauda  MB03  0.6  3.6  1  2.1  272  571.1  1298        17305  1562     20165 

49   2B2C7g1b  Mangrauda  MB24  0.6  3.6  1  2.1  285  599.4  1362        18162  1640     21164 

50   2B2C7g1b  Mangrauda  MB09  0.6  3.6  1  2.1  148  310.6  706        9410  850     10966 

51   2B2C7g1b  Mangrauda  MB08  0.6  3.6  1  2.1  570  1198  2722        36298  3277     42297 

52   2B2C7g1b  Mangrauda  MB07  0.6  3.6  1  2.1  207  434.8  988        13174  1189     15351 

53   2B2C7g1b  Mangrauda  MB06  0.6  3.6  1  2.1  175  367.8  836        11144  1006     12986 

54   2B2C7g1b  Mangrauda  MB05  0.6  3.6  1  2.1  365  766.5  1742        23226  2097     27065 

55   2B2C7g1b  Mangrauda  MB02  0.6  3.6  1  2.1  349  733.2  1666        22215  2006     25886 

56   2B2C7g1b  Mangrauda  MB46  0.6  3.6  1  2.1  710  1490.7  3388        45168  4078     52635 

57   2B2C7g1b  Mangrauda  MB18  0.6  3.6  1  2.1  122  256  582        7757  700     9039 

58   2B2C7g1b  Mangrauda  MB38  0.6  3.6  1  2.1  701  1472.2  3346        44607  4027     51980 

59   2B2C7g1b  Mangrauda  MB22  0.6  3.6  1  2.1  359  753.6  1712        22833  2062     26607 

60   2B2C7g1b  Mangrauda  MB40  0.6  3.6  1  2.1  708  1487.7  3381        45077  4070     52528 

61   2B2C7g1b  Mangrauda  MB41  0.6  3.6  1  2.1  532  1117.9  2540        33873  3058     39472 

62   2B2C7g1b  Mangrauda  MB42  0.6  3.6  1  2.1  220  462.1  1050        14001  1264     16315 

63   2B2C7g1b  Mangrauda  MB43  0.6  3.6  1  2.1  210  440  1000        13333  1204     15536 

Page 179: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

30

64   2B2C7g1b  Mangrauda  MB36  0.6  3.6  1  2.1  235  493.1  1121        14941  1349     17411 

65   2B2C7g1b  Mangrauda  MB45  0.6  3.6  1  2.1  214  450.1  1023        13638  1231     15892 

66   2B2C7g1b  Mangrauda  MB37  0.6  3.6  1  2.1  483  1013.9  2304        30720  2774     35797 

67   2B2C7g1b  Mangrauda  MB47  0.6  3.6  1  2.1  308  646.8  1470        19599  1770     22839 

68   2B2C7g1b  Mangrauda  MB48  0.6  3.6  1  2.1  533  1119.3  2544        33914  3062     39520 

69   2B2C7g1b  Mangrauda  MB49  0.6  3.6  1  2.1  87  181.7  413        5507  497     6417 

70   2B2C7g1b  Mangrauda  MB50  0.6  3.6  1  2.1  406  852.5  1937        25831  2332     30100 

71   2B2C7g1b  Mangrauda  MB51  0.6  3.6  1  2.1  372  781.3  1776        23674  2138     27588 

72   2B2C7g1b  Mangrauda  MB52  0.6  3.6  1  2.1  563  1183  2688        35846  3236     41771 

73   2B2C7g1b  Mangrauda  MB53  0.6  3.6  1  2.1  455  955.4  2171        28949  2614     33733 

74   2B2C7g1b  Mangrauda  MB54  0.6  3.6  1  2.1  418  877.6  1994        26590  2401     30985 

75   2B2C7g1b  Mangrauda  MB44  0.6  3.6  1  2.1  207  434.9  988        13178  1190     15356 

76   2B2C7g1b  Mangrauda  MB29  0.6  3.6  1  2.1  187  393.2  894        11915  1076     13885 

77   2B2C7g1b  Mangrauda  MB55  0.6  3.6  1  2.1  261  548.3  1246        16613  1500     19359 

78   2B2C7g1b  Mangrauda  MB25  0.6  3.6  1  2.1  193  405.3  921        12282  1109     14312 

79   2B2C7g1b  Mangrauda  MB26  0.6  3.6  1  2.1  167  350.2  796        10610  958     12364 

80   2B2C7g1b  Mangrauda  MB27  0.6  3.6  1  2.1  196  412  936        12482  1127     14545 

81   2B2C7g1b  Mangrauda  MB39  0.6  3.6  1  2.1  258  541.4  1230        16404  1481     19115 

82   2B2C7g1b  Mangrauda  MB35  0.6  3.6  1  2.1  197  413.9  941        12541  1132     14614 

83   2B2C7g1b  Mangrauda  MB23  0.6  3.6  1  2.1  378  794  1804        24057  2172     28033 

84   2B2C7g1b  Mangrauda  MB28  0.6  3.6  1  2.1  69  144  327        4363  394     5084 

85   2B2C7g1b  Mangrauda  MB20  0.6  3.6  1  2.1  257  540.2  1227        16367  1478     19071 

86   2B2C7g1b  Mangrauda  MB30  0.6  3.6  1  2.1  788  1654  3759        50117  4525     58401 

87   2B2C7g1b  Mangrauda  MB31  0.6  3.6  1  2.1  616  1293.6  2940        39195  3539     45674 

88   2B2C7g1b  Mangrauda  MB32  0.6  3.6  1  2.1  464  973.5  2212        29496  2663     34371 

89   2B2C7g1b  Mangrauda  MB19  0.6  3.6  1  2.1  496  1041  2366        31541  2848     36755 

90   2B2C7g1b  Mangrauda  MB33  0.6  3.6  1  2.1  372  781.3  1775        23673  2137     27585 

91   2B2C7g1b  Mangrauda  MB34  0.6  3.6  1  2.1  952  1998.5  4542        60555  5467     70564 

92   2B2C7g1b  Mangrauda  MB21  0.6  3.6  1  2.1  257  539.1  1225        16334  1475     19034 

93   2B2C7g1b  Mangrauda  PB06  0.6  3.6  1  2.1  604  1268.9  2883        38447  3471     44801 

94   2B2C7g1b  Mangrauda  PB01  0.6  3.6  1  2.1  685  1438.1  3268        43574  3934     50776 

95   2B2C7g1b  Mangrauda  PB03  0.6  3.6  1  2.1  519  1090.3  2478        33037  2983     38498 

96   2B2C7g1b  Mangrauda  PB07  0.6  3.6  1  2.1  238  500  1136        15150  1368     17654 

97   2B2C7g1b  Mangrauda  PB05  0.6  3.6  1  2.1  243  511.3  1162        15494  1399     18055 

98   2B2C7g1b  Mangrauda  PB02  0.6  3.6  1  2.1  438  920.5  2092        27891  2518     32501 

99   2B2C7g1b  Mangrauda  PB04  0.6  3.6  1  2.1  720  1511.1  3434        45786  4134     53354 

100   2B2C7g1b  Mangrauda  PB08  0.6  3.6  1  2.1  567  1191.4  2707        36099  3259     42065 

Total                       27749  111088.8  327548        4367295  197575  0  4892410 

Details of Water Resources                                        

101   2B2C7g1b  Mangrauda  WHB01  3  15  3  27  50  1350  821        63531  1232     69528 

Page 180: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

31

Total                       50  1350  821  0     63531  1232  0  69528 

Details of Afforestation and Agro forestry                                        

102   2B2C7g1b  Mangrauda  AFF01              7497                       36000 

Total                                               36000 

Grand Total                                         4997938 

Name of Gram Panchayat : Mehaura 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Mehaura  CB31  0.45  2.25  0.6  0.81  99  80.4  183        2435  366     2984 

2   2B2C7g1b  Mehaura  CB36  0.45  2.25  0.6  0.81  309  250.1  568        7579  1139     9286 

3   2B2C7g1b  Mehaura  CB35  0.45  2.25  0.6  0.81  240  194.8  443        5903  887     7233 

4   2B2C7g1b  Mehaura  CB34  0.45  2.25  0.6  0.81  550  445.1  1012        13487  2028     16527 

5   2B2C7g1b  Mehaura  CB38  0.45  2.25  0.6  0.81  856  693.1  1575        21000  3157     25732 

6   2B2C7g1b  Mehaura  CB39  0.45  2.25  0.6  0.81  211  171.1  389        5185  780     6353 

7   2B2C7g1b  Mehaura  CB40  0.45  2.25  0.6  0.81  234  189.6  431        5746  864     7041 

8   2B2C7g1b  Mehaura  CB37  0.45  2.25  0.6  0.81  1101  891.4  2026        27010  4061     33097 

9   2B2C7g1b  Mehaura  CB32  0.45  2.25  0.6  0.81  102  82.3  187        2492  375     3054 

10   2B2C7g1b  Mehaura  CB30  0.45  2.25  0.6  0.81  243  196.9  447        5966  897     7310 

11   2B2C7g1b  Mehaura  CB29  0.45  2.25  0.6  0.81  241  195.6  445        5927  891     7263 

12   2B2C7g1b  Mehaura  CB28  0.45  2.25  0.6  0.81  166  134.8  306        4086  614     5006 

13   2B2C7g1b  Purejorai  CB206  0.45  2.25  0.6  0.81  164  133.2  303        4037  607     4947 

14   2B2C7g1b  Purejorai  CB207  0.45  2.25  0.6  0.81  164  132.8  302        4023  605     4930 

15   2B2C7g1b  Mehaura  CB23  0.45  2.25  0.6  0.81  89  72.1  164        2183  328     2676 

16   2B2C7g1b  Mehaura  CB19  0.45  2.25  0.6  0.81  270  218.6  497        6622  996     8115 

17   2B2C7g1b  Mehaura  CB33  0.45  2.25  0.6  0.81  183  148.1  336        4486  674     5497 

18   2B2C7g1b  Purejorai  CB208  0.45  2.25  0.6  0.81  209  169.2  385        5128  771     6284 

19   2B2C7g1b  Mehaura  CB20  0.45  2.25  0.6  0.81  174  140.9  320        4269  642     5231 

20   2B2C7g1b  Mehaura  CB22  0.45  2.25  0.6  0.81  101  81.8  186        2477  372     3036 

21   2B2C7g1b  Mehaura  CB24  0.45  2.25  0.6  0.81  344  278.5  633        8439  1269     10341 

22   2B2C7g1b  Chack Madauli  CB210  0.45  2.25  0.6  0.81  466  377.1  857        11426  1718     14000 

23   2B2C7g1b  Mehaura  CB18  0.45  2.25  0.6  0.81  734  594.9  1352        18027  2710     22089 

24   2B2C7g1b  Mehaura  CB25  0.45  2.25  0.6  0.81  170  137.4  312        4162  626     5100 

25   2B2C7g1b  Mehaura  CB26  0.45  2.25  0.6  0.81  361  292.5  665        8863  1333     10860 

26   2B2C7g1b  Mehaura  CB27  0.45  2.25  0.6  0.81  164  132.6  301        4018  604     4923 

27   2B2C7g1b  Purejorai  CB209  0.45  2.25  0.6  0.81  213  172.5  392        5227  786     6405 

28   2B2C7g1b  Mehaura  CB21  0.45  2.25  0.6  0.81  292  236.7  538        7172  1078     8788 

Page 181: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

32

29   2B2C7g1b  Mehaura  ECD47  3  15  3  27  92  2471.4  8723        116305  2254     127283 

30   2B2C7g1b  Mehaura  ECD57  3  15  3  27  70  1890  6671        88943  1724     97339 

31   2B2C7g1b  Mehaura  ECD55  3  15  3  27  70  1890  6671        88943  1724     97339 

32   2B2C7g1b  Mehaura  ECD54  3  15  3  27  60  1620  5718        76237  1478     83433 

33   2B2C7g1b  Mehaura  ECD53  3  15  3  27  93  2521.3  8899        118652  2300     129850 

34   2B2C7g1b  Mehaura  ECD52  3  15  3  27  113  3040.1  10730        143068  2773     156571 

35   2B2C7g1b  Mehaura  ECD51  3  15  3  27  69  1857.8  6557        87430  1695     95682 

36   2B2C7g1b  Mehaura  ECD50  3  15  3  27  98  2643.3  9329        124392  2411     136132 

37   2B2C7g1b  Mehaura  ECD48  3  15  3  27  71  1913.5  6754        90048  1746     98547 

38   2B2C7g1b  Mehaura  ECD46  3  15  3  27  74  2000.1  7059        94126  1825     103009 

39   2B2C7g1b  Mehaura  ECD58  3  15  3  27  70  1890  6671        88944  1724     97339 

40   2B2C7g1b  Mehaura  ECD49  3  15  3  27  115  3101.3  10946        145950  2829     159725 

41   2B2C7g1b  Mehaura  ECD61  3  15  3  27  100  2695.6  9514        126855  2459     138828 

42   2B2C7g1b  Mehaura  ECD60  3  15  3  27  54  1460.4  5155        68727  1332     75215 

43   2B2C7g1b  Mehaura  ECD59  3  15  3  27  93  2520.5  8896        118615  2299     129810 

44   2B2C7g1b  Mehaura  ECD56  3  15  3  27  90  2430  8577        114356  2217     125149 

45   2B2C7g1b  Purejorai  MB210  0.6  3.6  1  2.1  87  183.1  416        5547  501     6464 

46   2B2C7g1b  Mehaura  MB85  0.6  3.6  1  2.1  198  414.8  943        12569  1135     14646 

47   2B2C7g1b  Mehaura  MB65  0.6  3.6  1  2.1  183  383.9  872        11633  1050     13555 

48   2B2C7g1b  Mehaura  MB64  0.6  3.6  1  2.1  266  558.7  1270        16930  1529     19728 

49   2B2C7g1b  Mehaura  MB63  0.6  3.6  1  2.1  526  1105.5  2512        33496  3024     39032 

50   2B2C7g1b  Mehaura  MB62  0.6  3.6  1  2.1  537  1127.9  2563        34175  3086     39824 

51   2B2C7g1b  Mehaura  MB61  0.6  3.6  1  2.1  486  1020.5  2319        30921  2792     36031 

52   2B2C7g1b  Mehaura  MB86  0.6  3.6  1  2.1  449  942.7  2142        28565  2579     33286 

53   2B2C7g1b  Mehaura  MB87  0.6  3.6  1  2.1  174  364.6  828        11046  997     12872 

54   2B2C7g1b  Purejorai  MB209  0.6  3.6  1  2.1  102  214.5  487        6499  587     7573 

55   2B2C7g1b  Mehaura  MB82  0.6  3.6  1  2.1  323  678  1541        20543  1855     23939 

56   2B2C7g1b  Chack Madauli  MB211  0.6  3.6  1  2.1  833  1750  3977        53025  4787     61789 

57   2B2C7g1b  Chack Madauli  MB212  0.6  3.6  1  2.1  236  495.8  1127        15024  1356     17508 

58   2B2C7g1b  Chack Madauli  MB213  0.6  3.6  1  2.1  410  861.5  1958        26103  2357     30418 

59   2B2C7g1b  Chack Madauli  MB214  0.6  3.6  1  2.1  154  324.1  737        9820  887     11444 

60   2B2C7g1b  Chack Madauli  MB215  0.6  3.6  1  2.1  335  704.2  1600        21337  1926     24864 

61   2B2C7g1b  Mehaura  MB60  0.6  3.6  1  2.1  217  456.6  1038        13836  1249     16123 

62   2B2C7g1b  Mehaura  MB59  0.6  3.6  1  2.1  483  1014.6  2306        30741  2776     35823 

63   2B2C7g1b  Mehaura  MB58  0.6  3.6  1  2.1  802  1683.4  3826        51007  4605     59439 

64   2B2C7g1b  Mehaura  MB57  0.6  3.6  1  2.1  623  1308.7  2974        39653  3580     46207 

65   2B2C7g1b  Chack Madauli  MB216  0.6  3.6  1  2.1  153  322.2  732        9763  881     11376 

66   2B2C7g1b  Chack Madauli  MB217  0.6  3.6  1  2.1  563  1183  2688        35844  3236     41768 

67   2B2C7g1b  Mehaura  MB56  0.6  3.6  1  2.1  420  882  2004        26725  2413     31142 

68   2B2C7g1b  Mehaura  MB88  0.6  3.6  1  2.1  327  687.7  1563        20836  1881     24281 

Page 182: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

33

69   2B2C7g1b  Mehaura  MB77  0.6  3.6  1  2.1  191  401.8  913        12174  1099     14186 

70   2B2C7g1b  Mehaura  MB70  0.6  3.6  1  2.1  360  756.5  1719        22922  2070     26711 

71   2B2C7g1b  Mehaura  MB72  0.6  3.6  1  2.1  549  1151.9  2618        34901  3151     40670 

72   2B2C7g1b  Mehaura  MB69  0.6  3.6  1  2.1  302  634.7  1442        19231  1736     22409 

73   2B2C7g1b  Mehaura  MB68  0.6  3.6  1  2.1  108  227.4  517        6891  622     8030 

74   2B2C7g1b  Mehaura  MB67  0.6  3.6  1  2.1  428  897.9  2041        27207  2456     31705 

75   2B2C7g1b  Purejorai  MB208  0.6  3.6  1  2.1  311  653.3  1485        19794  1787     23067 

76   2B2C7g1b  Mehaura  MB73  0.6  3.6  1  2.1  659  1384.7  3147        41956  3788     48891 

77   2B2C7g1b  Mehaura  MB74  0.6  3.6  1  2.1  392  823.1  1870        24940  2252     29062 

78   2B2C7g1b  Mehaura  MB84  0.6  3.6  1  2.1  618  1297.1  2948        39302  3548     45798 

79   2B2C7g1b  Mehaura  MB76  0.6  3.6  1  2.1  150  315.6  717        9564  864     11144 

80   2B2C7g1b  Mehaura  MB83  0.6  3.6  1  2.1  275  578.2  1314        17518  1582     20414 

81   2B2C7g1b  Mehaura  MB66  0.6  3.6  1  2.1  469  984.2  2236        29820  2692     34748 

82   2B2C7g1b  Mehaura  MB78  0.6  3.6  1  2.1  224  469.8  1068        14235  1285     16588 

83   2B2C7g1b  Mehaura  MB79  0.6  3.6  1  2.1  573  1202.4  2732        36432  3289     42453 

84   2B2C7g1b  Mehaura  MB80  0.6  3.6  1  2.1  295  619.1  1407        18759  1694     21860 

85   2B2C7g1b  Mehaura  MB81  0.6  3.6  1  2.1  177  372.2  846        11278  1018     13142 

86   2B2C7g1b  Mehaura  MB71  0.6  3.6  1  2.1  1037  2176.9  4947        65959  5955     76861 

87   2B2C7g1b  Mehaura  MB75  0.6  3.6  1  2.1  433  909.6  2067        27562  2489     32118 

88   2B2C7g1b  Mehaura  PB14  0.6  3.6  1  2.1  337  708.4  1610        21466  1938     25014 

89   2B2C7g1b  Mehaura  PB13  0.6  3.6  1  2.1  365  766.9  1743        23236  2098     27077 

90   2B2C7g1b  Mehaura  PB12  0.6  3.6  1  2.1  360  756.7  1720        22928  2070     26718 

91   2B2C7g1b  Mehaura  PB11  0.6  3.6  1  2.1  197  414.3  942        12554  1133     14629 

92   2B2C7g1b  Mehaura  PB09  0.6  3.6  1  2.1  538  1129.7  2567        34230  3091     39888 

93   2B2C7g1b  Mehaura  PB10  0.6  3.6  1  2.1  440  923.4  2098        27978  2526     32602 

94   2B2C7g1b  Chack Madauli  PB15  0.6  3.6  1  2.1  978  2054.8  4670        62261  5621     72553 

Total                       29435  84068  236232        3149702  176891  0  3562829 

Details of Water Resources  PLength  PWidth  PDepth                               

95   2B2C7g1b  Mehaura  PND01                 17901.3  0  2  HMP  956108     80000  1107816 

96   2B2C7g1b  Mehaura  WHB05  3  15  3  27  90  2441.4  1484.7        114893  2227     125737 

97   2B2C7g1b  Mehaura  WHB04  3  15  3  27  92  2494.6  1517.1        117394  2276     128474 

98   2B2C7g1b  Mehaura  WHB03  3  15  3  27  82  2212.8  1345.7        104134  2019     113962 

99   2B2C7g1b  Mehaura  WHB02  3  15  3  27  89  2406.2  1463.3        113236  2195     123924 

Total                       353  27456.3  5810.8  2     1405765  8717  80000  1599913 

Details of Afforestation and Agro forestry                                        

100   2B2C7g1b  Mehaura  AFF04              7683                       36870 

101   2B2C7g1b  Mehaura  AFF03              4181                       20070 

102   2B2C7g1b  Mehaura  AFF02              6905                       33150 

Total                                               90090 

Grand Total                                         5252832 

Page 183: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

34

Name of Gram Panchayat : Paharu Pur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7g1a  Paharu Pur  CB236  0.45  2.25  0.6  0.81  496  401.7  913        12170  1830     14913 

2  2B2C7g1a  Inder Pur  CB231  0.45  2.25  0.6  0.81  640  518  1177        15696  2360     19233 

3  2B2C7g1a  Inder Pur  CB232  0.45  2.25  0.6  0.81  142  115  261        3485  524     4270 

4  2B2C7g1a  Inder Pur  CB233  0.45  2.25  0.6  0.81  902  730.8  1661        22144  3329     27134 

5  2B2C7g1a  Inder Pur  CB234  0.45  2.25  0.6  0.81  371  300.7  683        9112  1370     11165 

6  2B2C7g1a  Inder Pur  CB235  0.45  2.25  0.6  0.81  626  506.8  1152        15355  2309     18816 

7  2B2C7g1a  Paharu Pur  CB239  0.45  2.25  0.6  0.81  204  165.3  376        5009  753     6139 

8  2B2C7g1a  Paharu Pur  CB237  0.45  2.25  0.6  0.81  177  143.6  326        4351  654     5332 

9  2B2C7g1a  Paharu Pur  CB240  0.45  2.25  0.6  0.81  135  109.4  249        3314  498     4061 

10  2B2C7g1a  Paharu Pur  CB238  0.45  2.25  0.6  0.81  150  121.1  275        3670  552     4497 

11  2B2C7g1a  Inder Pur  ECD42  3  15  3  27  68  1839.4  6492        86560  1678     94730 

12  2B2C7g1a  Inder Pur  ECD43  3  15  3  27  70  1890  6671        88943  1724     97338 

13  2B2C7g1a  Inder Pur  ECD44  3  15  3  27  70  1890  6671        88943  1724     97339 

14  2B2C7g1a  Inder Pur  ECD45  3  15  3  27  60  1620  5718        76237  1478     83433 

15  2B2C7g1a  Paharu Pur  ECD47  3  15  3  27  90  2430  8577        114356  2217     125150 

16  2B2C7g1a  Paharu Pur  ECD48  3  15  3  27  86  2311.8  8160        108794  2109     119063 

17  2B2C7g1a  Paharu Pur  ECD49  3  15  3  27  70  1890  6671        88943  1724     97339 

18  2B2C7g1a  Paharu Pur  ECD46  3  15  3  27  50  1350  4765        63531  1231     69527 

19  2B2C7g1a  Paharu Pur  ECD50  3  15  3  27  60  1620  5718        76237  1478     83433 

20  2B2C7g1a  Inder Pur  ECD40  3  15  3  27  90  2430  8577        114356  2217     125150 

21  2B2C7g1a  Inder Pur  ECD38  3  15  3  27  73  1965.4  6937        92494  1793     101224 

22  2B2C7g1a  Inder Pur  ECD39  3  15  3  27  68  1831.9  6466        86208  1671     94345 

23  2B2C7g1a  Paharu Pur  ECD66  3  15  3  27  75  2035.7  7185        95800  1857     104842 

24  2B2C7g1a  Inder Pur  ECD37  3  15  3  27  48  1292.8  4563        60838  1179     66581 

25  2B2C7g1a  Inder Pur  ECD35  3  15  3  27  50  1350  4765        63531  1231     69527 

26  2B2C7g1a  Inder Pur  ECD34  3  15  3  27  83  2233.9  7885        105127  2038     115050 

27  2B2C7g1a  Inder Pur  ECD33  3  15  3  27  50  1350  4765        63531  1231     69527 

28  2B2C7g1a  Inder Pur  ECD32  3  15  3  27  43  1171.7  4136        55142  1069     60347 

29  2B2C7g1a  Inder Pur  ECD41  3  15  3  27  75  2016.6  7117        94900  1840     103856 

30  2B2C7g1a  Paharu Pur  ECD59  3  15  3  27  73  1979.3  6986        93146  1806     101938 

31  2B2C7g1a  Inder Pur  ECD36  3  15  3  27  50  1350  4765        63531  1231     69527 

32  2B2C7g1a  Paharu Pur  ECD51  3  15  3  27  80  2160  7624        101650  1970     111244 

33  2B2C7g1a  Paharu Pur  ECD62  3  15  3  27  69  1875.3  6619        88249  1711     96579 

34  2B2C7g1a  Paharu Pur  ECD63  3  15  3  27  40  1075.3  3795        50604  981     55380 

35  2B2C7g1a  Paharu Pur  ECD61  3  15  3  27  30  810  2859        38119  739     41717 

36  2B2C7g1a  Paharu Pur  ECD64  3  15  3  27  74  1997.1  7049        93984  1822     102854 

Page 184: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

35

37  2B2C7g1a  Paharu Pur  ECD58  3  15  3  27  70  1882.1  6643        88573  1717     96933 

38  2B2C7g1a  Paharu Pur  ECD57  3  15  3  27  69  1856.3  6552        87356  1693     95601 

39  2B2C7g1a  Paharu Pur  ECD56  3  15  3  27  49  1312.5  4633        61767  1197     67597 

40  2B2C7g1a  Paharu Pur  ECD55  3  15  3  27  44  1200.9  4238        56512  1095     61846 

41  2B2C7g1a  Paharu Pur  ECD54  3  15  3  27  60  1620  5718        76237  1478     83433 

42  2B2C7g1a  Paharu Pur  ECD65  3  15  3  27  73  1974.5  6969        92921  1801     101691 

43  2B2C7g1a  Paharu Pur  ECD52  3  15  3  27  75  2022  7137        95155  1845     104136 

44  2B2C7g1a  Paharu Pur  ECD53  3  15  3  27  60  1620  5718        76237  1478     83433 

45  2B2C7g1a  Paharu Pur  ECD60  3  15  3  27  30  810  2859        38119  739     41717 

46  2B2C7g1a  Inder Pur  MB104  0.6  3.6  1  2.1  505  1061.2  2412        32154  2903     37469 

47  2B2C7g1a  Inder Pur  MB112  0.6  3.6  1  2.1  250  525.3  1194        15918  1437     18549 

48  2B2C7g1a  Inder Pur  MB111  0.6  3.6  1  2.1  489  1026.3  2332        31098  2808     36238 

49  2B2C7g1a  Inder Pur  MB110  0.6  3.6  1  2.1  199  418.9  952        12691  1146     14789 

50  2B2C7g1a  Inder Pur  MB93  0.6  3.6  1  2.1  388  814.7  1851        24684  2229     28764 

51  2B2C7g1a  Inder Pur  MB109  0.6  3.6  1  2.1  399  837.7  1904        25382  2292     29578 

52  2B2C7g1a  Inder Pur  MB94  0.6  3.6  1  2.1  407  854.3  1941        25886  2337     30164 

53  2B2C7g1a  Inder Pur  MB95  0.6  3.6  1  2.1  335  704.2  1600        21338  1927     24864 

54  2B2C7g1a  Inder Pur  MB108  0.6  3.6  1  2.1  204  429.1  975        13001  1174     15150 

55  2B2C7g1a  Inder Pur  MB107  0.6  3.6  1  2.1  229  481.5  1094        14589  1317     17000 

56  2B2C7g1a  Inder Pur  MB105  0.6  3.6  1  2.1  211  442.3  1005        13401  1210     15616 

57  2B2C7g1a  Inder Pur  MB103  0.6  3.6  1  2.1  456  957.2  2175        29004  2619     33797 

58  2B2C7g1a  Inder Pur  MB102  0.6  3.6  1  2.1  325  681.6  1549        20652  1865     24065 

59  2B2C7g1a  Inder Pur  MB96  0.6  3.6  1  2.1  344  722.5  1642        21892  1977     25511 

60  2B2C7g1a  Inder Pur  MB113  0.6  3.6  1  2.1  229  481.5  1094        14590  1317     17001 

61  2B2C7g1a  Inder Pur  MB97  0.6  3.6  1  2.1  384  806.6  1833        24440  2207     28480 

62  2B2C7g1a  Inder Pur  MB119  0.6  3.6  1  2.1  268  562.3  1278        17038  1538     19854 

63  2B2C7g1a  Inder Pur  MB98  0.6  3.6  1  2.1  539  1132.3  2573        34309  3098     39980 

64  2B2C7g1a  Inder Pur  MB99  0.6  3.6  1  2.1  424  890.6  2024        26985  2436     31445 

65  2B2C7g1a  Inder Pur  MB100  0.6  3.6  1  2.1  316  663.7  1508        20111  1816     23435 

66  2B2C7g1a  Inder Pur  MB101  0.6  3.6  1  2.1  205  430.5  978        13044  1178     15200 

67  2B2C7g1a  Inder Pur  MB106  0.6  3.6  1  2.1  225  472.1  1073        14304  1291     16669 

68  2B2C7g1a  Paharu Pur  MB137  0.6  3.6  1  2.1  231  484.2  1100        14670  1325     17095 

69  2B2C7g1a  Paharu Pur  MB131  0.6  3.6  1  2.1  362  760.6  1729        23047  2081     26857 

70  2B2C7g1a  Paharu Pur  MB132  0.6  3.6  1  2.1  536  1125.5  2558        34103  3079     39740 

71  2B2C7g1a  Paharu Pur  MB130  0.6  3.6  1  2.1  185  387.6  881        11745  1060     13686 

72  2B2C7g1a  Paharu Pur  MB129  0.6  3.6  1  2.1  302  634.2  1441        19217  1735     22393 

73  2B2C7g1a  Paharu Pur  MB128  0.6  3.6  1  2.1  448  940.5  2137        28497  2573     33207 

74  2B2C7g1a  Paharu Pur  MB127  0.6  3.6  1  2.1  752  1579.8  3590        47867  4322     55779 

75  2B2C7g1a  Paharu Pur  MB133  0.6  3.6  1  2.1  278  582.8  1324        17658  1594     20576 

76  2B2C7g1a  Paharu Pur  MB134  0.6  3.6  1  2.1  545  1145.5  2603        34710  3134     40447 

Page 185: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

36

77  2B2C7g1a  Paharu Pur  MB135  0.6  3.6  1  2.1  400  840.4  1910        25465  2299     29674 

78  2B2C7g1a  Paharu Pur  MB136  0.6  3.6  1  2.1  122  256.2  582        7763  701     9046 

79  2B2C7g1a  Inder Pur  MB114  0.6  3.6  1  2.1  1471  3089.1  7020        93599  8451     109070 

80  2B2C7g1a  Inder Pur  MB126  0.6  3.6  1  2.1  146  307.4  699        9314  841     10854 

81  2B2C7g1a  Inder Pur  MB125  0.6  3.6  1  2.1  1205  2530.6  5751        76677  6923     89351 

82  2B2C7g1a  Inder Pur  MB124  0.6  3.6  1  2.1  330  692.4  1573        20980  1894     24447 

83  2B2C7g1a  Inder Pur  MB123  0.6  3.6  1  2.1  519  1090.5  2478        33042  2983     38503 

84  2B2C7g1a  Inder Pur  MB122  0.6  3.6  1  2.1  486  1021.3  2321        30947  2794     36062 

85  2B2C7g1a  Inder Pur  MB121  0.6  3.6  1  2.1  610  1281  2911        38813  3504     45229 

86  2B2C7g1a  Inder Pur  MB120  0.6  3.6  1  2.1  1235  2593.9  5895        78597  7096     91588 

87  2B2C7g1a  Inder Pur  MB118  0.6  3.6  1  2.1  105  219.9  500        6664  602     7766 

88  2B2C7g1a  Inder Pur  MB117  0.6  3.6  1  2.1  142  298  677        9028  815     10521 

89  2B2C7g1a  Inder Pur  MB116  0.6  3.6  1  2.1  127  266.2  605        8066  728     9399 

90  2B2C7g1a  Inder Pur  MB115  0.6  3.6  1  2.1  185  388  882        11757  1061     13700 

91  2B2C7g1a  Inder Pur  MB92  0.6  3.6  1  2.1  415  872.5  1983        26436  2387     30805 

92  2B2C7g1a  Paharu Pur  PB03  0.6  3.6  1  2.1  187  393.7  895        11928  1077     13900 

93  2B2C7g1a  Inder Pur  PB01  0.6  3.6  1  2.1  337  708.3  1610        21461  1938     25009 

94  2B2C7g1a  Paharu Pur  PB02  0.6  3.6  1  2.1  1714  3599.1  8179        109052  9846     127077 

Total                       26774  106662.5  317897        4238551  187936  0  4744386 

Details of Water Resources                                        

95  2B2C7g1a  Paharu Pur  WHB06  3  15  3  27  60  1620  985.2        76237  1478     83433 

96  2B2C7g1a  Inder Pur  WHB05  3  15  3  27  85  2304.9  1401.7        108466  2103     118704 

97  2B2C7g1a  Inder Pur  WHB04  3  15  3  27  87  2357.3  1433.6        110932  2150     121403 

98  2B2C7g1a  Inder Pur  WHB03  3  15  3  27  78  2096.2  1274.8        98647  1912     107958 

99  2B2C7g1a  Inder Pur  WHB02  3  15  3  27  50  1350  821        63531  1232     69528 

100  2B2C7g1a  Inder Pur  WHB01  3  15  3  27  50  1350  821        63531  1232     69528 

Total                       410  11078.4  6737.3  0     521344  10107  0  570554 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         5314940 

Name of Gram Panchayat : Palhari 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2c  Palhari  CB50  0.45  2.25  0.6  0.81  499  404  918        12242  1841     15001 

2  2B2C7d2c  Palhari  CB37  0.45  2.25  0.6  0.81  408  330.3  751        10008  1505     12264 

3  2B2C7d2c  Palhari  CB38  0.45  2.25  0.6  0.81  238  192.9  438        5844  879     7160 

Page 186: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

37

4  2B2C7d2c  Palhari  CB39  0.45  2.25  0.6  0.81  407  329.8  749        9992  1502     12243 

5  2B2C7d2c  Palhari  CB40  0.45  2.25  0.6  0.81  1092  884.5  2010        26800  4029     32839 

6  2B2C7d2c  Palhari  CB41  0.45  2.25  0.6  0.81  690  559.3  1271        16946  2548     20764 

7  2B2C7d2c  Palhari  CB42  0.45  2.25  0.6  0.81  363  293.7  667        8900  1338     10905 

8  2B2C7d2c  Palhari  CB43  0.45  2.25  0.6  0.81  194  157.1  357        4759  716     5832 

9  2B2C7d2c  Palhari  CB44  0.45  2.25  0.6  0.81  295  238.5  542        7228  1087     8857 

10  2B2C7d2c  Palhari  CB45  0.45  2.25  0.6  0.81  232  187.8  427        5689  855     6972 

11  2B2C7d2c  Palhari  CB60  0.45  2.25  0.6  0.81  369  298.7  679        9051  1361     11091 

12  2B2C7d2c  Palhari  CB49  0.45  2.25  0.6  0.81  280  226.5  515        6864  1032     8411 

13  2B2C7d2c  Palhari  CB34  0.45  2.25  0.6  0.81  293  237.5  540        7196  1082     8818 

14  2B2C7d2c  Palhari  CB51  0.45  2.25  0.6  0.81  701  567.7  1290        17201  2586     21077 

15  2B2C7d2c  Palhari  CB52  0.45  2.25  0.6  0.81  238  192.5  437        5832  877     7146 

16  2B2C7d2c  Palhari  CB53  0.45  2.25  0.6  0.81  238  192.9  438        5843  879     7160 

17  2B2C7d2c  Palhari  CB54  0.45  2.25  0.6  0.81  320  259.1  589        7850  1180     9619 

18  2B2C7d2c  Palhari  CB55  0.45  2.25  0.6  0.81  107  86.5  197        2622  394     3213 

19  2B2C7d2c  Palhari  CB56  0.45  2.25  0.6  0.81  345  279.6  635        8471  1274     10380 

20  2B2C7d2c  Palhari  CB57  0.45  2.25  0.6  0.81  654  529.4  1203        16042  2412     19657 

21  2B2C7d2c  Palhari  CB58  0.45  2.25  0.6  0.81  305  246.7  561        7476  1124     9161 

22  2B2C7d2c  Palhari  CB59  0.45  2.25  0.6  0.81  267  216.6  492        6564  987     8043 

23  2B2C7d2c  Palhari  CB47  0.45  2.25  0.6  0.81  95  76.7  174        2324  349     2847 

24  2B2C7d2c  Palhari  CB24  0.45  2.25  0.6  0.81  333  270.1  614        8184  1230     10029 

25  2B2C7d2d  Palhari  CB106  0.45  2.25  0.6  0.81  972  787.2  1789        23851  3586     29226 

26  2B2C7d2d  Palhari  CB107  0.45  2.25  0.6  0.81  689  558  1268        16907  2542     20717 

27  2B2C7d2d  Palhari  CB108  0.45  2.25  0.6  0.81  678  549.2  1248        16640  2502     20389 

28  2B2C7d2d  Palhari  CB109  0.45  2.25  0.6  0.81  901  730.1  1659        22123  3326     27108 

29  2B2C7d2d  Palhari  CB110  0.45  2.25  0.6  0.81  462  374.2  850        11339  1705     13894 

30  2B2C7d2d  Palhari  CB111  0.45  2.25  0.6  0.81  276  223.7  508        6777  1019     8304 

31  2B2C7d2d  Palhari  CB112  0.45  2.25  0.6  0.81  323  261.9  595        7936  1193     9724 

32  2B2C7d2d  Palhari  CB113  0.45  2.25  0.6  0.81  285  230.9  525        6997  1052     8574 

33  2B2C7d2d  Palhari  CB114  0.45  2.25  0.6  0.81  326  264.4  601        8013  1205     9819 

34  2B2C7d2c  Palhari  CB36  0.45  2.25  0.6  0.81  399  323.1  734        9790  1472     11996 

35  2B2C7d2c  Palhari  CB23  0.45  2.25  0.6  0.81  402  326  741        9878  1485     12104 

36  2B2C7d2c  Palhari  CB35  0.45  2.25  0.6  0.81  220  178.2  405        5401  812     6618 

37  2B2C7d2c  Palhari  CB25  0.45  2.25  0.6  0.81  256  207.7  472        6293  946     7711 

38  2B2C7d2c  Palhari  CB26  0.45  2.25  0.6  0.81  169  136.5  310        4137  622     5069 

39  2B2C7d2c  Palhari  CB27  0.45  2.25  0.6  0.81  199  161.4  367        4891  735     5993 

40  2B2C7d2c  Palhari  CB28  0.45  2.25  0.6  0.81  401  324.9  738        9845  1480     12064 

41  2B2C7d2c  Palhari  CB29  0.45  2.25  0.6  0.81  105  85.4  194        2587  389     3169 

42  2B2C7d2c  Palhari  CB30  0.45  2.25  0.6  0.81  120  96.8  220        2934  441     3595 

43  2B2C7d2c  Palhari  CB31  0.45  2.25  0.6  0.81  582  471.3  1071        14280  2147     17498 

Page 187: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

38

44  2B2C7d2c  Palhari  CB32  0.45  2.25  0.6  0.81  938  759.9  1727        23025  3462     28213 

45  2B2C7d2c  Palhari  CB33  0.45  2.25  0.6  0.81  510  413.3  939        12522  1883     15343 

46  2B2C7d2c  Palhari  CB48  0.45  2.25  0.6  0.81  203  164.2  373        4975  748     6096 

47  2B2C7d2d  Palhari  CB115  0.45  2.25  0.6  0.81  302  244.3  555        7402  1113     9070 

48  2B2C7d2c  Palhari  CB68  0.45  2.25  0.6  0.81  407  329.8  749        9992  1502     12243 

49  2B2C7d2c  Palhari  CB75  0.45  2.25  0.6  0.81  316  256  582        7757  1166     9505 

50  2B2C7d2c  Palhari  CB72  0.45  2.25  0.6  0.81  106  86  195        2605  392     3191 

51  2B2C7d2c  Palhari  CB73  0.45  2.25  0.6  0.81  172  139.4  317        4223  635     5175 

52  2B2C7d2c  Palhari  CB46  0.45  2.25  0.6  0.81  115  92.9  211        2814  423     3448 

53  2B2C7d2c  Palhari  CB69  0.45  2.25  0.6  0.81  782  633.2  1439        19186  2885     23510 

54  2B2C7d2c  Palhari  CB70  0.45  2.25  0.6  0.81  719  582.1  1323        17639  2652     21614 

55  2B2C7d2c  Palhari  CB71  0.45  2.25  0.6  0.81  102  82.8  188        2509  377     3074 

56  2B2C7d2c  Palhari  CB61  0.45  2.25  0.6  0.81  598  484.7  1102        14687  2208     17997 

57  2B2C7d2c  Palhari  CB74  0.45  2.25  0.6  0.81  558  451.7  1026        13686  2058     16769 

58  2B2C7d2c  Palhari  CB67  0.45  2.25  0.6  0.81  501  405.8  922        12296  1849     15066 

59  2B2C7d2c  Palhari  CB66  0.45  2.25  0.6  0.81  544  440.3  1001        13342  2006     16348 

60  2B2C7d2c  Palhari  CB65  0.45  2.25  0.6  0.81  582  471.7  1072        14293  2149     17514 

61  2B2C7d2c  Palhari  CB64  0.45  2.25  0.6  0.81  106  85.7  195        2598  391     3184 

62  2B2C7d2c  Palhari  CB63  0.45  2.25  0.6  0.81  339  274.2  623        8310  1249     10182 

63  2B2C7d2c  Palhari  CB62  0.45  2.25  0.6  0.81  300  243.3  553        7373  1109     9035 

64  2B2C7d2d  Palhari  ECD10  3  15  3  27  50  1350  4765        63531  1232     69528 

65  2B2C7d2d  Palhari  ECD12  3  15  3  27  44  1182.9  4175        55670  1079     60924 

66  2B2C7d2d  Palhari  ECD11  3  15  3  27  41  1093.8  3861        51476  998     56335 

67  2B2C7d2d  Palhari  ECD13  3  15  3  27  41  1097.8  3875        51664  1001     56540 

68  2B2C7d2d  Palhari  MB92  0.6  3.6  1  2.1  433  909.1  2066        27545  2487     32098 

69  2B2C7d2c  Palhari  MB32  0.6  3.6  1  2.1  290  608.1  1382        18425  1664     21470 

70  2B2C7d2c  Palhari  MB31  0.6  3.6  1  2.1  425  891.7  2026        27020  2440     31485 

71  2B2C7d2d  Palhari  MB93  0.6  3.6  1  2.1  400  840.6  1910        25471  2300     29680 

72  2B2C7d2d  Palhari  MB95  0.6  3.6  1  2.1  670  1406.8  3197        42626  3849     49671 

73  2B2C7d2d  Palhari  MB85  0.6  3.6  1  2.1  318  667.3  1516        20219  1826     23561 

74  2B2C7d2d  Palhari  MB96  0.6  3.6  1  2.1  146  306.1  696        9275  837     10809 

75  2B2C7d2d  Palhari  MB94  0.6  3.6  1  2.1  427  896.2  2037        27156  2452     31645 

76  2B2C7d2d  Palhari  MB83  0.6  3.6  1  2.1  296  621.9  1413        18842  1701     21957 

77  2B2C7d2d  Palhari  MB75  0.6  3.6  1  2.1  1132  2376.2  5400        71999  6501     83900 

78  2B2C7d2d  Palhari  MB76  0.6  3.6  1  2.1  211  443.5  1008        13439  1213     15660 

79  2B2C7d2d  Palhari  MB77  0.6  3.6  1  2.1  177  372.6  847        11290  1019     13157 

80  2B2C7d2d  Palhari  MB78  0.6  3.6  1  2.1  175  368  836        11151  1007     12994 

81  2B2C7d2d  Palhari  MB79  0.6  3.6  1  2.1  486  1020.8  2320        30931  2793     36043 

82  2B2C7d2d  Palhari  MB80  0.6  3.6  1  2.1  211  443.2  1007        13428  1212     15647 

83  2B2C7d2d  Palhari  MB87  0.6  3.6  1  2.1  484  1017.2  2312        30822  2783     35917 

Page 188: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

39

84  2B2C7d2d  Palhari  MB82  0.6  3.6  1  2.1  167  350.7  797        10625  959     12381 

85  2B2C7d2d  Palhari  MB91  0.6  3.6  1  2.1  1306  2742.8  6233        83107  7504     96844 

86  2B2C7d2d  Palhari  MB84  0.6  3.6  1  2.1  359  753.7  1713        22837  2062     26612 

87  2B2C7d2c  Palhari  MB29  0.6  3.6  1  2.1  245  514.5  1169        15589  1407     18165 

88  2B2C7d2d  Palhari  MB86  0.6  3.6  1  2.1  926  1945.3  4421        58942  5322     68684 

89  2B2C7d2d  Palhari  MB97  0.6  3.6  1  2.1  375  787.7  1790        23869  2155     27814 

90  2B2C7d2d  Palhari  MB88  0.6  3.6  1  2.1  253  530.6  1206        16078  1452     18735 

91  2B2C7d2d  Palhari  MB89  0.6  3.6  1  2.1  490  1029.7  2340        31199  2817     36356 

92  2B2C7d2d  Palhari  MB90  0.6  3.6  1  2.1  444  931.7  2117        28231  2549     32897 

93  2B2C7d2d  Palhari  MB81  0.6  3.6  1  2.1  793  1664.7  3783        50440  4554     58777 

94  2B2C7d2c  Palhari  MB06  0.6  3.6  1  2.1  235  493.7  1122        14958  1351     17430 

95  2B2C7d2d  Palhari  MB98  0.6  3.6  1  2.1  364  764.7  1738        23171  2092     27001 

96  2B2C7d2c  Palhari  MB14  0.6  3.6  1  2.1  590  1239.2  2816        37548  3390     43754 

97  2B2C7d2c  Palhari  MB12  0.6  3.6  1  2.1  405  849.9  1931        25753  2325     30009 

98  2B2C7d2c  Palhari  MB11  0.6  3.6  1  2.1  369  775.1  1761        23486  2121     27368 

99  2B2C7d2c  Palhari  MB10  0.6  3.6  1  2.1  315  662.1  1505        20060  1811     23376 

100  2B2C7d2c  Palhari  MB09  0.6  3.6  1  2.1  297  623.6  1417        18894  1706     22017 

101  2B2C7d2c  Palhari  MB16  0.6  3.6  1  2.1  329  691.1  1570        20939  1891     24400 

102  2B2C7d2c  Palhari  MB07  0.6  3.6  1  2.1  153  321.7  731        9747  880     11358 

103  2B2C7d2c  Palhari  MB15  0.6  3.6  1  2.1  221  463.4  1053        14040  1268     16360 

104  2B2C7d2c  Palhari  MB05  0.6  3.6  1  2.1  635  1333.4  3030        40402  3648     47080 

105  2B2C7d2c  Palhari  MB04  0.6  3.6  1  2.1  576  1209.2  2748        36640  3308     42696 

106  2B2C7d2c  Palhari  MB03  0.6  3.6  1  2.1  299  628.9  1429        19057  1721     22207 

107  2B2C7d2c  Palhari  MB01  0.6  3.6  1  2.1  556  1168  2654        35391  3195     41240 

108  2B2C7d2d  Palhari  MB101  0.6  3.6  1  2.1  964  2023.6  4599        61315  5536     71450 

109  2B2C7d2c  Palhari  MB02  0.6  3.6  1  2.1  528  1109.6  2522        33621  3036     39179 

110  2B2C7d2c  Palhari  MB08  0.6  3.6  1  2.1  544  1142.5  2596        34618  3126     40339 

111  2B2C7d2c  Palhari  MB24  0.6  3.6  1  2.1  437  916.8  2084        27780  2508     32372 

112  2B2C7d2d  Palhari  MB99  0.6  3.6  1  2.1  535  1123  2552        34027  3072     39651 

113  2B2C7d2d  Palhari  MB100  0.6  3.6  1  2.1  538  1130.5  2569        34255  3093     39917 

114  2B2C7d2c  Palhari  MB30  0.6  3.6  1  2.1  121  254.6  579        7715  697     8990 

115  2B2C7d2c  Palhari  MB28  0.6  3.6  1  2.1  525  1102.5  2506        33407  3016     38929 

116  2B2C7d2c  Palhari  MB27  0.6  3.6  1  2.1  337  708.5  1610        21467  1938     25015 

117  2B2C7d2c  Palhari  MB26  0.6  3.6  1  2.1  265  557.4  1267        16890  1525     19682 

118  2B2C7d2c  Palhari  MB13  0.6  3.6  1  2.1  495  1039.1  2361        31486  2843     36689 

119  2B2C7d2c  Palhari  MB25  0.6  3.6  1  2.1  678  1422.9  3234        43114  3893     50240 

120  2B2C7d2c  Palhari  MB23  0.6  3.6  1  2.1  697  1464.7  3328        44380  4007     51714 

121  2B2C7d2c  Palhari  MB22  0.6  3.6  1  2.1  245  514.4  1169        15587  1407     18164 

122  2B2C7d2c  Palhari  MB21  0.6  3.6  1  2.1  176  368.9  838        11178  1009     13026 

123  2B2C7d2c  Palhari  MB20  0.6  3.6  1  2.1  513  1078.2  2450        32668  2950     38068 

Page 189: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

40

124  2B2C7d2c  Palhari  MB19  0.6  3.6  1  2.1  380  798.8  1815        24203  2185     28204 

125  2B2C7d2c  Palhari  MB18  0.6  3.6  1  2.1  99  208.2  473        6307  569     7350 

126  2B2C7d2c  Palhari  MB17  0.6  3.6  1  2.1  421  884.8  2011        26810  2421     31241 

127  2B2C7d2d  Palhari  PB13  0.6  3.6  1  2.1  186  390  886        11817  1067     13769 

128  2B2C7d2d  Palhari  PB11  0.6  3.6  1  2.1  639  1341.5  3048        40646  3670     47364 

129  2B2C7d2d  Palhari  PB12  0.6  3.6  1  2.1  181  380.1  864        11518  1040     13422 

130  2B2C7d2d  Palhari  PB10  0.6  3.6  1  2.1  305  641.5  1458        19438  1755     22651 

131  2B2C7d2d  Palhari  PB14  0.6  3.6  1  2.1  315  662.4  1505        20072  1812     23389 

Total                       52211  81844.3  191928        2559083  252040  0  3003035 

Details of Water Resources  PLength  PWidth  PDepth                               

132  2B2C7d2c  Palhari  PND01                 1209.9  0  2  HMP  64332     80000  149157 

133  2B2C7d2c  Palhari  PND02                 66.2  0  2  HMP  3464     80000  83724 

Total                       0  1276.1  0  4     67796  0  160000  232881 

Details of Afforestation and Agro forestry                                        

134  2B2C7d2d  Palhari  AFF05              1619                       7770 

135  2B2C7d2d  Palhari  AFF04              2074                       9960 

136  2B2C7d2d  Palhari  AFF03              2510                       12060 

Total                                               29790 

Grand Total                                         3265706 

Name of Gram Panchayat : Saidkhanpur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7g1a  Saidkhanpur  CB113  0.45  2.25  0.6  0.81  228  184.3  419        5584  840     6843 

2  2B2C7g1a  Saidkhanpur  CB100  0.45  2.25  0.6  0.81  413  334.3  760        10128  1523     12411 

3  2B2C7g1a  Saidkhanpur  CB101  0.45  2.25  0.6  0.81  187  151.7  345        4596  691     5633 

4  2B2C7g1a  Saidkhanpur  CB102  0.45  2.25  0.6  0.81  231  187  425        5668  852     6945 

5  2B2C7g1a  Saidkhanpur  CB103  0.45  2.25  0.6  0.81  195  157.9  359        4784  719     5862 

6  2B2C7g1a  Saidkhanpur  CB104  0.45  2.25  0.6  0.81  209  168.9  384        5119  770     6273 

7  2B2C7g1a  Saidkhanpur  CB105  0.45  2.25  0.6  0.81  665  538.8  1224        16324  2454     20003 

8  2B2C7g1a  Saidkhanpur  CB106  0.45  2.25  0.6  0.81  106  86.2  196        2613  393     3202 

9  2B2C7g1a  Saidkhanpur  CB107  0.45  2.25  0.6  0.81  400  323.8  736        9810  1475     12021 

10  2B2C7g1a  Saidkhanpur  CB108  0.45  2.25  0.6  0.81  396  320.6  729        9715  1461     11905 

11  2B2C7g1a  Saidkhanpur  CB123  0.45  2.25  0.6  0.81  238  192.4  437        5829  876     7143 

12  2B2C7g1a  Saidkhanpur  CB111  0.45  2.25  0.6  0.81  178  144.1  327        4366  656     5349 

13  2B2C7g1a  Saidkhanpur  CB97  0.45  2.25  0.6  0.81  178  144.5  328        4379  658     5365 

14  2B2C7g1a  Saidkhanpur  CB114  0.45  2.25  0.6  0.81  231  187.5  426        5680  854     6960 

Page 190: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

41

15  2B2C7g1a  Saidkhanpur  CB115  0.45  2.25  0.6  0.81  235  190  432        5756  865     7053 

16  2B2C7g1a  Saidkhanpur  CB116  0.45  2.25  0.6  0.81  192  155.8  354        4719  710     5783 

17  2B2C7g1a  Saidkhanpur  CB117  0.45  2.25  0.6  0.81  181  147  334        4453  669     5456 

18  2B2C7g1a  Saidkhanpur  CB118  0.45  2.25  0.6  0.81  179  145.4  330        4405  662     5398 

19  2B2C7g1a  Saidkhanpur  CB119  0.45  2.25  0.6  0.81  353  285.8  650        8660  1302     10612 

20  2B2C7g1a  Saidkhanpur  CB120  0.45  2.25  0.6  0.81  241  195.4  444        5921  890     7256 

21  2B2C7g1a  Saidkhanpur  CB121  0.45  2.25  0.6  0.81  224  181.6  413        5502  827     6742 

22  2B2C7g1a  Saidkhanpur  CB122  0.45  2.25  0.6  0.81  184  149.3  339        4523  680     5542 

23  2B2C7g1a  Saidkhanpur  CB109  0.45  2.25  0.6  0.81  214  173.7  395        5263  791     6449 

24   2B2C7g1b  Saidkhanpur  CB199  0.45  2.25  0.6  0.81  222  180.2  409        5459  821     6688 

25   2B2C7g1b  Saidkhanpur  CB188  0.45  2.25  0.6  0.81  620  501.8  1140        15205  2286     18631 

26   2B2C7g1b  Saidkhanpur  CB189  0.45  2.25  0.6  0.81  182  147.1  334        4457  670     5461 

27   2B2C7g1b  Saidkhanpur  CB190  0.45  2.25  0.6  0.81  321  260  591        7879  1185     9655 

28   2B2C7g1b  Saidkhanpur  CB191  0.45  2.25  0.6  0.81  306  247.8  563        7509  1129     9202 

29   2B2C7g1b  Saidkhanpur  CB192  0.45  2.25  0.6  0.81  112  90.7  206        2749  413     3368 

30   2B2C7g1b  Saidkhanpur  CB193  0.45  2.25  0.6  0.81  165  133.9  304        4057  610     4971 

31   2B2C7g1b  Saidkhanpur  CB194  0.45  2.25  0.6  0.81  138  111.6  254        3383  509     4146 

32   2B2C7g1b  Saidkhanpur  CB195  0.45  2.25  0.6  0.81  151  122.5  278        3711  558     4547 

33   2B2C7g1b  Saidkhanpur  CB196  0.45  2.25  0.6  0.81  189  153.5  349        4651  699     5699 

34  2B2C7g1a  Saidkhanpur  CB99  0.45  2.25  0.6  0.81  418  338.2  769        10247  1541     12557 

35   2B2C7g1b  Saidkhanpur  CB198  0.45  2.25  0.6  0.81  73  59  134        1786  269     2189 

36  2B2C7g1a  Saidkhanpur  CB98  0.45  2.25  0.6  0.81  545  441.8  1004        13385  2012     16402 

37   2B2C7g1b  Saidkhanpur  CB200  0.45  2.25  0.6  0.81  71  57.7  131        1749  263     2143 

38   2B2C7g1b  Saidkhanpur  CB201  0.45  2.25  0.6  0.81  212  171.4  389        5193  781     6362 

39  2B2C7g1a  Saidkhanpur  CB90  0.45  2.25  0.6  0.81  594  480.9  1093        14573  2191     17857 

40  2B2C7g1a  Saidkhanpur  CB91  0.45  2.25  0.6  0.81  369  298.8  679        9053  1361     11094 

41  2B2C7g1a  Saidkhanpur  CB92  0.45  2.25  0.6  0.81  158  127.7  290        3868  582     4740 

42  2B2C7g1a  Saidkhanpur  CB93  0.45  2.25  0.6  0.81  846  685.3  1557        20765  3122     25444 

43  2B2C7g1a  Saidkhanpur  CB94  0.45  2.25  0.6  0.81  1139  922.9  2097        27965  4205     34267 

44  2B2C7g1a  Saidkhanpur  CB95  0.45  2.25  0.6  0.81  183  147.9  336        4483  674     5493 

45  2B2C7g1a  Saidkhanpur  CB96  0.45  2.25  0.6  0.81  177  143.2  325        4340  653     5317 

46  2B2C7g1a  Saidkhanpur  CB112  0.45  2.25  0.6  0.81  233  188.7  429        5717  859     7005 

47   2B2C7g1b  Saidkhanpur  CB197  0.45  2.25  0.6  0.81  843  682.5  1551        20681  3109     25341 

48  2B2C7g1a  Saidkhanpur  CB150  0.45  2.25  0.6  0.81  241  195.3  444        5918  890     7252 

49  2B2C7g1a  Saidkhanpur  CB142  0.45  2.25  0.6  0.81  200  162.3  369        4918  739     6027 

50   2B2C7g1b  Saidkhanpur  CB202  0.45  2.25  0.6  0.81  282  228.3  519        6919  1040     8478 

51  2B2C7g1a  Saidkhanpur  CB144  0.45  2.25  0.6  0.81  106  85.7  195        2598  391     3184 

52  2B2C7g1a  Saidkhanpur  CB145  0.45  2.25  0.6  0.81  185  149.9  341        4541  683     5565 

53  2B2C7g1a  Saidkhanpur  CB146  0.45  2.25  0.6  0.81  172  139.1  316        4215  634     5165 

54  2B2C7g1a  Saidkhanpur  CB147  0.45  2.25  0.6  0.81  390  316.2  719        9582  1441     11742 

Page 191: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

42

55  2B2C7g1a  Saidkhanpur  CB148  0.45  2.25  0.6  0.81  262  212  482        6423  966     7870 

56  2B2C7g1a  Saidkhanpur  CB124  0.45  2.25  0.6  0.81  228  184.3  419        5584  840     6842 

57  2B2C7g1a  Saidkhanpur  CB140  0.45  2.25  0.6  0.81  193  156  355        4727  711     5793 

58  2B2C7g1a  Saidkhanpur  CB149  0.45  2.25  0.6  0.81  1120  907.3  2062        27490  4133     33685 

59  2B2C7g1a  Saidkhanpur  CB141  0.45  2.25  0.6  0.81  205  165.8  377        5022  755     6155 

60  2B2C7g1a  Saidkhanpur  CB151  0.45  2.25  0.6  0.81  161  130.5  297        3955  595     4846 

61  2B2C7g1a  Saidkhanpur  CB152  0.45  2.25  0.6  0.81  325  263.4  598        7980  1200     9777 

62  2B2C7g1a  Saidkhanpur  CB153  0.45  2.25  0.6  0.81  313  253.8  577        7689  1156     9422 

63  2B2C7g1a  Saidkhanpur  CB154  0.45  2.25  0.6  0.81  329  266.6  606        8078  1215     9899 

64   2B2C7g1b  Saidkhanpur  CB203  0.45  2.25  0.6  0.81  160  129.4  294        3920  589     4803 

65  2B2C7g1a  Saidkhanpur  CB156  0.45  2.25  0.6  0.81  516  418  950        12666  1904     15520 

66  2B2C7g1a  Saidkhanpur  CB155  0.45  2.25  0.6  0.81  384  311.3  708        9434  1418     11560 

67   2B2C7g1b  Saidkhanpur  CB204  0.45  2.25  0.6  0.81  173  139.8  318        4235  637     5190 

68   2B2C7g1b  Saidkhanpur  CB205  0.45  2.25  0.6  0.81  385  312.1  709        9458  1422     11589 

69  2B2C7g1a  Saidkhanpur  CB110  0.45  2.25  0.6  0.81  186  150.3  342        4555  685     5581 

70  2B2C7g1a  Saidkhanpur  CB136  0.45  2.25  0.6  0.81  328  265.7  604        8050  1210     9865 

71  2B2C7g1a  Saidkhanpur  CB132  0.45  2.25  0.6  0.81  358  289.6  658        8774  1319     10752 

72  2B2C7g1a  Saidkhanpur  CB133  0.45  2.25  0.6  0.81  432  349.6  794        10592  1592     12978 

73  2B2C7g1a  Saidkhanpur  CB131  0.45  2.25  0.6  0.81  160  129.7  295        3929  591     4815 

74  2B2C7g1a  Saidkhanpur  CB143  0.45  2.25  0.6  0.81  431  348.9  793        10570  1589     12952 

75  2B2C7g1a  Saidkhanpur  CB130  0.45  2.25  0.6  0.81  628  508.7  1156        15413  2317     18886 

76  2B2C7g1a  Saidkhanpur  CB139  0.45  2.25  0.6  0.81  293  237.1  539        7183  1080     8802 

77  2B2C7g1a  Saidkhanpur  CB159  0.45  2.25  0.6  0.81  718  581.2  1321        17611  2648     21580 

78  2B2C7g1a  Saidkhanpur  CB134  0.45  2.25  0.6  0.81  142  115  261        3483  524     4268 

79  2B2C7g1a  Saidkhanpur  CB135  0.45  2.25  0.6  0.81  304  245.8  559        7449  1120     9128 

80  2B2C7g1a  Saidkhanpur  CB157  0.45  2.25  0.6  0.81  130  105.5  240        3197  481     3918 

81  2B2C7g1a  Saidkhanpur  CB129  0.45  2.25  0.6  0.81  113  91.2  207        2764  416     3387 

82  2B2C7g1a  Saidkhanpur  CB137  0.45  2.25  0.6  0.81  288  233.4  530        7072  1063     8665 

83  2B2C7g1a  Saidkhanpur  CB128  0.45  2.25  0.6  0.81  347  280.8  638        8508  1279     10425 

84  2B2C7g1a  Saidkhanpur  CB138  0.45  2.25  0.6  0.81  291  236.1  537        7154  1076     8767 

85  2B2C7g1a  Saidkhanpur  CB127  0.45  2.25  0.6  0.81  603  488.7  1111        14807  2226     18144 

86  2B2C7g1a  Saidkhanpur  CB126  0.45  2.25  0.6  0.81  208  168.2  382        5095  766     6244 

87  2B2C7g1a  Saidkhanpur  CB125  0.45  2.25  0.6  0.81  213  172.7  392        5233  787     6412 

88  2B2C7g1a  Saidkhanpur  CB158  0.45  2.25  0.6  0.81  240  194.5  442        5893  886     7221 

89   2B2C7g1b  Saidkhanpur  MB195  0.6  3.6  1  2.1  210  440.2  1000        13338  1204     15542 

90   2B2C7g1b  Saidkhanpur  MB187  0.6  3.6  1  2.1  50  105.2  239        3186  288     3713 

91   2B2C7g1b  Saidkhanpur  MB199  0.6  3.6  1  2.1  202  423.7  963        12839  1159     14961 

92   2B2C7g1b  Saidkhanpur  MB198  0.6  3.6  1  2.1  262  549.3  1248        16642  1503     19393 

93   2B2C7g1b  Saidkhanpur  MB197  0.6  3.6  1  2.1  93  195.5  444        5923  535     6902 

94   2B2C7g1b  Saidkhanpur  MB188  0.6  3.6  1  2.1  529  1110.2  2523        33638  3037     39198 

Page 192: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

43

95   2B2C7g1b  Saidkhanpur  MB189  0.6  3.6  1  2.1  96  200.8  456        6085  549     7090 

96   2B2C7g1b  Saidkhanpur  MB194  0.6  3.6  1  2.1  195  408.6  928        12380  1118     14425 

97   2B2C7g1b  Saidkhanpur  MB190  0.6  3.6  1  2.1  56  118.2  269        3581  323     4174 

98  2B2C7g1a  Saidkhanpur  MB80  0.6  3.6  1  2.1  506  1062  2413        32179  2905     37498 

99   2B2C7g1b  Saidkhanpur  MB204  0.6  3.6  1  2.1  117  246.3  560        7464  674     8698 

100   2B2C7g1b  Saidkhanpur  MB193  0.6  3.6  1  2.1  115  242  550        7331  662     8543 

101   2B2C7g1b  Saidkhanpur  MB192  0.6  3.6  1  2.1  59  123.5  281        3742  338     4361 

102   2B2C7g1b  Saidkhanpur  MB191  0.6  3.6  1  2.1  152  319.5  726        9680  874     11280 

103   2B2C7g1b  Saidkhanpur  MB196  0.6  3.6  1  2.1  83  175.3  398        5311  480     6189 

104  2B2C7g1a  Saidkhanpur  MB72  0.6  3.6  1  2.1  306  643.1  1461        19485  1759     22705 

105  2B2C7g1a  Saidkhanpur  MB77  0.6  3.6  1  2.1  644  1352.8  3074        40991  3701     47766 

106  2B2C7g1a  Saidkhanpur  MB78  0.6  3.6  1  2.1  378  794.1  1805        24062  2173     28040 

107  2B2C7g1a  Saidkhanpur  MB79  0.6  3.6  1  2.1  1058  2222.3  5050        67336  6080     78465 

108  2B2C7g1a  Saidkhanpur  MB81  0.6  3.6  1  2.1  564  1183.7  2690        35867  3238     41795 

109   2B2C7g1b  Saidkhanpur  MB186  0.6  3.6  1  2.1  334  700.8  1592        21233  1917     24742 

110  2B2C7g1a  Saidkhanpur  MB76  0.6  3.6  1  2.1  1571  3298.7  7496        99950  9024     116471 

111  2B2C7g1a  Saidkhanpur  MB75  0.6  3.6  1  2.1  776  1629.6  3703        49378  4458     57540 

112  2B2C7g1a  Saidkhanpur  MB69  0.6  3.6  1  2.1  622  1307.2  2971        39609  3576     46156 

113  2B2C7g1a  Saidkhanpur  MB73  0.6  3.6  1  2.1  329  691.3  1571        20945  1891     24407 

114   2B2C7g1b  Saidkhanpur  MB200  0.6  3.6  1  2.1  627  1316.4  2992        39888  3601     46481 

115  2B2C7g1a  Saidkhanpur  MB71  0.6  3.6  1  2.1  1188  2494.5  5669        75584  6824     88078 

116  2B2C7g1a  Saidkhanpur  MB70  0.6  3.6  1  2.1  304  638.7  1452        19354  1747     22553 

117   2B2C7g1b  Saidkhanpur  MB205  0.6  3.6  1  2.1  119  250.6  569        7592  686     8847 

118   2B2C7g1b  Saidkhanpur  MB203  0.6  3.6  1  2.1  186  390.8  888        11841  1069     13798 

119   2B2C7g1b  Saidkhanpur  MB206  0.6  3.6  1  2.1  159  333.4  758        10103  912     11773 

120   2B2C7g1b  Saidkhanpur  MB207  0.6  3.6  1  2.1  122  257  584        7787  703     9074 

121   2B2C7g1b  Saidkhanpur  MB202  0.6  3.6  1  2.1  112  234.2  532        7098  641     8270 

122   2B2C7g1b  Saidkhanpur  MB201  0.6  3.6  1  2.1  216  453.6  1031        13744  1241     16016 

123  2B2C7g1a  Saidkhanpur  MB74  0.6  3.6  1  2.1  177  372.5  847        11288  1019     13154 

Total                       39385  48046.5  109187        1455800  171043  0  1736037 

Details of Water Resources  PLength  PWidth  PDepth                               

124  2B2C7g1a  Saidkhanpur  PND01                 9222.4  0  2  HMP  492309     80000  609232 

125   2B2C7g1b  Saidkhanpur  PND08                 7004.6  0  2  HMP  373760     80000  481792 

Total                       0  16227  0  4     866069  0  160000  1091024 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         2827061 

 

Page 193: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

44

Name of Gram Panchayat : Saifpur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Saifpur  CB67  0.45  2.25  0.6  0.81  219  177.7  404        5385  810     6598 

2   2B2C7g1b  Saifpur  CB76  0.45  2.25  0.6  0.81  628  508.8  1156        15418  2318     18892 

3   2B2C7g1b  Saifpur  CB01  0.45  2.25  0.6  0.81  327  265.2  603        8034  1208     9845 

4   2B2C7g1b  Saifpur  CB75  0.45  2.25  0.6  0.81  261  211.6  481        6410  964     7855 

5   2B2C7g1b  Saifpur  CB74  0.45  2.25  0.6  0.81  679  550  1250        16666  2506     20421 

6   2B2C7g1b  Saifpur  CB73  0.45  2.25  0.6  0.81  194  157  357        4756  715     5828 

7   2B2C7g1b  Saifpur  CB72  0.45  2.25  0.6  0.81  539  437  993        13240  1991     16223 

8   2B2C7g1b  Saifpur  CB71  0.45  2.25  0.6  0.81  162  130.8  297        3964  596     4857 

9   2B2C7g1b  Saifpur  CB70  0.45  2.25  0.6  0.81  242  195.9  445        5937  893     7275 

10   2B2C7g1b  Saifpur  CB91  0.45  2.25  0.6  0.81  117  95  216        2878  433     3527 

11   2B2C7g1b  Saifpur  CB68  0.45  2.25  0.6  0.81  225  182.1  414        5519  830     6763 

12   2B2C7g1b  Saifpur  CB77  0.45  2.25  0.6  0.81  620  501.9  1141        15208  2286     18635 

13   2B2C7g1b  Saifpur  CB66  0.45  2.25  0.6  0.81  249  201.8  458        6113  919     7490 

14   2B2C7g1b  Saifpur  CB65  0.45  2.25  0.6  0.81  243  197  448        5968  897     7314 

15   2B2C7g1b  Saifpur  CB64  0.45  2.25  0.6  0.81  368  297.7  677        9021  1356     11055 

16   2B2C7g1b  Saifpur  CB63  0.45  2.25  0.6  0.81  223  180.7  411        5477  823     6711 

17   2B2C7g1b  Saifpur  CB62  0.45  2.25  0.6  0.81  1010  817.9  1859        24784  3726     30369 

18   2B2C7g1b  Saifpur  CB04  0.45  2.25  0.6  0.81  180  145.9  332        4422  665     5419 

19   2B2C7g1b  Saifpur  CB03  0.45  2.25  0.6  0.81  189  153  348        4634  697     5679 

20   2B2C7g1b  Saifpur  CB02  0.45  2.25  0.6  0.81  177  143.7  327        4355  655     5336 

21   2B2C7g1b  Saifpur  CB69  0.45  2.25  0.6  0.81  218  176.2  400        5339  803     6542 

22   2B2C7g1b  Saifpur  CB83  0.45  2.25  0.6  0.81  311  251.7  572        7625  1146     9344 

23   2B2C7g1b  Saifpur  CB90  0.45  2.25  0.6  0.81  208  168.8  384        5114  769     6267 

24   2B2C7g1b  Saifpur  CB89  0.45  2.25  0.6  0.81  382  309.3  703        9371  1409     11483 

25   2B2C7g1b  Saifpur  CB88  0.45  2.25  0.6  0.81  216  175.4  399        5313  799     6511 

26   2B2C7g1b  Saifpur  CB87  0.45  2.25  0.6  0.81  126  102.4  233        3102  466     3801 

27   2B2C7g1b  Saifpur  CB86  0.45  2.25  0.6  0.81  634  513.4  1167        15557  2339     19063 

28   2B2C7g1b  Saifpur  CB85  0.45  2.25  0.6  0.81  307  248.5  565        7529  1132     9226 

29   2B2C7g1b  Saifpur  CB84  0.45  2.25  0.6  0.81  118  95.3  217        2887  434     3539 

30   2B2C7g1b  Saifpur  CB82  0.45  2.25  0.6  0.81  399  323.5  735        9801  1474     12010 

31   2B2C7g1b  Saifpur  CB81  0.45  2.25  0.6  0.81  258  209.3  476        6343  954     7773 

32   2B2C7g1b  Saifpur  CB80  0.45  2.25  0.6  0.81  144  116.8  265        3540  532     4337 

33   2B2C7g1b  Saifpur  CB79  0.45  2.25  0.6  0.81  272  220.1  500        6668  1003     8170 

34   2B2C7g1b  Saifpur  CB78  0.45  2.25  0.6  0.81  401  324.7  738        9838  1479     12056 

35   2B2C7g1b  Saifpur  ECD65  3  15  3  27  65  1741.8  6148        81969  1589     89706 

36   2B2C7g1b  Saifpur  ECD64  3  15  3  27  60  1622.8  5728        76370  1480     83578 

Page 194: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

45

37   2B2C7g1b  Saifpur  MB119  0.6  3.6  1  2.1  953  2002.1  4550        60665  5477     70692 

38   2B2C7g1b  Saifpur  MB117  0.6  3.6  1  2.1  828  1739.3  3953        52700  4758     61412 

39   2B2C7g1b  Saifpur  MB116  0.6  3.6  1  2.1  492  1033  2348        31301  2826     36475 

40   2B2C7g1b  Saifpur  MB121  0.6  3.6  1  2.1  576  1209.6  2749        36651  3309     42709 

41   2B2C7g1b  Saifpur  MB115  0.6  3.6  1  2.1  692  1452.3  3300        44006  3973     51279 

42   2B2C7g1b  Saifpur  MB114  0.6  3.6  1  2.1  455  955.4  2171        28948  2614     33733 

43   2B2C7g1b  Saifpur  MB118  0.6  3.6  1  2.1  493  1034.7  2351        31352  2831     36534 

44   2B2C7g1b  Saifpur  MB120  0.6  3.6  1  2.1  672  1410.5  3205        42737  3859     49800 

Total                       16132  22987.6  56474        752915  72743  0  882132 

Details of Water Resources                                        

Total                       0  0  0  0     0  0  0  0 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         882132 

Name of Gram Panchayat : Sarai Ka Sthan 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2d  Chilauki  CB101  0.45  2.25  0.6  0.81  199  161.1  366        4882  734     5982 

2  2B2C7d2c  Sarai Ka Sthan  CB146  0.45  2.25  0.6  0.81  326  264.2  600        8006  1204     9810 

3  2B2C7d2c  Sarai Ka Sthan  CB145  0.45  2.25  0.6  0.81  394  318.8  725        9660  1452     11838 

4  2B2C7d2c  Sarai Ka Sthan  CB144  0.45  2.25  0.6  0.81  337  272.9  620        8268  1243     10131 

5  2B2C7d2c  Sarai Ka Sthan  CB143  0.45  2.25  0.6  0.81  151  122.3  278        3705  557     4540 

6  2B2C7d2c  Sarai Ka Sthan  CB142  0.45  2.25  0.6  0.81  97  78.9  179        2391  360     2930 

7  2B2C7d2c  Sarai Ka Sthan  CB141  0.45  2.25  0.6  0.81  138  112  254        3393  510     4157 

8  2B2C7d2c  Sarai Ka Sthan  CB140  0.45  2.25  0.6  0.81  130  105.1  239        3186  479     3904 

9  2B2C7d2c  Sarai Ka Sthan  CB139  0.45  2.25  0.6  0.81  177  143.5  326        4348  654     5328 

10  2B2C7d2c  Sarai Ka Sthan  CB138  0.45  2.25  0.6  0.81  268  217.4  494        6587  990     8072 

11  2B2C7d2c  Sarai Ka Sthan  CB137  0.45  2.25  0.6  0.81  247  200.1  455        6063  912     7430 

12  2B2C7d2c  Sarai Ka Sthan  CB172  0.45  2.25  0.6  0.81  470  380.6  865        11533  1734     14132 

13  2B2C7d2d  Chilauki  CB104  0.45  2.25  0.6  0.81  125  100.9  229        3058  460     3747 

14  2B2C7d2c  Sarai Ka Sthan  CB147  0.45  2.25  0.6  0.81  393  318.5  724        9649  1451     11824 

15  2B2C7d2d  Chilauki  CB102  0.45  2.25  0.6  0.81  180  146  332        4423  665     5420 

16  2B2C7d2d  Chilauki  CB105  0.45  2.25  0.6  0.81  206  167.2  380        5065  762     6207 

17  2B2C7d2d  Chilauki  CB100  0.45  2.25  0.6  0.81  457  370.2  841        11218  1687     13746 

18  2B2C7d2d  Chilauki  CB99  0.45  2.25  0.6  0.81  136  110  250        3333  501     4084 

19  2B2C7d2d  Chilauki  CB98  0.45  2.25  0.6  0.81  128  103.4  235        3132  471     3838 

Page 195: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

46

20  2B2C7d2d  Chilauki  CB97  0.45  2.25  0.6  0.81  432  350.3  796        10614  1596     13006 

21  2B2C7d2d  Chilauki  CB96  0.45  2.25  0.6  0.81  260  210.4  478        6375  958     7811 

22  2B2C7d2c  Sarai Ka Sthan  CB07  0.45  2.25  0.6  0.81  82  66.2  151        2007  302     2460 

23  2B2C7d2c  Sarai Ka Sthan  CB06  0.45  2.25  0.6  0.81  144  116.7  265        3535  532     4332 

24  2B2C7d2c  Sarai Ka Sthan  CB05  0.45  2.25  0.6  0.81  146  118.3  269        3584  539     4391 

25  2B2C7d2c  Sarai Ka Sthan  CB04  0.45  2.25  0.6  0.81  315  255  580        7727  1162     9469 

26  2B2C7d2c  Sarai Ka Sthan  CB03  0.45  2.25  0.6  0.81  206  167  379        5059  761     6199 

27  2B2C7d2c  Sarai Ka Sthan  CB02  0.45  2.25  0.6  0.81  241  195.2  443        5913  889     7245 

28  2B2C7d2c  Sarai Ka Sthan  CB01  0.45  2.25  0.6  0.81  555  449.6  1022        13623  2048     16693 

29  2B2C7d2d  Chilauki  CB103  0.45  2.25  0.6  0.81  182  147.8  336        4477  673     5487 

30  2B2C7d2c  Sarai Ka Sthan  CB167  0.45  2.25  0.6  0.81  199  161.6  367        4896  736     5999 

31  2B2C7d2c  Sarai Ka Sthan  CB165  0.45  2.25  0.6  0.81  186  150.3  342        4556  685     5582 

32  2B2C7d2c  Sarai Ka Sthan  CB170  0.45  2.25  0.6  0.81  153  123.8  281        3750  564     4594 

33  2B2C7d2c  Sarai Ka Sthan  CB164  0.45  2.25  0.6  0.81  135  109.7  249        3324  500     4073 

34  2B2C7d2c  Sarai Ka Sthan  CB163  0.45  2.25  0.6  0.81  127  102.5  233        3105  467     3805 

35  2B2C7d2c  Sarai Ka Sthan  CB162  0.45  2.25  0.6  0.81  114  92.4  210        2800  421     3431 

36  2B2C7d2c  Sarai Ka Sthan  CB161  0.45  2.25  0.6  0.81  122  98.8  224        2992  450     3666 

37  2B2C7d2c  Sarai Ka Sthan  CB160  0.45  2.25  0.6  0.81  208  168.6  383        5108  768     6259 

38  2B2C7d2c  Sarai Ka Sthan  CB159  0.45  2.25  0.6  0.81  126  101.7  231        3082  463     3776 

39  2B2C7d2c  Sarai Ka Sthan  CB171  0.45  2.25  0.6  0.81  271  219.7  499        6657  1001     8157 

40  2B2C7d2c  Sarai Ka Sthan  CB148  0.45  2.25  0.6  0.81  408  330.2  750        10004  1504     12258 

41  2B2C7d2c  Sarai Ka Sthan  CB169  0.45  2.25  0.6  0.81  103  83.4  189        2527  380     3095 

42  2B2C7d2c  Sarai Ka Sthan  CB168  0.45  2.25  0.6  0.81  265  214.6  488        6501  977     7967 

43  2B2C7d2c  Sarai Ka Sthan  CB158  0.45  2.25  0.6  0.81  211  171  389        5183  779     6351 

44  2B2C7d2c  Sarai Ka Sthan  CB166  0.45  2.25  0.6  0.81  302  244.6  556        7412  1114     9083 

45  2B2C7d2c  Sarai Ka Sthan  CB149  0.45  2.25  0.6  0.81  244  197.9  450        5997  902     7348 

46  2B2C7d2c  Sarai Ka Sthan  CB150  0.45  2.25  0.6  0.81  322  261  593        7909  1189     9691 

47  2B2C7d2c  Sarai Ka Sthan  CB157  0.45  2.25  0.6  0.81  128  103.9  236        3147  473     3856 

48  2B2C7d2c  Sarai Ka Sthan  CB156  0.45  2.25  0.6  0.81  271  219.2  498        6642  999     8138 

49  2B2C7d2c  Sarai Ka Sthan  CB151  0.45  2.25  0.6  0.81  146  118.1  268        3578  538     4384 

50  2B2C7d2c  Sarai Ka Sthan  CB152  0.45  2.25  0.6  0.81  408  330.2  750        10005  1504     12259 

51  2B2C7d2c  Sarai Ka Sthan  CB153  0.45  2.25  0.6  0.81  180  145.9  332        4421  665     5418 

52  2B2C7d2c  Sarai Ka Sthan  CB154  0.45  2.25  0.6  0.81  252  204.1  464        6184  930     7578 

53  2B2C7d2c  Sarai Ka Sthan  CB155  0.45  2.25  0.6  0.81  114  92.7  211        2808  422     3441 

54  2B2C7d2d  Sarai Ka Sthan  CRB04  4.5  6  0.75  3.9375  211  831.8  1890        25204  4316     31410 

55  2B2C7d2d  Chilauki  ECD05  3  15  3  27  20  536.3  1893        25236  489     27618 

56  2B2C7d2d  Chilauki  ECD09  3  15  3  27  33  894  3155        42070  815     46040 

57  2B2C7d2d  Chilauki  ECD01  3  15  3  27  86  2324.9  8206        109408  2121     119735 

58  2B2C7d2d  Chilauki  ECD06  3  15  3  27  51  1374.2  4850        64671  1254     70775 

59  2B2C7d2d  Chilauki  ECD08  3  15  3  27  74  2006.5  7082        94425  1830     103337 

Page 196: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

47

60  2B2C7d2d  Chilauki  ECD04  3  15  3  27  48  1309  4620        61600  1194     67414 

61  2B2C7d2d  Chilauki  ECD03  3  15  3  27  60  1620  5718        76237  1478     83433 

62  2B2C7d2d  Chilauki  ECD02  3  15  3  27  40  1080  3812        50825  985     55622 

63  2B2C7d2d  Chilauki  ECD07  3  15  3  27  70  1877.4  6626        88348  1713     96687 

64  2B2C7d2d  Chilauki  MB62  0.6  3.6  1  2.1  465  976.8  2220        29597  2672     34489 

65  2B2C7d2d  Chilauki  MB64  0.6  3.6  1  2.1  581  1220.3  2773        36976  3338     43087 

66  2B2C7d2d  Chilauki  MB63  0.6  3.6  1  2.1  182  382.3  869        11585  1046     13499 

67  2B2C7d2d  Sarai Ka Sthan  MB61  0.6  3.6  1  2.1  665  1396.8  3174        42322  3821     49318 

68  2B2C7d2c  Sarai Ka Sthan  MB113  0.6  3.6  1  2.1  183  383.7  872        11625  1050     13547 

69  2B2C7d2d  Sarai Ka Sthan  MB60  0.6  3.6  1  2.1  165  347.4  789        10526  950     12265 

70  2B2C7d2d  Chilauki  MB58  0.6  3.6  1  2.1  225  473.4  1076        14345  1295     16716 

71  2B2C7d2d  Chilauki  MB57  0.6  3.6  1  2.1  228  479.6  1090        14533  1312     16936 

72  2B2C7d2d  Chilauki  MB56  0.6  3.6  1  2.1  837  1757.4  3994        53248  4808     62050 

73  2B2C7d2d  Chilauki  MB55  0.6  3.6  1  2.1  450  944  2145        28604  2583     33332 

74  2B2C7d2d  Chilauki  MB54  0.6  3.6  1  2.1  594  1247.4  2835        37797  3413     44044 

75  2B2C7d2d  Chilauki  MB53  0.6  3.6  1  2.1  863  1811.5  4117        54888  4956     63961 

76  2B2C7d2d  Chilauki  MB52  0.6  3.6  1  2.1  256  537.9  1222        16299  1472     18993 

77  2B2C7d2d  Chilauki  MB51  0.6  3.6  1  2.1  569  1193.9  2713        36175  3266     42154 

78  2B2C7d2d  Chilauki  MB50  0.6  3.6  1  2.1  968  2033.6  4621        61619  5563     71804 

79  2B2C7d2d  Chilauki  MB49  0.6  3.6  1  2.1  489  1026  2332        31087  2807     36226 

80  2B2C7d2d  Chilauki  MB48  0.6  3.6  1  2.1  557  1169  2657        35421  3198     41276 

81  2B2C7d2d  Chilauki  MB59  0.6  3.6  1  2.1  991  2080.5  4728        63040  5692     73459 

82  2B2C7d2d  Sarai Ka Sthan  MB103  0.6  3.6  1  2.1  338  710.5  1615        21529  1944     25088 

83  2B2C7d2c  Sarai Ka Sthan  MB109  0.6  3.6  1  2.1  414  870.2  1978        26368  2381     30727 

84  2B2C7d2c  Sarai Ka Sthan  MB110  0.6  3.6  1  2.1  255  534.8  1215        16205  1463     18883 

85  2B2C7d2c  Sarai Ka Sthan  MB108  0.6  3.6  1  2.1  149  312.8  711        9479  856     11046 

86  2B2C7d2c  Sarai Ka Sthan  MB107  0.6  3.6  1  2.1  173  362.5  824        10983  992     12799 

87  2B2C7d2d  Sarai Ka Sthan  MB113  0.6  3.6  1  2.1  171  360  818        10909  985     12712 

88  2B2C7d2d  Sarai Ka Sthan  MB112  0.6  3.6  1  2.1  1018  2137.3  4857        64761  5847     75466 

89  2B2C7d2d  Sarai Ka Sthan  MB111  0.6  3.6  1  2.1  61  128.7  292        3899  352     4543 

90  2B2C7d2d  Sarai Ka Sthan  MB110  0.6  3.6  1  2.1  136  285.4  648        8646  781     10075 

91  2B2C7d2d  Sarai Ka Sthan  MB109  0.6  3.6  1  2.1  101  211.2  480        6398  578     7456 

92  2B2C7d2d  Sarai Ka Sthan  MB108  0.6  3.6  1  2.1  65  136.2  309        4126  372     4807 

93  2B2C7d2d  Sarai Ka Sthan  MB107  0.6  3.6  1  2.1  208  436.9  993        13240  1195     15428 

94  2B2C7d2d  Sarai Ka Sthan  MB106  0.6  3.6  1  2.1  229  480.8  1093        14568  1315     16977 

95  2B2C7d2d  Chilauki  MB70  0.6  3.6  1  2.1  270  567  1288        17180  1551     20019 

96  2B2C7d2d  Sarai Ka Sthan  MB104  0.6  3.6  1  2.1  97  203.7  463        6173  557     7194 

97  2B2C7d2d  Chilauki  MB71  0.6  3.6  1  2.1  207  433.8  986        13144  1187     15317 

98  2B2C7d2d  Chilauki  MB66  0.6  3.6  1  2.1  499  1047.8  2381        31749  2866     36996 

99  2B2C7d2d  Chilauki  MB67  0.6  3.6  1  2.1  360  756.1  1718        22910  2068     26697 

Page 197: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

48

100  2B2C7d2d  Chilauki  MB68  0.6  3.6  1  2.1  375  786.8  1788        23839  2152     27780 

101  2B2C7d2d  Sarai Ka Sthan  MB105  0.6  3.6  1  2.1  144  301.4  685        9133  825     10642 

102  2B2C7d2d  Sarai Ka Sthan  MB102  0.6  3.6  1  2.1  116  244.4  555        7405  669     8629 

103  2B2C7d2d  Chilauki  MB65  0.6  3.6  1  2.1  140  293.8  668        8901  804     10373 

104  2B2C7d2d  Chilauki  MB72  0.6  3.6  1  2.1  348  730.8  1661        22143  1999     25804 

105  2B2C7d2d  Chilauki  MB73  0.6  3.6  1  2.1  199  418.7  952        12688  1146     14786 

106  2B2C7d2c  Sarai Ka Sthan  MB112  0.6  3.6  1  2.1  382  801.7  1822        24291  2193     28306 

107  2B2C7d2d  Chilauki  MB74  0.6  3.6  1  2.1  261  548.9  1247        16630  1502     19379 

108  2B2C7d2d  Chilauki  MB47  0.6  3.6  1  2.1  374  785.5  1785        23800  2149     27734 

109  2B2C7d2c  Sarai Ka Sthan  MB111  0.6  3.6  1  2.1  722  1516.1  3445        45937  4148     53529 

110  2B2C7d2d  Chilauki  MB69  0.6  3.6  1  2.1  277  581.8  1322        17627  1592     20541 

111  2B2C7d2d  Chilauki  PB08  0.6  3.6  1  2.1  177  371.4  844        11252  1016     13112 

112  2B2C7d2d  Chilauki  PB07  0.6  3.6  1  2.1  552  1159.3  2635        35127  3172     40934 

113  2B2C7d2d  Chilauki  PB09  0.6  3.6  1  2.1  348  730.2  1659        22125  1998     25781 

Total                       31244  62377.6  158120        2108278  166809  0  2433209 

Details of Water Resources                                        

114  2B2C7d2d  Chilauki  WHB02  3  15  3  27  23  630.2  383.3        29658  575     32457 

115  2B2C7d2d  Chilauki  WHB01  3  15  3  27  48  1304.5  793.4        61392  1190     67186 

Total                       71  1934.7  1176.7  0     91050  1765  0  99643 

Details of Afforestation and Agro forestry                                        

116  2B2C7d2d  Chilauki  AFF02              5448                       26160 

117  2B2C7d2d  Chilauki  AFF01              1953                       9360 

Total                                               35520 

Grand Total                                         2568372 

Name of Gram Panchayat : Shahpur 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2c  Shahpur  CB21  0.45  2.25  0.6  0.81  171  138.6  315        4200  631     5147 

2  2B2C7d2c  Shahpur  CB14  0.45  2.25  0.6  0.81  303  245.2  557        7430  1117     9105 

3  2B2C7d2c  Shahpur  CB11  0.45  2.25  0.6  0.81  130  105.6  240        3199  481     3920 

4  2B2C7d2c  Shahpur  CB12  0.45  2.25  0.6  0.81  175  141.4  321        4286  644     5251 

5  2B2C7d2c  Shahpur  CB08  0.45  2.25  0.6  0.81  164  133.1  303        4034  607     4944 

6  2B2C7d2c  Shahpur  CB13  0.45  2.25  0.6  0.81  163  131.7  299        3991  600     4890 

7  2B2C7d2c  Shahpur  CB174  0.45  2.25  0.6  0.81  857  694.6  1578        21045  3164     25788 

8  2B2C7d2c  Shahpur  CB177  0.45  2.25  0.6  0.81  225  182.4  414        5527  831     6771 

9  2B2C7d2c  Shahpur  CB22  0.45  2.25  0.6  0.81  374  302.5  688        9167  1378     11233 

Page 198: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

49

10  2B2C7d2c  Shahpur  CB178  0.45  2.25  0.6  0.81  273  221.2  503        6702  1008     8213 

11  2B2C7d2c  Shahpur  CB20  0.45  2.25  0.6  0.81  227  184.1  418        5579  839     6836 

12  2B2C7d2c  Shahpur  CB19  0.45  2.25  0.6  0.81  180  145.9  332        4422  665     5418 

13  2B2C7d2c  Shahpur  CB18  0.45  2.25  0.6  0.81  298  241.3  548        7311  1099     8959 

14  2B2C7d2c  Shahpur  CB17  0.45  2.25  0.6  0.81  150  121.9  277        3694  555     4526 

15  2B2C7d2c  Shahpur  CB16  0.45  2.25  0.6  0.81  172  139  316        4212  633     5161 

16  2B2C7d2c  Shahpur  CB15  0.45  2.25  0.6  0.81  192  155.7  354        4717  709     5780 

17  2B2C7d2c  Shahpur  CB173  0.45  2.25  0.6  0.81  190  153.9  350        4663  701     5714 

18  2B2C7d2c  Shahpur  CB185  0.45  2.25  0.6  0.81  214  173  393        5242  788     6423 

19  2B2C7d2c  Shahpur  CB09  0.45  2.25  0.6  0.81  630  510.5  1160        15468  2326     18953 

20  2B2C7d2c  Shahpur  CB10  0.45  2.25  0.6  0.81  150  121.9  277        3692  555     4524 

21  2B2C7d2c  Shahpur  CB191  0.45  2.25  0.6  0.81  190  154.1  350        4670  702     5722 

22  2B2C7d2c  Shahpur  CB190  0.45  2.25  0.6  0.81  744  602.5  1369        18257  2745     22371 

23  2B2C7d2c  Shahpur  CB189  0.45  2.25  0.6  0.81  298  241.5  549        7319  1100     8968 

24  2B2C7d2c  Shahpur  CB188  0.45  2.25  0.6  0.81  355  287.2  653        8704  1309     10665 

25  2B2C7d2c  Shahpur  CB176  0.45  2.25  0.6  0.81  250  202.8  461        6146  924     7531 

26  2B2C7d2c  Shahpur  CB186  0.45  2.25  0.6  0.81  225  182.7  415        5534  832     6781 

27  2B2C7d2c  Shahpur  CB175  0.45  2.25  0.6  0.81  120  97.6  222        2957  445     3624 

28  2B2C7d2c  Shahpur  CB184  0.45  2.25  0.6  0.81  188  152.3  346        4615  694     5655 

29  2B2C7d2c  Shahpur  CB183  0.45  2.25  0.6  0.81  238  192.4  437        5831  877     7144 

30  2B2C7d2c  Shahpur  CB182  0.45  2.25  0.6  0.81  240  194.4  442        5889  885     7217 

31  2B2C7d2c  Shahpur  CB181  0.45  2.25  0.6  0.81  185  149.7  340        4537  682     5560 

32  2B2C7d2c  Shahpur  CB180  0.45  2.25  0.6  0.81  264  213.8  486        6479  974     7939 

33  2B2C7d2c  Shahpur  CB179  0.45  2.25  0.6  0.81  210  169.8  386        5144  773     6304 

34  2B2C7d2c  Shahpur  CB187  0.45  2.25  0.6  0.81  592  479.5  1090        14530  2185     17804 

35  2B2C7d2c  Shahpur  MB114  0.6  3.6  1  2.1  1035  2172.6  4937        65831  5944     76711 

36  2B2C7d2c  Shahpur  MB116  0.6  3.6  1  2.1  382  801.8  1822        24296  2194     28311 

37  2B2C7d2c  Shahpur  MB119  0.6  3.6  1  2.1  730  1532.2  3482        46426  4192     54099 

38  2B2C7d2c  Shahpur  MB117  0.6  3.6  1  2.1  495  1040.2  2364        31518  2846     36728 

39  2B2C7d2c  Shahpur  MB118  0.6  3.6  1  2.1  1141  2396.9  5447        72626  6557     84631 

40  2B2C7d2c  Shahpur  MB115  0.6  3.6  1  2.1  376  790.3  1796        23948  2162     27906 

Total                       13496  16297.8  37037        493838  58353  0  589227 

Details of Water Resources  PLength  PWidth  PDepth                               

41  2B2C7d2c  Shahpur  PND05                 2413.6  0  2  HMP  128568     80000  218211 

Total                       0  2413.6  0  2     128568  0  80000  218211 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         807438 

Page 199: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

50

Name of Gram Panchayat : Sisauna 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1   2B2C7g1b  Sisauna  CB139  0.45  2.25  0.6  0.81  134  108.3  246        3281  493     4020 

2   2B2C7g1b  Sisauna  CB08  0.45  2.25  0.6  0.81  349  282.6  642        8563  1287     10493 

3   2B2C7g1b  Sisauna  CB09  0.45  2.25  0.6  0.81  446  361.2  821        10944  1645     13410 

4   2B2C7g1b  Sisauna  CB143  0.45  2.25  0.6  0.81  136  110.5  251        3347  503     4102 

5   2B2C7g1b  Sisauna  CB144  0.45  2.25  0.6  0.81  428  347.1  789        10517  1581     12887 

6   2B2C7g1b  Sisauna  CB10  0.45  2.25  0.6  0.81  194  157  357        4757  715     5829 

7   2B2C7g1b  Jariyari  CB145  0.45  2.25  0.6  0.81  263  213.2  485        6461  971     7917 

8   2B2C7g1b  Sisauna  CB11  0.45  2.25  0.6  0.81  134  108.7  247        3293  495     4035 

9   2B2C7g1b  Sisauna  CB140  0.45  2.25  0.6  0.81  134  108.6  247        3289  495     4031 

10   2B2C7g1b  Sisauna  CB141  0.45  2.25  0.6  0.81  218  176.4  401        5344  803     6549 

11   2B2C7g1b  Sisauna  CB142  0.45  2.25  0.6  0.81  100  81.3  185        2462  370     3017 

12   2B2C7g1b  Sisauna  CB07  0.45  2.25  0.6  0.81  119  96.7  220        2929  440     3590 

13   2B2C7g1b  Sisauna  CB06  0.45  2.25  0.6  0.81  127  102.7  233        3113  468     3814 

14   2B2C7g1b  Sisauna  CB05  0.45  2.25  0.6  0.81  132  107.1  243        3244  488     3975 

15   2B2C7g1b  Jariyari  CB146  0.45  2.25  0.6  0.81  335  271.2  616        8218  1236     10069 

16   2B2C7g1b  Sisauna  ECD09  3  15  3  27  47  1265.2  4466        59541  1154     65162 

17   2B2C7g1b  Sisauna  ECD12  3  15  3  27  51  1368.5  4830        64402  1248     70480 

18   2B2C7g1b  Sisauna  ECD01  3  15  3  27  94  2550.4  9002        120023  2327     131352 

19   2B2C7g1b  Sisauna  ECD13  3  15  3  27  47  1255.8  4432        59096  1146     64674 

20   2B2C7g1b  Sisauna  ECD06  3  15  3  27  83  2243.3  7918        105570  2046     115534 

21   2B2C7g1b  Sisauna  ECD02  3  15  3  27  70  1903  6717        89555  1736     98008 

22   2B2C7g1b  Sisauna  ECD03  3  15  3  27  75  2034.2  7180        95728  1856     104764 

23   2B2C7g1b  Sisauna  ECD04  3  15  3  27  105  2846.9  10048        133975  2597     146620 

24   2B2C7g1b  Sisauna  ECD11  3  15  3  27  109  2930.3  10342        137899  2673     150914 

25   2B2C7g1b  Sisauna  ECD05  3  15  3  27  106  2854.9  10076        134352  2604     147032 

26   2B2C7g1b  Sisauna  ECD07  3  15  3  27  41  1109.7  3917        52223  1012     57153 

27   2B2C7g1b  Sisauna  ECD66  3  15  3  27  208  5622.9  19846        264612  5129     289587 

28   2B2C7g1b  Sisauna  ECD08  3  15  3  27  37  999.3  3527        47026  912     51465 

29   2B2C7g1b  Sisauna  ECD10  3  15  3  27  56  1510  5330        71062  1377     77770 

30   2B2C7g1b  Sisauna  MB146  0.6  3.6  1  2.1  209  437.9  995        13269  1198     15462 

31   2B2C7g1b  Sisauna  MB150  0.6  3.6  1  2.1  437  917  2084        27785  2509     32378 

32   2B2C7g1b  Sisauna  MB01  0.6  3.6  1  2.1  836  1755  3988        53177  4801     61966 

33   2B2C7g1b  Sisauna  MB144  0.6  3.6  1  2.1  419  880.3  2001        26675  2408     31084 

34   2B2C7g1b  Sisauna  MB145  0.6  3.6  1  2.1  268  562.2  1278        17036  1538     19852 

35   2B2C7g1b  Sisauna  MB143  0.6  3.6  1  2.1  336  705.8  1604        21385  1931     24920 

36   2B2C7g1b  Sisauna  MB161  0.6  3.6  1  2.1  111  232.1  527        7033  635     8195 

Page 200: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

51

37   2B2C7g1b  Jariyari  MB175  0.6  3.6  1  2.1  121  255.1  580        7731  698     9009 

38   2B2C7g1b  Jariyari  MB174  0.6  3.6  1  2.1  220  462.7  1051        14020  1266     16336 

39   2B2C7g1b  Jariyari  MB173  0.6  3.6  1  2.1  159  334.3  760        10130  915     11805 

40   2B2C7g1b  Jariyari  MB172  0.6  3.6  1  2.1  124  259.6  590        7864  710     9165 

41   2B2C7g1b  Jariyari  MB171  0.6  3.6  1  2.1  81  169.1  384        5124  463     5971 

42   2B2C7g1b  Jariyari  MB170  0.6  3.6  1  2.1  64  134.1  305        4063  367     4735 

43   2B2C7g1b  Jariyari  MB169  0.6  3.6  1  2.1  54  113.8  259        3449  311     4019 

44   2B2C7g1b  Jariyari  MB168  0.6  3.6  1  2.1  116  244.4  555        7406  669     8630 

45   2B2C7g1b  Jariyari  MB167  0.6  3.6  1  2.1  551  1157.5  2630        35073  3167     40870 

46   2B2C7g1b  Sisauna  MB166  0.6  3.6  1  2.1  675  1418.3  3223        42973  3880     50076 

47   2B2C7g1b  Sisauna  MB165  0.6  3.6  1  2.1  632  1327.7  3017        40229  3632     46878 

48   2B2C7g1b  Sisauna  MB164  0.6  3.6  1  2.1  222  465.5  1058        14104  1273     16435 

49   2B2C7g1b  Sisauna  MB148  0.6  3.6  1  2.1  221  464.4  1055        14070  1270     16396 

50   2B2C7g1b  Sisauna  MB162  0.6  3.6  1  2.1  194  407.3  925        12340  1114     14379 

51   2B2C7g1b  Sisauna  MB147  0.6  3.6  1  2.1  2916  6122.8  13914        185520  16750     216184 

52   2B2C7g1b  Sisauna  MB160  0.6  3.6  1  2.1  104  218  495        6606  596     7697 

53   2B2C7g1b  Sisauna  MB159  0.6  3.6  1  2.1  72  151.8  345        4598  415     5359 

54   2B2C7g1b  Sisauna  MB158  0.6  3.6  1  2.1  132  277.1  630        8397  758     9785 

55   2B2C7g1b  Sisauna  MB157  0.6  3.6  1  2.1  28  58.2  132        1762  159     2053 

56   2B2C7g1b  Sisauna  MB156  0.6  3.6  1  2.1  68  142.4  324        4314  389     5027 

57   2B2C7g1b  Sisauna  MB155  0.6  3.6  1  2.1  345  725.5  1649        21984  1985     25617 

58   2B2C7g1b  Sisauna  MB154  0.6  3.6  1  2.1  51  106.9  243        3240  293     3775 

59   2B2C7g1b  Sisauna  MB153  0.6  3.6  1  2.1  82  173.1  393        5246  474     6113 

60   2B2C7g1b  Sisauna  MB152  0.6  3.6  1  2.1  84  175.4  399        5315  480     6194 

61   2B2C7g1b  Sisauna  MB151  0.6  3.6  1  2.1  207  434.2  987        13157  1188     15332 

62   2B2C7g1b  Jariyari  MB176  0.6  3.6  1  2.1  172  361.5  822        10955  989     12766 

63   2B2C7g1b  Sisauna  MB149  0.6  3.6  1  2.1  209  439.5  999        13316  1202     15517 

64   2B2C7g1b  Sisauna  MB163  0.6  3.6  1  2.1  162  339.7  772        10292  929     11994 

Total                       15060  55557.2  164587        2194464  101169  0  2460227 

Details of Water Resources  PLength  PWidth  PDepth                               

65   2B2C7g1b  Jariyari  PND05                 4399.1  0  2  HMP  234600     80000  332195 

66   2B2C7g1b  Sisauna  PND04                 6562.4  0  2  HMP  350165     80000  456427 

67   2B2C7g1b  Sisauna  PND03                 4374.3  0  2  HMP  233252     80000  330746 

68   2B2C7g1b  Sisauna  WHB08  3  15  3  27  69  1871.2  1138        88060  1707     96371 

69   2B2C7g1b  Sisauna  WHB07  3  15  3  27  63  1709.4  1039.6        80446  1559     88038 

70   2B2C7g1b  Sisauna  WHB06  3  15  3  27  70  1880.3  1143.5        88489  1715     96841 

Total                       202  20796.7  3321.1  6     1075012  4981  240000  1400618 

Details of Afforestation and Agro forestry                                        

Total                                               0 

Grand Total                                         3860845 

Page 201: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

52

Name of Gram Panchayat : Surajpur Khapraila 

S.No Watershed 

Code Village Name 

Structure Code 

Top width (T) 

Base width (B) 

Height (H) m 

CS (T+B)/2*H 

sqm 

Length m 

Earth Work Cum 

Dressing + Others 

Outlets Type of 

outlet 

EW Cost (Rs.) 

Sodding cost (Rs.) 

Outlet cost (Rs.) 

Total cost (Rs.) 

Details of Soil Moisture measures                                        

1  2B2C7d2c  Gudari  CB89  0.45  2.25  0.6  0.81  230  186.3  423        5643  848     6915 

2  2B2C7d2a  Surajpur Khapraila  CB05  0.45  2.25  0.6  0.81  605  489.8  1113        14842  2231     18186 

3  2B2C7d2a  Surajpur Khapraila  CB04  0.45  2.25  0.6  0.81  391  316.4  719        9588  1442     11748 

4  2B2C7d2a  Surajpur Khapraila  CB03  0.45  2.25  0.6  0.81  358  290.4  660        8798  1323     10781 

5  2B2C7d2a  Surajpur Khapraila  CB02  0.45  2.25  0.6  0.81  189  153.3  348        4646  698     5692 

6  2B2C7d2a  Surajpur Khapraila  CB01  0.45  2.25  0.6  0.81  355  287.4  653        8708  1309     10670 

7  2B2C7d2c  Surajpur Khapraila  CB107  0.45  2.25  0.6  0.81  734  594.7  1351        18019  2709     22079 

8  2B2C7d2c  Surajpur Khapraila  CB106  0.45  2.25  0.6  0.81  262  212.4  483        6435  967     7885 

9  2B2C7d2c  Surajpur Khapraila  CB99  0.45  2.25  0.6  0.81  169  136.6  310        4138  622     5070 

10  2B2C7d2c  Surajpur Khapraila  CB104  0.45  2.25  0.6  0.81  446  361.5  821        10953  1647     13421 

11  2B2C7d2c  Surajpur Khapraila  CB103  0.45  2.25  0.6  0.81  148  120.1  273        3640  547     4460 

12  2B2C7d2c  Surajpur Khapraila  CB102  0.45  2.25  0.6  0.81  141  114.5  260        3469  522     4251 

13  2B2C7d2c  Surajpur Khapraila  CB101  0.45  2.25  0.6  0.81  207  167.8  381        5083  764     6228 

14  2B2C7d2c  Surajpur Khapraila  CB100  0.45  2.25  0.6  0.81  108  87.3  198        2646  398     3242 

15  2B2C7d2a  Surajpur Khapraila  CB06  0.45  2.25  0.6  0.81  421  341.4  776        10343  1555     12674 

16  2B2C7d2c  Gudari  CB83  0.45  2.25  0.6  0.81  527  427  970        12938  1945     15854 

17  2B2C7d2c  Gudari  CB76  0.45  2.25  0.6  0.81  276  223.6  508        6776  1019     8303 

18  2B2C7d2c  Gudari  CB77  0.45  2.25  0.6  0.81  377  305.1  693        9245  1390     11328 

19  2B2C7d2c  Gudari  CB78  0.45  2.25  0.6  0.81  455  368.2  837        11158  1678     13672 

20  2B2C7d2c  Gudari  CB79  0.45  2.25  0.6  0.81  136  110  250        3332  501     4082 

21  2B2C7d2c  Gudari  CB80  0.45  2.25  0.6  0.81  79  63.7  145        1929  290     2364 

22  2B2C7d2c  Gudari  CB91  0.45  2.25  0.6  0.81  107  86.5  197        2621  394     3212 

23  2B2C7d2c  Gudari  CB82  0.45  2.25  0.6  0.81  242  196.2  446        5944  894     7283 

24  2B2C7d2c  Gudari  CB90  0.45  2.25  0.6  0.81  113  91.3  207        2767  416     3389 

25  2B2C7d2c  Gudari  CB84  0.45  2.25  0.6  0.81  305  246.7  561        7475  1124     9160 

26  2B2C7d2c  Gudari  CB85  0.45  2.25  0.6  0.81  481  389.5  885        11803  1775     14463 

27  2B2C7d2c  Gudari  CB86  0.45  2.25  0.6  0.81  445  360  818        10909  1640     13368 

28  2B2C7d2c  Gudari  CB87  0.45  2.25  0.6  0.81  283  229  520        6938  1043     8501 

29  2B2C7d2c  Gudari  CB88  0.45  2.25  0.6  0.81  805  652.4  1483        19767  2972     24222 

30  2B2C7d2c  Surajpur Khapraila  CB105  0.45  2.25  0.6  0.81  273  221.4  503        6709  1009     8220 

31  2B2C7d2c  Gudari  CB81  0.45  2.25  0.6  0.81  195  158  359        4788  720     5867 

32  2B2C7d2c  Surajpur Khapraila  CB109  0.45  2.25  0.6  0.81  165  133.5  303        4044  608     4955 

33  2B2C7d2c  Surajpur Khapraila  CB116  0.45  2.25  0.6  0.81  227  183.6  417        5563  836     6816 

34  2B2C7d2c  Surajpur Khapraila  CB115  0.45  2.25  0.6  0.81  246  199.1  452        6033  907     7392 

35  2B2C7d2c  Surajpur Khapraila  CB114  0.45  2.25  0.6  0.81  173  140.4  319        4255  640     5214 

36  2B2C7d2c  Surajpur Khapraila  CB113  0.45  2.25  0.6  0.81  160  129.8  295        3933  591     4819 

Page 202: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

53

37  2B2C7d2c  Surajpur Khapraila  CB112  0.45  2.25  0.6  0.81  272  220.4  501        6678  1004     8183 

38  2B2C7d2c  Surajpur Khapraila  CB111  0.45  2.25  0.6  0.81  270  218.3  496        6616  995     8106 

39  2B2C7d2c  Surajpur Khapraila  CB110  0.45  2.25  0.6  0.81  366  296.6  674        8986  1351     11011 

40  2B2C7d2c  Surajpur Khapraila  CB108  0.45  2.25  0.6  0.81  160  129.5  294        3922  590     4806 

41  2B2C7d2c  Surajpur Khapraila  CB94  0.45  2.25  0.6  0.81  214  173.4  394        5253  790     6437 

42  2B2C7d2c  Surajpur Khapraila  CB98  0.45  2.25  0.6  0.81  191  154.7  352        4689  705     5746 

43  2B2C7d2c  Surajpur Khapraila  CB97  0.45  2.25  0.6  0.81  172  139.1  316        4215  634     5165 

44  2B2C7d2c  Surajpur Khapraila  CB95  0.45  2.25  0.6  0.81  310  251  570        7607  1144     9320 

45  2B2C7d2c  Surajpur Khapraila  CB93  0.45  2.25  0.6  0.81  426  345  784        10454  1572     12810 

46  2B2C7d2c  Surajpur Khapraila  CB92  0.45  2.25  0.6  0.81  631  511.1  1162        15487  2328     18977 

47  2B2C7d2c  Surajpur Khapraila  CB96  0.45  2.25  0.6  0.81  181  146.2  332        4430  666     5428 

48  2B2C7d2c  Gudari  ECD08  3  15  3  27  30  810  2859        38118  739     41716 

49  2B2C7d2c  Gudari  ECD06  3  15  3  27  30  810  2859        38119  739     41716 

50  2B2C7d2c  Surajpur Khapraila  ECD16  3  15  3  27  27  721.9  2548        33973  659     37179 

51  2B2C7d2c  Surajpur Khapraila  ECD17  3  15  3  27  37  987.5  3485        46470  901     50855 

52  2B2C7d2c  Surajpur Khapraila  ECD12  3  15  3  27  60  1619.3  5715        76203  1477     83395 

53  2B2C7d2c  Gudari  ECD01  3  15  3  27  55  1496.2  5281        70410  1365     77056 

54  2B2C7d2c  Surajpur Khapraila  ECD11  3  15  3  27  58  1572.4  5550        73996  1434     80981 

55  2B2C7d2c  Gudari  ECD05  3  15  3  27  125  3377.2  11920        158930  3081     173931 

56  2B2C7d2c  Surajpur Khapraila  ECD14  3  15  3  27  41  1095.3  3866        51544  999     56409 

57  2B2C7d2c  Gudari  ECD04  3  15  3  27  45  1215  4288        57178  1108     62574 

58  2B2C7d2c  Surajpur Khapraila  ECD10  3  15  3  27  55  1483.5  5236        69813  1353     76402 

59  2B2C7d2c  Surajpur Khapraila  ECD13  3  15  3  27  57  1532.6  5409        72124  1398     78931 

60  2B2C7d2c  Surajpur Khapraila  ECD09  3  15  3  27  76  2064.4  7286        97153  1883     106322 

61  2B2C7d2c  Gudari  ECD07  3  15  3  27  50  1350  4765        63531  1232     69528 

62  2B2C7d2c  Surajpur Khapraila  ECD15  3  15  3  27  63  1696.1  5986        79817  1547     87350 

63  2B2C7d2c  Gudari  ECD03  3  15  3  27  60  1620  5718        76237  1478     83433 

64  2B2C7d2c  Gudari  ECD02  3  15  3  27  64  1724.7  6087        81164  1573     88825 

65  2B2C7d2c  Surajpur Khapraila  MB60  0.6  3.6  1  2.1  123  257.7  586        7808  705     9099 

66  2B2C7d2c  Gudari  MB49  0.6  3.6  1  2.1  543  1139.5  2590        34527  3117     40235 

67  2B2C7d2c  Gudari  MB42  0.6  3.6  1  2.1  175  367  834        11119  1004     12957 

68  2B2C7d2c  Gudari  MB51  0.6  3.6  1  2.1  93  195.8  445        5933  536     6913 

69  2B2C7d2c  Gudari  MB48  0.6  3.6  1  2.1  273  573.8  1304        17386  1570     20259 

70  2B2C7d2c  Gudari  MB47  0.6  3.6  1  2.1  499  1048.4  2383        31767  2868     37018 

71  2B2C7d2c  Gudari  MB50  0.6  3.6  1  2.1  531  1114.2  2532        33760  3048     39341 

72  2B2C7d2c  Gudari  MB46  0.6  3.6  1  2.1  385  807.8  1836        24476  2210     28522 

73  2B2C7d2c  Gudari  MB45  0.6  3.6  1  2.1  516  1083.9  2463        32843  2965     38271 

74  2B2C7d2c  Gudari  MB44  0.6  3.6  1  2.1  346  725.8  1649        21991  1986     25626 

75  2B2C7d2c  Gudari  MB43  0.6  3.6  1  2.1  545  1144.2  2600        34670  3130     40400 

76  2B2C7d2c  Surajpur Khapraila  MB53  0.6  3.6  1  2.1  440  923.8  2099        27991  2527     32617 

Page 203: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

54

77  2B2C7d2c  Gudari  MB41  0.6  3.6  1  2.1  392  822.4  1869        24919  2250     29038 

78  2B2C7d2c  Gudari  MB40  0.6  3.6  1  2.1  516  1083.1  2461        32819  2963     38243 

79  2B2C7d2c  Gudari  MB39  0.6  3.6  1  2.1  184  387.3  880        11735  1060     13675 

80  2B2C7d2c  Gudari  MB38  0.6  3.6  1  2.1  362  760.3  1728        23038  2080     26846 

81  2B2C7d2c  Gudari  MB37  0.6  3.6  1  2.1  429  901.7  2049        27321  2467     31837 

82  2B2C7d2c  Gudari  MB36  0.6  3.6  1  2.1  370  777.8  1767        23566  2128     27461 

83  2B2C7d2c  Gudari  MB35  0.6  3.6  1  2.1  242  508.8  1156        15416  1392     17964 

84  2B2C7d2c  Gudari  MB34  0.6  3.6  1  2.1  445  935  2125        28331  2558     33014 

85  2B2C7d2c  Gudari  MB33  0.6  3.6  1  2.1  587  1233.4  2803        37371  3374     43548 

86  2B2C7d2c  Surajpur Khapraila  MB61  0.6  3.6  1  2.1  255  534.6  1215        16197  1462     18874 

87  2B2C7d2c  Surajpur Khapraila  MB63  0.6  3.6  1  2.1  481  1010.2  2296        30610  2764     35670 

88  2B2C7d2c  Surajpur Khapraila  MB75  0.6  3.6  1  2.1  599  1258  2859        38118  3442     44419 

89  2B2C7d2c  Surajpur Khapraila  MB74  0.6  3.6  1  2.1  442  928.2  2109        28125  2539     32773 

90  2B2C7d2c  Surajpur Khapraila  MB73  0.6  3.6  1  2.1  263  551.6  1253        16712  1509     19474 

91  2B2C7d2c  Surajpur Khapraila  MB72  0.6  3.6  1  2.1  277  581.2  1321        17612  1590     20523 

92  2B2C7d2c  Surajpur Khapraila  MB71  0.6  3.6  1  2.1  413  866.8  1970        26264  2371     30606 

93  2B2C7d2c  Surajpur Khapraila  MB70  0.6  3.6  1  2.1  248  521.2  1184        15791  1426     18401 

94  2B2C7d2c  Surajpur Khapraila  MB69  0.6  3.6  1  2.1  911  1914.1  4350        57997  5236     67583 

95  2B2C7d2c  Surajpur Khapraila  MB68  0.6  3.6  1  2.1  255  535  1216        16211  1464     18890 

96  2B2C7d2c  Surajpur Khapraila  MB67  0.6  3.6  1  2.1  608  1276.3  2900        38672  3492     45063 

97  2B2C7d2c  Surajpur Khapraila  MB66  0.6  3.6  1  2.1  171  360  818        10907  985     12710 

98  2B2C7d2c  Surajpur Khapraila  MB62  0.6  3.6  1  2.1  323  678.6  1542        20561  1856     23960 

99  2B2C7d2c  Surajpur Khapraila  MB64  0.6  3.6  1  2.1  223  468.3  1064        14190  1281     16535 

100  2B2C7d2c  Surajpur Khapraila  MB65  0.6  3.6  1  2.1  256  537  1220        16270  1469     18959 

101  2B2C7d2c  Surajpur Khapraila  MB81  0.6  3.6  1  2.1  174  365.9  832        11087  1001     12920 

102  2B2C7d2c  Surajpur Khapraila  MB52  0.6  3.6  1  2.1  349  733.6  1667        22229  2007     25903 

103  2B2C7d2c  Surajpur Khapraila  MB54  0.6  3.6  1  2.1  208  436.8  993        13236  1195     15424 

104  2B2C7d2c  Surajpur Khapraila  MB55  0.6  3.6  1  2.1  233  490.2  1114        14853  1341     17308 

105  2B2C7d2c  Surajpur Khapraila  MB56  0.6  3.6  1  2.1  421  883.8  2009        26781  2418     31208 

106  2B2C7d2c  Surajpur Khapraila  MB57  0.6  3.6  1  2.1  94  197.8  449        5992  541     6982 

107  2B2C7d2c  Surajpur Khapraila  MB59  0.6  3.6  1  2.1  320  672.2  1528        20368  1839     23735 

108  2B2C7d2c  Surajpur Khapraila  MB76  0.6  3.6  1  2.1  184  386  877        11695  1056     13628 

109  2B2C7d2c  Surajpur Khapraila  MB80  0.6  3.6  1  2.1  190  398  904        12059  1089     14052 

110  2B2C7d2c  Surajpur Khapraila  MB79  0.6  3.6  1  2.1  230  482.6  1097        14624  1320     17041 

111  2B2C7d2c  Surajpur Khapraila  MB78  0.6  3.6  1  2.1  401  842.2  1914        25519  2304     29737 

112  2B2C7d2c  Surajpur Khapraila  MB77  0.6  3.6  1  2.1  211  443.3  1007        13433  1213     15653 

113  2B2C7d2c  Surajpur Khapraila  MB58  0.6  3.6  1  2.1  326  685.2  1557        20763  1875     24195 

114  2B2C7d2c  Surajpur Khapraila  PB09  0.6  3.6  1  2.1  999  2097.9  4767        63566  5739     74072 

115  2B2C7d2c  Surajpur Khapraila  PB11  0.6  3.6  1  2.1  422  885.6  2013        26834  2423     31270 

116  2B2C7d2c  Surajpur Khapraila  PB10  0.6  3.6  1  2.1  76  160.1  364        4851  438     5653 

Page 204: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

55

117  2B2C7d2c  Surajpur Khapraila  PB08  0.6  3.6  1  2.1  511  1073.7  2440        32534  2937     37911 

118  2B2C7d2c  Surajpur Khapraila  PB12  0.6  3.6  1  2.1  550  1156  2627        35026  3162     40816 

119  2B2C7d2c  Surajpur Khapraila  PB07  0.6  3.6  1  2.1  334  700.6  1592        21228  1917     24736 

120  2B2C7d2c  Surajpur Khapraila  PB06  0.6  3.6  1  2.1  655  1375.1  3125        41667  3762     48554 

121  2B2C7d2c  Surajpur Khapraila  PB03  0.6  3.6  1  2.1  494  1037.3  2357        31430  2838     36625 

122  2B2C7d2c  Gudari  PB02  0.6  3.6  1  2.1  427  896.4  2037        27162  2452     31651 

123  2B2C7d2c  Surajpur Khapraila  PB05  0.6  3.6  1  2.1  105  221.2  503        6702  605     7810 

124  2B2C7d2c  Surajpur Khapraila  PB04  0.6  3.6  1  2.1  828  1737.9  3949        52659  4754     61363 

125  2B2C7d2c  Gudari  PB01  0.6  3.6  1  2.1  212  444.2  1009        13460  1215     15684 

Total                       37635  84152.7  222877        2971777  204984  0  3399633 

Details of Water Resources                                        

126  2B2C7d2c  Surajpur Khapraila  WHB04  3  15  3  27  46  1231.4  748.9        57949  1123     63418 

127  2B2C7d2c  Surajpur Khapraila  WHB03  3  15  3  27  38  1026.9  624.5        48324  937     52885 

128  2B2C7d2c  Surajpur Khapraila  WHB02  3  15  3  27  20  527  320.5        24801  481     27142 

129  2B2C7d2c  Surajpur Khapraila  WHB01  3  15  3  27  56  1508.8  917.5        71002  1376     77703 

130  2B2C7d2c  Surajpur Khapraila  WHB07  3  15  3  27  47  1274.8  775.3        59991  1163     65653 

131  2B2C7d2c  Surajpur Khapraila  WHB06  3  15  3  27  63  1691.5  1028.7        79604  1543     87117 

132  2B2C7d2c  Surajpur Khapraila  WHB05  3  15  3  27  54  1456.7  885.9        68554  1329     75025 

Total                       324  8717.1  5301.3  0     410225  7952  0  448943 

Details of Afforestation and Agro forestry                                        

133  2B2C7d2c  Gudari  AFF05              8567                       41130 

134  2B2C7d2c  Gudari  AFF04              1336                       6420 

135  2B2C7d2c  Gudari  AFF03              10228                       49080 

136  2B2C7d2c  Gudari  AFF02              4088                       19620 

137  2B2C7d2c  Gudari  AFF01              2751                       13200 

Total                                               129450 

Grand Total                                         3978026 

Page 205: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

56

ANNEXURE‐II Contribution to Watershed Development Fund (WDF) 

 Name of Gram Panchayat :Akbarpur Dhanethi    Benificiary wise details of Proposed / Planned Watershed Development Activities 

 S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 1  Ingholia  2B2C7d2c        Suryapur Khapraila        CB192                    307 2.837 0.364 15079  97 2              308    0.434    115 3              309    0.472    126 4              310/656              0.408    108 5              313    0.101    27 6              314    0.054    14 7              315    0.034    9 8              317    0.164    44 9              318    0.050    13 10              321    0.016    4 11              322    0.015    4 12              323    0.029    8 13              324    0.695    185 14           CB193                    151 0.811 0.441 6222  169 15              152    0.127    49 16              153    0.117    45 17              154    0.126    48 18           CB194                    293 2.174 0.024 6998  4 19              294    0.181    29 20              301    0.784    126 21              302    0.290    47 22              303    0.109    17 23              304    0.060    10 24              325    0.550    88 

Page 206: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

57

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 25              335    0.129    21 26              336    0.018    3 27              337    0.029    5 28           CB195                    195 1.137 0.213 9044  85 29              288    0.083    33 30              289    0.086    34 31              290    0.011    4 32              291    0.304    121 33              292    0.221    88 34              327    0.103    41 35              328    0.117    46 36           CB196                    346 1.180 0.215 5604  51 37              347    0.355    84 38              348    0.115    27 39              356    0.249    59 40              357    0.245    58 41           CB197                    365 0.456 0.239 2652  70 42              366    0.217    63 43           CB198                    345 1.091 0.530 8797  214 44              358    0.209    84 45              359    0.180    73 46              360    0.171    69 47           CB199                    363 0.545 0.269 2646  65 48              364    0.276    67 49           CB200                    376 0.508 0.076 2548  19 50              377    0.235    59 51              378    0.198    50 52     2B2C7d2d       Akbarpur Dhaneti          CB116                    121 1.265 0.395 7244  113 53              123    0.208    60 54              124    0.021    6 

Page 207: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

58

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 55              133    0.308    88 56              134    0.191    55 57              136    0.142    41 58           CB117                    235 1.105 0.324 11122  163 59              236    0.073    37 60              249    0.293    147 61              253    0.415    209 62           CB118                    226 1.551 0.544 9285  163 63              228    0.720    215 64              229    0.287    86 65           CB119                    138 0.698 0.405 5852  170 66              140    0.292    123 67           CB120                    126 0.883 0.454 5905  152 68              127    0.101    34 69              128    0.142    47 70              129    0.186    62 71           CB121                    212 0.494 0.122 6074  75 72              213    0.372    229 73           CB122                    209 1.023 0.137 8350  56 74              210    0.393    160 75              214    0.056    23 76              215    0.295    120 77              218    0.142    58 78  Akbarpur Dhanethi        CB123                    449 1.193 0.425 6257  111 79              451    0.769    202 80           CB124                    450 1.485 0.311 11023  116 81              452    0.499    185 82              453    0.518    192 83              455    0.156    58 84           CB126                    429 0.342 0.342 2616  131 

Page 208: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

59

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 85           CB127                    456 2.947 0.612 10396  108 86              457    0.027    5 87              459    0.385    68 88              469    0.203    36 89              NS/626                1.586    280 90              T/458                   0.135    24 91           CB128                    439 0.914 0.308 4584  77 92              440    0.312    78 93              441    0.294    74 94           CB129                    438 0.987 0.987 4317  216 95           CB130                    437 0.728 0.728 4510  226 96           CB131                    410 0.917 0.129 6411  45 97              411    0.788    276 98           CB132                    376 0.300 0.300 2282  114 99           CB133                    381 0.650 0.650 4478  224 100           CB134                    391 0.417 0.417 3422  171 101           CB135                    397 0.164 0.079 3432  82 102              398    0.085    89 103           CB136                    869 0.271 0.271 3942  197 104           CB137                    211 0.434 0.434 4577  229 105           CB138                    308 1.373 0.489 5079  91 106              312    0.471    87 107              313    0.413    76 108           CB139                    671 0.548 0.548 3821  191 109           CB140                    872 0.795 0.148 4034  38 110              873    0.647    164 111           CB141                    807 2.142 0.413 12170  117 112              835    0.555    158 113              888    0.415    118 114              893    0.389    111 

Page 209: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

60

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 115              G/836                  0.075    21 116              G/837                  0.295    84 117           CB142                    889 0.356 0.356 3213  161 118           CB143                    890 0.271 0.271 3419  171 119           CB144                    861 0.594 0.594 5825  291 120           CB145                    927 0.265 0.265 2281  114 121           CB146                    929 0.950 0.705 5737  213 122              938    0.245    74 123           CB147                    914 0.448 0.448 4797  240 124           CB148                    956 0.677 0.677 10994  550 125           CB149                    729 0.509 0.074 4898  36 126              730    0.158    76 127              731    0.276    133 128           CB150                    744 0.227 0.227 2836  142 129           CB151                    742 0.551 0.156 4543  64 130              746    0.396    163 131           CB152                    740 0.646 0.343 4620  123 132              741    0.303    108 133           CB153                    751 0.267 0.267 3222  161 134           CB154                    754 0.463 0.090 3353  32 135              755    0.071    26 136              756    0.112    40 137              757    0.058    21 138              758    0.132    48 139           CB155                    760 0.455 0.239 5619  147 140              761    0.216    134 141           CB156                    773 0.670 0.346 5944  154 142              777    0.323    143 143           CB157                    779 1.150 1.150 3774  189 144           CB158                    780 0.328 0.328 3623  181 

Page 210: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

61

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 145           CB159                    776 2.169 0.429 10820  107 146              801    0.366    91 147              802    0.315    78 148              803    0.122    30 149              804    0.649    162 150              817    0.289    72 151           CB160                    796 0.465 0.465 2663  133 152           CB161                    819 1.144 0.178 5240  41 153              820    0.173    40 154              821    0.163    37 155              822    0.141    32 156              823    0.489    112 157           CB162                    832 0.902 0.443 9341  229 158              833    0.123    64 159              896    0.156    81 160              897    0.181    94 161           CB163                    891 0.256 0.256 3379  169 162           CB164                    895 0.363 0.363 3166  158 163           CB165                    894 0.334 0.334 3290  164 164           CB166                    808 1.887 0.222 6660  39 165              809    0.567    100 166              810    0.033    6 167              811    0.186    33 168              B/805                  0.880    155 169           CB167                    268 0.234 0.234 3585  179 170           CB168                   265 1.102 1.102 8528  426 171           CB169                    1009 2.188 0.288 9133  60 172              1010    0.358    75 173              1011    1.088    227 174              1012    0.213    44 

Page 211: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

62

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 175              1013    0.206    43 176              1014    0.036    8 177           CB170                    1015 0.419 0.419 5047  252 178           CB171                    1016 0.526 0.526 5400  270 179           CB172                    1017 0.319 0.319 4896  245 180           CB173                    1018 0.856 0.856 5040  252 181           CB174                    1020 1.946 1.674 9555  411 182              1021    0.272    67 183           CB175                    CR/1029           0.514 0.514 4826  241 184           CB176                    CR/1029           0.286 0.286 4467  223 185           CB177                    1028 1.063 1.063 4604  230 186           CB178                    1140 1.976 0.203 8150  42 187              1141    0.237    49 188              1144    0.204    42 189              1145    0.192    40 190              1146    0.275    57 191              1149    0.201    41 192              1150    0.352    73 193              1151    0.312    64 194           CB179                    1137 2.892 0.776 12527  168 195              1165    0.585    127 196              1167    0.275    60 197              1168    0.282    61 198              1170    0.477    103 199              1171    0.083    18 200              1172    0.089    19 201              1189    0.087    19 202              1190    0.019    4 203              T/1188                0.219    47 204           CB180                    1127 0.590 0.308 4582  120 

Page 212: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

63

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 205              1128    0.282    110 206           CB181                    1129 0.757 0.757 5699  285 207           CB182                    339 0.181 0.110 3049  92 208              G/338                  0.071    60 209           CB183                    1104 0.597 0.193 3859  63 210              1109    0.249    80 211              1110    0.040    13 212              G/113                  0.115    37 213           CB184                    1055 1.117 0.022 6071  6 214              1100    0.283    77 215              1103    0.487    132 216              G/1056                0.325    88 217           CB185                    G/1057             0.377 0.377 4412  221 218           CB186                    1033 4.075 0.902 24307  269 219              1035    0.108    32 220              1060    0.099    29 221              1071    0.200    60 222              1072    0.415    124 223              1073    0.093    28 224              1074    0.070    21 225              1075    0.757    226 226              G/1032                0.305    91 227              G/1062                0.051    15 228              G/1064                0.231    69 229              G/1065                0.780    233 230              K/1061                0.066    20 231           CB187                    957 0.537 0.186 5319  92 232              958    0.158    78 233              959    0.092    45 234              960    0.102    50 

Page 213: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

64

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 235           CRB05                                              12.954 0.374 185156  267 236              118    0.865    618 237              119    0.433    309 238              133    0.702    502 239              134    0.094    67 240              135    0.270    193 241              136    0.576    411 242              137    0.579    414 243              144    0.834    596 244              145    0.200    143 245              146    0.301    215 246              147    1.043    746 247              149    0.653    467 248              150    0.310    222 249              151    0.161    115 250              152    1.092    781 251              155    0.197    141 252              156    0.473    338 253              161    0.125    89 254              162    0.394    282 255              165    0.591    423 256              168    0.125    89 257              280    0.484    346 258              282    0.101    72 259              854    1.502    1073 260              T/320                   0.476    340 261  Ingholia                                  MB114                   118 1.305 0.457 31575  552 262              145    0.829    1002 263              146    0.020    24 264           MB115                   107 1.929 0.260 28167  190 

Page 214: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

65

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 265              108    0.323    236 266              113    0.181    132 267              114    0.106    77 268              115    0.133    97 269              117    0.925    676 270  Akbarpur Dhanethi              MB121                   519 10.572 0.798 89022  336 271              520    0.324    136 272              524    0.130    55 273              560    0.234    98 274              635    0.509    214 275              636    0.534    225 276              637    0.506    213 277              643    0.417    175 278              644    0.076    32 279              645    0.256    108 280              654    0.054    23 281              655    0.387    163 282              661    0.111    47 283              662    0.105    44 284              663    0.086    36 285              664    0.097    41 286              668    0.319    134 287              673    1.918    807 288              B/633                  1.168    492 289              B/666                  0.281    119 290              CR/578                0.686    289 291              CR/578                0.236    99 292              CR/578                0.062    26 293              CR/578                0.370    156 294              CR/578                0.327    138 

Page 215: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

66

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 295              CR/578                0.206    87 296              P/521                  0.377    159 297           MB122                   652 0.363 0.179 26585  656 298              U/651                  0.184    674 299           MB123                   672 0.255 0.255 12006  600 300           MB124                   585 1.999 0.312 35707  278 301              591    0.056    50 302              592    0.293    262 303              593    0.168    150 304              594    0.184    164 305              595    0.223    199 306              596    0.167    149 307              603    0.347    310 308              CR/578                0.249    222 309           MB125                   525 5.446 0.406 76369  285 310              526    0.137    96 311              528    0.370    259 312              528    0.567    398 313              588    0.240    168 314              598    0.081    57 315              599    0.340    238 316              600    0.161    113 317              601    0.333    234 318              602    0.113    79 319              638    0.201    141 320              640    0.258    181 321              641    1.124    788 322              642    0.379    266 323              CR/578                0.173    121 324              CR/578                0.226    159 

Page 216: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

67

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 325              CR/578                0.338    237 326           MB126                   657 1.626 0.134 21101  87 327              658    0.157    102 328              659    0.192    125 329              685    0.383    249 330              686    0.441    286 331              688    0.319    207 332           MB127                   478 3.405 0.242 46098  164 333              479    0.926    627 334              494    0.147    100 335              495    0.163    110 336              496    0.115    78 337              536    0.175    118 338              537    0.177    120 339              539    0.347    235 340              543    0.211    143 341              560    0.033    22 342              562    0.163    110 343              564    0.224    151 344              567    0.165    111 345              568    0.318    215 346           MB128                                             2.709 0.290 53925  288 347                                           0.003    3 348                                           0.006    6 349                                           0.284    283 350                                           0.052    52 351              477    0.839    836 352              548    0.602    599 353              549    0.128    127 354              552    0.089    89 

Page 217: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

68

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 355              565    0.202    201 356              566    0.158    158 357              CR/550                0.054    54 358           MB129                   474 0.492 0.492 10813  541 359           MB130                   612 2.972 1.646 35870  993 360              620    1.326    800 361           MB132                   532 4.754 0.330 53910  187 362              555    0.352    200 363              556    0.091    52 364              557    0.313    178 365              581    0.090    51 366              583    0.150    85 367              5880    0.175    99 368              605    1.276    724 369              608    0.321    182 370              609    0.216    123 371              B/632                  0.580    329 372              CR/578                0.499    283 373              CR/578                0.360    204 374           MB133                   42 2.375 0.095 39454  79 375              43    0.304    252 376              61    0.354    294 377              62    0.126    104 378              64    0.284    236 379              76    0.252    209 380              77    0.025    21 381              78    0.094    78 382              79    0.060    50 383              80    0.075    62 384              81    0.079    66 

Page 218: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

69

S.No  Village  MWS Code  MWS Name  Name of Work  Khasara No.  Total Benifited area  Plot Area  Total Cost  WDF 385              83    0.086    72 386              84    0.140    117 387              87    0.192    159 388              88    0.114    95 389              90    0.074    61 390              N/82                    0.021    18 391           MB134                   51 1.717 0.173 30599  154 392              53    0.316    281 393              59    0.231    205 394              T/45                     0.966    861 395              T/52                     0.032    29 396           MB135                   293 2.746 0.660 28433  342 397              294    0.143    74 398              295    0.085    44 399              296    0.089    46 400              297    0.158    82 401              300    0.146    76 402              309    0.792    410 403              CR/306                0.671    348 404           PB16                       683 20.524 0.199 31254  15 405              689    0.711    54 406              CR/578                19.613    1493 407           PB18                       513 0.400 0.236 12661  373 408              514    0.055    87 409              B/517                  0.109    173             G. Total     151.807    1325791  32759 

 Note : WDF contribution has been calculated @5% proportand to the individual area. The detail WDF contribution for the complete cluster is given in the project file.

Page 219: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

70

ANNEXURE‐III  Cost of watershed works Gram panchayat wise and MWS wise  

 Amount in Rs. Lakhs 

S.No  Grampanchayat  2B2C7e2b  2B2C7e2d  2B2C7e3a  2B2C7e3c  2B2C7f1b  Total GP 1  Akbarpur Dhanethi  0.596 18.937 19.533 2  Ambour  31.392 8.164 39.556 3  Baghaura  12.07 12.07 4  Beerkithai  11.568 11.568 5  Chandwal  41.293 41.293 6  Danapurkyampur  10.269 10.269 7  Ghazipur  8.572 59.371 67.943 8  Hameed Nagar  16.197 16.197 9  Ichaulia  40.153 40.153 10  Mahmoodabad  14.407 14.407 11  Mangrauda  49.979 49.979 12  Mehaura  52.528 52.528 13  Paharu Pur  53.149 53.149 14  Palhari  17.453 15.204 32.657 15  Saidkhanpur  9.237 19.033 28.27 16  Saifpur  8.821 8.821 17  Sarai Ka Sthan  4.639 21.044 25.683 18  Shahpur  8.074 8.074 19  Sisauna  38.608 38.608 20  Surajpur Khapraila  0.698 39.083 39.781    Total MWS  198.349 73.383 90.079 95.338 153.39 610.539 

Page 220: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

71

ANNEXURE‐IV (Parameters) 

 Labour Rate (Rs.)  100Unit Cost Masonary Outlet (Rs.)  0.05PLength%  100PWidth%  100PDepth%  150Plantation Cost (Rs.)  30Inter Plantation Distance (mtr)  2.5Sodding Rate (Rs.)  1.5

      

Type of Structure  Soil Type  Soil   Unit  EW  Rate  Dressing % Top  Base  Height  Side_Slope  CS CB  Sandy Loam  Normal Soil  cum  3.3  30.3 7.5 0.45 2.25 0.6 1.5:1  0.81 CD  Sandy Loam  Normal Soil  cum  2.85  35.09    1 1 1.5 1.5:1  1.5 CRB  Sandy Loam  Normal Soil  cum  3.3  30.3 7.5 4.5 6 0.75 1.5:1  3.9375 ECD  Sandy Loam  Normal Soil  cum  2.125  47.06 7.5 3 15 3 2:01  27 MB  Sandy Loam  Normal Soil  cum  3.3  30.3 7.5 0.6 3.6 1 1.5:1  2.1 PB  Sandy Loam  Normal Soil  cum  3.3  30.3 7.5 0.6 3.6 1 1.5:1  2.1 PND  Sandy Loam  Normal Soil     1.8  55.56 7.5               SMB  Sandy Loam  Normal Soil  cum  3.3  30.3 7.5 4 6.25 0.75 1.5:1  3.84375 WHB  Sandy Loam  Normal Soil  cum  2.125  47.06 7.5 3 15 3 2:01  27 

Type of Structure Type of Outlet  Code  Unit_cost 

CB  Drop spillway  DSW  7000 CD  Stone  NIL  25000 CRB  Hume Pipe  HMP  30000 ECD  Masonary  MSN  80000 FB  Chute  CHT  2000 GP  Masonary  MSN  15000 MB  Hume Pipe  CHT  10000 PB  Chute  CHT  10000 PND  Hume Pipe  HMP  40000 SMB  Drop spillway  DSW  7000 WHB  Hume Pipe  MSN  40000 

Page 221: DET AILED PR OJECT REPORT (D.P.R) (IWMP-IIIrd, BARABANKI)upldwr.up.nic.in/pdfs/Updated_DPR/2010-11/dpr10_11... · 2017-01-17 · DRDA, Barabanki, UP Chief Development Officer Distt.-Barabanki,

72

Abbreviations :  S. No. 

Abbreviations Descreption 

1  AFF  Afforestation block plantation 2  AFS  Staggered trenching with Afforestation 3  AFL  Afforestation Scattered 4  PND  Pond 5  PB  Peripheral Bund 6  MB  Marginal Bund 7  CB  Contour Bund 8  RS  Recharge Shaft 9  ECD  Earthen Check Dam 10  SMB/ SB  Submergence bund 11  RS  Recharge Shaft 12  CRB  Checkroad Bund 13  WHB  Water Harvesting Bund 14  GP  Gully Plug 15  FB  Field Bund 16  DB  Diversion Bund 17  HMP  Hume Pipe Outlet 18  MSN  Masonary Outlet 19  STN  Stone Outlet 20  CHT  Chute Outlet 21  DSW  Drop Spillway Outlet 

  


Recommended