OBSHelpOBS---------------------------------------------------------------------------------------------------Import and Export of OBS DataUse this Worksheet to Add, Update or Delete OBS dataUPDATING / INSERTING OBS NAMES:1. Existing OBS Names are updated based on matching Internal ID (obs_id) values.2. New OBS Names will be added if the Internal ID value is blank.3. OBS Names must appear in the correct hierarchical format**4. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Internal ID (obs_id) - the internal ID used by the database; this value cannot be specifiedOrder (seq_num) - The order in which the values at the same level in the hierarchy will appear in the dictionaryOBS Names (obs_name) - The OBS Name that will appear in the OBS dictionary** For each OBS Name, there must be another OBS Name in the column to its immediate left, in any row above it.stop

RSRCHelpRESOURCES---------------------------------------------------------------------------------------------------Import and Export of Resource DataUse this Worksheet to Add, Update or Delete ResourcesUPDATING \ INSERTING RESOURCE DATA:1. Existing Resources are updated based on matching rsrc_id values.2. New Resources will be added if the rsrc_id value is blank.3. New Resources require values for rsrc_short_name and rsrc_name.4. To delete a Resource, add "Y" to the DELETE column. Note: Any Actuals will be lost.5. Macro will stop when two consecutive rsrc_short_name values are blank.COLUMN DESCRIPTIONS:Internal ID (rsrc_id) - the internal ID used by the database; this value cannot be specifiedResource ID (rsrc_short_name) - Resource IDDescription (rsrc_name) - Resource NameTitle (rsrc_title_name) - TitleEmployee Code (employee_code) - Employee CodeOffice Phone (office_phone) - Office PhoneOther Phone (other_phone) - Other PhoneE-Mail Address (email_addr) - Email AddressQty Per Hour (def_qty_per_hr) - Default Units\Timestop

ProjCodeHelpPROJECT CODES---------------------------------------------------------------------------------------------------Import and Export of Project Code DataUse this Worksheet to Add, Update or Delete Project CodesUPDATING / INSERTING / DELETING PROJECT CODES:1. Existing Project Codes are updated based on matching Internal ID (proj_catg_type_id) values.2. New Project Codes will be added if the Internal ID value is blank.3. New Project Codes require the value 'Code' in Column 2.4. To delete a Project Code, add "Y" to the DELETE column.UPDATING / INSERTING / DELETING PROJECT CODE VALUES:1. Existing Project Code Values are updated based on matching Internal ID (proj_catg_id) values.2. New Project Code Values will be added if the Internal ID value is blank.3. New Project Code Values require a value in the 'Code Value' field.4. To delete a Project Code Value, add "Y" to the DELETE column.5. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Code Value (proj_catg_short_name) - Project Code ValueDescription (proj_catg_name) - Project Code Value's DescriptionCode Length (proj_catg_short_len) - The maximum length for the Code Values (default length is 7)Order (seq_num) - The order in which the values will appear in the dictionaryInternal ID (proj_catg_id) - the internal ID used by the database; this value cannot be specifiedstop

NotebookTopicsHelpNOTEBOOK TOPICS---------------------------------------------------------------------------------------------------Import and Export of Notebook Topic DataUse this Worksheet to Add, Update or Delete Notebook TopicsUPDATING / INSERTING / DELETING NOTEBOOK TOPICS:1. Existing Notebook Topics are updated based on matching Internal ID (memo_type_id) values.2. New Notebook Topics will be added if the Internal ID value is blank.3. New Notebook Topics require a value in the 'Notebook Topic' field.4. To delete a Notebook Topic, add "Y" to the DELETE column.5. Macro will stop when two consecutive Notebook Topic fields are blank.COLUMN DESCRIPTIONS:Internal ID (memo_type_id) - the internal ID used by the database; this value cannot be specifiedNotebook Topic (memo_type) - name for the Notebook TopicEPS (eps_flag) - determines whether the Notebook is available for EPS node*Proj (proj_flag) - determines whether the Notebook is available for Projects*WBS (wbs_flag) - determines whether the Notebook is available for WBS values*Actv (task_flag) - determines whether the Notebook is available for activities*Order (seq_num) - The order in which the Notebook Topics will appear in the dictionary* Valid values for EPS, Proj, WBS, and Actv fields are 'Y' and 'N'stop

RiskTypesHelpRISK TYPES---------------------------------------------------------------------------------------------------Import and Export of Risk Type DataUse this Worksheet to Add, Update or Delete Risk TypesUPDATING / INSERTING / DELETING RISK TYPES:1. Existing Risk Types are updated based on matching Internal ID (risk_type_id) values.2. New Risk Types will be added if the Internal ID value is blank.3. New Risk Types require a value in the 'Risk Type' field.4. To delete a Risk Type, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (risk_type_id) - the internal ID used by the database; this value cannot be specifiedRisk Type (risk_type) - name of the Risk TypeOrder (seq_num) - The order in which the Notebook Topics will appear in the dictionarystop

OverheadCodesHelpOVERHEAD CODES---------------------------------------------------------------------------------------------------Import and Export of Overhead Code DataUse this Worksheet to Add, Update or Delete Overhead CodesUPDATING / INSERTING / DELETING OVERHEAD CODES:1. Existing Overhead Codes are updated based on matching Internal ID (nonwork_type_id) values.2. New Overhead Codes will be added if the Internal ID value is blank.3. New Risk Types require a value in the 'OH Code' field.4. To delete an Overhead Code, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (nonwork_type_id) - the internal ID used by the database; this value cannot be specifiedOH Code (nonwork_code) - name of the Risk TypeOverhead Description (nonwork_type)Order (seq_num) - The order in which the Overhead Codes will appear in the dictionarystop

DocStatusCodesHelpDOCUMENT STATUS CODES---------------------------------------------------------------------------------------------------Import and Export of Document Status Code DataUse this Worksheet to Add, Update or Delete Document Status CodesUPDATING / INSERTING / DELETING DOCUMENT STATUS CODES:1. Existing Document Status Codes are updated based on matching Internal ID (doc_status_id) values.2. New Document Status Codes will be added if the Internal ID value is blank.3. New Document Status Codes require a value in the 'Status Code' field.4. To delete a Document Status Code, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (doc_status_id) - the internal ID used by the database; this value cannot be specifiedStatus Code (doc_status_code) - name of the Document Status CodeOrder (seq_num) - The order in which the Document Status Codes will appear in the dictionarystop

DocCatgHelpDOCUMENT CATEGORIES---------------------------------------------------------------------------------------------------Import and Export of Document Category DataUse this Worksheet to Add, Update or Delete Document CategoriesUPDATING / INSERTING / DELETING DOCUMENT CATEGORIES:1. Existing Document Categories are updated based on matching Internal ID (doc_catg_id) values.2. New Document Categories will be added if the Internal ID value is blank.3. New Document Categories require a value in the 'Document Category' field.4. To delete a Document Category, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (doc_catg_id) - the internal ID used by the database; this value cannot be specifiedDocument Category (doc_status_code) - name of the Document CategoryOrder (seq_num) - The order in which the Document Categories will appear in the dictionarystop

ProjPhaseHelpPROJECT PHASES / WBS CATEGORIES---------------------------------------------------------------------------------------------------Import and Export of Project Phase / WBS Category DataUse this Worksheet to Add, Update or Delete Project Phases/WBS CategoriesUPDATING / INSERTING / DELETING PROJECT PHASES:1. Existing Project Phases are updated based on matching Internal ID (phase_id) values.2. New Project Phases will be added if the Internal ID value is blank.3. New Project Phases require a value in the 'Category Value' field.4. To delete a Phase, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (phase_id) - the internal ID used by the database; this value cannot be specifiedCategory Value (phase_name) - name of the Project Phase / WBS CategoryOrder (seq_num) - The order in which the Project Phases will appear in the dictionarystop

ExpCatgHelpEXPENSE CATEGORIES---------------------------------------------------------------------------------------------------Import and Export of Expense Category DataUse this Worksheet to Add, Update or Delete Expense CategoriesUPDATING / INSERTING / DELETING EXPENSE CATEGORIES:1. Existing Expense Categories are updated based on matching Internal ID (cost_type_id) values.2. New Expense Categories will be added if the Internal ID value is blank.3. New Expense Categories require a value in the 'Expense Category' field.4. To delete an Expense Category, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (cost_type_id) - the internal ID used by the database; this value cannot be specifiedExpense Category (cost_type) - name of the Expense CategoryOrder (seq_num) - The order in which the Expense Categories will appear in the dictionarystop

BaseTypesHelpBASELINE TYPES---------------------------------------------------------------------------------------------------Import and Export of Baseline Type DataUse this Worksheet to Add, Update or Delete Baseline TypesUPDATING / INSERTING / DELETING EXPENSE CATEGORIES:1. Existing Baseline Types are updated based on matching Internal ID (base_type_id) values.2. New Baseline Types will be added if the Internal ID value is blank.3. New Baseline Types require a value in the 'Baseline Type' field.4. To delete a Baseline Type, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (base_type_id) - the internal ID used by the database; this value cannot be specifiedBaseline Type (base_type) - name of the Baseline TypeOrder (seq_num) - The order in which the Baseline Types will appear in the dictionarystop

ResShiftsHelpRESOURCE SHIFTS---------------------------------------------------------------------------------------------------Import and Export of Resource Shift DataUse this Worksheet to Update Resource Shifts*UPDATING RESOURCE SHIFTS (only the Shift Name is updateable):1. Existing Resource Shifts are updated based on matching Internal ID (shift_id) values.UPDATING RESOURCE SHIFT PERIODS (only the Start Hour is updateable):1. Existing Resource Shift Periods are updated based on matching Internal ID (shift_period_id) values.COLUMN DESCRIPTIONS:Internal ID (shift_period_id) - the internal ID used by the database; this value cannot be specifiedShift Name (shift_name) - Name of the Resource ShiftShift # - The order of shift periods per Resource ShiftStart Hour - The time/hour which the shift period startsDuration (Hrs) - The duration of the shift period*NOTE: You cannot add or delete resource shifts. You can only update existing shiftsstop

ResCurvesHelpRESOURCE CURVES---------------------------------------------------------------------------------------------------Import and Export of Resource Curve DataUse this Worksheet to Update Resource Curves*UPDATING \ DELETING RESOURCE CURVES*:1. Existing Resource Curves are updated based on matching Internal ID (curv_id) values.2. To delete a Resource Curve, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (curv_id) - the internal ID used by the database; this value cannot be specifiedResource Curve Name (curv_name) - Name of the Resource CurveDefault/Global (default_flag_descr) - Whether the curve is a default or global curveCurve PCT (curve_value_percent) - The percent of the curve increase over time*NOTE: Only "Global" Curves can be updatedstop

ResCodesHelpRESOURCE CODES---------------------------------------------------------------------------------------------------Import and Export of Resource Code DataUse this Worksheet to Add, Update or Delete Resource CodesUPDATING / INSERTING / DELETING RESOURCE CODES:1. Existing Resource Codes are updated based on matching Internal ID (rsrc_catg_type_id) values.2. New Resource Codes will be added if the Internal ID value is blank.3. New Resource Codes require the value 'Code' in Column 2 and a value in the 'Resource Code Value' field4. To delete a Resource Code, add "Y" to the DELETE column.UPDATING / INSERTING / DELETING RESOURCE CODE VALUES:1. Existing Resource Code Code Values are updated based on matching Internal ID (rsrc_catg_id) values.2. New Resource Code Values will be added if the Internal ID value is blank.3. New Resource Code Values require a value in the 'Resource Code Value' field.4. To delete a Resource Code Value, add "Y" to the DELETE column.5. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Internal ID (rsrc_catg_type_id) - the internal ID used by the database; this value cannot be specifiedCode (Read-Only) - The hierarchical ID of the resource codeParent Code Id - The ID of the Resource Code's parentResource Code Value (rsrc_catg_short_name) - the Resource Code ValueCode Description (rsrc_catg_name) - the desciptioon of the Resource CodeMax Length (rsrc_catg_short_len) - The maximum length for the Code Values (default length is 7)Order (seq_num) - The order in which the Resource Codes will appear in the dictionarystop

CalendarsHelpCALENDARS---------------------------------------------------------------------------------------------------Import and Export of Calendar Type DataUse this Worksheet to Add, Update or Delete CalendarsUPDATING / INSERTING / DELETING CALENDARS:1. Existing Calendars are updated based on matching Internal ID (clndr_id) values.2. New Calendars will be added if the Internal ID value is blank.3. New Calendars require a value in the 'Calendar Name' field.4. To delete a Calendar, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (clndr_id) - the internal ID used by the database; this value cannot be specifiedCalendar Name (clndr_name) - name of the calendarDefault - whether or not the calendar is the default global calendar*Type - determines whether the calendar is a Global, Resource or Project calendar**Project - Name of project the calendar is associated with. This value is blank for Resource and Global calendars.*NOTE: only one calendar may be the default**Valid values for this field are 'Global', 'Resource' and 'Project'stop

FundingSourcesHelpFUNDING SOURCES---------------------------------------------------------------------------------------------------Import and Export of Funding Source DataUse this Worksheet to Add, Update or Delete Funding SourcesUPDATING / INSERTING / DELETING FUNDING SOURCES:1. Existing Funding Sources are updated based on matching Internal ID (fund_id) values.2. New Funding Sources will be added if the Internal ID value is blank.3. New Funding Sources require a value in the 'Funding Source Name' field.4. To delete a Funding Source, add "Y" to the DELETE column.COLUMN DESCRIPTIONS:Internal ID (fund_id) - the internal ID used by the database; this value cannot be specifiedFunding Source Name (fund_name) - name of the Funding SourceParent Funding Source - the name of the Funding Source's parentOrder (seq_num) - The order in which the Funding Sources will appear in the dictionarystop

RolesHelpROLES---------------------------------------------------------------------------------------------------Import and Export of Role DataUse this Worksheet to Add, Update or Delete RolesUPDATING / INSERTING / DELETING ROLES:1. Existing Roles are updated based on matching 'Internal ID' (role_id) values.2. New Roles will be added if the 'Internal ID' value is blank.3. New Roles require values for 'Role ID' and 'Role Name'.4. To delete a Role, add "Y" to the DELETE column.5. Macro will stop when two consecutive rows are blank.COLUMN DESCRIPTIONS:Internal ID (role_id) - the internal ID used by the database; this value cannot be specifiedRole (role_concat_name) - READ_ONLY The role concat nameParent Role ID - Role ID of the parent role in the Role heirarchyRole ID (role_short_name) - Role IDRole Name (role_name) - Role namestop

updates12/2/05error getting Resources - variable not definederrors with EPS level Activity Codes12/5/05Variable not defined error getting/setting Users

Login

Get Activity CodesSet Activity CodesGet Project CodesSet Project CodesGet OBS NamesSet OBS NamesSet ResourcesGet ResourcesGet Cost AccountsSet Cost AccountsGet UsersGet RolesGet Funding SourcesSet UsersSet RolesSet Funding SourcesGet CalendarsSet CalendarsGet Resource CodesSet Resource CodesGet Baseline TypesSet Baseline TypesGet Expense CategoriesSet Expense CategoriesUpdate Project ListSet Project PhasesGet Project PhasesGet Document CatgSet Document CatgGet Document StatusSet Document StatusGet Risk TypesSet Risk TypesGet Overhead CodesSet Overhead CodesSet Notebook TopicsGet Notebook TopicsGet Resource Shifts CodesSet Resource ShiftsGet Resource Curves CodesSet Resource CurvesGet CurrenciesGet Resource RatesSet Resource Rates

ResourcesInternal ID (Read-Only)Resource IDResource NameTitleEmployee IDOffice PhoneOther PhoneE-Mail AddressParent Resource IDDefault Units/TimeLabor? (Read-only)Active?overtime allowed?overtime factorAutoCompute Actuals?Calc costs from units?CurrencyCalendarUser LoginUses Timesheets?Time Approval MgrInternal ID (Read-Only)DELETE ?1709Project CostsProject Cost Breakdown1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1710Site LSitework Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1711DesignDesign CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1712Structure LStructural Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1713Ext. Finishes LExterior Finishes Labor CostProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1714Int.Finishes LInterior Finish Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1715Mech LHeating, Air Conditioning & Plumbing Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1716Elev LElevator Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1717Elec LElectrical Labor CostsProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1722Site NLSite Non LaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1723Site MSite MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1724Structure NLStructure NLProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1725Structure MStructure MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1726Ext. Finishes NLExterior Finishes NonlaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1727Ext Finishes MExterior Finishes MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1728Interior Finishes NLInterior Finishes NLProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1729Interior Finishes MInterior Finishes MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1730Elev NLElevator NonlaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1731Elev MElevator MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1732Mech NLHeating, Air Conditioning, Plumbing NonlaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1733Mech MHeating, Air Conditioning, Plumbing MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1734Electrical NLElectrical NonlaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1735Electrical MElectrical MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1736Foundation LFoundation LaborProject Costs1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1737Foundation NLFoundation NonlaborProject Costs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1738Foundation MFoundation - MaterialProject Costs1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1739Foundation AFoundation Added Work ForceProject Costs1RT_LaborYNYYDollarStandard 24/7 Workweek Schedule (non-labor)NN1741Foundation L-1Steve SteelmanFoundation L1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1742Structure L-1Gary [email protected] L1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1743SubcontractorsSubcontractor1RT_LaborYNYNDollarStandard 5 Day WorkweekNN1744SurveySite Survey Subcontractor(215) [email protected]_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1745Innovative ResourcesInnovative Construction Internal [email protected]_LaborYN1YYDollarStandard 5 Day WorkweekNN1747ISInformation Systems DepartmentInnovative Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1748PurchasingPurchasing DepartmentInnovative Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1749Design EngineersDesign Engineering DepartmentInnovative Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1750ManagementManagementInnovative Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1751Highway ProjectResources for Highway ProjectProject SpecificRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1752ConstructConstruction DepartmentInnovative Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1753PRINTCSTPrinting CostsProject CostsRT_EquipYY0NYDollarPRINTCST - CalNN1754ENGR ProjectResources for ENGR ProjectProject SpecificRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1755SchoolSchool ProjectProject Specific1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1756GRGeorge RobertsField EngineerIS1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1757PKPaul KimDesign EngineerDesign Engineers1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1758WRWendy ResnerAutomation Systems EngineerDesign Engineers1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1759ACAce CorpVendorPurchasing1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1760JYJeff YoungAnalystDesign Engineers1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1761CostEngCost EngineersDesign EngineersRT_LaborYY0YYDollarCT* - CalNN1762PMsProject ManagersManagement1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1763OROliver RockAccounts ManagerPurchasing1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1764StructEngStructural EngineersDesign EngineersRT_LaborYY0YYDollarST* - CalNN1765InstrEngInstrumentation EngineersDesign EngineersRT_LaborYY0YYDollarIE* - CalNN1766Highway LaborHighway LaborHighway Project1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1767School SubsSubcontratorsSchool1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1768Construct NonlaborMaterial ResourcesConstruct1RT_MatYN0YYDollarStandard 24/7 Workweek Schedule (non-labor)NN1769ENGR LaborEngineer LaborENGR Project1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1770EDEd WoodProgram ManagerDesign Engineers1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1771ElecEngElectrical EngineersDesign EngineersRT_LaborYY0YYDollarEE* - CalNN1772ExecExecutiveManagement1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1773CivilEngCivil EngineersDesign EngineersRT_LaborYY0YYDollarCV* - CalNN1774Construct LaborLabor ResourcesConstruct1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1775AMAshok MehtaInternal DeveloperIS1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1776SchedulersProject ManagersManagement1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1777Highway MaterialHighway MaterialHighway Project1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1778ArchSenior ArchitectsDesign EngineersRT_LaborYY0YYDollarAR1* - CalNN1779MechEngMechanical EngineersDesign EngineersRT_LaborYY0YYDollarME* - CalNN1780ProgrammerProgrammerAM1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1781Fld Eng1Field Eng-SeniorGR1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1782RghcarpRough CarpenterConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1783MachinistMachinistConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1784PainterPainterConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1785ElectrcnElectricianConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1786GENCNTRGeneral Contractor PersonnelENGR LaborRT_LaborYY0YYDollarGENCNTR - CalNN1787Sfwr EngSoftware EngineerAM1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1788HV2KATYDKaty Dunn, HVAC EngineerMechEngRT_LaborYY0YYDollarHV2KATYD - CalNN1789PlumberPlumberConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1790Hvac TecHeating Ventilation & AC TechnicianConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1791ExcavatrExcavatorConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1792HV1TEDGTed Green, HVAC DesignerMechEngRT_LaborYY0YYDollarHV1TEDG - CalNN1793FinisherFinisherConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1794IrwkIronworkerConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1795Fld Eng2Field EngineerGR1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1796Op EngOperating EngineerConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1797ME1MARKHMark Hall, Junior Mechanical EngineerMechEngRT_LaborYY0YYDollarME1MARKH - CalNN1798Fld Eng3Field Eng-AssistantGR1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1799Elev InstElevator InstallerConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1800ST2JENMJen Martin, Structural EngineerStructEngRT_LaborYY0YYDollarST2JENM - CalNN1801PM1BOBPBob Patterson, Project ManagerPMsRT_LaborYY0YYDollarPM1BOBP - CalNN1802PM1SUEWSue White, Project ManagerPMsRT_LaborYY0YYDollarPM1SUEW - CalNN1803MasonMasonConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1804CT2FRANKFrank Danson, Cost EngineerCostEngRT_LaborYY0YYDollarCT2FRANK - CalNN1805CV2MIKEHMike Hall, Civil DesignerCivilEngRT_LaborYY0YYDollarCV2MIKEH - CalNN1806EE1BARBWBarb Wire, Senior Electrical EngineerElecEngRT_LaborYY0YYDollarEE1BARBW - CalNN1807EE2BILLSBill Sanders, Junior Electrical EngineerElecEngRT_LaborYY0YYDollarEE2BILLS - CalNN1808Hdwr SpecHardware SpecialistAM1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1809PE3Planning EngineerSchedulersRT_LaborYY0YYDollarPE3 - CalNN1810PEXECProject ExecutiveExecRT_LaborYY0YYDollarPEXEC - CalNN1811FnshcarpFinishes CarpenterConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1812FlrlyrFloor and Carpet LayerConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1813ME2DEBODeb O'Brien, Junior Mechanical EngineerMechEngRT_LaborYY0YYDollarME2DEBO - CalNN1814LaborerLaborer-ConstructionConstruct Labor1RT_LaborYNYYDollarStandard 5 Day WorkweekNN1815ME1GREGVGreg Van, Senior Mechanical EngineerMechEngRT_LaborYY0YYDollarME1GREGV - CalNN1816PAVERAsphalt Paver, 130 H.P.Highway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1817ST1LISAHLisa Hall, Structural DesignerStructEngRT_LaborYY0YYDollarST1LISAH - CalNN1818ST2GREGMGreg Miller, Structural EngineerStructEngRT_LaborYY0YYDollarST2GREGM - CalNN1819STRIPPERPaint Stripper, S.P.Highway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1820SHEETINGSheeting DriverHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1821CARPCarpenterHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1822FOREMANForemanHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1823DRIVERTruck Driver - HeavyHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1824ELECElectricianHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1825LABOR-GGeneral LaborerHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1826LABOR-SSkilled LaborerHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1827Piping MatPiping MaterialConstruct NonlaborRT_MatYNYYDollarStandard 24/7 Workweek Schedule (non-labor)NN1828IE2PAULKPaul Kelly, Instrumentation EngineerInstrEngRT_LaborYY0YYDollarIE2PAULK - CalNN1829IE2PETELPete Lopez, Instrumentation EngineerInstrEngRT_LaborYY0YYDollarIE2PETEL - CalNN1830CV1KERIBKeri Brown, Civil EngineerCivilEngRT_LaborYY0YYDollarCV1KERIB - CalNN1831IE1BRETSBret Sanders, Instrumentation EngineerInstrEngRT_LaborYY0YYDollarIE1BRETS - CalNN1832AR1LORIWLori White, Senior Architect**ArchRT_LaborYY0YYDollarAR1LORIW - CalNN1833CT1KELLYKelly Frank, Cost EngineerCostEngRT_LaborYY0YYDollarCT1KELLY - CalNN1834OPERLEquipment Operator - LightHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1835LANGPAVLang PavingSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1836POSTDRVRPost DriverHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1837OPERATOREquipment OperatorHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN1838BRISTLEBristle Paint and PaperSchool Subs1RT_MatYNYYDollarStandard 5 Day WorkweekNN1839JOLTJolt Electrical ContractorsSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1840STONYStony Masonry ContractorsSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1841HASKLEHaskle Mechnical ContractorsSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1842CNTYLNCounty Line SteelSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1843ALPHAAlpha PlumbingSchool Subs1RT_MatYNYYDollarStandard 5 Day WorkweekNN1844LOADERLoader/Backhoe 80 H.P.Highway Material1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1845SPREADERAggregate SpreaderHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1846CV2WILLSWill Summers, Civil EngineerCivilEngRT_LaborYY0YYDollarCV2WILLS - CalNN1847ROLLER1Roller, TandemHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1848ROLLER2Roller, Steel WheelHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1849TRUCKTruck - Flatbed, 3 TonHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1850TRUCKDDump TruckHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1851VIBRATORGas Engine VibratorHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1852CRANETruck CraneHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1853DOZERDozer, 200 H.P.Highway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1854COMPRAir Compressor & HosesHighway MaterialRT_MatYN0YYDollarStandard 5 Day WorkweekNN1855GOCRETEGo ConcreteSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1856REGENTRegent ContractorsSchool Subs1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1857Edison ResourcesEdison HighProject Specific1RT_EquipYNNNDollarSchool District 5 DayNN1858ContContractorEdison Resources1RT_EquipYNNNDollarSchool District 5 DayNN18592Division 02Cont1RT_EquipYNYNDollarSchool District 5 DayNN1860DemoDemolition Crew21RT_EquipYNYYDollarSchool District 5 DayNN1861Lofty ResourcesLofty Heights ResourcesProject Specific1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1862LH LaborLH LaborLofty Resources1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1863LH Non-LaborLH Non-LaborLofty Resources1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1864LH ExpensesLH ExpensesLofty Resources1RT_EquipYNYYDollarStandard 5 Day WorkweekNN1865LH MaterialLH MaterialLofty Resources1RT_MatYN0YYDollarStandard 5 Day WorkweekNN1866LH SubsLH Sub-Contractor/TradesLofty Resources1RT_EquipYNYYDollarStandard 5 Day WorkweekNN18781Division 01Cont1RT_EquipYNNNDollarSchool District 5 DayNN187911Division 11Cont1RT_EquipYNYNDollarSchool District 5 DayNN18807Division 07Cont1RT_EquipYNYNDollarSchool District 5 DayNN188115Division 15Cont1RT_EquipYNYNDollarSchool District 5 DayNN18828Division 08Cont1RT_EquipYNYNDollarSchool District 5 DayNN18835Division 05Cont1RT_EquipYNYNDollarSchool District 5 DayNN18843Division 03Cont1RT_EquipYNYNDollarSchool District 5 DayNN188510Division 10Cont1RT_EquipYNYNDollarSchool District 5 DayNN18866Division 06Cont1RT_EquipYNYNDollarSchool District 5 DayNN18879Division 09Cont1RT_EquipYNYNDollarSchool District 5 DayNN188812Division 12Cont1RT_EquipYNYNDollarSchool District 5 DayNN188914Division 14Cont1RT_EquipYNYNDollarSchool District 5 DayNN189016Division 16Cont1RT_EquipYNYNDollarSchool District 5 DayNN18914Division 04Cont1RT_EquipYNYNDollarSchool District 5 DayNN1892CurbCurb & Walks Crew21RT_EquipYNYYDollarSchool District 5 DayNN1893EarthEarthwork Crew21RT_EquipYNYYDollarSchool District 5 DayNN1894PavePaving Crew21RT_EquipYNYYDollarSchool District 5 DayNN1895ConcConcrete Crew31RT_EquipYNYYDollarSchool District 5 DayNN1896DrainStorm Drainage Crew21RT_EquipYNYYDollarSchool District 5 DayNN1897SurvSurvey Crew11RT_EquipYNYNDollarSchool District 5 DayNN1898IrrigIrrigation Crew21RT_EquipYNYYDollarSchool District 5 DayNN1899MasMasonry Crew41RT_EquipYNYYDollarSchool District 5 DayNN1900TiltTiltwall Crew31RT_EquipYNYYDollarSchool District 5 DayNN1901DoorDoors & Frame Crew81RT_EquipYNYYDollarSchool District 5 DayNN1902FinFinish Hardware Crew81RT_EquipYNYYDollarSchool District 5 DayNN1903WinWindow Frame Crew81RT_EquipYNYYDollarSchool District 5 DayNN1904GlazGlass Crew81RT_EquipYNYYDollarSchool District 5 DayNN1905LandscLandscape Crew21RT_EquipYNYYDollarSchool District 5 DayNN1906DryDrywall Crew91RT_EquipYNYYDollarSchool District 5 DayNN1907PlasPlaster Crew91RT_EquipYNYYDollarSchool District 5 DayNN1908TileTile Crew91RT_EquipYNYYDollarSchool District 5 DayNN1909AccCAccoustical Ceiling Crew91RT_EquipYNYYDollarSchool District 5 DayNN1910WdFlrWood Flooring Crew91RT_EquipYNYYDollarSchool District 5 DayNN1911OflrOther Flooring Crew91RT_EquipYNYYDollarSchool District 5 DayNN1912PaintPainting Crew91RT_EquipYNYYDollarSchool District 5 DayNN1913SteelSteel Crew51RT_EquipYNYYDollarSchool District 5 DayNN1914SpecSpecialties Crew101RT_EquipYNYYDollarSchool District 5 DayNN1915CleanCleaning Crew11RT_EquipYNYNDollarSchool District 5 DayNN1916InsulInsulation Crew71RT_EquipYNYYDollarSchool District 5 DayNN1917RoofRoofing Crew71RT_EquipYNYYDollarSchool District 5 DayNN1918ClearSite Clearing Crew21RT_EquipYNYYDollarSchool District 5 DayNN1919AthAthletic Equipment Crew111RT_EquipYNYYDollarSchool District 5 DayNN1920BlindBlind & Shade Crew121RT_EquipYNYYDollarSchool District 5 DayNN1921ElevElevator Crew141RT_EquipYNYYDollarSchool District 5 DayNN1922HVACHVAC Crew151RT_EquipYNYYDollarSchool District 5 DayNN1923PlumPlumbing Crew151RT_EquipYNYYDollarSchool District 5 DayNN1924FSFire Suppression Crew151RT_EquipYNYYDollarSchool District 5 DayNN1925PunchPunch Crew11RT_EquipYNYNDollarSchool District 5 DayNN1926InsInsurance11RT_EquipYNYNDollarSchool District 5 DayNN1927FGCField General Expenses11RT_EquipYNYNDollarSchool District 5 DayNN1928BondProject Bonds11RT_EquipYNYNDollarSchool District 5 DayNN1929ContingContingency11RT_EquipYNYNDollarSchool District 5 DayNN1930OHPOverhead & Profit11RT_EquipYNYNDollarSchool District 5 DayNN1931CFConstruction fee11RT_EquipYNYNDollarSchool District 5 DayNN1932EnvironmentalEnvironmental Consulting SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1933GeotechGeotechnical EngineeringSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1934DemolitionDemolition SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1935ConcreteConcrete Foundation SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1936MasonryMasonry SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1937Structural SteelStructural Steel SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1938Specialty MetalsSpecialty Metal Fabricator SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1939Rough CarpentryRough Capentry SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1940Finish CarpentryFinish Carpentry SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1941Millwork CarpentryMillwork SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1942Thermal ProtectionThermal Protection SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1943Sheet MetalSheet Metal SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1944RoofingRoofing SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1945GlassGlass & Glazing SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1946DrywallDrywall SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1947FinishesFinishes & Fit-out SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1948FlooringFlooring SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1949PaintingPainting SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1950SpecialtiesFF&E SpecialtiesSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1951PoolsPool Installation SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1952ConveyingConveying SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1953Fire SuppressionFire Suppression SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1954PlumbingPlumbing SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1955HVAC SubHeating, Ventilation and Air-conditioning SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1956Integrated AutomatioIntegrated Automation, Computers, LAN SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1957ElectricalElectrical SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1958CommunicationsTelecommunications SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1959Electronic SafetyElectronic Safety SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1960EarthworkEarthwork SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1961PavingPaving & Roadways SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1962UtilitiesUtilities SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1963ProcessProcess Integration SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1965LandscapingLandscaping SubcontractorSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN1967CarptrCarpentry Crew61RT_EquipYNYYDollarSchool District 5 DayNN1968ElectrElectrical Crew161RT_EquipYNYYDollarSchool District 5 DayNN1973EMAEd MallardLH Labor1RT_LaborYNNYDollarStandard 5 Day WorkweekNN1974JLAJeff LangeLH Labo+I245:R245r1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1975KANKen AndersonPlanner+I245:R2451RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1976JROJohn RockLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1977LBALourdes BariettoLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1978ATEAngel TejadaLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1979BBUBuck BuchanonLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1980MMAMark MalloyLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1981MNEMark NewtonLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1982SROSteve RohazLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1983BFEBill FeeleyLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1984TCATom CampbellLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1985JGAJuan GarciaLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1986DLODon LouserLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1987HEPHarry EpsteinLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1988TNITim NicholsLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1989JMEJose MendezLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1990SKESean KennedyLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1991SFOSally FoonLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1992JMIJane MillerLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1993SJEScott JeffersonLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1994CSAChris SawyerLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1995JDIJuan DiazLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1996BSMBarb SmithLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1997JMOJoe MonmouthLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1998ACOAlice CooperLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN1999JMAJorge MartinLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN2000RCRRay CrammerLH Labor1RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN2001MMOMichael MooreLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN2002ASWAl SwitcherLH Labor1RT_LaborYNYYDollarStandard 5 Day Workweek w/ Basic HolidaysNN2003GCGeneral ContractorSubcontractors1RT_LaborYNNYDollarStandard 5 Day WorkweekNN2004FrameFraming ContractorSubcontractors1RT_LaborYNNYDollarStandard 5 Day WorkweekNN2005CranesCranesSubcontractors1RT_LaborYNNNDollarStandard 5 Day Workweek w/ Basic HolidaysNN2006StuccoStuccoSubcontractors1RT_LaborYNNYDollarStandard 5 Day WorkweekNN2007LABOR-HHighway LaborerHighway LaborRT_LaborYY0YYDollarStandard 5 Day WorkweekNN2008Project SpecificProject Specific Resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN2011CV1ERUAErun Azia, Civil EngineerCivilEngRT_LaborYY0YYDollarCV1KERIB - CalNN2013EXTExternal resources1RT_LaborYNYYDollarStandard 5 Day WorkweekNN2055IMCIMCEXT1RT_EquipYNYYDollarStandard 5 Day WorkweekNN2057MKCMKCEXT1RT_EquipYNYYDollarStandard 5 Day WorkweekNN2077School LaborLaborSchool1RT_LaborYNYYDollarStandard 5 Day WorkweekNN2091School CarpSchool CarpenterSchool Labor1RT_LaborYNYYDollar7-Day WorkweekNN2092mikebMike Brown, [email protected]_LaborYN1YYDollarStandardNN2093bobmBob McArthur, Dir of Marketing610 [email protected]_LaborYY1.5NYDollarStandardNN2094trentsTrent Smith, PMO Director610 [email protected]_LaborYNNYDollarStandardNN2095johnmJohn McDougal610 [email protected]_LaborYNNYDollarStandardNN2096charlesnCharles North610 [email protected]_LaborYNNYDollarStandardNN2097franklFrank Lee610 [email protected]_LaborYNNYDollarStandardNN2098georgeaGeorge Abrams, VP of Developmentmikeb1RT_LaborYNNYDollarStandardNN2099rajpRaj Patel, Dir of Programming610 [email protected]_LaborYNNYDollarStandardNN2100teamTEAM MEMBERSenior Programmer12345610 [email protected]_LaborYY1.5NYDollarStandardNN2101GN17 - RootResources for project GN17RT_LaborYY0YYDollarCorporate - Standard Full TimeNN2102APEX - RootResources for project APEXRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2104ACCTSAccounts ManagerAPEX - RootRT_LaborYY0YYDollarACCTS - CalNN2105ANALYSTAnalyst-Systems AutomationAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2106ATM ENGAutomation Systems EngineerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2107DES ENGDesign EngineerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2110EQUIPMNTEquipment-CraneAPEX - RootRT_MatYNYYDollarCorporate - Standard Full TimeNN2112FLD ENG*Field Eng-AllAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2114HWSPECHardware SpecialistAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2116FNISHRFinisherAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2121PIPINGPiping MaterialAPEX - RootRT_MatYNYYDollarCorporate - Standard Full TimeNN2122OPENGOperating EngineerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2123PROGRMRProgrammerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2126PRG MGRProgram ManagerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2127VENDORVendorAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNN2128SW ENGSoftware EngineerAPEX - RootRT_LaborYY0YYDollarCorporate - Standard Full TimeNNCCIChris IkadehPlannerPlanner+I245:R2451RT_LaborYNNYDollarStandard 5 Day Workweek w/ Basic HolidaysNN

Back to Login Page

RolesInternal ID (Read-Only)Role (Read_only)Parent Role IDRole IDRole NameDelete?50411Roles HeirarchyN5061.PS1PSServices DepartmentN5081.PS.CON1.PSCONConsultantN365EngrEngrEngineerN366Engr.SEEngrSEStructural EngineerN367Engr.EEEngrEEElectrical EngineerN368Engr.MEEngrMEMechanical EngineerN390PMPMProject ManagerN465PM.TMPMTMTraining ManagerN452PM.QAMPMQAMQuality Assurance ManagerN467PM.PPDCPMPPDCProject Problem / Defect ControllerN400ConstructionConstructionConstructionN486Construction.TradeConstructionTradeTradesN496Construction.Trade.CarpentryConstruction.TradeCarpentryCarpentryN402Construction.ManageConstructionManageManagementN338SubSubSubcontratorN342Sub.SiteSubSiteSiteworkN403Sub.FoundSubFoundFoundationN349Sub.ConcSubConcConcreteN340Sub.MasonSubMasonMasonryN341Sub.StructSubStructStructural SteelN350Sub.RoughSubRoughRough CarpentryN351Sub.MillSubMillMillworkN352Sub.DoorsSubDoorsDoors and WindowsN370Sub.CWSubCWCurtain wallsN373Sub.DWSubDWDry WallboardN374Sub.FloorSubFloorFlooringN405Sub.PartSubPartPartitionsN354Sub.AccessSubAccessAccessoriesN404Sub.PlumbSubPlumbPlumbingN356Sub.FireSubFireFire ProtectionN339Sub.HVACSubHVACHVACN357Sub.ElecSubElecElectricalN392SuptSuptSuperintendantN393ForemanForemanForemanN399EOperEOperEquipment OperatorN394LaborLaborLaborN500QAMQAMQuality Assurance ManagerN398ControlsControlsProject ControlsN395Clerical/AdminClerical/AdminAdmin/ClericalN396EngineerEngineerEngineersN397InspectorInspectorInspectorsN336TradesTradesTradesN332CorpCorpCorporate RolesN401Corp.ITCorpITITN333Corp.AccountingCorpAccountingAccountingN391Corp.PECorpPEProject ExecutiveN503BABABusiness AnalystN444IMCIMCIntegrated Management ConceptsN501SDSDSoftware DeveloperN505SD.WEBSDWEBWeb DeveloperN507SD.WEB.JAVASD.WEBJAVAJava ProgrammerN509SD.WEB.JAVA.JRSD.WEB.JAVAJRJunior Java ProgrammerN510SD.WEB.JAVA.SNSD.WEB.JAVASNSenoir Java ProgrammerN514SD.WEB.ASPSD.WEBASPASP DeveloperN513SD.MFSDMFMainframe DeveloperN512SD.CSSDCSClient / Server DeveloperN511INTINTIntegration SpecialistN502IMPIMPImplementation ConsultantN

Back to Login Page

OBSInternal ID (Read-Only)OrderDelete?565Innovative GC6300Engineering/ ConstructionN6040FacilitiesN6221Health CareN6152EducationN6400School ProjectsN6164CommercialN6031InfrastructureN6120TransportationN6131Water / WasteN6172IndustrialN6360AutomtiveN6101N637101ManufacturingN606400Corporate ServicesN641300Construction - Tim EvansN6436Andy MasonN6470Tom MillsN6461Linda HarisN642506Meg FoleyN6441006Joe NolanN6451106Therese SwanN

Back to Login Page

Resource CodesInternal ID (Read-Only)Code (Read-Only)Parent Code IDResource Code ValueCode DescriptionMax LengthOrderDELETE ?

Back to Login Page

Project CodesInternal ID (Read-Only)Code ValueDescriptionMax LengthOrderDELETE ?73CodeContract Type7N238GCGeneral Contracting0N235GMPGuaranteed Maximum Price100N237CPFFCost Plus Fixed Fee200N272CMRCM at Risk300N270AIAArchitect/Design400N274CONSConsulting500N236DBDesign-Build600N271EJCDCEJCDC Contract700N273SUBSubcontractor800N93CodeDivision5N315EngEngineering0N316OpsOperations100N18CodeDivision/Office5N188AMERAmericas Division0N198AUGAugusta, ME Office0N230CHNRChina Region0N204CLTCharlotte, NC Office0N229DUBDubai, UAE Office0N223EUREuropean Region0N207INDIndianapolis, IN Office0N226LONLondon, UK Office0N220MEXMexico City, Mexico Office0N222MONMontreal, Canada Office0N191NERNortheast Region0N201PHLPhiladelphia, PA Office0N215PHXPheonix, AZ Office0N211SEASeattle, WA Office0N213ANCAncorage, AK Office1N192MARMid-Atlantic Region1N221TORToronto, Canada Office1N224AFRAfrican Region100N205ATLAtlanta, GA Office100N199BOSBoston, MA100N208CHIChicago, IL Office100N189EAMEEurope/Africa/Middle East Division100N231JPNRJapan Region100N216LAXLos Angeles, CA Office100N227MUNMunich, Germany Office100N218SDMSan Juan, PR Office100N193SERSoutheast Region100N212SFOSan Francisco, CA Office100N202WASWashington D.C. Office100N190AsiaAsia Division200N194CERCentral Region200N214DENDenver, CO Office200N209HOUHouston, TX Office200N228MADMadrid, Spain Office200N225MERMiddle East Region200N206MIAMiami, FL Office200N200NYCNew York, NY200N203RCMRichmond, VA Office200N217SDOSan Diego, CA Office200N210DETDetroit, MI Office300N195NWRNorthwest Region300N196SWRSouthwest Region400N197LARLatin American Region500N219CANCanada Region600N95CodeIndustry10N310IndIndustrial200N311InfrasInfrastructure500N65CodeProject Manager10N144GANNONLISA GANNON255N145GREENJIM GREEN255N146MOYERJOHN MOYER255N276AIZANURE AIZA256N260EPSTEINHARRY EPSTEIN355N261SMITHJOHN SMITH455N262LOUSERDON LEWIS555N263LUKEPETER LUKE655N265SHERIDANJOHN SHERIDAN855N266CARROLLCHRIS CARROLL955N267BISHOPHUETT BISHOP1055N268TEJADAANGEL TEJADA1155N90CodeProject Region10N301EEast101N302WWest201N286USUnited States255N303NENortheast501N305SESouthEast601N86CodeWin Confidence4N27710%Have Relationship With Owner0N27830%Commitment From Owner To Receive RFP100N27950%RFP Accepted and Made Shortlist200N28070%Invited To Contract Negotiation300N28190%Contract Pending Signatures400N28299%All Contracts Signed500N283100%Live Project600N

Back to Login Page

Activity CodesInternal ID (Read-Only)Global / ProjectCode ValueCode DescriptionMax LengthOrderParent Code IDDELETE ?7300PROJECT(New Activity Code)7N7175EPSContractors7N12083SELFSelf0N12084STDPAVPaving Contractors1N12085BIGCConcrete Contractors2N12086BRINKBrink Contractors3N12087BUTTONPaint & Paper Contractors4N12077DESIGNThe Design Group5N12078ELECTRElectrical Contractors6N12079MASONMason Contractors7N12082MECHMechanical Contractors8N12080LOTUSElevator Contractors9N12081STEELSteel Contractors10N12075STRESSStresson Industrials11N12076FREMONTPlumbing Contractors12N305EPSContractor7N4712SELFSelf0N4713STDPAVStandard Paving1N4714BIGCBig Concrete2N4715BRINKBrink Contractors3N4716BUTTONButton Paint & Paper4N4717DESIGNThe Design Group5N4718ELECTRElectrical Contractors6N4719MASONACE Mason Contractors7N4720MECHMechanical Contractors8N4721LOTUSLotus Elevator9N4722STEELTri-State Steel10N4723STRESSStresson Industrials11N4724FREMONTFremont Plumbing12N7160GLOBALDepartment3N11943ENGEngineering Department0N11944PCHPurchasing Department1N11946CONConstruction Department100N11945ISDInformation Systems Department200N11984MGTManagement300N7243GLOBALIPT Leader7N12661ZEKEZEKE0N12662SACCULLSACULLO3N12663CONANTCONANT5N12664CURINACURINA6N7109GLOBALNOTES10N11722YesSee Note attached0N7240GLOBALPRIORITY-LVL2N12655a32450N12656b22550N7161GLOBALPhase5N11947DESGNDesign and Engineering Phase0N11948PROCRProcurement Phase100N11949SYST1System Integration Phase I200N11950SYST2System Integration Phase II300N11951INSTLInstallation Phase400N11952FOUNDFoundation Construction Phase500N11953STRUCStructural Phase600N11954ROUGHRough-In Phase700N11955CLOSEClose-In Phase800N11956FINSHFinishes and Closeout Phase900N7162GLOBALResp. Discipline4N11969PMGTProject Management10N11968PROTPrototyping20N11972SYSTSystems Engineering30N11971INTRInterior Systems40N11970STRTStructural Engineering50N11964CIVLCivil Engineering60N11963ELECElectrical Engineering70N11962ARCHArchitectural80N11967PROCProcess Engnieering90N11966HVACHVAC Engineering100N11965MECHMechanical Engineering110N11959ESTMEstimating120N11958CNTRContracts130N11957ALLAll Disciplines140N11961INSTInstrumentation Engineering150N11960PRODProduction Management160N7163GLOBALResponsibility3N11976RSRichard Stevens - Site Project Manager10N11980MFMeg Foley11N11981JNJoe Nolan12N11982LHLinda Haris14N11983TETim Evans15N11985AMAndy Mason16N11979KLKen Lang - Design Team17N11973AWAlice White - Purchasing20N11974GGGeorge Green - Sitework Crew Foreman30N11975PRPete Reynolds - Electrical Crew Foreman40N11977JMJoe Martin - Structural Crew Foreman50N11978JAMJoyce A. Miller - Paving Crew Foreman60N

Back to Login Page

CalendarsInternal ID (Read-Only)Calendar NameDefault?TypeProjectDELETE ?593Calendar 1NProjectN597Standard 5 Day WorkweekNGlobalN644Standard 24/7 Workweek Schedule (non-labor)NGlobalN651MACHINEB - CalNResourceN652MACHINEA - CalNResourceN653ME* - CalNResourceN654ME1MARKH - CalNResourceN655ME1GREGV - CalNResourceN656IE1CALB - CalNResourceN657IE1BRETS - CalNResourceN658IE2KARLN - CalNResourceN659IE2PETEL - CalNResourceN660IE2PAULK - CalNResourceN661ME2DEBO - CalNResourceN662ST* - CalNResourceN663PRINTCST - CalNResourceN664ST1LISAH - CalNResourceN665ST2JENM - CalNResourceN666ST2GREGM - CalNResourceN667PEXEC - CalNResourceN668PE3 - CalNResourceN669PM* - CalNResourceN670PM1SUEW - CalNResourceN671PM1BOBP - CalNResourceN672IE* - CalNResourceN673CT1KELLY - CalNResourceN674CT* - CalNResourceN675CT2FRANK - CalNResourceN676CV1KERIB - CalNResourceN677CV* - CalNResourceN678AR1* - CalNResourceN679AR* - CalNResourceN680AR1BUDW - CalNResourceN681AR2JIMG - CalNResourceN682AR1LORIW - CalNResourceN683CV1TEDM - CalNResourceN684EE2GLENB - CalNResourceN685EE2BILLS - CalNResourceN686GENCNTR - CalNResourceN687HV2KATYD - CalNResourceN688HV1TEDG - CalNResourceN689CV2WILLS - CalNResourceN690CV2MIKEH - CalNResourceN691EE* - CalNResourceN692EE1BOBN - CalNResourceN693EE1BARBW - CalNResourceN696WIRING - CalNResourceN700LUMPSUM - CalNResourceN717ACCTS - CalNResourceN720Standard 5 Day Workweek w/ Basic HolidaysYGlobalN7215 Day 24 hour Milestones onlyNGlobalN732EM11 - 4 - 7 DAYSNGlobalN733EM11 - 5 - Unit 10 TreatersNGlobalN735EM11 - 1 - 4 DAYSNGlobalN736EM11 - 2 - 5 DAYSNGlobalN737BRD - CalNResourceN738CBI - CalNResourceN739AIE - CalNResourceN740BLS - CalNResourceN782School District 5 DayNGlobalN7947-Day WorkweekNGlobalN796Office Building Addition Calendar 1NProjectBldgN8267 x 24hr. DaysNGlobalN827Frank LeeNResourceN82913h/dNGlobalN830TENResourceN831MNResourceN832BANResourceN833TSNResourceN835MENResourceN838StandardNGlobalN841Corporate - Standard Full TimeNGlobalN842GN17 - 1NGlobalN843APEX - GlobalNGlobalN844APEX - 1 - Standard 5-dayNGlobalN845PAINT - CalNResourceN

Back to Login Page

Resource ShiftsInternal ID (Read-Only)Shift NameShift # (Read-Only)Start HourDuration(Hrs) (Read-Only)

Back to Login Page

CostAcctsInternal ID (Read-Only)Cost Account (Read_only)Parent Account IDCost Account IDCost Account NameDelete?743PRJPRJProject CostingN747PRJ.DESNPRJDESNDesignN749PRJ.DESN.6PRJ.DESN6Design DevelopmentN753PRJ.DESN.6.31PRJ.DESN.631System Controller DesignN744PRJ.DOCMPRJDOCMDocumentationN745PRJ.DOCM.11PRJ.DOCM11Operation ManualsN746ConConConstruction DivisionN748Con.11Con11Automated SystemN750Con.11.1Con.111EngineeringN756Con.11.1.01Con.11.11Automation System DesignN751Con.11.2Con.112HardwareN755Con.11.2.11Con.11.211Temperature Control Equipment - DesignN757Con.11.2.13Con.11.213Temperature Control Equipment - InstallN759Con.11.2.23Con.11.223Robot Controller - InstallN758Con.11.2.31Con.11.231System Controller - DesignN752Con.11.4Con.114TrainingN754Con.11.4.15Con.11.415Automation System Training & ManualsN760Con.13Con13Office Building AdditionN762Con.13.1Con.131EngineeringN764Con.13.1.06Con.13.16Building Addition DesignN761Con.13.4Con.134Mechanical/Electrical SystemsN763Con.13.4.36Con.13.436Plumbing/Piping/ElectricalN1152AA(New Account)N1167101101Mechanical EngineeringN1166201201FinanceN800HWY1HWY1HWY1N816HWY1.010100HWY110100General Field ConditionsN847HWY1.010100.GHWY1.010100GGeneral Field Conditions - Category GN817HWY1.010???HWY1010???General ConditionsN815HWY1.015300HWY115300Construction Facilities & Temp. ControlsN846HWY1.015300.GHWY1.015300GConstruction Facilities & Temp. Controls - Category GN855HWY1.015300.LHWY1.015300LConstruction Facilities & Temp. Controls - Category LN854HWY1.015300.EHWY1.015300EConstruction Facilities & Temp. Controls - Category EN813HWY1.015500HWY115500Access RoadsN849HWY1.015500.LHWY1.015500LAccess Roads - Category LN831HWY1.015500.EHWY1.015500EAccess Roads - Category EN814HWY1.015800HWY115800SignsN826HWY1.015800.LHWY1.015800LSigns - Category LN832HWY1.015800.EHWY1.015800ESigns - Category EN818HWY1.021100HWY121100Site ClearingN845HWY1.021100.EHWY1.021100ESite Clearing - Category EN848HWY1.021100.LHWY1.021100LSite Clearing - Category LN822HWY1.021200HWY121200Site RemovalsN840HWY1.021200.LHWY1.021200LSite Removals - Category LN839HWY1.021200.EHWY1.021200ESite Removals - Category EN823HWY1.021600HWY121600UnderpinningN838HWY1.021600.LHWY1.021600LUnderpinning - Category LN837HWY1.021600.EHWY1.021600EUnderpinning - Category EN821HWY1.021???HWY1021???Site PreparationN819HWY1.022250HWY122250Excavation & BackfillN857HWY1.022250.LHWY1.022250LExcavation & Backfill - Category LN856HWY1.022250.EHWY1.022250EExcavation & Backfill - Category EN820HWY1.022270HWY122270Erosion ControlN824HWY1.022270.LHWY1.022270LErosion Control - Category LN827HWY1.022270.MHWY1.022270MErosion Control - Category MN812HWY1.022???HWY1022???EarthworkN804HWY1.025100HWY125100Asphaltic Concrete PavementN851HWY1.025100.EHWY1.025100EAsphaltic Concrete Pavement - Category EN850HWY1.025100.LHWY1.025100LAsphaltic Concrete Pavement - Category LN853HWY1.025100.MHWY1.025100MAsphaltic Concrete Pavement - Category MN805HWY1.025400HWY125400Pavement SurfacingN852HWY1.025400.LHWY1.025400LPavement Surfacing - Category LN829HWY1.025400.MHWY1.025400MPavement Surfacing - Category MN828HWY1.025400.EHWY1.025400EPavement Surfacing - Category EN803HWY1.025???HWY1025???Paving and SurfacingN801HWY1.027100HWY127100Subdrainage SystemsN830HWY1.027100.LHWY1.027100LSubdrainage Systems - Category LN825HWY1.027100.EHWY1.027100ESubdrainage Systems - Category EN802HWY1.028400HWY128400Site Improvements - Road AppurtenancesN842HWY1.028400.MHWY1.028400MSite Improvements - Road Appurtenances - Category MN806HWY1.028???HWY1028???Site ImprovementsN810HWY1.033100HWY133100Structural ConcreteN841HWY1.033100.LHWY1.033100LStructural Concrete - Category LN844HWY1.033100.EHWY1.033100EStructural Concrete - Category EN843HWY1.033100.MHWY1.033100MStructural Concrete - Category MN811HWY1.033???HWY1033???Cast-in-place ConcreteN809HWY1.160100HWY1160100Electric ConductorsN834HWY1.160100.LHWY1.160100LElectric Conductors - Category LN835HWY1.160100.MHWY1.160100MElectric Conductors - Category MN807HWY1.160700HWY1160700Underground UtilitiesN833HWY1.160700.LHWY1.160700LUnderground Utilities - Category LN836HWY1.160700.EHWY1.160700EUnderground Utilities - Category EN808HWY1.160???HWY1160???ElectricalN1083APEXAPEXAPEXN1084APEX.11101APEX11101Automation System DesignN1112APEX.11101.LAPEX.11101LAutomation System Design - Category LN1085APEX.11211APEX11211Temperature Control Equipment-DesignN1118APEX.11211.LAPEX.11211LTemperature Control Equipment-Design - Category LN1086APEX.11213APEX11213Temperature Control Equipment-InstallN1114APEX.11213.LAPEX.11213LTemperature Control Equipment-Install - Category LN1119APEX.11213.MAPEX.11213MTemperature Control Equipment-Install - Category MN1087APEX.11221APEX11221Robot Controller-DesignN1088APEX.11223APEX11223Robot Controller-InstallN1113APEX.11223.LAPEX.11223LRobot Controller-Install - Category LN1089APEX.11231APEX11231System Controller-DesignN1120APEX.11231.LAPEX.11231LSystem Controller-Design - Category LN1090APEX.11233APEX11233System Controller-InstallN1115APEX.11233.LAPEX.11233LSystem Controller-Install - Category LN1121APEX.11233.MAPEX.11233MSystem Controller-Install - Category MN1091APEX.11314APEX11314Software ProcessorN1116APEX.11314.LAPEX.11314LSoftware Processor - Category LN1092APEX.11415APEX11415Automation System Training & ManualsN1117APEX.11415.LAPEX.11415LAutomation System Training & Manuals - Category LN1093APEX.12101APEX12101Conveyor System DesignN1145APEX.12101.LAPEX.12101LConveyor System Design - Category LN1094APEX.12213APEX12213Conveyor System InstallationN1147APEX.12213.LAPEX.12213LConveyor System Installation - Category LN1095APEX.12223APEX12223Conveyor System TestingN1146APEX.12223.LAPEX.12223LConveyor System Testing - Category LN1096APEX.12311APEX12311Conveyors-DesignN1149APEX.12311.LAPEX.12311LConveyors-Design - Category LN1097APEX.12312APEX12312ConveyorsN1148APEX.12312.LAPEX.12312LConveyors - Category LN1150APEX.12312.MAPEX.12312MConveyors - Category MN1098APEX.12325APEX12325Conveyor System Operation ManualsN1151APEX.12325.LAPEX.12325LConveyor System Operation Manuals - Category LN1099APEX.13106APEX13106Building Addition DesignN1122APEX.13106.LAPEX.13106LBuilding Addition Design - Category LN1100APEX.13206APEX13206Foundation & Site Woek (Civil)N1129APEX.13206.LAPEX.13206LFoundation & Site Woek (Civil) - Category LN1130APEX.13206.EAPEX.13206EFoundation & Site Woek (Civil) - Category EN1101APEX.13306APEX13306Building StructureN1131APEX.13306.LAPEX.13306LBuilding Structure - Category LN1132APEX.13306.EAPEX.13306EBuilding Structure - Category EN1102APEX.13416APEX13416ElevatorN1139APEX.13416.CAPEX.13416CElevator - Category CN1142APEX.13416.LAPEX.13416LElevator - Category LN1103APEX.13426APEX13426HVACN1124APEX.13426.LAPEX.13426LHVAC - Category LN1126APEX.13426.MAPEX.13426MHVAC - Category MN1104APEX.13436APEX13436Plumbing/Piping/ElectricalN1137APEX.13436.LAPEX.13436LPlumbing/Piping/Electrical - Category LN1138APEX.13436.MAPEX.13436MPlumbing/Piping/Electrical - Category MN1105APEX.13516APEX13516BrickN1125APEX.13516.LAPEX.13516LBrick - Category LN1127APEX.13516.MAPEX.13516MBrick - Category MN1133APEX.13516.EAPEX.13516EBrick - Category EN1106APEX.13526APEX13526RoofN1135APEX.13526.MAPEX.13526MRoof - Category MN1136APEX.13526.EAPEX.13526ERoof - Category EN1107APEX.13536APEX13536Doors/WindowsN1134APEX.13536.LAPEX.13536LDoors/Windows - Category LN1108APEX.13616APEX13616Floors/CarpetingN1123APEX.13616.LAPEX.13616LFloors/Carpeting - Category LN1128APEX.13616.MAPEX.13616MFloors/Carpeting - Category MN1109APEX.13626APEX13626Plumbing and Lighting FixturesN1141APEX.13626.LAPEX.13626LPlumbing and Lighting Fixtures - Category LN1110APEX.13636APEX13636CarpentryN1140APEX.13636.LAPEX.13636LCarpentry - Category LN1111APEX.13646APEX13646PaintingN1143APEX.13646.MAPEX.13646MPainting - Category MN1144APEX.13646.LAPEX.13646LPainting - Category LN765ENGRENGRENGRN777ENGR.1.0ENGR1Pre-Proposal Selections/NegotiationsN794ENGR.1.0.LENGR.1.0LPre-Proposal Selections/Negotiations - Category LN778ENGR.1.1ENGR1.1ProposalN795ENGR.1.1.LENGR.1.1LProposal - Category LN775ENGR.1.2ENGR1.2Pre-Design ServicesN792ENGR.1.2.LENGR.1.2LPre-Design Services - Category LN776ENGR.1.3ENGR1.3Site AnalysisN796ENGR.1.3.LENGR.1.3LSite Analysis - Category LN781ENGR.1.4ENGR1.4Schematic DesignN797ENGR.1.4.LENGR.1.4LSchematic Design - Category LN782ENGR.1.5ENGR1.5Design DevelopmentN798ENGR.1.5.LENGR.1.5LDesign Development - Category LN779ENGR.1.6ENGR1.6Construction DocumentsN793ENGR.1.6.LENGR.1.6LConstruction Documents - Category LN799ENGR.1.6.MENGR.1.6MConstruction Documents - Category MN780ENGR.1.7ENGR1.7Post Contract Award ServicesN785ENGR.1.7.LENGR.1.7LPost Contract Award Services - Category LN774ENGR.1??ENGR1??Engineering CostsN768ENGR.2.0ENGR2General InstallationN791ENGR.2.0.LENGR.2.0LGeneral Installation - Category LN790ENGR.2.0.EENGR.2.0EGeneral Installation - Category EN769ENGR.2.1ENGR2.1ArchitecturalN788ENGR.2.1.LENGR.2.1LArchitectural - Category LN766ENGR.2.2ENGR2.2StructuralN784ENGR.2.2.LENGR.2.2LStructural - Category LN767ENGR.2.3ENGR2.3ElectricalN786ENGR.2.3.LENGR.2.3LElectrical - Category LN772ENGR.2.4ENGR2.4MechanicalN783ENGR.2.4.LENGR.2.4LMechanical - Category LN773ENGR.2.5ENGR2.5ProcessN789ENGR.2.5.LENGR.2.5LProcess - Category LN770ENGR.2.6ENGR2.6EquipmentN787ENGR.2.6.EENGR.2.6EEquipment - Category EN771ENGR.2??ENGR2??Installation CostsN979CACACost AccountsN1069CA.00CA0ManagementN1051CA.01CA1Indirect CostN984CA.01.01100CA.011100Temp FacilitiesN1044CA.01.01200CA.011200HoistsN985CA.01.01300CA.011300Temp UtilitiesN993CA.01.01400CA.011400CleaningN1043CA.01.01600CA.011600General ExpenseN1041CA.01.01700CA.011700StaffN1042CA.01.01800CA.011800Fringes, Taxes, Ins, BondsN1052CA.02CA2SiteworkN992CA.02.02000CA.022000General SiteworkN986CA.02.02050CA.022050DemolitionN987CA.02.02100CA.022100Site PrepN988CA.02.02200CA.022200EarthworkN989CA.02.02220CA.022220ExcavationN990CA.02.02410CA.022410Storm SewersN991CA.02.02480CA.022480LandscapingN983CA.02.02500CA.022500PavingN982CA.02.02700CA.022700Piped UtilitiesN981CA.02.02800CA.022800Power and Comm UtilsN1053CA.03CA3ConcreteN994CA.03.03000CA.033000General ConcreteN995CA.03.03300CA.033300Cast-In-Place ConcreteN1054CA.04CA4MasonryN996CA.04.04000CA.044000MasonryN997CA.04.04200CA.044200Unit MasonryN998CA.04.04210CA.044210Brick MasonryN999CA.04.04400CA.044400StoneN1055CA.05CA5MetalsN1000CA.05.05120CA.055120Structural SteelN1001CA.05.05300CA.055300Metal DeckingN1002CA.05.05500CA.055500Misc MetalN1003CA.05.05700CA.055700Ornamental MetalN1070CA.06CA6Oranamental MetalsN1004CA.06.06100CA.066100Rough CarpentryN1005CA.06.06200CA.066200Finish CarpentryN1006CA.06.06220CA.066220MillworkN1071CA.07CA7Thermal & Moisture ProtectionN1007CA.07.07200CA.077200InsulationN1008CA.07.07250CA.077250Spray on FireproofingN1009CA.07.07500CA.077500Roofing and Slate sidingN1010CA.07.07510CA.077510Built up Bituminous RoofingN1072CA.08CA8Doors & WindowsN1011CA.08.08100CA.088100Metal Doors and FramesN1012CA.08.08350CA.088350Folding DoorsN1013CA.08.08400CA.088400Entrances and StoresN1014CA.08.08600CA.088600Wood and Plastic WindowsN1073CA.09CA9FinishesN1016CA.09.09000CA.099000General FinishesN1015CA.09.09250CA.099250Gypsum WallboardN1017CA.09.09300CA.099300Ceramic TileN1019CA.09.09500CA.099500Accoutic CeilingsN1020CA.09.09650CA.099650Resiliient FLooringN1021CA.09.09900CA.099900PaintingN1074CA.10CA10SpecialtiesN1022CA.10.10600CA.1010600PartitionsN1023CA.10.10800CA.1010800Toilet and Bath AccessoriesN1075CA.11CA11EquipmentN1024CA.11.11400CA.1111400Food Service EquipmentN1025CA.11.11500CA.1111500Industrial and Process EquipmentN1026CA.11.11700CA.1111700Medical EquipmentN1076CA.12CA12FurnishingsN1027CA.12.12500CA.1212500Window TreatmentsN1028CA.12.12600CA.1212600Furniture and AccessoriesN1077CA.13CA13Special ConstructionN1029CA.13.13040CA.1313040CleanroomsN1078CA.14CA14Conveying SystemsN1030CA.14.14200CA.1414200ElevatorsN1031CA.14.14500CA.1414500Material Handling SystemsN1079CA.15CA15PlumbingN1032CA.15.15400CA.1515400General PlumbingN1033CA.15.15500CA.1515500Fire ProtectionN1034CA.15.15600CA.1515600HVACN1080CA.16CA16ElectricalN1035CA.16.16000CA.1616000General ElectricalN1036CA.16.16500CA.1616500LightingN1018CA.16.16700CA.1616700CommunicationsN1037CA.16.16900CA.1616900ControlsN1081CA.17CA17Building Managment SystemsN1038CA.17.17100CA.1717100EnvironmentalN1039CA.17.17300CA.1717300Security SystemsN1082CA.20CA20MiscellaneousN1040CA.20.20600CA.2020600ArchitecturalN1153FCC2FCC2FCC2N1157FCC2.AFCC2AAdded Work BudgetN1156FCC2.IFCC2IIndirect LaborN1163FCC2.I.MFCC2.IMIndirect Labor - Category MN1158FCC2.LFCC2LDirect Field LaborN1162FCC2.L.MFCC2.LMDirect Field Labor - Category MN1161FCC2.L.OFCC2.LODirect Field Labor - Category ON1159FCC2.L.CFCC2.LCDirect Field Labor - Category CN1160FCC2.L.PFCC2.LPDirect Field Labor - Category PN1154FCC2.MFCC2MMaterial ChargesN1155FCC2.RFCC2RRentalsN1168301301Technical SupportN1164ENGENGEngineeringN1170ENG.HWENGHWHardwareN1169ENG.SWENGSWSoftwareN1165401401MarketingN

Back to Login Page

CostAcctHelpCOST ACCOUNTS---------------------------------------------------------------------------------------------------Import and Export of Cost Account DataUse this Worksheet to Add, Update or Delete Cost AccountsUPDATING / INSERTING / DELETING COST ACCOUNTS:1. Existing Cost Accounts are updated based on matching Internal ID (acct_id) values.2. New Cost Accounts will be added if the Internal ID value is blank.3. All new Cost Accounts will be imported into the highest level of the Cost Account hierarchy.4. To delete a Cost Account, add "Y" to the DELETE column.4. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Internal ID (acct_id) - the internal ID used by the database; this value cannot be specifiedCost Account ID (acct_concat_name) - the Cost Account IDCost Account Name (acct_name) - the Cost Account NameAdditional Notes:1. All new Cost Accounts will be imported into the highest level of the Cost Account hierarchy.2. It is recommended that you 'Get Cost Accounts' before you set the values into the dictionary in order to eliminate creating duplicate Cost Accounts.stop

Resource RatesInternal ID (Read-Only)Resource IDDescriptionShift NumberEffective DateMax Units/TimePrice/UnitPrice/Unit2Price/Unit3Price/Unit4Price/Unit5DELETE

Back to Login Page

Funding SourcesInternal ID (Read-Only)Funding Source NameParent Funding SourceDelete?21ApexN22School Construction AuthorityN23City Schools BoardN24IT BudgetCity Schools BoardN25Arts BudgetCity Schools BoardN

Back to Login Page

Res CurvesInternal ID (Read-Only)Resource Curve NameDefault / GlobalCurve Pct (Read-Only)Delete?10Back LoadedDefault0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5N11Bell ShapedDefault0 0.5 0.5 1.5 1.5 4 4 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4 4 1.5 1.5 0.5 0.5N12Front LoadedDefault0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5N13LinearDefault0 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5N14Offset TriangularDefault0 1 1 2.5 2.5 3.5 3.5 5 5 6.5 6.5 7.5 7.5 8.5 8.5 7 7 5 5 3.5 3.5N15Three StepDefault0 4 4 4 4 4 4 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4 4 4 4 4 4N16TrapezoidalDefault0 1 1 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1 1N17TriangularDefault0 1 1 3 3 5 5 7 7 9 9 9 9 7 7 5 5 3 3 1 1N18Triangular DecreaseDefault0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1N19Triangular IncreaseDefault0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9N20Double PeakDefault0.0 1.3 2.5 3.8 5.1 7.6 10.1 7.6 5.1 3.8 2.5 2.5 2.5 3.8 5.1 7.6 10.1 7.6 5.1 3.8 2.5N21Early PeakDefault0.0 1.2 2.5 3.8 5.0 7.5 10.1 10.1 10.1 8.8 7.5 6.3 5.0 5.0 5.0 3.8 2.5 2.0 1.5 1.3 1.0N22ENGR - TRIANGULARGlobal0 1 1 3 3 5 5 7 7 9 9 9 9 7 7 5 5 3 3 1 1N23ENGR - TRIANGULAR INCREASEGlobal0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9N24ENGR - TRIANGULAR DECREASEGlobal0.0 9.0 9.0 8.5 8.5 7.0 7.0 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3.0 3.0 1.5 1.5 1.0 1.0N25ENGR - BACK LOADEDGlobal0.0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5N26ENGR - FRONT LOADEDGlobal0.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5N27ENGR - TRAPEZOIDALGlobal0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0N28ENGR - BELL SHAPEDGlobal0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5N29ENGR - THREE STEPGlobal0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0N30ENGR - OFFSET TRIANGULARGlobal0.0 1.0 1.0 2.5 2.5 3.5 3.5 5.0 5.0 6.5 6.5 7.5 7.5 8.5 8.5 7.0 7.0 5.0 5.0 3.5 3.5N31HWY1 - LINEARGlobal0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0N32HWY1 - TRIANGULARGlobal0.0 1.0 1.0 3.0 3.0 5.0 5.0 7.0 7.0 9.0 9.0 9.0 9.0 7.0 7.0 5.0 5.0 3.0 3.0 1.0 1.0N33HWY1 - TRIANGULAR INCREASEGlobal0.0 1.0 1.0 1.5 1.5 3.0 3.0 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7.0 7.0 8.5 8.5 9.0 9.0N34HWY1 - TRIANGULAR DECREASEGlobal0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1N35HWY1 - BACK LOADEDGlobal0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5N36HWY1 - FRONT LOADEDGlobal0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5N37HWY1 - TRAPEZOIDALGlobal0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0N38HWY1 - BELL SHAPEDGlobal0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5N39HWY1 - THREE STEPGlobal0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0N40HWY1 - OFFSET TRIANGULARGlobal0.0 1.0 1.0 2.5 2.5 3.5 3.5 5.0 5.0 6.5 6.5 7.5 7.5 8.5 8.5 7.0 7.0 5.0 5.0 3.5 3.5N41DEMO - LinearGlobal0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0N42DEMO - TriangularGlobal0.0 1.0 1.0 3.0 3.0 5.0 5.0 7.0 7.0 9.0 9.0 9.0 9.0 7.0 7.0 5.0 5.0 3.0 3.0 1.0 1.0N43DEMO - Triangular IncreaseGlobal0.0 1.0 1.0 1.5 1.5 3.0 3.0 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7.0 7.0 8.5 8.5 9.0 9.0N44DEMO - Triangular DecreaseGlobal0.0 9.0 9.0 8.5 8.5 7.0 7.0 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3.0 3.0 1.5 1.5 1.0 1.0N45DEMO - Back LoadedGlobal0.0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5N46DEMO - Front LoadedGlobal0.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5N47DEMO - TrapezoidalGlobal0.0 1.0 1.0 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1.0 1.0N48DEMO - Bell ShapeGlobal0.0 0.5 0.5 1.5 1.5 4.0 4.0 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4.0 4.0 1.5 1.5 0.5 0.5N49DEMO - Three StepGlobal0.0 4.0 4.0 4.0 4.0 4.0 4.0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4.0 4.0 4.0 4.0 4.0 4.0N50ConcaveGlobal0 10.4 11.2 11.2 11.2 0 0 0 0 0 0 0 0 0 0 0 11.2 11.2 11.2 11.2 11.2N51ENGR - LINEARGlobal0.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0N52APEX - LINEARGlobal0 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5N53APEX - TRIANGULARGlobal0 1 1 3 3 5 5 7 7 9 9 9 9 7 7 5 5 3 3 1 1N54APEX - TRIANGULAR INCREASEGlobal0 1 1 1.5 1.5 3 3 3.5 3.5 4.5 4.5 5.5 5.5 6.5 6.5 7 7 8.5 8.5 9 9N55APEX - TRIANGULAR DECREASEGlobal0 9 9 8.5 8.5 7 7 6.5 6.5 5.5 5.5 4.5 4.5 3.5 3.5 3 3 1.5 1.5 1 1N56APEX - BACK LOADEDGlobal0 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5N57APEX - FRONT LOADEDGlobal0 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5N58APEX - TRAPEZOIDALGlobal0 1 1 3.5 3.5 5.5 5.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 5.5 5.5 3.5 3.5 1 1N59APEX - BELL SHAPEDGlobal0 0.5 0.5 1.5 1.5 4 4 7.5 7.5 11.5 11.5 11.5 11.5 7.5 7.5 4 4 1.5 1.5 0.5 0.5N60APEX - THREE STEPGlobal0 4 4 4 4 4 4 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 4 4 4 4 4 4N61APEX - OFFSET TRIANGULARGlobal0 1 1 2.5 2.5 3.5 3.5 5 5 6.5 6.5 7.5 7.5 8.5 8.5 7 7 5 5 3.5 3.5N62EM11 - LinearGlobal0 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5N63At StartGlobal100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0N64At FinishGlobal0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100N

Back to Login Page

UsersInternal ID (Read-Only)Login NamePersonal NameOffice PhoneEmail AddressGlobal ProfileResource IDProject ManagementTeam MemberProgress ReporterWeb Access PortfoliosWeb Access ProjectsWeb Access ResourcesIntegration APIWeb ServicesDELETE ?25adminAdminstratorYYYYYYYYN83BruceBruce (V.P. of Construction)310 555 [email protected] UserN87JeffJeff (Project Manager)End UserN88ChuckChuck (Scheduling Manager)End UserN

Back to Login Page

UsersHelpUSERS---------------------------------------------------------------------------------------------------Import and Export of User DataUse this Worksheet to Add, Update or Delete UsersUPDATING / INSERTING / DELETING USERS:1. Existing Users are updated based on matching Internal ID (user_id) values.2. New Users will be added if the Internal ID value is blank.3. To delete a User, enter "Y" in the DELETE column.4. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Internal ID (user_id) - the internal ID used by the database; this value cannot be specifiedLogin Name (user_name) - the Login Name for the userPersonal Name (actual_name) - the Personal Name of the userOffice Phone (office_phone) - the user's phone numberEmail Address (actv_short_len) - the user's email addressGlobal Profile (email_addr) - The order in which the values will appear in the dictionaryResource ID (rsrc_id) - The resource that the user is assigned toGlobal Profile (prof_id) - The user's global security profilestop

CurrenciesInternal ID (Read-Only)Base?Currency IDCurrency NameCurrency SymbolExchange RateDecimal Symbol# Decimal DigitsDigit Group SymbolPos Currency FormatNeg Currency Format1YUSDDollar$1.0,#1.1(#1.1)10NARSArgentine Peso$3.077.2,#1.1(#1.1)11NAUSTAustralian DollarA$1.208.2,#1.1(#1.1)13NBRLBrazilian RealR$2.014.2,#1.1(#1.1)14NU.K.British Pound0.685097.2,#1.1(#1.1)15NCADCanadian DollarCA$1.10573.2,#1.1(#1.1)16NCNYChinese YuanY7.694.2,#1.1(#1.1)17NEUREURO0.739088.2,#1.1(#1.1)20NHKDHong Kong DollarHK$7.81967.2,#1.1(#1.1)21NINRIndian RupeeRs40.67.2,#1.1(#1.1)23NJPYJapanese Yen120.167.2,#1.1(#1.1)24NKRWKorean WonK924.743.2,#1.1(#1.1)25NMXNMexican PesoN$10.7938.2,#1.1(#1.1)26NRUBRussian RoubleR25.8085.2,#1.1(#1.1)28NSEKSwedish KronaSk6.80579.2,#1.1(#1.1)29NCHFSwiss Franckr1.21864.2,#1.1(#1.1)30NILSIsrael ShekelNIS3.96384.2,#1.1(#1.1)

Back to Login Page

Baseline TypesInternal ID (Read-Only)Baseline TypeOrderDelete?104Customer Sign-Off1N120Prior Month Update2N111Initial Plan9N105What-if Project Plan10510N107Mid-Project Status20510N103Management Sign-Off20511N

Back to Login Page

Expense CategoriesInternal ID (Read-Only)Expense CategoryOrderDelete?

Back to Login Page

Project PhasesInternal ID (Read-Only)Category ValueOrderDelete?1148Close-Out10N1149Commissioning / Delivery110N1000Design and Engineering210N1147Installation and Testing310N1117Implementation / Deployment410N1139Manufacturing / Production510N1156Requirements Definition521N1154Design540N1150Needs Analysis / Requirements610N1151Procurement710N1100Project Management810N1129Project Planning910N1138Prototyping1010N1101Quality Assurance1110N1153Regulatory / Compliance1210N1152Scope Definition1310N1144Shutdown1410N1155Implementation1500N1141Startup1510N1157Deployment3303N

Back to Login Page

Document CategoriesInternal ID (Read-Only)Document CategoryOrderDelete?

Back to Login Page

Doc Status CodesInternal ID (Read-Only)Status CodeOrderDelete?

Back to Login Page

Overhead CodesInternal ID (Read-Only)OH CodeOverhead DescriptionOrderDelete?

Back to Login Page

Risk TypesInternal ID (Read-Only)Risk TypeOrderDelete?

Back to Login Page

Notebook TopicsInternal ID (Read-Only)Notebook TopicEPSProjWBSActvOrderDelete?30Anticipated ProblemsYYYY1N64Basis & AssumptionsNYYY101N69CautionYYYY201N63Change OrderYYYY301N76ObjectivesYYYY400N59Constraints and AssumptionsNYYY401N22Corrective ActionsYYYY501N65Current StatusYYYY601N32Customer ProblemNNNY701N58Delay ImpactsNYYY801N68DescriptionYYNN901N47District IssuesNYNN1001N21EstimationNYYY1101N70ExplanationYYYY1201N71Executive FeedbackYYYY1202N24JustificationYYNN1301N25Lessons LearnedYYYY1401N20P3 Activity Log InfoNNNY1501N29Problems EncounteredYYYY1601N67Progress PhotographsYYYY1701N28Project Manager's NarrativeYYYN1801N26Project ObjectivesYYNN1901N27Project RationaleYYNN2001N50Project StatusNYNN2101N40Recent HighlightsYYYY2201N42ResolutionNNNY2301N19Review CommentsNNYY2401N43ScopeYYYY2501N77PurposeNYNY2600N44Status ReportYYYY2601N51Team Member FeedbackNYNY2701N72Entry CriteriaYYYY2800N1Vendor IssuesYYYY2801N2WBS DescriptionNYYN2901N75Core RequirementsYYYY3200N74Verification / ValidationYYYY3300N73Exit CriteriaYYYY3600N78Description-projNYYY5401N

Back to Login Page

ErrorRptDictionary.xls - Error Report

ResRatesHelpRESOURCE RATES---------------------------------------------------------------------------------------------------UPDATING / INSERTING / DELETING RESOURCE RATE VALUES:1. Existing Resource Rates are updated based on matching Internal ID values.2. New Resource Rates will be added if the Internal ID value is blank.3. New Resource Rates require values for Resource ID and Start Date.4. To delete a Resourc Rate, add "Y" to the DELETE column.5. Macro will stop when two consecutive Resource ID values are blank.COLUMN DESCRIPTIONS:Internal ID (rsrc_rate_id) - the internal ID used by the database; this value cannot be specifiedResource ID (rsrc_short_name) - Resource IDDescription (rsrc_name) - Resource NameShift Number (shift_period_id) - Shift Number - (Internal ID - Can be retrieved from running Get Resource Shifts)Start Date (start_date) - Effective DateMax Units/Time (max_qty_per_hr) - Max Units/TimePrice/Unit (cost_per_qty) - Price/UnitPrice/Unit2 (cost_per_qty2) - Price/Unit2Price/Unit3 (cost_per_qty3) - Price/Unit3Price/Unit4 (cost_per_qty4) - Price/Unit4Price/Unit5 (cost_per_qty5) - Price/Unit5stop

HelpACTIVITY CODES---------------------------------------------------------------------------------------------------Import and Export of Activity Code DataUse this Worksheet to:* Add, Modify or Delete Global and Project level Activity Codes* Modify or Delete EPS level Activity Codes ****** CANNOT ADD EPS CODES* Add, Modify or Delete Activity Code Values and their descriptions* Modify the Order in which the Activity Code Values appear in the dictionary* Modify the Length for the values of each Activity Code* Change Activity Codes from Global to Project specific, and vice versa.UPDATING / INSERTING / DELETING ACTIVITY CODES:1. Existing Activity Codes are updated based on matching Internal ID (actv_code_type_id) values.2. New Activity Codes will be added if the Internal ID value is blank.3. New Activity Codes require a value in the 'Global/Project' field.4. To delete an Activity Code, add "Y" to the DELETE column.UPDATING / INSERTING / DELETING ACTIVITY CODE VALUES:1. Existing Activity Code Values are updated based on matching Internal ID (actv_code_id) values.2. New Activity Code Values will be added if the Internal ID value is blank.3. New Activity Code Values require a value in the 'Code Value' field.4. To delete an Activity Code Value, add "Y" to the DELETE column.5. Macro will stop when two consecutive Code Value fields are blank.COLUMN DESCRIPTIONS:Global/Project - This will display 'PROJECT' for Project level Activity Codes and 'GLOBAL' for Global CodesCode Value (short_name) - Activity Code ValueDescription (actv_code_name) - Activity Code Value's DescriptionCode Length (actv_short_len) - The maximum length for the Code Values (default length is 7)Order (seq_num) - The order in which the values will appear in the dictionaryInternal ID (actv_code_id) - the internal ID used by the database; this value cannot be specifiedstop