Date post: | 29-Dec-2015 |
Category: |
Documents |
Upload: | mitchell-garrett |
View: | 228 times |
Download: | 1 times |
DIPKA AREA - AT A GLANCE
SOUTH EASTERN COALFIELDS LIMITED(A NAVARATNA COMPANY)
LOCATION PLAN
NORTH
AMBIKAPUR
KATGHORAAHIRAN RIVER
SUTTARA
BILA
SPU
R
PALI
HARDI BAZAR
BILASPUR BALAUDA BAZAR
GEVRA PROJECTKUSMUNDA PROJ
HA
SD
EO
RIV
ER
CSEBAIR STRIP
BALCO
NTPC
CSEB
KORBA
GEVRA RLY STN.
CHAMPA
HOWRAWMUMBAI
BANKI
DIPKA
DHELWADIH
RAJGAMAR
51km
34km
DIPKA AREA
NTPC SEEPAT
SILO
INDEX –Railway Line-
River -
Road -
BRIEF HISTORY OF DIPKA PROJECT
Particulars Details
Date of opening of the project June 1985 (2MT/Year at a Capital of Rs. 56.06 crores).
1st Expansion approved in 1992 3 MT/Year at a capital of Rs.65.41 crores.
2nd Phase Expansion in Dec. 1996 10 MT/Year approved in 1996 at a capital of Rs.533.96 crores.
3rd Phase Expansion in July 2005 20 MT/Year approved in 2005 at a capital of Rs.1268.53 crore.
4th Phase Expansion in Dec. 2009 25 MT/Year with an estimated capital of Rs.1943.66 crores.
5th Phase Expansion in Mar. 2013 30 MT / Year
SALIENT INFORMATION – DIPKA EXPN. PROJECT
25 MT EXISTING(31.01.2013)
COAL RESERVE : 617 MT 432.94 MTO B R : 615 MCu.M. 495.46 MCu.M.CAPITAL OUTLAY : Rs. 675.13 CR (Additional)
STRIPPING RATIO : 1 1.091MAX. QUARRY DEPTH : 240 MTRS. 155 MTRS.
GRADE OF COAL : G-10 & G-11LINKAGE : NTPC Seepat
POWER HOUSES OTHER CUSTOMERS
MAN POWER REQUIRED(AS PER PR) : 2594 1668
LIFE : 25 YEARS 20 YEARSTOTAL LEASE HOLD AREA : 1999.417 Ha 1999.417 Ha
Particulars Details
OVER BURDEN REMOVAL Presently overburden is removed departmentally and backlog is being made up contractually. In departmental patch, O B is removed by deploying 10 Cu.M. & 42 Cu.M. shovels in combination with 120Te & 240Te dumpers respectively. Contractual Patch is being worked by deploying 3 Cu.M. backhoe and 14.9 Cu.M. tippers.
COAL 100% coal of (-)100mm size is produced by deploying eco-friendly surface miner.
METHOD OF MINING IN DIPKA
Presently coal is transported from face to surface by road through tippers and is dispatched to:
1. Different linked Power Houses through Washeries by road cum rail mode.
1. NTPC Seepat through SILO MGR system.2. Other consumers by rail mode through Dipka Siding.
Construction & installation work of eco-friendly in-pit belt conveyor system is in progress and is likely to be commissioned by next financial year (2013-14), which will replace the existing system of road transportation completely.
COAL TRANSPORTATION & DESPATCH
COAL TRANSPORT ARRANGEMENT, DIPKA EXPANSION PROJECT
STATE POWER HOUSE (ACB) 20000 TPD
CHPB1-B6
LOWER KUSMUNDA SEAM
SILO TO NTPC30000 TPD
DIPKA SIDING 8000TPD (Avg.)CHP
B7-B10
COAL STOCK
STATE POWER HOUSE (SCPL) 17000 TPD
HOPPER
BeltSTATE POWER HOUSE (SCPL) 7000 TPD
E-Auctn.4500TPD
(55,000 Te)
(35,000 Te)
OLD DIPKA
TOTAL = 90,000 TPD
OTHER WASHERIES 8000 TPD
RAPID LOADING SYSTEM- SILO , DIPKA AREA
SALIENT FEATURES
1. Capacity of Silo : 3200 Tones each
2. No. of Silos : 02 Nos.
3. Speed of Rake : 0.8 KM/hr.
4. Loading Capacity : 5500 Te./hr.
5. Loading time of one wagon : One minute (Approx.)
6. Type of weighment : Pre-Weigh System
7. Sampling collection arrangement : Automatic Sampler
COAL DESPATCH THROUGH RLS
RAPID LOADING SYSTEM
CIL : SECL : DIPKA AREACOAL PRODUCTION 2013-2014 ( UP TO 30.11.2013 )
( Fig. in Te.)
Month Target Achievement Cont. Depart Total
April 2400000 2390118.22 2386618.22 3500.00 2390118.22
May 2500000 2399700.93 2195100.93 204600.00 2399700.93
June 2400000 2075393.19 1971993.19 103400.00 2075393.19
July 2400000 2184682.70 2184682.70 0.00 2184682.70
August 2400000 2087287.10 2084687.10 2600.00 2087287.10
September 2400000 2041972.51 1995322.51 46650.00 2041972.51
October 2600000 2262718.81 1921078.81 341640.00 2262718.81
November 2500000 2004195.04 1957495.04 46700.00 2004195.04
December 2600000
January 2600000
February 2400000
March 2800000
Total 30000000 17446068.50 16696978.50 749090.00 17446068.50
CIL : SECL : DIPKA AREAO.B.R. 2013-2014 (UP TO 30.11.2013)
(Fig. in Cu. M.)
Month
Departmental Contractual TOTAL
2013-2014 2013-2014 2013-2014
Target Achievement Target Achievement Target Achievement
April 900000 770656 1300000 562090.62 2200000 1332746.62
May 900000 711764 1600000 1444638.75 2500000 2156402.75
June 1425000 905600 1600000 1203276.25 3025000 2108876.25
July 1400000 1192357 1000000 1051290.62 2400000 2243647.62
August 1200000 969179 1000000 943956.25 2200000 1913135.25
September 1500000 1015950 700000 1381890.00 1900000 2397840.00
October 1500000 703205 2000000 1130000.00 3500000 1833205.00
November 1630000 877243 2000000 1052000.00 3630000 1929243.00
December 1630000 2100000 3730000
January 1760000 2100000 3860000
February 1500000 1800000 3300000
March 1710000 2000000 3710000
Total 16755000 7145954 19200000 8769142.49 35955000 15915096.49
YEAR-WISE PRODUCTION OF COAL(IN MILL. TONS)
30 MT
YEAR
PR
OD
N. (
In M
.T.)
Expected production in the current year- 30M T.
YEAR-WISE OFFTAKE(IN MILL. TONS)
YEAR
OF
FT
AK
E (
In M
.T.)
ANNUAL PROFIT(IN Rs. CRORES)
(As PER AUDITED ACCOUNTS)
YEAR
Rs.
Cro
res
Details Unit 2009-10 2010-11 2011-12 2012-13 2013-14 (up to Nov’13)
Coal Production Mil. Te 24.09 25.00 25.00 29.13 17.44
OB Removal Mil. Cu. M. 14.42 13.94 14.28 15.62 15.91
O M S Te/ Manshift 39.75 39.05 37.49 40.89 52.42
E M S Rs. 1358.95 1635.20 2009.89 2450.06 2644.26
Cost per Te ( C P T ) Rs. 250.92 307.43 349.58 477.32 358.76
Sale Price /Te (S P T) Rs. 598.65 648.16 783.15 816.56 1011.93
Profit Per Te (P P T) Rs. 347.72 340.73 433.57 480.63 653.17
Total Profit (Before Tax)
Rs. Cr. 886.00 928.41 1182.43 1400.07 1139.11
FINANCIAL PERFORMANCE (Last 4 years)
EXECUTIVES : 154
TECHNICAL & SUPERVISORY STAFF : 280
CLERICAL STAFF : 113
DAILY RATED WORKERS : 1121
TOTAL : 1668
YEAR EXISTING AS PER 25MT PR
SURPLUS / SHORTAGE
2012 -13 1667 2594 (-) 927
2013-14 (as on 30.11.13)
1668 2594 (-) 926
H E M M
S N HEMMs MODEL POPULATION
1 DUMPER MARK 30B 20
2 DUMPER CAT 793D 06
3 DUMPER BH 100 12
4 DUMPER CAT-777D 04
4 DUMPER BH- 35-II 13
5 DOZER BD 155X 03
6 DOZER BD 355 11
7 WHEEL DOZER CAT 834B 02
8 DOZER 475A5 06
9 DRILL PV 351E 01
10 DRILL ROTACOAL 01
11 DRILL RECP 650 01
12 DRILL RECP 650E 01
13 DRILL RECP 750 02
14 DRILL SBSH 250MM 03
15 DRILL ICM-260, 100MM 01
16 DRILL IDM 30D 02
17 DRILL IDM 70E 02
18 SHOVEL 495HD 01
19 SHOVEL 182M ROPE 01
20 SHOVEL P&H 1900AL 04
POPULATION OF HEMMs (As on 30.11.2013) Excv.-1
S N HEMMs MODEL POPULATION
21 HYD. BACKHOE BE-200LC 01
22 HYD. BACKHOE EX-300LCH 01
23 HYD. BACKHOE EX-700 02
24 HYD. BACKHOE BE 1000-1 03
25 PAY LOADER TWL-3036 06
26 WATER TANKER WS 1035 01
27 WATER TANKER WS-28-2 03
28 WATER TANKER WS-70 05
29 GRADER CAT24M 01
30 GRADER CAT-16H 01
31 GRADER BG 825 05
32 GRADER GD 825A2 01
33 CRANE ESCORTS 02
34 CRANE RT 630C 30T 03
35 CRANE RT 880 70T 02
36 CRANE 630 HUSKY 01
37 CRANE 150 TE 01
38 CRANE 40 TE 01
39 TYRE HANDLER BL 14 TH 01
40 TYRE HANDLER VOLTAS 01
41 TYRE HANDLER MANITOU 02
(As on 30.11.2013) Excv.-2
TOTAL = 141 Nos
POPULATION OF HEMMs
HEMM IN MINE
BUCYRUS SHOVEL- 42Cu. M.
MAKE – BUCYRUSMODEL – 495HDAnnual Capacity – 8 Mill. Cu. M.
CSR & WELFARE ACTIVITIES
EMPLOYMENT GIVEN TO PAPS
S N NAME OF VILLAGE PERSONS GIVEN EMPLOYMENT
1 BELTEKARI 232
2 SIRKI 115
3 CHAINPUR 578
4 RENKI 01
5 RATIZA 28
6 SUVABONDI 163
7 MALGAON 147
8 JHINGATPUR 98
9 JHABHAR 83
10 DIPKA 25
T O T A L 1470
S N NAME OF VILLAGE
Family to be Rehabilitated
Family already Rehabilitated
Balance to be Rehabilitated
1 BELTEKARI 351 332 ** 0
2 SIRKI 388 367 ** 0
3 CHAINPUR 385 381 ** 0
4 SUVABONDI 148 138 ** 0
5 MALGAON 284 199 ** 7
6 JHINGATPUR 134 71 ** 36
T O T A L 1690 1488 43
REHABILITATION AND RESETTLEMENT
** Remaining families shifted elsewhere with cash compensation in lieu of plot.
Environment Protection Activities
Continious Ambient monitoring System
ENVIRONMENT PROTECTION ACTIVITIES
Deployment of protective eco-friendly mining technology i.e. Surface Miners for coal winning.
Coal transportation from face to different despatch points on surface through in-pit belt conveying system likely to be commissioned by next financial year (2013-14).
Dust suppression arrangement by installing automatic sprinklers, dust extractors/wet drilling in drill machines and mobile water sprinklers.
Oil and Grease Traps commissioned in the workshop for treatment of waste water and recycling.
Rain water harvesting arrangement are made in the colony, service buildings and offices.
Green belt around the roads and colony are maintained.
ENVIRONMENT PROTECTION ACTIVITIES
1. AUTOMATIC DUST SUPPRESSION BY SPRINKLERS : 5.95 KM
2. MOBILE WATER SPRINKLERS : 5 Nos. (70 KL each) : 4 Nos. (28 KL each)
3. DUST EXTRACTORS/ WET DRILLING IN ALL DRILL MACHINES.
4. WATER SPRINKLING ARRANGEMENTS AT CHP’s & FEEDER BREAKERS.
5. PLANTATIONS IN OB DUMPS, MINE BOUNDARY AND COLONIES.
6. BLACK TOPPING OF ROADS.
7. LEVEL OF S.P.M. IN INDUSTRIAL AREA (MICRO GRAMS/M3 ) 300 - 350
AGAINST PERMISSIBLE LIMIT OF 600 MICRO GRAMS/M3 .
PLANTATION
• Plantations done up to Jan. 2013 – 12.31 Lakhs
• Total Area planted – 368.01 Ha
• Survival rate is more than 90%.
RECLAMATION
• Technical Reclamation done – 308.24 Ha
• Area Biologically Reclaimed – 123.48 Ha
PLANTATION ON RECLAIMED LAND
DUST SUPRESSION ON HAUL ROAD BY 70KL WATER TANKER
GREEN BELT AROUND WORKSHOP
WATER RESERVOIR AT PRGATI NAGAR