Date post: | 22-Mar-2016 |
Category: |
Documents |
Upload: | workscapes |
View: | 219 times |
Download: | 0 times |
Choosing DIRTT allows you to create a building that is:
• Flexible
• Can quickly change to meet your needs throughout its life wihtout
requiring demolition
• Is environmentally sustainable and affordable
User gain Control. They control the:
• Experience
• Process
• Outcome
• Costs
• Response to an unknown & evolving future
ICE software provides the framework to create comprehensive pre-
manufactured integrated solutions that:
• Visually allow all stakeholders to share and understand the solution
• Streamline & increase efficiency in the design process
• Manage the process from design through manufacturing, delivery,
installation & future renovations
why choose DIRTT
DIRTT’s sustainable pre-manufactured construction solutions:
• Increase integration between construction trades
• Seamlessly integrate any material device
• Reduce the construction schedule
• Increase project efficiency
• Provide long-term flexibility & real value to users
• Adapt to any future requirement
Behavioral Sustainability:
• DIRTT’s pre-manufactured solutions can adapt to any chance
and be repurposed as necessary
• ICEcycle provides seamless comprehensive design and renovation
capabilities
• Reusing & repurposing integrated premanufactured solutions
results in significant improvement of the triple bottom line; People-
Profit-Planet
why choose DIRTT
Clean
Speed to install
Real time changes
No down time
Built to exact specifications
Full range of accessories for performance & productivity
98% on time installation
Reconfiguration ease as you grow or change
competitive advantages
DIRTT is an agile architectural option with many great benefits.
• Schedule: We are faster than any competitor with 4 week fabrication time, can install approximately 8,000 sq. ft. or more per week and one week delivery times. Making short deadlines possible. Product arrives at our warehouse to hold until site is ready, assuring no delays.
• Flexibility: With up to 2.1/2” height adjustment, changes in level in flooring are not an issue.
• Aesthetics: A fit and finish that produces unsurpassed detail and virtually no punch items.
• Sustainability: Factory produced, so there is no on-site waste of product, no off gassing VOCs. Can install while other trades are still in operation- no down times.
• Installation: We use our own factory certified crews. With onsite inspections from the manufacturer. We have installed more than 100,000 LF locally in 4 short years.
• Costs: Costs are kept to a minimum for glass installations: extrusions ship from our Savannah plant and all glass is locally sourced.
References:Darden Restaurants Headquarters, over 6,000 LF DIRTT wallsContact: David Clark, facilities, 407-245-4102
LSQ Financial Services, over 900 LF DIRTT walls and two expansionsContact: Shaun Schlossmacher, GC AD Owens, 407-228-6485
Siemens Shared Services, over 900 LF glass DIRTT wallsContact: Stephen Ball, CB Richard Ellis, project PM, 321-377-8568
Adventist Health Systems, over 2,400 LF DIRTT walls (another 1,700 due in October 2012)Contact: Toni Berrios, Building Manager AHS, 407-357-2466
University of Central Florida, College of Medicine, 100 LF DIRTT wallsContact: Barbara O’Hara, Facilities 407-823-4070
Additional Workscapes DIRTT projects:NASCAR, Daytona BeachAmway CenterFlorida HospitalHealth CentralOld Florida National BankSun Trust (Orlando, Los Angeles, Miami)
DIRTT References
w w w . w o r k s c a p e s . c o m
DIRTT Champion in your area
Jay LovellCentral Florida407.575.0654
F U R N I T U R E | A R C H I T E C T U R A L P R O D U C T S