+ All Categories
Home > Documents > Division Street Presentation from April 26

Division Street Presentation from April 26

Date post: 30-May-2018
Category:
Upload: gary-howe
View: 215 times
Download: 0 times
Share this document with a friend

of 22

Transcript
  • 8/9/2019 Division Street Presentation from April 26

    1/22

    Division Street (14th to Grandview Parkway)

  • 8/9/2019 Division Street Presentation from April 26

    2/22

    Project CharacteristicsSilver Lake Road/14th Street to Grandview Parkway (1.2 miles)

    4 11 wide lanes

    Road condition is poor

    4 signalized

    intersections

    Discontinuous sidewalks

    27 un-signalized

    intersections 26,000-33,000 per day

    Pedestrian & bicyclecrossing difficult

    Front Street & 14th

    Street highest crashnc en s rear en

  • 8/9/2019 Division Street Presentation from April 26

    3/22

    Project Background

    Current Project (2011)urrent Project (2011) Capital Preventive Maintenance (interim fix)

    Initial MDOT ro ect dela ed to obtain communit in ut

    Future Project (2016 +)( ) Longer term pavement fix

    Opportunities to address community long term needs

    Proposed alternatives may require additional right of way

    Requires Environmental Assessment

  • 8/9/2019 Division Street Presentation from April 26

    4/22

    Project Background Creatin a sense of

    place Gateway

    Treatment Pedestrian access

    across Division

    Continuity ofsidewalks

    Trees & landscape

    treatments

  • 8/9/2019 Division Street Presentation from April 26

    5/22

    Project Background

    Charrette

    Concentrated effort to

    identify problems and

    Opportunity to involve the

    affected community in

    Presents a format for

    brainstorming ideas

    Results are available for

    timely feedback

  • 8/9/2019 Division Street Presentation from April 26

    6/22

    Project PartnersCentral Neighborhood North Front Street NeighborhoodBATA

    Kids Creek NeighborhoodThe Minervini GroupJoint Planning Commission

    W t F t St t GRichmond Architects Elks Lodge

    TBAISDh C it l C li tGrand Traverse County RoadCommission

    Joint Planning Commission

    West Front Street GroupSlabtown Neighborhood Traverse City Parks and Recreation

    TBAISDherry Capital Cyclist

    Immaculate Conception Church TART Trails, Inc.

    yCommissionRecreation Authority

    Immaculate Conception ChurchMunson Medical Center Traverse City Planning Commission

    The City of Traverse City

  • 8/9/2019 Division Street Presentation from April 26

    7/22

    Project Purpose and Need

    Stakeholder

    Meeting

    Results

  • 8/9/2019 Division Street Presentation from April 26

    8/22

    Project Purpose and Need

    -motorized) flow, safety on Division Street that is

    contextually sensitive to the adjacentcommunities and regional transportationneeds.

    ee : Poor road condition

    Crash locations

    Sense of place Pedestrian/bicycle accessibility

    Access to adjacent properties

  • 8/9/2019 Division Street Presentation from April 26

    9/22

    Sample Road Cross Sections

    Suburban Cross Section

    Downtown Cross Section

    Boulevard Cross Section

  • 8/9/2019 Division Street Presentation from April 26

    10/22

    Proposed Alternatives

    Capital Preventive

    Maintenance

    Boulevard

    Roundabouts

    Hybrid/Phased

  • 8/9/2019 Division Street Presentation from April 26

    11/22

    Proposed Alternatives

    Capital PreventiveMaintenance (5 8 yr fix)aintenance (5-8 yr fix) Road condition

    Existing intersectionsremain

    access improvements

    No additional right-of-

  • 8/9/2019 Division Street Presentation from April 26

    12/22

    Proposed Alternatives - Boulevard

  • 8/9/2019 Division Street Presentation from April 26

    13/22

  • 8/9/2019 Division Street Presentation from April 26

    14/22

    Proposed Alternatives

    Potential for Roundabouts at Five Locationsotential for Roundabouts at Five Locations14th/Sil L k R d 14th/Silver Lake Road

    11th Street 8 Street Front Street Grandview Parkway (US-31/M-37/M-72)

  • 8/9/2019 Division Street Presentation from April 26

    15/22

    Roundabout Benefits

  • 8/9/2019 Division Street Presentation from April 26

    16/22

  • 8/9/2019 Division Street Presentation from April 26

    17/22

    Proposed AlternativesRoundabout at 11th Street

    Requires some right ofwa at SW uadrantfrom the park (ballot)(140 x 240 triangle)

    Creates gatewayentrance to the city

    Improves safety

    Provides pedestrian &non-mo or ze access

  • 8/9/2019 Division Street Presentation from April 26

    18/22

    Proposed AlternativesRoundabout at 11th Street

  • 8/9/2019 Division Street Presentation from April 26

    19/22

    Proposed AlternativesRoundabout at 8 Street

    Alternative to roundaboutth

    Requires right of way

    (two - 160 x 300tr ang es o par

    Provides additionalaccess to Munson

    Hospital & the parkSlows traffic

    Improves safety

    Adds pedestrian and non-

    Can be phased in overtime

  • 8/9/2019 Division Street Presentation from April 26

    20/22

  • 8/9/2019 Division Street Presentation from April 26

    21/22

    Proposed AlternativesRoundabout at Grandview Parkway

    May require park

    Park)

    to/from the city

    Slows traffic

    Improves safety

    Adds pedestrian andnon-motorized

    access

    Can be phased inover time

  • 8/9/2019 Division Street Presentation from April 26

    22/22

    Roundabout Videos

    http://vodpod.com/watch/1392797-michigan-dot-on-roundabouts

    http://www.wcroads.org/news/roundabouts/RndAbouts-SWFs/iihs.swf


Recommended