+ All Categories
Home > Documents > DMS User Manual - ECM

DMS User Manual - ECM

Date post: 29-Sep-2015
Category:
Upload: deepak-singh
View: 41 times
Download: 1 times
Share this document with a friend
Popular Tags:
17
ECM Bhushan Power and Steel Ltd Ver : 1.0 Classification : Internal Page 1 of 17 Document Management System SAP R/3 User Training Document Engineering Change Management Version 1.0 20/03/2013
Transcript
  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 1 of 17

    Document Management System

    SAP R/3 User Training

    Document

    Engineering Change Management

    Version 1.0 20/03/2013

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 2 of 17

    Change Record

    Date Approved

    Author Version Change Description

    Prateek Goel

    1.0 Document Created

    SUPPORTING DOCUMENTS

    Date Appvd Document Title Document Reference

    REVIEW AND SIGN-OFF

    Name Role Date Comments Signatur

    e

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 3 of 17

    Contents

    1 Business Process 4

    1.1 Overview 4 1.2 Procedural steps 4

    2 Procedural Steps 5

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 4 of 17

    1 Business Process

    1.1 Overview

    Change management process is defined if any revision to an approved document is required in the released drawing.

    1.2 Pre-requisites

    Following document types are identified for ECM process ZPS & ZTS. The department and discipline wise approvers must be maintained in table ZECM_REVAPP.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 5 of 17

    2 Procedural Steps

    Firstly goto transaction CC01 and enter the profile ZDMS

    Press enter

    Now maintain the description, valid from date and reason for change.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 6 of 17

    Now goto menu path Extras -> Accompanying Docs

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 7 of 17

    On next screen maintain the DIR number for which the revision needs to be created.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 8 of 17

    Press enter or click on

    Now goto the objects tab

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 9 of 17

    Mention the next version of the DIR for which ECM is triggered. This helps in auto-population of change number during creation of new version of DIR after after approval of ECM.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 10 of 17

    On pressing enter, system issues a warning message of document not found.

    Ignore it by pressing enter.

    ECM header can be reached again by clicking on

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 11 of 17

    Now press on save button to trigger the workflow.

    The approver will go to the SAP Inbox through transaction SBWP or by clicking on the highlighted button

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 12 of 17

    The mail for ECM approval is visible in the inbox

    Double click on the mail to open it. First the ECM is displayed in display mode.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 13 of 17

    The approver can see the ECM and verify the request.

    Now click on back button to goto inbox again

    Click on refresh and the mail is visible again

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 14 of 17

    Again open the mail to give the decision

    Now decision can be given by clicking on the corrosponding button.

    Based on the decision, user status is set in ECM as following:

    1. If approver gives the decision Approved, the status REL (released) is set in ECM.

    2. If approver gives the decision Approved with comments, the status AWC (approved with comments) is set in ECM.

    3. If approver gives the decision Rejected, the status REJ (rejected) is set in ECM.

    4. If multiple disciplines are maintained in the DIR for which ECM is triggered, the mail will go to the approver of each of those disciplines as maintained through ZECM_REVAPP. In this case RL status is set only when all the approvers give the decision Approved. Even if one approver rejects the ECM, status REJ is set.

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 15 of 17

    In this case the decision given was Approved, hence the status REL is set in the ECM.

    Now the new version of the DIR (for which ECM is approved), can be created through CV01N

    On creating the new version system gives the ECM number automatically in popup and copies it to the DIR

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 16 of 17

    Now the original can be attached to the DIR and sent again for reviewal/approval.

    After the DIR is successfully reviewed/approved and released, the revision number appears in the DIR

  • ECM Bhushan Power and Steel Ltd

    Ver : 1.0 Classification : Internal Page 17 of 17


Recommended