DD
Director’s ReviewDec 1999 (DL)
DØ Fiber Tracker
Installation and
Commissioning
Don LincolnDØ Collaboration
Fermilab
Director’s ReviewDecember 7, 1999
DD
Director’s ReviewDec 1999 (DL)
Fiber Tracker Overview
Scint Fibers m , multiclad 1.6-2.5m active
length 10m clear
waveguide to photodetector
rad hard (100 krad) (10yr @ 20cm @1032)
Fiber Ribbons 8 axial doublets 8 stereo doublets
(3o pitch)
Readout 77,000 channels VLPC readout run at low temp (9
K) fast pickoff for
trigger SVXII readout
end view
side view
axial
stereo
axial
stereo
Scintillating FiberOptical Connector
Waveguide Fiber
Mirror
Photodetector CassetteElectrical Signal Out
Cryostat
DD
Director’s ReviewDec 1999 (DL)
Prototype Commissioning
At Lab 3, a prototype cosmic ray test has been underway for about a year.
To date: Tested two cylinders (3A & 3B) Lightguides and connectors Prototype cassettes (final design) Cryogenics and control Prototype analog electronics boards
(‘stereo’ boards, with SVX-II readout) Standalone sequencer DAQ
Soon Final sequencers VRB readout
Eventually Final analog board (AFE) shakedown
DD
Director’s ReviewDec 1999 (DL)
Cosmic Ray Test of CFT
110 cm
xvv
xvv
xvv
19.05 cm19.05 cm
Light GuidesLight Guides
88 cm
127 cm
Proportional Drift TubesProportional Drift Tubes
2(3 deg) Stereo Ribbons2(3 deg) Stereo Ribbons4 Axial Ribbons4 Axial Ribbons
4096 4096 VLPC pixelsVLPC pixels4 Cassettes4 Cassettes
CryostatCryostat
Forward and Forward and Central Preshower ModulesCentral Preshower Modules
110 cm
xvv
xvv
xvv
19.05 cm19.05 cm
Jadzia WarcholNotre Dame
DD
Director’s ReviewDec 1999 (DL)
DAQ
CBDCBD82108210
CAMACCAMAC(TDCs for drift tubes)(TDCs for drift tubes)
DART eventDART eventin lab3sgi1in lab3sgi1
MVMEMVME162162Motorola 68kMotorola 68k
FE board on CassetteFE board on Cassette
Stand Stand Alone Alone SequencersSequencers
XVMEXVME200200((GENERATESGENERATESINTERRUPTINTERRUPT))
EthernetEthernet linklink
VME CRATEVME CRATE
Jadzia WarcholNotre DameStan Krzywdzinski
DD
Director’s ReviewDec 1999 (DL)
Prototype Commissioning
Cosmic Ray Test Installed two separate
cylinders (3A/3B) Tested lightguides Tested prototype
electronics Tested DAQ
Jadzia WarcholVolker BuescherJuan EstradaStefan Grunendahl
DD
Director’s ReviewDec 1999 (DL)
Pre-installation Commisisoning
At Lab 3, all components of the CFT will be tested.
Fiber positions are surveyed. During nesting, each cylinder
is aligned to the others on CMM.
CFT arrives at DAB as a single-piece unit.
Each VLPC cassette is qualified at Lab 3
Each lightguide is tested at ND or IU prior to shipping.
DD
Director’s ReviewDec 1999 (DL)
Necessary Components
Installation Support fixtures Installation fixtures Fiber bundles
Installation and Commission Cassettes Cryostat and cryogenics plant Electronics (readout,
temperature and voltage control, LEDs)
Gas system DA system Tracking code Examines, etc.
Pre-Installation and Pre-Commissioning
DD
Director’s ReviewDec 1999 (DL)
Cryogenics
Two independent cryostats
Most material either in house or on order.
Fabrication 11/4/99 - 4/7/00 Installation 4/10/00 - 4/28/00 Shakedown 4/28/00 - 6/12/00
Prototype installed and running at Lab 3 7/15/97.
Russ RucinskiBob Barger
Cryostat positions, relative to DØ
(Nothing to Scale)
DD
Director’s ReviewDec 1999 (DL)
Lab 3 VLPC Cryostat
Test Cryostat - holds 4, full-size VLPC cassettes. Provided input to final cryo design
Fully Tested Meets specification
Russ RucinskiBob Barger
DD
Director’s ReviewDec 1999 (DL)
Cryostat
DD
Director’s ReviewDec 1999 (DL)
Lightguide Production
Magnitude of the problem CPS 30 bundles of 256 fibers FPS 64 bundles of 256 fibers CFT 300 bundles of 256 fibers,
with each cylinder having a different connector
106 m of fiber (500 kg)
100 CFT bundles of unconnectorized fiber, pulled to correct length
Many CPS bundles under construction.
50% of waveguides 3/1 100% of waveguides 7/6
Notre DameIndiana University
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing I
2-FRONT
CFWCFE
CENTERBEAM
FORWARD DETECTORS
FORWARD PRE-SHOWERICD
LEVEL ZERO
WAVE GUIDEPATCH PANEL
VLPC CRYOSTAT INSTALLATION
SEPT 98
WAVE GUIDE FIBERBUNDLE INSTALLATION
VLPC CASSETTE
VLPC CRYOSTAT
SILICON TRACKER POWER SUPPLIES
VLPC CASSETTE
VLPC CRYOSTAT
TRACKER CABLING SLOT
ECS
Waveguide bundles consist of 256 fibers in light-tight nylon sheath
Curved connector (256 ch.) at detector 2 128 ch. Connector at cassette end
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing II
3-FRONT
4-FRONT
D3
-G4
B 1
5A 5B
E 3
R99.000
A2
-G5
A 2
G 5
C 3
E 4
C3
-E4
A 1
H 5
A1
-H5
B 2
F 4
123
ONE HALF CONNECTOR IN SECTOR 3 ONLY WITH FULL SHAREDCONNECTORS AT SECTORS 1 & 2, AND SECTORS 4 & 5.
4 5
B2
-F4
274
296
232
135
177
SECTORS 1 THRU 5 (5 SPLIT)CABLE ROUTES3/4 DIA. BUNDLES HELD AT R58 AND
CONTINUING ON TO THE TOP OF THE NOTCHES575eith3card.dwg
SCALE: 1/8(LOOKING AT SOUTH FACE OF CC)
B 3
H 6
B3
-H6
D4
-F5
D 4
F 5
B 5
B5
-H1
1
F 9
G 1 0
H 1 1
F9
-G1
0
D 7
E 8
D7
-E8
C 6
H 1 0
B1
-E3
C 2
F 3
H 4
D 2
C2
-H4
D2
-F3
D 3
G 4
C6
-H1
0
G 9
A 4
A4
-G9
E 7
G 3
H 3
G3
-H3
E2
-F2
E 2
F 2
F 8
E7
-F8
D 6
H 9
D6
-H9
C 5
G 8
C5
-G8
E 6
F 7
E6
-F7
B 4
H 8
B4
-H8
G 7
D 5
D5
-G7
A 3
F 6
A3
-F6
C 4
H 7
C4
-H7
E 5
G 6
E5
-G6
C1
-D1
C 1
D 1
E 1
F 1
G 1
H 1
H 2
G 2
E1
-G1
F1
-H2
G1
-H1
C.P.S
.
C.P.S
.
H 1 2
H 1 3
H 1 4
H 1 5
H 1 6
H 1 7
G 1 1
G 1 2
G 1 3
G 1 4
G 1 5
F 1 0
F 1 1
F 1 2
F 1 3
F 1 4
E 9
E 1 0
E 1 1
E 1 2
D 8
D 9
D 1 0
D 1 1
C 7
C 8
C 9
B 6
B 7
B 8
A 5
A 6
H 1 8
H 1 9
H 2 0
H 2 1
H 2 2
G 1 6
G 1 7
G 1 8
G 1 9
G 2 0
G 2 1G 2 2
F 1 5
F 1 6
F 1 7
F 1 8
F 1 9
F 2 0
E 1 3
E 1 4
E 1 5
E 1 6
E 1 7 E 1 8
D 1 2
D 1 3
D 1 4
D 1 5
D 1 6
C 1 0
C 1 1
C 1 2
C 1 3
C 1 3
B 9
B 1 0
B 1 1B 1 2
A 7
A 8
A 9
A 1 0
B 1 3
C 1 4
C 1 5
D 1 7
D 1 8
E 1 9
E 2 0
F 2 1
F 2 2
F 2 3
G 2 3
G 2 4
G 2 5
H 2 3
H 2 4H 2 5
H 2 6
H 2 7
H 2 8
B6
-C8
-F1
0-H
12
E9
-G1
1
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing III
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing IV
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing V
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing VI
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing VII
DD
Director’s ReviewDec 1999 (DL)
Fiber Routing VIII
DD
Director’s ReviewDec 1999 (DL)
Waveguide Installation Manpower
Waveguide Installation 5/11/00 Duration 8 weeks
Physicists: Wayne 25%ND
Shepard 25% ND PostDoc 100% ND 1 student 100% ND Ray 50% Gutierrez 50%
Engineer: Cease 50%
Techs: (All Lab 3) Butler 100% Kubinski " Spartana " Garramone " Tolian " C. Davis " Flores "
DD
Director’s ReviewDec 1999 (DL)
Cassettes
VLPC’s and most mechanical components in house
Four prototype cassettes have been built
Production manufacture has begun
50% completion 5/3/00 100% completion 9/13/00 2.5 cassettes/week
George GintherVolker BuescherGreg DavisDan Olis
DD
Director’s ReviewDec 1999 (DL)
Cassette
Engineering Drawing Constructed Cassette
DD
Director’s ReviewDec 1999 (DL)
Cassette Installation Manpower
Cassette Installation - First 50 4/26/00 Duration: 5 weeks
Physicists: All University of Rochester Ginther 25% Buescher 50% G. Davis 50% J. Estrada 50% F. Canelli 50%
Engineer: Anderson 20% Fogelsong 25%
Techs: B. Davis 100% Lab 3 Barger 20% Electronics 50% From MJ
DD
Director’s ReviewDec 1999 (DL)
Cassette Installation Manpower
Cassette Installation - Last 50 8/15/00 Duration: 5 weeks
Physicists: All University of Rochester Ginther 25% Buescher 50% G. Davis 50% J. Estrada 50% F. Canelli 50%
Engineer: Anderson 20% Fogelsong 25%
Techs: B. Davis 100% Lab 3 Barger 20% Electronics 50% From MJ
DD
Director’s ReviewDec 1999 (DL)
Electronics Status
In House: prototype stereo boards (used in Lab3 CRT)
AFE ordered 3/8/00 AFE 10 boards available 5/3/00 AFE all available 8/11/00
DFE ordered 12/15/99 DFE 10 boards available 5/10/99 DFE all available 9/1/00
Mixer boards ordered 5/31/00 Mixer boards available 7/27/00
First crate operational 5/17/00
Marvin Johnsonand crew
DD
Director’s ReviewDec 1999 (DL)
Tracking Test
Current Code can track single muons as long as impact parameter is not too big.
Run I algorithms allowed larger impact parameter
Kin YipNorm Graf
DD
Director’s ReviewDec 1999 (DL)
EXAMINE/Data Integrity
Code exists and is ready for data
Andrei MayorovIndiana University
DD
Director’s ReviewDec 1999 (DL)
Cosmic Ray Manpower
Cosmic Ray Run 7/15/00Duration: 8 w Physicists: Warchol 100% ND PostDoc
100% Mayorov 100% Lincoln 25% ND Students 100%
Techs: Electronics 25%
From MJ
DD
Director’s ReviewDec 1999 (DL)
FullDAQ Startup
CFT Timeline
2000 2001 J F M A M J J A S O N D J F
FT install/hookup
1st CFT crate
operational
Waveguide production
SMT install/ hookup
Roll
in
Beam-
ready
Ribbon Mounting
Cryo Install/Shakedown
Support Design/Fabricate
Cassettes Installed
50%
50%
Assembly Complete
4/27
5/11
2/1 3/13 4/24
5/12 5/25
7/24
9/1
8
9/2
5
10/3
0
3/1 7/6
Cryo Fabrication4/7
4/10 4/28 6/12
Cassette Assembly
50% 5/3 9/13
5/1710/48/01
5/17
Full SystemTest
9/5 10/30
3/8 4/7
Commission CFT
6/12 10/30
DD
Director’s ReviewDec 1999 (DL)
Technician Manpower
Fiber Tracker Tech EffortFNAL
0
5
10
15
20
25
Jan-
99
Mar
-99
May
-99
Jul-9
9
Sep
-99
Nov
-99
Jan-
00
Mar
-00
May
-00
Jul-0
0
Sep
-00
Nov
-00
Jan-
01
FT
Es
All
Install.
Fiber Tracker
Note about the legend:
“All” - refers to effort assigned to all tasks in the relevant schedule
“Install.” - refers to effort assigned to a subset of those tasks flagged as installation tasks
Tech effort is sum of MTF112+ETF112
DD
Director’s ReviewDec 1999 (DL)
Summary
All components will be pre-tested and pre-commissioned, prior to arrival at DAB
Lightguide map is complete.
Manpower lists here are adequate for installation
Will need close cooperation with electronics group for cosmic ray commissioning
DD
Director’s ReviewDec 1999 (DL)
Ribbons
DD
Director’s ReviewDec 1999 (DL)
Ribbons
= 18.4 mAve. = 0.3 m
DD
Director’s ReviewDec 1999 (DL)
Ribbons - Optical Connectors
Have now received 50%
of curved connectors Material - Torlon Optical coupling efficiency > 90%
Cylinder 3 Stereo Connector
0.00.10.20.30.40.5
0.60.70.80.91.0
1 16 31 46 61 76 91 106 121
Fiber Number
Tra
nsm
issi
on
Outside Row
Inside Row
DD
Director’s ReviewDec 1999 (DL)
Mechanical Supports
WBS 1.1.2.7
Cylinder 850 meas. Along L
3.5 mil RMS
1 division = 6.25 mil
DD
Director’s ReviewDec 1999 (DL)
Ribbon Mounting
Ribbon 3S2 mounting radii
11.86811.87011.87211.87411.87611.87811.88011.88211.88411.88611.888
0 20 40 60 80 100
Axial position [inches]
Ou
ter
rad
ius
[in
ch
es
]
121.7 deg 126.7 131.7 136.7 141.7
G. GutierrezRon RayJohn Krider
DD
Director’s ReviewDec 1999 (DL)
Support Fixtures
Two (three?) fixtures at 3 & 9 o’clock (possibly one at 6)
Aluminum plates Connect to the FT between
layers 6-8
Design 2/1/00 - 3/13/00 Fabricate 3/14/00 - 4/24/00
Kurt Krempetz
DD
Director’s ReviewDec 1999 (DL)
Installation Fixturing
Technique same as inserting solenoid
Use same (modified) fixturing
Design/fabricate installation fixture 2/18/00 - 4/14/00
CFT
Rollers
Solenoid
DD
Director’s ReviewDec 1999 (DL)
CFT Install Manpower
CFT moves to DØ 5/4/00 Duration: 1 week
Fnal Surveyors 100% Krempetz 50% D. Butler 100%