+ All Categories
Home > Documents > Document ID: 0.7.522.604532 From: Hwang, Jin

Document ID: 0.7.522.604532 From: Hwang, Jin

Date post: 23-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
46
From: Hwang, Jin <[email protected]> To: Kemper, James M. <[email protected]> Cc: Moosbrugger, Earl <[email protected]>; Tabakh, Amir <[email protected]> Subject: RE: Crossroads Hollywood Project - Rehab Jim, Below is the info I have currently. Is it sufficient to conclude plumbing fixtures need to be upgraded in 50,000 sf to be retained? The Project will remove all existing on-site uses except 50,000 sf of Crossroads of the World complex, which would be rehabilitated and converted to retail/restaurant uses. Crossroads of the World would be integrated into a new mixed-use development comprised of 8 new buildings. Please see the attached site plan. Green is existing to be retained, and other 8 buildings in color will be new buildings. 50,000 sf to be retained: Existing Proposed Office: 41,725 sf Restaurant: ? sf Retail: 5,000 sf Retail: ? sf Recording Studio: 3,275 sf Total: 50,000 sf Total: 50,000 sf Total Project: Existing (50,000 sf to be retained included) Proposed Residential - multi-family: 84 units Residential - multi-family: 950 units Date: Wed May 18 2016 11:05:54 PDT Attachments: Crossroads Hollywood WSA site plan.pdf Bcc: Document ID: 0.7.522.604532 Page 2 of 68
Transcript
Page 1: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kemper, James M. <[email protected]>Cc: Moosbrugger, Earl <[email protected]>; Tabakh, Amir <[email protected]>

Subject: RE: Crossroads Hollywood Project - Rehab

Jim,

Below is the info I have currently. Is it sufficient to conclude plumbing fixtures need to be upgraded in50,000 sf to be retained?

The Project will remove all existing on-site uses except 50,000 sf of Crossroads of the World complex,which would be rehabilitated and converted to retail/restaurant uses. Crossroads of the World would beintegrated into a new mixed-use development comprised of 8 new buildings. Please see the attachedsite plan. Green is existing to be retained, and other 8 buildings in color will be new buildings.

50,000 sf to be retained:Existing

Proposed

Office: 41,725 sf

Restaurant: ? sf

Retail: 5,000 sf

Retail: ? sf

Recording Studio: 3,275 sf

Total: 50,000 sf

Total: 50,000 sf

Total Project:Existing(50,000 sf to be retained included)

Proposed

Residential - multi-family: 84 units

Residential - multi-family: 950 units

Date: Wed May 18 2016 11:05:54 PDTAttachments: Crossroads Hollywood WSA site plan.pdf

Bcc:

Document ID: 0.7.522.604532

Page 2 of 68

Page 2: Document ID: 0.7.522.604532 From: Hwang, Jin

Office: 79,107 sf

Office: 95,000 sf

Commercial/Retail: 26,690 sf

Commercial/Retail: 101,800 sf

Restaurant: 475 sf

Restaurant: 38,200 sf

Hotel: 308 rooms

Total: 172,573 sf

Total: 1,432,500 sf

Thank you.

From: Kemper, James M.Sent: Wednesday, May 18, 2016 10:05 AMTo: Hwang, JinCc: Moosbrugger, Earl; Tabakh, Amir; Kemper, James M.Subject: RE: Crossroads Hollywood Project - Rehab

Hi Jin,This will require more information. Generally, changes of occupancy of this type would trigger acomplete upgrade to current Plumbing Code but not the Title 24 Code. This is historical so there maybe some areas that can not be changed. Usually, the historically significant features do not include theplumbing fixtures though. Also potentially triggered is the LA Green Building Code and the new Mayoralplumbing ordinance since this involves costly renovations and additions to the building. Also potentiallytriggered is SB 407 (2009) which is state bill similar to our Retrofit on Resale Ordinance but it is alsotriggered by building alterations.

We would need to know the scope of the project to make a proper determination. Is the demolition andnew work going to be considered a building addition or is the construction going to be classified as aseparate building? What is the existing occupancy and what will it be after construction? What is thevaluation of the work? What fixtures are currently installed and what are their flush and flow rates?What is considered "historical" in the building and does it include the plumbing fixtures or restroomfacilities?

My gut feeling is that the plumbing fixtures would not be exempt from upgrade and that they would needto put in the fixtures mandated under Article V, (Ord. 180822): 1.28 gpf WC, 1 pint urinals, 0.5 gpm lavsor 0.25 gallon per cycle metered faucets, and 2.0 gpm shower heads. I'm not sure regarding the hotwater piping, sub metering, and other requirements of the new Mayoral water conservation ordinance.

JimFrom: Hwang, JinSent: Wednesday, May 18, 2016 9:06 AMTo: Kemper, James M.Cc:

Page 3 of 68

Page 3: Document ID: 0.7.522.604532 From: Hwang, Jin

Subject: Crossroads Hollywood Project - Rehab

Good morning, Jim,

I'm working on Water Supply Assessment for the Crossroads Hollywood Project. Existing is 172,573 sfof floor area, and most of it will be demolished, except for approximately 50,000 sf of the Crossroads ofthe World complex, which is a designated City Cultural-Historic Monument, and will be retained. The50,000 sf to be retained is currently used mostly for office, and partly for retail and recording studio. Aspart of the project, uses will be converted to retail and restaurant (square footage breakdown is notavailable, so we'll just assume 50,000 sf will be converted to all restaurant to be conservative).

Applicant says plumbing fixtures in this 50,000 sf would be retained. Is this allowed, or is the Applicantrequired to upgrade the plumbing fixtures to meet current code since the uses will be changed frommostly office to restaurant?

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

Page 4 of 68

Page 4: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>

Subject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna MarceloPrincipal Planner

[cid:[email protected]]

6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

Date: Wed May 04 2016 17:16:15 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx

Bcc:

Document ID: 0.7.522.598078

Page 5 of 68

Page 5: Document ID: 0.7.522.604532 From: Hwang, Jin

From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I'm attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

Page 6 of 68

Page 6: Document ID: 0.7.522.604532 From: Hwang, Jin

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>

Page 7 of 68

Page 7: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>

Subject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna MarceloPrincipal Planner

cid:[email protected]

Date: Wed May 04 2016 17:16:15 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx

Bcc:

Document ID: 0.7.522.385446

Page 8 of 68

Page 8: Document ID: 0.7.522.604532 From: Hwang, Jin

6701 Center Drive West, Suite 900

Los Angeles, California 90045

T (424) 207-5337

F (424) 207-5349

Email [email protected]

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Page 9 of 68

Page 9: Document ID: 0.7.522.604532 From: Hwang, Jin

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>

Page 10 of 68

Page 10: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Moosbrugger, Earl <[email protected]>Cc:

Subject: FW: Crossroads Hollywood Project WSA

From: Madonna Marcelo [mailto:[email protected]]Sent: Friday, May 13, 2016 4:23 PMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are our additional responses to your comments and questions regarding our originalresponses.

Given where we are in the design process, this is the level of specificity we can provide at the moment.We would appreciate it very much if your team can make conservative and reasonable assumptions forthose Project components for which we currently do not have more specific information.

We will have the Draft Water Conservation Commitment Letter to you shortly.

Thank you so much for your and your team's responsiveness to our request!

Madonna

Madonna MarceloPrincipal Planner

[cid:[email protected]]

6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

Date: Thu Jul 14 2016 13:43:19 PDTAttachments: Attachments to Responses_revised.pdf image001.jpg WSA Scoping Questions and Responses_05-13-16.docx

Bcc:

Document ID: 0.7.522.630370

Page 11 of 68

Page 11: Document ID: 0.7.522.604532 From: Hwang, Jin

P Please consider the environment before printing this email.

From: Hwang, Jin [mailto:[email protected]]Sent: Monday, May 09, 2016 2:46 PMTo: Madonna Marcelo; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hello Madonna,

Please see our comments/questions in track changes in the attached file.

Also, as requested at the April 26, 2016 Water Conservation Meeting, please submit a DRAFT WaterConservation Commitment Letter by e-mail.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

From: Madonna Marcelo [mailto:[email protected]]Sent: Thursday, May 05, 2016 11:14 AMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.

If you need anything else, please let us know.

Thank you!

Madonna

From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Page 12 of 68

Page 12: Document ID: 0.7.522.604532 From: Hwang, Jin

Hi Jin,

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna MarceloPrincipal Planner

[cid:[email protected]]

6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTS

Page 13 of 68

Page 13: Document ID: 0.7.522.604532 From: Hwang, Jin

SEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I'm attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Resid andComl_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File: ATT00014.htm>>

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Water

Page 14 of 68

Page 14: Document ID: 0.7.522.604532 From: Hwang, Jin

and Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 15 of 68

Page 15: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>

Subject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.

If you need anything else, please let us know.

Thank you!

Madonna

From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna Marcelo

Date: Thu May 05 2016 11:14:28 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx

Bcc:

Document ID: 0.7.522.599084

Page 16 of 68

Page 16: Document ID: 0.7.522.604532 From: Hwang, Jin

Principal Planner

[cid:[email protected]]

6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I'm attaching some handouts for the meeting below. I may send you an updated meeting notice with

Page 17 of 68

Page 17: Document ID: 0.7.522.604532 From: Hwang, Jin

more handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>

Page 18 of 68

Page 18: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>

Subject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are our additional responses to your comments and questions regarding our originalresponses.

Given where we are in the design process, this is the level of specificity we can provide at the moment.We would appreciate it very much if your team can make conservative and reasonable assumptions forthose Project components for which we currently do not have more specific information.

We will have the Draft Water Conservation Commitment Letter to you shortly.

Thank you so much for your and your team’s responsiveness to our request!

Madonna

Madonna MarceloPrincipal Planner

Date: Fri May 13 2016 16:22:46 PDTAttachments: Attachments to Responses_revised.pdf image001.jpg WSA Scoping Questions and Responses_05-13-16.docx

Bcc:

Document ID: 0.7.522.399547

Page 19 of 68

Page 19: Document ID: 0.7.522.604532 From: Hwang, Jin

cid:[email protected]

6701 Center Drive West, Suite 900

Los Angeles, California 90045

T (424) 207-5337

F (424) 207-5349

Email [email protected]

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

From: Hwang, Jin [mailto:[email protected]]Sent: Monday, May 09, 2016 2:46 PMTo: Madonna Marcelo; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hello Madonna,

Please see our comments/questions in track changes in the attached file.

Also, as requested at the April 26, 2016 Water Conservation Meeting, please submit a DRAFT WaterConservation Commitment Letter by e-mail.

Thank you.

Page 20 of 68

Page 20: Document ID: 0.7.522.604532 From: Hwang, Jin

Jin Hwang

Civil Engineering Associate

Los Angeles Department of Water and Power

Water Executive / Water Resources

111 N. Hope St. Room 1468

Los Angeles, CA 90012

213-367-4845

From: Madonna Marcelo [mailto:[email protected]]Sent: Thursday, May 05, 2016 11:14 AMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.

If you need anything else, please let us know.

Thank you!

Madonna

From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta (alejandro.

Page 21 of 68

Page 21: Document ID: 0.7.522.604532 From: Hwang, Jin

[email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna MarceloPrincipal Planner

cid:[email protected]

6701 Center Drive West, Suite 900

Los Angeles, California 90045

T (424) 207-5337

F (424) 207-5349

Email [email protected]

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly

Page 22 of 68

Page 22: Document ID: 0.7.522.604532 From: Hwang, Jin

prohibited. If you are not the intended recipient, please immediately notify the sender by reply e-mail orphone and delete this message and its attachments, if any.

P Please consider the environment before printing this email.

From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources

Page 23 of 68

Page 23: Document ID: 0.7.522.604532 From: Hwang, Jin

111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Resid andComl_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File: ATT00014.htm>>

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 24 of 68

Page 24: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>

Subject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.

If you need anything else, please let us know.

Thank you!

Madonna

From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA

Hi Jin,

Date: Thu May 05 2016 11:14:28 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx

Bcc:

Document ID: 0.7.522.387138

Page 25 of 68

Page 25: Document ID: 0.7.522.604532 From: Hwang, Jin

Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.

Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.

Thank you!

Madonna

Madonna MarceloPrincipal Planner

cid:[email protected]

6701 Center Drive West, Suite 900

Los Angeles, California 90045

T (424) 207-5337

F (424) 207-5349

Email [email protected]

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

Page 26 of 68

Page 26: Document ID: 0.7.522.604532 From: Hwang, Jin

From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

Page 27 of 68

Page 27: Document ID: 0.7.522.604532 From: Hwang, Jin

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>

Page 28 of 68

Page 28: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>

Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012

Date: Tue Apr 26 2016 09:08:35 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (3).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls

Bcc:

Document ID: 0.7.522.591453

Page 29 of 68

Page 29: Document ID: 0.7.522.604532 From: Hwang, Jin

213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 30 of 68

Page 30: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>

Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Date: Tue Apr 26 2016 09:14:56 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (5).msg Crossroads Hollywood Project WSA - Scope questions (6).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Crossroads Hollywood WSA Request Letter_3-31-16.pdf Resid and Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf Sample Conservation Commitment Letter.doc Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls Water Conservation for New Construction March 2014.xls

Bcc:

Document ID: 0.7.522.592006

Page 31 of 68

Page 31: Document ID: 0.7.522.604532 From: Hwang, Jin

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 32 of 68

Page 32: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc:

Subject: Crossroads Hollywood Project WSA

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Date: Fri Apr 22 2016 14:25:19 PDTAttachments: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (2).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf

Bcc:

Document ID: 0.7.522.590699

Page 33 of 68

Page 33: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>

Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Date: Tue Apr 26 2016 09:14:56 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (5).msg Crossroads Hollywood Project WSA - Scope questions (6).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Crossroads Hollywood WSA Request Letter_3-31-16.pdf Resid and Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf Sample Conservation Commitment Letter.doc Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls Water Conservation for New Construction March 2014.xls

Bcc:

Document ID: 0.7.522.368219

Page 34 of 68

Page 34: Document ID: 0.7.522.604532 From: Hwang, Jin

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

Page 35 of 68

Page 35: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>

Subject: Crossroads Hollywood Project WSA

UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012

Date: Tue Apr 26 2016 09:08:35 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (3).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls

Bcc:

Document ID: 0.7.522.367913

Page 36 of 68

Page 36: Document ID: 0.7.522.604532 From: Hwang, Jin

213-367-4845

Page 37 of 68

Page 37: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc:

Subject: Crossroads Hollywood Project WSA

Hi all,

Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.

Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400

I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.

Thank you.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845

Date: Fri Apr 22 2016 14:25:19 PDTAttachments: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (2).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf

Bcc:

Document ID: 0.7.522.364474

Page 38 of 68

Page 38: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Moosbrugger, Earl <[email protected]>To: Hwang, Jin <[email protected]>Cc: Kwan, Delon <[email protected]>

Subject: FW: Crossroads WSA Request Letter Resubmitted

Jin,

Please process.

Also, please come by to discuss schedule when you return.

Thanks!

From: Alejandro Huerta [mailto:[email protected]]Sent: Friday, April 15, 2016 10:03 AMTo: Moosbrugger, EarlCc: Hwang, Jin; Kwan, Delon; Stephanie Eyestone-Jones; Laura RodriguezSubject: Crossroads WSA Request Letter Resubmitted

Hello Earl,

Attached is the Request Letter. I have copied the project's environmental consultants. I respectfully askthat the start date of the request be backdated to March 31, when the original Request Letter wassigned for by DWP per the attached document.

To expedite the process, the applicant will hand deliver the check . To whom and where should thecheck be delivered?

Thank you,Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454[Image removed by sender.]

On Fri, Apr 15, 2016 at 9:02 AM, Moosbrugger, Earl <[email protected]<mailto:[email protected]>> wrote:Hello Alejandro,

Per our phone conversation this morning, please cancel check and re-submit with Request Letter.

In addition, you may also reply-all to this e-mail with PDF of Request Letter so we may process prior toreceiving hardcopy.

Thank you!

Date: Fri Apr 15 2016 11:21:31 PDTAttachments: Crossroads WSA Request Letter_3-31-16.pdf image001.jpg image002.jpg image003.jpg Original_WSA_Receipt.pdf

Bcc:

Document ID: 0.7.522.352153

Page 39 of 68

Page 39: Document ID: 0.7.522.604532 From: Hwang, Jin

Earl Moosbrugger, PEResources Development and Supply Assessment GroupWater System Executive Office / Water Resources SectionLos Angeles Department of Water and Power111 N. Hope Street, Room 1450Los Angeles, CA 90012(213) 367-2527<tel:%28213%29%20367-2527>

From: Alejandro Huerta [mailto:[email protected]<mailto:[email protected]>]Sent: Thursday, April 14, 2016 3:32 PMTo: Moosbrugger, EarlCc: Hwang, JinSubject: Re: WSA Request Letter

Hello Earl,

Per our phone conversation, we'll look forward to hearing tomorrow morning regarding the status of theWSA Letter and check.

Sincerely,

Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454<tel:%28213%29%C2%A0978-1454>[Image removed by sender.]

On Wed, Mar 9, 2016 at 7:55 AM, Hwang, Jin <[email protected]<mailto:[email protected]>> wrote:Hello Alejandro and Laura,

The Planning Department should send the WSA request letter to the following address:

Los Angeles Department of Water and PowerMr. Martin L. Adams, Senior Assistant General Manager for Water System111 North Hope StreetRoom 1455Los Angeles, CA 90012

A check in the amount of $17,000 should be attached to the WSA request letter, payable to: LosAngeles Department of Water and Power.

Thank you, and please let me know if you have any questions.

Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845<tel:213-367-4845>

From: Alejandro Huerta [mailto:[email protected]<mailto:[email protected]>]Sent: Wednesday, March 09, 2016 7:38 AMTo: Laura Rodriguez

Page 40 of 68

Page 40: Document ID: 0.7.522.604532 From: Hwang, Jin

Cc: Hwang, Jin; Kwan, DelonSubject: Re: WSA Request Letter

Hi Jin/Delon,

I am good with the WSA request letter prepared by Eyestone so please proceed as necessary.

Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454<tel:%28213%29%C2%A0978-1454>[Image removed by sender.]

On Tue, Mar 8, 2016 at 5:22 PM, Laura Rodriguez <[email protected]<mailto:[email protected]>> wrote:Hi Jin/Delon,

We are working with the City on a project that will need a WSA. Alejandro Huerta, copied on this email,is the planner for the project. We have the WSA request letter ready to submit to you. What is theprocess?

Thank you

Laura RodriguezPrincipal Planner

[EE logo -- horizontal stack (RGB, screen-res, 3]

6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5333<tel:%28424%29%20207-5333>F (424) 207-5349<tel:%28424%29%20207-5349>

DIRECT (424) 207-5339<tel:%28424%29%20207-5339>EMAIL [email protected]<mailto:[email protected]>

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 41 of 68

Page 41: Document ID: 0.7.522.604532 From: Hwang, Jin

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 42 of 68

Page 42: Document ID: 0.7.522.604532 From: Hwang, Jin

From: Alejandro Huerta <[email protected]>To: Moosbrugger, Earl <[email protected]>Cc: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>

Subject: Crossroads WSA Request Letter Resubmitted

Hello Earl,

Attached is the Request Letter. I have copied the project's environmental consultants. I respectfully askthat the start date of the request be backdated to March 31, when the original Request Letter wassigned for by DWP per the attached document.

To expedite the process, the applicant will hand deliver the check . To whom and where should thecheck be delivered?

Thank you,Alejandro A. HuertaEnvironmental Analysis • Major Projects

(213) 978-1454

On Fri, Apr 15, 2016 at 9:02 AM, Moosbrugger, Earl <[email protected]> wrote:

Hello Alejandro,

Per our phone conversation this morning, please cancel check and re-submit with Request Letter.

In addition, you may also reply-all to this e-mail with PDF of Request Letter so we may process prior toreceiving hardcopy.

Thank you!

Date: Fri Apr 15 2016 10:03:24 PDTAttachments: Crossroads WSA Request Letter_3-31-16.pdf image002.jpg image003.jpg Original_WSA_Receipt.pdf

Bcc:

Document ID: 0.7.522.351270

Page 43 of 68

Page 43: Document ID: 0.7.522.604532 From: Hwang, Jin

Earl Moosbrugger, PE

Resources Development and Supply Assessment Group

Water System Executive Office / Water Resources Section

Los Angeles Department of Water and Power

111 N. Hope Street, Room 1450

Los Angeles, CA 90012

(213) 367-2527

From: Alejandro Huerta [mailto:[email protected]]Sent: Thursday, April 14, 2016 3:32 PMTo: Moosbrugger, EarlCc: Hwang, JinSubject: Re: WSA Request Letter

Hello Earl,

Per our phone conversation, we'll look forward to hearing tomorrow morning regarding the status of theWSA Letter and check.

Sincerely,

Alejandro A. Huerta

Environmental Analysis • Major Projects

(213) 978-1454

Image removed by sender.

On Wed, Mar 9, 2016 at 7:55 AM, Hwang, Jin <[email protected]> wrote:

Hello Alejandro and Laura,

Page 44 of 68

Page 44: Document ID: 0.7.522.604532 From: Hwang, Jin

The Planning Department should send the WSA request letter to the following address:

Los Angeles Department of Water and Power

Mr. Martin L. Adams, Senior Assistant General Manager for Water System

111 North Hope Street

Room 1455

Los Angeles, CA 90012

A check in the amount of $17,000 should be attached to the WSA request letter, payable to: LosAngeles Department of Water and Power.

Thank you, and please let me know if you have any questions.

Jin Hwang

Civil Engineering Associate

Los Angeles Department of Water and Power

Water Executive / Water Resources

111 N. Hope St. Room 1468

Los Angeles, CA 90012

213-367-4845

From: Alejandro Huerta [mailto:[email protected]]Sent: Wednesday, March 09, 2016 7:38 AMTo: Laura RodriguezCc: Hwang, Jin; Kwan, DelonSubject: Re: WSA Request Letter

Hi Jin/Delon,

I am good with the WSA request letter prepared by Eyestone so please proceed as necessary.

Page 45 of 68

Page 45: Document ID: 0.7.522.604532 From: Hwang, Jin

Alejandro A. Huerta

Environmental Analysis • Major Projects

(213) 978-1454

Image removed by sender.

On Tue, Mar 8, 2016 at 5:22 PM, Laura Rodriguez <[email protected]> wrote:

Hi Jin/Delon,

We are working with the City on a project that will need a WSA. Alejandro Huerta, copied on this email,is the planner for the project. We have the WSA request letter ready to submit to you. What is theprocess?

Thank you

Laura RodriguezPrincipal Planner

EE logo -- horizontal stack (RGB, screen-res, 3

6701 Center Drive West, Suite 900

Los Angeles, California 90045

T (424) 207-5333

F (424) 207-5349

DIRECT (424) 207-5339

EMAIL [email protected]

Page 46 of 68

Page 46: Document ID: 0.7.522.604532 From: Hwang, Jin

Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.

P Please consider the environment before printing this email.

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.

Page 47 of 68


Recommended