From: Hwang, Jin <[email protected]>To: Kemper, James M. <[email protected]>Cc: Moosbrugger, Earl <[email protected]>; Tabakh, Amir <[email protected]>
Subject: RE: Crossroads Hollywood Project - Rehab
Jim,
Below is the info I have currently. Is it sufficient to conclude plumbing fixtures need to be upgraded in50,000 sf to be retained?
The Project will remove all existing on-site uses except 50,000 sf of Crossroads of the World complex,which would be rehabilitated and converted to retail/restaurant uses. Crossroads of the World would beintegrated into a new mixed-use development comprised of 8 new buildings. Please see the attachedsite plan. Green is existing to be retained, and other 8 buildings in color will be new buildings.
50,000 sf to be retained:Existing
Proposed
Office: 41,725 sf
Restaurant: ? sf
Retail: 5,000 sf
Retail: ? sf
Recording Studio: 3,275 sf
Total: 50,000 sf
Total: 50,000 sf
Total Project:Existing(50,000 sf to be retained included)
Proposed
Residential - multi-family: 84 units
Residential - multi-family: 950 units
Date: Wed May 18 2016 11:05:54 PDTAttachments: Crossroads Hollywood WSA site plan.pdf
Bcc:
Document ID: 0.7.522.604532
Page 2 of 68
Office: 79,107 sf
Office: 95,000 sf
Commercial/Retail: 26,690 sf
Commercial/Retail: 101,800 sf
Restaurant: 475 sf
Restaurant: 38,200 sf
Hotel: 308 rooms
Total: 172,573 sf
Total: 1,432,500 sf
Thank you.
From: Kemper, James M.Sent: Wednesday, May 18, 2016 10:05 AMTo: Hwang, JinCc: Moosbrugger, Earl; Tabakh, Amir; Kemper, James M.Subject: RE: Crossroads Hollywood Project - Rehab
Hi Jin,This will require more information. Generally, changes of occupancy of this type would trigger acomplete upgrade to current Plumbing Code but not the Title 24 Code. This is historical so there maybe some areas that can not be changed. Usually, the historically significant features do not include theplumbing fixtures though. Also potentially triggered is the LA Green Building Code and the new Mayoralplumbing ordinance since this involves costly renovations and additions to the building. Also potentiallytriggered is SB 407 (2009) which is state bill similar to our Retrofit on Resale Ordinance but it is alsotriggered by building alterations.
We would need to know the scope of the project to make a proper determination. Is the demolition andnew work going to be considered a building addition or is the construction going to be classified as aseparate building? What is the existing occupancy and what will it be after construction? What is thevaluation of the work? What fixtures are currently installed and what are their flush and flow rates?What is considered "historical" in the building and does it include the plumbing fixtures or restroomfacilities?
My gut feeling is that the plumbing fixtures would not be exempt from upgrade and that they would needto put in the fixtures mandated under Article V, (Ord. 180822): 1.28 gpf WC, 1 pint urinals, 0.5 gpm lavsor 0.25 gallon per cycle metered faucets, and 2.0 gpm shower heads. I'm not sure regarding the hotwater piping, sub metering, and other requirements of the new Mayoral water conservation ordinance.
JimFrom: Hwang, JinSent: Wednesday, May 18, 2016 9:06 AMTo: Kemper, James M.Cc:
Page 3 of 68
Subject: Crossroads Hollywood Project - Rehab
Good morning, Jim,
I'm working on Water Supply Assessment for the Crossroads Hollywood Project. Existing is 172,573 sfof floor area, and most of it will be demolished, except for approximately 50,000 sf of the Crossroads ofthe World complex, which is a designated City Cultural-Historic Monument, and will be retained. The50,000 sf to be retained is currently used mostly for office, and partly for retail and recording studio. Aspart of the project, uses will be converted to retail and restaurant (square footage breakdown is notavailable, so we'll just assume 50,000 sf will be converted to all restaurant to be conservative).
Applicant says plumbing fixtures in this 50,000 sf would be retained. Is this allowed, or is the Applicantrequired to upgrade the plumbing fixtures to meet current code since the uses will be changed frommostly office to restaurant?
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
Page 4 of 68
From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>
Subject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna MarceloPrincipal Planner
[cid:[email protected]]
6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
Date: Wed May 04 2016 17:16:15 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx
Bcc:
Document ID: 0.7.522.598078
Page 5 of 68
From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I'm attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
Page 6 of 68
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>
Page 7 of 68
From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>
Subject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna MarceloPrincipal Planner
Date: Wed May 04 2016 17:16:15 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx
Bcc:
Document ID: 0.7.522.385446
Page 8 of 68
6701 Center Drive West, Suite 900
Los Angeles, California 90045
T (424) 207-5337
F (424) 207-5349
Email [email protected]
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Page 9 of 68
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>
Page 10 of 68
From: Hwang, Jin <[email protected]>To: Moosbrugger, Earl <[email protected]>Cc:
Subject: FW: Crossroads Hollywood Project WSA
From: Madonna Marcelo [mailto:[email protected]]Sent: Friday, May 13, 2016 4:23 PMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are our additional responses to your comments and questions regarding our originalresponses.
Given where we are in the design process, this is the level of specificity we can provide at the moment.We would appreciate it very much if your team can make conservative and reasonable assumptions forthose Project components for which we currently do not have more specific information.
We will have the Draft Water Conservation Commitment Letter to you shortly.
Thank you so much for your and your team's responsiveness to our request!
Madonna
Madonna MarceloPrincipal Planner
[cid:[email protected]]
6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
Date: Thu Jul 14 2016 13:43:19 PDTAttachments: Attachments to Responses_revised.pdf image001.jpg WSA Scoping Questions and Responses_05-13-16.docx
Bcc:
Document ID: 0.7.522.630370
Page 11 of 68
P Please consider the environment before printing this email.
From: Hwang, Jin [mailto:[email protected]]Sent: Monday, May 09, 2016 2:46 PMTo: Madonna Marcelo; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hello Madonna,
Please see our comments/questions in track changes in the attached file.
Also, as requested at the April 26, 2016 Water Conservation Meeting, please submit a DRAFT WaterConservation Commitment Letter by e-mail.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
From: Madonna Marcelo [mailto:[email protected]]Sent: Thursday, May 05, 2016 11:14 AMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.
If you need anything else, please let us know.
Thank you!
Madonna
From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected]<mailto:[email protected]>)Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Page 12 of 68
Hi Jin,
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna MarceloPrincipal Planner
[cid:[email protected]]
6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTS
Page 13 of 68
SEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I'm attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Resid andComl_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File: ATT00014.htm>>
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Water
Page 14 of 68
and Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 15 of 68
From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>
Subject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.
If you need anything else, please let us know.
Thank you!
Madonna
From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna Marcelo
Date: Thu May 05 2016 11:14:28 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx
Bcc:
Document ID: 0.7.522.599084
Page 16 of 68
Principal Planner
[cid:[email protected]]
6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5337F (424) 207-5349Email [email protected]<mailto:[email protected]>
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
From: "Hwang, Jin" <[email protected]<mailto:[email protected]>>To: "Kwan, Delon" <[email protected]<mailto:[email protected]>>, "Moosbrugger, Earl"<[email protected]<mailto:[email protected]>>, "Estrada, Robert" <[email protected]<mailto:[email protected]>>, "Alejandro Huerta ([email protected]<mailto:[email protected]>)" <[email protected]<mailto:[email protected]>>, "Stephanie Eyestone-Jones" <[email protected]<mailto:[email protected]>>, "Laura Rodriguez" <[email protected]<mailto:[email protected]>>, "Kyndra Joy Casper" <[email protected]<mailto:[email protected]>>Cc: "Masis Mesropian" <[email protected]<mailto:[email protected]>>, "'JodiMensen'" <[email protected]<mailto:[email protected]>>, "Deering Volkmann"<[email protected]<mailto:[email protected]>>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I'm attaching some handouts for the meeting below. I may send you an updated meeting notice with
Page 17 of 68
more handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>
Page 18 of 68
From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>
Subject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are our additional responses to your comments and questions regarding our originalresponses.
Given where we are in the design process, this is the level of specificity we can provide at the moment.We would appreciate it very much if your team can make conservative and reasonable assumptions forthose Project components for which we currently do not have more specific information.
We will have the Draft Water Conservation Commitment Letter to you shortly.
Thank you so much for your and your team’s responsiveness to our request!
Madonna
Madonna MarceloPrincipal Planner
Date: Fri May 13 2016 16:22:46 PDTAttachments: Attachments to Responses_revised.pdf image001.jpg WSA Scoping Questions and Responses_05-13-16.docx
Bcc:
Document ID: 0.7.522.399547
Page 19 of 68
6701 Center Drive West, Suite 900
Los Angeles, California 90045
T (424) 207-5337
F (424) 207-5349
Email [email protected]
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
From: Hwang, Jin [mailto:[email protected]]Sent: Monday, May 09, 2016 2:46 PMTo: Madonna Marcelo; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hello Madonna,
Please see our comments/questions in track changes in the attached file.
Also, as requested at the April 26, 2016 Water Conservation Meeting, please submit a DRAFT WaterConservation Commitment Letter by e-mail.
Thank you.
Page 20 of 68
Jin Hwang
Civil Engineering Associate
Los Angeles Department of Water and Power
Water Executive / Water Resources
111 N. Hope St. Room 1468
Los Angeles, CA 90012
213-367-4845
From: Madonna Marcelo [mailto:[email protected]]Sent: Thursday, May 05, 2016 11:14 AMTo: Hwang, Jin; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.
If you need anything else, please let us know.
Thank you!
Madonna
From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta (alejandro.
Page 21 of 68
[email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna MarceloPrincipal Planner
6701 Center Drive West, Suite 900
Los Angeles, California 90045
T (424) 207-5337
F (424) 207-5349
Email [email protected]
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly
Page 22 of 68
prohibited. If you are not the intended recipient, please immediately notify the sender by reply e-mail orphone and delete this message and its attachments, if any.
P Please consider the environment before printing this email.
From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources
Page 23 of 68
111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >> <<File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> << File:Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Resid andComl_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File: ATT00014.htm>>
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 24 of 68
From: Madonna Marcelo <[email protected]>To: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>Cc: Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>
Subject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Attached are the updated versions of our responses to the WSA scope questions and the attachments(including Attachment B) that I sent you yesterday.
If you need anything else, please let us know.
Thank you!
Madonna
From: Madonna MarceloSent: Wednesday, May 04, 2016 5:16 PMTo: 'Hwang, Jin'; Kwan, Delon; Moosbrugger, Earl; Estrada, Robert; Alejandro Huerta ([email protected])Cc: Stephanie Eyestone-Jones; Laura Rodriguez; Kyndra Joy CasperSubject: RE: Crossroads Hollywood Project WSA
Hi Jin,
Date: Thu May 05 2016 11:14:28 PDTAttachments: Attachments to Responses.pdf image001.jpg WSA Scoping Questions and Responses.docx
Bcc:
Document ID: 0.7.522.387138
Page 25 of 68
Attached are most of our responses to the WSA scope questions and a pdf of the attachmentsreferenced in the responses.
Please note there are a couple of outstanding questions (related to amenities and cooling towers) thatwe are still working on. We will have those to you shortly. In the meantime, please review the attachedand let us know if you need anything else.
Thank you!
Madonna
Madonna MarceloPrincipal Planner
6701 Center Drive West, Suite 900
Los Angeles, California 90045
T (424) 207-5337
F (424) 207-5349
Email [email protected]
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
Page 26 of 68
From: "Hwang, Jin" <[email protected]>To: "Kwan, Delon" <[email protected]>, "Moosbrugger, Earl" <[email protected]>,"Estrada, Robert" <[email protected]>, "Alejandro Huerta ([email protected])"<[email protected]>, "Stephanie Eyestone-Jones" <[email protected]>, "LauraRodriguez" <[email protected]>, "Kyndra Joy Casper" <[email protected]>Cc: "Masis Mesropian" <[email protected]>, "'Jodi Mensen'" <[email protected]>,"Deering Volkmann" <[email protected]>Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
Page 27 of 68
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
<< File: Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00001.htm >> <<File: Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00002.htm >> <<File: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00003.htm>> << File: Water Conservation for New Construction March 2014.xls >> << File: ATT00004.htm >><< File: Sample Conservation Commitment Letter.doc >> << File: ATT00005.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00006.htm >> << File:Crossroads Hollywood WSA Request Letter_3-31-16.pdf >> << File: ATT00007.htm >> << File:Crossroads Hollywood Project WSA - Scope questions .eml >> << File: ATT00008.htm >> << File:Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc >> << File: ATT00009.htm >><< File: Water Conservation for New Construction March 2014.xls >> << File: ATT00010.htm >> <<File: Sample Conservation Commitment Letter.doc >> << File: ATT00011.htm >> << File: 2016 WtrEfficiency Req Ordinance - PENDING APPROVAL.pdf >> << File: ATT00012.htm >> << File: Residand Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf >> << File: ATT00013.htm >> << File:ATT00014.htm >>
Page 28 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>
Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012
Date: Tue Apr 26 2016 09:08:35 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (3).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls
Bcc:
Document ID: 0.7.522.591453
Page 29 of 68
213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 30 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>
Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Date: Tue Apr 26 2016 09:14:56 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (5).msg Crossroads Hollywood Project WSA - Scope questions (6).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Crossroads Hollywood WSA Request Letter_3-31-16.pdf Resid and Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf Sample Conservation Commitment Letter.doc Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls Water Conservation for New Construction March 2014.xls
Bcc:
Document ID: 0.7.522.592006
Page 31 of 68
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 32 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc:
Subject: Crossroads Hollywood Project WSA
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Date: Fri Apr 22 2016 14:25:19 PDTAttachments: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (2).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf
Bcc:
Document ID: 0.7.522.590699
Page 33 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>
Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 1 MORE DOCUMENT. THERE ARE 7 ATTACHMENTS TOTAL.
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Date: Tue Apr 26 2016 09:14:56 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (5).msg Crossroads Hollywood Project WSA - Scope questions (6).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Crossroads Hollywood WSA Request Letter_3-31-16.pdf Resid and Coml_CALGreen_Plumbing_Tips_1_21_2016.pdf Sample Conservation Commitment Letter.doc Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls Water Conservation for New Construction March 2014.xls
Bcc:
Document ID: 0.7.522.368219
Page 34 of 68
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
Page 35 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc: Masis Mesropian <[email protected]>; Jodi Mensen <[email protected]>; Deering Volkmann <[email protected]>
Subject: Crossroads Hollywood Project WSA
UPDATED:ADDED 3 MORE DOCUMENTSSEE https://cityclerk.lacity.org/lacityclerkconnect/index.cfm?fa=ccfi.viewrecord&cfnumber=15-0458FOR NEW ORDINANCE PENDING APPROVAL 5/2/16.
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012
Date: Tue Apr 26 2016 09:08:35 PDTAttachments: 2016 Wtr Efficiency Req Ordinance - PENDING APPROVAL.pdf Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (3).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf Sample Conservation Commitment Letter.doc Water Conservation for New Construction March 2014.xls
Bcc:
Document ID: 0.7.522.367913
Page 36 of 68
213-367-4845
Page 37 of 68
From: Hwang, Jin <[email protected]>To: Kwan, Delon <[email protected]>; Moosbrugger, Earl <[email protected]>; Estrada, Robert <[email protected]>; Alejandro Huerta ([email protected]) <[email protected]>; Stephanie Eyestone-Jones ([email protected]) <[email protected]>; Laura Rodriguez <[email protected]>; Kyndra Joy Casper <[email protected]>Cc:
Subject: Crossroads Hollywood Project WSA
Hi all,
Please attend the Water Conservation Meeting for the Crossroads Hollywood Project Water SupplyAssessment.
Meeting Number: 993 261 062Meeting Password: Not requiredPhone Number(s): (213) 367-0100, (818) 771-3100, (661) 294-3300, (310) 522-1400
I’m attaching some handouts for the meeting below. I may send you an updated meeting notice withmore handouts later.
Thank you.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845
Date: Fri Apr 22 2016 14:25:19 PDTAttachments: Crossroads Hollywood Project - Water Conservation Mtg Agenda.doc Crossroads Hollywood Project WSA - Scope questions (2).msg Crossroads Hollywood WSA Request Letter_3-31-16.pdf
Bcc:
Document ID: 0.7.522.364474
Page 38 of 68
From: Moosbrugger, Earl <[email protected]>To: Hwang, Jin <[email protected]>Cc: Kwan, Delon <[email protected]>
Subject: FW: Crossroads WSA Request Letter Resubmitted
Jin,
Please process.
Also, please come by to discuss schedule when you return.
Thanks!
From: Alejandro Huerta [mailto:[email protected]]Sent: Friday, April 15, 2016 10:03 AMTo: Moosbrugger, EarlCc: Hwang, Jin; Kwan, Delon; Stephanie Eyestone-Jones; Laura RodriguezSubject: Crossroads WSA Request Letter Resubmitted
Hello Earl,
Attached is the Request Letter. I have copied the project's environmental consultants. I respectfully askthat the start date of the request be backdated to March 31, when the original Request Letter wassigned for by DWP per the attached document.
To expedite the process, the applicant will hand deliver the check . To whom and where should thecheck be delivered?
Thank you,Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454[Image removed by sender.]
On Fri, Apr 15, 2016 at 9:02 AM, Moosbrugger, Earl <[email protected]<mailto:[email protected]>> wrote:Hello Alejandro,
Per our phone conversation this morning, please cancel check and re-submit with Request Letter.
In addition, you may also reply-all to this e-mail with PDF of Request Letter so we may process prior toreceiving hardcopy.
Thank you!
Date: Fri Apr 15 2016 11:21:31 PDTAttachments: Crossroads WSA Request Letter_3-31-16.pdf image001.jpg image002.jpg image003.jpg Original_WSA_Receipt.pdf
Bcc:
Document ID: 0.7.522.352153
Page 39 of 68
Earl Moosbrugger, PEResources Development and Supply Assessment GroupWater System Executive Office / Water Resources SectionLos Angeles Department of Water and Power111 N. Hope Street, Room 1450Los Angeles, CA 90012(213) 367-2527<tel:%28213%29%20367-2527>
From: Alejandro Huerta [mailto:[email protected]<mailto:[email protected]>]Sent: Thursday, April 14, 2016 3:32 PMTo: Moosbrugger, EarlCc: Hwang, JinSubject: Re: WSA Request Letter
Hello Earl,
Per our phone conversation, we'll look forward to hearing tomorrow morning regarding the status of theWSA Letter and check.
Sincerely,
Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454<tel:%28213%29%C2%A0978-1454>[Image removed by sender.]
On Wed, Mar 9, 2016 at 7:55 AM, Hwang, Jin <[email protected]<mailto:[email protected]>> wrote:Hello Alejandro and Laura,
The Planning Department should send the WSA request letter to the following address:
Los Angeles Department of Water and PowerMr. Martin L. Adams, Senior Assistant General Manager for Water System111 North Hope StreetRoom 1455Los Angeles, CA 90012
A check in the amount of $17,000 should be attached to the WSA request letter, payable to: LosAngeles Department of Water and Power.
Thank you, and please let me know if you have any questions.
Jin HwangCivil Engineering AssociateLos Angeles Department of Water and PowerWater Executive / Water Resources111 N. Hope St. Room 1468Los Angeles, CA 90012213-367-4845<tel:213-367-4845>
From: Alejandro Huerta [mailto:[email protected]<mailto:[email protected]>]Sent: Wednesday, March 09, 2016 7:38 AMTo: Laura Rodriguez
Page 40 of 68
Cc: Hwang, Jin; Kwan, DelonSubject: Re: WSA Request Letter
Hi Jin/Delon,
I am good with the WSA request letter prepared by Eyestone so please proceed as necessary.
Alejandro A. HuertaEnvironmental Analysis • Major Projects(213) 978-1454<tel:%28213%29%C2%A0978-1454>[Image removed by sender.]
On Tue, Mar 8, 2016 at 5:22 PM, Laura Rodriguez <[email protected]<mailto:[email protected]>> wrote:Hi Jin/Delon,
We are working with the City on a project that will need a WSA. Alejandro Huerta, copied on this email,is the planner for the project. We have the WSA request letter ready to submit to you. What is theprocess?
Thank you
Laura RodriguezPrincipal Planner
[EE logo -- horizontal stack (RGB, screen-res, 3]
6701 Center Drive West, Suite 900Los Angeles, California 90045T (424) 207-5333<tel:%28424%29%20207-5333>F (424) 207-5349<tel:%28424%29%20207-5349>
DIRECT (424) 207-5339<tel:%28424%29%20207-5339>EMAIL [email protected]<mailto:[email protected]>
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 41 of 68
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 42 of 68
From: Alejandro Huerta <[email protected]>To: Moosbrugger, Earl <[email protected]>Cc: Hwang, Jin <[email protected]>; Kwan, Delon <[email protected]>; Stephanie Eyestone-Jones <[email protected]>; Laura Rodriguez <[email protected]>
Subject: Crossroads WSA Request Letter Resubmitted
Hello Earl,
Attached is the Request Letter. I have copied the project's environmental consultants. I respectfully askthat the start date of the request be backdated to March 31, when the original Request Letter wassigned for by DWP per the attached document.
To expedite the process, the applicant will hand deliver the check . To whom and where should thecheck be delivered?
Thank you,Alejandro A. HuertaEnvironmental Analysis • Major Projects
(213) 978-1454
On Fri, Apr 15, 2016 at 9:02 AM, Moosbrugger, Earl <[email protected]> wrote:
Hello Alejandro,
Per our phone conversation this morning, please cancel check and re-submit with Request Letter.
In addition, you may also reply-all to this e-mail with PDF of Request Letter so we may process prior toreceiving hardcopy.
Thank you!
Date: Fri Apr 15 2016 10:03:24 PDTAttachments: Crossroads WSA Request Letter_3-31-16.pdf image002.jpg image003.jpg Original_WSA_Receipt.pdf
Bcc:
Document ID: 0.7.522.351270
Page 43 of 68
Earl Moosbrugger, PE
Resources Development and Supply Assessment Group
Water System Executive Office / Water Resources Section
Los Angeles Department of Water and Power
111 N. Hope Street, Room 1450
Los Angeles, CA 90012
(213) 367-2527
From: Alejandro Huerta [mailto:[email protected]]Sent: Thursday, April 14, 2016 3:32 PMTo: Moosbrugger, EarlCc: Hwang, JinSubject: Re: WSA Request Letter
Hello Earl,
Per our phone conversation, we'll look forward to hearing tomorrow morning regarding the status of theWSA Letter and check.
Sincerely,
Alejandro A. Huerta
Environmental Analysis • Major Projects
(213) 978-1454
Image removed by sender.
On Wed, Mar 9, 2016 at 7:55 AM, Hwang, Jin <[email protected]> wrote:
Hello Alejandro and Laura,
Page 44 of 68
The Planning Department should send the WSA request letter to the following address:
Los Angeles Department of Water and Power
Mr. Martin L. Adams, Senior Assistant General Manager for Water System
111 North Hope Street
Room 1455
Los Angeles, CA 90012
A check in the amount of $17,000 should be attached to the WSA request letter, payable to: LosAngeles Department of Water and Power.
Thank you, and please let me know if you have any questions.
Jin Hwang
Civil Engineering Associate
Los Angeles Department of Water and Power
Water Executive / Water Resources
111 N. Hope St. Room 1468
Los Angeles, CA 90012
213-367-4845
From: Alejandro Huerta [mailto:[email protected]]Sent: Wednesday, March 09, 2016 7:38 AMTo: Laura RodriguezCc: Hwang, Jin; Kwan, DelonSubject: Re: WSA Request Letter
Hi Jin/Delon,
I am good with the WSA request letter prepared by Eyestone so please proceed as necessary.
Page 45 of 68
Alejandro A. Huerta
Environmental Analysis • Major Projects
(213) 978-1454
Image removed by sender.
On Tue, Mar 8, 2016 at 5:22 PM, Laura Rodriguez <[email protected]> wrote:
Hi Jin/Delon,
We are working with the City on a project that will need a WSA. Alejandro Huerta, copied on this email,is the planner for the project. We have the WSA request letter ready to submit to you. What is theprocess?
Thank you
Laura RodriguezPrincipal Planner
EE logo -- horizontal stack (RGB, screen-res, 3
6701 Center Drive West, Suite 900
Los Angeles, California 90045
T (424) 207-5333
F (424) 207-5349
DIRECT (424) 207-5339
EMAIL [email protected]
Page 46 of 68
Statement of Confidentiality. The contents of this e-mail message and any attachments are confidentialand are intended solely for addressee. The information may also be legally privileged. This transmissionis sent in trust, for the sole purpose of delivery to the intended recipient. If you have received thistransmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited. Ifyou are not the intended recipient, please immediately notify the sender by reply e-mail or phone anddelete this message and its attachments, if any.
P Please consider the environment before printing this email.
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
-------------------------Confidentiality Notice--------------------------This electronic message transmission contains information from the Los Angeles Department of Waterand Power, which may be confidential. If you are not the intended recipient, be aware that anydisclosure, copying, distribution or use of the content of this information is prohibited. If you havereceived this communication in error, please notify us immediately by e-mail and delete the originalmessage and any attachment without reading or saving in any manner.
Page 47 of 68