Flow calculation for BC Headquarters-Ghala Description Loading Unit Qty GROUND FLOOR Taps details Wash basin, Ablution 2 22 44 WC with flushing Valve 2 15 30 Urinal 1 8 8 Bidet 3 0 0 Dish washer 3 1 3 Kitchen Sink 5 4 20 Total LU 105 FIRST FLOOR Taps details Wash basin, Ablution 2 18 36 WC with flushing Valve 2 19 38 Urinal 1 8 8 Bidet 3 0 0 Dish washer 3 0 0 Kitchen Sink 5 0 0 Total LU 82 GRAND TOTAL LU 187 Total Loading Unit will be 187 LU. From page no 120 of standard BS 6700 - 2006, Convert this in to Design fl For total loading unit of 187 corresponding design flow rat 2 The pressure drop is - Friction Factor - kPa / Meter 0.8 Head calculation for BC Headquarters-Ghala Description Qty Total Length Vertical Lift from basement to first floor ( 4.0+5+5+1.5) Total Pipe length index ci 1 178 178 Fittings 1 44.5 44.5 Valves 1 35.6 35.6 Total Loading unit LU Eq Length in M
Transcript

Flow calculation for BC Headquarters-Ghala

Description Loading Unit Qty

GROUND FLOORTaps details

Wash basin, Ablution 2 22 44

WC with flushing Valve 2 15 30

Urinal 1 8 8Bidet 3 0 0Dish washer 3 1 3

Kitchen Sink 5 4 20Total LU 105

FIRST FLOORTaps details

Wash basin, Ablution 2 18 36

WC with flushing Valve 2 19 38

Urinal 1 8 8Bidet 3 0 0Dish washer 3 0 0

Kitchen Sink 5 0 0Total LU 82

GRAND TOTAL LU 187

Total Loading Unit will be 187 LU.From page no 120 of standard BS 6700 - 2006, Convert this in to Design flow rate

For total loading unit of 187 corresponding design flow rate is = 2

The pressure drop is - Friction Factor - kPa / Meter 0.8

Head calculation for BC Headquarters-Ghala

Description Eq Length in M Qty Total Length

Vertical Lift from basement to first floor ( 4.0+5+5+1.5)

Total Pipe length index circuit 1 178 178

Fittings 1 44.5 44.5

Valves 1 35.6 35.6

Total Loading unit LU

Min pressure required at last tap 1.5 bar

Sub Total

Safety margine - 10 % of total head loss

Total Head req. in mtr

Selected Head in Meter

PUMP SELECTION

Total Capacity Required 2 l/sHead Required 60.0 Meter

No of pump working 1No of Pump stand by 1

Pump Capacity 2 l/sPump Head 60 MeterQuantity of Pumps 2 Nos

13 of 14

PROJECT: 1058-BC HEADQUARTERS-GHALA

DRAINAGE SCHEDULE (with 50mm slope in the pipe)

SI.NO: REFERENCE OUTLET INVERT LEVEL REMARKS

MH- ENTRY IL MH-EXIT IL

MH-06 103.780 103.730 105.000

MH-05 103.630 103.580 104.800

1 MH-01 102.780 102.730 104.200 First at the Bottom

2 MH-02 102.630 102.580 104.000 Second from Ablution

3 MH-03 101.850 101.800 103.300 Third from small Toilet

4 MH-04 101.700 101.650 102.500 Fourth from big Toilet

5 Inspection Chamber 101.550 101.500 102.500

99.000 Bottom of Holding Tank

0.100 0.100

0.050 0.050 0.100 0.730

COVER LEVEL (Approximate)

14 of 14

PROJECT: 1058-BC HEADQUARTERS-GHALA

DRAINAGE SCHEDULE (with 50mm slope in the pipe)

SI.NO: REFERENCE OUTLET INVERT LEVEL REMARKS

MH- ENTRY IL MH-EXIT IL

1 MH-01 102.230 102.200 104.200 First at the Bottom

2 MH-02 102.120 102.090 104.000 Second from Ablution

3 MH-03 101.940 101.910 103.300 Third from small Toilet

4 MH-04 101.810 101.780 102.500 Fourth from big Toilet

5 MH-05 101.640 101.610 102.500

6 MH-06 101.450 101.420

7 Inspection Chamber 101.360 101.330

97.330 Bottom of Holding Tank

COVER LEVEL (Approximate)


Recommended