Double-Shell
Tank Corrosion
Chemistry
Control &
Monitoring
May 30, 2013
Tank
Operations
Contract
2
Page 2
Double-Shell Tank Chemistry Control
Key Elements of Tank Corrosion Control and Monitoring
Predictive Elements Chemistry Control (Hydroxide/Nitrite)
Hydroxide Depletion
Waste Compatibility Assessments
Laboratory Testing
Monitoring and Evaluation Corrosion Probe Monitoring
Ultrasonic Testing
Visual Inspections
Overall DST Integrity Program Schedule
Tank
Operations
Contract
3
Page 3
Waste Chemistry Corrosion Control
Objective: Limit corrosion inside the DSTs
Maintain established pH and nitrite (NO2-) concentration to
limit pitting corrosion and prevent cracking corrosion
Refine pH and NO2- ranges using corrosion testing program
with guidance from the Expert Panel Oversight Committee
DSTs are controlled to requirements defined in OSD-151-T-00007, Operating Specifications for the Double-Shell Tanks
Why is it Important to Establish the Minimum Essential Corrosion
Protection Needed to Preserve the DSTs?
Every 1,000 gallons of 50% NaOH added to a DST for pH corrosion
control increases the Na inventory by 1.65 MTs, extending the WTP
mission between and 1 days depending on feed envelope. In 4
years during the FY2000 2005 period, 288 MTs of Na were added to the DSTs for pH control, extending the WTP mission by ~ 144 days.
Tank
Operations
Contract
4
Page 4
Waste Chemistry Corrosion Control
(as described in OSD-151-T-00007)
Why are Hydroxide (OH-) and Nitrite (NO2) Important for DST
Chemistry Corrosion Control?
Pitting and stress cracking are the principal forms of corrosion attacking
the carbon steel DSTs. OH- additions increase the pH, preventing
pitting; and NO2- additions prevent initiation of nitrate-induced stress
cracking corrosion.
Double-Shell Tank Waste Corrosion Chemistry Controls
Tank
Operations
Contract
5
Page 5
OSD-151-T-00007 Limits Vary with
Temperature
Limits change based on waste temperature
At low waste temperatures, no concern of SSC, protection from pitting based on modest [OH-]
concentration
At high waste temperatures, greater need for higher [NO2
-] concentrations to prevent cracking
Minimum pH requirements of 12 (0.010M [OH-])
Tank
Operations
Contract
6
Page 6
Implementation of OSD Chemistry Control
Conduct periodic sampling of the waste in DSTs to determine the [NO2
-], [NO3-], and [OH-] concentrations, and to verify that measured
concentrations are within the limits
Establish and maintain a database to track the [NO2-], [NO3
-], and
[OH-] concentrations in each DST
Prior to waste transfers, the final states of the shipping and receiving DSTs are evaluated for compliance with the waste chemistry limits (Waste Compatibility Program)
Waste samples are analyzed per the requirements of a Tank Sampling and Analysis Plan (TSAP) and when results are not in
compliance with the TSAP:
Out-of-specification chemistry must restored within 30 days or an Operating Specification Recovery Action Plan prepared to restore [NO2],
[NO3-], and [OH-] concentrations within established limits
Tank
Operations
Contract
7
Page 7
Basis for Periodic Sampling
Sampling requirements identified in annual update to RPP-7795 Chemistry Control Technical Basis
RPP-7795 identifies which DSTs are approaching limits with prediction of when they should be sampled
Default sample interval is once/five years; up to ten years allowed if model determines longer interval is justified
Tanks containing highly-concentrated liquids, such as double-shell slurry (typically Waste Group A tanks), show chemical stability and a
longer interval may be justified
The database is RPP-13639 Caustic Limits Report, updated every year, and just recently issued
Tank
Operations
Contract
8
Page 8
Corrosion Chemistry In-Tank Changes
Hydroxide depletion occurs by
CO2 absorption at supernatant surfaces
Oxidation of organic species
Reaction with aluminum solids
Mechanistic Hydroxide Demand Model and empirical Hobbs model require ventilation air flows to estimate
absorption of CO2 by waste
Flows for most tanks are individually controlled
Aging waste tanks (AY & AZ Tank Farms) have shared primary ventilation system
SST Waste Retrieval
Tank
Operations
Contract
9
Page 9
Chemistry Control During Retrieval
SST solids are expected to have some hydroxide depletion during retrieval during to:
Aluminum dissolution
Carbonate/Bicarbonate and Phosphate/Biphosphate buffering
The body of corrosion testing indicates little risk of corrosion at the high [NO2
-] concentration and low supernatant temperature (< 40oC [104oF]),
even with some [OH-] depletion
Approach to SST Retrieval
Start with the DST supernatant within corrosion chemistry limits
Sample DST supernatant at an appropriate point during retrieval (usually ~50% completion)
Be prepared to respond with [OH-] addition at an appropriate time, supported with more specific information from samples
Resample after [OH-] has been added and/or retrieval has been completed to verify tank has been returned to specification
Tank
Operations
Contract
10
Page 10
Laboratory Testing
Provides the basis for specification changes and to understanding of corrosion propensity for any off-normal
conditions discovered
Includes testing for pitting propensity by Cyclic Potentiodynamic Polarization (CPP) and cracking by Slow Strain Rate Testing
(SSR)
222-S Laboratory for CPP tests on actual tank waste samples
Det Norske Veritas Laboratory (DNV) and Savannah River National Laboratory (SRNL) for more extensive testing with waste simulants
Special test plan under development to evaluate vapor-space corrosion
Understand effect of ammonia as inhibitor
All work guided by Expert Panel (EPOC)
Tank
Operations
Contract
11
Page 11
In-Tank Corrosion Monitoring
Five tanks currently fitted with corrosion monitoring systems and corrosion coupons
Waste corrosion potentials have been stable
Coupons removed from the tanks have shown little sign of corrosion (
Tank
Operations
Contract
12
Page 12
Primary Tank Wall Ultrasonic Inspection
Inspections conducted on a eight to ten year cycle
Two 24-inch risers used to gain access to the annulus
Walls cleaned as necessary
Inspections performed:
Four 15-inch wide full height wall inspections
Examine 20 feet of vertical and horizontal welds
Criteria: 20% wall loss, 50% through wall pitting, and critical crack lengths
All DSTs have completed a minimum of one UT cycle; 60% two or more UT cycles; 10% three UT cycles through FY 2012
Force Institute PSP-4 Plus Digital System on AWD-5 Crawler
Tank
Operations
Contract
13
Page 13
Primary Tank and Annulus Video Inspections
Video inspections performed on a five to seven year interval
Inspect all four quadrants
Re-inspect areas of interest identified in the Tank Integrity Inspection Guide [Archived Inspection database]
Water intrusion inspection done every two years in each tank farm
Annulus Extent of Condition Inspections completed to establish visual baseline for DSTs with construction histories similar to tank AY-102
Examined between ten to twelve risers
Created >95% visual reference for annulus floor and portion of primary tank visible from inspection risers
Radiation-hardened, Pan, Tilt, Zoom Auto-focus Inspection Cameras
Tank
Operations
Contract
14
Page 14
Double-Shell Tank Integrity Program Schedule
Expert
Panels
Field Work
Ultrasonic Testing
Visual Inspections
Technology
Ultrasonic Testing
Visual Inspection
Chemistry Optimization
Probe Design
1997 1998 2001 2002 2004 2006 1999 2000 2003 2005 2007
BNL-52527
Tank Structural Integrity Panel
PNNL-13571
DST Life Extension
1996 2008
First Round of UT for 28 DSTs
BNL-52361
Structural Analysis Guideline Panel
RPP-RPT-22162
Waste Chemistry Optimization
RPP-19438
Waste Level Rise
RPP-31129
Vapor Space
Corrosion
Activities
Forensic First
AN-107 Probe
Forensic Second
AN-107 Probe
First Generation
Electro-Chemical Noise Probes
Electro-Chemical
Noise Probes
Multi-Function
Corrosion Probes
Analog Ultrasonic
Testing
Digital Ultrasonic
Testing
Knuckle Ultrasonic
Testing
Potential Measurement
Corrosion Probes
Tank Specific
Testing
Bounding Chemistry
Analysis
Limited Access Analog Cameras Digital Cameras
Second Round of
UT for 6 DSTs
Continued UT of DSTs
2009 2010 2011
Forensic AY-101 Probe
Forensic AN-102 Probe
Vapor Space, Liquid Air Interface, and Pit Corrosion
Expert Panel Oversight Committee
2013 2012 2014 2015 2016
Stress Corrosion Cracking
Replaceable Corrosion
Monitoring Probes
Integrity
Assessments RPP-28538 Double-Shell Tank
Integrity Assessment,
HFFACO, Milestone M-48-14 Update RPP-28538
Tank AY-102 Leak / DST
Extent of Condition