Site Legend
EXISTING RAINWATER TANK
DOWN PIPE LOCATIONDP
SILTATION CONTROL AS DETAILED IN ACCORDANCE WITH URALLA SHIRE COUNCIL REQUIREMENTS
CONSTRUCTION FENCING
STORMWATER LINE
EXTENT OF RECTIFICATION LANDSCAPING
SITE AREAFLOOR AREA (Existing Residence & Studio)FLOOR AREA (Studio Extension)TOTAL FLOOR AREABUSHFIRE AFFECTED
1183m²144.5m2
32.0m²
174.5m²NO
::
:
::
SITE ADDRESSPROPERTY DETAILS
::
9 KING STREET, URALLALOT 1, DP 1132705
SITE NOTES:• CONTOURS AND SPOT LEVELS ARE INDICATIVE
ONLY AND FINAL SITE LEVELS COMPLETED BY A REGISTERED SURVEYOR IS RECOMMENDED BEFORE START OF CONSTRUCTION.
• STORMWATER DRAINAGE AND OVERLAND FLOW TO STREET.
• SEDIMENTATION AND EROSION CONTROL MEASURES DURING CONSTRUCTION IN ACCORDANCE WITH COUNCIL REQUIREMENTS.
• SECURITY FENCING AND GATES DURING CONSTRUCTION TO COUNCIL REQUIREMENTS
Existing Residence
King
Stre
et
Existing Studio
Existing Deck
Existing Rainwater TankExisting Entry Driveway
Boun
dary
24.
11m
Boundary 49.105m
Boundary 49.105m
Boun
dary
24.
11m
3.0m
Wid
e Dr
aina
ge E
asem
ent
Lot 1 DP 11327059 King Street, Uralla
Adjoining Property7 King Street, Uralla
Adjoining Property11 King Street, Uralla
Connect New Stormwater Lines to Existing Stormwater Infrastructure
Approx. 19500
Extent of Proposed Landscaping -Limited to New Turf / Grass to Match Existing as Rectification Work on Completion of Construction
Proposed Studio
Extension
Proposed Porch
Overall
6200
Existing 1500 High Timber Paling Fence on Boundary
Overall4
380
1890
911
MN
TN Scale Date
Project1:200 @ A3
1:100 @ A3
0
0
1
0.5
2
1 2
5 10m
5m
20m
10m
15m0 0.1 0.2 0.5 1m 2m1.5m 1:20 @ A3
1:50 @ A30 0.5 1 5m2m
FOR
contact: peter holzberger po box 1992 armidale nsw 2350 P 0428 714592 E [email protected]
a.n.e.buildingdesign
DO NOT SCALEUSE FIGURED DIMENSIONS ONLYContractor must verify all dimensions on site before commencing any work or preparing shop drawings.The building design and this drawing is copyright and remains the property of a.n.e. building design. Unauthorised reproduction is prohibited.
COPYRIGHT C
armidale new england building design
NOTE: VISUAL SCALE FOR REFERENCE ONLY - DO NOT USE VISUAL SCALE DURING CONSTRUCTION Designed:
Drawn DrawingChecked:
Approved:
As indicated
25/0
9/20
20 9
:48:
21 A
M
/CD:\P
H-W
ork\
Dro
pbox
\Dro
pbox
\AN
E Pr
ojec
ts\2
0011
_Par
ker S
tudi
o\D
raw
ings
\Sta
ge 2
\Par
ker S
tudi
o St
age
2.rv
t
20011
Proposed Studio Extension9 King Street, Uralla NSW
February 2020
A201
Andrew Parker
PH
ANE
Site Plans
PH
PH
Sediment Control Fence
No. Date Revision1 9/07/20 Stage 2 Construction Drawings issued for Final Review
2 19/08/20 Stage 2 Construction Drawing Revisions - Reduced slab size, relocatedDoor D01, Additional and Relocated Windows, Steel Beams B1 & B2.
A 14/09/20 Stage 2 Increase Slab Size and Issued for Construction
B 18/09/20 Include Heating Appliances, Reduce Size of Verandah & Reissue forConstruction
C 25/09/20 Relocate Downpipe, Include Flue Information on Elevations, Reissue forConstruction