DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber, AIA, LEED AP, CEO PGAL Architects 3 October 2012
Transcript
Page 1: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly

2 new Net Zero Ready BEQ facilities

Ian Nestler, AIA, LEED AP, PrincipalJeff. Gerber, AIA, LEED AP, CEO

PGAL Architects3 October 2012

Page 2: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Compatible DoD Missions

Missions: Sustainability & SecurityEnergy efficiency = Savings = More $$ for War-Fighting

Missions: Home-style Setting & Military-style DisciplineQuality of Life Upgrades = Unit cohesion and more effective

learning/training/living environment for War-Fighters

10-3-12 Net Zero through Emerging Technologies 2

Page 3: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Net Zero Ready vs Net Zero

Federal funds not available for total on-site photovoltaic power system needed to reach Net Zero

Took Marines’ approach: “improvise and overcome”

Designed/built to meet Net Zero if/when additional funds available to complete power system

Much more affordable to retrofit to Net Zero if originally designed as Net Zero Ready

Highly efficient building systems & exterior envelopes, using Whole Building approach

3-4-12 XD Report 3

Page 4: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Fulfilling the Missions

Consecutive projects, US Marine Corps Air Ground Combat Center (MCAGCC) Twentynine Palms, CA

Package 9, completed September, 2011

$129 Million

Net Zero Ready, awaiting LEED Platinum certification Original mandate LEED Silver. Team pursued LEED Gold without adding costs

or renewable energy re DoD certification policy

At 85% completion, received $20M Energy Enhancement Project grant which funded solar panels

3-4-12 XD Report 4

Page 5: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

BEQ Package 9 continued

• Team granted modifications to provide for design/construction of:

PV solar power exterior lighting

Advanced metering (including SCADA)

Additional insulation for building roof systems

Permeable paving

• Completed on schedule despite mid-construction retrofitting

3-4-12 XD Report 5

Page 6: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

BEQ Package 9 continued

464,000 SF solar project— 4 separate solar array structures

4,680 SunPower E19/318 solar panels, generating 2.1 megawatts/year

Offsets 29% of total electrical load

Saves $331,144/yr at current CA power rate

Project designed to be 57% more efficient than baseline code minimum comparable building

Besides cost savings, photovoltaic system provides shade in desert location

2 parking areas, amphitheater, recreation area

3-4-12 XD Report 6

Page 7: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

BEQ Package 4

3-4-12 XD Report 7

Page 8: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Maximizing Sustainability

Approach to Photovoltaic Utilization: Designing for Maximum Solar Panel Efficiency

1. Location/placement

2. Aesthetic incorporation

Energy and Water Saving Methods Integrated Design with the Local Climate in Mind

1. Thermostats tied to CAC cards at unit entry doors

2. Fan coil override switch on operable windows

3. Occupancy sensors in public areas

4. Water saving plumbing fixtures, Mojave adapted landscape

with subsurface irrigation, graywater filtration system.

3-4-12 XD Report 8

Page 9: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Mechanical Systems

• Mechanical systems, both projects Designed with advanced metering capabilities tied to Base Energy Management

Controls System (EMCS) through dedicated computerized Supervisory Control and Data Acquisition (SCADA) program

BEQ complexes have preconditioned (heating and chilled water) outside air systems to temper airflows via a central air distribution system per floor

Use of pressure-independent control valves to enhance efficiency of 4-pipe hydronic system and allow for whole-building design approach through seamless controls integration

3-4-12 XD Report 9

Page 10: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Selecting Green Elements

Criteria for Selection

1. Cost Efficiency

2. Impact on Design

3. Contribution to Net Zero Ready

4. Examples of Green elements:

. Window interlock systems that shut off fan coil units when windows are opened

. Perforated metal exterior sunshades with vertical fins to cut off low angle morning and afternoon solar heat gain

. Native, drought-tolerant landscaping irrigated with subsurface drip irrigation to minimize evaporation

. 100% of the landscape irrigation provided through graywater filtration system supplying non-potable water recovered from the buildings’ laundry facilities.

3-4-12 XD Report 10

Page 11: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Housing Worthy of a War-Fighter

Overall goal: Address 2009 Marine Corps BEQ Enhancement Initiative to create “more home-like living environment for single Marines”

Team Betterments included:

. 10% increase in room size

. Upgrades on materials, finishes

. Additional amenities including amphitheater, exercise circuit course, ‘home theater’ room

10-3-12 Net Zero through Emerging Technologies 11

Page 12: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Housing Worthy of a War-Fighter

1. Campus Site Design and Landscape Architecture

2. Sustainable Site Amenities

3. Home-like living Environments

4. Common areas to promote unit cohesion

3-4-12 XD Report 12

Page 13: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Housing Worthy of a War-Fighter

• Both BEQ Packages:– Campus environment

– Three 4-story BEQs

– 576 two-person rooms

– Hotel-style 2-story entrances

– Non-institutional styling—e.g., corridors with inset doors, smooth plaster wall finish applied above honed, sealed CMU chair rails

– Parking Garages. Package 9: 706 spaces. Package 4: 540 spaces

– Landmark features. Package 9: landmark tower with outdoor amphitheater. Package 4: 500-seat open-air amphitheater, 420’ Ninja Warrior style obstacle course

– Separated passive/active outdoor amenities

3-4-12 XD Report 13

Page 14: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

• Two design approaches

Package 9:

. Multi-purpose space within BEQ buildings

Package 4:

. Each BEQ has free-standing 9,825 ‘E-Club’ building

. Complex incudes 445-seat dining facility

3-4-12 XD Report 14

Housing Worthy of a War-Fighter

Page 15: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Sustainable Landscape

10-3-12 Net Zero through Emerging Technologies 15

BEQ Package 9MCAGCC Twentynine Palms, CA

Page 16: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Campus Environment

10-3-12 Net Zero through Emerging Technologies 16

Quality of Life Facility Package 4MCAGCC Twentynine Palms, CA

DUNHAM MEMORIALDINING HALL

P163 PARKINGSTRUCTURE

P114 BEQ & COMMONBUILDING

P170 BEQ & COMMONBUILDING

SPORTS ARENA &AMPHITHEATER

Page 17: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Quality of Life Improvements

1. Sustainable Amenity Elements

a. Active & Passive Recreation

b. Renewable Energy with Multiple Uses

c. Shade and Protection from Wind

d. Minimal Hardscape Reduces Heat Island Effect

10-3-12 Net Zero through Emerging Technologies 17

Page 18: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Sustainable Amenities

10-3-12 Net Zero through Emerging Technologies 18

BEQ Package 9MCAGCC Twentynine Palms, CA

Page 19: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Sustainable Amenities

10-3-12 Net Zero through Emerging Technologies 19

Quality of Life Facilities Pkg. 4MCAGCC Twentynine Palms, CA

Page 20: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Interior Environment

10-3-12 Net Zero through Emerging Technologies 20

Page 21: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Net Zero Ready and LEED Certification

NZE Measures

1. Envelope Efficiency and Controls

2. Renewable Energy

3. Occupant/ PWD Education

4. Energy Efficiency Drives LEED point choices

10-3-12 Net Zero through Emerging Technologies 21

Page 22: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Managing the Projects

Systems/protocols developed to ensure critical coordination. --Weekly “Go To” meetings, meeting minutes, critical needs list and updated design agenda

--Multiple Partnering Meetings to help keep team members on track 

Role of Building Information Modeling (BIM) systems

Use of "mock-up" rooms/installation trials

Role of Value Engineering

3-4-12 XD Report 22

Managing the Projects

Page 23: DRAFT DRAFT DRAFT ONLY Sustainable, Affordable, Warrior-Friendly 2 new Net Zero Ready BEQ facilities Ian Nestler, AIA, LEED AP, Principal Jeff. Gerber,

Saluting our War-Fighters

3-4-12 XD Report 23

Saluting our War-Fighters with sustainable, functional and aesthetically welcoming

places to live, work and play.