Drive Beam BPM’s. CLIC 09 work shop, CERN , 12-16 of October 2009, Lars Søby. CLIC BPM overview Specifications Constraints and possible BPM types Planning up to CDR. CLIC BPM overview. A total of 52813 BPMs!!...or ~800MCHF. - PowerPoint PPT Presentation
Popular Tags:
15
CLIC09 Workshop 12-16 October 2009 Drive beam BPM’s Lars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, 12-16 of October 2009, Lars Søby
Transcript

Slide 1

CLIC09 Workshop 12-16 October 2009Drive beam BPMsLars Sby 1

Drive Beam BPMs

CLIC 09 work shop, CERN, 12-16 of October 2009, Lars Sby1CLIC BPM overviewSpecificationsConstraints and possible BPM typesPlanning up to CDRCLIC09 Workshop 12-16 October 2009Drive beam BPMsLars Sby 22CLIC BPM overviewCLIC09 Workshop 12-16 October 2009Drive beam BPMsLars Sby 3AccuracyResolutionStab.BWNBFBMPSInjectors100 m50 m?1 GHz40 mm189??Pre damping rings10 m10 m?10MHz20/9 mm600Yes?Damping rings10 m?2 m?10MHz20/9 mm600Yes?BC1, Booster Linac, Transfer lines, BC2 100m10m?10MHz??1404??DBA, DLs, CRs and transfer lines 20m20m?100MHz40mm900??DB long transfer lines???100MHz200mm848??DB Turn arounds20m20m?100MHzVar.1920??DB decelerators20m2m2m10MHz23mm41576YesYesMB Linac5m50nm5m10MHz8mm4776YesYesA total of 52813 BPMs!!...or ~800MCHF3CLIC module, type 1CLIC09 Workshop 12-16 October 2009Drive beam BPMsLars Sby 4

DB-BPMMB-BPMWake Field MonitorsDB-BPM4Drive beam BPMQuadBPMWPSPETS 130MWBase line scenarioThe drive beam quadrupole and BPM are mounted on the drive beam girders. BPMs cannot be moved independently of the PETS, the quadrupoles will either be on movers, or equipped with dipole corrector coils. The BPMs are mounted before quadrupoles. The acceptable level of wake field needs to be determined.CLIC09 Workshop 12-16 October 2009Lars Sby 5Drive beam BPMsBPM20m2m?