Due Diligence Report – Social Safeguards (Land Acquisition and Resettlement) Project number: 42486-016 August 2016
IND: Madhya Pradesh Urban Services Improvement
Program – Water Supply Improvement in Katangi,
Bhedaghat, Majholi, Panagar, Patan, Sihora and
Tendukheda
Package Number: MPUSIP-5B Prepared by the Madhya Pradesh Urban Development Company, Government of Madhya Pradesh for the Asian Development Bank. This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Land Acquisition and Resettlement Due Diligence
Report
Document stage: Draft for consultation
Project Number: 42486
Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX}
August, 2016
India: Madhya Pradesh Urban Services Improvement Project Group Water Supply Scheme, (Katangi, Bhedaghat, Majholi,
Panagar, Patan, Sihora, Tendukheda) Jabalpur district
This due diligence report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be
preliminary in nature.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal
CURRENCY EQUIVALENTS
(As of August 01, 2016)
Currency unit = Rupee (INR)
INR 1.00 = USD0148
USD 1.00 = INR 66.02
ABBREVIATIONS
ADB - Asian Development Bank
AP - Affected Person
BPL - Below Poverty Line
DP - Displaced Person
EA - Executing Agency
GOI - Government of India
GOMP - Government of Madhya Pradesh
HHs - Households
IA - Implementing Agency
IR - Involuntary Resettlement
KM - Kilometer
MPUDC - Madhya Pradesh Urban Development Company
OHT - Over Head Tank
O&M - Operation and Maintenance
PIU - Project Implementation Unit
PMC - Project Management Consultant
PMU - Project Management Unit
R&R - Resettlement and Rehabilitation
RF - Resettlement Framework
RFCTLARR - The Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013
RP - Resettlement Plan
ROW - Right Of Way
RWA - Resident Welfare Associations
SO - Safeguard Officer
SPS - Safeguard Policy Statement
TA - Technical Assistance
UADD - Urban Administration and Development Directorate
UDED - Urban Development and Environment Department
ULBs - Urban Local Body
WRD - Water Resource Department
WTP - Water Treatment Plant
i
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal
CONTENTS
I INTRODUCTION 04
A. Background of subproject 04
B. Project description 04
C. Scope and Nature of Resettlement 05
II Policy Framework & entitlement 05
III SUB-PROJECT DESCRIPTION 05
III FIELD WORK AND PUBLIC CONSULTATION 09
A. Public Consultation 09
IV. LAND AVAILABILITY AND RESETTLEMENT
IMPACTS
10
V. BUDGET 13
VI. CONCLUSIONS 14
A. Summary and Conclusions
B. Next Step
LIST OF TABLES
Table 1 Details of Existing water supply of Katangi 06
Table 2 Proposed Water Supply System of Katangi 08
Table 3 Proposed sub-project components in
Katangi Water Supply Subproject and their
involuntary resettlement impact status
12
Table 4 Budget of replenishment 13
LIST OF APPENDIX
Appendix 1. Site Photographs 26
Appendix 2. Details of land ownership for different sites
Appendix3. Summary of Stakeholder Consultation
27
Appendix 4. Stakeholder photograph and list of Stakeholder
Consultation
29
Appendix 5. Involuntary Resettlement Screening Checklist 31
Appendix 6. Khasra details and maps 33
Appendix 7. Certificate of Land Status Chief Municipal Officer 39
ii
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 1
I. INTRODUCTION
A. Background
1. Government of Madhya Pradesh (GoMP) with a sector project loan funding from Asian
Development Bank (ADB) has proposed to implement Madhya Pradesh Urban Services
Improvement Project (MPUSIP), herein after referred as ‘the Project’. Madhya Pradesh
Urban Development Company Limited (MPUDC) shall be the Implementing Agency (IA)
and the State Urban Development and Housing Department (UDHD) shall be the
executing agency for the Project. A project management unit (PMU) created under
MPUDC is implementing MPUSIP.
2. The Resettlement Framework (RF) for MPUSIP outlines the objectives, policy principles
and procedures for land acquisition, if any, compensation and other assistance
measures for Displaced Persons1 (DPs)/Affected Persons (APs), if any.
This framework reflects the borrower’s law on the Right to Fair Compensation and
Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013, state
government policies, ADB’s Safeguard Policy Statement (SPS), 2009 and other social
safeguard guidelines. A detailed description of compensation measures and assistance
is provided in the entitlement matrix.
3. An entitlement matrix, consistent with the existing norms and guidelines of the country
and the state government, and ADB’s Safeguard Policy Statement has been prepared
to cover losses identified in this Project. The matrix recognizes that the lack of
title/customary rights recognized under law will not be a bar to entitlement and has
special provisions for non-titled persons. The eligibility for compensation will be
determined through a cut-off date. People moving into the sub-project area after the cut-
off date will not be entitled to compensation or other assistance.
B. Program Description
4. Coverage: MPUSIP’s physical components include (a) improvements to water in 64
project towns; and (b) sewage and storm water collection and treatment services
proposed in two (2) identified towns (Khajuraho, and Rajnagar). The project also includes
an institutional strengthening component and a project management and administrative
support component.
1 In the context of involuntary resettlement, displaced persons are those who are physically displaced (relocation, loss of
residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or
means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to
legally designated parks and protected areas. It covers them whether such losses and involuntary restrictions are full or partial,
permanent or temporary
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 2
C. Scope of this Report
5. This land acquisition and resettlement due diligence report is prepared for the proposed
Group water supply subproject for Katangi,Bhedaghat,majholi,Panagar,Patan,Sihora
and Tendukheda Nagar Parishads, located in Jabalpur district, under MPUSIP.
Proposed components of the group water supply subproject include construction of
common water intake, and water treatment plant separate storage reservoirs as per
demand of the towns, transmission mains and distribution system. The proposed
subproject will provide metered water supply for domestic, institutional and commercial
users, including metered connections to each household in the towns of the subproject.
All municipal wards of the towns will be covered under the project. The total population
of the town will thus be covered 19040 population as per census 2011) and 28999
population in the design year, 2048.
6. A due diligence process was conducted to examine the land acquisition and resettlement
issues in detail, in line with ADB SPS 2009. This report describes the findings and
provides copies of relevant documents, maps, minutes of meetings and photographs.
This land acquisition and resettlement due diligence report needs to be read along with
the Resettlement Framework prepared for MPUSIP.
7. Upon project implementation, the Social Safeguards Personnel at PMU, MPUDC will be
required to undertake a review of this due diligence report, prepare a confirmation letter
or report documenting any modifications for the subproject and submit to ADB; and
receive a ‘no objection’ confirmation from ADB prior to start of construction in the
subproject.
II. POLICY FRAMEWORK, AND ENTITLEMENTS
8. The Resettlement Framework (RF) prepared for MPUSIP sets out the objectives,
principles, eligibility criteria and entitlements for APs, based on ADB SPS, 2009 and
LARR 2013 as well as national and state laws for protection of street vendors. Until
recently, all activities related to rehabilitation and resettlement in the State of MP had
been based on the Madhya Pradesh Resettlement and Rehabilitation Policy, 2002
(MPRR) and National Rehabilitation and Resettlement Policy, 2007 (NRRP-2007).
GoMP adopted LARR 2013 on 3rd October, 2014 with some specifications for
operationalizing its implementation in the state 1 . Details of policies are in the
Resettlement Framework for MPUSIP.
1 These GOs issued separately in September 2014 (i) notifies administrative cost of land acquisition; (ii) appoints Divisional
Commissioners as Commissioner for Rehabilitation & Resettlement within their respective jurisdictions; (iii) authorizes
District Collectors for constituting an Expert Group separately in respect of each project, (iv) notifies the factor which the
market value is to be multiplied in case of rural areas, (v) appoints Officer-in charge of Land Acquisition Section in the Office
of the Collector as Administrator for Rehabilitation and Resettlement an d (vi) limits agricultural land acquisition, as required
by the RTFCLARR, 2013.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 3
III. SUBPROJECT DESCRIPTION
9. Project area of Group water supply subproject towns:
a. Katangi: Geographically Katangi town is located at 23° 27'49’’ North Latitude and
79° 47'38’’ East Latitude, at an average elevation of 373 meters above Mean Sea
Level. The town is situated on State Highway 37 connecting Jabalpur and Damoh.
It is located 38 km from Jabalpur towards the North-West and 22 km North of
Katangi. The town area is divided in 15 wards
b. Patan: Patan geographically lies between 220 31’ 48’’ north latitude and 790 25’
12’’ east Longitude, at an altitude of 379 meters above mean sea level and is
nearly 33 Km from Jabalpur. The municipal council was constituted in the year
1981, with an area of 13.06 sq. kms and comprising of 15 municipal wards.
c. Majholi: Geographically Majholi town is located at 23° 30' 0’’ North Latitude and
79° 55' 12’’ East Latitude, at an altitude of 385 meters above mean sea level. The
town is situated on Road connecting Sihora Gubra. The distance from Jabalpur is
around 47 km. Majholi Town is located at distance of 30 kms for Sihora. The area
of the town is spread over in 629.00 Ha (6.29 Sq Kms ) as per 2011 data.
d. Sihora: Geographically Sihora town is located at Latitude 23° 28’ 48’’ N
Longitude 80° 7' 12’’ E, Town is situated at average elevation of 386 m from Mean
Sea Level. The year of Establishment of Sihora ULB is 1967. The area of the town
is spread over in 2302.00 Ha (23.02 Sq Kms ) as per 2011 data. The town area is
divided in 18 wards.
e. Bhedaghat: Geographically, Bhedaghat lies between 23°08’N 79°48’E, 23°13°N
79°80°E. Bhedaghat is located at 25 km from Jabalpur and 5 km eastern side on
the State Highway 12A leading towards Bhopal- Jabalpur. Presently Bhedaghat has
10 wards.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 4
f. Panagar: Geographically, Panagar lies between 23°9'58"N and 79°56'33"E.
Panagar is situated on NH – 7 connecting Nagpur – Katni. The distance from
Jabalpur is about 16 Km. Panagar is divided into total 15 Wards.
g. Tendukheda: Geographically Tendukheda town is located at Latitude 23° 23'59’’
N Longitude 79° 32'59’’E.It is 260 km. from the state capital of Bhopal and around
52 km from district headquarter Damoh. Town is situated at average elevation of
398 m from Mean Sea Level. The area of the town is spread over in 1400.00 Ha
(14.00 Sq Kms ) as per 2011 data. The year of Establishment of Tendukheda ULB
is 1984. The town area is divided in 15 wards.
A. Existing water supply arrangements of group water supply scheme for
Katangi, Patan, Majholi, Sihora, Bhedaghat, Panagar and Tendukheda Nagar
Parishad
S.No. Particulars Details
1 Town Katangi, Patan, Majholi, Sihora, Bhedaghat,
Panagar and Tendukheda
2 District Jabalpur Except Tendukheda( Damoh)
3 Population - As per
2011 census
137838
4 Projected
Population-
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 5
4.1 In year 2018 152228
4.2 In year 2033 185462
4.3 In year 2048 221964
5 Projected Water
Demand
5.1 Per Capita Demand 70 LPCD except Bhedaghat and Sihora @ 135 lpcd
5.2 In year 2018 16.81 MLD
5.3 In year 2033 20.53 MLD
5.4 In year 2048 24.68 MLD
1.Salient Features of the Katangi
S.No. Particulars Details
1 Town Katangi
2 District Jabalpur
3 Location 38 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 23° 27'49’’ N
Longitude 79° 47'38’’ E
5 Population - As per
2011 census
19040
6 Projected
Population-
6.1 In year 2016 20386
6.2 In year 2018 20924
6.3 In year 2033 24962
6.4 In year 2048 28999
7 Projected Water
Demand
@ 70 LPCD
7.1 Per Capita Demand 70 LPCD
7.2 In year 2016 1.70 MLD
7.3 In year 2018 1.75 MLD
7.4 In year 2033 2.08 MLD
7.5 In year 2048 2.42 MLD
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (10 Nos.)
Surface source:
8.2 Total supply 0.60 MLD (25.00 LPCD including 20% losses)
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 6
8.3 Overhead
Tank/GSR
Location of
OHTs/GSRs
Capacity (in KL) Staging
Height
Nagar
Parishad
Ward no.5
OHT 150
KL(Structurally
good and it is in
use)
12 m
Ward no.12 OHT 200 KL 15 m
(Structurally good
and it is in use)
Ward no.15 OHT 250 KL
(Structurally good
and it is in use)
12 m
8.4 Distribution Network Dia.( mm) Material
50 mm -200 mm GI, CI
8.5 Water Connection Domestic (nos.) Non Domestic (nos.)
465 02
8.6 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
45/- 90/-
2.Salient Features of the Patan
S.No. Particulars Details
1 Town Patan
2 District Jabalpur
3 Location 33 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 220 31’ 48’’ N Longitude
790 25’ 12’’ E
5 Population - As per
2011 census
14624
6 Projected
Population-
6.1 In year 2016 15525
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 7
6.2 In year 2018 15885
6.3 In year 2033 18587
6.4 In year 2048 21289
7 Projected Water
Demand
@ 70 LPCD
7.1 Per Capita Demand 70 LPCD
7.2 In year 2016 1.30 MLD
7.3 In year 2018 1.33 MLD
7.4 In year 2033 1.55 MLD
7.5 In year 2048 1.78 MLD
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (19 Nos.)
Surface source: Nil
8.2 Total supply 0.88 MLD (48.00 LPCD including 20% losses)
8.3 Overhead
Tank/GSR
Location of
OHTs/GSRs
Capacity (in KL) Staging
Height
Ward no.15 OHT 908 KL
(Structurally good
and it is in use)
15 m
8.4 Distribution Network Dia.( mm) Material
150-250 ACP, GI
8.5 Water Connection Domestic (nos.) Non Domestic (nos.)
950 70
8.6 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
60/- 90/-
3.Salient Features of the Majholi
S.No. Particulars Details
1 Town Majholi
2 District Jabalpur
3 Location 47 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 23° 30' 0’’ N
Longitude 79° 55' 12’’ E
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 8
5 Population - As per
2011 census
13210
6 Projected Population-
6.1 In year 2016 13959
6.2 In year 2018 14258
6.3 In year 2033 16504
6.4 In year 2048 18750
7 Projected Water
Demand
@ 70 LPCD
7.1 Per Capita Demand 70 LPCD
7.2 In year 2016 1.16 MLD
7.3 In year 2018 1.19 MLD
7.4 In year 2033 1.38 MLD
7.5 In year 2048 1.56 MLD
8.0 Existing Water Supply System
8.1 Water Source Ground water: Tube well (11 Nos.)
Surface source: Suhar River
8.2 Total supply 0.70 MLD (42.00 LPCD including 20% losses)
8.3 Intake well 1 no., 25 years old not in working condition
8.4 WTP 0.70 MLD not in working condition
8.5 Overhead
Tank/GSR
Location of
OHTs/GSRs
Capacity (in KL) Staging
Height
Ward no.1 OHT 100
KL(Structurally
good and it is in
use)
15 m
Ward no.9 OHT 115 KL
(Structurally good
and it is in use)
15 m
Ward no.13 OHT 320 KL
(newly onstructed)
18 m
Ward no 15 180 KL (newly
constructed)
18 m
8.6 Distribution Network Dia.( mm) Material
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 9
50-150 ACP, GI
8.7 Water Connection Domestic (nos.) Non Domestic (nos.)
400 03
8.8 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
40/- 70/-
4.Salient Features of the Sihora
S.No. Particulars Details
1 Town Sihora
2 District Jabalpur
3 Location 42 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 23° 28’ 48’’ N
Longitude 80° 7' 12’’ E
5 Population - As per
2011 census
44062
6 Projected
Population-
6.1 In year 2016 47236
6.2 In year 2018 48541
6.3 In year 2033 58965
6.4 In year 2048 70514
7 Projected Water
Demand
@ 135 LPCD
7.1 Per Capita Demand 135 LPCD
7.2 In year 2016 7.52 MLD
7.3 In year 2018 7.73 MLD
7.4 In year 2033 9.39 MLD
7.5 In year 2048 11.23 MLD
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (30 Nos.)
Surface source: Hiran River
8.2 Total supply 2.00 MLD (36.00 LPCD including 20% losses)
Intake well 1 No. 6m Dia. & 18 m height (Cons.Yr.1973)
WTP 4 MLD, 42 years old
8.4 Dia.( mm) Material Condition
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 10
Clear water rising
main
160 PVC
Not useful
8.5 Overhead
Tank/GSR
Location of
OHTs/GSRs
Capacity (in KL)
Ward no. 4 GSR 300 KL
Ward no.14 GSR 400 KL
Ward no.18 GSR 200 KL
8.6 Distribution Network Dia.( mm) Material
110 PVC, GI
8.7 Water Connection Domestic (nos.) Non Domestic (nos.)
5488 115
8.8 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
80/- 120/-
5.Salient Features of the Bhedaghat
S.No
.
Particulars Details
1 Town Bhedaghat
2 District Jabalpur
3 Location 25 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 23°13°N Longitude
79°80°E
5 Population - As per
2011 census
4571
6 Projected
Population-
6.1 In year 2016 5174
6.2 In year 2018 5436
6.3 In year 2033 7777
6.4 In year 2048 10784
7 Projected Water
Demand
@ 135 LPCD
7.1 Per Capita Demand 135 LPCD
7.2 In year 2016 0.82 MLD
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 11
7.3 In year 2018 0.87 MLD
7.4 In year 2033 1.21 MLD
7.5 In year 2048 1.24 MLD
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (4 Nos.)
Surface source : Narmada River
(Direct pumping at various points (Gopalpur, Paramhans
Ghat and Banerji Ghat)
8.2 Total supply 0.07 MLD from ground water
0.13 mld from surface water
(44.00 LPCD including 20% losses)
8.3 Water connection Domestic 368 nos.
8.8 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
30/- 60/-
6.Salient Features of the Panagar
S.No. Particulars Details
1 Town Panagar
2 District Jabalpur
3 Location 16 Km. from Jabalpur
4 Geographical Co-
ordinate
Latitude 23°9'58"N Longitude 79°56'33"E
5 Population - As per
2011 census
27932
6 Projected
Population-
6.1 In year 2016 29947
6.2 In year 2018 30753
6.3 In year 2033 36798
6.4 In year 2048 42843
7 Projected Water
Demand
@ 70 LPCD
7.1 Per Capita Demand 70 LPCD
7.2 In year 2016 2.50 MLD
7.3 In year 2018 2.57 MLD
7.4 In year 2033 3.07 MLD
7.5 In year 2048 3.57 MLD
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 12
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (23Nos. working)
Surface source: Nil
8.2 Total supply 0.50 MLD (39.00 LPCD including 20% losses)
8.3 Overhead Tank/GSR
Location of
OHTs/GSRs
Capacity (in KL) Staging
Height
Ward no.8 OHT 200 KL (Structurally good and it is in use)
15 m
Ward no.14 OHT 100 KL
(Structurally good and it is in use)
12.5 m
Ward no.15 OHT 250 KL
(Structurally good and it is in use)
15.0 m
8.4 Distribution Network Dia.( mm) Material
110 PVC, GI
8.5 Water Connection Domestic (nos.) Non Domestic (nos.)
1989
8.6 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
70/- 100/-
7. Salient Features of the Tendukheda
S.No. Particulars Details
1 Town Tendukheda
2 District Damoh
3 Location 52 Km. from Damoh
4 Geographical Co-
ordinate
Latitude 23° 23'59’’ N Longitude
79° 32'59’’E
5 Population - As per
2011 census
14399
6 Projected
Population-
6.1 In year 2016 15818
6.2 In year 2018 16431
6.3 In year 2033 21869
6.4 In year 2048 28785
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 13
7 Projected Water
Demand
@ 70 LPCD
7.1 Per Capita Demand 70 LPCD
7.2 In year 2016 1.32 MLD
7.3 In year 2018 1.37 MLD
7.4 In year 2033 1.82 MLD
7.5 In year 2048 2.40 MLD
8.0 Existing Water
Supply System
8.1 Water Source Ground water: Tube well (12 Nos.)
Surface source:
8.2 Total supply 0.72 MLD (40.00 LPCD including 20% losses)
8.3 Distribution Network Dia.( mm) Material
110 PVC, GI
8.4 Water Connection Domestic (nos.) Non Domestic (nos.)
2000 07
8.5 Water Tariff Domestic(Rs.) Non Domestic(Rs.)
80/- 120/-
B. Proposed Group Water Supply System
10. Sihora , Katangi, Panagar, Patan, Majholi (jbp), Bhedaghat(jbp) and Tendukheda
(Damoh) town is having acute water problem. Sustainable source are not available
near to these towns. Reliable source for Panagar, Bhedaghat town is River Narmada
near Jabalpur. Reliable source for Patan town is River Narmada. Both towns are
approximately 25 km from Jabalpur. Sihora is approximately 25 km from Panagar
,Majholi (jbp) is approximately 20 km from Sihora, Katangi is 20 km from Majholi and
Tedukheda is nearly 20 km from Patan. A common scheme for all these towns
including Tendukheda can be framed from the river Narmada. If combined scheme
is framed; then storage structure cost & intake structure cost can be avoided. The
feasibility & viability is worked out after survey & investigation.
Hence from the above facts it is justified that Narmada River is as final and common
source for Katangi, Patan, Majholi, Sihora, Panagar, Bhedaghat and Tendukheda
Nagar Parishad.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 14
11. Proposed subproject components. The proposed subproject components of Group
water supply of Katangi are presented in Table 2:
12. Intake well: The common intake well is proposed for Katangi, Patan, Majholi,
Sihora, Panagar, Bhedaghat and Tendukheda Nagar Parishad at Bhedaghat. At
Bhedaghat in the bank of Narmada River, there is proposed R.C.C. intake well of 10
m diameter and 14 m height to collect and lift water up to treatment works.
13. Raw Water Rising Main: There will be common raw water rising main for Katangi,
Patan, Majholi, Sihora, Bhedaghat,and Panagar city. The proposed raw water rising
main is 338 m long 600 mm dia. DI K9 from proposed Intake well to proposed WTP.
14. Water Treatment Plant: The common WTP for all these cities having capacity of
27.00 MLD considering 22 Hrs of pumping has been proposed for the ultimate year
of 2048 at Bhedaghat.
15. Clear Water Sump well at new WTP: The clear water sump is proposed to 850 KL of
sump well at WTP for storing Clear water after treatment from WTP.
Table 2: Proposed Water Supply Subproject Components Particulars Bhedaghat Katangi Majholi Panagar Patan Sihora Tendukheda
I. Water
demand
1 Base year
(2016)
0.71
MLD
MLD MLD 2.14 1.13
2 Commission
ing year
(2018.)
1.06
MLD
2.04
MLD
1.35
MLD
2.63 1.56
3 Design year
(2048)
1.47
MLD
2.37
MLD
1.53
MLD
3.06 2.06
II. Source
1 Alternatives
2 Selected
source
Narmada River
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 15
Particulars Bhedaghat Katangi Majholi Panagar Patan Sihora Tendukheda
III. Proposed
system
1 From
source to
consumer
supply
Raw water abstraction from Narmada river → raw water transmission (pumping) →
treatment → clear water transmission (pumping) → storage → distribution → house
connections with meters
IV. Proposed components
1 Water
intake
The common intake well is proposed for Katangi, Patan, Majholi, Sihora, Panagar,
Bhedaghat and Tendukheda Nagar Parishad at Bhedaghat. At Bhedaghat in the bank of
Narmada River, there is proposed R.C.C. intake well of 10 m diameter and 14 m height
2 Pumping
stations
Three nos. vertical turbine type pump with 50% as standby is proposed at intake well. The
discharge of each pump is (20.53 MLD) 259.22 LPS and head is 36.56 meter at
intermediate stage Yr.2033. The rating of each pump is 58.92 KW (say 59.0 KW). Two
nos. working and one pump will be as a standby. This will be replaced by 24.68 MLD or
311.62 LPS discharging capacity at 36.73 m head pumps of 71.5 KW in year 2048. The
pumping is proposed for 22 hours.
3 Raw water
Rising Main
There will be common raw water rising main for Katangi, Patan, Majholi,
Sihora, Bhedaghat,and Panagar city. The proposed raw water rising main is
338 m long 600 mm dia. DI K9 from proposed Intake well to proposed WTP.
4 WTP A common WTP for all these cities having capacity of 27.00 MLD considering 22 Hours of
pumping has been proposed for the ultimate year of 2048 at Bhedaghat
Process/components (same for all towns): Coagulation &flocculation,
sedimentation, rapid gravity filtration, chlorination, wash water recovery, sludge drying
beds, tube settlers & miscellaneous infra (compound wall, landscaping, lighting, rest
rooms etc)
Location: On a government land (1.5 ha available) in Northern outskirts of the town near
the intake Site is partly cultivated by neighboring farmers
5 Sump Wells 850 KL of sump well is proposed at WTP for storing Clear water after treatment from WTP.
OHT Two OHTs
proposed
1. 200 KL
2. 220 KL
proposed
OHT of
120 KL of staging height 12m
Not
applicable
Three OHTs proposed of capacity
1. 500KL
2. 200KL
3. 600KL
Not
applicable
Four OHTs proposed 1. 920 KL
2. 1020KL
3. 630 KL
4. 620 KL
Two OHTs proposed of capacity
1. 300 KL
2. 325 KL
6 Clear water
transmission
150 to 200
mm pipes
dia DI- K9
pipes from WTP to Bhedaghat
.
mm dia DI
pipe From
the clear
water
sump (at
WTP) to
service reservoirs
Location:
Governme
nt owned
feeder main from sump well to
majholi
Length
-1835m
Dia- 100
to
200 mm DI
CLEAR
WATER
FEEDER
MAIN
FROM
SUMP
WELL TO
SIHORA
Length -
6297 m
CLEAR
WATER
FEEDER
MAIN
FROM
SUMP WELL TO TENDUKHE
RA PAHARI
Length -
5866 m
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 16
lands and
along
public
roads
K9
Pipes
Dia- 200 to 300 mm DI
K9 Pipes
Dia- 250 mm
DI K9 Pipes
7 Distribution
network
24114 m
– 110 mm
dia HDPE
pipes
Location: Along the public roads in the entire town.
30548 m –
110 mm to
250 mm
HDPE
(75%
pipes are
of less
than 110
mm dia
Location:
Along the
public
roads in
the entire
town.
31378
m –
110 mm
to 250
mm
HDPE
(90% pipes are
of less
than
110 mm dia
Location:
Along the
public
roads in
the entire
town.
42573 m
– 110 mm
to
2
50 mm
HDPE
(79%
pipes are
of less
than 110
mm dia
Location:
Along the
public
roads in
the entire
town.
21085
m –
110 mm to
280 mm
HDPE
(70%
pipes are
of less
than
110 mm
dia
Location:
Along the
public
roads in
the entire
town.
81138 m –
110 mm to
250 mm
HDPE
(75%
pipes are
of less
than 110
mm dia
Location:
Along the
public
roads in
the entire
town.
37196 m – 110 mm to 250 mm
HDPE
(79.4%
pipes are of
less than
110 mm dia
Location:
Along the
public roads
in the entire
town.
8 Bulk flow
meters
Electromagnetic Bulk flow meter will be installed to monitor the bulk flow in the main
components i.e. at the inlet of the raw water mains to know the quantity of water coming
to the WTP, outlet of the clear water sump to know the quantity of water going for the
distribution, outlet of the service reservoirs to know the quantity of water going in the
distribution zone or DMA. This will help in maintaining the UFW in the limit and also
equitable distribution of the water.
9 Consumer
connects
with meters
Total 10284 house connections proposed (for all towns)
IV. FIELD WORK AND PUBLIC CONSULTATION
A. Public Consultation
15. Stakeholder mapping was undertaken as the first step and the major potential
stakeholders listed:
(a) The municipality, its elected members and staff who will be required to oversee
the construction of the distribution networks and WTP as well as be directly
responsible for the maintenance of the installations
(b) Concerned government departments (Water Resources Department, Revenue
Department)
(c) Local residents who will take initiative to connect their houses with the water
distribution line.
(d) Local business persons and traders
(e) School and College Students
(f) Opinion makers or prominent citizens/residents, who are intimately acquainted to
and well regarded by the community. They need to be enlisted in spreading
environmental awareness within the community as well as in conveying the
benefits of the project.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 17
16. Consultations were undertaken with key stakeholders in line with ADB’s requirements
pertaining to environment and social considerations. Tools used for consultation were
formal stakeholder meetings and focus group discussions (FGD). Extensive
consultations with stakeholders (municipality, concerned government departments,
community members including slum dwellers, and traders associations) including
individual face to face interviews and public consultations were conducted. No users
(boatmen and washermen) were found at the intake site which is vacant and unused,
hence no special consultation was conducted with them.
17. Field visits were made to all proposed sites and pipeline alignments and the potential
impacts and mitigation measures discussed with stakeholders. These consultations
helped identify the felt needs/concerns and apprehensions of the communities related to
the project and priorities of concerned stakeholders. Discussions were held with people
residing at and/or having businesses at/near the proposed subproject locations.
Consultations revealed that people are aware of the problems of the existing water
supply system in the city as they are getting 35 lpcd and are willing to cooperate in the
proposed project. The field visits and interactions done with community persons of towns
Katangi, Patan, Majholi, Sihora, Panagar, Bhedaghat and Tendukheda Nagar Parishad
at Bhedaghat helped ascertain that no further survey and inventories are required.
Appendix 2 provides a summary of consultations and discussions held in above
mentioned towns.
V. LAND AVAILABILITY AND INVOLUNTARY RESETTLEMENT IMPACTS
18. No land acquisition or resettlement impacts are anticipated for any of the proposed civil
works for Group water supply subproject. Narmada River is selected as common
source for Katangi, Patan, Majholi, Sihora, Panagar, Bhedaghat and Tendukheda
Nagar Parishad. Proposed Common Intake well, Common WTP, Common Raw
water rising main, the Clear water feeder main and water distribution network are
separate for towns etc.
19. Common Intake well: Proposed Intake well-constructed at Bhedaghat on the bank of
Narmada River, there is proposed R.C.C. intake well of 10 m diameter and 14 m
height to collect and lift water up to treatment works. The permission from Water
Resource Department for extraction and construction is to be taken, making sure that its
conditions for granting of NOC
20. Raw water rising main: Proposed common raw water rising main for Katangi, Patan,
Majholi, Sihora, Bhedaghat,and Panagar towns. The proposed raw water rising main
is 338 m long 600 mm dia. DI K9 from proposed Intake well to proposed WTP. 26
Common Water Treatment Plant: common WTP for all these cities having capacity
of 27.00 MLD. The land identified for WTP is at distance of 338 m from intake well.
The land is in possession of revenue department from years, it is not anticipated
under MPUSIP.
21. Clear Water Sump well at new WTP: It is proposed of capacity of 850 KL of sump
well at WTP for storing Clear water after treatment from WTP. The land belongs to
Revenue department.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 18
22. Clear water sump at Majholi: There are four existing OHTs having 2 nos. 15 m
staging and 2 nos. 18 m staging height. A huge head of pumps will be required to
feed these tanks directly from the WTP., to avoid this an Intermediate pumping station
at junction point (elevation 393.39m) a sump well of capacity 35KL is proposed
considering 30 minutes detention time. The land is identified for pumping station is in
possession of Revenue Department.
23. Clear Water Sump well at Sihora: There are four proposed OHTs having 2 nos. 10 m
staging and 2 nos. 8 m & 11 m staging height, at ground level 401.47m, 418.62 m 418.09
m and 403.70 m. A huge head of pumps will be required to feed these tanks directly
from the WTP., to avoid this a intermediate pumping station has been proposed for
boosting the water at required head. An Intermediate pumping station at junction point
(elevation 393.39m) a sump well of capacity 35KL is proposed considering 30 minutes
detention time.
24. Clear Water Sump well near Basan and Break Pressure Tank (For Tendukheda): In
Tendukheda there are two proposed OHTs having 13 m staging and 9 m staging height.
For storing clear water by direct pumping from WTP sump to overhead tanks there will
be not getting required pressure. An intermediate pumping station with a sump well of
capacity 52 KL is proposed for 30 minutes detention time at junction point near Basan
village (elevation 413.35m) where a break pressure tank on hill (capacity 52 KL) is also
proposed.
25. Clear Water common Pump at WTP at Bhedaghat:It is proposed that clear water
common pump for Katangi, Patan, Sihora, Panagar, Majholi, and Tendukheda except
Bhedaghat Nagar Parishad. Separate pumping is proposed for Bhedaghat. Provision of
3 numbers Centrifugal type pump having discharge 18.34 MLD or 231.57 LPS and head
of 99.37 m with suitable motor is proposed with 50 percent standby.
26. Clear water feeder main from WTP to different OHTs & sump for katangi, patan,
majholi, sihora, panagar and tendukheda nagar parishad
DIAMETER(mm) LENGTH(m) PIPE MATERIAL
150 4049 DI K-9
200 6274 DI K-9
250 30809 DI K-9
300 17300 DI K-9
450 33312 DI K-9
500 14680 DI K-9
600 15301 DI K-9
TOTAL 121725
27. Details of pipelines of clear water feeder main from WTP to Bhedaghat
DIAMETER(mm) LENGTH(m) PIPE MATERIAL
150 392 DI K-9
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 19
200 4869 DI K-9
TOTAL 5261
28. Details of pipelines of clear water feeder main from sump well to majholi
LENGTH(m) DIAMETER(mm) PIPE MATERIAL
100 1381 DI K9
150 440 DI K9
200 14 DI K9
Total 1835 m DI K9
29. Details of pipelines of clear water feeder main from sump well to sihora
LENGTH(m) DIAMETER(mm) PIPE MATERIAL
200 2523 DI K9
250 424 DI K9
300 3350 DI K9
Total 6297 m DI K9
30. Details of pipelines of clear water feeder main from sump well to tendukhera
pahari
LENGTH(m) DIAMETER(mm) PIPE MATERIAL
250 5866 DI K9
Total 5866 m DI K9
31. Details of pipelines of clear water feeder main from Tendukhera sump to OHTs
water supply scheme
LENGTH(m) DIAMETER(mm) PIPE MATERIAL
150 2048 DI K9
200 9235 DI K9
Total 11283 m DI K9
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 20
32. Summary of Clear Water Feeder Main
DIAMETER(mm) LENGTH(m) PIPE MATERIAL
100 1381 DI K-9
150 6929 DI K-9
200 22915 DI K-9
250 37099 DI K-9
300 20650 DI K-9
450 33312 DI K-9
500 14680 DI K-9
600 15301 DI K-9
TOTAL 152267 m
33. Overhead Tank for Katangi: As per mass curve the total storage required is 0.705 ML.
The cumulative existing storage capacity in the town is 0.60 ML. Hence additional
storage of 0.105 ML or 105 KL is required. One ESR of 120 KL of 12 m staging height
will be taken in the proposed scheme.
34. Overhead Tanks at Sihora: As per mass curve the total storage required is 3.182 ML.
Presently there not OHT only GSRs exist. From GSR required pressure is not found in
distribution line so GSRs are not taken into account. Total 3.182 ML storage is required.
Hence 4 nos. of ESR of total 3190 KL will be taken in the proposed scheme.
35. Overhead Tanks at Panagar: total storage required is 1.040 ML. The cumulative
existing storage capacity in the town is 0.55 ML. Hence additional storage of 0.49 ML or
490 KL is required. Total 570 KL will be taken in the proposed scheme.
36. Overhead Tanks at Bhedaghat: Intermediate Clear Water demand is 1.14 MLD. As per
mass curve the total storage required is 0.415 ML. There is no existing OHT and
requirement is 415 KL capacity of OHT. Hence 2 nos of total 420 KL capacity of OHT is
proposed. 37. Overhead Tanks at Tendukheda: Intermediate Clear Water demand is 1.70 MLD.
There is no existing OHT and requirement is 618 KL capacity of OHT. Hence 2 nos of
total 625 KL capacity of OHT is proposed.
38. The Distribution network design of Katangi, Patan, Majholi, Sihora, Panagar, Bhedaghat
and Tendukheda Nagar Parishad is done separately. These have been divided into
different no. of zones. The total length of the proposed network is around 268032 m of
diameter 110 mm to 280 mm HDPE PN 10 pipe. The minimum size of pipeline taken is
110 mm as per CPHEEO manual for population less than 50000.
39. Distribution network of katangi water supply augmentation scheme
Distribution system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 6152 HDPE PN10
116.8 140 600 HDPE PN10
133.6 160 465 HDPE PN10
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 21
150.2 180 249 HDPE PN10
167 200 333 HDPE PN10
209 250 145 HDPE PN10
Total 7,944
40. Details of pipeline of distribution system of zone-2
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 5,803 HDPE PN10
116.8 140 829 HDPE PN10
133.6 160 280 HDPE PN10
150.2 180 126 HDPE PN10
167 200 134 HDPE PN10
209 250 414 HDPE PN10
Total 7,587
41. Details of pipeline of distribution system of zone-3
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 8,355 HDPE PN10
116.8 140 561 HDPE PN10
133.6 160 958 HDPE PN10
150.2 180 962 HDPE PN10
167 200 51 HDPE PN10
209 250 210 HDPE PN10
Total 11,097
42. Details of pipeline of distribution system of zone-4
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 2,728 HDPE PN10
116.8 140 391 HDPE PN10
133.6 160 509 HDPE PN10
150.2 180 52 HDPE PN10
167 200 106 HDPE PN10
209 250 134 HDPE PN10
Total 3,920
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 22
43. Distribution network of Patan water supply scheme Details of pipeline of
distribution system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 14931 HDPE PN10
116.8 140 1,985 HDPE PN10
133.6 160 1,041 HDPE PN10
150.2 180 927 HDPE PN10
167 200 786 HDPE PN10
209 250 1,161 HDPE PN10
234.2 280 254 HDPE PN10
Total 21,085
44. Distribution network of Majholi water supply augmentation scheme Details of
pipeline of distribution system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 3952 HDPE PN10
116.8 140 109 HDPE PN10
133.6 160 136 HDPE PN10
150.2 180 75 HDPE PN10
167 200 88 HDPE PN10
Total 4,359
45. Details of pipeline of distribution system of zone-2
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 3906 HDPE PN10
116.8 140 75 HDPE PN10
133.6 160 109 HDPE PN10
150.2 180 129 HDPE PN10
167 200 179 HDPE PN10
Total 4,398
46. Details of pipeline of distribution system of zone-3
Pipe Details
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 23
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 11228 HDPE PN10
116.8 140 553 HDPE PN10
133.6 160 648 HDPE PN10
150.2 180 197 HDPE PN10
167 200 173 HDPE PN10
209 250 83 HDPE PN10
Total 12,883
47. Details of pipeline of distribution system of zone-4
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 9207 HDPE PN10
116.8 140 81 HDPE PN10
133.6 160 260 HDPE PN10
150.2 180 142 HDPE PN10
167 200 48 HDPE PN10
Total 9,738
48. Sihora water supply augmentation scheme Details of pipeline of distribution
system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 18189 HDPE PN10
116.8 140 730 HDPE PN10
133.6 160 691 HDPE PN10
150.2 180 242 HDPE PN10
167 200 474 HDPE PN10
209 250 23 HDPE PN10
234.2 280 64 HDPE PN10
Total 20,414
49. Details of pipeline of distribution system of zone-2
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 21939 HDPE PN10
116.8 140 1,273 HDPE PN10
133.6 160 628 HDPE PN10
150.2 180 786 HDPE PN10
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 24
167 200 2,384 HDPE PN10
209 250 585 HDPE PN10
234.2 280 203 HDPE PN10
Total 27,797
50. Details of pipeline of distribution system of zone-3
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 10834 HDPE PN10
116.8 140 1,069 HDPE PN10
133.6 160 404 HDPE PN10
150.2 180 144 HDPE PN10
167 200 213 HDPE PN10
209 250 211 HDPE PN10
234.2 280 124 HDPE PN10
Total 12,999
51. Details of pipeline of distribution system of zone-4
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 16060 HDPE PN10
116.8 140 1,290 HDPE PN10
133.6 160 443 HDPE PN10
150.2 180 74 HDPE PN10
167 200 620 HDPE PN10
209 250 1,256 HDPE PN10
234.2 280 185 HDPE PN10
Total 19,928
52. Panagar water supply augmentation scheme Details of pipeline of distribution
system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 2816 HDPE PN10
116.8 140 316 HDPE PN10
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 25
133.6 160 650 HDPE PN10
150.2 180 138 HDPE PN10
167 200 282 HDPE PN10
209 250 25 HDPE PN10
Total 4,227
53. Details of pipeline of distribution system of zone-2
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 4566 HDPE PN10
133.6 160 57 HDPE PN10
150.2 180 59 HDPE PN10
Total 4,681
54. Design of distribution system of zone-3
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 7865 HDPE PN10
116.8 140 1,460 HDPE PN10
133.6 160 63 HDPE PN10
150.2 180 127 HDPE PN10
167 200 316 HDPE PN10
209 250 70 HDPE PN10
Total 9,901
55. Details of pipeline of distribution system of zone-4
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 11521 HDPE PN10
116.8 140 745 HDPE PN10
133.6 160 576 HDPE PN10
150.2 180 115 HDPE PN10
167 200 541 HDPE PN10
209 250 234 HDPE PN10
234.2 280 442 HDPE PN10
Total 14,174
56. Details of pipeline of distribution system of zone-5
Pipe Details
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 26
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 7279 HDPE PN10
116.8 140 708 HDPE PN10
133.6 160 471 HDPE PN10
150.2 180 8 HDPE PN10
167 200 591 HDPE PN10
209 250 252 HDPE PN10
234.2 280 281 HDPE PN10
Total 9,590
57. Distribution network of Bhedaghat water supply augmentation scheme
Details of pipeline of distribution system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 9526 HDPE PN10
Total 9,526
58. Details of pipeline of distribution system of zone-2
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 14588 HDPE PN10
Total 14,588
59. Distribution network of Tendukhera water supply augmentation scheme
Details of pipeline of distribution system of zone-1
Pipe Details
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 11377 HDPE PN10
116.8 140 975 HDPE PN10
133.6 160 1,936 HDPE PN10
150.2 180 893 HDPE PN10
167 200 142 HDPE PN10
209 250 255 HDPE PN10
Total 15,577
60. Details of pipeline of distribution system of zone-2
Pipe Details
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 27
Inner Dia(MM) Outer Dia(MM) LENGTH(M) MATERIAL
91.6 110 18168 HDPE PN10
116.8 140 93 HDPE PN10
133.6 160 1,428 HDPE PN10
150.2 180 952 HDPE PN10
167 200 717 HDPE PN10
209 250 260 HDPE PN10
Total 21,619
61. The ULBs shall apply for No Objection Certificate (NOC) from WRD for raw water
extraction and construction of Intake well at source. The other sites are revenue land
(GoMP), for construction of the proposed water works ULB has to take NOC or transfer
of land.
62. Measures will be taken to minimize excavation, disturbance to pedestrians and traffic
and avoid income loss to businesses, while minimizing road reconstruction costs.
Temporary impacts to traffic/access to shops and residences due to digging of pits for
trenchless pipe laying are possible during construction; however, these will be mitigated
by ensuring access to properties through provision of pedestrian planks, provision of
adequate signage, and careful traffic management.
63. Mobile hawkers will be assisted to move to places nearby, to ensure their earnings are
not affected. The weekly market day will be avoided for construction. Only mobile
vendors will be shifted to a nearby location during the period of construction and
assistance to shift will be provided by the contactor. No income loss is anticipated.
64. In case temporary shifting of vendors with temporary structures is necessary, such
shifting will be undertaken on a weekly holiday, to avoid income loss on the day(s) of
shifting. The vendors will be assisted to shift and will be able to continue plying their trade
during the construction period at the alternative location. Potential disruption of water
supply to existing consumers is possible during construction, and will be mitigated
through supply by water tankers.
65. House Service connections: Provision of house service connections will involve tapping
from a distribution main/ sub-main including one tapping saddles, elbows, service pipe
from tapping point to the chamber near property boundary or inside the property
boundary .The work will involve excavation and road restoration. Each connection will
include a domestic water meter: Installation of AMR compatible water meters for each
house service water connection is envisaged.
66. Potential temporary impacts to traffic/access to shops and residences due to digging and
excavation for pipe laying are possible during construction; however, these will be
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 28
mitigated by ensuring access to properties through provision of pedestrian planks,
provision of adequate signage, and careful traffic management.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 29
VI. BUDGET
67. A provisional budget for consultation, communication, grievance redress, awareness
generation, and mitigation measures such as tanker supply to existing consumers if
supply is affected during construction is included in the DDR for Katangi, Patan, Majholi,
Tendukheda, Sihora, Bedaghat, Panagar and overall subproject costs.
Table 5. Budget
S.no Description Target
group/area
Estimated
cost
Source of fund
1 Consultation Stakeholder and
communities
INR 150,000; Included in
subproject cost
2 Communication, awareness
generation and grievance
redress
subproject area
(grievance cell
zone wise)
INR 1500,000 Included in
subproject cost
3 Tanker supply for areas
where existing water supply
disrupted during construction
areas where supply is
disrupted
INR 650,000 Included in
subproject cost
4 10% contingencies INR 230,000 Included in
subproject cost
Total INR 25,30,000
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 30
VII. CONCLUSIONS
A. Summary and Conclusions
68. No IR impacts are assessed at identified sites for sub-project components of Katangi ,
Patan,Majholi , Tendukheda , Sihora , Bedaghat, Panagar, as adequate vacant land is
available for the proposed facilities, within the compounds of government lands. The
intake well is proposed to be constructed on Water Resource Department Land, for which
NOC is under approval. The proposed site WTP and OHTs is under the possession of
revenue Department. The land record of this sites are appended to the DDR. For linear
components (pipe laying) or those proposed along government road ROWs, temporary
disruption to road users, pedestrians and community members will be avoided. In the
most congested zones of Katangi , Patan,Majholi , Tendukheda , Sihora , Bedaghat,
Panagar safety measures and simple mitigation measures during construction by the
contractor such as provision of planks for pedestrian access to shops, avoidance of
weekly haat days for construction, undertaking construction on weekly market holidays,
and proper traffic management and information sharing with the public, will be adopted.
A budgetary provision is made for costs likely to be incurred for impact mitigation.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 31
Annexure 1: Site Photographs
1. Bhedaghat
WTP Location
Intake Well Location
OHT-1 Location
OHT-2 Location
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 32
Katangi
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 33
Majholi
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 34
Panagar
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 35
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 36
Patan
Sihora
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 37
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 38
Annexure 1: Details of Land Ownership of Sites for Proposed Water Works Components
Component Location Ownership of
Land proposed Plot No. (Khasra No)/available
Land
required
(Sqm/ha)
Availability of
land Record Status of NOC Sites
Intake well on Narmada river (near Gram- Mubarakabad)
Owned by Revenue
department
56
50sqm Yes NOC to be obtained
by ULB from
Revenue
department
Water Treatment Plant
near existing WTP
owned by Revenue
Department 156 Available
land 10.211
hacter
Yes Land in possession
of ULB
OHT at
Katangi near existing
Defunct OHT owned by Revenue
Department 136/3,137/3
Yes Land in possession
of Revenue
Department
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 39
OHT-1 at
Sihora Ward no 4, Sayad Baba Toriya
owned by Revenue
Department 197/2 Yes Land in
possession of
Revenue
Department
OHT-3 at
Sihora Ward No 13, DANAV Baba Toriya
owned by Revenue
Department 230/1 Yes Land in
possession of
Revenue
Department
OHT-1 at Tendukheda
Ward no.9 in
front of Module owned by Revenue
Department 685/30 Yes Land in
possession of
Revenue
Department
OHT-2 at Tendukheda
Ward no.10 owned by Revenue
Department 579/1a Yes Land in
possession of
Revenue
Department
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 40
Appendix 3 : Summary of Consultation with Stakeholders
Date Location No. of
Participants
Participants Topics Discussed Issues
2nd
April
2016
30
M=23
F=07
Elected representatives, Chairperson of ULB, Chief Municipal Officer, Revenue department, elder person
• Present drinking water supply source and its condition
• Need of improvement of the present situation
• Briefing on project objectives probable implementation procedures
• Potential positive and negative impacts due to project implementation
• Land use and area to be covered under the project
• Nagar Parishad is operating the water supply system for the town, but capacity to be further built.
• The Chairman of the ULB expressed need for the project and willingness to take it up;
• The Nagar Parishads do not have capacity or resources to be party to sharing the loan repayment.
• The prime concern and apprehension of the ULB Chairman regarding the project was whether it will be a financial burden on the Nagar Parishad.
• Operation and maintenance of the facilities developed under the project and community participation;
• The official from revenue department gave
consent of speedy allotment for required land for
project.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 41
3rd
April
2016
Ward -05 M=15
F=3
T=18
Community
persons
• Briefing on project objectives probable implementation procedures
• Potential positive and negative impacts due to project implementation
• Experiences sharing on - livelihood activities,
Resettlement and
Rehabilitation, women
empowerment, tribal
development, health,
education, convergence
with existing government
social security schemes
• None of the people knew about the proposed project. On learning about the project, they expressed that they were happy that the entire community would be benefited from the upgraded water supply.
• Slum dwellers showed willingness to take water connections but demanded relaxation in user charges.
• People were briefed about the complaint redress
mechanism.
etc.
� Grievance Redress
procedures
3rd
April
2016
ward 10 Total= 20 F=8
,
M=12
Slum community • Knowledge of project
• Present water supply situation: only half an hours of supply alternate day
• Drinking water user
charge
• Women had heard about the proposed project and welcomed it as women are facing many problem in fetching water for hours..
• Some participants did not have water connections. The women were happy to learn about the proposed project.
• Possibility of exempting the poor and vulnerable
from user charge payment.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 42
4th
April
2016
ward no.
03
Total - 25
(Female 10,
Male - 15)
Community
members (Low income group; the men work as daily laborers and the women are housewives)
• Status of existing drinking water supply system;
• Need for improvements to present system;
• Relevant information of the upcoming project and benefits of the project.
• Potential positive and negative impacts due to project implementation
• Ensuring no income loss
• The area has insufficient and inadequate drinking water supply. Water from two tube wells is presently supplied to the area/community. The area faces severe water crisis during the summer season when the ground water level drops.
• The community welcomed the project and expressed need for it. However, they were apprehensive that their economic condition would prevent them from paying water user charges.
• Possibility of exempting the poor and vulnerable
from user charge payment.
4th
April
2016
Market
area
Total= 20
M=15,F=05
Street vendors and
shopkeepers
• Temporarily shifting of weekly vegetable market during excavation.
• Shifting of Street
vendors.
• Shifting or adjusting
extended potion of
shopkeepers.
• As excavation may not be possible at night as labour may not get agree to work in night shift, construction will be undertaken with care to avoid the weekly haat day, such that no income loss takes place due the civil work.
• Mobile vendors will be given sufficient notice and assistance to shift to nearby locations, so that they do not face income loss. Mobile street vendors agreed to the proposal.
• Some small restaurant/food stall owners
expressed a concern that dust during excavation
may fall on / spoil eatables. Mitigation measures
such as spraying of water on the excavated soil
particularly around such restaurants/food stalls to
ensure there is no dust flying around and other
appropriate measures as per IEE shall be taken
during construction.
Note: Boatmen and washermen were not observed near the proposed intake well location on Narmada river, hence need
for a separate consultation with them was not perceived.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 43
Annexure 2: Stakeholder Consultation photographs and list of participants
Stakeholder Consultation
Katangi
Community consultation
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 44
Patan
holi Maj
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 45
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 46
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 47
Appendix-5. INVOLUNTARY RESETTLEMENT SCREENING CHECKLIST A.
Introduction
1. Each project/subproject/component needs to be screen for any involuntary resettlement
impacts and indigenous people impacts which will occur or already occurred. This screening
determines the necessary action to be done by the project team.
B. Information on project/subproject/component:
a. District/ Administrative Name:Jabalpur
b. Location (km): Katangi 80 Kms
c. Civil work dates (proposed): NA
d. Technical Description: Katangi-Water Supply Subproject
C. Screening Questions for Involuntary Resettlement Impact
2. Below is the initial screening for involuntary resettlement impacts and due diligence
exercise. Both permanent and temporary impacts must be considered and reported in the
screening process.
Involuntary Resettlement Impacts Yes No Not
known Remarks
Will the project include any physical
construction work? �
Construction of OHT and distribution
network proposed.
Does the proposed activity include
upgrading or rehabilitation of existing
physical facilities?
�
On the existing OHT which will be
integrated into the proposed system, no
rehabilitation work is proposed. Only
SCADA will be installed on the existing
OHT.
Will there be permanent land acquisition? �
Will it require temporary land acquisition? �
Is the ownership status and current usage of
the land known?
�
All sites where facilities are proposed
belong to Revenue Department and are
vacant.
Are there any non-titled people who live or
earn their livelihood at the site or within the
corridor of impact (COI) / Right of Way
(ROW)?
�
Land is vacant and unused.
Will there be loss of housing? �
Will there be loss of agricultural plots? �
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 48
Will there be losses of crops, trees, and fixed
assets (i.e. fences, pumps, etc.)?
�
As distribution lines are proposed along roads in the town (within available road RoW) no losses to crops, trees and fixed
assets are envisaged. In case of any
damage to property (of titleholders or non-
titleholders) during construction, the
contractor will be required to
Will there be loss of businesses or
enterprises? �
Will there be loss of incomes and livelihoods?
�
Will people lose access to facilities, services,
or natural resources?
�
Any disruption of public facilities or
services will be taken care of during
excavation.Grievance redress cell will be
formed wardwise to settle the grievances
early.
Will any social or economic activities be
affected by land use-related changes? �
Will people lose access to natural resources, or common property resources, or communal facilities and/or
services? �
If land use is changed will it have an
adverse impact on social and economic
activities?
�
Will access to land and resources own
communally or by the state be restricted?
�
Are any of the affected persons (AP)
from indigenous or ethnic minority
groups?
�
D. Involuntary Resettlement Impact
3. After reviewing the answers above, EA/ Safeguard Team confirms that the proposed
subsection/ section/ subproject/component (tick as appropriate):
[ ] Has involuntary resettlement (IR) impact, a resettlement plan (or corrective action plan)
is required
[ Y ] Has No IR impact, no resettlement plan is required.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 49
Prepared By: L N Malviya
Signature:
Name:Chandan
Verified by:
Signature:
Position: project coordinator Name:
Position:
Date: 21.05.2016 Date:
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 50
Annexure 5: Land records
Katangi : Khasra details of Proposed OHT site
Note: Khasra is land record maintained by the state government, which depicts for each land
parcel, the parcel number, ownership, area and landuse. The Khasra/land record is usually
accompanied by a scaled map.
The above records depict that the proposed OHT site is owned by government and has an
area of 1.874 hectares.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 51
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 52
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 53
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
Bhedaghat –Khasra details of WTP
Note: The above records shows that the proposed WTP at Bhedaghat site khasra no. 74 & 75 are owned by government
and has an area of 6.710 and 13.290 hectares.
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 55
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 55
Note: Khasra is land record maintained by the state government, which depicts for each land
parcel, the parcel number, ownership, area and landuse. The Khasra/land record is usually
accompanied by a scaled map.
The above records depict that the proposed WTP at Bhedaghat site is owned by government and
has an area of 6.710 and 13.290 hectares.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 56
Note: Khasra is land record maintained by the state government, which depicts for each land
parcel, the parcel number, ownership, area and landuse. The Khasra/land record is usually
accompanied by a scaled map.
The above records depict that the proposed OHT site at tendukheda is owned by government
and has an area of 4.724 hectares.
Land records of Tendukheda
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 57
Note: Khasra is land record maintained by the state government, which depicts for each land
parcel, the parcel number, ownership, area and landuse. The Khasra/land record is usually
accompanied by a scaled map.
The above records depict that the proposed OHT-2 site at tendukheda is owned by government
and has an area of 4.000 hectares.
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 58
Annexure 6: Certificate of CMO Sihora
DDR of Group WSS (Katangi, Bhedaghat ,Majholi , Panagar ,Patan,Sihora,Tendukheda) -IR
M/s L N Malviya Infra Projects Pvt. Ltd Bhopal 59
CMO certificate Tendukheda