1 Annual Implementation Report (EAFRD) ...................................................................................................... 4 Workflow ....................................................................................................................................................... 6 Create the Annual Implementation Report (EAFRD)..................................................................................... 8 Record/Edit the Annual Implementation Report (EAFRD) .......................................................................... 11 General ........................................................................................................................................................ 12 Version Information ................................................................................................................................. 12 Officials in Charge .................................................................................................................................... 13 History ...................................................................................................................................................... 15 Documents ............................................................................................................................................... 16 Uploading Documents.......................................................................................................................... 16 Deletion of an unsent document ......................................................................................................... 18 Observations ............................................................................................................................................ 19 1. KEY INFORMATION ON IMPLEMENTATION OF THE PROGRAMME AND ITS PRIORITIES ........................ 20 a) Financial Data....................................................................................................................................... 20 b) Common and programme-specific indicators and quantified target values....................................... 21 c) Key information on RDP implementation based on data from a) and b) by Focus Areas ................... 21 d) Key information on achievements towards the milestones set in the performance Framework based on Table F................................................................................................................................................. 23 e) Other RDP specific element ................................................................................................................. 24 f) Macro-Regional and sea basin strategies (Optional) ........................................................................... 26 g) Currency rate for conversion AIR (non EUR countries) ....................................................................... 28 2. THE PROGRESS IN IMPLEMENTING THE EVALUATION PLAN .................................................................. 30 a) Description of any modifications made to the evaluation plan in the RDP during the year, with their justification .............................................................................................................................................. 30 b) A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan) ....................................................................................................................................... 31 c) A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan) ......................................................................................................... 33 d) A list of completed evaluations, including references to where they have been published on-line .. 34
Transcript
Page 1: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

1

Annual Implementation Report (EAFRD) ...................................................................................................... 4

Workflow ....................................................................................................................................................... 6

Create the Annual Implementation Report (EAFRD)..................................................................................... 8

Record/Edit the Annual Implementation Report (EAFRD) .......................................................................... 11

General ........................................................................................................................................................ 12

Version Information ................................................................................................................................. 12

Officials in Charge .................................................................................................................................... 13

History ...................................................................................................................................................... 15

Documents ............................................................................................................................................... 16

Uploading Documents .......................................................................................................................... 16

Deletion of an unsent document ......................................................................................................... 18

Observations ............................................................................................................................................ 19

1. KEY INFORMATION ON IMPLEMENTATION OF THE PROGRAMME AND ITS PRIORITIES ........................ 20

a) Financial Data....................................................................................................................................... 20

b) Common and programme-specific indicators and quantified target values ....................................... 21

c) Key information on RDP implementation based on data from a) and b) by Focus Areas ................... 21

d) Key information on achievements towards the milestones set in the performance Framework based on Table F ................................................................................................................................................. 23

e) Other RDP specific element ................................................................................................................. 24

f) Macro-Regional and sea basin strategies (Optional) ........................................................................... 26

g) Currency rate for conversion AIR (non EUR countries) ....................................................................... 28

2. THE PROGRESS IN IMPLEMENTING THE EVALUATION PLAN .................................................................. 30

a) Description of any modifications made to the evaluation plan in the RDP during the year, with their justification .............................................................................................................................................. 30

b) A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan) ....................................................................................................................................... 31

c) A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan) ......................................................................................................... 33

d) A list of completed evaluations, including references to where they have been published on-line .. 34

Page 2: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

2

e) A summary of completed evaluations, focussing on evaluation findings ........................................... 37

f) A description of communication activities undertaken in relation to publicising evaluation findings (in relation to section 6 of the evaluation plan) ........................................................................................... 39

g) Description of the follow-up given to evaluation results (in relation to section 6 of the evaluation plan) ................................................................................................................................................................. 41

3. ISSUES WHICH AFFECT THE PERFORMANCE OF THE PROGRAMME AND THE MEASURES TAKEN ......... 42

a) Description of steps taken to ensure quality and effectiveness of programme implementation ...... 42

b) Quality and efficient delivery mechanisms ......................................................................................... 44

4. STEPS TAKEN TO IMPLEMENT TECHNICAL ASSISTANCE AND PROGRAMME PUBLICITY REQUIREMENTS ..................................................................................................................................................................... 48

a) Action taken and state of play as regards the establishment of the NRN and the implementation of its action plan ............................................................................................................................................... 48

a1) Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit) .......................................................................................................................... 48

a2) Actions taken and state of play as regards the implementation of the action plan...................... 50

b) Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014) ................................................................................................................. 52

5. ACTIONS TAKEN TO FULFIL EX ANTE CONDITIONALITIES ........................................................................ 54

a) Unfulfilled criteria of general ex-ante conditionalities ........................................................................ 54

b) Actions taken to fulfil applicable general ex-ante conditionalities ..................................................... 54

c) Unfulfilled criteria of priority-linked ex-ante conditionalities ............................................................. 55

d) Actions taken to fulfil applicable priority-linked ex-ante conditionalities .......................................... 55

e) (Optional) additional information to complement the information provided on the 'actions taken' table ......................................................................................................................................................... 56

6. DESCRIPTION OF IMPLEMENTATION OF SUB-PROGRAMMES ................................................................ 57

7. ASSESMENT OF THE INFORMATION AND PROGRESS TOWARDS ACHIEVING THE OBJECTIVES OF THE PROGRAMME .............................................................................................................................................. 60

8. IMPLEMENTATION OF ACTIONS TO TAKE INTO ACCOUNT THE PRINCIPLES SET OUT IN ARTICLES 5, 7 AND 8 OF REGULATION (EU) NO 1303/2013 ....................................................................................................... 60

a) Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013) ......................................................................................................................................... 60

b) Sustainable development (Article 8 of Regulation (EU) No 1303/2013) ............................................. 62

Page 3: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

3

c) The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme ......................................................................................................... 64

9. PROGRESS MADE IN ENSURING INTEGRATED APPROACH TO USE EAFRD AND OTHER UNION FINANCIAL INSTRUMENTS ............................................................................................................................................. 66

10. REPORT ON IMPLEMENTATION OF FINANCIAL INSTRUMENTS (ARTICLE 46 OF REGULATION (EU) NO 1303/2013) .................................................................................................................................................. 67

Financial instrument (Fund of Funds) ...................................................................................................... 71

Thematic objectives ............................................................................................................................. 80

Financial instrument (Specific Fund/Fund of Funds) ............................................................................... 82

Indicators ............................................................................................................................................. 91

Products ............................................................................................................................................... 93

Financial instrument (Specific Fund) ....................................................................................................... 94

Thematic objectives ........................................................................................................................... 106

Indicators ........................................................................................................................................... 108

Products ............................................................................................................................................. 110

Financial instrument (Direct management) ........................................................................................... 111

Thematic objectives ........................................................................................................................... 120

Indicators ........................................................................................................................................... 123

Products ............................................................................................................................................. 124

11. ENCODING TABLES FOR COMMON AND PROGRAMME-SPECIFIC INDICATORS AND QUANTIFIED TARGET VALUES ......................................................................................................................................... 125

Table A: Committed expenditure by measure and focus area – ANNUAL ............................................ 126

Table B: Realised output indicators by measure and focus area ........................................................... 131

Table B1: Realised outputs (AIR) – CUMULATIVE .............................................................................. 131

Table B2.1: Realised LEADER outputs (AIR) – CUMULATIVE .............................................................. 133

Table B2.2: LEADER Data items to monitor contributions to the main Focus Area – CUMULATIVE . 134

Table B2.3: Monitoring of technical assistance – CUMULATIVE ........................................................ 136

Table B3: Annual monitoring for area based, multi-annual and livestock unit measures (AIR) – ANNUAL ............................................................................................................................................................ 138

Page 4: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

4

Table B4: Total public of the operations which have additional contributions to other Focus Areas (AIR) – CUMULATIVE ................................................................................................................................... 140

Table C: Breakdown for relevant outputs and measures by type of area, gender and/or age – CUMULATIVE.......................................................................................................................................... 141

Table D: Progress towards targets ......................................................................................................... 153

Table E: Monitoring of transitional measures – ANNUAL ..................................................................... 156

Table F: Achievement of the performance framework indicators ........................................................ 158

Table G: Programme-specific indicators ................................................................................................ 163

Table G1: Specific target table ........................................................................................................... 163

Table G2: Specific output table .......................................................................................................... 167

Additional Functionality ............................................................................................................................ 169

Early Warning Notification ..................................................................................................................... 169

Validate the Annual Implementation Report (EAFRD) .............................................................................. 169

Send the Annual Implementation Report (EAFRD) ................................................................................... 182

Delete the Annual Implementation Report (EAFRD) ................................................................................. 184

Create a New Version of the Annual Implementation Report (EAFRD) .................................................... 186

Annual Implementation Report (EAFRD)

PURPOSE

This document describes the specifications and details related to the EAFRD Annual Implementation Report (AIR) procedure under:

Article 50 of CPR Regulation (EU) No 1303/2013;

Article 75 of EAFRD Regulation (EU) No 1305/2013;

Article 75: Annual implementation report

1. By 30 June 2016 and by 30 June of each subsequent year until and including 2024, the Member State shall submit to the Commission an annual implementation report on implementation of the rural development programme in the previous calendar year. The report submitted in 2016 shall cover the calendar years 2014 and 2015.

Page 5: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

5

2. In addition to complying with the requirements of Article 50 of Regulation (EU) No 1303/2013 annual implementation reports shall include information inter alia on financial commitments and expenditure by measure, and a summary of the activities undertaken in relation to the evaluation plan.

3. In addition to complying with the requirements of Article 50 of Regulation (EU) No 1303/2013, the annual implementation report submitted in 2017 shall also cover a description of the implementation of any sub-programmes included within the programme.

4. In addition to complying with the requirements of Article 50 of Regulation (EU) No 1303/2013, the annual implementation report submitted in 2019 shall also cover, a description of the implementation of any sub-programmes included within the programme and an assessment of progress made in ensuring an integrated approach to use of the EAFRD and other EU financial instruments to support the territorial development of rural areas, including through local development strategies.

5. The Commission shall adopt implementing acts, laying down rules concerning the presentation of the annual implementation reports. Those implementing acts shall be adopted in accordance

Annex VII of EAFRD Implementing Regulation (EU) No 808/2014;

This document describes in detail:

the content of the AIR related to a national or regional RDP to be submitted by the Managing Authority (structure of the AIR has already been as defined in the "Technical guidance document"). Some of the sections described in this document don't apply to AIR related to a Rural Network programme.

how to create/edit/delete/send/etc... the AIR in SFC2014;

the life-cycle of the AIR within SFC2014;

the deadlines for submission of an AIR:

AIR version YYYY, submitted by 30 June (+3 months flexibility) YYYY+1, covers calendar year YYYY (= Implementing period)

Exception: AIR version 2015, submitted by 30 June (+3 months flexibility) 2016, shall cover calendar years 2015 and 2014 (= Implementing period)

the validation rules that apply to the AIR data;

REGULATIONS

More details about the regulation regarding the ANNUAL IMPLEMENTATION REPORT (EAFRD) can be found in the About SFC2014 section of this portal.

ROLES

Roles involved in the Annual and Final Implementation Report for EAFRD are:

Page 6: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

6

MS Managing Authority

Record the AIR for EAFRD

Upload the AIR for EAFRD

Consult the AIR for EAFRD

Delete the AIR for EAFRD

Validate the AIR for EAFRD

Send the AIR for EAFRD

Return the AIR for EAFRD

Create New Version of an AIR for EAFRD

MS Certification Authority Consult the AIR for EAFRD

FUNDS

EAFRD

PRE-CONDITIONS:

The related Rural development programme (EAFRD) has been ADOPTED by the Commission before the end of the AIR implementation period (31/12/YYYY) and the AIR for this specific AIR implementation period (01/01/YYYY - 31/12/YYYY) doesn’t yet exist.

Workflow

This section shows the lifecycle to create and manage the Annual and Final Implementation Report for EAFRD. If the Commission rejects an AIR EAFRD, the programme is returned and a new version has to be created and go through the whole process. The Commission cannot change an AIR – only respond.

Click here to see the AIR EAFRD workflow diagram in high resolution.

Page 7: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

7

Page 8: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

8

Create the Annual Implementation Report (EAFRD)

REMARK

To create the Annual Implementation Report EAFRD you must have MS Managing Authority with Update access.

At least one Rural development programme (EAFRD) must have been ADOPTED by the Commission before the end of the implementing period, in order for you to create the Annual Implementation Report EAFRD.

In tables with achievement year columns, only the years equal and before the Reporting Year will be shown.

For Table F1 and F2 in AIR2018, the milestone (column D) and Target 2023 (column E) are retrieved from the last adopted version of the RDP in force at the creation of the AIR first version.

1. To access into the ANNUAL IMPLEMENTATION REPORT EAFRD section, first click on the MONITORING link (1) in the menu and then on the Annual Implementation Report (EAFRD) link (2).

2. Click on the Create New EAFRD Annual Implementation Report link to create a new Annual Implementation Report (EAFRD).

Page 9: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

9

You are redirected to the EAFRD Annual Implementation Report creation wizard:

3. Enter or Select the following information:

(1) Select a CCI.

Page 10: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

10

The CCI list contains all the last adopted EAFRD Programmes versions with a Decision Date smaller or equal to the last day of the Implementing Year (31/12/YYYY). The list contains only versions managed at the User's Node for which the User is registered. The list returns the CCI and the Programme Title and the Programme version

(2) Select a Monitoring committee approval date.

When work version is 0 the Report approval date by the monitoring committee should not be empty.

(3) Enter a National reference.

(4) Click on the SAVE button to confirm the creation.

The status of the Annual Implementation Report is OPEN.

REMARK

The first version of each AIR can only be created during the 6 months following the Implementing Period. The Implementing Period is automatically set by the system based on the current date.

AIR version YYYY for which Implementing period = 01/01/YYYY to 31/12/YYYY, can only be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility)

The AIR is linked to the last adopted version of the RDP with a Decision Date smaller or equal to the last day of the Implementing Year (31/12/YYYY).

For Table F1 and F2 in AIR2018, the milestone (column D) and Target 2023 (column E) are retrieved from the last adopted version of the RDP in force at the creation of the AIR first version. The National Rural Network Programme is excluded of this rule.

Exceptions:

For AIR version 2015 (first AIR), the Implementing period = 01/01/2014 to 31/12/2015. The first version of this first AIR can only be created from 01/01/2016 to 30/09/2016 (= 30/06/2016 +3 Months flexibility)

For AIR version 2016, due to the technical implementation of the new sections (7. Evaluation question and 10. Reporting on FIs), the first version of the AIR2016 can only be created from 02/05/2017. The validation and submission of this first version will be activated from the 01/06/2017.

A footnote is displayed (not for the National Rural Network Programme):

If AIR2018: "Data and content of Tables F of the Annual Implementation Report on the achievement of milestones is linked with the last Rural Development Programme adopted by the Commission. In case of imminent adoption of an on-going Rural Development Programme amendment with modification of milestones, it is recommended to wait until Rural Development Programme amendments are adopted before creating the Annual Implementation Report.

Page 11: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

11

Relevant data and content of the others sections of the Annual Implementation Report is linked to the last Rural Development Programme adopted before the end of the implementing period"

Record/Edit the Annual Implementation Report (EAFRD)

Find all the information to complete each screen of the AIR for EAFRD. Below are the links to the main sections:

NOTE

The information on the AIR EAFRD is accessible via a Navigation Tree (Table of Content) containing all elements (items) of the template.

In case a section is not relevant for a specific AIR EAFRD year version, the referring Table of Content item is displayed in light grey

In compare mode, a marker (#) displays before the Table of Content item name highlights the fact that the content of the referring section has changed (not yet implemented)

Annual Implementation Report EAFRD:

- General

- 1. KEY INFORMATION ON IMPLEMENTATION OF THE PROGRAMME AND ITS PRIORITIES

- 2. THE PROGRESS IN IMPLEMENTING THE EVALUATION PLAN

- 3. ISSUES WHICH AFFECT THE PERFORMANCE OF THE PROGRAMME AND THE MEASURES TAKEN

- 4. STEPS TAKEN TO IMPLEMENT TECHNICAL ASSISTANCE AND PROGRAMME PUBLICITY REQUIREMENTS

- 5. ACTIONS TAKEN TO FULFIL EX ANTE CONDITIONALITIES

- 6. DESCRIPTION OF IMPLEMENTATION OF SUB-PROGRAMMES

- 7. ASSESSMENT OF THE INFORMATION AND PROGRESS TOWARDS ACHIEVING THE OBJECTIVES OF THE PROGRAMME

- 8. IMPLEMENTATION OF ACTIONS TO TAKE INTO ACCOUNT THE PRINCIPLES SET OUT IN ARTICLES 5, 7 AND 8 OF REGULATION (EU) NO 1303/2013

- 9. PROGRESS MADE IN ENSURING INTEGRATED APPROACH TO USE EAFRD AND OTHER UNION FINANCIAL INSTRUMENTS

- 10. REPORT ON IMPLEMENTATION OF FINANCIAL INSTRUMENTS (ARTICLE 46 OF REGULATION (EU) NO 1303/2013)

Page 12: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

12

- 11. ENCODING TABLES FOR COMMON AND PROGRAMME-SPECIFIC INDICATORS AND QUANTIFIED TARGET VALUES

General

Version Information

The Version Information contains information on the identification and status of the Annual Implementation Report (EAFRD) version; like the CCI, the Title, the Version Number, the Status, the Current Node, etc. It also shows the results of the last validation done on this Implementation Report version.

Only the Report approval date by the monitoring committee can be updated.

1. Clicking on the Edit button will enable you the modification of the Report approval date by the monitoring committee.

The Edit Details pop-up window appears:

Page 13: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

13

2. Enter or select the modifications:

(1) Click on the new Monitoring committee approval date.

(2) Enter the National Reference (not mandatory)

(3) Click on the Update link to save the information.

NOTE

Implemented period: AIR version 2018, submitted by 30 June 2019, shall cover calendar year 2018.

A footnote is displayed under ‘Linked Programme version’: Data and content of Tables F of the AIR on the achievement of milestones is linked with the last Rural Development Programme adopted by the Commission. Relevant data and content of the others sections of the AIR is linked to the last RDP adopted before the end of the implementing period.

This disclaimer for Table F is no displayed in the AIR related to a Rural Network programme.

Officials in Charge

NOTE

Officials in Charge can be updated at any time, independent from the status of the Annual Implementation Report (EAFRD).

The email is directly accessible via the email link.

Page 14: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

14

Click on the ADD button to add a new official in charge.

Select an official and click in the EDIT button to modify the information of this official.

Select an official and click on the REMOVE button to delete the official in charge selected.

1. Click on the ADD button to add a new official in charge.

The Edit Details popup window appears:

Page 15: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

15

2. Enter the following information:

(1) Enter the Name.

(2) Enter the Email.

(3) Click on Update to save the information.

NOTE Commission Officials (email domain "ec.europa.eu") can only be created/updated/deleted by Commission Users.

History

This section shows all the actions that happened in the Annual Implementation Report (EAFRD) since it was created, for example:

Page 16: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

16

Documents

The following document types will be foreseen:

Description Non-Integral

Integral System Required Internal Code

Other Member State Document IR.OM

Snapshot of data before send

Snapshot of monitoring data before Send

X X X SNP.IRSNT

Citizens' summary X IR.CIT

Report on the implementation of financial instruments (For AIR 2015 only. For AIR 2016 onwards, data must be provided in SFC structured forms)

X if 59(4)(c) or 59(4)(d)

in RDP

IR.FI

Financial Annex (System). This document is automatically generated by the System at the creation of the AIR. (MS can force a refresh of this document)

X X At least one is

mandatory

IR.FAS

Financial Annex (Other) X IR.FAO

Other Annex X IR.OA

Uploading Documents

Citizens' Summary document can be uploaded in the Annual Implementation Report (EAFRD), is optional.

Clicking on the Add button will open a pop up window allowing you to add a new document type with attachments.

Selecting a document row and click in the Edit button will allow you to modify the document information.

Page 17: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

17

Selecting a row of a previously uploaded document and click on the Remove button to delete the document and associated attachments.

1. Click on the ADD button to add a new document.

The document detail pop-up window appears:

Page 18: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

18

2. Enter or select the following information:

(1) Select a Document Type

(2) Enter a Title for your Document

(3) Enter a Document Date

(4) Click on the ADD button to add a new attachment

- You can add multiple attachments by clicking on the ADD button

- You can remove unwanted attachments by selecting the attachment and clicking on the REMOVE

button

(5) Enter a Title for your attachment.

(6) Select the Language of the document.

(7) Select the file to upload.

(8) Click on Update to save the information.

REMARK Commission Registration N° is only enabled for Commission Users, while Local Reference is only enabled for Member State Users.

The pop-up window closes and the documents are uploaded.

REMARK

Integral documents can only be added, updated or deleted when the main object is editable.

Integral documents are automatically sent - together with the encoded data – when the Programme is submitted to the EC.

A document is only visible to the Commission when the Sent Date is visible.

Deletion of an unsent document

1. Select a row (1) of a previously uploaded document and click on the REMOVE button (2) to delete the document and associated attachments.

Page 19: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

19

A confirmation window appears:

2. Click on Yes to confirm deletion. Click on No to return to the Annual Implementation Report (EAFRD) documents.

Observations

This section is used to provide any relevant information to the Annual Implementation Report (EAFRD). It can be used as a type of 'chat' between the Member State and Commission.

Page 20: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

20

(1) Enter an observation.

All users who have Read and Observation permission on the Implementation Report will be able to send an Observation and participate in the conversation.

(2) Click on Add to save the information.

All Observations are kept against the specific version of the Annual Implementation Report (EAFRD).

1. KEY INFORMATION ON IMPLEMENTATION OF THE PROGRAMME AND ITS PRIORITIES

a) Financial Data

1. At the creation of the AIR, the Financial Data Annex Report is automatically created and accessible in the section 1a but also in the section 'General/Document'

2. Click on General > Documents to be able to 'Refresh' the Financial Data Annex Report. The Report displayed in section 1a) and in section General/Document will be automatically replaced

Page 21: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

21

b) Common and programme-specific indicators and quantified target values

Enter the information of this section in the working tables of section 11.

c) Key information on RDP implementation based on data from a) and b) by Focus Areas

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the key information on RDP implementation based on data from a) and b) by Focus Area.

Page 22: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

22

The key information on RDP implementation based on data from a) and b) by Focus Area pop-up appears:

2. Enter the following information:

(1) Enter a description text. (characters limit has been increased to 100000 char + 15% tolerance)

Page 23: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

23

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

d) Key information on achievements towards the milestones set in the performance Framework based on Table F

Only for AIR2016 (submitted in 2017)

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the key information on achievements towards the milestones set in the performance Framework based on Table F

The key information on achievements towards the milestones set in the performance Framework based on Table F pop-up appears:

Page 24: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

24

2. Enter the following information:

(1) Enter a description text. (max 35000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

e) Other RDP specific element

1. Clicking on the EDIT button will open a pop-up window allowing you to enter Other RDP specific element [optional]

Page 25: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

25

The Other RDP specific element [optional] pop-up appears:

2. Enter the following information:

(1) Enter a description text. (max 7000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

Page 26: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

26

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 7000 characters (+/- 15%) = approx. 2 pages – Optional – Figures allowed – Tables allowed.

f) Macro-Regional and sea basin strategies (Optional)

This section applies to AIR(s) > = 2017 only.

1. Clicking on the EDIT button will open a pop-up window allowing you to enter a description.

The Edit Details pop-up window appears:

Page 27: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

27

2. Enter the following information:

(1) Enter a description text.

(2) Click on the Update link to save the information.

3. Clicking on the EDIT button will allow you to select the Strategy.

The table becomes editable:

Page 28: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

28

4. Enter the following information:

(1) Select an EU Strategy.

(2) Click on the Update link to save the information.

g) Currency rate for conversion AIR (non EUR countries)

This section applies to AIR(s) > = 2017 only.

REMARK This section applies and is only displayed to non EUR countries. 100 characters max (approx. ¼ pages), optional – figures allowed.

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the Description for the currency rate used.

Page 29: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

29

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter a description text.

(2) Click on the figures link if you need to add figures.

(3) Enter the figure name.

(4) Click on the Update link to save the information.

Page 30: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

30

2. THE PROGRESS IN IMPLEMENTING THE EVALUATION PLAN

a) Description of any modifications made to the evaluation plan in the RDP during the year, with their justification

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the Description of any modifications made to the evaluation plan in the RDP during the year, with their justification.

The Description of any modifications made to the evaluation plan in the RDP during the year, with their justification pop-up appears:

Page 31: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

31

2. Enter the following information:

(1) Enter a description text. (max 14000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

b) A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan)

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan).

Page 32: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

32

A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan) pop-up appears:

2. Enter the following information:

(1) Enter a description text. (max 14000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

Page 33: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

33

NOTE

Text field – a maximum of 14000 characters (+/- 15%) = approx. 4 pages – Mandatory – Figures allowed – Tables allowed.

Footnote: *Reference shall be made to the evaluation plan, any difficulties encountered in implementation shall be described, together with solutions adopted or proposed.

c) A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan)

1. Clicking on the EDIT button will open a pop-up window allowing you to enter a description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan).

A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan) pop-up appears:

Page 34: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

34

2. Enter the following information:

(1) Enter a description text. (max 7000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE

Text field – a maximum of 7000 characters (+/- 15%) = approx. 2 pages – Mandatory – Figures allowed – Tables allowed.

Footnote: *Reference shall be made to the evaluation plan, any difficulties encountered in implementation shall be described, together with solutions adopted or proposed.

d) A list of completed evaluations, including references to where they have been published on-line

Click on the ADD button to add an evaluation

Select an evaluation and click in the EDIT button to modify the information of this evaluation.

Page 35: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

35

Select an evaluation and click on the REMOVE button to delete the evaluation selected.

1. Click on the ADD button to add a new evaluation.

The Edit Details popup window appears:

Page 36: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

36

2. Enter the following information:

(1) Enter the Publisher/Editor

(2) Enter the Author(s)

(3) Enter the Title

(4) Enter the Abstract (max 1000 char + 15% tolerance)

(5) Enter the URL

(6) Click on Update to save the information.

Page 37: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

37

e) A summary of completed evaluations, focussing on evaluation findings

1. Clicking on the EDIT button will open a pop-up window allowing you to enter a summary of completed evaluations, focussing on evaluation findings

The summary of completed evaluations, focussing on evaluation findings pop-up appears:

Page 38: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

38

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 14000 characters (+/- 15%) = approx. 4 pages – Mandatory – Figures allowed – Tables allowed.

Page 39: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

39

f) A description of communication activities undertaken in relation to publicising evaluation findings (in relation to section 6 of the evaluation plan)

Click on the Add button to add a communication activity

Select an evaluation and click in the Edit button to modify the information of this communication activity.

Select an evaluation and click on the Remove button to delete the communication activity selected.

1. Click on the ADD button to add a new communication activity.

The Edit Details popup window appears:

Page 40: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

40

2. Enter the following information:

(1) Select a Date OR tick the Period option and select a date on both From and To fields

(2) Enter the Title of communication activity/event & topic of evaluation findings discussed/ disseminated

(3) Enter the Overall organiser of activity/ event

(4) Enter the Information channels/ format used

(5) Enter the Type of target audience

(6) Enter the Approximate number of stakeholders reached

(7) Enter the URL

(8) Click on Update to save the information.

Page 41: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

41

g) Description of the follow-up given to evaluation results (in relation to section 6 of the evaluation plan)

Click on the Add button to add a follow-up given to evaluation results

Select an evaluation and click in the Edit button to modify a follow-up given to evaluation results.

Select an evaluation and click on the Remove button to delete a follow-up given to evaluation results.

1. Click on the ADD button to add a follow-up given to evaluation results.

The description of communication activities undertaken in relation to publicising evaluation findings (in relation to section 6 of the evaluation plan) pop-up appears:

Page 42: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

42

2. Enter the following information:

(1) Enter the Evaluation result relevant for follow-up (Describe finding & mention source in brackets).

(2) Enter the Follow-up carried out

(3) Select a Responsible authority for follow-up

(4) Click on the Update link to save the information.

3. ISSUES WHICH AFFECT THE PERFORMANCE OF THE PROGRAMME AND THE MEASURES TAKEN

a) Description of steps taken to ensure quality and effectiveness of programme implementation

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the description of steps taken to ensure quality and effectiveness of programme implementation.

Page 43: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

43

The Description of steps taken to ensure quality and effectiveness of programme implementation pop-up appears:

Page 44: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

44

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 42000 characters (+/- 15%) = approx. 12 pages – Mandatory – Figures allowed – Tables allowed.

b) Quality and efficient delivery mechanisms

NOTE The Simplified Cost Options (SCOs), proxy automatically calculated is a read only table

NOTE Simplified Cost Options (SCOs), based on specific detailed MS data table is editable only if No detailed MS data available for SCO is unchecked

If no data will be entered in the Simplified Cost Options (SCOs), based on specific detailed MS data is then the No detailed MS data available for SCO must be ticked.

Page 45: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

45

(1) Click on the EDIT button

(2) Tick the option No detailed MS data available for SCO

(3) Click on the Update link to save the information.

To enter the Simplified Cost Options (SCOs), based on specific detailed MS

1. Click on the EDIT button

The table becomes editable:

Page 46: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

46

2. Enter the following information:

(1) Enter the [%] PLANNED SCO COVERAGE OUT OF THE TOTAL RDP ALLOCATION

(2) Enter the [%] REALISED EXPENDITURE THROUGH SCO OUT OF TOTAL RDP ALLOCATION (CUMULATIVE)

(3) Click on the Update link to save the information.

To enter the E-management for beneficiaries [optional]:

1. Click on the EDIT button

The table becomes editable:

Page 47: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

47

2. Enter the following information:

(1) Enter the [%] EAFRD FUNDING

(2) Enter the [%] OPERATIONS CONCERNED

(3) Click on the Update link to save the information.

To enter the Average time limits for beneficiaries to receive payments [optional]:

1. Click on the EDIT button

2. The table becomes editable:

Page 48: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

48

3. Enter the following information:

(1) Enter the [DAYS] WHERE APPLICABLE, MS DEADLINE FOR PAYMENTS TO BENEFICIARIES

(2) Enter the [DAYS] AVERAGE TIME FOR PAYMENTS TO BENEFICIARIES

(3) Enter the COMMENTS

(4) Click on the Update link to save the information.

4. STEPS TAKEN TO IMPLEMENT TECHNICAL ASSISTANCE AND PROGRAMME PUBLICITY REQUIREMENTS

a) Action taken and state of play as regards the establishment of the NRN and the implementation of its action plan

a1) Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit)

1. Clicking on the EDIT button will open a pop-up window allowing you to enter Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit).

Page 49: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

49

The Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit) pop-up appears:

Page 50: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

50

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 7000 characters (+/- 15%) = approx. 2 pages – Mandatory – Figures allowed – Tables allowed.

a2) Actions taken and state of play as regards the implementation of the action plan

1. Clicking on the EDIT button will open a pop-up window allowing you to enter Actions taken and state of play as regards the implementation of the action plan.

The Actions taken and state of play as regards the implementation of the action plan pop-up appears:

Page 51: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

51

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 70.000 characters (+/- 15%) = approx. 20 pages – Mandatory – Figures allowed.

Page 52: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

52

b) Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014)

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014).

The Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014) pop-up appears:

Page 53: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

53

2. Enter the following information:

(1) Enter a description text. (max 10500 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 10.500 characters (+/- 15%) = approx. 3 pages – Mandatory – Figures allowed.

Page 54: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

54

5. ACTIONS TAKEN TO FULFIL EX ANTE CONDITIONALITIES

a) Unfulfilled criteria of general ex-ante conditionalities

This section applies to AIR(s) 2015, 2016 ONLY.

AIR 2015 covers calendar year 2015 and shall be submitted by 30/06/2016

AIR 2016 covers calendar year 2016 and shall be submitted by 30/06/2017

REMARK In case of no unfulfilled criteria of general ex-ante conditionalities have been defined in the linked programme, the system will display the message "No unfulfilled criteria of general ex-ante conditionalities are defined in the RDP" instead of an empty table.

b) Actions taken to fulfil applicable general ex-ante conditionalities

For AIR2016 (submitted in 2017) and AIR2015 (submitted in 2016) if relevant

REMARK In case of no unfulfilled criteria of general ex-ante conditionalities have been defined in the linked programme, the system could display the message" No unfulfilled criteria of general ex-ante conditionalities are defined in the RDP" instead of an empty table.

Page 55: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

55

c) Unfulfilled criteria of priority-linked ex-ante conditionalities

For AIR2016 (submitted in 2017) and AIR2015 (submitted in 2016) if relevant

REMARK In case of no unfulfilled criteria of priority-linked ex-ante conditionalities have been defined in the linked programme, the system could display the message "No unfulfilled criteria of priority-linked ex-ante conditionalities are defined in the RDP" instead of an empty table.

d) Actions taken to fulfil applicable priority-linked ex-ante conditionalities

For AIR2016 (submitted in 2017) and AIR2015 (submitted in 2016) if relevant

REMARK In case of no unfulfilled criteria of priority-linked ex-ante conditionalities have been defined in the linked programme, the system could display the message "No unfulfilled criteria of priority-linked ex-ante conditionalities are defined in the RDP" instead of an empty table.

Page 56: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

56

e) (Optional) additional information to complement the information provided on the 'actions taken' table

For AIR2016 (submitted in 2017) and AIR2015 (submitted in 2016) if relevant

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the (Optional) additional information to complement the information provided on the 'actions taken' table.

The (Optional) additional information to complement the information provided on the 'actions taken' table pop-up appears:

Page 57: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

57

2. Enter the following information:

(1) Enter a description text. (max 14000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

6. DESCRIPTION OF IMPLEMENTATION OF SUB-PROGRAMMES

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

Page 58: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

58

REMARK If the Linked RDP doesn't include Thematic Sub-Programmes, please fill "Non applicable".

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the description of implementation of sub-programmes.

The Description of implementation of sub-programmes pop-up appears:

Page 59: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

59

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE

Text field – a maximum of 14.000 characters (+/- 15%) = approx. 4 pages – Mandatory – Figures allowed.

This text field is editable only if the linked RDP includes Thematic Sub-Programmes.

Page 60: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

60

7. ASSESMENT OF THE INFORMATION AND PROGRESS TOWARDS ACHIEVING THE OBJECTIVES OF THE PROGRAMME

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

Please see specific guidance devoted to the SFC2014 template for evaluation elements.

8. IMPLEMENTATION OF ACTIONS TO TAKE INTO ACCOUNT THE PRINCIPLES SET OUT IN ARTICLES 5, 7 AND 8 OF REGULATION (EU) NO 1303/2013

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

a) Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013)

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013).

Page 61: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

61

The Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013) pop-up appears:

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

Page 62: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

62

NOTE Text field – a maximum of 7.000 characters (+/- 15%) = approx. 2 pages – Mandatory – Figures allowed – Tables allowed.

b) Sustainable development (Article 8 of Regulation (EU) No 1303/2013)

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the Sustainable development (Article 8 of Regulation (EU) No 1303/2013)

The Sustainable development (Article 8 of Regulation (EU) No 1303/2013) pop-up appears:

Page 63: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

63

2. Enter the following information:

(1) Enter a description text. (max 7000 char + 15% tolerance)

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 7.000 characters (+/- 15%) = approx. 2 pages – Mandatory – Figures allowed – Tables allowed.

Page 64: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

64

c) The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme

For AIR2016 (submitted in 2017) and AIR2018 (submitted in 2019) only.

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme

The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme pop-up appears:

Page 65: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

65

2. Enter the following information:

(1) Enter a description text.

(2) If you need to upload figures click on the Figures link

(3) Enter a figure name.

(4) Click on the Upload button to browse for the file and select it.

(5) Click on the Update link to save the information.

NOTE Text field – a maximum of 7.000 characters (+/- 15%) = approx. 2 pages – Mandatory – Figures allowed – Tables allowed.

Page 66: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

66

9. PROGRESS MADE IN ENSURING INTEGRATED APPROACH TO USE EAFRD AND OTHER UNION FINANCIAL INSTRUMENTS

For AIR2018 (submitted in 2019) only.

Description of progress made in ensuring an integrated approach to use the EAFRD and other Union financial instruments to support the territorial development of rural areas, including through local development strategies.

4. Clicking on the EDIT button will open a pop-up window allowing you to enter the description.

The table becomes editable:

Page 67: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

67

2. Enter the following information:

(1) Enter a description text. (max 30000 char).

(2) Click on the Update link to save the information.

10. REPORT ON IMPLEMENTATION OF FINANCIAL INSTRUMENTS (ARTICLE 46 OF REGULATION (EU) NO 1303/2013)

NOTE

Section 10 of the AIR includes a specific report covering the operations comprising financial instruments. The content of this report is set out in Article 46(2) of Regulation (EU) No 1303/2013.

Section 10 on financial instruments is required to be filled in by all Managing Authorities up to the extent where it is relevant (e.g. ex-ante assessment started/completed, selection of implementing bodies launched, Funding Agreement signed etc.). Detailed reporting in line

Page 68: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

68

with Article 46(2) of Regulation (EU) No 1303/2013 is required only for RDPs where a Funding Agreement has been signed for the implementation of financial instruments.

In order to ensure the consistency of data, Managing Authorities are to refer to the technical explanations provided in the form of an updated reporting template (in MS excel format).

REMARK In List of financial instruments, the questions appear only in the case of a valid and positive reply in the previous line. If a question is set to negative, the subsequent questions must be reset to negative as well (and dates to null).

1. Clicking on the EDIT button will open a pop-up window allowing you to answer the List of financial instruments questions.

The Edit Details pop-up appears:

Page 69: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

69

2. Enter the following information:

(1) Tick an answer for the question 30A. Has the ex-ante assessment been started ?

(2) Tick an answer for the question 30B. Has the ex-ante assessment been completed ?

(3) Select a date for the question 30. Date of completion of ex-ante assessment

(4) Tick an answer for the question 31.1. Has selection or designation process already been launched ?

(5) Tick an answer for the question 13A. Has the funding agreement been signed ?

(6) Select a date for the question 13. Date of signature of the funding agreement with the body implementing the financial instrument

(7) Click on the Update link to save the information.

REMARK If the question 13. Date of signature of the funding agreement with the body implementing the financial instrument was answered a financial instrument can be added; otherwise this field will remain greyed out and Section 10 is completed.

Click on the ADD button to add a new financial instrument.

Select an official and click in the EDIT button to modify the financial instrument.

Select an official and click on the REMOVE button to delete the financial instrument selected.

Page 70: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

70

1. Click on the ADD button to add a new financial instrument.

The Edit Details popup window appears:

2. Enter the following information:

(1) Enter the 5. Name of the financial instrument

(2) Select the 8. Type of the financial instrument (If you select option 2 – Fund of funds specific fund then you must also select a value for field 8.2. Related Fund of Funds)

(3) Click on Update to save the information.

REMARK

Depending on the Type of the financial instrument that you have selected (Fund of funds, Fund of funds specific fund, Specific fund and/or Direct management) you will get different sections to complete.

In case of a Fund of Funds structure, a layer (in this context a financial instrument to be named in row 5.) for the FoF level, and separate layers for each different Specific Fund under the FoF level has to be created (this is necessary, because certain information will be required only on certain layers: for example Indicators under Chapter IX. and identification of the financial products will not be required on FoF level, while other information such as Payments to the given layer will be required for each different layers and specific funds). In case of lack of FoF structure, only Specific Fund layer has to be created and filled in accordingly.

Page 71: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

71

Financial instrument (Fund of Funds)

1. Clicking on the EDIT button will allow you to enter data for the Financial instrument (Fund of Funds):

The table becomes editable:

Page 72: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

72

Page 73: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

73

Page 74: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

74

Page 75: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

75

Page 76: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

76

2. Enter the following information:

(1) Click on the button related to the item 1.1 Reference (number and title) of each priority axis or measure supporting the financial instrument under the ESI Fund programme

The popup window appears:

Page 77: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

77

(1.1) Select one Measure at a time

(1.2) Click on the >> (arrows) button to transfer your measure to the Selected measures box

(1.3) Click on Update to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme Version among M04; M06; M07; M08; M16; M19.

Very important: in order the system takes into account your selection of measures in the other fields of the form. Please update also this 'main' form

After updating it, click on the EDIT button again to continue entering data

(2) Name of ESI Fund(s) supporting the financial Instrument under the measure is set automatically by the system to 'EAFRD'

(3) Click on the button related to the item 4.1. CCI number of each other ESI Fund programme providing contributions to the financial instrument

The popup window appears:

Page 78: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

78

(3.1) Select one Available other ESI Fund programmes at a time

(3.2) Click on the >> (arrows) button to transfer your measure to the Selected other ESI Fund programmes box

(3.3) Click on Update to save the information.

(4) Select a date for the field 30. Date of completion of the ex ante assessment, if the one given in the intro panel is not valid for this financial instrument.

(5) Select yes or no for the field 31.1. Has selection or designation process already been launched (automatically filled in based on the intro panel).

(6) Enter the 6. Official address/place of business of the financial instrument (name of the country and city)

(7) Select yes or no if the financial instruments set up at Union level, is managed directly or indirectly by the Commission.

(8) Enter the Name of the Union-level financial instrument

The Name of the Union-level financial instrument (7.1.1) is only to be enabled when 7.1 is true.

(9) Select the legal status

(10) Select the type of implementing body

(11) Enter the Name of body

(12) Enter the official address of business of the body implementing the financial instrument

(13) Select the procedure

(14) Select the date of signature of the funding agreement with the body implementing the financial instrument, if the one given in the intro panel is not valid for this financial instrument.

(15) Enter the total amount of programme contributions committed in the funding agreement

(16) Enter the total amount of programme contributions committed in the funding agreement out of which ESI Funds contributions, ERDF, Cohesion Fund, ESF, EAFRD and EMFF (optional).

Page 79: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

79

(17) Enter the total amount of programme contributions paid to the financial instrument out of which ERDF, Cohesion Fund, ESF, EAFRD, and EMFF (in EUR).

(18) Enter the total amount of programme contributions paid to the financial instrument out of which total amount of national co-financing out of which total amount of national public funding and private funding.

(19) Enter the total amount of programme contributions paid to the financial instrument under YEI.

(20) Enter the total amount of management costs and fees paid out of programme contributions.

(21) Enter the amount out of which base remuneration and performance-based remuneration.

(22) Select whether the financial instrument was still operational at the end of the reporting year.

(23) Select the date of the winding-up if it was not operational.

(24) Enter the interest and other gains generated by payments from ESI Funds to the financial instrument.

(25) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds.

(26) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds out of which amounts paid for preferential remuneration of private investors operating under the market economy principle.

(27) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds out of which amounts paid for the reimbursement of management costs incurred and payment of management fees of the financial instrument.

(28) Enter the total amount of other contributions, outside the ESI Funds committed in the funding agreement with the body.

(28) Enter the total amount of other contributions outside the ESI Funds paid to the financial instrument out of which public contributions and private contributions.

(29) Enter the out of which public contributions (EUR)

(30) Click on the Update link to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme version among M04; M06; M07; M08; M16; M19.

The name of ESI fund (2) contains only the value ‘EAFRD’. This value can’t be modified.

The list of Other ESI Fund Programmes (4.1) contains all IGJ, EMFF and EAFRD Programmes of the same Member state as the linked Programme.

The Name of the Union-level financial instrument (7.1.1) is only to be enabled when 7.1 is true.

The Description of the other procedure (12.1) is only to be enabled when the value of 12 = 'Others'

Elements 18 to 21 are only to be enabled when Final Implementation Report.

The Date of winding-up (32.1) is only to be enabled when 32 is false.

Page 80: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

80

Thematic objectives

REMARK Based on amounts filled in this table by Measure/Focus Area, another table aggregated by Thematic objectives will be automatically generated by the system directly in the pdf snapshot report

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

The Edit Details pop-up window appears:

Page 81: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

81

2. Enter the following information:

(1) Select the Measure

(2) Select the Focus Area

(3) Enter the 3.01 amount of ESI Funds committed in the Funding Agreement to the individual focus areas (FAs) referred to in Art of 1305/2013 by measure

(4) Select the Thematic objective

Page 82: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

82

(5) Click on the Update link to save the information.

REMARK

The list of Thematic Objectives (3) contains all 18 Focus Areas and Additional Focus Area (if exist) of the Linked programme version.

The list of Thematic Objectives (3) contains all 11 Thematic Objectives. The Thematic Objective is automatically filled by the system depending on the selected focus Area (based on the mapping table), but the possibility to select a different Thematic objective exists.

Financial instrument (Specific Fund/Fund of Funds)

1. Clicking on the EDIT button will allow you to enter data for the Financial instrument (Specific Fund/Fund of Funds):

The table becomes editable:

Page 83: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

83

Page 84: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

84

Page 85: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

85

Page 86: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

86

Page 87: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

87

2. Enter the following information:

(1) Click on the button related to the item 1.1 Reference (number and title) of each priority axis or measure supporting the financial instrument under the ESI Fund programme

The popup window appears:

(1.1) Select one Measure at a time

(1.2) Click on the >> (arrows) button to transfer your measure to the Selected measures box

(1.3) Click on Update to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme Version among M04; M06; M07; M08; M16; M19.

Very important: in order the system takes into account your selection of measures in the other fields of the form. Please update also this 'main' form

After updating it, click on the EDIT button again to continue entering data

1

(2) Enter the Official address/place of business of the financial instrument (name of the country and city)

(3) Select the Tailor-made or financial instruments complying with standard terms and conditions i.e. "off-the-shelf instruments":

Page 88: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

88

REMARK

If you choose "off-the-shelf instruments" you will have to select a value for field 8.1.1. Off-the-shelf instrument type

(4) Tick the options applicable to the Type of products provided by financial instrument: loans, micro-loans, guarantees, equity, or quasi-equity investments, other financial product or other support combined within the financial instrument pursuant to Article 37(7) of Regulation (EU) No 1303/2013

REMARK

If you tick box for 9.0.6. Other financial products you will have to enter data for field 9.1. Description of the other financial product

If you tick box for 9.0.7. Other support combined with a financial instrument you will have to enter data for field 9.2. Other support combined within the financial instrument: grant, interest rate subsidy, guarantee fee subsidy pursuant to Article 37(7) of Regulation (EU) No 1303/2013

(5) Select the Legal status of the financial instrument, pursuant to Article 38(6) of Regulation (EU) No 1303/2013 (for financial instruments referred to in Article 38(4)(b) only): fiduciary account opened in the name of the implementing body and on behalf of the managing authority or separate block of finance within a financial institution

(6) Select a value for the Type of implementing body pursuant to Article 38(4) of Regulation (EU) No 1303/2013 (a) existing or newly created legal entity dedicated to implementing financial instruments; (b) a body entrusted with the implementation task or (c) managing authority undertaking implementation task directly (for loans or guarantees only)

Page 89: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

89

(7) Enter the Name of the body implementing the financial instrument

(8) Enter the Official address/place of business (country and town name) of the body implementing the financial instrument

(9) Select the Procedure of selecting the body implementing the financial instrument: award of a public contract; other procedure

REMARK If you select 5 - Others you will have to enter data for field 12.1. Description of the other procedure of selecting the body implementing the financial instrument

(10) Select the Date of signature of the funding agreement with the body implementing the financial instrument. On the layer of the Specific Fund under the FoF structure, this means the funding agreement between the FoF and the Specific Fund (financial intermediary).

(11) Click on the button related to the item 14. Total amount of programme contributions committed in the funding agreement (in EUR) On the layer of the Specific Fund under the FoF structure, this means the funding agreement between the FoF and the Specific Fund (financial intermediary).

The popup window appears: Enter the amount for each field and click on the Update button

(12) Click on the button related to the item 14.1. out of which ESI Funds contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(13) Enter the out of which ERDF (in EUR) (optional)

(14) Enter the out of which Cohesion Fund (in EUR) (optional)

(15) Enter the out of which ESF (in EUR) (optional)

(16) Click on the button related to the item 14.1.4. out of which EAFRD (in EUR) (optional)

The popup window appears: Enter the amount for each field and click on the Update button

(17) Click on the button related to the item 17. Total amount of management costs and fees paid out of programme contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(18) Click on the button related to the item 17. Total amount of management costs and fees paid out of programme contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

Page 90: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

90

(19) Enter the out of which Cohesion Fund (in EUR)

(20) Enter the out of which ESF (in EUR)

(21) Click on the button related to the item 15.1.4. out of which EAFRD (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(22) Enter the out of which EMFF (in EUR)

(23) Click on the button related to the item 15.2.1. out of which total amount of national public funding (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(24) Click on the button related to the item 17. Total amount of management costs and fees paid out of programme contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(25) Click on the button related to the item 17.1. out of which base remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(26) Click on the button related to the item 17.2. out of which performance-based remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(27) Select ‘Yes’ or ‘No’ for the item 32. Information whether the financial instrument was still operational at the end of the reporting year

REMARK If you select ‘No’ you will have to enter data for field 12.1. Description of the other procedure of selecting the body implementing the financial instrument

(28) Enter the Total number of disbursed loans defaulted or total number of guarantees provided and called due to the loan default

(29) Enter the Total amount of disbursed loans defaulted (in EUR) or total amount committed for guarantees provided and called due to loan default (in EUR)

(30) Enter the Interest and other gains generated by payments from ESI Funds to the financial instrument (in EUR)

(31) Enter the out of which capital repayments (in EUR)

(32) Enter the out of which gains, other earnings and yields (in EUR)

(33) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds

Page 91: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

91

(34) Enter the out of which amounts paid for preferential remuneration of private investors operating under the market economy principle who provide counterpart resources to the support from the ESI Funds to the financial instrument or who co-invest at the level of final recipient (in EUR)

(35) Enter the out of which amounts paid for the reimbursement of management costs incurred and payment of management fees of the financial instrument (in EUR)

(36) Enter the Value of investments and participations in equity (in EUR)

(37) Enter the Total amount of other contributions, outside the ESI Funds committed in the funding agreement with the body implementing the financial instrument (in EUR)

(38) Enter the out of which public contributions (EUR)

(39) Enter the out of which private contributions (EUR)

(40) Enter the out of which public contributions (EUR)

(41) Enter the out of which private contributions (EUR)

(42) Enter the Expected leverage effect for loan/guarantee/equity or quasi-equity investment/other financial product, by reference to the funding agreement, by product

(43) Enter the Investment mobilised through ESIF financial instruments for loan/guarantee/equity and quasi-equity investment, by product (Optional)

(44) Click on the Update link to save the information.

REMARK

The Off-the-shelf instrument type (8.1.1) is only to be enabled when 8.1 is Off-the-shelf-instrument.

The Description of the other financial product (9.1) is only to be enabled when 9.0.6 is true.

The Description of the other financial product (9.2) is only to be enabled when 9.0.7 is true.

The Description of the other procedure (12.1) is only to be enabled when the value of 12 = Others (internal code 5).

Elements 18 to 21 are only to be enabled when Final Implementation Report.

The Date of winding-up (32.1) is only to be enabled when 32 is false.

Indicators

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

Page 92: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

92

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Measure

The list of Measures contains all measure selected by the user for the FI in field 1.1 of the template.

(2) Select the Output indicator (code number and name) to which the financial instrument contributes

Page 93: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

93

The list of Output Indicators (41) contains all O1, O2 (operations supported by FI), O3, O4, O16, O17, O20 and O21. Programme Specific Output Indicators used in the linked Programme for this measure.

(3) Enter the Target value of the output indicator

(4) Enter the Value achieved by the financial instrument in relation to the target value of the output indicator

(5) Click on the Update link to save the information.

Products

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

The Edit Details pop-up window appears:

Page 94: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

94

2. Enter the following information:

(1) Enter the Name of financial product offered by the financial instrument

(2) Select the Type of financial product offered by the financial instrument

(3) Click on the Update link to save the information.

Financial instrument (Specific Fund)

1. Clicking on the EDIT button will allow you to enter data for the Financial instrument (Specific Fund):

Page 95: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

95

The table becomes editable:

Page 96: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

96

Page 97: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

97

Page 98: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

98

Page 99: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

99

Page 100: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

100

Page 101: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

101

2. Enter the following information:

(1) Click on the button related to the item 1.1 Reference (number and title) of each priority axis or measure supporting the financial instrument under the ESI Fund programme

The popup window appears:

(1.1) Select one Measure at a time

(1.2) Click on the >> (arrows) button to transfer your measure to the Selected measures box

(1.3) Click on Update to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme Version among M04; M06; M07; M08; M16; M19.

Very important: in order the system takes into account your selection of measures in the other fields of the form. Please update also this 'main' form

After updating it, click on the EDIT button again to continue entering data

(2) Click on the button related to the item 4.1. CCI number of each other ESI Fund programme providing contributions to the financial instrument

The popup window appears:

Page 102: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

102

(2.1) Select one Available CCI number at a time

(2.2) Click on the >> (arrows) button to transfer your measure to the Selected other ESI Fund programmes box

(2.3) Click on Update to save the information.

(3) Select a Date of completion of the ex ante assessment

(4) Select ‘Yes’ or ‘No’ for the item 31.1. Has selection or designation process already been launched

(5) Enter the Official address/place of business of the financial instrument (name of the country and city)

(6) Select ‘Yes’ or ‘No’ for the item 7.1. Financial instruments set up at Union level, managed directly or indirectly by the Commission referred to in Article 38(1)(a) of Regulation (EU) No 1303/2013, supported from ESI Fund programme contributions

(7) Select a value for item 7.2. Financial instrument set up at national, regional, transnational or cross-border level, managed by or under the responsibility of the managing authority referred to in Article 38(1)(b), supported from ESI Fund programme contributions under point (a), (b) and (c) of Article 38(4) of Regulation (EU) No 1303/2013

(8) Select a value for item 8.1. Tailor-made or financial instruments complying with standard terms and conditions i.e. "off-the-shelf instruments"

REMARK If you select Off-the-shelf instrument type you will have to select a value for field 8.1.1. Off-the-shelf instrument type:

Page 103: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

103

(9) Tick the options applicable to the Type of products provided by financial instrument: loans, micro-loans, guarantees, equity, or quasi-equity investments, other financial product or other support combined within the financial instrument pursuant to Article 37(7) of Regulation (EU) No 1303/2013

REMARK

If you tick box for 9.0.6. Other financial products you will have to enter data for field 9.1. Description of the other financial product

If you tick box for 9.0.7. Other support combined with a financial instrument you will have to enter data for field 9.2. Other support combined within the financial instrument: grant, interest rate subsidy, guarantee fee subsidy pursuant to Article 37(7) of Regulation (EU) No 1303/2013

(10) Select a value for item 10. Legal status of the financial instrument, pursuant to Article 38(6) of Regulation (EU) No 1303/2013 (for financial instruments referred to in Article 38(4)(b) only): fiduciary account opened in the name of the implementing body and on behalf of the managing authority or separate block of finance within a financial institution

(11) Select a value for item 11.1. Type of implementing body pursuant to Article 38(4) of Regulation (EU) No 1303/2013 (a) existing or newly created legal entity dedicated to implementing financial instruments; (b) a body entrusted with the implementation task or (c) managing authority underatking implementation task directly (for loans or guarantees only)

(12) Enter the Name of the body implementing the financial instrument

(13) Enter the Official address/place of business (country and town name) of the body implementing the financial instrument

(14) Select a value for item 12. Procedure of selecting the body implementing the financial instrument: award of a public contract; other procedure

Page 104: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

104

REMARK If you select 5 - Others you will have to enter data for field 12.1. Description of the other procedure of selecting the body implementing the financial instrument

(15) Select a 13. Date of signature of the funding agreement with the body implementing the financial instrument

(16) Click on the button related to the item 14. Total amount of programme contributions committed in the funding agreement (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(17) Click on the button related to the item 14.1. out of which ESI Funds contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(18) Enter the out of which ERDF (in EUR) (optional)

(19) Enter the out of which Cohesion Fund (in EUR) (optional)

(20) Enter the out of which ESF (in EUR) (optional)

(21) Click on the button related to the item 14.1.4. out of which EAFRD (in EUR) (optional)

The popup window appears: Enter the amount for each field and click on the Update button

(22) Enter the out of which EMFF (in EUR) (optional)

(23) Enter the out of which ERDF (in EUR)

(24) Enter the out of which Cohesion Fund (in EUR)

(25) Enter the out of which ESF (in EUR)

(26) Click on the button related to the item 15.1.4. out of which EAFRD (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(27) Enter the out of which EMFF (in EUR)

(28) Click on the button related to the item 15.2.1. out of which total amount of national public funding (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(29) Click on the button related to the item 17. Total amount of management costs and fees paid out of programme contributions (in EUR)

Page 105: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

105

The popup window appears: Enter the amount for each field and click on the Update button

(30) Click on the button related to the item 17.1. out of which base remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(31) Click on the button related to the item 17.2. out of which performance-based remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(32) Select ‘Yes’ or ‘No’ for the item 32. Information whether the financial instrument was still operational at the end of the reporting year

REMARK If you select ‘No’ you will have to select a date for field 32.1. If the financial instrument was not operational at the end of the reporting year, date of the winding-up

(33) Enter the Total number of disbursed loans defaulted or total number of guarantees provided and called due to the loan default

(34) Enter the Total amount of disbursed loans defaulted (in EUR) or total amount committed for guarantees provided and called due to loan default (in EUR)

(35) Enter the Interest and other gains generated by payments from ESI Funds to the financial instrument (in EUR)

(36) Enter the out of which capital repayments (in EUR)

(37) Enter the out of which gains, other earnings and yields (in EUR)

(38) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds

(39) Enter the out of which amounts paid for preferential remuneration of private investors operating under the market economy principle who provide counterpart resources to the support from the ESI Funds to the financial instrument or who co-invest at the level of final recipient (in EUR)

(40) Enter the out of which amounts paid for the reimbursement of management costs incurred and payment of management fees of the financial instrument (in EUR)

(41) Enter the Value of investments and participations in equity (in EUR)

(42) Enter the Total amount of other contributions, outside the ESI Funds committed in the funding agreement with the body implementing the financial instrument (in EUR)

(43) Enter the out of which public contributions (EUR)

(44) Enter the out of which private contributions (EUR)

(45) Enter the out of which public contributions (EUR)

(46) Enter the out of which private contributions (EUR)

Page 106: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

106

(47) Enter the Expected leverage effect for loan/guarantee/equity or quasi-equity investment/other financial product, by reference to the funding agreement, by product

(48) Enter the Investment mobilised through ESIF financial instruments for loan/guarantee/equity and quasi-equity investment, by product (Optional)

(49) Click on the Update link to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme Version among M04; M06; M07; M08; M16; M19.

The name of ESI fund (2) contains only the value 'EAFRD'. This value can't be modified

The list of Other ESI Fund Programmes (4.1) contains all IGJ, EMFF and EAFRD Programmes of the same Member State as the linked Programme.

The Name of the Union-level financial instrument (7.1.1) is only to be enabled when 7.1 is true.

The Off-the-shelf instrument type (8.1.1) is only to be enabled when 8.1 is false.

The Description of the other financial product (9.1) is only to be enabled when 9.0.6 is true.

The Description of the other financial product (9.2) is only to be enabled when 9.0.7 is true.

The Description of the other procedure (12.1) is only to be enabled when the value of 12 = 'Others' (Internal code 5).

Elements 18 to 21 are only to be enabled when Final Implementation Report.

The Date of winding-up (32.1) is only to be enabled when 32 is false.

Thematic objectives

REMARK Based on amounts filled in this table by Measure/Focus Area, another table aggregated by Thematic objectives will be automatically generated by the system directly in the PDF snapshot report

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

Page 107: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

107

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Measure

Page 108: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

108

(2) Select the Focus Area

(3) Enter the 3.01 amount of ESI Funds committed in the Funding Agreement to the individual focus areas (FAs) referred to in Art of 1305/2013 by measure

(4) Select the Thematic objective

(5) Click on the Update link to save the information.

REMARK

The list of Thematic Objectives (3) contains all 18 Focus Areas and Additional Focus Area (if exist) of the Linked programme version.

The list of Thematic Objectives (3) contains all 11 Thematic Objectives. The Thematic Objective is automatically filled by the system depending on the selected focus Area (based on the mapping table), but the possibility to select a different Thematic objective exists.

Indicators

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

Page 109: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

109

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Measure

(2) Select the Output indicator (code number and name) to which the financial instrument contributes

Page 110: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

110

(3) Enter the Target value of the output indicator

(4) Enter the Value achieved by the financial instrument in relation to the target value of the output indicator

(5) Click on the Update link to save the information.

Products

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

The Edit Details pop-up window appears:

Page 111: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

111

2. Enter the following information:

(1) Enter the Name of financial product offered by the financial instrument

(2) Select the Type of financial product offered by the financial instrument

(3) Click on the Update link to save the information.

Financial instrument (Direct management)

1. Clicking on the EDIT button will allow you to enter data for the Financial instrument (Direct Management):

Page 112: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

112

The table becomes editable:

Page 113: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

113

Page 114: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

114

Page 115: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

115

2. Enter the following information:

(1) Click on the button related to the item 1.1 Reference (number and title) of each priority axis or measure supporting the financial instrument under the ESI Fund programme

The popup window appears:

Page 116: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

116

(1.1) Select one Measure at a time

(1.2) Click on the >> (arrows) button to transfer your measure to the Selected measures box

(1.3) Click on Update to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme Version among M04; M06; M07; M08; M16; M19.

Very important: in order the system takes into account your selection of measures in the other fields of the form. Please update also this 'main' form

After updating it, click on the EDIT button again to continue entering data

(2) Click on the button related to the item 4.1. CCI number of each other ESI Fund programme providing contributions to the financial instrument

The popup window appears:

Page 117: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

117

(2.1) Select one Available CCI number at a time

(2.2) Click on the >> (arrows) button to transfer your measure to the Selected other ESI Fund programmes box

(2.3) Click on Update to save the information.

(3) Select a Date of completion of the ex ante assessment

(4) Enter the Official address/place of business of the financial instrument (name of the country and city)

(5) Select a value for item 7.2. Financial instrument set up at national, regional, transnational or cross-border level, managed by or under the responsibility of the managing authority referred to in Article 38(1)(b), supported from ESI Fund programme contributions under point (a), (b) and (c) of Article 38(4) of Regulation (EU) No 1303/2013

(6) Tick the options applicable to the Type of products provided by financial instrument: loans, micro-loans, guarantees, equity, or quasi-equity investments, other financial product or other support combined within the financial instrument pursuant to Article 37(7) of Regulation (EU) No 1303/2013

REMARK

If you tick box for 9.0.7. Other support combined with a financial instrument you will have to enter data for field 9.2. Other support combined within the financial instrument: grant, interest rate subsidy, guarantee fee subsidy pursuant to Article 37(7) of Regulation (EU) No 1303/2013

(7) Select a value for item 11.1. Type of implementing body pursuant to Article 38(4) of Regulation (EU) No 1303/2013 (a) existing or newly created legal entity dedicated to implementing financial instruments; (b) a body entrusted with the implementation task or (c) managing authority underatking implementation task directly (for loans or guarantees only)

Page 118: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

118

(8) Enter the Name of the body implementing the financial instrument

(9) Enter the Official address/place of business (country and town name) of the body implementing the financial instrument

(10) Select a value for item 12. Procedure of selecting the body implementing the financial instrument: award of a public contract; other procedure

REMARK If you select 5 - Others you will have to enter data for field 12.1. Description of the other procedure of selecting the body implementing the financial instrument

(11) Click on the button related to the item 14. Total amount of programme contributions committed in the funding agreement (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(12) Click on the button related to the item 14.1. out of which ESI Funds contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

REMARK If you select 5 - Others you will have to enter data for field 12.1. Description of the other procedure of selecting the body implementing the financial instrument

(13) Click on the button related to the item 14.1.4. out of which EAFRD (in EUR) (optional)

Page 119: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

119

The popup window appears: Enter the amount for each field and click on the Update button

(14) Click on the button related to the item 15.1.4. out of which EAFRD (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(15) Click on the button related to the item 15.2.1. out of which total amount of national public funding (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(16) Click on the button related to the item 17. Total amount of management costs and fees paid out of programme contributions (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(17) Click on the button related to the item 17.1. out of which base remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(18) Click on the button related to the item 17.2. out of which performance-based remuneration (in EUR)

The popup window appears: Enter the amount for each field and click on the Update button

(19) Select ‘Yes’ or ‘No’ for the item 32. Information whether the financial instrument was still operational at the end of the reporting year

REMARK If you select ‘No’ you will have to select a date for field 32.1. If the financial instrument was not operational at the end of the reporting year, date of the winding-up

(20) Enter the Total number of disbursed loans defaulted or total number of guarantees provided and called due to the loan default

(21) Enter the Total amount of disbursed loans defaulted (in EUR) or total amount committed for guarantees provided and called due to loan default (in EUR)

(22) Enter the out of which capital repayments (in EUR)

(23) Enter the out of which gains, other earnings and yields (in EUR)

(24) Enter the Amounts of resources reused which were paid back to the financial instrument and are attributable to ESI Funds

(25) Enter the out of which public contributions (EUR)

(26) Enter the out of which private contributions (EUR)

(27) Enter the Expected leverage effect for loan/guarantee/equity or quasi-equity investment/other financial product, by reference to the funding agreement, by product

Page 120: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

120

(28) Enter the Investment mobilised through ESIF financial instruments for loan/guarantee/equity and quasi-equity investment, by product (Optional)

(29) Click on the Update link to save the information.

REMARK

The list of measures (1.1) contains all measures of the linked Programme version among M04; M06; M07; M08; M16; M19.

The name of ESI fund (2) contains only the value ‘EAFRD’. This value can’t be modified.

The list of Other ESI Fund Programmes (4.1) contains all IGJ, EMFF and EAFRD Programmes of the same Member state as the linked Programme.

The Description of the other financial product (9.2) is only enabled when 9.0.7 is true.

The Description of the other procedure (12.1)is only to be enabled when the value of 12 = Others.

The Date of winding-up (32.1) is only to be enabled when 32 is false.

Thematic objectives

REMARK Based on amounts filled in this table by Measure/Focus Area, another table aggregated by Thematic objectives will be automatically generated by the system directly in the pdf snapshot report

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

Page 121: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

121

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Measure

Page 122: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

122

(2) Select the Focus Area

(3) Enter the 3.01 amount of ESI Funds committed in the Funding Agreement to the individual focus areas (FAs) referred to in Art of 1305/2013 by measure

(4) Select the Thematic objective

(5) Click on the Update link to save the information.

REMARK

The list of Measures contains all measure selected by the user for the FI in field 1.1 of the template.

The list of Thematic Objectives (3) contains all 18 Focus Areas and Additional Focus Area (if exist) of the Linked programme version.

The list of Thematic Objectives (3) contains all 11 Thematic Objectives. The Thematic Objective is automatically filled by the system depending on the selected focus Area (based on the mapping table), but the possibility to select a different Thematic objective exists.

Page 123: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

123

Indicators

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Measure

Page 124: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

124

(2) Select the Output indicator (code number and name) to which the financial instrument contributes

(3) Enter the Target value of the output indicator

(4) Enter the Value achieved by the financial instrument in relation to the target value of the output indicator

(5) Click on the Update link to save the information.

Products

1. Clicking on the ADD button will open the thematic objectives table allowing you to enter the information.

Page 125: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

125

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter the Name of financial product offered by the financial instrument

(2) Select the Type of financial product offered by the financial instrument

(3) Click on the Update link to save the information.

11. ENCODING TABLES FOR COMMON AND PROGRAMME-SPECIFIC INDICATORS AND QUANTIFIED TARGET VALUES

You can export the monitoring values clicking the button ‘Export’ (1) and also select an excel file to import monitoring values (tables A to F) (2)

Page 126: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

126

Table A: Committed expenditure by measure and focus area – ANNUAL

REMARK

The Table A is not prefilled anymore with BAIDP values starting from the Annual Implementation Report 2017 as it has been cancelled by the ‘Omnibus regulation’.

MS can edit the Committed expenditure pre-calculated by the system

1. Clicking on the EDIT button will allow you to enter data for the Table A: Committed expenditure by measure and focus area – ANNUAL

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

Page 127: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

127

Page 128: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

128

Page 129: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

129

Page 130: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

130

2. Enter the following information:

(1) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M01

(2) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M02

(3) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M03

(4) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M04

(5) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M06

(6) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M07

(7) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M08

(8) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M10

(9) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M11

(10) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M12

(11) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M13

(12) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M14

(13) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M15

(14) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M16

Page 131: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

131

(15) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M19

(16) Enter the TOTAL PUBLIC EXPENDITURE values for Measure M20

(17) Click on the Update link to save the information.

Table B: Realised output indicators by measure and focus area

Table B1: Realised outputs (AIR) – CUMULATIVE

REMARK

The system must display all the rows (Measure/ Sub measure/ Indicator/ Dimensions/ Priority /FA) as defined in the Reference Data for Table B1, filtered out by the linked programme strategy.

In order to improve performance and experience, the system displays one separate table for each relevant measure

Whether additional focus areas have been programmed in the linked programme strategy for a given measure, the system displays also the appropriate extra rows for this combination [additional focus areas/measure] as defined in Reference Data for Table B1.

By default the table is sorted alphabetically by 1: measure; 2:sub-measure; 3: Indicator; 4: Dim1; 5: Dim2; 6: Dim3; 7: priority; 8: FA. Nevertheless, it is also possible to sort alphabetically (ascending and descending) the table by one (and only one) of these 4 columns. In order to get back the default order, just reload the screen.

For a specific measure, if one of the Dimension columns is totally empty, then this column will not be displayed by the system.

NOTE The quick guide displays below one measure example: M01 - Knowledge transfer and information actions (art 14). You must fill in the tables of each measure of the list that is shown in your AIR. They were filtered out by the linked programme strategy.

1. Clicking on the EDIT button will allow you to enter data for the Table M01 - Knowledge transfer and information actions (art 14)

Page 132: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

132

The table becomes editable:

Page 133: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

133

2. Enter the following information:

(1) Enter the B1: OUTPUT REALISED (2014-2016 CUMUL) values

(2) Click on the Update link to save the information.

Table B2.1: Realised LEADER outputs (AIR) – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table B2.1: Realised LEADER outputs (AIR) – CUMULATIVE

The table becomes editable:

Page 134: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

134

2. Enter the following information:

(1) Enter the OUTPUT REALISED (2014-2016 CUMUL) values for Measure M01

(2) Click on the Update link to save the information.

Table B2.2: LEADER Data items to monitor contributions to the main Focus Area – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table B2.2: LEADER Data items to monitor contributions to the main Focus Area – CUMULATIVE

Page 135: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

135

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

Page 136: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

136

2. Enter the following information:

(1) Enter the VALUE (2014-2016 CUMUL)

(2) Click on the Update link to save the information.

Table B2.3: Monitoring of technical assistance – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table B2.3: Monitoring of technical assistance – CUMULATIVE

Page 137: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

137

The table becomes editable:

Page 138: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

138

2. Enter the following information:

(1) Enter the TABLE B2.3 VALUE

(2) Click on the Update link to save the information.

Table B3: Annual monitoring for area based, multi-annual and livestock unit measures (AIR) – ANNUAL

1. Clicking on the EDIT button will allow you to enter data for the Table B3: Annual monitoring for area based, multi-annual and livestock unit measures (AIR) – ANNUAL

Page 139: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

139

The table becomes editable:

Page 140: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

140

2. Enter the following information:

(1) Enter the OUTPUT REALISED (ANNUAL) values

(2) Click on the Update link to save the information.

Table B4: Total public of the operations which have additional contributions to other Focus Areas (AIR) – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table B4: Total public of the operations which have additional contributions to other Focus Areas (AIR) – CUMULATIVE

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

Page 141: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

141

2. Enter the following information:

(1) Enter the TOTAL PUBLIC values

(2) Click on the Update link to save the information.

Table C: Breakdown for relevant outputs and measures by type of area, gender and/or age – CUMULATIVE

Table C1.1: Monitoring of outputs broken down by area type – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C1.1: Monitoring of outputs broken down by area type – CUMULATIVE

Page 142: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

142

The table becomes editable:

Page 143: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

143

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table C1.2 – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C1.2 – CUMULATIVE

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

Page 144: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

144

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table C1.3 – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C1.3 - CUMULATIVE

Page 145: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

145

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

Page 146: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

146

(2) Click on the Update link to save the information.

Table C2.1: Monitoring of outputs broken down by age and gender – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C2.1: Monitoring of outputs broken down by age and gender – CUMULATIVE

The table becomes editable:

Page 147: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

147

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table C2.2: Monitoring of outputs broken down by type of agricultural branch – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C2.2: Monitoring of outputs broken down by type of agricultural branch - CUMULATIVE

Page 148: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

148

The table becomes editable:

Page 149: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

149

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table C2.3: Monitoring of outputs broken down by size – CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C2.3: Monitoring of outputs broken down by size – CUMULATIVE

Page 150: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

150

The table becomes editable:

Page 151: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

151

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table C2.4: Monitoring of supported operations addressing integration of third-country nationals (TCN) (amended art 14 of Regulation 808/2014) - CUMULATIVE

1. Clicking on the EDIT button will allow you to enter data for the Table C2.4: Monitoring of supported operations addressing integration of third-country nationals (TCN) (amended art 14 of Regulation 808/2014) – CUMULATIVE

Page 152: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

152

The table becomes editable:

Page 153: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

153

2. Enter the following information:

(1) Enter the CUMUL 2014-2016 values

(2) Click on the Update link to save the information.

Table D: Progress towards targets

1. Clicking on the EDIT button will allow you to enter data for the table Approved operations

The table becomes editable:

Page 154: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

154

2. Enter the following information:

(1) Enter the BASED ON APPROVED OPERATIONS (2014-2016) values

(2) Click on the Update link to save the information.

3. Clicking on the EDIT button will allow you to enter data for the table Realised targets

Page 155: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

155

The table becomes editable:

NOTE

The Legend helps to identify which cells need to be filled in

Page 156: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

156

4. Enter the following information:

(1) Enter the BASED ON COMPLETED REALISED TARGET values

(2) Click on the Update link to save the information.

Table E: Monitoring of transitional measures – ANNUAL

1. Clicking on the EDIT button will allow you to enter data for the Table E: Monitoring of transitional measures – ANNUAL

Page 157: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

157

The table becomes editable:

Page 158: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

158

2. Enter the following information:

(1) Enter the TOTAL PUBLIC EXPENDITURTE (EUR) values

(2) Click on the Update link to save the information.

Table F: Achievement of the performance framework indicators

Table F1: Performance Framework Indicators

Applicable in AIR2019 (submission in 2020) and onwards

1. Clicking on the EDIT button will allow you to enter data for the F1: Performance Framework Indicators

Page 159: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

159

REMARK

Only applicable in AIR2018 (submission in 2019) – Performance review:

2 additional columns are displayed

A': "Total public expenditure paid in 2019 and related to 2018 operations"

B' "Adjustments top up paid in 2019 and related to 2018 operations"

The percentage (2 decimals precision) 'Calculated achievement rate' (column C) is automatically calculated by the system. For AIR2018 the only Formula used is: Column C = ((Column A – column B) + (Column A' – column B')) / column E

The values for column D and E are retrieved from the last adopted programme in force at the creation of the first version of the AIR2018 (and not the last adopted programme in force the last day of Implementation period). These values for column D and E are the same for all working versions of the same AIR2018 (not impacted by values from a newer RDP that could have been adopted in the meantime)

Column E is used for the calculation of column C

For the Annual Implementation Report 2018, the values for column D and E are retrieved from the last adopted programme in force at the creation of the first version of the Annual Implementation Report.

REMARK

Applicable in AIR2019 (submission in 2020) and onwards – Post Performance review:

The system displays one row for each performance indicator (applicable AND not applicable) defined in the table 'Indicators' of the section 7: 'Performance framework' of the linked programme.

Page 160: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

160

The 'Milestone 2018' and the 'Target 2023' values are also automatically retrieved from the table 'Indicators' of the section 7 of the linked programme

'Realised performance Framework indicators' values (column A) and 'Adjustments Top ups' (column B) values consists in values filled by the Member State

The percentage (2 decimals precision) 'Calculated achievement rate' (column C) is automatically calculated by the system. Formula used is: Column C = (Column A – column B) / column E

The values of column D ' Target 2023 ' are retrieved from the last adopted programme in force at the creation of the first version of the AIRYYYY (and not the last adopted programme in force the last day of Implementation period). The values for E are the same for all working versions of the same current AIRYYY (not impacted by values from a newer RDP that could have been adopted in the meantime)

Column E is used for the calculation of column C

2. Enter the following information:

(1) Enter the ADJUSTMENT TOP UPS values

(2) Click on the Update link to save the information.

Page 161: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

161

Table F2: Alternative Performance Framework Indicators

1. Clicking on the EDIT button will allow you to enter data for the F1: Performance Framework Indicators

The table becomes editable:

Page 162: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

162

2. Enter the following information:

(1) Enter the REALISED PERFORMANCE FRAMEWORK INDICATORS values

(2) Enter the ADJUSTMENTS TOP UPS values

(3) Click on the Update link to save the information.

REMARK

Only applicable in AIR2018 (submission in 2019) – Performance review:

For the Annual Implementation Report 2018, the values for column D and E are retrieved from the last adopted programme in force at the creation of the first version of the Annual Implementation Report.

REMARK

Applicable in AIR2019 (submission in 2020) and onwards – Post Performance review:

The system displays one row for each performance indicator (applicable AND not applicable) defined in the table 'Indicators' of the section 7: 'Performance framework' of the linked programme.

The 'Milestone 2018' and the 'Target 2023' values are also automatically retrieved from the table 'Indicators' of the section 7 of the linked programme

'Realised performance Framework indicators' values (column A) and 'Adjustments Top ups' (column B) values consists in values filled by the Member State

Page 163: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

163

The percentage (2 decimals precision) 'Calculated achievement rate' (column C) is automatically calculated by the system. Formula used is: Column C = (Column A – column B) / column E

Table G: Programme-specific indicators

Table G1: Specific target table

REMARK

The system displays, in the same order, all the specific target indicators (Code, Target indicator name, Focus area, Unit, Target value 2023) existing in the linked programme.

In case of no specific target indicators have been defined in the linked programme, the system displays the message "No specific target indicators are defined in the RDP" instead of an empty table.

YYYY, in Target value YYYY, is dynamically replaced by the AIR version number (version only and not work version)

1. Clicking on the EDIT button will allow you to enter data for the F1: Performance Framework Indicators

Page 164: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

164

The table becomes editable:

Page 165: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

165

2. Enter the following information:

(1) Enter the values for REALISED 2019

(2) Enter the COMMENTS

(3) Click on the Update link to save the information.

Click on the ADD button to add a new Specific Target Indicator

Select an official and click in the EDIT button to modify a Specific Target Indicator

Select an official and click on the REMOVE button to delete a Specific Target Indicator.

3. Click on the ADD button to add a new Specific Target Indicator

Page 166: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

166

The Edit Details popup window appears:

4. Enter the following information:

(1) Enter the Code

(2) Enter the Target indicator name

(3) Select the Focus Area

(4) Enter the Realised 2019

(5) Enter the Unit

(6) Enter the Comments (source)

(7) Click on Update to save the information.

Page 167: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

167

Table G2: Specific output table

REMARK

The system displays, in the same order, all the specific output indicators (Code, Output indicator name, measure, Focus area(s), Unit, Planned output) existing in the linked programme.

In case of no specific target indicators have been defined in the linked programme, the system displays the message "No specific target indicators are defined in the RDP" instead of an empty table.

YYYY, in Target value YYYY, is dynamically replaced by the AIR version number (version only and not work version)

Click on the ADD button to add a new Specific Output Indicator

Select an official and click in the EDIT button to modify a Specific Output Indicator

Select an official and click on the REMOVE button to delete a Specific Output Indicator.

1. Click on the ADD button to add a new Specific Output Indicator

Page 168: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

168

The Edit Details popup window appears:

2. Enter the following information:

(1) Enter the Code

(2) Enter the Output indicator name

Page 169: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

169

(3) Select the Measure

(4) Click on the >> (arrows) button to transfer the selected Focus Area

(5) Enter the Realised 2019

(6) Enter the Unit

(7) Enter the Comments (source)

(8) Click on Update to save the information.

Additional Functionality

Early Warning Notification

An early warning notification job will run on 1, 15, 20, 26, 27, 28, 29 and 30 of June for years YYYY 2016-2024. It will select all last adopted (before 31/12/YYYY-1) EAFRD Programmes for which no AIRYYYY has been sent to the Commission.

For these Programmes, an email notification will be sent to the Member State Officials in Charge of the Programme and to the subscribers of this Event Type. The notification will say:

"The Annual Implementation Report [YYYY] for Programme [CCI] has not yet been sent to the Commission. Please submit it as soon as possible."

Validate the Annual Implementation Report (EAFRD)

REMARK

The Annual Implementation Report (EAFRD) can be validated when it is in a status 'OPEN' and currently resides at your Node.

It is a must to have the role of MS Managing Authority Update.

1. Click on the Validate link to validate the Annual Implementation Report (EAFRD).

Page 170: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

170

REMARK

An ERROR will block you from sending the Annual Implementation Report (EAFRD).The error(s) should be resolved and the Implementation Report must be revalidated.

NOTE that a WARNING does not block you from sending the Implementation Report (EAFRD).

The system validates the following information:

For AIR related to a Regional or National RDP:

Code Validation Rule Severity

2 Implementation report version has been validated. INFO

10 Validate that at least one official in charge of the Member State exists. ERROR

30 Validate that the 'Monitoring committee approval date' is filled. WARNING

50 For AIR2015, in case the MS uses FI (art 59(4)(c) or art 59(4)(d)), validate that at least the "Report on the implementation of financial instruments" is annexed to the AIR. If this Programme version doesn't exist it must have been linked to the first adopted version.

ERROR

Page 171: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

171

60 Validate that at least one Financial annex (system or other) is annexed to the AIR.

ERROR

61 Validate that the Financial Annex (system) is up-to-date.

‘The Financial Annex generated by the system is out of date, please refresh it to get the last version (section General > Documents).’

ERROR

70 Validate that a "Citizen's summary" is annexed to the AIR. WARNING

80 Validate that all integral documents have at least one attachment with a length > 0.

ERROR

90 Validate that in section 1.c) the field 'Key information on RDP implementation based on data from a) and b) by Focus Area' is filled.

ERROR

91 Validate that in section 1.d) the field 'Key information on achievements towards the milestones set in the performance Framework based on Table F' is filled.

ERROR

92 Validate that in section 2.a) the 'Description of any modifications made to the evaluation plan in the RDP during the year, with their justification' is filled.

ERROR

93 Validate that in section 2.b) the field 'A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan)' is filled.

ERROR

94 Validate that in section 2.c) the field 'A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan)' is filled.

ERROR

95 Validate that in section 2.e) the field the field 'A summary of completed evaluations, focussing on evaluation findings' is filled.

ERROR

96 Validate that in section 3.a) the field 'Description of steps taken to ensure quality and effectiveness of programme implementation' is filled.

ERROR

97 Validate that in section 4.a.1) the field 'Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit)' is filled.

ERROR

98 Validate that in section 4.a.2) the field 'Actions taken and state of play as regards the implementation of the action plan' is filled.

ERROR

Page 172: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

172

99 Validate that in section 4.b) the field 'Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014)' is filled.

ERROR

100 Validate that in section 5.e) the field '(Optional) additional information to complement the information provided on the 'actions taken' table' is filled.

WARNING

101 Validate that in section 6 the field 'Description of implementation of sub-programmes' is filled.

ERROR

102 Validate that in section 8.a) the field 'Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013)' is filled.

ERROR

103 Validate that in section 8.b) the field 'Sustainable development (Article 8 of Regulation (EU) No 1303/2013)' is filled.

ERROR

104 Validate that in section 8.c) the field 'The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme' is filled.

ERROR

105 Validate that in section 9 the field 'Progress made in ensuring integrated approach to use EAFRD and other Union financial instruments' is filled.

ERROR

106 Validate that in section 1.e) the field ‘Other RDP specific element (optional) is filled.

WARNING

107 Validate that in section 7. the text fields are filled for relevant questions.

Text in ‘7. Assessment of the information and progress towards achieving the objectives of the programme {0} / {1} is not filled’.

ERROR

108 Validate that in section 7. the comment/rationale fields are filled.

‘7. Assessment of the information and progress towards achieving the objectives of the programme {0}: comment is not filled’.

WARNING

109 Validate that in Evaluation Questions the gross values are correct.

Gross value = primary contribution + secondary contribution, including Leader/CLLD contribution.

ERROR

110 Validate that in section 7, the indicator’s net values are correct.

‘Net Value’ is equal or lower than the value for ‘gross value’.

ERROR

Page 173: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

173

111 Validate that in section 7, the indicator’s secondary contribution values are correct.

‘Secondary contribution without LEADER’ plus ‘LEADER contribution’ matches the value put under *’Secondary contribution, including LEADER/CLLD contribution’.

WARNING

120 Validate that in section 7 / Table of result indicators, for each result indicator, a comment is filled when no others values are provided.

ERROR

125 Validate that in section 7 / Table of CAP impact indicators, for each CAP impact indicators, a comment is filled when no others values are provided.

ERROR

150 Validate that in section 10 (introduction panel), the field 30A. Has the ex-ante assessment been started? is filled

ERROR

155 Validate in section 10 (introduction panel), the Date of signature of the funding agreement is not null if financial instrument(s) has/have been added in field 5.

‘The Date of signature of the funding agreement can't be removed if financial instrument(s) has/have been added in field 5, please first delete the financial instrument(s).’

ERROR

200 Validate that the sum of the ‘Total public expenditure committed’ filled in section 11 Table A by CCI is higher or equal than the DoE.

For measure {0}, the cumulative ‘Total public expenditure committed (table A)’ (= {1} euros) filled in section 11 is lower than the cumulative total public expenditure incurred in the declarations of expenditure (={2} euros).

WARNING

210 Validate that the sum of the ‘Total public expenditure committed’ filled in section 11 Table A by CCI is higher or equal than the total public expenditure realised (tables B).

WARNING

230 Validate that the value of the ‘Total public expenditure from Table A’ filled in section 11 Table A by measure is consistent with the value of the relevant number of selected operations (table D).

WARNING

240 Validate that the value of the realised output indicator filled in section 11 Table B1 by CCI is consistent with the value of the relevant number of selected operations (table D).

WARNING

Page 174: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

174

For AIR YEAR N, the realised output indicators filled in section 11 table B1 should be equal or lower than the value of the relevant number of selected operations (table D)

245 Validate that the value of the relevant number of indicators (table D) filled in section 11 Table A by measure is consistent with the value of the ‘Total public expenditure’ from table A.

For AIR YEAR N, if the value of the indicators (table D) of AIR YEAR N is > 0; then cumulatively from 2014 until Year N, the Sum of the 'Total public expenditure committed' filled-in in section 11 table A should be > 0

WARNING

250 Validate that the value of the realized target indicator filled in section 11 Table D by CCI is consistent with the value of the realised output (table B).

The warning should only be relevant if the target indicator values (values for T8, T9, T10, T11, T12, T13, T22, T24) encoded by MS for the year in question are higher than in any previous year.

WARNING

255 Validate that the value of the realised target indicator values for T8, T9, T10, T11, T12, T13, T18, T19, T22, T24 filled in in section 11 Table D by CCI is higher or equal to the value reported in previous AIRs.

WARNING

260 Validate that the value of the total public expenditure realised for transitional measure filled in section 11 Table D by CCI is consistent with the value of the realized output (table B).

WARNING

270 Validate that the value of the realised target indicator filled in section 11 Table D by CCI is consistent with the value of the target planned in the RDP.

WARNING

280 Validate that the value of the total public expenditure realised for transitional measure filled in section 11 Table E by CCI is consistent with the value of the total public expenditure equivalent of chapter 19.2 in the RDP.

For AIR YEAR N, the total public expenditure realised filled in section 11 table E should be equal or lower than the value of the total public expenditure corresponding to the EAFRD value in chapter 19.2 of the RDP

WARNING

290 Validate that the value of all indicators/dimensions filled in section 11 Table B1, B2.1, B2.2, B2.3 B4, C1.1 to C1.3, C2.1 to C2.4) of year N are equal or higher than the value of all indicators/dimensions filled in

WARNING

Page 175: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

175

section 11 Table B1, B2.1, B2.2, B2.3 B4, C1.1 to C1.3, C2.1 to C2.4) of year N-1.

300 Validate that the value of indicator 07 for M10.1 is filled in section 11 Table B3, when O6 for M10.1 is filled in section 11 Table B3.

WARNING

310 Validate that the Financing Plan has planned Financial Instrument in the RDP when measures under financial instruments are filled-in in section 11 Table A & B1 & B2.2 & C2.2 & C2.3.

WARNING

419 Validate in Financial Instruments when Thematic Objectives are defined that the sum of all Thematic Objective amounts (3.1) equals 14.1

WARNING

420 Validate in Financial Instruments that element 7.1.1 is empty when 7.1 is empty or false.

ERROR

421 Validate in Financial Instruments that element 12.1 is empty when 12 is different from Others (Internal code 5).

ERROR

422 Validate in Financial Instruments when (14.1.1+14.1.2+14.1.3+14.1.4+ 14.1.5) is not null that this sum is equal to 14.1.

ERROR

423 Validate in Financial Instruments that elements 18, 19, 20 and 21 are empty when not a final implementation report.

ERROR

424 Validate in Financial Instruments that element 32.1 is empty when element 32 is empty or true.

ERROR

425 Validate in Financial Instruments that element 8.1.1 is empty when 8.1 is empty or "Tailor-made".

ERROR

426 Validate in Financial Instruments that element 9.1 is empty when 9.0.6 is empty or false.

ERROR

427 Validate in Financial Instruments that element 9.2 is empty when 9.0.7 is empty or false.

ERROR

428 Validate in Financial Instruments that element 25 is equal to 25.1 + 25.2 + 25.3.

WARNING

429 Validate in Financial Instruments that element 29.4.1 is empty when 29.4 is <= 0

ERROR

436 Validate in Financial Instruments that the Output Indicators (41) are used in the linked Programme version under the selected Priority Axis.

ERROR

Page 176: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

176

463 Validate in Financial Instruments for FoF, SF and MA, that at least one Fund (=element 2) is selected.

WARNING

468 Validate in Financial Instruments for FoF and SF, that element 13 is >= element 30.

WARNING

469 Validate in Financial Instruments for SF/FoF, that element 13 is >= element 13 in master FoF.

ERROR

470 Validate in Financial Instruments for FoF, SF/FoF and SF, that element 15 is <= element 14.

ERROR

471 Validate in Financial Instruments for MA, that element 7.2 = ‘d. undertaking implementation directly’.

ERROR

472 Validate in Financial Instruments for FoF, SF/FoF and SF that element 38.2 is <= element 38.1

WARNING

476 Validate in Financial Instruments for SF/FoF and SF that element 22 is different from element 11.1.1

ERROR

477 Validate in Financial Instruments for SF/FoF, SF and MA that element 25 is <= element 24

ERROR

478 Validate in Financial Instruments for SF/FoF, SF and MA that element 25.1 is <= element 24.1

ERROR

479 Validate in Financial Instruments for SF/FoF, SF and MA that element 28 is <= element 27

ERROR

480 Validate in Financial Instruments for SF/FoF, SF and MA that element 29 is <= element 27

ERROR

481 Validate in Financial Instruments for SF/FoF, SF and MA that element 29 = element 29.1+29.2+29.3+29.4

ERROR

482 Validate in Financial Instruments for SF/FoF, SF and MA that element 24.1 is <= element 24

ERROR

485 Validate in Financial Instruments Guarantees for SF/FoF and SF when element 25 > 0 that element 26 is > 0

WARNING

486 Validate in Financial Instruments for SF/FoF and SF when element 22.1 is “Other” that 9.0.7 is true.

ERROR

Page 177: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

177

488 Validate in Financial Instruments for MA that element 11.1 = '(c) body undertaking implementation task directly (managing authority or intermediate body)'.

ERROR

503 Validate in Financial Instruments Products for SF/FoF, SF and MA when element 29.2.1 is not null that it is <= 29.2

ERROR

507 Validate in Financial Instruments for FoF, SF and MA that element 1.1 is not null.

ERROR

509 Validate in Financial Instruments FoF, SF and MA when the same FI doesn’t exist in previous year’s AIR or exists but has its element 30 filled in, that element 30 in the current AIR is not null.

WARNING

510 Validate in Financial Instruments for FoF and SF that from elements 7.1, 7.2 and 7.3, one and only one has a value selected.

ERROR

511 Validate in Financial Instruments for FoF and SF, that element 7.3 doesn’t contain Implementation Arrangement Type 4.

ERROR

512 Validate in Financial Instruments for FoF and SF when element 13 is not empty, that element 30 is also not empty.

WARNING

515 Validate in Financial Instruments for FoF and SF/FoF when the amount in element 14 is > 0 that the date of signature in element 13 is not empty.

ERROR

516 Validate in Financial Instruments for FoF and SF/FoF when the amount in element 14 is > 0 that the date of signature in element 13 <= cut-off date for the report (31/12/Reporting Year).

WARNING

517 Validate in Financial Instruments for FoF when the amount in element 14 is > 0, that date element 30 is not empty.

WARNING

524 Validate in Financial Instruments for FoF, SF/FoF and SF, that element 15.1 is <= element 14.1

ERROR

528 validate in Financial Instruments for FoF, SF/FoF and SF, that element 15.1.4 is <= element 14.1.4

WARNING

530 Validate in Financial Instruments for FoF, SF/FoF and SF, when element 15 is > 0, that elements 13 and 14 are not null.

ERROR

Page 178: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

178

532 Validate in Financial Instruments for FoF, SF/FoF and SF, that element 17 is not null.

WARNING

533 Validate in Financial Instruments for FoF, SF/FoF and SF, that element 17 is >= 17.1 + 17.2

ERROR

534 Validate in Financial Instruments for FoF, SF/FoF and SF, when element 16 for the same instrument in previous Year’s AIR is > 0, that element 35 fo rthe same instrument is > 0/

WARNING

535 Validate in Financial Instruments for FoF, SF/FoF and SF, that element 38.1 is >= 14 – 14.1

ERROR

536 Validate in Financial Instruments for SF/FoF, that the sum of elements 14 of all SF/FoFs is <= element 14 in the master FoF.

ERROR

537 Validate in Financial Instruments for SF/FoF, that the sum of elements 14.1 of all SF/FoFs is <= element 14.1 in the master FoF.

ERROR

541 Validate in Financial Instruments for SF/FoF, that the sum of elements 14.1.4 of all SF/FoFs is <= element 14.1.4 in the master FoF.

WARNING

544 Validate in Financial Instruments for SF/FoF, that the sum of elements 15.1 of all SF/FoFs is <= element 15.1 in the master FoF.

ERROR

548 Validate in Financial Instruments for SF/FoF, that the sum of elements 15.1.4 of all SF/FoFs is <= element 15.1.4 in the master FoF.

WARNING

550 Validate in Financial Instruments for SF/FoF, that the sum of elements 15.2 of all SF/FoFs is <= element 15.2 in the master FoF.

ERROR

551 Validate in Financial Instruments for SF/FoF, that the sum of elements 15.2.1 of all SF/FoFs is <= element 15.2.1 in the master FoF.

WARNING

552 Validate in Financial Instruments for SF/FoF, that the sum of elements 15.2.2 of all SF/FoFs is <= element 15.2.2 in the master FoF.

WARNING

554 Validate in Financial Instruments for SF/FoF and SF, that the sum of product elements 25 of a SF/FoF or SF is <= element 15 of the master SF/FoF or SF.

ERROR

555 Validate in Financial Instruments for SF/FoF and SF, that element 25.1.1 has only a value when a value different from 0 exists in element 15.1.1

ERROR

Page 179: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

179

558 Validate in Financial Instruments for SF/FoF and SF, that element 25.1.4 has only a value when a value different from 0 exists in element 15.1.4

ERROR

562 Validate in Financial Instruments for SF/FoF and SF, when element 27 is empty or 0 that date in element 13 is <= cut-off date (=31/12/reporting year) - 2 years.

WARNING

563 Validate in Financial Instruments for SF/FoF and SF, that element 39.1 is not null.

WARNING

564 Validate in Financial Instruments for SF/FoF and SF, when element 25 is > 0 in the current AIR and in the previous AIR for the same FI and Product, that element 40 is > 0.

WARNING

565 Validate in Financial Instruments for SF/FoF, SF and MA, when in the previous AIR the same FI and Product exists, that element 24 is > 0.

WARNING

566 Validate in Financial Instruments for SF/FoF and SF, when element 24 is > 0 in the previous AIR for the same FI and Product, that element 25 in the current AIR is > 0.

WARNING

567 Validate in Financial Instruments for SF/FoF and SF, when element 26 is > 0 in the previous AIR for the same FI and Product, that element 26 in the current AIR is > 0.

WARNING

568 Validate in Financial Instruments for SF/FoF and SF, when element 26.1 is > 0 in the previous AIR for the same FI and Product, that element 26.1 in the current AIR is > 0.

WARNING

569 Validate in Financial Instruments for SF/FoF and SF, when element 25 is > 0, that element 27 is > 0

ERROR

570 Validate in Financial Instruments for SF/FoF and SF, when element 33 is > 0, that element 34 is > 0

ERROR

571 Validate in Financial Instruments for FoF and SF, when element 31.1 is false and element 30 is not null, that the cut-off date of the current AIR (=31/12/Reporting Year) is > date of element 30 + 2 years.

WARNING

572 Validate in Financial Instruments for FoF and SF when element 13 is null and element 30 is not null, that the cut-off date of the current AIR (=31/12/Reporting Year) is > date of element 30 + 2 years.

WARNING

Page 180: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

180

574 Validate in Financial Instruments for FoF, SF/FoF and SF when element 13 is not empty, that element 14 is > 0

ERROR

575 Validate in Financial Instruments for SF/FoF and SF, that element 39.1 is < 20 for guarantee and equity and is < 10 for loan.

WARNING

580 Validate in Financial Instruments for SF/FoF and SF, that elements 14.1.1, 14.1.2, 14.1.3, 14.1.5 and 15.1.1, 15.1.2, 15.1.3, 15.1.5 and financial products 25.1.1, 25.1.2, 25.1.3, 25.1.5 are empty.

ERROR

For AIR related to a Rural Network Programme:

Code Validation Rule Severity

2 Implementation report version has been validated. INFO

90 Validate that in section 2.a) the field 'Description of any modifications made to the evaluation plan in the NRN during the year, with their justification' is filled

ERROR

91 Validate that in section 2.b) the field 'A description of the evaluation activities undertaken during the year (in relation to section 3 of the evaluation plan)' is filled

ERROR

92 Validate that in section 2.c) the field 'A description of activities undertaken in relation to the provision and management of data (in relation to section 4 of the evaluation plan)' is filled

ERROR

93 Validate that in section 2.e) the field 'A summary of completed evaluations, focussing on evaluation findings' is filled.

ERROR

94 Validate that in section 3.a.1) the field 'Actions taken and state of play as regards establishment of the NRN (governance structure and network support unit)' is filled.

ERROR

95 Validate that in section 3.a.2) the field 'Actions taken and state of play as regards the implementation of the action plan' is filled.

ERROR

96 Validate that in section 3.b) the field 'Steps taken to ensure that the programme is publicised (Article 13 of Commission Implementing Regulation (EU) No 808/2014)' is filled.

ERROR

Page 181: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

181

97 Validate that in section 3.c) the field 'NRN activities to support and coordinate regional network activities - if relevant' is filled.

ERROR

99 Validate that in section 5.a) the field 'Promotion of equality between men and women and non-discrimination (Article 7 of Regulation (EU) No 1303/2013)' is filled.

ERROR

100 Validate that in section 5.b) the field 'The role of the partners referred to in Article 5 of Regulation (EU) No 1303/2013 in the implementation of the programme' is filled.

ERROR

107 Validate that in section 4. The text fields are filled for relevant question.

‘4. Assessment of the information and progress towards achieving the objectives of the programme {0}: ‘Answer to evaluation question’ can’t be empty.

ERROR

108 Validate that in section 4. The comment/rationale fields are filled.

4. Assessment of the information and progress towards achieving the objectives of the programme {0}: ‘Comment if not applicable’ is not filled.

WARNING

After all errors have been resolved the status of the Implementation Report becomes READY TO SEND.

An example of a validation window:

Page 182: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

182

Send the Annual Implementation Report (EAFRD)

REMARK

The Annual Implementation Report (EAFRD) can only be sent once the Validation Errors have been removed and the status is 'READY TO SEND' OR 'SENT'.

It is a must to have the privilege to send the Implementation Report, the user has the role of MS Managing Authority with Send access.

The '4 eye principle' must be respected. Therefore, the user sending must be different from the user who last validated.

The Sending of information by a Member State to the Commission should be electronically signed in accordance with Directive 1999/93/EC. Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

1. Click on the Send link to send the Implementation Report (EAFRD) to the Commission or to an upper Node.

Page 183: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

183

The system will ask you to confirm the send action:

2. Click on Yes to confirm or click on No to return to the Annual Implementation Report (EAFRD). 3. The Sending of information by a Member State to the Commission should be electronically signed in

accordance with Directive 1999/93/EC.

Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

Page 184: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

184

This acknowledge document is signed but the Member State was not signing the snapshot document. The EU Login now provides a functionality of signing without forcing the user to have a certificate. The action to sign will only be triggered when sending to the European Commission:

(1) Enter your SFC2014 Password

(2) Click on the 'SIGN' button

On success, the Implementation Report version has been sent to the Commission or to an upper Node and the status is set to SENT.

Delete the Annual Implementation Report (EAFRD)

Page 185: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

185

REMARK

An Implementation Report (EAFRD) can be deleted only if its version currently resides on the owner's Node and the status is 'OPEN', 'READY TO SEND' or 'RETURNED FOR MODIFICATION BY

MS' and has never been sent to the Commission before and has no sent documents attached.

It is a must to have the role of MS Managing Authority with Update access.

1. Click on the Delete link to remove the Implementation Report from the system.

The system will ask you to confirm the delete action:

Page 186: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

186

2. Click on Yes to confirm or click on No to return to the Annual Implementation Report (EAFRD).

On success, the Implementation Report is removed physically from the system.

Create a New Version of the Annual Implementation Report (EAFRD)

REMARK

A New Version can only be created when the last Implementation Report version for the specific Reporting Year is in status 'RETURNED FOR MODIFICATION BY EC', ‘TECHNICAL RETURN ON

PERFORMANCE REVIEW’ OR ‘NON-ADMISSIBLE’.

It is a must to have the role of MS Managing Authority with Update access.

1. Click on the Create New Version link to create a new version of the Annual Implementation Report (EAFRD).

Page 187: e) A summary of completed evaluations, focussing on ... · be created and submitted from 01/01/YYYY+1 to 30/09/YYYY+1 (= 30/06/YYYY+1 +3 Months flexibility) The AIR is linked to the

187

The system will ask you to confirm the creation of a new version:

2. Click on Yes to confirm. Click on No to return to the Annual Implementation Report (EAFRD). 3. On success, a new version of the Annual Implementation Report (EAFRD) has been created as a copy

of the previous version, with a version number identical to the previous and a working version number incremented by one. Its status was set to 'OPEN'.

The "Report approval date by the monitoring committee" should not be copied.