ENGLISH ROAD OVER P ADDY HILL CREEK CULVERT REHABILITATION CHERYL DINOLFO COUNTY EXECUTIVE
Transcript
Page 1: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD OVER PADDY HILL CREEK CULVERT REHABILITATION

CHERYL DINOLFO COUNTY EXECUTIVE

Page 2: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PRESENTERS

Tom Frys, P.E. – Project Manager Monroe County Dept. of Transportation

Mark Laistner, P.E. – Dir. of Bridge Design Popli Design Group

Page 3: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CULVERT CHARACTERISTICS

• Located in the Town of Greece • Collector Road w/8,862 ADT • Built in 1982 (I-390 project) • Twin 78” Diameter C.M.P. • 220’ Length (end to end) • Drainage Area: 2530 Acres/3.95 Sq. Miles • Height of Cover: 23’

Page 4: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Aerial view of site

Basil A. Marella Park

English Road

Culvert Outlet

Culvert Inlet

North

Page 5: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PROBLEM DISCOVERED

Page 6: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Upstream debris catcher

Page 7: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Debris at inlet

Page 8: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

April 2015 – debris removed

Page 9: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Collapse in west pipe (span 1) inlet side, outside of roadway

Page 10: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

RESPONSE

Page 11: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

We used our term service agreement to bring in a contractor to do an emergency temporary repair.

Page 12: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Excavation of soil over collapsed area

Page 13: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Temporary cofferdam in place

Page 14: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Soil being removed from above

Page 15: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

72” x 25’ long diameter steel pipe being installed

Page 16: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Completed temporary repair

Page 17: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

LONG TERM SOLUTION

• Monroe County had concerns about another failure occurring under the roadway or sidewalk and the resulting lack of hydraulic capacity.

• Using our term services agreement, we

brought in Popli Design Group to design a permanent solution.

Page 18: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

BASICS OF CULVERT LINING

Page 19: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CULVERT LINING ALTERNATIVES

• Paving invert with concrete • Lining with Shotcrete • Lining with cured in place pipe (CIPP) • Lining with new pipe

Page 20: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

BENEFITS OF CULVERT LINING

• Cost effective for deeply buried culverts • Structurally redundant (pipe within pipe) • Can be done without closing the road

Page 21: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CHALLENGES OF CULVERT LINING

• Hydraulic opening is reduced (higher velocity) • Installation difficulties (fit & grouting) • Environmental (no natural bottom)

Page 22: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PRELIMINARY ENGINEERING

Page 23: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

FIELD INSPECTION

• Verified condition of pipes • Verified pipe geometry (length, diameter, slope) • Documented pipe deformations • Documented any obvious voids (location, size) • Verified end conditions (headwalls, scour)

Page 24: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Gap between pipe sections

Page 25: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Pipe deformation at joint (beginning to fail)

Page 26: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Pipe section corroded to the point of failure

Page 27: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Culvert inlet

Page 28: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Culvert outlet (concrete apron w/ energy dissipater)

Page 29: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Laser scanning of culvert interior

Page 30: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Laser scanning of culvert interior

Page 31: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

HYDRAULIC ANALYSIS

• Culvert is not in a mapped flood hazard area • Compared existing/proposed performance • Used flows from previous drainage study • Used HY-8 culvert analysis program

Page 32: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

HYDRAULIC ANALYSIS

• Existing 78” CMP (pipe roughness, n = 0.026) • Proposed 66” I.D. smooth HDPE profile wall pipe

(n = 0.013) w/ beveled inlet headwall • Q50 backwater level was slightly lower • Q50 outlet velocity increased from 13 fps to 15 fps

Page 33: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

REHABILITATION DESIGN

Page 34: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CULVERT LINING SPECIFICATION

• NYSDOT Item 602.2766 (Lining with profile wall HDPE pipe - 66”) • Pipe material: NYSDOT 706-11 (ASTM F894) • Grout: designed by contractor

Page 35: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CULVERT LINING SPECIFICATION

• 1-inch annular grout space is required between the host and liner pipes

• Proposed installation procedure must be submitted for review

• A note on plans required all joints to be welded

Page 36: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

GENERAL PLAN

Page 37: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

GENERAL PLAN

Page 38: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

GENERAL PLAN

Page 39: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PERMITTING

Page 40: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PERMITTING

• A NYSDEC Permit was not required • USACE Nationwide Permit #3 – Maintenance • PCN was required – submitted to USACE • Blanket water quality certification does not

apply to culvert lining projects – NYSDEC review was needed

Page 41: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

PERMITTING • The agencies had concerns with culvert lining

as a rehabilitation technique • They had concerns related to the passage of

aquatic organisms through the culvert • They also preferred to have a natural bottom

in the culvert • Permit authorization was eventually obtained

by persistent communications with the permitting agencies

Page 42: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

BIDDING

• Monroe County bid the purchase of the pipe and installation separately to save time. Pipe Supplier: ISCO Industries $ 76,337 Pipe Installation: Skanex Pipe Services $257,700 Total Cost $334,037 Engineer’s Estimate: $314,220

Page 43: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

CONSTRUCTION

Page 44: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

LINER PIPE INSTALLATION

Page 45: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Liner pipe arrives in 50-ft lengths

Page 46: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Liner pipe storage area

Page 47: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Profile pipe ends not square due to spiral construction

Page 48: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Moving pipe down the embankment

Page 49: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Moving pipe down the embankment

Page 50: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Liner being inserted into Span 2

Page 51: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Fusion welder

Page 52: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Beveling joint for welding

Page 53: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Welding outside of pipe

Page 54: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Welding inside of pipe

Page 55: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Welding at jog in spiral end

Page 56: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Removing temporary repair pipe

Page 57: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Removing temporary repair pipe

Page 58: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Removing temporary repair pipe

Page 59: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

GROUTING

Page 60: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Grout bulkhead with grout and vent tubes

Page 61: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

HDPE bulkhead for flooding pipe to weigh it down

Page 62: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Pump and foaming equipment for cellular grout

Page 63: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Verifying unit weight of cellular grout (38 lb/ft3)

Page 64: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Pumping in grout

Page 65: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

HDPE bulkhead failure

Page 66: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Bulkhead repaired and grouting completed

Page 67: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Inspection holes were made in the grout bulkheads

Page 68: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Void found at Span 2 outlet

Page 69: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Void found at Span 2 outlet

Page 70: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Finishing pipe ends to proper bevel

Page 71: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Finished project

Page 72: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

LESSONS LEARNED • The lining spec. allows various pipe wall

thicknesses & joint types – this can affect pipe fit

• Bidding the pipe and installation separately created coordination issues

• USACOE and NYSDEC have concerns with culvert lining – be prepared to defend your design

• Each contractor may do things differently – the work procedure submittal is critical

Page 73: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

PDH QUESTIONS

Page 74: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Q: True or false? Culvert lining is an

appropriate rehabilitation method for culverts under large amounts of fill.

A: True.

Page 75: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Q: What type of liner was used on the

English Road culvert rehabilitation?

A: HDPE profile wall pipe.

Page 76: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Q: What type of grout was used on the

English Road culvert rehabilitation?

A: Cellular grout.

Page 77: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

ENGLISH ROAD CULVERT REHABILITATION

Q: What was the unit weight of the cellular

grout?

A: 38 lb/ft3.

Page 78: E ROAD OVER PADDY HILL CREEK CULVERT ......ENGLISH ROAD CULVERT REHABILITATION CULVERT CHARACTERISTICS • Located in the Town of Greece • Collector Road w/8,862 ADT • Built in

Monroe County DOT Town of Greece Popli Design Group ISCO Industries, Inc. Skanex Pipe Services, Inc.

PROJECT CREDITS