+ All Categories
Home > Documents > Earned Value Management Fundamentals - Ten Six … · Earned Value Management Fundamentals Earned...

Earned Value Management Fundamentals - Ten Six … · Earned Value Management Fundamentals Earned...

Date post: 25-Sep-2018
Category:
Upload: dinhdien
View: 238 times
Download: 1 times
Share this document with a friend
1
Ten Six Consulting LLC | T: (703) 910-2600 F: (866) 780-8996 | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451 Earned Value Management Fundamentals Earned Value Management Duration: 1 Day Prerequisites: A basic understating of project management techniques and principles, with some experience as part of a project team is recommended. Whether you’re a program manager, control account manager, an analyst or tool specialist, this training will provide you with an invaluable education in the field of earned value management (EVM). This class offers an introduction to the world of EVM, how and why it was created and why it has become so relevant to project performance measurement in industry today. Attendees will learn the principals and language of earned value management as well as the technical aspects of EVM data and how it is calculated. Typical EVM Systems and processes are also covered to provide a context for how earned value is set up and managed through each reporting cycle. Attendees will also learn about data analysis and how to read and interpret standard reports. In short, this class covers all the basics your team will need to operate effectively within an earned value project management system. Training Contents Introduction to Earned Value, history and purpose Earned Value Concepts The ANSI 748 Criteria Earned Value Team Roles and Responsibilities Organization Planning, Scheduling and Budgeting Accounting Considerations Analysis and Management Reports Revisions and Maintenance Common Technology Earned Value Processes Typical Earned Value Systems The periodic update cycle for earned value systems Best Practices for WBS, OBS and other structures Control Accounts, Work Packages and Planning Packages The Performance Measurement Baseline Selecting the Optimum Earned Value Technique for a work package Common pitfalls and things to avoid The Earned Value System Implementation time-line Preparing for a Integrated Baseline Review (IBR) Understanding, analyzing and interpreting Contract Performance Reports (CPRs)
Transcript
Page 1: Earned Value Management Fundamentals - Ten Six … · Earned Value Management Fundamentals Earned Value Management Duration: 1 Day Prerequisites: A basic understating of project management

 

 

Ten Six Consulting LLC | T: (703) 910-2600 F: (866) 780-8996 | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451

Earned Value Management Fundamentals Earned Value Management

Duration: 1 Day Prerequisites: A basic understating of project management techniques and principles, with some experience as part of a project team is recommended. Whether you’re a program manager, control account manager, an analyst or tool specialist, this training will provide you with an invaluable education in the field of earned value management (EVM). This class offers an introduction to the world of EVM, how and why it was created and why it has become so relevant to project performance measurement in industry today. Attendees will learn the principals and language of earned value management as well as the technical aspects of EVM data and how it is calculated. Typical EVM Systems and processes are also covered to provide a context for how earned value is set up and managed through each reporting cycle. Attendees will also learn about data analysis and how to read and interpret standard reports. In short, this class covers all the basics your team will need to operate effectively within an earned value project management system.

Training Contents • Introduction to Earned Value, history and purpose • Earned Value Concepts • The ANSI 748 Criteria • Earned Value Team Roles and Responsibilities • Organization • Planning, Scheduling and Budgeting • Accounting Considerations • Analysis and Management Reports • Revisions and Maintenance • Common Technology • Earned Value Processes • Typical Earned Value Systems • The periodic update cycle for earned value systems • Best Practices for WBS, OBS and other structures • Control Accounts, Work Packages and Planning Packages • The Performance Measurement Baseline • Selecting the Optimum Earned Value Technique for a work package • Common pitfalls and things to avoid • The Earned Value System Implementation time-line • Preparing for a Integrated Baseline Review (IBR) • Understanding, analyzing and interpreting Contract Performance Reports (CPRs)

Recommended