+ All Categories
Home > Documents > ECCAF Slide Pack - Welcome to National Grid Group

ECCAF Slide Pack - Welcome to National Grid Group

Date post: 15-Nov-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
18
ECCAF – Meeting 5 Teleconference 29 June 2014; 10:00 – 11:00 Revised Version
Transcript
Page 1: ECCAF Slide Pack - Welcome to National Grid Group

ECCAF – Meeting 5

Teleconference

29 June 2014; 10:00 – 11:00

Revised Version

Page 2: ECCAF Slide Pack - Welcome to National Grid Group

1. Introductions and Apologies

Barbara Vest (Energy UK)ECCAF Chair

1 42 3

Page 3: ECCAF Slide Pack - Welcome to National Grid Group

ECCAF Membership Update

Fiona Navesey has left DECC, so her ECCAF positionis vacant. Steve Davies attending today as alternate.

DECC are considering their ECCAF representation

There are ECCAF vacancies from the STC Panel andSQSS Panel. ECCAF Technical Secretary continues towork with the Panel Secretaries to fill vacancies.

Page 4: ECCAF Slide Pack - Welcome to National Grid Group

2. Action Log Update

Paul Wakeley (National Grid)ECCAF Technical Secretary

1 42 3

Page 5: ECCAF Slide Pack - Welcome to National Grid Group

Action Updates

Update

Update

Page 6: ECCAF Slide Pack - Welcome to National Grid Group

UpdateInformation provide by Will Francis (DECC) at June JESG

4/1 Provide further information on the likely nextsteps for GB Stakeholder engagement on the CACMNetwork Code

Once a further draft is released by the Commission, it isexpected that another DECC/Ofgem StakeholderWorkshop will be held to prioritise GB Stakeholder keyissues with the Code (possibly August/September)

Further information will be circulated in JESG WeeklyUpdate

Page 7: ECCAF Slide Pack - Welcome to National Grid Group

Update IIInformation provide by Will Francis (DECC) at June JESG

4/2 Investigate the difference between ‘DirectEffect’ and ‘Directly Applicable’

All EU Regulations are “Directly Applicable” in that theydo not require transposition in to domestic law.

As Network Codes will be regulations there is norequirement to transpose the requirements in to thedomestic framework. However, we will need to ensureconsistency of domestic and EU provision, and locationsfor ‘GB detail’ may need to be found

The principle of Direct Effect enables individuals withrights under European legislation to invoke those rightsbefore a national or European court. It is of secondaryconcern to ECCAF in undertaking the Code Mapping.

Page 8: ECCAF Slide Pack - Welcome to National Grid Group

3. ECCAF Workplan and future meetings

Paul Wakeley

National Grid

1 42 3

Page 9: ECCAF Slide Pack - Welcome to National Grid Group

Supporting Paper

Please refer to SupportingPaper “Revised Principles forECCAF Workplan” which wascirculated with the Agenda

Page 10: ECCAF Slide Pack - Welcome to National Grid Group

Background

ECCAF has held five meetings, and mapped 2 EUCodes to date (RFG, CACM)

Progress by ECCAF is linked to the EU Codes passingthrough Comitology

Progress of all ENCs through Comitology has beenmuch slower than original expected

Page 11: ECCAF Slide Pack - Welcome to National Grid Group

Florence Forum

Particular concern by Commission’s Legal Service onCACM:

It can not be adopted as a network code due to thenumber of decisions delegated to TSOs and NRAs afterentry in to force.

Expected to proceed using its current formulation as aguideline.

Both network codes and guidelines will becomedirectly applicable EU Regulations. The endproducts have exactly the same legal status, but thedevelopment and modification routes are differentas defined in Regulation (EU) 714/2009.

Page 12: ECCAF Slide Pack - Welcome to National Grid Group

Other Codes…

Based on the view of the Commission, it is expected;

RFG, DCC, HVDC continue as network codes

CACM, FCA, BAL become guidelines

OS, OPS, LFCR remain as network codes but that furtherdrafting is required to provide further detail and ‘ambition’.This drafting is expected to include ENTSO-E.

Therefore, there is limited benefit in mapping theoperational codes whilst there is no draft versionfrom the Commission and changes are expected.

Page 13: ECCAF Slide Pack - Welcome to National Grid Group

6mo

ECprogramm

e 12 months 3 months See note †18 months – 3+ yearsdepending on Code

European Network Code Development Status: 2 June 2014

Ba

lan

cin

g

Member StateImplementation

ENTSO-EdevelopsNetwork

Code

ACER recommendsNetwork Code to ECACER

reviewsNetwork

Code

HV

DC

Revisions toCode after

Opinion

Tra

ns

pa

ren

cy

Re

gu

lati

on

s

* Areas developed by EC follow a different development process and there are no Framework Guidelines.† Timescales for the stages of Comitology are not specified and under the Commission control

Comitology

DC

C

RF

G

CA

CM

Grid Connection

CACM

System Operation

Balancing

Developed by EC*

Framework Guideline

AC

ER

dev

elo

ps

FW

GL

EC

inv

ites

EN

TS

O-E

tod

ev

elo

pN

C

Pu

bli

ca

tio

nin

OJ

EU

E&

R

LF

CR

Op

Se

c

Op

Sc

h&

Pla

n

Prepared by:

[email protected]

FC

A

ACERrevisesopinion

Preparations and Informal Cross-Border Committee Discussions

Formal Cross-BorderCommittee Voting

Council & ParliamentApproval

Commission indicated at Florence Forum(May 2014) that further drafting was

required to consider these as “NetworkCodes”

Page 14: ECCAF Slide Pack - Welcome to National Grid Group

6mo

ECprogramm

e 12 months 3 months See note †18 months – 3+ yearsdepending on Code

European Network Code Development Status: 2 June 2014

Ba

lan

cin

g

Member StateImplementation

ENTSO-EdevelopsNetwork

Code

ACER recommendsNetwork Code to ECACER

reviewsNetwork

Code

HV

DC

Revisions toCode after

Opinion

Tra

ns

pa

ren

cy

Re

gu

lati

on

s

Grid Connection

CACM

System Operation

Balancing

Developed by EC*

Framework Guideline

AC

ER

dev

elo

ps

FW

GL

EC

inv

ites

EN

TS

O-E

tod

ev

elo

pN

C

Pu

bli

ca

tio

nin

OJ

EU

E&

R

ACERrevisesopinion

LF

CR

Op

Se

c

Op

Sc

h&

Pla

n

Preparations and Informal Cross-Border Committee Discussions

Formal Cross-BorderCommittee Voting

Council & ParliamentApproval

Redrafting expected onOperational Codes prior toany release of version byCommission

ECCAF has alreadymapped CACM and RFG

FCA has only just beensubmitted to the

Commission. No versionhas been published

Commission indicated at Florence Forum(May 2014) that further drafting was

required to consider these as “NetworkCodes”

DC

C

RF

G

CA

CM

FC

A

No ‘stable’ version ofDCC has been issued by

the Commission yet

Comitology

Focussing on Codes with the Commission

Page 15: ECCAF Slide Pack - Welcome to National Grid Group

Improving ECCAF processes

In completing the Code Mapping for RFG and CACM ithas been noted that EU Codes continue to: changethrough the initial drafts of the Commission, containareas which are ‘TBC’ and poor drafting

To prepare the GB mapping a ‘stable draft’ would bepreferable to maximise the efficiency of the mapping

This must be balanced against giving GB early visibility

It is therefore proposed for ECCAF to initially map aEU Code to the GB Codes after the inter-serviceconsultation or when there is a stable draft (whichmay be earlier)

Page 16: ECCAF Slide Pack - Welcome to National Grid Group

Conclusions

There has been a continued slowdown in the progressof the ENCs through Comitology, and an uncertaintyabout future timescales especially for Operational EUCodes where redrafting is required.

As Comitology timescales remain fluid and poorlydefined, ECCAF and GB industry needs to remainpoised to act when required, potentially at short notice

In the short-term we expect the DECC-OfgemStakeholder Workshops and JESG to continue toprovide information / forums to the broader industry

Page 17: ECCAF Slide Pack - Welcome to National Grid Group

ECCAF is asked to approve the following:Abridged version of text in paragraph 20 of supporting paper

a) To postpone ECCAF meetings until September 2014.

b) The ECCAF Chair and Technical Secretary are to maintain awatching brief on developments in Comitology and if there is asignificant change to the timescales reconvene ECCAF sooner.

c) Continue to map the ENCs according to the principles of therevised ECCAF workplan

d) As further intelligence on timings becomes available then theTechnical Secretary will develop a new work schedule for CodeMapping for consideration by ECCAF.

Page 18: ECCAF Slide Pack - Welcome to National Grid Group

4. AOB

1 42 3


Recommended