+ All Categories
Home > Documents > Ehp4 for Sap Erp 6

Ehp4 for Sap Erp 6

Date post: 26-Oct-2014
Category:
Upload: vaibhav-batra
View: 123 times
Download: 14 times
Share this document with a friend
118
EHP4 for SAP ERP 6.0 March 2010 English Basic Overhead Cost Controlling (103) SAP AG Dietmar-Hopp-Allee 16 Building Block Configuration Guide
Transcript
Page 1: Ehp4 for Sap Erp 6

EHP4 for SAP ERP 6.0

March 2010

English

Basic Overhead Cost Controlling (103)

SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany

Building Block Configuration Guide

Page 2: Ehp4 for Sap Erp 6
Page 3: Ehp4 for Sap Erp 6

Copyright

© 2010 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

Page 4: Ehp4 for Sap Erp 6

These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

Page 5: Ehp4 for Sap Erp 6

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

External Process

Business Process Alternative/Decision Choice

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include Field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, Transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

Page 6: Ehp4 for Sap Erp 6

Contents1 Purpose............................................................................................................................. 6

2 Preparation........................................................................................................................ 6

2.1 Prerequisites...................................................................................................6

3 Configuration Overhead Controlling...................................................................................6

3.1 Organizational Elements.................................................................................6

3.1.1 Maintaining the Controlling Area.....................................................................6

3.1.2 Maintaining Versions.......................................................................................9

3.1.3 Maintaining Number Ranges for CO Documents..........................................12

3.1.4 Number Ranges for CO Settlement Documents (Internal Orders)................15

3.2 General Master Data Configuration...............................................................17

3.2.1 Defining Cost Center Categories...................................................................17

3.2.2 Orders and Settlement..................................................................................17

4 Configuration Budget and Plan........................................................................................34

4.1 Budgeting and Budget Management (Define Tolerance Limits for Availability Control) 34

4.2 User Defined Planning..................................................................................35

4.2.1 Creating Planning Layouts for Cost Element Planning / Cost Centers..........35

4.2.2 Creating Planning Layouts for Activity Type Planning...................................38

4.2.3 Creating Planning Layouts for Statistical Key Figure Planning......................41

4.2.4 Creating Planning Layouts for Cost Element Planning / Internal Orders.......43

4.2.5 Maintaining User-Defined Planner Profiles....................................................45

5 Basic Master Data...........................................................................................................49

5.1 Cost Elements and Groups...........................................................................50

5.1.1 Primary Cost Elements..................................................................................50

5.1.2 Creating Secondary Cost Elements..............................................................56

5.1.3 Creating Groups: Cost Elements...................................................................57

5.1.4 Selection Variants (Cost Elements)...............................................................66

5.2 Cost Centers and Groups..............................................................................67

5.2.1 Creating Standard Hierarchy: Cost Centers..................................................67

5.2.2 Creating Cost Centers...................................................................................68

5.2.3 Creating Alternative Groups: Cost Centers...................................................69

5.2.4 Selection Variants (Cost Center)...................................................................71

5.3 Creating Statistical Key Figures....................................................................71

5.4 Creating Activity Types..................................................................................72

5.5 Creating Internal Order..................................................................................73

6 Configuration with Use of CO Master Data......................................................................73

6.1 Actual Postings.............................................................................................73

6.1.1 Editing Automatic Account Assignment - Defining Account Assignment.......73

6.1.2 Editing Automatic Account Assignment- Details per valuation area..............75

6.2 Accrual Calculation.......................................................................................76

6.2.1 Maintaining Overhead Structure for Accrual Calculation (Actual and Plan)...76

Page 7: Ehp4 for Sap Erp 6

6.2.2 Maintaining Overhead Structure - Base Determination.................................78

6.3 Assessment...................................................................................................79

6.3.1 Defining Assessment Plan............................................................................79

6.3.2 Defining Assessment Actual..........................................................................81

Page 8: Ehp4 for Sap Erp 6

Basic Overhead Cost Controlling1 PurposeThis configuration guide provides the information you need to set up the configuration of this building block manually.

If you do not want to configure manually and prefer an automated installation process using the SAP Best Practices Installation Assistant and other tools, refer to the SAP Best Practices Quick Guide.

2 Preparation

2.1 PrerequisitesBefore you start installing this building block, you must install prerequisite building blocks. For more information, see the building block prerequisite matrix (Prerequisites_Matrix_[xx]_EN_IN.xls; the placeholder [xx] depends on the SAP Best Practices version you use, for example, BL refers to the SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_IN.xls). This document can be found on the SAP Best Practices documentation DVD in the folder ..\..\BL_IN\Documentation\.

3 Configuration Overhead Controlling

UseIn this step, all the Customizing settings from the Central Cost Center Accounting building block are copied to the development client.

ProcedureAccess the Customizing activity as described and make the settings according to the table values listed in this documentation.

3.1 Organizational Elements

3.1.1 Maintaining the Controlling Area

UseMind the following:

Controlling area 1000 is configured as cross-company code for India. Company code 1000 – India – is assigned. The name can vary.

The currency is INR, the currency type is 30 (group or client currency).

The extended chart of accounts is YAIN.

The fiscal year is Apr.- March (fiscal year variant V3).

The variance indicators (price differences can be determined for specific transactions) and company code validation (postings to cost centers or orders only possible within the same company code) are set for the controlling area.

The following Controlling components are active:

Cost Centers

Order Management

Page 9: Ehp4 for Sap Erp 6

Commitments Management

Projects

Sales Orders with Commitments Management

Cost Objects

3.1.1.1 Maintaining Controlling Area - Basic Settings (Detail)

Procedure1. Access the activity using one of the following navigation options:

Transaction code OKKP

IMG menu Controlling General Controlling Organization Maintain Controlling Area Maintain Controlling Area (Choose Activity Screen)

2. On the Change View: “Basic Data” Overview screen, double-click controlling area 1000.

3. On the Change View: “Basic Data” Details screen, check and make the following entries:

Field name Description User action and values Comment

Controlling Area 1000

Name Controlling Area 1000

CoCd->CO Area Allocation Indicator

2 Cross-company code cost accounting

Currency type 30  Group currency

Currency Currency INR  

Diff.CCode Currency

Indicator: Different Company Code Currency is Allowed

Set  allowed

Chart of accts Chart of accounts

YAIN  

Fiscal year variant V3  

CCtr Std. Hierarchy Standard Hierarchy for Cost Centers

0001 Do not maintain the standard hierarchy, confirm warnings. The standard hierarchy is maintained later.

4. Save your entries.

3.1.1.2 Maintaining Controlling Area - Activating Components/Control Indicator

Procedure1. Access the activity using one of the following navigation options:

Page 10: Ehp4 for Sap Erp 6

Transaction code OKKP

IMG menu Controlling General Controlling Organization Maintain Controlling Area Maintain Controlling Area (Choose Activity Screen)

2. On the Change View: “Basic Data” Overview screen, select controlling area 1000. Do not double-click.

3. On the Change View: “Basic Data” Details screen, double-click Activate Components/Control Indicators.

4. If several fiscal year intervals exist, double-click the latest year in this list.

5. On the Change View: “Activate Components/Control Indicators”: Details screen, make the following entries:

Field name Description User action and values Comment

Cost centers Component active  

Order management Component active  

Commit. management

Component active  

Profit Analysis Component not active  Building block 168 activates profitability analysis

Acty-Based Costing Component not active  

Profit center Acctg. No selection Not active

Projects Set

Sales Orders Set SD Order Processing is Active

Cost Objects Set

Real Estate Mgmt. No selection Not active

W. Commitment Mgt

Set Ind. Commitment Management with Sales Orders is Active

All currencies Set

Variances Set  

Company Code validation

Set Applies only if several company codes are assigned to the controlling area

6. Save your entries.

ResultYou have created and maintained the controlling area 1000.

Page 11: Ehp4 for Sap Erp 6

3.1.1.3 Maintaining Controlling Area - Assigning Company Code

UseAll company codes used are to be assigned to the controlling area.

If the company code 1000 is already assigned to controlling area 1000, the following step can be omitted. These entries are then assigned in building block 101.

Procedure1. Access the activity using one of the following navigation options:

Transaction code OKKP

IMG menu Controlling General Controlling Organization Maintain Controlling Area Maintain Controlling Area

2. On the Change View: “Basic Data” Overview screen, select controlling area 1000. Do not double-click.

3. On the Change View: “Basic Data” Overview screen, choose Assignment of company code(s) with a double-click (right-hand side of the screen).

4. On the Change View: “Assignment of Company Code(s)”: Overview screen, choose New Entries.

5. On the New Entries: Overview of added entries screen, make the following entries:

Field name Description User action and values Comment

CoCd Company Code 1000 Enter your company code

6. Save your entries.

3.1.2 Maintaining Versions

UseVersions enable you to have independent sets of planning and actual data.

         Version 0

Planning- Integrated planning is set- Copying is allowed- Exchange rate type M with value date = start of fiscal year- Valuation version for internal activity allocation = 0- Integrated planning with cost centers/business processes

Price calculation- Purely iterative price- Actual and planned periodic price (the costs of the individual period are divided by the activities during that period, which may result in different prices for each period)- You can initiate revaluation in a separate business transaction and revaluation at actual prices. The original allocations for the planned price are not changed in the process. Instead, the system posts the deviation from the allocation for the planned

Page 12: Ehp4 for Sap Erp 6

price in a separate transaction.

        More versions: 1, 2, 3 (plan versions only)

Planning

- Integrated planning is set- Copying is allowed- Exchange rate type P with value date = start of fiscal year- Valuation version for internal activity allocation = 0- Integrated planning with cost centers/business processes

Price calculation

- Purely iterative price

- Periodic price

Integrated planning controls whether or not planning data from Cost Center Accounting and Activity-Based Costing is passed on to other applications (such as Special Purpose Ledger or Profit Center Accounting), and whether or not line item documents are written each time planning data is changed.

Integrated planning- Controls whether or not planning of an internal order is integrated in a plan version with cost center planning.

Strictly iterative priceYou should only set this indicator if you use output prices that have been set manually for planning activity types. If the indicator is set, price calculation will also include the calculation of a strictly iterative price, in addition to the price that results from your planning (for example, through a mixture of iterative and manually set allocation prices). When determining this strictly iterative price, the system acts as if there were no manually set prices. As a result, the allocation prices for all activity types are also determined iteratively for all the cost centers in this version.

3.1.2.1 Maintaining Versions – General Version Definition

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling General Controlling Organization Maintain Versions

2. On the Enter General Version Definition screen, enter the following values:

Version Name Plan Actual WIP/RA Variance ExclusiveUse

0 Plan/actual version

Set Set Set Set

1 Plan Version: Change 1

Set Set

Page 13: Ehp4 for Sap Erp 6

Version Name Plan Actual WIP/RA Variance ExclusiveUse

2 Plan Version: Change 2

Set Set

3 Plan Version: Change 3

Set Set

3. Save your entries.

3.1.2.2 Maintaining Versions – Settings for Each Fiscal Year

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling General Controlling Organization Maintain Versions

2. On the View “General Version Definition”: Overview screen, choose Version 0.

3. Choose Controlling area settings Settings for each year.

4. If the dialog box Determine Work Area: Entry appears, enter controlling area 1000.

5. On the Change View “Settings for Each Fiscal Year”: Overview screen, select New Entries.

6. On the Change View “Settings for Each Fiscal Year”: Details screen, enter the following values:

Field name Description User action and values Comment

Fiscal Year <previous year> for example 2009

Version locked set Version previous year locked

Integrated Planning set

Copying allowed set

Exchange rate type M Standard translation at average rate

Value date for example 1.1. from the selected fiscal year

Integrated planning with cost centers/bus.processes

set

Version for ind.act.alloc. 0 Plan/actual version

7. Save your entries.

Page 14: Ehp4 for Sap Erp 6

8. Repeat steps 5 and 6 for fiscal year <current year> (for example, 2010). On the Change View “Settings for Each Fiscal Year”: Details screen, enter the following values:

Field name Description User action and values Comment

Fiscal Year <current year> for example 2010

Version locked Actual year not locked

Integrated Planning set

Copying allowed set

Exchange rate type M Standard translation at average rate

Value date for example 1.1. from the selected fiscal year

Integrated planning with cost centers/bus.processes

set

Version for ind.act.alloc. 0 Plan/actual version

9. Save your entries.

10. Repeat steps 5 and 6 for fiscal year <next year> (for example, the next 5 following years). On the Change View “Settings for Each Fiscal Year”: Details screen, enter the following values:

Field name Description User action and values Comment

Fiscal Year <next year> for example 2011

Version locked

Integrated Planning set

Copying allowed set

Exchange rate type M Standard translation at average rate

Value date for example 1.1. from the selected fiscal year

Integrated planning with cost centers/bus.processes

set

Version for ind.act.alloc. 0 Plan/actual version

11. Save your entries.

ResultYou have configured:

Page 15: Ehp4 for Sap Erp 6

Version 0 for planning and actual postings and

Versions 1, 2 and 3 only for planning.

The planning horizon for these versions are 5 years and you have assigned them to controlling area 1000.

3.1.3 Maintaining Number Ranges for CO Documents

UseThe purpose of this activity is to define the number ranges for the CO documents.

3.1.3.1 Maintaining Number Ranges for CO Documents - No. Range Intervals

Procedure1. Access the activity using one of the following navigation options:

Transaction code KANK

IMG menu Controlling General Controlling Organization Maintain Number Ranges for Controlling Documents

2. In the field of CO Area enter controlling area 1000.

3. Choose Maintain Groups (F6).

4. Define the number range group menu item Group item Insert F6.

5. Insert the text for the new number range group and assign the number range. Maintain the table as follows:

Text From number To number

Primary Postings 0100000000 0199999999

Planning Transactions 0200000000 0299999999

Actual Postings (without primary postings)

0300000000 0399999999

Other Transactions 0400000000 0499999999

6. Save your entries.

3.1.3.2 Maintaining Number Ranges for CO Documents - CO Documents Groups

UseTo assign CO documents to the related number ranges, the corresponding groups are to be maintained (assigned).

Procedure1. Access the activity using the following navigation options:

Transaction code KANK

IMG menu Controlling General Controlling Organization Maintain Number Ranges for Controlling Documents

Page 16: Ehp4 for Sap Erp 6

2. In the field of CO Area enter controlling area 1000.

3. Choose Maintain Groups (F6).

4. Select the element and assign them to the respective group as in the table below. For that purpose:

Choose a number-range-group and mark the group.

Choose a CO Business Transaction (Element) with button Select element (F2).

The assignment proceeds with button Assign element group (F5).

Group/ CO Business Transaction Description Comment

Primary Postings (number range number 01) Group

COIN CO Through-postings from FI Element

KAZO Down payment Element

Planning Transactions (number range number 02)   Group

CPPPABC process assessment: plan Element

FIPA Payment scheduling Element

KAZP Plan cost center accrual Element

KOAP Plan settlement Element

KPIV Actual cost distrib. cost obj. Element

KPPB Standard cost estimate Element

KSII Actual price calculation Element

KSP0 Plan split costs Element

KSPB Plan assessment to CO-PA Element

KZPP Plan overhead (periodic) Element

KZRP Interest Calculation (Plan) Element

PAPL Profit Planning Element

RKP1 Planning primary costs Element

RKP2 Planning activities Element

RKP3 Planning secondary costs Element

RKP4 Planning stat. key figures Element

RKP5 Plan Revenue Types Element

RKP6 Planning activity-dep. costs Element

RKP7 Planning act.-dep. sec. costs Element

RKP8 Planning order costs Element

RKP9Plan. act-dep.settlement costs Element

RKPBPeriodic Reposting: Plan Data Element

RKPL Plan indirect activity alloc. Element

RKPQ Manual cost planning Element

RKPS Sec. planning with template Element

Page 17: Ehp4 for Sap Erp 6

RKPUPlan overhead cost assessment Element

RKPV Plan overhead cost distrib. Element

RKPWSecondary order cost planning Element

RKPX Aty-dep. sec. order cost plan. Element

RKPZ Planning overhead credits Element

RKU1 Repost costs Element

RKU2 Repost revenue Element

RKU3 Repost CO line items Element

Planning Transactions (number range number 02)   Group

CPPPABC process assessment: plan Element

FIPA Payment scheduling Element

KAZP Plan cost center accrual Element

KOAP Plan settlement Element

KPIV Actual cost distrib. cost obj. Element

KPPB Standard cost estimate Element

KSII Actual price calculation Element

KSP0 Plan split costs Element

KSPB Plan assessment to CO-PA Element

KZPP Plan overhead (periodic) Element

KZRP Interest Calculation (Plan) Element

PAPL Profit Planning Element

RKP1 Planning primary costs Element

RKP2 Planning activities Element

RKP3 Planning secondary costs Element

RKP4 Planning stat. key figures Element

RKP5 Plan Revenue Types Element

RKP6 Planning activity-dep. costs Element

RKP7 Planning act.-dep. sec. costs Element

RKP8 Planning order costs Element

RKP9Plan. act-dep.settlement costs Element

RKPBPeriodic Reposting: Plan Data Element

RKPL Plan indirect activity alloc. Element

RKPQ Manual cost planning Element

RKPS Sec. planning with template Element

RKPUPlan overhead cost assessment Element

RKPV Plan overhead cost distrib. Element

RKPWSecondary order cost planning Element

Page 18: Ehp4 for Sap Erp 6

RKPX Aty-dep. sec. order cost plan. Element

RKPZ Planning overhead credits Element

RKU1 Repost costs Element

RKU2 Repost revenue Element

RKU3 Repost CO line items Element

Other Transactions (number range number 04)   Group

KABGAutomat. WIP/results analysis Element

KABM Manual WIP/results analysis Element

KAFM Payment data Element

KAUS Calculate Scrap Element

KEKB Unit costing Element

KEKZ Unit costing (overhead) Element

KFPI Transfer price allocation Element

KFPP Transfer price agreement Element

KPPZ Standard costing (overhead) Element

KSOS Sec. Target Cost Calculation Element

KSPA Assessment to CO-PA Element

KSWPPrim. Target Cost Calc. (WIP) Element

KSWS Sec. Target Cost Calc. (WIP) Element

KVAR Variance calculation Element

RKLX Predistribution of fixed costs Element

RKS Enter statistical key figures Element

5. Save your entries.

ResultYou have configured the number ranges for Controlling documents.

3.1.4 Number Ranges for CO Settlement Documents (Internal Orders)

3.1.4.1 Maintaining Number Ranges for CO Settlement Documents - No. Range Intervals

Procedure1. Access the activity using one of the following navigation options:

Transaction code SNUM

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Number Ranges for Settlement Documents

2. If you accessed the transaction through the code SNUM, enter CO_ABRECHN under Object and select Number Ranges.

Page 19: Ehp4 for Sap Erp 6

3. Choose the Maintain Groups (F6).

4. Define the number range group menu item Group item Insert F6.

5. Insert the text for the new number range group and assign the number range. Maintain the table as follows:

Text From_number To_number

Standard Accounting Document 0000000001 0001000000

6. Save your entries.

ResultThe number ranges are configured for the settlement documents for internal orders.

3.1.4.2 Maintaining Number Ranges for CO Settlement Documents - Assign Controlling Area

UseThe controlling area is to be assigned to the number range group.

Procedure1. Access the activity using one of the following navigation options:

Transaction code SNUM

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Number Ranges for Settlement Documents

2. If you accessed the transaction through the code SNUM, enter CO_ABRECHN under Object and select Number Ranges.

3. Choose the Maintain Groups (F6).

4. If controlling area 1000 is listed under “Not assigned”, it has to be assigned to a number range group. If the controlling area 1000 is not listed here, the following steps are not relevant.

5. Select controlling area 1000 in the list Not assigned and choose Select Element (F2).

6. Select the Standard Accounting document group and choose Select Element (F2).

7. Save your entries.

ResultThe controlling area is assigned to a number range group.

3.2 General Master Data Configuration

3.2.1 Defining Cost Center Categories

UseCost center categories group together properties that the cost centers receive by assigning a cost center category to a cost center.

Page 20: Ehp4 for Sap Erp 6

All cost center categories provided with standard SAP are used in SAP Best Practices. Additionally a cost center category is needed for marketing cost centers.

Procedure1. Access the activity using the following navigation options:

Transaction code SPRO

IMG menu Controlling Cost Center Accounting Master Data Cost Centers Define Cost Center Categories

2. On the Change View “Cost Center Categories”: Overview screen, choose New Entries.

3. On the New Entries: Overview of added Entries screen, make the following entries:

Field name Description User action and values Comment

CCtC Cost Center Category 9

Name Marketing

ActRev Actual Revenue Postings Set

PlnRev Planning Revenues Set

Cmmt Commitment Update Set

Func Functional Area YB35

ResultYou have created the Cost Center Category 9 Marketing.

3.2.2 Orders and Settlement

3.2.2.1 Maintaining Allocation Structures

UseAn allocation structure defines how an order is settled.

The allocation structure differentiates the different possibilities of allocations.

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Allocation Structures

2. On the Change View “Allocation Structures”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Alloc.str. Text

Y1 CO allocation structure

Y2 No Split - All cost elements

Page 21: Ehp4 for Sap Erp 6

Alloc.str. Text

Y9 Rework Orders

YH PS Settlement

YL Service Order Settlement

YM Allocation Structure IM

YP PP Valuated

YR R&D Orders

YS Sales Order Settlement

4. Save your entries.

ResultThe allocation structures are added.

3.2.2.1.1 Maintaining Allocation Structures — Assignments

UseAssignments are added to the allocation structures.

Prerequisites Allocation structures are added in previous step.

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Allocation Structures

2. On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right-hand side of the screen).

3. Choose Assignments with a double-click (left-hand side of the screen).

4. Choose New Entries.

5. On the New Entries: Overview of Added Entries screen, make the following entries and save.

Allocation Structure

Assignment Text

Y1 010 Personnel costs

Y1 020 Raw-/service material consump.

Y1 030 Other costs

Y1 040 Secondary costs

Y1 050 Revenues

Page 22: Ehp4 for Sap Erp 6

Allocation Structure

Assignment Text

Y2 100 All cost elements

Y9 100 Rework Costs

YH 10 BP Revenues

YH 20 BP Costs

YH 30 Personnel costs

YH 40 Raw-/service material consump.

YH 50 Other costs

YH 60 Secondary costs

YH 70 Revenues

YH 80 Production Material

YL 100 Service revenues

YL 200 Service costs

YM 010 External procurement

YM 020 Material

YM 030 Internal services

YP 100 PP Valuated

YR 100 R&D Costs

YS 100 Sales order

ResultThe assignments are added.

3.2.2.1.2 Maintaining Allocation Structures — Source (CE-Group)

UseCost element groups are assigned as sources.

Page 23: Ehp4 for Sap Erp 6

PrerequisitesThe allocation structures and assignments are maintained.

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Allocation Structures

2. On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right hand side of the screen).

This step and the following steps have to be repeated for each allocation structure and each assignment. You can find the required entry data in the table below.

3. Choose Assignments with a double-click (left hand side of the screen).

4. Select the assignment (right hand side of the screen).

5. Select Source with a double-click (left hand side of the screen).

6. If the Set Controlling Area dialog box appears, enter controlling area 1000.

7. On the Change View “Source”: Details screen, make the following entries and save.

Allocation Structure

Assignment Cost Elem.Group

Y1 010 YBMF_001

Y1 020 YBMF_002

Y1 030 YBMF_003

Y1 040 200_CE

Y1 050 20_CE

Y2 100 YB_ALL

Y9 100 YB_ALL

YH 10 93200000

YH 20 93111000 to 93114000

YH 30 YBMF_001

YH 40 YBMF_002

YH 50 YBMF_003

YH 60 YBMF_004

YH 70 5100_CE

Page 24: Ehp4 for Sap Erp 6

Allocation Structure

Assignment Cost Elem.Group

YH 80

YL 100 20_CE

YL 200 10_CE

YM 010 1400_CE

YM 020 1200_CE

YM 030 4500_CE

YP 100 YB_ALL

YR 100 YB_ALL

YS 100 YB_ALL

ResultThe cost element groups are assigned to the allocation structures as sources.

3.2.2.1.3 Maintaining Allocation Structures — Settlement Cost Elements (CE)

UseThere are two types of settlement:

settlement by cost elements

settlement by settlement cost element

PrerequisitesThe allocation structure, assignments and sources are maintained.

For the second type you have to define the following cost elements, to ensure that settlement is successfully executed:

Internal settlement (means internal CO): Cost element category 21 (secondary).

External settlement (means receivers in external accounting for example, in Asset Management): Cost element category 22 (primary).

Procedure1. Access the activity using one of the following navigation options:

Transaction code SPRO

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Allocation Structures

2. On the Change View “Allocation Structures”: Overview screen, select the allocation structure (right hand side of the screen).

Page 25: Ehp4 for Sap Erp 6

3. Choose Assignments with a double-click (left-hand side of the screen).

4. Select the assignment (right-hand side of the screen).

This step and the following steps have to be repeated for each assignment. You can find the required entry data in the table below.

5. Choose Settlement Cost Elements with a double-click (left-hand side of the screen).

6. On the Change View “Settlement Cost Elements”: Overview screen, choose New Entries.

7. On the New Entries: Overview of added Entries screen, make the following entries and save.

Allocation Structure

Assign-ment

Receiver cat.

ByCost Element

SettlementCost Element

Y1 010 CTR Select

Y1 010 ORD Select

Y1 010 WBS Select

Y1 010 FXA Select

Y1 020 CTR Select

Y1 020 ORD Select

Y1 020 WBS Select

Y1 020 FXA Select

Y1 030 CTR Select

Y1 030 ORD Select

Y1 030 WBS Select

Y1 030 FXA Select

Y1 040 CTR Select

Y1 040 ORD Select

Y1 040 WBS Select

Y1 040 FXA Select

Y1 050 CTR Select

Y1 050 ORD Select

Y1 050 WBS Select

Y1 050 FXA Select

Y2 100 FXA Select

Y2 100 CTR Select

Y2 100 SDI Select

Y2 100 WBS Select

Page 26: Ehp4 for Sap Erp 6

Allocation Structure

Assign-ment

Receiver cat.

ByCost Element

SettlementCost Element

Y9 100 CTR 92101500

YH 10 PSG 92110000

YH 20 PSG 92111000

YH 30 CTR Select

YH 30 ORD Select

YH 30 WBS Select

YH 30 FXA Select

YH 40 CTR Select

YH 40 ORD Select

YH 40 WBS Select

YH 40 FXA Select

YH 50 CTR Select

YH 50 ORD Select

YH 50 WBS Select

YH 50 FXA Select

YH 60 CTR Select

YH 60 ORD Select

YH 60 WBS Select

YH 60 PSG Select

YH 60 FXA 39118000

YH 70 CTR Select

YH 70 ORD Select

YH 70 WBS Select

YH 70 FXA Select

YH 80

YL 100 PSG 92105000

YL 200 PSG 92105500

YL 200 SDI Select

YL 200 CTR 92105500

Page 27: Ehp4 for Sap Erp 6

Allocation Structure

Assign-ment

Receiver cat.

ByCost Element

SettlementCost Element

YM 010 FXA Select

YM 010 CTR 92102000

YM 020 FXA Select

YM 020 CTR 92101000

YM 030 FXA 39118000

YM 030 CTR 92103000

YP 100 CTR Select

YP 100 ORD Select

YR 100 PSG 92101700

YR 100 CTR 92101700

YS 100 PSG 92101900

ResultSettlement cost elements are added to allocation structures.

3.2.2.2 Maintaining Settlement Profiles

UseIn the settlement profile, you define a range of control parameters for settlement.

Procedure1. Access the activity using one of the following navigation options:

Transaction code OKO7

IMG menu Controlling Internal Orders Actual Postings Settlement Maintain Settlement Profiles

2. On the Change View “Settlement Profile”: Overview screen, select the settlement profile.

This step and the following steps have to be repeated for each settlement profile. You can find the required entry data in the table below.

3. Choose Details.

4. On the Change View “Settlement Profile”: Details screen, make the following sets of entries:

Page 28: Ehp4 for Sap Erp 6

Field name User action / value:Settlement profile YB0020

User action / value:Settlement profile YB0030

User action / value:Settlement profile YB0050

User action / value:Settlement profile YB00AI

User action / value:Settlement profile YB00R1

Settlement profile

YB0020 YB0030 YB0050 YB00AI YB00R1

Text Overhead costs

Production Measure

Investment Measure

Settlement assets under

const.

R&D Internal Order

Settlement

Actual costs cost of sales

To be settled in full

set set set set Set

Can be settled

Not for settlement

Default Values

Allocation Structure

Y1 Y1 Y1 YM YR

PA Transfer str,

Default object type

CTR ORD FXA FXA PSG

Indicators

100% validation

set

%-Settlement set set set set set

Equivalence numbers

set set set set set

Amount Settlement

Var. to costing based PA

Valid Receivers

G/L account Settlement optional

Settlement optional

Settlement optional

Settlement not allowed

Settlement not allowed

Cost Center Settlement optional

Settlement not allowed

Settlement optional

Settlement not allowed

Settlement optional

Page 29: Ehp4 for Sap Erp 6

Field name User action / value:Settlement profile YB0020

User action / value:Settlement profile YB0030

User action / value:Settlement profile YB0050

User action / value:Settlement profile YB00AI

User action / value:Settlement profile YB00R1

Order Settlement optional

Settlement optional

Settlement optional

Settlement not allowed

Settlement not allowed

WBS element

Settlement optional

Settlement optional

Settlement optional

Settlement not allowed

Settlement not allowed

Fixed Asset Settlement not allowed

Settlement not allowed

Settlement optional

Settlement Required

Settlement not allowed

Material Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Network Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Profit. Segment

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement optional

Sales order Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Cost objects Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Order item Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Business proc.

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Real Est.Object

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Settlement not allowed

Other parameter

Document type

SA SA SA AA SA

Max.no.dist. rls

10 10 100 999 3

Residence time

3 3 24 12 3

5. Choose Save and Back.

ResultYou have created the settlement profiles.

Page 30: Ehp4 for Sap Erp 6

3.2.2.3 Defining Order Types

UseThere are several kinds of order types in controlling. The order category determines the technical properties of orders.

The most important order categories in overhead controlling are:

Order category Description

01 Internal order

02 Accrual Calculation Order

03 Model Order

Accrual Orders

You use accrual orders to monitor the period-related accrual calculation between the expenses posted in Financial Accounting and the accrued costs charged in Cost Accounting. You can therefore take the expenses you record in Financial Accounting and distribute them as accrued costs across multiple periods.

Order Type:Y9A0 Internal Order – Accrual Cost Accounting

External Number Assignment: 9A00 + Sequence Number

Settlement Profile: 20

Not Matched with Revenue

Internal order

These order types differ in two attributes in revenue management and the settlement profile. You can uncheck the “Revenue Postings” flag for order type Z010 (Third-Party Services) if necessary.

As cost centers cannot manage true revenues, special customizing settings are needed to settle cost centers with orders for which costs are matched with revenues.

You define a number of control parameters for settlement in the settlement profile. The settlement profile is a prerequisite for later entering a settlement rule for a sender in the order master record. The settlement profile is usually defined in the order type.

If the costs are for information only you could create a statistical internal order. In this case you have to mark the checkbox ‘statistical order’ on tab index ‘Controlling data’ by creating an internal order.

The statistical order does not require a settlement profile, since statistical costs and revenues cannot be charged further.

Procedure1. Access the activity using the following navigation options:

Transaction code KOT2_OPA

IMG menu Controlling Internal Orders Order Master Data Define Order Types

2. On the Change View “Order Types”: Overview screen, choose New Entries.

Page 31: Ehp4 for Sap Erp 6

3. On the Order type: New Entry screen, provide Order Category 01 and choose Enter.

4. On the New Entries: Details of Added Entries screen, make the following entries:

Field name Description User actions and values Comment

Order category 1 Internal Order (Controlling)

Order Type Y010

Short Text Internal Order: Third-party services

5. Choose Assign/Change Intervals to assign the number range.

6. To assign an Internal Order Type to the related Number Ranges Group perform the following steps:

a) Select the number range group checkbox.

b) Choose an order type with ‘Select element F2’. (The color of the order type changes from black to blue.)

c) Assign the order type to the number range group by selecting Element/Group (F5).

Order Type Number Range group

Y010 Internal Order: Third-party services

7. On New Entries: Details of Added Entries screen, make the following entries:

Field name Description User actions and values Comment

Order Type Y010 Already maintained in preceding steps

Short Text Third-party services Already maintained in preceding steps

Order category 1 Internal Order (Controlling) Already maintained in preceding steps

Number range interval

500000 – 599999

Number range group:

Services

Already maintained in preceding steps

Settlement profile YB0030 Production measure

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object Class

Functional area YB30 Sales and Distribution

Collective order with/without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 3 Calendar Months

Page 32: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

1

CO Partner Update

X ACTIVE Select from the drop down menu

Commitments Management

set Commitments Management Active

Revenue postings

set Identifier "Revenue posting allowed"

Integrated Planning

set Indicator for Integrated Planning

Status profile 00000002 Internal Orders

Release immediately

Not set

8. Save your entries.

9. Repeat the entries and enter the required fields for order type Y020:

Field name Description User actions and values Comment

Order Type Y020

Short Text Internal Order : Overhead costs

Order category 1 Internal Order (Controlling)

Number range interval

200000 - 299999

Number range group: Design

Settlement profile YB0020 Overhead costs

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Functional area YB40 Administration

Object Class

Collective order with/without automatic goods movement

Collective order without automatic goods movement

Residence Time 1

3

CO Partner Update

X ACTIVE

Commitments Management

set

Page 33: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

Revenue postings

Not set

Integrated Planning

set

Status profile 00000002

Release immediately

Not set

10. Save your entries.

11. Repeat the entries and enter the required fields for order type Y090:

Field name Description User actions and values Comment

Order Type Y090

Short Text Internal Order: Statistical orders

Order category 1 Internal Order (Controlling)

Number range interval

300000 – 399999 Number range group: Tools and Equipment

Settlement profile

Not set

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object Class

Functional area Not set

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 1

3

CO Partner Update

X ACTIVE Select from the drop down menu

Commitments Management

Set Commitments Management Active

Revenue postings

Not set

Integrated Planning

Not set

Page 34: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

Status profile 00000002 Internal Order

Release immediately

Set "Release immediately" indicator

12. Save your entries.

13. Repeat the entries and enter the required fields for order type Y100:

Field name Description User actions and values Comment

Order Type Y100

Short Text Research and Development

Order category 1 Internal Order (Controlling)

Number range interval

100000 - 199999

Number range group: Development

Settlement profile

YB00R1 R&D Internal Order Settlement

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object class

Functional area YB50 Research & Development

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 1

3

CO Partner Update

X Active Select from the drop down menu

Commitments Management

set

Revenue plannings

Not set

Integrated Planning

set

Status profile 00000002 Internal Orders

Page 35: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

Release immediately

Not set

14. Save your entries.

15. Repeat the entries and enter the required fields for order type Y400:

Field name Description User actions and values Comment

Order Type Y400

Short Text Internal Order: Marketing

Order category 1 Internal Order (Controlling)

Number range interval

500000 – 599999

Number range group:

Services

Settlement profile

Not set Not for settlement

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object class

Functional area

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 1

3

Residence Time 2

CO Partner Update

X Active Select from the drop down menu

Commitments Management

set

Revenue plannings

Not set

Integrated Planning

Not set

Status profile 00000002 Internal Orders

Release immediately

set

16. Save your entries.

Page 36: Ehp4 for Sap Erp 6

17. Repeat the entries and enter the required fields for order type Y600:

Field name Description User actions and values Comment

Order Type Y600

Short Text Internal Orders: Investment

Order category 1 Internal Order (Controlling)

Number range interval

600000 - 699999

Number range group: Capital Spending

Settlement profile

YB00AI Assets under construction settlement

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object class

Functional area YB40 Administration

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 1

6

Residence Time 2

6

CO Partner Update

X Active Select from the drop down menu

Commitments Management

set

Revenue plannings

Not set

Integrated Planning

Not set

Status profile 00000002 Internal Orders

Release immediately

Not set

18. Save your entries.

19. Repeat the entries and enter the required fields for order type Y9A0:

Field name Description User actions and values Comment

Order Type Y9A0

Page 37: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

Short Text Internal orders: Accrual cost accounting

Order category 2 Accrual Calculation Order (Controlling)

Number range interval

9A0000000000 - 9AZZZZZZZZZZ

Number range group: Imputed cost orders

Settlement profile

YB0020 Overhead costs

Planning profile 000001 General plan profile

Budget Profile 000001 General budget profile

Object class

Functional area YB40 Administration

Collective order with /without automatic goods movement

Collective order without automatic goods movement

Select from the drop down menu

Residence Time 1

3

Residence Time 2

CO Partner Update

X Active Select from the drop down menu

Commitments Management

Not set

Revenue plannings

Not set

Integrated Planning

Set

Status profile 00000002 Internal Orders

Release immediately

Set

20. Save your entries.

Page 38: Ehp4 for Sap Erp 6

3.2.2.4 Assigning Strategy Sequence to Order Type

Use

In this IMG activity, you assign a strategy sequence for relevant order type. For new orders, the system transfers the strategy sequence to a corresponding order type in the settlement parameters.

Procedure1. Access the activity using the following navigation options:

Transaction code KSR3_ORC

IMG menu Controlling Internal Orders Actual Postings Settlement Automatic Generation of Settlement Rules Assign Strategy Sequence To Order Type

2. On Change View “Assignment of Strategy Sequence to the Order Type”: Overview screen, make the following entries:

Field name Description User actions and values

Comment

Order type Y020 Overhead costs

Strat. Sequ. SAP040 Use standard

Modifiable 2 Always Overwrite Standard

Status REL Release Standard

Order type Y100 Research and Development

Strat. Sequ. SAP040 Use standard

Modifiable 2 Always Overwrite Standard

Status CRTD Create Standard

3. Save your entries.

4 Configuration Budget and Plan

4.1 Budgeting and Budget Management (Define Tolerance Limits for Availability Control)

UseThe monitoring of allotted funds is a primary element of order controlling. At any time, you can call up the funds overview, an overview of all allotments and their types. Particularly with critical orders, the allotted funds can exceed the funds made available at an early stage.

In addition to the funds overview as a “passive availability control”, an “active availability control” has been implemented that enables you to prevent excessive allotments from occurring in the first place. Based on the defined tolerance limits and when certain activities are recorded, the system checks whether the available budget or available released budget (release) is still sufficient.

Page 39: Ehp4 for Sap Erp 6

Procedure1. Access the activity using the following navigation options:

Transaction code SPRO

IMG menu Controlling Internal Orders Budgeting and Availability Control Define Tolerance Limits for Availability Control

2. On the Change View “Order Availability Control: Tolerance Limits”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Field name Description User actions and values Comment

COAr Controlling Area 1000

Prof. Budget profile 000001

Tr.grp Availability-control activity group

++ All activity groups allowed

Act. Availability control action 1 Only warning message

Usage Usage rate in % 90.00%

4. Save your entries.

ResultYou have defined the tolerance limits for the availability control for profile 000001 in controlling area 1000.

4.2 User Defined Planning

4.2.1 Creating Planning Layouts for Cost Element Planning / Cost Centers

Procedure1. Access the activity using one of the following navigation options:

Transaction code KP65

IMG menu Controlling Cost Center Accounting Planning Manual Planning User-Defined Planning Layouts Create Planning Layouts for Cost Element Planning Create planning layout for cost planning.

2. On the Report Painter: Create Cost Centers: Planning layout for cost elements screen, enter the planning layout and description. Do all steps per layout.

Field name Description User action and values Comment

Planning layout

Y1-101

Text BP CE/AT Excel

Page 40: Ehp4 for Sap Erp 6

Field name Description User action and values Comment

Planning layout

Y1-101-1

Text BP CE/AT Excel

Planning layout

Y1-101-A

Text BP CE/AT Dependent

3. Choose Create.

4. Create the layouts with following values:

Y1-101:

Y1-101-1:

Y1-101-A:

Element definition:

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Layout Y1-101, Y1-101-1 and Y1-101-A

Activity Type Set Set LAGRU Not set

Cost Element Set Set KAGRU Not set

Page 41: Ehp4 for Sap Erp 6

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Plan Fixed Costs

Plan Fixed Costs in CO Area Currency

Not set Not set Not set

DK Distri-bution key

Plan Fixed Costs in CO Area Currency

Not set Not set Not set

Plan Var. Costs

Plan Variable Costs in CO Area Currency

Not set Not set Not set

DK Distri-bution key

Plan Variable Costs in CO Area Currency

Not set Not set Not set

with

Text maintenance of elements

Short Medium Long

Layout Y1-101, Y1-101-1 and Y1-101-A

ActType Activity Type Activity Type

Cost elem. Cost element Cost element

PlnFxdCOCu Plan Fixed Costs Plan fixed costs in COArea currency

PlanVar.CO Plan Variable Costs Plan variable costs in CO area currency

General Data Selection:

Name Flag for entering sets

Variable on/off (from)

From Variable on/off (to)

To

Layout Y1-101, Y1-101-1 and Y1-101-A

Version Not set set VERSN Not set

Period Not set set PERIA set PERIB

Fiscal Year Not set set GJAHR Not set

Cost Center set set KSGRU Not set

Sequence of header char.

Layout Y1-101, Y1-101-1 and Y1-101-A

1 Version

Page 42: Ehp4 for Sap Erp 6

2 Period

3 Fiscal Year

4 Cost Center

Variables:

Name Type Characteristic Description Opt./oblig

Layout Y1-101, Y1-101-1 and Y1-101-A

GJAHR Characteristic value Fiscal Year Fiscal year

KAGRU Characteristic value Cost Element or group

KSGRU Characteristic value Cost Center or group

LAGRU Characteristic value Activity Type or group Set

PERIA Characteristic value Period or group

PERIB Characteristic value Period From period

VERSN Characteristic value Version To period

4.2.2 Creating Planning Layouts for Activity Type Planning

Procedure1. Access the activity using one of the following navigation options:

Transaction code KP75

IMG menu Controlling Cost Center Accounting Planning Manual Planning User-Defined Planning Layouts Create Planning Layouts for Activity Type Planning Create activity type planning layout

2. On the Report Painter: Create Cost Centers: Planning layout for acitivities/pr screen, enter the planning layout and description.

Field name Description User action and values Comment

Planning layout

Y1-202-1

Text Act.type / price

Planning layout

Y1-202-2

Text Act.Price Expanded

Page 43: Ehp4 for Sap Erp 6

3. Choose Create.

4. Create the layouts with the following values:

Element definition:

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Layout Y1-202-1

Cost Center Set Set KSGRU Not set

Activity Type Set Set LAGRU Not set

Plan Activity Plan activity Not set Not set Not set

Dist. Distri-bution key

Not set Not set Not set

Pln Fix Price Plan Fix Price in CO Area Currency

Not set Not set Not set

Plan Var. Costs

Price variable

Plan Variable Costs in CO Area Currency

Not set Not set Not set

Layout Y1-202-1

Cost center Set Set KSGRU Not set

Activity Type Set Set LAGRU Not set

Plan Activity Plan Activity Not set Not set Not set

Dist Distribution key

Distr. Kew plan activity

Not set Not set Not set

Page 44: Ehp4 for Sap Erp 6

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Unit Unit of measures

Unit plan activity

Not set not set Not set

Plan Fix Price

Plan Fix Price in CO Area Currency

Not set Not set Not set

Plan Var. Price

Plan Variable Price in CO Area Currency

Not set Not set Not set

Plan Unit Price

Plan Unit Price in CO Area Currency

Not set Not set Not set

Price Price indicator

Plan price indicator

Not set Not set Not set

Alloc Celem. Alloc. CElem

Allocation cost element

Not set Not set Not set

A ATypCategory

ATyp category

Not set Not set Not set

L Text exists

Long text Not set Not set Not set

with

Text maintenance of elements

Short Medium Long

Layout Y1-202-1

Cost Ctr Cost center Cost Center

ActType Activity Type Activity Type

PlanActvty Plan acitivity Plan activity

Price Fxd Price Fixed Fixed price in controlling area currency

Price Vbl. Price Variable Variable price in CO area currency

Layout Y1-202-2

Cost Ctr Cost center Cost Center

ActType Activity Type Activity Type

PlanActvty Plan acitivity Plan activity

Page 45: Ehp4 for Sap Erp 6

Short Medium Long

Price Fxd Price Fixed Fixed price in controlling area currency

Price Vbl. Price Variable Variable price in CO area currency

Price Unit Price Unit Price Unit

General Data Selection:

Name Flag for entering sets

Variable on/off (from)

From Variable on/off (to)

To

Layout Y1-202-1 and Y1-202-1

Version Not set set VERSN Not set

Period Not set set PERIA set PERIB

Fiscal Year Not set set GJAHR Not set

Sequence of header char.

Layout Y1-202-1 and Y1-202-1

1 Version

2 Period

3 Fiscal Year

Variables:

Name Type Characteristic Description Opt./oblig

Layout Y1-202-1 and Y1-202-1

GJAHR Characteristic value Fiscal Year Fiscal year

KSGRU Characteristic value Cost Center or group

LAGRU Characteristic value Activity Type or group Set

PERIA Characteristic value Period From period

PERIB Characteristic value Period To period

VERSN Characteristic value Version Version

4.2.3 Creating Planning Layouts for Statistical Key Figure Planning

Procedure1. Access the activity using one of the following navigation options:

Transaction code KP85

IMG menu Controlling Cost Center Accounting Planning Manual Planning User-Defined Planning Layouts Create planning layouts for statistical key figure planning Create statistical key

Page 46: Ehp4 for Sap Erp 6

figure planning layout

2. On the Report Painter: Create Cost Centers: Planning layout for key figures screen, enter the planning layout and description.

Field name Description User action and values Comment

Planning layout

Y1-301-1

Text BP: key fig.plan

Planning layout

Y1-301-2

Text BP: key fig.plan exp

3. Choose Create.

4. Create the layouts with following values:

Element definition:

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Layout Y1-301-1

Cost Center Set Set KGRSU Not set

Stat. key fig. Set Set STAGRU Not set

Curent Plan value

Current Plan Value

Not set Not set Not set

Dist. Distri-bution key

Not set Not set Not set

Page 47: Ehp4 for Sap Erp 6

Name Attrib. Key figure Flag for entering sets

Var. on/off (from)

From Var.on/off (to)

To

Layout Y1-301-2

Cost center Set Set KSGRU Not set

Stat. key fig. Set Set STAGRU Not set

Key figure category

KeyFig.Cat.

Not set Not set Not set

Curent Plan value

Current Plan Value

Not set Not set Not set

Dist Distribution key

Not set Not set Not set

Unit Unit of measure

Unit current plan value

Not set not set Not set

L Text exists

Long text Not set Not set Not set

Text maintenance of elements

Short Medium Long

Layout Y1-301-1

Cost Ctr Cost center Cost Center

StatKeyFig Stat Key Figure Statistical key figure

Plan value Current Plan value Current Plan value

Layout Y1-301-2

Cost Ctr Cost center Cost Center

KeyFigCat T Key Figure Category

Plan value Current Plan value Current Plan value

General Data Selection:

Name Flag for entering sets

Variable on/off (from)

From Variable on/off (to)

To

Layout Y1-301-1 and Y1-301-2

Version Not set set VERSN Not set

Period Not set set PERIA set PERIB

Fiscal Year Not set set GJAHR Not set

Page 48: Ehp4 for Sap Erp 6

Sequence of header char.

Layout Y1-301-1 and Y1-301-2

1 Version

2 Period

3 Fiscal Year

Variables:

Name Type Characteristic Description Opt./oblig

Layout Y1-301-1 and Y1-301-2

GJAHR Characteristic value Fiscal Year Fiscal year

KGRSU Characteristic value Cost Center

PERIA Characteristic value Period From period

PERIB Characteristic value Period To period

STAGRU Characteristic value Stat. key fig. Or group

VERSN Characteristic value Version Version

4.2.4 Creating Planning Layouts for Cost Element Planning / Internal Orders

Procedure1. Access the activity using one of the following navigation options:

Transaction code KPG5

IMG menu Controlling Internal Orders Planning Manual Planning User-Defined Planning Layouts Create Planning Layouts for Cost Element Planning Create planning layout for cost planning.

2. On the Report Painter: Create Orders: Planning layout for cost elements/active screen, enter the planning layout and description.

Field name Description User action and values Comment

Planning layout

Y1-401-1

Text BP order planning

Page 49: Ehp4 for Sap Erp 6

3. Choose Create.

4. Create the layout with following values:

Element definition:

Name Attr. Key figure

Flag for entering sets

Var. on/off (from)

From Var. on/off (to)

To

Cost element

set Set KAGRU Not set

TtlPCost CO

Total Plan Costs in CO Area Currency

Not set Not set Not set

DK Distri-bution key

Total Plan Costs in CO Area Currency

Not set Not set Not set

TtlPCons. Total Plan Consumption

Not set Not set Not set

DK Distri-bution key

Total Plan Costs in CO Area Currency

Not set Not set Not set

Quantity Record Quantity

Not set Not set Not set

Text field Text existis

Not set Not set Not set

with

Text maintenance of elements

Short Medium Long

Cost element Cost element Cost element

TtlPCost CO Ttl Plan Costs COArC Total Plan Costs in CO Area Currency

TtlPCons. Ttl Plan Consumption Total Plan Consumption

Page 50: Ehp4 for Sap Erp 6

General Data Selection:

Name Flag for entering sets

Variable on/off (from)

From Variable on/off (to)

To

Version Not set set VERSN Not set

Period Not set set PERIA set PERIB

Fiscal Year Not set set GJAHR Not set

Order set set AUFGR Not set

Sequence of header char.

1 Version

2 Period

3 Fiscal Year

4 Order

Variables:

Name Type Characteristic

AUFGR Characteristic value Order

GJAHR Characteristic value Fiscal Year

KAGRU Characteristic value Cost Element

PERIA Characteristic value Period

PERIB Characteristic value Period

VERSN Characteristic value Version

4.2.5 Maintaining User-Defined Planner Profiles

UseIn a planner profile, you specify per planning area which planning layout is to be used and also with which default values.

Procedure1. Access the activity using one of the following navigation options:

Transaction code KP34

IMG menu Controlling Internal Orders Planning Manual Planning Maintain User-Defined Planner Profiles Maintain User-Defined Planner Profiles

2. On the Change View “Planner profiles”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Profile Description Auth. group

YBALL_01 BP planning with Excel (reduced)

Page 51: Ehp4 for Sap Erp 6

YBALL_02 BP Planning: All Planning Areas

4. Choose Save.

5. On the Change View “Planner profiles”: Overview screen, select the profile and choose General Controlling.

6. On the Change View “General Controlling”: Overview screen, choose New Entries.

7. On the New Entries: Overview of Added Entries screen, make the following entries for the profile:

Planning Profile YBALL_01

Planning Area Table Name

CuDK QIDK

Cost ctrs: Cost element/activity inputs 1P1 2 2

Cost centers: Activities/prices 1P2 2 2

CCtr: Statistical key figures 1P3 2 2

Orders: Cost element/activity inputs 1P4 2 2

Planning Profile YBALL_02

Planning Area Table Name

CuDK QIDK

Cost ctrs: Cost element/activity inputs 1P1 2 2

Cost centers: Activities/prices 1P2 2 2

CCtr: Statistical key figures 1P3 2 2

Orders: Cost element/activity inputs 1P4 2 2

Ord: Statistical key figures 1P6 2 2

WBS elements: Cost element/acty inputs 1P7 2 2

WBS elements: Statistical key figures 1P9 2 2

Networks: Statistical key figures 1PC 2 2

Business processes: Activity inputs 1PD 2 2

Business processes: Quantities/prices 1PE 2 2

Business processes: Stat. key figures 1PF 2 2

Cost objects: Cost element/acty inputs 1PG 2 2

Cost objects: Statistical key figures 1PI 2 2

RE: Cost elements, activity allocations 1PJ 2 2

RE:Stat. key figures 1PL 2 2

CCtr: Manual actual prices 1PN 2 2

Business process: Manual actual prices 1PQ 2 2

Page 52: Ehp4 for Sap Erp 6

8. Choose Save.

9. On the Change View “General Controlling”: Overview screen select the layout and select Layouts for Controlling.

10. On the Change View “Layouts for Controlling”: Overview screen, choose New Entries.

11. On the New Entries: Overview of Added Entries screen, make the following entries:

Planing profile YBALL_01

Planning Area Table Itm Layout Defit Overw.

Integr.

File description

Cost ctrs: Cost element/activity inputs

1P1 1Y1-101

set set set 01_1P1_YBALL_01_001Y1-101

Cost ctrs: Cost element/activity inputs

1P1 1Y1-101-A

Cost centers: Activities/prices

1P2 1Y1-202-1

set set

Cost centers: Activities/prices

1P2 1Y1-202-2

set set

CCtr: Statistical key figures

1P3 1Y1-301-1

set set

CCtr: Statistical key figures

1P3 1Y1-301-2

set set

Orders: Cost element/activity inputs

1P4 1Y1-401-1

set set

Planing profile YBALL_02

Planning Area Table Itm Layout Defit Overw.

Integr.

File description

Cost ctrs: Cost element/activity inputs

1P1 1Y1-101-1

set set

Cost centers: Activities/prices

1P2 11-201

Cost centers: Activities/prices

1P2 11-204

Cost centers: Activities/prices

1P2 11-201C

CCtr: Statistical key figures

1P3 11-301

CCtr: Statistical key figures 1P3

11-302

CCtr: Statistical key figures 1P3

11-303C

Orders: Cost element/activity inputs 1P4

11-401

Page 53: Ehp4 for Sap Erp 6

Orders: Cost element/activity inputs 1P4

11-402

Orders: Cost element/activity inputs 1P4

11-402P

Orders: Cost element/activity inputs 1P4

11-404

Ord: Statistical key figures 1P6

11-601

Ord: Statistical key figures 1P6

11-603C

WBS elements: Cost element/acty inputs 1P7

11-701

WBS elements: Cost element/acty inputs 1P7

11-702

WBS elements: Cost element/acty inputs 1P7

11-702P

WBS elements: Cost element/acty inputs 1P7

11-703

WBS elements: Cost element/acty inputs 1P7

11-704

WBS elements: Statistical key figures 1P9

11-901

WBS elements: Statistical key figures 1P9

11-903C

Networks: Statistical key figures 1PC

11-C01

Networks: Statistical key figures 1PC

11-C02

Networks: Statistical key figures 1PC

11-C03C

Business processes: Activity inputs 1PD

11-D01

Business processes: Activity inputs 1PD

11-D02

Business processes: Activity inputs 1PD

11-D02P

Business processes: Quantities/prices 1PE

11-E01

Business processes: Quantities/prices 1PE

11-E02

Business processes: Stat. key figures 1PF

11-F01

Page 54: Ehp4 for Sap Erp 6

Business processes: Stat. key figures 1PF

11-F03C

Cost objects: Cost element/acty inputs 1PG

11-G01

Cost objects: Cost element/acty inputs 1PG

11-G02

Cost objects: Cost element/acty inputs 1PG

11-G02P

Cost objects: Statistical key figures 1PI

11-I01

Cost objects: Statistical key figures 1PI

11-I03C

RE: Cost elements 1PJ 1 1-J01-1

RE: Cost elements 1PJ 1 1-J01-2

RE: Cost elements 1PJ 1 1-J01-3

RE: Cost elements 1PJ 1 1-J01-4

RE: Cost elements 1PJ 1 1-J01-5

RE: Cost elements 1PJ 1 1-J01-6

RE: Cost elements 1PJ 1 1-J02-1

RE: Cost elements 1PJ 1 1-J02-2

RE: Cost elements 1PJ 1 1-J02-3

RE: Cost elements 1PJ 1 1-J02-4

RE: Cost elements 1PJ 1 1-J02-5

RE: Cost elements 1PJ 1 1-J02-6

RE:Stat. key figures 1PL 1 1-L01-1

RE:Stat. key figures 1PL 1 1-L01-2

RE:Stat. key figures 1PL 1 1-L01-3

RE:Stat. key figures 1PL 1 1-L01-4

RE:Stat. key figures 1PL 1 1-L01-5

RE:Stat. key figures 1PL 1 1-L01-6

CCtr: Manual actual prices 1PN

11-N01

Business process: Manual actual prices 1PQ

11-Q01

Page 55: Ehp4 for Sap Erp 6

12. Choose Save.

13. On the Change View “Layouts for Controlling”: Overview screen select the layout and choose Default Parameters.

14. On the Cost Element/Activity Input Planning: Init.Screen Pre-Parameteriz, screen make the following entries for profile:

Planning Layout YBALL_01

Planning Area Table Ver-sion

Period from

Period to

Fiscal year

Cost center

CElem Activity Type

Cost ctrs: Cost element/activity inputs 1P1

001 1 12 <current year>

* * n.a.

Cost centers: Activities/prices 1P2

001 1 12 <current year>

* group = 100_CE

*

15. Choose Save.

16. Save your entries and quit the transaction.

5 Basic Master Data

UseMaster data is imported using application transactions or eCATTs (extended Computer Aided Test Tools). Because some of the master data is required for configuration, a description of the data used appears below.

PrerequisitesIf a dialog box Set Controlling Area appears, enter the following data:

Field name User actions and values

Controlling Area 1000

5.1 Cost Elements and Groups

5.1.1 Primary Cost Elements

5.1.1.1 Deleting Unneeded Default Settings for Primary Cost Elements

UseCost elements are created with batch input sessions. SAP standard delivers some examples for creation of the batch input sessions which are not used for SAP Best Practices. These examples have to be deleted so that the correct batch input sessions can be created.

Procedure1. Access the activity using the following navigation options:

Transaction code OKB2

Page 56: Ehp4 for Sap Erp 6

IMG menu Controlling Cost Element Accounting Master Data Cost Elements Automatic Creation of Primary and Secondary Cost Elements Make Default Settings

2. On the Determine Work Area: Entry screen provide chart of accounts YAIN and choose Enter.

3. On the Change View “Automatic Generation of Cost Elements: Default Setting”: screen, choose Select All (F7).

4. Choose Delete (Shift + F2) and save your entries.

ResultThe default settings are deleted. The screen is empty.

5.1.1.2 Making Default Settings for Primary Cost Elements - Costs

UseThe ranges of cost elements to be created are defined.

Prerequisites

The respective P&L accounts must have been created in FI. This has been done during installation of layer 0.

Procedure1. Access the activity using the following navigation options:

Transaction code OKB2

IMG menu Controlling Cost Element Accounting Master Data Cost Elements Automatic Creation of Primary and Secondary Cost Elements Make Default Settings

2. On the Determine Work Area: Entry screen provide chart of accounts YAIN and choose Enter.

3. On the Change View “Automatic Generation of Cost Elements: Default Setting” screen, choose New Entries (F5).

4. On the New Entries: Overview of Added Entries screen, make the following entries:

Acct from Account to CElem cat.

39118000 39118000 22

40111100 40111100 01

40111199 40111199 01

40401100 40401100 01

40402100 40402100 01

40403100 40403100 01

40404100 40404100 01

Page 57: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

40405100 40405100 01

40406100 40406100 01

40407100 40407100 01

40408100 40408100 01

40409100 40409100 01

40491100 40491100 01

41201100 41201100 01

41281100 41281100 01

41301100 41301100 01

42001100 42001100 01

42021100 42021100 01

42022100 42022100 01

42023100 42023100 01

42031100 42031100 01

42061100 42061100 01

42101100 42101100 01

42121100 42121100 01

42122100 42122100 01

42123100 42123100 01

42131100 42131100 01

42201100 42201100 01

42201200 42201200 01

42221100 42221100 01

42222100 42222100 01

42223100 42223100 01

42231100 42231100 01

42302100 42302100 01

42302200 42302200 01

42303100 42303100 01

42304100 42304100 01

42304200 42304200 01

42332100 42332100 01

42402100 42402100 01

42402200 42402200 01

Page 58: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

42403100 42403100 01

42404100 42404100 01

42404200 42404200 01

42405100 42405100 01

42432100 42432100 01

42502100 42502100 01

42502200 42502200 01

42503100 42503100 01

42504100 42504100 01

42504200 42504200 01

42505100 42505100 01

42506100 42506100 01

42532100 42532100 01

42633000 42633000 01

42633100 42633100 01

42633200 42633200 01

42770100 42770100 01

42770200 42770200 01

42770300 42770300 01

42770400 42770400 01

42801100 42801100 01

42988100 42988100 01

42988200 42988200 01

42988300 42988300 01

43501100 43501100 01

43511100 43511100 01

43601100 43601100 01

43701100 43701100 01

43702100 43702100 01

43703100 43703100 01

43704100 43704100 01

43705100 43705100 01

43706100 43706100 01

43707100 43707100 01

Page 59: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

43708100 43708100 01

43709100 43709100 01

43772100 43772100 01

43772200 43772200 01

43772300 43772300 01

43790000 43790000 01

43970100 43970100 01

44709900 44709900 01

44970700 44970700 01

44971100 44971100 01

44971200 44971200 01

44971600 44971600 01

44971700 44971700 01

44972001 44972001 01

44972031 44972031 01

44972041 44972041 01

44972051 44972051 01

44972061 44972061 01

44972071 44972071 01

44972091 44972091 01

44973100 44973100 01

44973200 44973200 01

44973300 44973300 01

44973400 44973400 01

44973500 44973500 01

44974100 44974100 01

44974200 44974200 01

44974300 44974300 01

44974400 44974400 01

44974500 44974500 01

44974700 44974700 01

44974800 44974800 01

44974900 44974900 01

44976300 44976300 01

Page 60: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

44976400 44976400 01

44976500 44976500 01

44976600 44976600 01

44976700 44976700 01

44976800 44976800 01

44977901 44977901 01

44977902 44977902 01

44977904 44977904 01

44977911 44977911 01

44977912 44977912 01

44979100 44979100 01

44981100 44981100 01

44981200 44981200 01

44981300 44981300 01

44981400 44981400 01

44981500 44981500 01

44982100 44982100 01

44983100 44983100 01

44983200 44983200 01

44983300 44983300 01

44983400 44983400 01

44983500 44983500 01

44983600 44983600 01

44983700 44983700 01

44983900 44983900 01

44984100 44984100 01

44984200 44984200 01

44984500 44984500 01

44984600 44984600 01

46110010 46110010 01

46986100 46986100 01

46986200 46986200 01

46986300 46986300 01

46986320 46986320 01

Page 61: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

46986330 46986330 01

46986340 46986340 01

46986400 46986400 01

46986410 46986410 01

46986420 46986420 01

46986430 46986430 01

46986440 46986440 01

46986600 46986600 01

46987100 46987100 01

46987200 46987200 01

46987300 46987300 01

46987400 46987400 01

46987500 46987500 01

46987600 46987600 01

46987700 46987700 01

46987800 46987800 01

46987900 46987900 01

46989900 46989900 01

46999900 46999900 01

47010100 47010100 01

47010110 47010110 01

47010120 47010120 01

47010130 47010130 01

47010140 47010140 01

47020100 47020100 01

47020200 47020200 01

48888888 48888888 01

49999100 49999100 01

49999200 49999200 01

80300111 80300111 03

80300112 80300112 03

80300113 80300113 03

80300114 80300114 03

80300121 80300121 03

Page 62: Ehp4 for Sap Erp 6

Acct from Account to CElem cat.

80300122 80300122 03

80300123 80300123 03

80300124 80300124 03

5. Save your entries.

5.1.1.3 Creating Primary Cost Elements: Create Batch Input Session

Procedure1. Access the activity using the following navigation options:

Transaction code OKB3

IMG menu Controlling Cost Element Accounting Master Data Cost Elements Automatic Creation of Primary and Secondary Cost Elements Create Batch Input Session

2. On the Create Batch Input Session to Create Cost Elements screen, make the following entries:

Field name Description User actions and values Comment

Controlling Area 1000

Valid from Valid from date 1.1. from previous year Maintain previous year so that postings concerning previous year can be made.

Valid to Valid to date 31.12.9999

Session Name <User-ID>

Batch input user <User-ID>

3. Choose Execute.

5.1.1.4 Creating Primary Cost Elements: Execute Batch Input Session

Procedure1. Access the activity using the following navigation options:

Transaction code SM35

IMG menu Controlling Cost Element Accounting Master Data Cost Elements Automatic Creation of Primary and Secondary Cost Elements Execute Batch Input Session

2. On the Batch Input: Session Overview screen select session <User-ID> and process the session.

Page 63: Ehp4 for Sap Erp 6

ResultYou have created the primary cost elements in Controlling Area 1000.

5.1.2 Creating Secondary Cost Elements

UseSecondary cost elements are controlling-specific and have no counter part in FI. They are used to describe the consumption of resources provided or produced by the company itself. They enable the controller to assign to a cost object the real amount of resource consumption caused by it.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Element Individual Processing Create Secondary

Transaction code KA06

2. On the Create Cost Element: Initial Screen, provide the necessary data and choose Master Data.

3. On the Create Cost Element: Basic Screen, provide the necessary data.

Cost element

Valid from Valid to Name Description CElem categ.

Unit meas.

92101900 01.01.2006 31.12.9999Settl. Sales Order Settl. Sales Order 21

92105000 01.01.2006 31.12.9999SettlServRev

Settlement Service Revenue 21

92105500 01.01.2006 31.12.9999SettlServCost

Settlement Service Costs 21

93100000 01.01.2006 31.12.9999Res.Anal.Technical

Res.Anal.Technical 31

94308000 01.01.2006 31.12.9999 Consulting Consulting 43 H

94311000 01.01.2006 31.12.9999 Pers hrs Personnel hours 43 H

94201000 01.01.2006 31.12.9999 Build&MaintBuildings & Maintenance 42

94220000 01.01.2006 31.12.9999COPA Assessment

COPA Assessment 42

4. Save your entries.

ResultYou have created the secondary cost elements in Controlling Area 1000.

5.1.3 Creating Groups: Cost Elements

UseCost element groups enable the controller to address cost elements in groups by providing the group name instead of single cost element names, such as in customizing or reporting.

Page 64: Ehp4 for Sap Erp 6

5.1.3.1 Cost Element Groups: Header and Text

UseCost element groups are created and texts are maintained.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Element Accounting Master Data Cost Element Group Create

Transaction code KAH1

2. On the Create Cost Element Group: Initial Screen, enter the cost element group and choose Enter.

3. On the Create Cost Element Group: Structure screen, enter the necessary data, and choose Save.

4. Make the following sets of entries:

Cost element group Description

YB_ALL BP all cost elements

YB1000_CE Cost elements summary Best Practices

10_CE Costs Best Practices

20_CE Rev. / Sales Ded. (Type 11,12)

30_CE Non operating costs

90_CE Statistical Accounts

100_CE Primary costs

200_CE Secondary costs

1100_CE Personnel expenses

1200_CE Production costs materials

1300_CE Utility costs

1400_CE Subcontracting/Third party

1500_CE Changes inventories

1600_CE Purchasing/Inventory differences

1700_CE Administration

1800_CE Buildings and Maintenance

1900_CE Travel costs

2000_CE Taxes

2100_CE Revenues and Sales Deductions (Type 01)

3000_CE Other income/expense

4100_CE Order Settlement

Page 65: Ehp4 for Sap Erp 6

Cost element group Description

4110_CE Order Settlement Service / Development

4200_CE Result analysis

4300_CE Overhead rate

4400_CE Assessments

4500_CE Activity allocation

5100_CE Revenues (Type 11)

5200_CE Sales deductions (type 12)

6100_CE Non operating revenues

6200_CE Non operating expenses

6300_CE Corporate Taxes

9100_CE Asset Accounting Accounts (category 90)

YBMF_001 Personal related costs

YBMF_002 Raw-/service material consumption costs

YBMF_003 Other Costs

YBMF_004 Other Secondary Costs

ResultYou have created the cost element groups.

5.1.3.2 Cost Element Groups: Values (Cost Elements)

UseThe purpose of this activity is to assign all cost elements to one of the cost element groups.

Procedure1. Access the activity using one of the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Element Group Change

Transaction code KAH2

2. On the Change Cost Element Group: Initial Screen, enter the cost element group and choose Hierarchy.

3. On the Change Cost Element Group: Structure screen, choose Insert Cost Element.

4. Enter the minimum and the maximum value of cost element range to be assigned.

5. Choose Save.

6. Make the following sets of entries:

Cost Element Group From Value To Value

1100_CE 42001100 42001100

Page 66: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

1100_CE 42021100 42021100

1100_CE 42022100 42022100

1100_CE 42023100 42023100

1100_CE 42031100 42031100

1100_CE 42061100 42061100

1100_CE 42101100 42101100

1100_CE 42121100 42121100

1100_CE 42122100 42122100

1100_CE 42123100 42123100

1100_CE 42131100 42131100

1100_CE 42201100 42201100

1100_CE 42201200 42201200

1100_CE 42221100 42221100

1100_CE 42222100 42222100

1100_CE 42223100 42223100

1100_CE 42231100 42231100

1100_CE 42302100 42302100

1100_CE 42302200 42302200

1100_CE 42303100 42303100

1100_CE 42304100 42304100

1100_CE 42304200 42304200

1100_CE 42332100 42332100

1100_CE 42402100 42402100

1100_CE 42402200 42402200

1100_CE 42403100 42403100

1100_CE 42404100 42404100

1100_CE 42404200 42404200

1100_CE 42405100 42405100

1100_CE 42432100 42432100

1100_CE 42502100 42502100

1100_CE 42502200 42502200

1100_CE 42503100 42503100

1100_CE 42504100 42504100

1100_CE 42504200 42504200

Page 67: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

1100_CE 42505100 42505100

1100_CE 42506100 42506100

1100_CE 42532100 42532100

1100_CE 42633000 42633000

1100_CE 42633100 42633100

1100_CE 42633200 42633200

1100_CE 42770100 42770100

1100_CE 42770200 42770200

1100_CE 42770300 42770300

1100_CE 42770400 42770400

1100_CE 42801100 42801100

1100_CE 42988100 42988100

1100_CE 80300111 80300111

1100_CE 80300112 80300112

1100_CE 80300113 80300113

1100_CE 80300114 80300114

1100_CE 80300121 80300121

1100_CE 80300122 80300122

1100_CE 80300123 80300123

1100_CE 80300124 80300124

1200_CE 40111100 40111100

1200_CE 40111199 40111199

1200_CE 40401100 40401100

1200_CE 40402100 40402100

1200_CE 40403100 40403100

1200_CE 40404100 40404100

1200_CE 40405100 40405100

1200_CE 40406100 40406100

1200_CE 40407100 40407100

1200_CE 40408100 40408100

1200_CE 40409100 40409100

1200_CE 43501100 43501100

1200_CE 43511100 43511100

Page 68: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

1200_CE 43601100 43601100

1200_CE 43701100 43701100

1200_CE 43702100 43702100

1200_CE 43703100 43703100

1200_CE 43704100 43704100

1200_CE 43705100 43705100

1200_CE 43706100 43706100

1200_CE 43707100 43707100

1200_CE 43708100 43708100

1200_CE 43709100 43709100

1200_CE 43790000 43790000

1200_CE 43970100 43970100

1300_CE 44709900 44709900

1300_CE 44970700 44970700

1300_CE 44972041 44972041

1400_CE 40491100 40491100

1400_CE 49999100 49999100

1400_CE 49999200 49999200

1500_CE 41201100 41201100

1500_CE 41281100 41281100

1500_CE 41301100 41301100

1700_CE 42988200 42988200

1700_CE 42988300 42988300

1700_CE 43772100 43772100

1700_CE 43772200 43772200

1700_CE 43772300 43772300

1700_CE 44971100 44971100

1700_CE 44971200 44971200

1700_CE 44971600 44971600

1700_CE 44973100 44973100

1700_CE 44973200 44973200

1700_CE 44973300 44973300

1700_CE 44973400 44973400

Page 69: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

1700_CE 44973500 44973500

1700_CE 44976300 44976300

1700_CE 44976400 44976400

1700_CE 44976500 44976500

1700_CE 44976600 44976600

1700_CE 44976700 44976700

1700_CE 44976800 44976800

1700_CE 44979100 44979100

1700_CE 44981100 44981100

1700_CE 44981200 44981200

1700_CE 44981300 44981300

1700_CE 44981400 44981400

1700_CE 44983900 44983900

1700_CE 44984100 44984100

1700_CE 44984200 44984200

1700_CE 44984500 44984500

1700_CE 44984600 44984600

1800_CE 44974100 44974100

1800_CE 44974200 44974200

1800_CE 44974300 44974300

1800_CE 44974400 44974400

1800_CE 44974500 44974500

1800_CE 44974700 44974700

1800_CE 44974800 44974800

1800_CE 44974900 44974900

1800_CE 48888888 48888888

1900_CE 44983100 44983100

1900_CE 44983200 44983200

1900_CE 44983300 44983300

1900_CE 44983400 44983400

1900_CE 44983500 44983500

1900_CE 44983600 44983600

1900_CE 44983700 44983700

Page 70: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

2000_CE 44972001 44972001

2000_CE 44972031 44972031

2000_CE 44972051 44972051

2000_CE 44972061 44972061

2000_CE 44972071 44972071

2000_CE 44972091 44972091

3000_CE 39118000 39118000

3000_CE 44971700 44971700

3000_CE 44977901 44977901

3000_CE 44977902 44977902

3000_CE 44977904 44977904

3000_CE 44977911 44977911

3000_CE 44977912 44977912

3000_CE 44981500 44981500

3000_CE 44982100 44982100

3000_CE 46110010 46110010

3000_CE 46986100 46986100

3000_CE 46986200 46986200

3000_CE 46986300 46986300

3000_CE 46986320 46986320

3000_CE 46986330 46986330

3000_CE 46986340 46986340

3000_CE 46986400 46986400

3000_CE 46986410 46986410

3000_CE 46986420 46986420

3000_CE 46986430 46986430

3000_CE 46986440 46986440

3000_CE 46986600 46986600

3000_CE 46987100 46987100

3000_CE 46987200 46987200

3000_CE 46987300 46987300

3000_CE 46987400 46987400

3000_CE 46987500 46987500

Page 71: Ehp4 for Sap Erp 6

Cost Element Group From Value To Value

3000_CE 46987600 46987600

3000_CE 46987700 46987700

3000_CE 46987800 46987800

3000_CE 46987900 46987900

3000_CE 46989900 46989900

3000_CE 46999900 46999900

3000_CE 47010100 47010100

3000_CE 47010110 47010110

3000_CE 47010120 47010120

3000_CE 47010130 47010130

3000_CE 47010140 47010140

3000_CE 47020100 47020100

3000_CE 47020200 47020200

4110_CE 92105000 92105000

4110_CE 92105500 92105500

4200_CE 93100000 93100000

4400_CE 94201000 94201000

4400_CE 94220000 94220000

4500_CE 94308000 94308000

4500_CE 94311000 94311000

ResultYou have assigned all cost elements to a cost element group.

5.1.3.2.1 Cost Element Groups: Lower Level Sets (Cost Element Groups)

UseThe purpose of this activity is to create all remaining cost element groups. The groups are automatically assigned to the cost element hierarchy.

Procedure1. Access the activity using one of the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Element Group Change

Transaction code KAH2

Page 72: Ehp4 for Sap Erp 6

2. On the Change Cost Element Group: Initial screen, provide the upper level node of the cost element hierarchy (father node) and choose Hierarchy.

3. On the Change Cost Element Group: Structure screen, select the cost element group, and choose Lower Level.

4. Enter the key and the description for the lower level cost element group, and choose Save.

5. Make the following sets of entries:

Cost Element GroupUpper Level

Cost Element GroupLower Level

YB1000_CE 10_CE

YB1000_CE 20_CE

YB1000_CE 30_CE

YB1000_CE 90_CE

100_CE 1100_CE

100_CE 1200_CE

100_CE 1300_CE

100_CE 1400_CE

100_CE 1500_CE

100_CE 1600_CE

100_CE 1700_CE

100_CE 1800_CE

100_CE 1900_CE

100_CE 2000_CE

100_CE 2100_CE

100_CE 3000_CE

10_CE 100_CE

10_CE 200_CE

200_CE 4100_CE

200_CE 4110_CE

200_CE 4200_CE

200_CE 4300_CE

200_CE 4400_CE

200_CE 4500_CE

20_CE 5100_CE

20_CE 5200_CE

30_CE 6100_CE

30_CE 6200_CE

Page 73: Ehp4 for Sap Erp 6

Cost Element GroupUpper Level

Cost Element GroupLower Level

30_CE 6300_CE

90_CE 9100_CE

YBMF_001 1100_CE

YBMF_002 1200_CE

YBMF_002 1300_CE

YBMF_002 1400_CE

YBMF_002 1500_CE

YBMF_002 1600_CE

YBMF_003 1700_CE

YBMF_003 1800_CE

YBMF_003 1900_CE

YBMF_003 2000_CE

YBMF_003 3000_CE

YBMF_004 4100_CE

YBMF_004 4300_CE

YBMF_004 4400_CE

YBMF_004 4500_CE

ResultYou have created cost element groups and composed with them a cost element hierarchy.

5.1.3.3 Assigning All Cost Elements to Cost element Group

UseThe purpose of this activity is to create cost element group which contains all cost elements. This group is used in the case if a selection of all cost elements is needed.

Procedure1. Access the activity using one of the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Element Group Change

Transaction code KAH2

2. On the Change Cost Element Group: Initial Screen, enter the cost element group BP_ALL, and choose Hierarchy.

3. On the Change Cost Element Group: Structure screen, choose Edit Cost Element Insert “All Values” in the menu.

4. Save your entries.

Page 74: Ehp4 for Sap Erp 6

ResultAll cost elements are assigned to one cost element group.

5.1.4 Selection Variants (Cost Elements)

UseThe selection variants for program RKKOASEL (select Cost Elements) are created. This program is used for Cost Element reporting.

Procedure1. Access the activity using the following navigation options:

Transaction code KM7V

IMG menu Controlling Cost Center Accounting Information System Define Selection Variants – Define Selection Variants for Cost Elements

2. On the ABAP Variants: Initial Screen, enter the variant.

3. Select Values and choose Create.

4. On the Maintain Variant: Report RKKOASEL, Variant screen, make the following entries and save:

Field nameDescription

User action and values Comment

Variant YBMF001

Subobject: Values

Cost Centers From 31111100 (all Cost Elements)

To 89999999

Subobject: Attributes

Meaning Cost Elements

5.2 Cost Centers and Groups

5.2.1 Creating Standard Hierarchy: Cost Centers

Procedure1. Access the activity using one of the following navigation options:

Transaction code OKKP

IMG menu Controlling General Controlling Organization Maintain Controlling Area Maintain Controlling Area (Choose Activity Screen)

2. On the Change View: “Basic Data” Overview screen, double-click controlling area 1000.

3. On the Change View: “Basic Data” Details screen, make the following entries:

Page 75: Ehp4 for Sap Erp 6

Field name Description User action and values Comment

Controlling Area 1000

CCtr Std. Hierarchy Standard Hierarchy for Cost Centers

0001

Select change See buttom at the right of the field CCtr. Std. Hierarchy

4. On the Standard Hierarchy Cost Center Group Structure screen, enter the text Standard Hierachy Best Practices.

5. Choose Save.

6. Leave the transaction.

ResultYou have adapted the cost center standard hierarchy.

5.2.2 Creating Cost Centers

UseA cost center is the smallest responsibility area in an enterprise for which costs are planned and accrual of costs is kept track of separately.

PrerequisitesCost center categories must be defined. The cost center standard hierarchy must be created.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Center Individual Processing Create

Transaction code KS01

2. On the Create Cost Center: Initial Screen, enter the necessary data and choose Master Data.

3. On the Create Cost Center: Basic Screen, enter the necessary data and save.

Make the following sets of entries:

All Cost Centers are valid from 01.01.2006 to 31.12.9999.

Cost Center NameDescription

PersonResponsible

CC- Cat. Hier. Area Comp Code

1101Financials & Admin

Financials and Administration SAP W 0001 1000

1201Purch & Stores 1 Purchasing & Stores - 1 SAP G

0001 1000

Page 76: Ehp4 for Sap Erp 6

1202Purch & Stores 2 Purchasing & Stores - 2 SAP G

0001 1000

1601 Marketing Marketing SAP 9 0001 1000

1602 Sales Sales SAP V 0001 1000

1701Plant & Maintenance Plant & Maintenance SAP H

0001 1000

1750Build. & Maintenance

Buildings and Maintenace SAP H

0001 1000

1801Other Inc.&Expense

Other Income & Expenses SAP W

0001 1000

1901Customer Service Customer Service SAP V

0001 1000

ResultYou have created cost centers.

5.2.3 Creating Alternative Groups: Cost CentersCost center groups enable the controller to address cost centers by providing the group name instead of single cost center names, for example, in Customizing or reporting. In reporting, this allows an analysis of controlling key figures on an aggregate level.

5.2.3.1 Cost Center Groups: Header and Texts

UseCost center groups are created and texts are maintained.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Center Group Create

Transaction code KSH1

2. On the Create Cost Center Group: Initial Screen, provide Cost Center Group and choose Enter.

3. On the Create Cost Center Group: Structure screen, enter the description in the field which is ready for input (Description) and choose Save.

4. Repeat this step for the following entries:

Cost Center Group Description

1000 India

110 Shared Services

120 Stores

130 Operations

140 Quality Management

Page 77: Ehp4 for Sap Erp 6

150 Research and Development

160 Marketing

170 Sales

180 Other Income & Expense

190 Services and consulting

ResultYou have created the cost center groups.

5.2.3.2 Cost Center Groups: Values (Cost Centers)

UseThe purpose of this activity is to assign cost centers to the alternative cost center groups.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Center Group Change

Transaction code KSH2

2. On the Change Cost Center Group: Initial Screen, provide cost center group and choose Hierarchy.

3. On the Change Cost Center Group: Structure, choose Insert Cost Center.

4. Provide the minimum and maximum values of the cost center range to be assigned

Make the following sets of entries:

Cost CenterGroup

From Value To Value

110 1101 1101

110 1701 1701

110 1750 1750

120 1201 1201

120 1202 1202

160 1601 1601

170 1602 1602

180 1801 1801

190 1901 1901

5. Choose Save.

ResultYou have assigned cost centers to the alternative cost center groups.

Page 78: Ehp4 for Sap Erp 6

5.2.3.3 Cost Center Groups: Lower Level Sets (Cost Center Groups)

UseThe purpose of this activity is to assign the cost center groups one to another to build up an alternative cost center hierarchy.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Cost Center Group Change

Transaction code KSH2

2. On the Change Cost Center Group: Initial Screen, enter the upper level node of the cost center hierarchy (father node), and choose Hierarchy.

3. On the Change Cost Center Group: Structure screen, choose Lower Level.

4. Enter the key of the lower level cost center group, and choose Save.

5. Make the following entries:

Group Upper level Group Lower level

1000 110

1000 120

1000 130

1000 140

1000 150

1000 160

1000 170

1000 180

1000 190

ResultYou have created the alternative cost center hierarchy.

5.2.4 Selection Variants (Cost Center)

UseThe selection variants for program RKKSTSEL (select Cost Center) are created. This program is used for cost center reporting.

Procedure1. Access the activity using the following navigation options:

Transaction code KM7V

Page 79: Ehp4 for Sap Erp 6

IMG menu Controlling Cost Center Accounting Information System Define Selection Variants – Define Selection Variants for Cost Centers

2. On the ABAP Variants: Initial Screen, enter the variant.

3. Select Values and choose Create.

4. On the Maintain Variant: Report RKKSTSEL, Variant Screen, make the following entries and save:

Field name Description User action and values Comment

Variant YBMF001

Subobject: Values

Cost Centers From 1000 (all Cost Centers)

To 9999

Subobject: Attributes

Meaning Cost Centers

5.3 Creating Statistical Key Figures

UseStatistical key figures are created to show period end closing-related scenarios in cost center accounting.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Statistical Key Figures Individual Processing Create

Transaction code KK01

2. On the Create Statistical Key Figure: Initial Screen, enter the necessary data and choose Master Data.

3. On the Create Statistical Key Figure: Basic Screen, enter the necessary data and save.

Make the following sets of entries:

Statistical Key Figure

Name Stat. key fig. UnM Key Fig Category

1001 Number of employees PC Fixed Value

1002 Area in square metres M3 Fixed Value

The Name is the name of statistical base; the Stat. key. Fig. UnM is the unit for the statistical key figure; the Key Fig Category determines whether the value of the key figure should be fixed for each month or summarized to a total value.

Page 80: Ehp4 for Sap Erp 6

ResultYou have created statistical key figures.

5.4 Creating Activity Types

UseActivity types are used for cost center allocations and other logistic scenarios (for example, production).

PrerequisitesAllocation cost elements (cost element category ‘43’) must have been defined.

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Cost Center Accounting Master Data Activity Type Individual Processing Create

Transaction code KL01

2. On the Create Activity Type: Initial Screen, enter the necessary data and choose Master Data.

3. On the Create Activity Type: Basic Screen, enter the necessary data and save.

Make the following sets of entries:

All activity types are valid from 01.01.2006 to 31.12.9999.

Activity Type

Name DescriptionActivity Unit

CC Categories

ATyp Category

AllocationCost Element

PriceIndicator

8Consulting Consulting H * 1 94308000 1

4. Save your entries.

CCtr categories are the Valid Cost Center Categories, A Type Category refers to the Activity Type Category and the Price Indicator is the Price Indicator Calculate Allocation Price.

ResultYou have created activity types.

Page 81: Ehp4 for Sap Erp 6

5.5 Creating Internal Order

UseInternal orders are created for use in the CO area.

Internal order for accrual calculation

Prerequisites Order type Y9A0

Procedure1. Access the activity using the following navigation options:

SAP ECC menu Accounting Controlling Internal Orders Master Data Special Functions Order Create

Transaction code KO01

2. On the Create Internal Order: Initial Screen, enter the order type Y9A0 and choose Master Data.

3. On the Create Internal Order: Master Data screen, choose the Assignments tab page and enter the necessary data.

Order Description Company Code

Object Class

9A0000000001 Accrual order 1000 Overhead

4. Choose save.

ResultYou have created the internal orders.

6 Configuration with Use of CO Master Data

6.1 Actual Postings

6.1.1 Editing Automatic Account Assignment - Defining Account Assignment

UseWhen you create accounting postings, the system proposes a corresponding cost accounting-relevant object if a default account assignment is configured for the account involved.

You could use, for example, the default account assignment for the following business transactions:

Transferring price differences posted in Purchasing as the result of different prices during invoice receipt

Revaluating material stocks

Transferring inventory differences

Page 82: Ehp4 for Sap Erp 6

If you use the Logistics components, it makes sense to use the default account assignment for those cost elements that are automatically posted to from the Logistics modules (logistical income statement accounts).

Procedure1. Access the activity using the following navigation options:

Transaction code OKB9

IMG menu Controlling Cost Center Accounting Actual Postings Manual Actual Postings Edit Automatic Account Assignment

2. On the Change View “Default account assignment”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

CoCdCompany Code

Cost Elem.Cost Element

Cost Ctr Cost Center

Acct. assignment detail

1000 40111100 1

1000 40111199 1

1000 40401100 1

1000 40402100 1

1000 40403100 1

1000 40404100 1

1000 40405100 1

1000 40406100 1

1000 40407100 1

1000 40408100 1

1000 40409100 1

1000 40491100 1

1000 41201100 1

1000 41301100 1

1000 43501100 1

1000 43790000 1

1000 44972001 1

1000 49999100 1201

1000 49999200 1201

4. Save your settings.

Page 83: Ehp4 for Sap Erp 6

ResultYou have defined automatic account assignment for reasonable accounts.

6.1.2 Editing Automatic Account Assignment- Details per valuation area

UseIf valuation area is mandatory is set in previous step, cost centers are to be assigned on valuation area level.

Procedure1. Access the activity using the following navigation options:

Transaction code OKB9

IMG menu Controlling Cost Center Accounting Actual Postings Manual Actual Postings Edit Automatic Account Assignment

2. On the Change View “Default account assignment”: Overview screen, select the cost element and choose Detail per business area/valuation area.

3. On the Change View: “Detail per business area/valuation area”: Overview screen, select New Entries.

4. Make the following entries and save:

CoCdCompany Code

Cost Elem.Cost Element

ValA Valuation Area

Cost Ctr Cost Center

1000 40111100 1000 1201

1000 40111100 1100 1202

1000 40111199 1000 1201

1000 40111199 1100 1202

1000 40401100 1000 1201

1000 40401100 1100 1202

1000 40402100 1000 1201

1000 40402100 1100 1202

1000 40403100 1000 1201

1000 40403100 1100 1202

1000 40404100 1000 1201

1000 40404100 1100 1202

1000 40405100 1000 1201

1000 40405100 1100 1202

1000 40406100 1000 1201

1000 40406100 1100 1202

Page 84: Ehp4 for Sap Erp 6

CoCdCompany Code

Cost Elem.Cost Element

ValA Valuation Area

Cost Ctr Cost Center

1000 40407100 1000 1201

1000 40407100 1100 1202

1000 40408100 1000 1201

1000 40408100 1100 1202

1000 40409100 1000 1201

1000 40409100 1100 1202

1000 40491100 1000 1201

1000 40491100 1100 1202

1000 41201100 1000 1201

1000 41201100 1100 1202

1000 41301100 1000 1201

1000 41301100 1100 1202

1000 43501100 1000 1201

1000 43501100 1100 1202

1000 43790000 1000 1201

1000 43790000 1100 1202

1000 44972001 1000 1201

1000 44972001 1100 1202

5. Save your settings.

6.2 Accrual Calculation

6.2.1 Maintaining Overhead Structure for Accrual Calculation (Actual and Plan)

UseThere are costs that occur only once a year, although they are incurred throughout all periods of a year. Accrual calculation provides for an even distribution of such costs over all periods.

You must define accrual parameters. These parameters are usually identical for the plan accrual and the actual accrual.

You define an overhead percentage rate for accruing the additional employee benefit costs. Reference cost elements are the costs for wages and salaries. The accrued costs are credited to an order with category Y9A0 (Internal orders: Accrual).

PrerequisitesCost elements used for accrual by surcharge:

Cost Element Description Cost Element Category

Valid from To

Page 85: Ehp4 for Sap Erp 6

80300111 OTH WGE OH % ACCR 3 01.01.2006 31.12.9999

80300112 WRK BONUS OH % ACCR 3 01.01.2006 31.12.9999

80300113 WGE OVRHD OH % ACCR 3 01.01.2006 31.12.9999

Procedure1. Access the activity using the following navigation options:

Transaction code KSAZ

IMG menu Controlling Cost Center Accounting Planning Planning Aids Accrual Calculation Percentage Method Maintain Overhead Structure

2. On the Maintain CO-OM Accrual Calculation: Overhead Struc. Overview screen, choose Create Overhead structure (F7)

3. In the following dialog box, make the following entries:

Field name Description User action and values Comment

Overhead Structure

YBL

Description Sum wages and salaries

4. Choose Save.

5. On the Maintain CO-OM Accrual Calculation: Overhead Struc. Detail screen, create the following entries:

Row Base O/H rate Description From To Credit

110 Y-B1   Wages      

120 Y-B2   Salaries      

190     Sum wages and salaries

110 120  

210   Y-Z1 Vacation bonus paid

110 110 Y11

220   Y-Z2 Yearly bonus

190 190 Y12

230   Y-Z3 Misc. Personnel Costs

190 190 Y13

If you create the O/H rate choose Dependency Controlling Area/Overhead Type 1000.

6. Select row and choose Goto Calculation Base or double-click the selected Base entry.

7. Now you have to define the details of the calculation base. Double-click the calculation base and make the following entries:

Page 86: Ehp4 for Sap Erp 6

Base From Cost Element To Cost Element

Y-B1 42201100 42201100

Y-B2 42001100 42001100

Y-B2 42101100 42101100

8. Save your entries.

9. Choose Goto Overhead rate, or double-click the selected O/H rate entry.

10. On the Maintain CO-OM Accrual Calculation: Overhead Struc. Detail screen, make the following entries:

CO Area O/H rate

Dependency Valid from

Valid to

Plan overhead

Act. Overhead*

1000 Y-Z1 Controlling area/overhead type

01. current year

12. current year + 15

3% 3%

1000 Y-Z2 Controlling area/overhead type

01. current year

12. current year + 15

3% 3%

1000 Y-Z3 Controlling area/overhead type

01. current year

12. current year + 15

3% 3%

The overhead rates have been selected at random and do not correspond to genuine requirements.

Overhead rates cannot be transported and have to be maintained manually in Customizing.

11. Save your entries.

12. Choose Goto Credit or double-click the selected credit entry.

13. On the Maintain CO-OM Accrual Calculation: Credit – Detail screen, make the following entries:

Controlling

Area

Company Code

Credit

Description

Valid to Cost Element

Order

1000 1000 Y11 Vacation bonus paid

12. current year + 15

80300111 9A0000000001

1000 1000 Y12 Yearly bonus

12. current year + 15

80300112 9A0000000001

1000 1000 Y13 Misc. Personnel Costs

12. current year + 15

80300113 9A0000000001

Page 87: Ehp4 for Sap Erp 6

14. Save your entries.

ResultThe overhead structure has been defined.

6.2.2 Maintaining Overhead Structure - Base Determination

UseFor using plan and actual accrual calculation you have to assign the overhead structure to a controlling area.

Procedure1. Access the activity using the following navigation options:

Transaction code KSAZ

IMG menu Controlling Cost Center Accounting Actual Postings Period-End Closing Accrual Calculation Percentage Method Maintain Overhead Structure

2. Select the Overhead Structure YBL and choose Select Assignments (F5).

3. On the Maintain CO-OM Accrual Calculation: Overhead Struc. Overview screen, choose following.

4. Mark ‘Actual accrual’ .Continue

valid from 01.01. current year

valid to 31.12. current year+15

overhead structure : YBL

5. Save the entries.

6. Repeat steps 2 to 3 for Assignment Plan accrual

7. Mark ‘Plan accrual’ and Version 3. Continue

valid from 01.01. current year

valid to 31.12. current year+15

overhead structure : YBL

8. Save the entries.

ResultThe overhead structure is defined.

6.3 Assessment

6.3.1 Defining Assessment Plan

UseAssessment is used to allocate primary and secondary costs. The original cost elements are combined and allocated to the receiver cost center in an assessment cost element.

Page 88: Ehp4 for Sap Erp 6

The following cycles have been defined for the plan assessment:

Cycle Segment Sender Tracing Factor Receiver

Y_P020

Ass. shared facility (plan)

100

buildings & maintenance cost

1750

BUILD. & MAINTENANCE

Area in square metres

Stat.key figure 1002

Cost center

group 1000

(1750 and 1801 set to factor 0%)

PrerequisitesAssessment cost elements (cost element type ‘42’) must be defined.

Cost Element Description

94201000 Buildings & Maintenance

Procedure: Cycle Y_P0201. Access the activity using the following navigation options:

Transaction code KSU7

IMG menu Controlling Cost Center Accounting Planning Allocations Assessment Define Assessment

2. On the Create Plan Assessment Cycle: Initial screen, make the following entries:

Field name Description User actions and values Comment

Cycle Y_P020

Start Date 01.01. current year Example

3. On the Create Plan Assessment Cycle: Header Data screen, enter the following data:

Field name Description User actions and values Comment

Controlling Area 1000

Cycle Y_P020

Start Date From 01.01. current year Example

Start Date To 31.12. 2099 Example

Text Ass. shared facility (plan)

Indicator: Iterative

Not Set

Object Currency Not set

Version Version 2

4. Choose Attach Segment.

5. On the Create Plan Assessment Cycle: Segment screen, under segment header data, make the following entries:

Segment Name Text

Page 89: Ehp4 for Sap Erp 6

100 buildings & maintenance cost

6. On the Create Plan Assessment Cycle: Segment screen, choose the Segment header tab page and make the following entries:

Segment Assessment CEle

Sender rule Share % Plan value origin

100 94201000 Posted amounts 100.00 set

Segment Receiver rule var.portion type

scale neg. tracing fact.

100 Variable portions Plan Stat key figures

No scaling

7. On the Create Plan Assessment Cycle: Segment screen, under the Senders/Receivers tab page, make the following entries:

Segment Sender Cost Center from

Sender Cost Element from

Receiver Cost Center group

100 1750 10_CE 1000

8. On the Create Plan Assessment Cycle: Segment screen, under the Sender Values tab page, make the following entries:

Segment Share % Plan value origin

Version From

100 100.00 Set 2

9. On the Create Plan Assessment: Segment screen, under the Receiver Tracing Factor tab page, make the following entries:

Segment Var.portion type Scale neg. tracing fact.

Stat. key figure from

100 Plan Stat Key Figures No scaling 1002

10. On the Create Plan Assessment Cycle: Segment screen, under the Receiver Weighting Factors tab page, make the following entries:

11. Make the following sets of entries for all segments (example data):

Cost Center FactorSegment 100

Other segments

1101 100

1201 100

1202 100

1301 100

1302 100

1401 100

Page 90: Ehp4 for Sap Erp 6

Cost Center FactorSegment 100

Other segments

1501 100

1601 100

1602 100

1701 100

1750 0

1801 0

1901 100

12. Save your entries.

ResultYou have defined the plan assessment cycles Y_P020.

6.3.2 Defining Assessment Actual

UseAssessment is used to allocate primary and secondary costs. The original cost elements are combined and allocated to the receiver cost center in an assessment cost element.

The following cycles have been defined for the plan assessment:

Cycle Segment Sender Tracing Factor Receiver

Y_A020

Ass. shared facility (actual)

100

buildings & maintenance cost

1750

BUILD. & MAINTENANCE

“Area in square metres”

Stat.key figure 1002

Cost center

group 1000

(1750 and 1801 set to factor 0%)

PrerequisitesAssessment cost elements (cost element type ‘42’) must be defined.

Cost Element Description

94201000 Buildings & Maintenance

Procedure: Cycle Y_A0201. Access the activity using the following navigation options:

Transaction code KSU1

IMG menu Controlling Cost Center Accounting Actual Postings Period-End Closing Assessment Maintain Assessment Create Actual Assessment

2. On the Create Actual Assessment Cycle: Initial screen, make the following entries:

Page 91: Ehp4 for Sap Erp 6

Field name Description User actions and values Comment

Cycle Y_A020

Start Date 01.01. current year Example

3. On the Create Actual Assessment Cycle: Header Data screen, enter the following data:

Field name Description User actions and values Comment

Controlling Area 1000

Cycle Y_A020

Start Date From 01.01. current year Example

Start Date To 31.12. 2099 Example

Text Ass. shared facility (actual)

Indicator: Iterative

Not Set

Object Currency Set

4. Choose Attach Segment.

5. On the Create Actual Assessment Cycle: Segment screen, under segment header data, make the following entries:

Segment Name Text

100 buildings & maintenance cost

6. On the Create Actual Assessment Cycle: Segment screen, under the Segment header tab page, make the following entries:

Segment Assessment CEle

Sender rule Share % Actual value origin

100 94201000 Posted amounts 100.00 set

Segment Receiver rule var.portion type scale neg. tracing fact.

100 Variable portions Actual Stat key figures

No scaling

7. On the Create Actual Assessment Cycle: Segment screen, under the Senders/Receivers tab page, make the following entries:

Segment Sender Cost Center from

Sender Cost Element from

Receiver Cost Center group

100 1750 10_CE 1000

8. On the Create Actual Assessment Cycle: Segment screen, under the Sender Values tab page, make the following entries:

Segment Share % Actual value Version From

Page 92: Ehp4 for Sap Erp 6

origin

100 100.00 Set 0

9. On the Create Actual Assessment: Segment screen, under the Receiver Tracing Factor tab page, make the following entries:

Segment Var.portion type Scale neg. tracing fact.

Stat. key figure from

100 Actual Stat Key Figures No scaling 1002

10. On the Create Actual Assessment Cycle: Segment screen, under the Receiver Weighting Factors tab page, make the following entries:

Make the following sets of entries for all segments (example data):

Cost Center FactorSegment 100

Other segments

1101 100

1201 100

1202 100

1301 100

1302 100

1401 100

1501 100

1601 100

1602 100

1701 100

1750 0

1801 0

1901 100

11. Save your entries.

ResultYou have defined the plan assessment cycles Y_A020.


Recommended