CAP Roger de Flor El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB Arquitectes Xavier Martínez. Engineer. AIA Instal·lacions Arquitectòniques
Transcript
Page 1: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

El CAP Roger de Flor

(Roger de Flor Primary Healthcare Center)

Date: February 4th 2.009

Francisco Gallardo. Architect. GB Arquitectes

Xavier Martínez. Engineer. AIA Instal·lacions Arquitectòniques

Page 2: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

SUMMARY

1. Introduction. The SARA Project

2. The Roger de Flor Primary Healthcare Center1. General issues

2. Architecture• Concept idea

3. Facilities• HVAC and HSW

• Electricity & Lightning

• BMS

3. Operating Previsions

4. Others

Page 3: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

1. INTRODUCTION > The SARA project

History

The Roger de Flor Primary Healthcare Centre project was

lidered by different departments of Catalan Government:

Servei Català de la Salut

Eficiencia d’instal·lacions Sanitàries

Institut Català d’Energia

Departament de Medi Ambient i Habitatge

Page 4: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

1. INTRODUCTION > The SARA project

History

The building was included into the SARA PROJECT, European

project coordinated by GESP from UB

Sustainable

Architecture applied to

Replicable public

Acces buildings

Demonstration Project co-financed by European Commission

(TREN/04/FP6EN/S07.31838/503188)

Now the building is negotiated by a medical and nurses

cooperative called EAP Dreta de l’eixample

Page 5: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

1. INTRODUCTION > The SARA project

Aims

SARA aims to construct six sustainable, cost effective, high energy

performance, public-access eco-buildings that are immediately

replicable at large scale in many locations and demonstrate the cost-

effective potential for improving the energy performance of Europe’s

buildings :

– High efficiency,

• > 30% CO2 emissions reduction

• Reduction use of non renewals energy source

– Replicability,

• reasonable costs:

• 5% of building total cost,

• <50 Euros /m2 de over cost

• Innovation with market technology

Page 6: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

1. INTRODUCTION > The SARA project

Ideas

SARA was applied in the next fields:

Facilities

• High performance systems

• Use of solar energy

• “clever” ventilation

• Low emissions sources

• BMS and monitoring

• Water consumption

Architecture

• Orientation

• Solar protection and shadows

• Use of natural lightning and ventilation

• Thermal inercy

• Low transmission materials

Page 7: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2 . CAP ROGER DE FLOR

Operation - generalities

SARA ideas were concreted in:

Page 8: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2 . CAP ROGER DE FLOR

Architecture: location

CAP Roger de Flor: “l’Eixample” de Barcelona

Page 9: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture: conceptual design

Evolution of the configuration of Barcelona’s Eixample

1858 1889 1975 - PGM PROPOSTA CAP

TRADITIONAL SOLUTIONBIO-CLIMATIC SOLUTION

Page 10: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture: building organization

Floor

Section

Page 11: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

3D Simulations

Page 12: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Facades treatment – shadow analysis

Page 13: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Facades treatment– details

Page 14: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Photovoltaic facade

Page 15: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Photovoltaic facade

Page 16: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Photovoltaic facade

Page 17: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Lamas inner court

Page 18: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Architecture

Lamas inner court

Page 19: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

HVAC

2. CAP ROGER DE FLOR

Facilities: HVAC

New system in Primary Healthcare Center

• Two zones (doctor & wait area)

• Use of air

• Fresh air treatment by free cooling

Multizone

Use of water (radiant ceiling)

Free cooling

+ Energy recuperation (over refrigerant)

+ Dryer (Cl-Li)

* 33.000 kWh/year saved

* COP up than 4

Page 20: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Facilities – HVAC - Scheme

GAS

M

DE

PR

OD

UC

CIÓ

CA

LD

ER

ES

A P

RO

DU

CC

IÓ C

AL

DE

RE

S

M

RECIRCULACIÓ DE A.C.S.

A CONSUM DE A.C.S.

DE CIRCUIT CALOR

A CIRCUIT CALOR

++

A POST-A BATERIES EN CONDUCTES

RETORN DE BATERIES

RETORN DE SOSTRE

ESCALFAMENT

Page 21: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

HVAC – Production units

Heating: DT= 40-35

HSW: DT= 70-55

Conditioning: DT=15-18

CONDITIONING: High temperature chillerHEATING: High performance boiler

Page 22: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

HVAC– Air treatment

Fresh air: Dryer with ClLi

GAS

M

DE

PR

OD

UC

CIÓ

CA

LD

ER

ES

A P

RO

DU

CC

IÓ C

AL

DE

RE

S

M

RECIRCULACIÓ DE A.C.S.

A CONSUM DE A.C.S.

DE CIRCUIT CALOR

A CIRCUIT CALOR

++

A POST-A BATERIES EN CONDUCTES

RETORN DE BATERIES

RETORN DE SOSTRE

ESCALFAMENT

Radiant ceiling

Page 23: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

HVAC – Solar thermal

Solar thermal: HSW & Heating

GAS

M

DE

PR

OD

UC

CIÓ

CA

LD

ER

ES

A P

RO

DU

CC

IÓ C

ALD

ER

ES

M

RECIRCULACIÓ DE A.C.S.

A CONSUM DE A.C.S.

DE CIRCUIT CALOR

A CIRCUIT CALOR

++

A POST-A BATERIES EN CONDUCTES

RETORN DE BATERIES

RETORN DE SOSTRE

ESCALFAMENT

* 24 m2 thermal collectors

* 11.500 kWh/ year - 65% HSW consumption

Page 24: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

WATER – Use of rainwater

Water saved – 380 m3/year

RAINWATER: use for toilets & fire extinction

Page 25: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Facilities: Electricity & lightning

Lighting control in waiting rooms

according to the sunlight -

complementing the lamas atrium -

with separate roof treatment

LIGHTNING

Page 26: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Facilities: Electricity & lightning

10 kWp photovoltaic power: mounted in facade and cover

12.000 kWh/year equal a CAP lighting consumption

ELECTRICITY: Solar photovoltaic

Page 27: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

2. CAP ROGER DE FLOR

Facilities – BMS

BMS controls al facilities

• Building control necessities:– Boiler, chiller and thermal collectors

– Radiant ceiling

– Fresh air conditions

– Lighting

• SARA control necessities:- Energy dates storage

– Monitoring

– Divulgation

CONTROL

Page 28: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

3 . OPERATION

Saving forecast

GENERAL DATA

Consumption reference: 660.000 kWh/year

(220 kWh/m2/year)

Consumption target: 446.598 kWh/year

(148 kWh/m2/year)

Saving target: 213.402 kWh/year --- 32%

OPERATION FORECAST

Page 29: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

3. Operation

Saving forecast– by facilities

INDIVIDUAL DATA

• HVAC system – 33.000 kWh/year

•24 m2 solar collector – 11.500 kWh/year

• Water – 380 m3/year

• 10 kWp photovoltaic – 12.000 kWh/year

Page 30: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

Source: CATSALUT & SARA Project

3 . Operation

Saving forecast

Page 31: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

Links:

• www.catsalut.cat

• www.icaen.es

• www.sara-project.net

• www.ecobuildings.info

• www.aia.cat

• www.controlli.es

• www.eapdretaeixample.com

Final >

4. MATERIAL COMPLEMENTARI

Page 32: El CAP Roger de Flor - eapdretaeixample.cat english.pdf · El CAP Roger de Flor (Roger de Flor Primary Healthcare Center) Date: February 4th 2.009 Francisco Gallardo. Architect. GB

CA

P R

og

er d

e F

lor

CAP ROGER DE FLORFebruary 4th 2009