2
Make the most of your energy Cellino San Marco - Italy 43 MWp Photovoltaic Power Plant AES Solar was established in 2008 as a joint venture between the AES Corporation and Riverstone Holding LLC. It is a global company that develops, finances, constructs and manages utility-scale solar photovoltaic power plants across the world. The company seeks to be a leading developer, owner and operator of utility-scale solar power plants that will be connected to the power grid, in order to supply homes and businesses with clean, renewable energy. Its Italian subsidiary AES Sole has started the construction of a large- scale park in Pouilles in Italy. With an output of 38,5 MW, the park consists of 3 sites, 573,100 solar panels spread over 100 hectares of land. This park will have a power generation capacity equivalent to the consumption of 18,000 homes, i.e. 50,000 inhabitants (based on 3,300 kWh per year). A park of this type represents an annual saving of 28,000 tonnes of CO2. In order to gain a quick return on its investment, AES Sole wanted to optimise the construction time (9 months), and has called upon a reliable and competitive player that can offer attractive technical solutions and a suitable operating and maintenance contract. Electrical Energy - Photovoltaic PROJECT AT A GLANCE Cellino San Marco Photovoltaic Power Plant Situation Cellino San Marco - Puglia - Italy Customer: AES Sole Application Turnkey solution for Photovoltaic Power Plant Equipment installed EPC contract (Engineering, Procurement & Construction) PV panels procured by customer CUSTOMER BENEFITS A single coordinator for the entire project A single contract for both the design phase and for the electrical and video-surveillance package Minimum downtime in the event of a fault, owing to the monitoring system that allows energy production to be controlled remotely Schneider Electric’s commitment to overall power plant performance and installation availability Production secured with the operating and maintenance contract (2 years) An EPC partner which also manufactures the equipment used
Transcript
Page 1: Electrical Energy - Photovoltaic Cellino San Marco - SE Solar€¦ · Electrical Energy - Photovoltaic Schneider Electric Projects & Engineering Center F-38050 Grenoble Cedex France

Make the most of your energy

Cellino San Marco - Italy43 MWp Photovoltaic Power Plant

AES Solar was established in 2008 as a joint venture between the AES Corporation and Riverstone Holding LLC. It is a global company that develops, finances, constructs and manages utility-scale solar photovoltaic power plants across the world. The company seeks to be a leading developer, owner and operator of utility-scale solar power plants that will be connected to the power grid, in order to supply homes and businesses with clean, renewable energy.

Its Italian subsidiary AES Sole has started the construction of a large-scale park in Pouilles in Italy. With an output of 38,5 MW, the park consists of 3 sites, 573,100 solar panels spread over 100 hectares of land. This park will have a power generation capacity equivalent to the consumption of 18,000 homes, i.e. 50,000 inhabitants (based on 3,300 kWh per year). A park of this type represents an annual saving of 28,000 tonnes of CO2.

In order to gain a quick return on its investment, AES Sole wanted to optimise the construction time (9 months), and has called upon a reliable and competitive player that can offer attractive technical solutions and a suitable operating and maintenance contract.

Electrical Energy - Photovoltaic

PROJECT AT A GLANCE Cellino San Marco Photovoltaic Power Plant

SituationCellino San Marco - Puglia - Italy

Customer: AES Sole

ApplicationTurnkey solution for Photovoltaic Power Plant

Equipment installedEPC contract (Engineering, Procurement & Construction) PV panels procured by customer

CUSTOMER BENEFITS• A single coordinator for the entire project

• A single contract for both the design phase and

for the electrical and video-surveillance package

• Minimum downtime in the event of a fault,

owing to the monitoring system that allows

energy production to be controlled remotely

• Schneider Electric’s commitment to overall

power plant performance and installation

availability

• Production secured with the operating and

maintenance contract (2 years)

• An EPC partner which also manufactures the

equipment used

Page 2: Electrical Energy - Photovoltaic Cellino San Marco - SE Solar€¦ · Electrical Energy - Photovoltaic Schneider Electric Projects & Engineering Center F-38050 Grenoble Cedex France

© 2

009

Sch

neid

er E

lect

ric. A

ll rig

hts

rese

rved

.

02/2011

Electrical network:@ 36 transformation station of 1 100 KVA, equipped with: > 71 Xantrex GT540E-IT inverters > 35 X 1 100 low loss transformer > 1 X 550 low loss transformer > 40 SM6-36 switchboards @ 4 grid connection stations of 30 kV@ 426 array boxes@ 1,300 km of solar cables

Monitoring system:@ Supervision and control of equipment@ Support for maintenance and exploitation activities @ Evaluation of availability@ Weather monitoring@ Increased reliability @ Centralisation of information@ Creation of graphics and reports@ Data storage@ Management of remote and multiple access

The security system:@ An infrared intrusion detection system@ A video-surveillance (access control, cameras, lighting) @ A monitoring station

Electrical Energy - Photovoltaic

Schneider Electric Projects & Engineering Center F-38050 Grenoble Cedex France Telephone: 00 (33) (4) 76 57 60 60 www.schneider-electric.com

Solution: A turnkey contract, including: @ Design and installation of structures, panels and the electrical network between the solar modules and the network, including Xantrex inverters @ Civil engineering, construction and wiring (30 kms of trenches, 8.5 km of fencing)@ Overall project control and coordination of partners and sub-contractors@ On-site commissioning@ Securing of the site@ 2-year operating and maintenance contract, renewable. It includes preventive and curative maintenance operations with a commitment to performance ratio and availability

OTHER REFERENCES@ Ground-based arrays- Spain - Almería (7,76 MW) - Germany - Rote Jahne (6 MW) - France - Vinon Sur Verdon (4,2 MW) - France - Les Mées 1 - La Mouisse (12 MW) - France - Le Gabardan (20 MW) - France - St Clar (8,9 MW) - France - Les Mées 2 (12 MW)

@ Buildings- Spain - Saragossa (10 MW) - Spain - Villacañas - Toledo (2,5 MW) - Spain - Molina De Segura - Murcia (300 KW) - Reunion & Mayotte Islands - 7 Casino stores (16 MW)