    Quality Program LessonElectrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    2/21

    At the end of this lesson you will understand the

    requirements for electrical systems, generator installationsand the use of Transfer Switches for site protection. You will

    achieve an understanding of transfer switch installations and

    be able to recognize their proper installation and that they

    are in accordance with manufacturer specs.

    Objectives

  • 7/28/2019 Electrical Generator Transfer Switch

    3/21

    Electrical/Generator/Transfer Switch

    Introduction

    Electrical component installation

    Electrical routing and termination

    Generator, fuel tank and associated signage

    Generator receptacle

    Automatic transfer switch (ATS)

    Lighting

    DC power cables

  • 7/28/2019 Electrical Generator Transfer Switch

    4/21

    Electrical component installation Verify all interior & exterior electrical components

    (conduit, outlets, switches, work boxes, breakers, pullboxes, junction boxes, and panels etc.) are properly

    installed, anchored and grounded.

    Verify that cables, lugs, etc. are correctly installed,

    routed, supported, secured, protected, crimped, andlabeled.

    Verify that clear heat shrink has been installed in

    electrical cable lugs.

    Verify that the DC breakers in shelter room are thecorrect size:

    DC Fan 5A

    DC Smoke 5A

    DC Lights 10A

  • 7/28/2019 Electrical Generator Transfer Switch

    5/21

    Generator, fuel tank and associated signage

    Verify the emergency generator, associated fuel tanksand signage have been installed where required by the

    construction drawings and/or project specifications.

    Fuel tank will have an AT&T designation label.

    Generator pad free of cracks and defects. Fixed generator is properly grounded

    Solid ground leads (min. 2) attached to generator with

    the correct lug No-Ox is applied and paint removed at contact point.

    Fixed generator doors and fuel filler cap/box locked, if

    applicable.

  • 7/28/2019 Electrical Generator Transfer Switch

    6/21

    Generator receptacle

    Verify site is equipped with AT&T Mobility standard

    generator receptacle (cam-lock), if required. Verify cam-lock is grounded.

    Automatic transfer switch (ATS)

    ATS is required on sites with a fixed generator only.

    May be contained in the Intersect PTLC (AC breaker panel)

    or equivalent.

    Verify ATS has been installed and is labeled per the

    construction drawings and/or project specifications andtested.

    Generator / ATS Testing & Commissioning

    If in scope, verify that the generator and ATS have been

    tested and commissioned.

  • 7/28/2019 Electrical Generator Transfer Switch

    7/21

    Lighting

    Insure all lighting (indoor/outdoor) is

    functional, including DC powered lights if

    equipped. Insure the lighting in the equipment areas is

    adequate and in good repair.

    Verify emergency lamps are workingproperly.

  • 7/28/2019 Electrical Generator Transfer Switch

    8/21

    DC power cables

    Verify that all DC power cables are the proper

    type. Verify that all DC power cables are correctly

    routed, supported, secured and protected.

    Verify that all DC power cables are correctlycolor coded for voltage per specs.

    Verify that all DC power cable lugs are the

    correct type & size, are correctly installed and clear

    heat shrink is used.

    Verify that all indoor DC power cables enter /

    exit cable ladder racks over the side (waterfall) and

    not through ladder rungs.

  • 7/28/2019 Electrical Generator Transfer Switch

    9/21

    What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    10/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

  • 7/28/2019 Electrical Generator Transfer Switch

    11/21What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    12/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

  • 7/28/2019 Electrical Generator Transfer Switch

    13/21What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    14/21What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    15/21

    What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    16/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

  • 7/28/2019 Electrical Generator Transfer Switch

    17/21What do you see? Good? Not good?

    Electrical/Generator/Transfer Switch

  • 7/28/2019 Electrical Generator Transfer Switch

    18/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

  • 7/28/2019 Electrical Generator Transfer Switch

    19/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

  • 7/28/2019 Electrical Generator Transfer Switch

    20/21

    Electrical/Generator/Transfer Switch

    What do you see? Good? Not good?

    / /