+ All Categories
Home > Documents > eLight Case Study Sealed Air - eLight Group · Case Study: Sealed Air Burn Hours: 8,568 hours p/...

eLight Case Study Sealed Air - eLight Group · Case Study: Sealed Air Burn Hours: 8,568 hours p/...

Date post: 26-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Case Study: Sealed Air Burn Hours: 8,568 hours p/ year Sector: Packaging Location: Cambridgeshire, UK Building Type: Factory Size of Property: 200,000 ft2 Average Net Savings per annum £31,600 Average Net % Savings per annum 27% Carbon Reduction over 5 years 1,621 tCO2 Client Capital Outlay £0 Unlocking £158,202 over 5 years BEFORE AFTER BEFORE AFTER Lux Levels: 21-621 lux Lux Levels: 150-1000 lux kWh Usage: 1,060,000 kWh Usage: 332,700 kWh Savings: 69% Annual Lighting Costs: £108,200 Annual Lighting Costs: £26,700
Transcript
Page 1: eLight Case Study Sealed Air - eLight Group · Case Study: Sealed Air Burn Hours: 8,568 hours p/ year Sector: Packaging Location: Cambridgeshire, UK Building Type: Factory Size of

Case Study: Sealed Air

Burn Hours: 8,568 hours p/ year

Sector: Packaging

Location: Cambridgeshire, UK

Building Type: Factory

Size of Property: 200,000 ft2

Average Net Savings

per annum£31,600

Average Net % Savings

per annum27%

Carbon Reduction over 5 years

1,621 tCO2

Client Capital Outlay

£0

Unlocking £158,202 over 5 years

BEFORE AFTER

BEFORE AFTERLux Levels: 21-621 lux Lux Levels: 150-1000 lux

kWh Usage: 1,060,000 kWh Usage: 332,700

kWh Savings: 69%

Annual Lighting Costs: £108,200 Annual Lighting Costs: £26,700

Recommended