Page 1: eLight Case Study Sealed Air - eLight Group · Case Study: Sealed Air Burn Hours: 8,568 hours p/ year Sector: Packaging Location: Cambridgeshire, UK Building Type: Factory Size of

Case Study: Sealed Air

Burn Hours: 8,568 hours p/ year

Sector: Packaging

Location: Cambridgeshire, UK

Building Type: Factory

Size of Property: 200,000 ft2

Average Net Savings

per annum£31,600

Average Net % Savings

per annum27%

Carbon Reduction over 5 years

1,621 tCO2

Client Capital Outlay

£0

Unlocking £158,202 over 5 years

BEFORE AFTER

BEFORE AFTERLux Levels: 21-621 lux Lux Levels: 150-1000 lux

kWh Usage: 1,060,000 kWh Usage: 332,700

kWh Savings: 69%

Annual Lighting Costs: £108,200 Annual Lighting Costs: £26,700