Energy consideration in cement grinding
Transcript
Page 1: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

Energy consideration in cement grinding

Page 2: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH2

Introduction

Reasons for energy considerationsIntroduction

o Rising consumption

depleting energy

resources

o Depleting resources

escalating energy prices

o Consumption generates

increasing green house

gases

o Energy costs are a

major expense in

cement production

Energy consideration in cement grinding

Page 3: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH3

Statistics

Energy consumption in cement production

Energy consideration in cement grinding

Page 4: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH4

Statistics

Energy consumption in cement production

o ~ 2 % of the global primary energy, or 5 % of global industrial

energy, is consumed in cement production, of which:

85 - 90 % is thermal energy & 10 - 15 % electricity;

o ~ 25 % of cement cost is due to energy costs, of which:

o ~ 50 % is for electricity, mainly for grinding.

Energy consideration in cement grinding

Page 5: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH5

Consumption

Consumption of energy in cement plantDry process

Energy consideration in cement grinding

Page 6: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH6

Consumption

Consumption of energy in cement plantDry process

o Modern plant able to achieve 3,000 kJ/kg clinker & 90 kWh/t

cement

o Electricity required for crushing, raw materials / coal milling &

finished grinding represents ~ 25% of overall primary consumed

in cement production

o 65% of the electricity consumed is used in the grinding

operations

Energy consideration in cement grinding

Page 7: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH7

Consumption

Power consumption in cement plant

~ 65 % of

electricity in

cement plants

is consumed in

the grinding

processes

Energy consideration in cement grinding

Page 8: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH8

Consumption

Typical power requirement of finished ball mill

Example:

Total consumption 3333 kW,

104 t/h product

=>

Total Power Consumption

= 32,0 kWh/t

Mill Power Consumption

= 27,5 kWh/t (85,8 %)

Energy consideration in cement grinding

Page 9: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH9

Performance

Grinding inherently inefficient ...Performance

Energy consideration in cement grinding

Page 10: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH10

Performance

Grinding inherently inefficient ...

o Only < 2 - 5% of energy input is theoretically required to fracture

particles; the bulk of the input energy ends up largely as heat &

typically generates ~ 25 kcal of heat per kg cement ground

o Mill temperature could rise to 140 ˚C and causes gypsum to

dehydrate & produces “false set” in cement, as well as “media

coating” which impairs grinding efficiency

o typically, ~ 0.8 m³ of cooling air is required to remove the heat

Energy consideration in cement grinding

Page 11: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH11

Performance

Example: material grindability & correlation with ball millEvaluation of performance with help of Zeisel test

Guiding values for the grindability of an OPC cement 95/5 are

o 27-32 kWh/t at 3000 cm²/g acc. Blaine

o 39-47 kWh/t at 4000 cm²/g acc. Blaine

o 58-69 kWh/t at 5000 cm²/g acc. Blaine

Energy consideration in cement grinding

Page 12: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH12

Performance

Detrimental effects of feed moistureon energy consumption

o Typically, every 1%

increase in moisture

content above 0.5%

increases energy

consumption by >10%,

especially at higher

product fineness

o At limiting moisture, eg. above ~ 5% in limestone,

a ball mill may not be

operable!

TPH kWh/t

Energy consideration in cement grinding

Page 13: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH13

Performance

Influence of media filling ratio on specific power

consumption

Energy consideration in cement grinding

Page 14: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH14

Performance

Influence of equipment / process design

o Process / equipment configuration (mill L/D & speed, closed v

open circuit, pregrinder & type, mechanical v pneumatic

transport, ducting arrangement, dampers, etc)

o Equipment design including the separator, mill internals such as

liners (lifter/classifying), diaphragm (flow control), media, etc

o Degree of automation such as fuzzy logic / total feed / sonic

control, auto sampling, etc)

Energy consideration in cement grinding

Page 15: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH15

Performance

Optimising mill internals

Energy consideration in cement grinding

Well designed /

upgrade of mill

internals may

improve mill

output, product

quality & specific

power

consumption by

10 - 20 %.

Page 16: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH16

The new CPB separator generation:

OptiTromp

First results with the new QDK technology

High efficiency separator QDK

Page 17: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH17

New QDK separator: design basis

Result of CFD analysis: improvement of air flow pattern

High efficiency separator QDK

Page 18: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH18

New QDK separator: design basis

Changes in air guide vanes and rotating cage

New design

Guide vanes Number increased, directed

tangentially to rotating cage

Cage rods Number increased,

free cage surface area appr. 90 %,

backwards curved cage rods

New design

Former design

Air guide vanes

(louvres)

Separation zone

Rotating cage

High efficiency separator QDK

Page 19: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH19

Separating zone

Form

er

Actu

el

High efficiency separator QDK

Page 20: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH20

New QDK separator: design basis

Changes in design of spiral casing

Approximation of an ideal spiral

design

Leading to an almost ideal

distribution of separation air into

the separation zone

High efficiency separator QDK

Page 21: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH21

0

10

20

30

40

50

60

70

80

90

100

0 1 10 100 1000

T(x

) [%

]

Particle Size x [µm]

Trompcurve T(x)

CEM I 32,5R

CEM I 42,5R

CEM II/A-LL 32,5R

CEM I

32,5 R

CEM I

42,5 R

CEM II/A-

LL 32,5 R

Bypass

[%]

3,9 6,9 5,7

Om

[cm²/g]

rejects

670 720 620

Om

[cm²/g]

cement

3510 4260 4140

Om

[cm²/g]

feed

2080 1970 2230

Separator efficiency

High efficiency separator QDK

Page 22: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH22

Functioning of mill shell liners

1st compartment 2nd compartment

Shell liners

CPB Shell liners

Page 23: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH23

Lifting height

-decreasing-

Lifting height

-maintained-

Conventional liner

Activator liner

1st compartment liners: activator liners

Shell liners

Page 24: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH24

1st compartment

activator liners

Shell liners

Page 25: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH25

2nd compartment classifying liners

Shell liners

Page 26: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH26

CPB mill diaphragms

Cement mill diaphragm

• Intermediate Diaphragm (ID)

• Discharge Diaphragm (DD)

• Functions & requirements

Retain media in 1st / 2nd

compartments for different grinding

actions

Regulate material flow & particle

size to maximize grinding efficiency

Mill ventilation not obstructed (low

ΔP)

Low maintenance (constant slot

opening, no breakage or loosening

of plates )

Structure stability & long useful life

Page 27: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH27

CPB Monobloc® Diaphragm Structure

Cement mill diaphragm

A strong, rigidly welded steel frame afixed to mill shell via “Tie Plates“

to avoid direct rotational stress transmission from mill shell & ensures

an exceptionally long useful life & maintenance-free operation

Page 28: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH28

Flexible plates division

Cement mill diaphragm

Provides further cost reduction opportunity

Easy conversion from 3 to 4 plates division

Page 29: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH29

Maximum free diaphragm area

Cement mill diaphragm

= Lower Δp & maximum mill ventillation / optimum air velocity

v = 1.8 m/s v = 1.8 m/s

Calculated air velocity above ball charge

p = 2.4 mbar

Page 30: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH30

Material flow control

Cement mill diaphragm

Allows optimization of material levels in 1st & 2nd compartments &

ensures maximum grinding efficiency

Page 31: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH31

Air-material separation

Cement mill diaphragm

Negates particles “throw” & maximizes effective grinding length

• Older design

• 旧的设计

• Current design

• 现在的设计

Page 32: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH32

Performance

Operations & maintenance considerations

Efficient grinding can only be achieved by maximizing the feed

throughput, rapid removal of the desired fines to avoid over-

grinding, transferring of optimum impact / shearing forces from the

grinding media to the materials being ground & minimize

generation of wasteful heat, wear, vibration & noise.

Energy consideration in cement grinding

Page 33: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH33

Performance

Relationship between power consumption &

product fineness

For every 100 cm²/g

increase in fineness

increases power

consumption by 1-2 kWh/t

for closed circuit mill & 2-3

kWh/t for open circuit mill.

Energy consideration in cement grinding

20

25

30

35

40

45

50

55

60

2500 3000 3500 4000 4500 5000

Open circuit kWh/t Closed circuit kWh/t

Page 34: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH34

Performance

Good practices in operations & maintenance

Maintain maximum, continuous feed without over-fill of material

which cushions & absorbs the impact energy in 1st chamber or lifts

media & causes reverse or even de-classification of media in the 2nd

Chamber

Avoid meal starvation -eg at feed inlet, in front & behind

intermediate diaphragm- & wasteful metal to metal contact between

the grinding elements causing wear & tear, generate heat & noise

Conduct regular mill sampling/analysis to maximise feed & periodic

technical audit to ensure optimum process conditions

Maintain optimum milling temperature (ventilation/water spray) &

use grinding aid (if cost effective) to minimise media coating &

particles re-agglomeration

Adhere to a well design planned maintenance programme

Energy consideration in cement grinding

Page 35: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH35

Performance

Use of additives & grinding aids

o Use appropriate grinding

aid such as air entrainer

or strength enhancer

o Provide water injection to

maintain optimum milling

temperature; water also

acts as a grinding aid

o Reduce clinker factor &

use filler such as

limestone and/or

extenders such as slag,

fly-ash or other pozzolan

Energy consideration in cement grinding

Page 36: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH36

Performance

Energy Improvement Potentials in Grinding

o Pre-grinding (e.g. roll press) => 10 - 30 %

o Separator upgrade => 5 - 25 %

o New mill internals (liners / diaphragm) => 5 - 20 %

o Mill operations & maintenance => 5 - 10 %

o Using grinding aids => 3 - 10 %

o Using fillers / Extenders => 10 - 50 %*

* Based on total energy consideration

Energy consideration in cement grinding

Page 37: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH37

Performance

Case example 1: Results of mill internal upgrade

Energy consideration in cement grinding

Page 38: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH38

Performance

Case example 2: Results of conversion

to high performnace QDK

Energy consideration in cement grinding

Page 39: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH39

Performance

Case example 3: Operational results of QDK

conversion & mill internals upgrade

Energy consideration in cement grinding

Page 40: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH40

Performance

Case example 4: Results of the russian plant upgrade

Before upgrade After upgrade

Cement type CEM400 D0 CEM400 D0 CEM400 D0

Product fineness [Blaine] 2.800 cm²/g 2.800 cm²/g 3.160 cm²/g

Average

production rate

76,0 t/h 103,0 t/h

(- 35,5 %)

88,0 t/h

(- 15,8 %)

Specific energy

consumption of

mill drive (at counter)

36,0 kWh/t 26,6 kWh/t

(- 26,0 %)

31,1 kWh/t

(- 15,7 %)

Cement strength after 28

days

44,2 MPa 44,2 MPa 44,2 MPa

Significant reduction in specific power consumption of the mill was

achieved despite relatively coarse products.

Energy consideration in cement grinding

Page 41: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH41

Conclusions

Conclusions

o Energy consideration in cement grinding makes sense: it

decreases production cost, increases output & reduces green

house gas emission;

o Proven technology available for both new & existing plant /

equipment upgrade to generate attractive ROI;

o Energy consideration should be regarded a basic responsibility

of cement producers to help conserve the fast depleting fossil

fuels & minimize impact of GHG on the environment to ensure a

sustainable development of the cement industry.

Energy consideration in cement grinding

Page 42: Energy consideration in cement grinding considerationChristian... · Energy consideration in cement grinding. ... o ~ 25 % of cement cost is due ... Consumption of energy in cement

© Christian Pfeiffer Maschinenfabrik GmbH42 Energy consideration in cement grinding

Any questions?Feel free to ask!