UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED Energy Huntsville May 15, 2018 UNCLASSIFIED Mark D. Smith, P.E., C.E.M. U.S. Army Garrison - Redstone
Transcript
Page 1: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

Energy HuntsvilleMay 15, 2018

UNCLASSIFIED

Mark D. Smith, P.E., C.E.M.U.S. Army Garrison-Redstone

Page 2: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Thank You!

Page 3: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Redstone Arsenal Overview

Lauderdale

Colbert

Franklin Morgan

Cullman

Madison

Marshall

Jackson

Giles Lincoln Franklin Marion

17,500Civilians

(43%) 800Military

(2%)

22,200Contractors

(55%)

40,500+Total

Employees

Major Redstone Career Fields

Supporting Redstone Arsenal✓ Science and Engineering

✓ Logistics Management

✓ Acquisition & Contracting

✓ 40K Direct Jobs on RSA

✓ 66.5K Indirect & Induced Jobs Across

Region

✓ Over 1,200 RSA Employees live in

Tennessee

✓ Approximately 500 live in Fayetteville

~104,500 Total Jobs Across

Tennessee Valley

~$18B Total Annual Economic Impact

Overview✓ 38,162 Acres

✓ 13,000 Developable Acres

✓ 1,774 Buildings (19M sq ft)

✓ 78 Tenant Organizations

Page 4: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Logistics Services

Materiel Management,

Acquisition, Contracting

& Sustainment

Redstone Arsenal – Federal Center of Excellence

Sustaining the Force

Research, Development, Test

& Engineering

Innovation Application of

Sciences & Technology

Space Operations & Missile Defense

Exploration &

Defensive Capabilities

Intelligence & Homeland Defense

Threat Analysis &

Explosives Training

UNCLASSIFIED

5UNCLASSIFIED

Page 5: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Production:

Controls:

Efficiency:

– Increase Secure & Renewable Energy

– Budget Neutral Requirement

– Energy Source Selection (TVA UESC

Steam Pruning)

– Facility and Installation Energy Demand

Reduction (Facility Energy Audits)

How we’re getting there…

– Facility & Utility Level Metering

– Bldg Controls & Monitoring Systems

– Utility Switching Capability

Electricity Steam Nat Gas

RSA Energy Strategy

Page 6: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Energy Waste

Fossil Fuels

Metering, Customer Audits, & Other Programs

JUN 2005DOE Steam System Options Study

Short-term & long-term steam recommendations

AUG 2003DOE Facility Energy Decision System (FEDS)

Determined steam as priority for gaining efficiencies

1940s

Steam as non-ignition

energy source

1980s

Joint venture between Army

& SWDA

Strategy

Energy Efficiency

Energy Security

Water Efficiency

History & Direction

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

TVA

Study

Decrease

Increase

TVA Task

Order 3 (PII)TVA Task

Order 3 (PI) TVA Task

Order 1

TVA Task

Order 2

Page 7: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

62%

32%

18%

5%

20%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Cost Consumption

Natural Gas

Steam

Electricity

FY 17 Redstone Arsenal Total Energy

63%

Page 8: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓The Department of Energy has suggested that our steam distribution system loses about 35%, as a minimum, just from the pipe being heated.

100 BTUs

Input

35 BTUs Loss

To Atmosphere

65 BTUs

Usable HeatTypical Steam Distribution System

Redstone Arsenal Energy Loss

$

$$

$$

Page 9: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Utility Energy Service Contract (TVA)

7

9 8

1

3Meter Group A

Meter Group B

North Loop

Phases 1-4

Page 10: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Utility Energy Service Contract (TVA)

Goal• Increase efficiency & reduce

energy demand and cost

Scope to Date• Switching from steam to natural

gas or other feasible alternative

• Lighting retrofits

• Building automation controls and

metering

• Mechanical system replacement

• Building envelope improvements

D.O. #1 Meter Group A (37 Bldgs)• Cost $9.8 million

• Annual savings $1.4 million

• Payback 7 years

• Construction complete FEB 2010

• Loan closed SEP 2014

D.O. #2 Meter Group B (28 Bldgs)• Cost $14.7 million

• Annual savings $2 million

• Payback 7 years

• Construction complete FY14

• Loan closed NOV 2015

D.O. #3 North Loop 1 (27 Bldgs)• Cost $9.6 million

• Annual savings $1.4 million

• Payback 7.1 years

Page 11: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

The geothermal bore field is located in grassy area between the

3200 block of buildings

Utility Energy Service Contract (TVA)

Page 12: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Utility Energy Service Contract (TVA)

Page 13: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

System Design - Bore field

✓168 vertical bores

✓200 feet deep

✓Heat exchange pipe loops in each bore.

✓This system is estimated to use 1/3 of the Btu’s per sq. ft. of the average building on RSA.

✓It will provide both heating and cooling for the 19 surrounding buildings.

Page 14: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Utility Energy Service Contract – Way Ahead

D.O. # North Loop 2 (19 Bldgs)

• Cost $ 6.9 million

• Annual savings $ 941 K

• Payback 7.4 years

• Design and submittal phase

North Loop 3 & 4 Detailed Energy

Study (29 Bldgs)

• 3 - Currently In Review

• 4 - Currently in Development

Sparkman Data Center – PNNL study

Redstone Technical Test Center

McMorrow Lab Bldg 5400 Relook

Projects from DPW Annual Work Plan

Page 15: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

A Successful Process – Reality

Page 16: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓ Understanding of the needs and goals

✓ Develop a mutually desirable Basic Ordering

Agreement (BOA)

✓ Audit plan for detailed energy study (DES)

✓ Thorough proposal evaluation

✓ Thorough delivery order

✓ Thorough competition

✓ Joint contractor evaluation

A Successful Process - Procurement

Page 17: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓Performance Assurance Plan IAW DOE guidelines

✓Commissioning Agent

✓Quality Assurance Evaluator – ASQ CQI

✓Measurement and Verification - 1 year

✓Preventative Maintenance – 1 to 3 years

✓Thorough design/submittal review

✓Detailed project schedule

✓Designer approved changes

✓Designer construction oversight / inspection

A Successful Process – Quality

Page 18: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓ Project Liaison

✓ On-site construction project manager

✓ Weekly progress/update meetings

✓ Coordination w/Base Planning and Engineering

✓ Coordination w/Base O & M

A Successful Process – Relationships

Page 19: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓ Extension for engineering support

✓ Option to pay off early

✓ Low interest financing

✓ Demand reduction – for both parties

✓ Helps stretch appropriated funds

A Successful Process – Benefits

✓ Capital improvements

✓ ECM bundling

✓ Payment is line item on the utility bill

✓ Supports local economy/job creation

✓ Helps meet mandates

Page 20: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

✓ Insure Appropriate Approval Thresholds

✓ Education on the UESC process => Buy-in

• Leadership

• Resource Management

• Contract Personnel

• O & M Personnel => Performance Assurance

➢ Warranty

➢ Preventative Maintenance

✓ Same engineer for audit and design => Consistency

✓ Communicate, communicate, communicate!

A Successful Process – Tips to Avoid Pitfalls

Page 21: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

A Successful Process – The Team

RSAJoe Davis, Director, Directorate of Public Works

Craig Northridge, Chief, Master Planning Division

Mary Dotson, Chief, Military Construction Branch, MP

Mark Smith, Energy Manager, MP

Patrick Holmes, Energy Manager, MP

Tim Smith, Base Operations

Pete Green, Base Operations

Beverly Love, Contract Officer, Army Contracting Command

Portia Sampson, Contract Specialist, ACC

Genevia Fontenot, Attorney Advisor

TVAGary Harris, Vice President, Industrial Marketing & Services

Mary Jane Owens, Manager, Industrial Accounts

Daryl Williams, Manager, Industrial Services

Brent Powell, Sr. Program Manager, Federal Energy Services Program

Peyton Butler, Attorney, Office of General Counsel

Kaye Murphey, Business Support Representative

Ashley Thrasher, Contracts Manager, Supply Chain

Tim Campbell, Program Manager, Industrial Services

Andrew Harris, Program Manager, Power Customer Contracts

Rick Penter, Project Manager

Ron Westmoreland, Project Manager

Randy Summers, Project Manager

Contract SupportBruce Fisackerly, Advanced Energy Consultants, Inc.

Robert Staples, Johnson Contractors, Inc.

Lee Palmer, Allen & Hoshall, Inc.

Richard Crowe, REA, Inc.

Donnie Allen, General Manager, CCI Group

Jeff Thrower, QAE, CCI Group

Mark Hardiman, System Admin, CCI Group

Merlon Largen, Project Liaison, CCI Group

Chris Hester, Wolf Creek, Base Maintenance

Page 22: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

0

50

100

150

200

250

200320042005200620072008200920102011201220132014201520162017

MB

TU/K

SF

Energy Progress

20,000

40,000

60,000

03 05 07 09 11 13 15 17

ASIP Pop.

Factors Beyond the

Formula• Installation Population

• Mission Requirements

• Facility & System Efficiencies

0

500,000

1,000,000

1,500,000

2,000,000

03 05 07 09 11 13 15 17

Total

Electricity

Steam

Nat. Gas

Fuel Oil

0

10,000

20,000

03 05 07 09 11 13 15 17

Bldg kSF

MB

TU

Year

Year

Year

kS

FP

ers

on

nel

A Successful Process – Results

Page 23: Energy Huntsvilleenergyhuntsville.com/wp-content/uploads/2018/05/Mark-Smith... · 1,774 Buildings (19M sq ft) ... Audit plan for detailed energy study (DES) ... Mark Hardiman, System

UNCLASSIFIED

UNCLASSIFIED

Questions?