+ All Categories
Home > Documents > ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation...

ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation...

Date post: 25-Apr-2018
Category:
Upload: phamlien
View: 230 times
Download: 4 times
Share this document with a friend
26
ENGINEERING & CONSTRUCTION TEKNOPRO MÜHENDİSLİK VE ENDÜSTRİ TESİSLERİ ÜRETİMİ A.Ş. www.teknopro.com.tr
Transcript
Page 1: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

ENGINEERING & CONSTRUCTION

TEKNOPRO MÜHENDİSLİK VE ENDÜSTRİ TESİSLERİ ÜRETİMİ A.Ş.

ww

w.t

ek

no

pro

.co

m.t

r

Page 2: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

ww

w.t

ek

no

pro

.co

m.t

r

CORPORATE INFORMATION

TEKNOPRO Mühendislik ve Endüstri Tesisleri Üretimi A.Ş. has been established for engineering services, process equipment design, manufacturing, industrial plant manufacturing and erection in 1999 .

TEKNOPRO, serves with experienced staff, computer-aided design and project group, opportunities for good outfitting workshop and large construction site for

chemical, pharmaceutical, paper, wood, food and

industrial facilities investments. Our service areas are fluid mechanics, fluid transfer, heat transfer, crystallization, evaporation, distillation, extraction, absorption system, tubular and plate heat exchanger, special chemical process equipment design, manufacturing and erection at site. TEKNOPRO certified Quality Management System ISO 9001:2008 and serves work with the understanding that is based customer satisfaction in all services areas. We are proud to let you know that we have obtained the EN ISO 3834-2 certification recently. This EN ISO 3834-2 certification means an international well-known quality assurance system for the welding technology. TEKNOPRO ENGINEERING & CONSTRUCTION

Page 3: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

ww

w.t

ek

no

pro

.co

m.t

r

ABOUT US

Engineering and Manifacturing Office Adress : Devlet Karayolu Üzeri, Dereköy Sapağı Yalova-Kocaeli İl Sınırı Karamürsel / Kocaeli / TURKEY Tel. : +90 (226) 462 90 89 – 90 99 : +90 (262) 454 44 94 – 44 99 Fax : +90 (226) 462 91 33 GSM : +90 (533) 485 05 02 E-Mail : [email protected] Website : www.teknopro.com.tr : www.teknoplate.com.tr Distance : from İstanbul 90 minutes from Bursa 90 minutes from Kocaeli 45 minutes 40°41’04.47”K / 29°33’23.50”D – Google Earth

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 4: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

4

WHAT CAN WE DO FOR YOU ?

ww

w.t

ek

no

pro

.co

m.t

r

PROJECT MANAGEMENT

ENGINEERING MANUFACTURING SITE

ERECTION

- FIELD OF ACTIVITIES

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 5: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

5

PROJECT MANAGEMENT

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Scope of Work • Scope Documentation

• Preliminary Schedule / Planning • Cost Estimation / Budget Price • Design • Detailed Schedule / Planning • Construction Packages

• Workshop Drawings • Specifications

• Construction • Procurement • Inspection • Supervision • Check-out • Commissioning • Start-Up Support • Performance Tests • Guarantees

PLANNING

ORGANIZING

APPLICATION REPORTING

FOLLOW-UP

Page 6: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

6

ENGINEERING

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Preparation of Project Design Package • Basic & Detailed Planning • Lists • Specifications

• Equipment Design Documentation • Specifications • Workshop Drawings

• Piping Design Documentation • Specifications • Manufacturing Drawings

• Equipment Installation Instructions

• Steel Structural Drawings* • Architectural / Civil Drawings*

• Application Drawings ( Foundation ) • Bill of Materials (BOMs) • Bid Evaluations

ENGINEERING

PROCESS DESIGN

BASIC ENGINEERING

DETAILED ENGINEERING

EQUIPMENT DESIGN

PIPING DESIGN

STEEL STRUCTURE DESIGN *

CIVIL DESIGN *

Page 7: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

7

PROCESS DESIGN

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Preparation of Process Flow Diagrams • Process Balance

• Material Balances • Energy Balances • Utility Consumption Calculations

• Preparation of P&IDs • Preparation of E&IDs * • Equipment List • Equipment Specifications • Unit Specifications • Guidance for Selection of Utility Units

• Cooling Towers, • Steam HP / LP • Air Supply Unit • etc..

• Equipment Layout Design • Pipe Design • Special Installation Instructions

Page 8: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

8

EQUIPMENT DESIGN

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Reactors • Mixers

• Shell & Tube Heat Exchangers

• Plate Type Heat Exchangers

• Piston Type Dip Valves

• Tray Type Filters

• Special Filter

• Crystallizators

• Evaporators

• Distillation Columns

• Extraction Columns

• Absorption & Adsorption Columns

• Reactor Heating & Cooling Packed Systems

• Sea Water Cooling Systems

• Storage Tanks

• and Custom Equipment/Machine Design

Page 9: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

9

PIPING DESIGN

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Piping Specifications • Instrument & Equipment Specifications • Selection and Preparation Specifications for Pumps, Instrument, etc. • Process Piping & Utility Piping Design

• Isometrics Drawings • Piping Layout & Sections Drawings • Line Lists • Component Lists • Instrument Lists • Equipment List* • 3D Study • Pipe Supports Selection/Design • Piperack Design

• Hook-up Diagrams • Hidrolics Diagrams • Instrumentation Lines • Stress Analyses • Bill of Materials (BOMs) • Cost Estimation

Page 10: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

10

MANUFACTURING

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

MANUFACTURING

1. EQUIPMENT MAN.

Materials:

Austenitic Steels, Hastelloy, Titanium, Nickel Alloy, Aluminum, PVC

Process:

TIG, MAG, SAW, Plasma (PAW) – Column&Beam System

Coating:

Teflon, Halar

Code:

ASME, EN 13445, AD2000 Merkblatter, API, etc.

3rd Party Inspection

One welding on circumference – Long Length Plate

2. INSTALLATION

Equipment

Machine

Pumps

Motors

Gearbox

Coupling Alignment, Belt Alignment

Special Rotor Units

Instrument

Glass Equipment

Glass Piping

Vibration Analysis*

3. PIPING

Process Piping

Utility Piping

Steam&Condensate Piping

Glass-fiber Piping

PVC Piping

Hydraulic Piping

Instrumention Lines

4. STRUCTURE

Small Scale Steel Structure

Big Scale Steel Structure*

Machine Parts

Special Supports

Equipment Base Supports

Piperacks

Pump Supports

Piping Supports

Insulation Supports

Page 11: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

11

EQUIPMENT MANUFACTURING

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Agitated Pressurized Tanks, Shell & Tube Heat Exchangers

• Plate Type Heat Exchangers www.teknoplate.com.tr

• Piston Type Dip Valves, Tray Type Filters, Special Filter

• Crystallizators, Evaporators

• Distillation Columns, Extraction Columns

• Absorption & Adsorption Columns

• Scrubber Columns

• Reactor Heating & Cooling Packed Systems

• Sea Water Cooling Systems

• Custom Equipment/Machine Design

• Hot Air Ducting

• Storage Tanks

Page 12: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

12

AVAILABLE TEST DEVICE

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Teodolite – Wild T2 • Level Measurement Device • Coupling & Belt Aligment Device – Fixture Laser • Roughness Measurement Device • Dry Film Thickness Measurement Device • Wet Film Thickness Measurement Device • Lazer Termometer • Sound Measurement Device • pH Measuring Probe • Periodically Calibrated Measuring Tools

Page 13: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

13

AVAILABLE MACHINE PARK

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Wokshop – 1.000 m2 / 7 & 3 tons 9m Height Overhead Cranes • Wokshop – 350 m2 / 3 tons 9m Height Overhead Cranes • Totally 1.000 m2 Space Area

• TIG, MAG, SAW and PAW Welding Machines • Column & Beam Automatic Tracing Welding System • Automatic Tank Rotating Device • Tube Expander • Rolling Machine • Bending Machine - Abkant • Cutting Machine – Giyotin • Profile Bending Machine • Hydrostatic Test Pump Up to 200 bar • Lathe • Plasma Cutting Machine • Tools for Site Erection

Page 14: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

14

SITE ERECTIONS

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Installation and Reports of Process Equipment

( Installation Quality - IQ )

• Reactors, Columns, Speacial Unit, etc.

• Installation and Alignment of ( Alignment Reports )

• Pumps

• Special Rotor Units or Gearbox

• Process & Utility Piping

• Pipes, Valves, etc.

• Special Intruments

• Installation of Pipe Supports

• Installation of Piperacks

• Hidrolic Piping – Tubing

• Instrument Lines – Flexible Hosing

• Plastic Piping

• Preparation Hydrostatic Test Plan for Equipment and Pipes

• Service for DRY-RUN

Page 15: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

15

SITE SERVICE

ww

w.t

ek

no

pro

.co

m.t

r

• Equipment Supervision/Installation

• Equipment Revision/Maintenance

• Piping

• Installation of Equipment & Instrument

• Installation of Rotor Units - Coupling Alignment

• Pipe re-routing at Site

• Modifications

• Supply Manpower

• Supply Machine

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 16: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

16

OUTSOURCING

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Processes

• Evaporation, Crystallization, Mixing, Drying etc.

• Equipment

• Glass-Lined Equipment, Centrifuges, Pumps, Valves etc.

• Tools – Rental Equipment

• Bending Machines, Cuttings Machine, etc.

• Parts

• Laser, Plasma, Oxy and Water-Jet cut plates, machined parts, tubesheet, etc.

• Long Length Stainless Stell Plate – Upto 15m ( ie. 5 x 1.5000 x 15.000 )

• Lifting Machines – Mobile Crane

• Up to 500 ton Mobile Cranes

• Manpower

• Up to 100 Certified Welders acc. to standard

( EN 287-1, ASME IX, etc. )

• Totally up to 250 person/project

• Company

• Isolation, Paint, Steel Structure Manufacturing, Galvanization, etc.

Page 17: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

17

OUTSOURCING

TEKNOPRO ENGINEERING & CONSTRUCTION

ww

w.t

ek

no

pro

.co

m.t

r

• Transportation Company

• Can be transported up to 4m Diameter/Height

• Coating

• Rubber Lining, Halar, Teflon

• Instrumentation/Automation Company

• Cabeling and Piping for Ex-proof zones

• Design Company

• Steel Structure and Civil Design

• Test Company

• Material Analyzing, Strenth Measurement

• Radiograhical and Penetrant Test

• Machinig Company

• For Elliptical Heads, Machine Parts, etc.

• Rental Workshop

• Inspection for Manufacturing and Design

• 3rd Party

Page 18: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

18

PROJECTS by COMPANY

ww

w.t

ek

no

pro

.co

m.t

r

Sandoz Turkey EagleBurgmann Turkey Deva Holding – Çerkezköy API Üretim Tesisleri EKMEK Unlu Gıda San. ve Tic. A.Ş. AK-KİM Kimya San. ve Tic. A.Ş. Metso Paper Italy S.p.A. Metso Paper Finland Metso Paper Sweden Jordan Bromine Company TÜL Kağıt A.Ş. ENPAY Endüstriyel Pazarlama ve Yatırım A.Ş. ALKİM Kimya San. A.Ş. HPD Process Engineering, S.A. Ulkar Kimya San. ve Tic. A.Ş. Eczacıbaşı-Zentiva Kimyasal Ürünler San. ve Tic. A.Ş. AKSA Akrilik Kimya San. A.Ş. LİLA Kağıt A.Ş. Modern Karton A.Ş. Kastamonu Entegre A.Ş. Eti Soda A.Ş.

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 19: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

19

REFERENCES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 20: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

20

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 21: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

21

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 22: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

22

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 23: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

23

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 24: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

24

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 25: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

25

PICTURES

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

Page 26: ENGINEERING & CONSTRUCTION - TeknoProteknopro.com.tr/images/dokumanlar/TEKNOPRO... · Preparation of Project Design Package • Basic & Detailed Planning ... Equipment Layout Design

26

ww

w.t

ek

no

pro

.co

m.t

r

TEKNOPRO ENGINEERING & CONSTRUCTION

THANK YOU

Do Not Forget to View Detailed “Reference List”


Recommended