ENGINEERING INSURANCE ORIGINATED IN
U.K.IN THE MIDDLE OF THE 19th CENTURY
WITH INSURANCE AGAINST BOILER
EXPLOSION RISKS
OTHER INSURANCES LIKE MACHINERY
BREAKDOWN /DOS/ PROJECT INSURANCES
BECAME POPULAR WITH THE GROWTH OF
INDUSTRIALISATION
TWO BROAD GROUPS-
4. CONSTRUCTION PHASE COVERS
5. OPERATIONAL PHASE COVERS
BACKGROUND
8/14/2019 Engineering Ins
3/38
PROJECT COVERS
I. MATERIAL DAMAGE (MD)
A) CONTRACTORS ALL RISK (CAR)
B)ERECTION ALL RISKS (EAR)
STORAGE CUM ERECTION (SCE)
C)MARINE CUM ERECTION (MCE)
II. BUSINESS INTERRUPTION
A) ADVANCE LOSS OF PROFIT(ALOP)
FOLLOWING LOSS OR DAMAGE
PROPERTY UNDER EAR/CAR
CONSTRUCTION PHASE
8/14/2019 Engineering Ins
4/38
OPERATIONAL PHASE-OPERATIONAL COVERSI. MATERIAL DAMAGER(M.D.)
A. I) MACHINERY INSURANCE
II) BOILER AND PRESSURE PLANT(BPP)
III) ELECTRONIC EQUIPMENT
INSURANCE (EEI)
F. CONTRACTORS PLANT MACHIENRY
(CPM)
G. CIVIL ENGINEERING COMPLETED
RISKS(CECR)INSURANCE
OPERATIONAL PHASE
8/14/2019 Engineering Ins
5/38
D. DETERIORATION OF STOCK (DOS)
II. BUSINES INTERRUPTION=LOP
MACHINERY LOSS OF PROFIT (MLOP)
FOLLOWING MATERIAL DAMAGE
UNDER M.B.POLICYBPPLOP FOLLOWING
EXPLOSION/IMPLOSION DAMAGE TO
BOILER/PRESSURE VESSEL
OPERATIONAL PHASE COVERS
contd
8/14/2019 Engineering Ins
6/38
PURPOSE
2. TO PROTECT THE INTEREST OF
CONTRACTORS
PRINCIPALS
FINANCIERS
2. POLICY IDEALLY SUITED FOR CIVILENGINEERINGPROJECTS LIKEMULTISTORIED BUILDINGS/ BRIDGES /FLYOVERS
/DAMS/ ROADS/ CANALS/ SILOS/TUNNELS etc.
VALUE OF CIVIL WORKS SHOULD BE MORE THAN50%
CONTRACTORS ALL RISK POLICY
(CAR)
8/14/2019 Engineering Ins
7/38
CAR POLICY- PERILS COVERED
SECTION I (MATERIAL DAMAGE)
ALL RISK COVER (ALL RISKS OTHER
THAN EXCLUSIONS) THIS MEANS
THAT ALMOST ANY SUDDEN AND
UNFORESEEN LOSS OR DAMAGE WILL
BE COVERED INCLUDING- ACCIDENTAL LOSSES LIKE COLLAPSE,
IMPACT FIRE ,LIGHTNING, EXPLOSION
AOG PERILS LIKE STFI GROUP,
EARTHQUAKE, LANDSLIDE/ROCKSLIDE
HUMAN PERILS LIKE THEFT / BURGLARY,
BAD WORKMANSHIP,LACK OF SKILL,
NEGLIGENCE, MALICIOUS ACTS , HUMAN
8/14/2019 Engineering Ins
8/38
CAR POLICY- PERILS COVERED ..contd
EXCLUSIONS UNDER SECTION I
EXCESSNORMAL WEAR AND TEAR,RUSTING
CORRECTION OF ANY ERROR UNLESSRESULTING IN PHYSICAL DAMAGE/LOSS
FILES/DRAWINGS/CURRENCY,CHEQUESPACKING MATERIAL
PENALTIES UNDER CONTRACTCONDITIONS
VEHICLES LICENSED FOR ROAD USELOSS/DAMAGE DUE TO FAULTY DESIGN
SECTION-II (THIRD PARTY LIABILITY)
8/14/2019 Engineering Ins
9/38
CAR POLICY -SUM INSURED
SUM INSUREDESTIMATED COMPLETELY ERECTED VALUE OF
THE CONTRACT WORKS INCLUSIVE OF
WAGESMATERIALSCOST OF CONSTRUCTIONFREIGHTCUSTOM DUTY
TAXES ITEMS SUPPLIED BY PRINCIPALSUM INSURED IS ADJUSTABLE ON COMPLETION OF
CONSTRUCTION ON THE BASIS OF ACTUAL VALUES IN
RESPECT OF CONSTRUCTION COST,FREIGHT CUSTOM DUTIES
(INCREASE/DECREASE IN PRIME COST OF MATERIAL NOT TOBE TAKEN INTO ACCOUNT
8/14/2019 Engineering Ins
10/38
CAR POLICY-OTHER IMPORTANT
PROVISIONS
POLICY PERIOD -COMMENCEMENT OF WORK ORAFTER THE UNLOADING OF THE FIRST
CONSIGNMENT AT THE SITE--WHICHEVER IS
EARLIER. THE COVER EXPIRES ON COMPLETION
OF THE PROJECT/COMPLETED PART BEING TAKENOVER OR PUT INTO OPERATION BY PRINCIPAL/THE
DATE SPECIFIED IN THE POLICY --- WHICHEVER IS
EARLIER.
COVER FOR CONSTRUCTION PLANT MACHINERY-CONSTRUCTION PLANT& MACHINERYCAN BE
COVERED WHERE S/I FOR CPM DOES NOT EXCEED
5% OF CAR S/I
SURROUNDING PROPERTY-SEPARATE S/I TO BE
8/14/2019 Engineering Ins
11/38
CAR POLICY-OTHER IMPORTANT
PROVISIONS..contd
a REMOVAL OF DEBRISREMOVAL OF DEBRIS
a MAINTENANCE COVER-TWO TYPESMAINTENANCE COVER-TWO TYPES
3.3. LIMITED MAINTENANCE-LOSS/DAMAGE TOLIMITED MAINTENANCE-LOSS/DAMAGE TO
COTRACT WORKS CAUSED BY CONTRACTORCOTRACT WORKS CAUSED BY CONTRACTOR
DUE TO OPERATIONS CARRIED OUT FORDUE TO OPERATIONS CARRIED OUT FORCOMPLYING WITH MAINTENANCECOMPLYING WITH MAINTENANCE
PROVISIONS OF THE CONTRACTPROVISIONS OF THE CONTRACT
4.4. EXTENDED MAINTENANCE-AS ABOVE PLUSEXTENDED MAINTENANCE-AS ABOVE PLUS
LOSS/DAMAGE DURING MAINTENANCELOSS/DAMAGE DURING MAINTENANCEPERIOD CAUSED BY FAULT/PERIL INSUREDPERIOD CAUSED BY FAULT/PERIL INSURED
DURING THE CONSTRUCTION PERIODDURING THE CONSTRUCTION PERIOD
a ADDITIONAL EXPENSES FOR OVERTIME/ADDITIONAL EXPENSES FOR OVERTIME/
EXPRESS FREIGHT/AIR FREIGHTEXPRESS FREIGHT/AIR FREIGHT
a COVER FOR ADDITIONAL CUSTOMS DUTYCOVER FOR ADDITIONAL CUSTOMS DUTY
8/14/2019 Engineering Ins
12/38
ERECTION ALL RISK POLICY
WHEREAS CAR POLICY IS CONCERNED WITHCIVIL ENGINEERING WORKS,EAR OR SCE
(STORAGE CUM- ERECTION) IS CONCERNED WITH
INDUSTRIES AND DEALS WITH ERECTION OF
PLANT AND MACHINERY/ EQUIPMENT AND
STRUCTURES WHERE THE COST OF CIVIL WORKS
DOES NOT EXCEED 5%OF THE PROJECT COST.
POLICY MAY BE ISSUED IN THE JOINT NAMES OF
PRINCIPALS/CONTRACTORS /FINANCIERS IN
RESPECT OF THE ENTIRE PROJECT OR PART
THEREOF AS PER CONTRACT SPECIFICATIONS.
COVERAGEALL RISK COVER ON THE LINES OFCAR POLICY
8/14/2019 Engineering Ins
13/38
SCOPE OF EAR POLICY
SUM INSURED=COMPLETELY ERECTED
VALUE OF PROJECT INCLUDING
FREIGHT, COST OF ERECTION etc. POLICY PROVIDES FOR-
3. PREMIUM ADJUSTMENT
4. CPM COVER
5. SURROUNDING PROPERTY6. REMOVAL OF DEBRIS
7. THIRD PARTY LIABILITY
8. MAINTENANCE COVER
ON THE LINES OF CAR POLICY
8/14/2019 Engineering Ins
14/38
POLICY PERIOD
POLICY WILL COMMENCE FROM THE TIME OF
UNLOADING OF THE FIRST CONSIGNMENT AT
THE SITE AND CONTINUES DURING THESTORAGE/ERECTION / TEST OPERATION OR
TEST LOADING /TRIAL RUNNING etc. AND EXPIRE
AFTER COMPLETION OF THE PROJECT/HANDING
OVER TO THE PRINCIPALS OR THE DATE
SPECIFIED IN THE POLICY WHICHEVER IS
EARLIER. ONE MONTH TESTING IS INBUILT
UNDER THE POLICY
REFUND OF PREMIUM ALLOWED FOR EARLY
COMPLETION SUBJECT TO TERMS/CONDITIONS
SCOPE OF EAR POLICYcontd
8/14/2019 Engineering Ins
15/38
MARINE-CUM-ERECTION POLICY
MCE POLICY PROVIDES MARINE ALL RISK
COVER IN CONJUNCTION WITH EAR POLICY
POLICY PERIOD-COMMENCES WITH THE
DISPATCH OF THE FIRST CONSIGNMENT TO
THE PROJECT SITE. A SEPARATE MARINE
TRANSIT POLICY FOR IMPORTED AND
INDIGENEOUS EQUIPMENTS /PROJECT
MATERIAL ON ALL RISK PLUS WAR/SRCC
TERMS IS ISSUED IN CONJUNCTION WITH THEEAR/SCE POLICY.
FABRICATORS WORKS EXTENTION-COVERS PROJECT
MATERIAL AGAINST TO-AND FRO TRANSIT RISKS AND
STORAGE RISKS AT FABRICATORS PREMISES
8/14/2019 Engineering Ins
16/38
PROPERTY TO BE COVERED-BOILERS/PRESSURE PLANTS WITH
AUXILLARIES
ELECTRICAL EQIPMENTS LIKE
ALTERNATORS/GENERATORS/MOTORS/RECTIFIERS/SWITCHGEAR/TRANFORMERS
MECHANICAL PLANT/ MACHINERY
INCLUDING ENGINES/ PUMPS/ PROCESS
MACHINERY/BLOWERS/COMPRESSORS/REFRIGERATION PLANT/TURBINES
/MACHINE TOOLS AND PRESSES
LIFTING EQUIPMENTS LIKE LIFTS ,
HOISTS, CRANES,CONVEYORS
MACHINERY INSURANCE POLICY
8/14/2019 Engineering Ins
17/38
POLICY COVERAGE
UNFORSEEN AND SUDDEN PHYSICAL LOSS
OR DAMAGE BY ANY CAUSE (OTHER
THAN EXCLUSIONS) TO THE INSURED
PROPERTY-3. WHILE IT IS AT WORK OR AT REST OR
4. WHILE BEING DISMANTLED FOR CLEANING OR
OVERHAULING OR
5. DURING CLEANING OR OVERHAULING
6. DURING SUBSEQUENT ERECTION/ REASSEMBLY
OR
5. WHILE BEING SHIFTED WITHIN THE INSURED
PREMISES
MACHINERY INSURANCE POLICY
8/14/2019 Engineering Ins
18/38
LOSS PRODUCING EVENTS COULD BE-
ELECTRICAL eg. Short circuit,arcing,failure of
insulation, malfunctioning of control circuits etc.
MECHANICAL eg.faulty material/ casting,vibrations, maladjustments,loosening of parts,
abnormal stress, centrfugal forces, defective
lubrication, failure of protective devices etc.
EXTERNAL/ACCIDENTAL eg.entry of foreignbody,impact,collision etc.SUM INSURED=CURRENT NEW REPLACEMENT
VALUE INCLUDING TRANSPORTATION TO
SITE/DUTY/ERECTION OR INSTALLATION COST
MACHINERY INSURANCE POLICY
contd
8/14/2019 Engineering Ins
19/38
MACHINERY INSURANCE POLICY
contd
a IMPORTANT EXCLUSIONS-IMPORTANT EXCLUSIONS-2.2. FIRE AND SPECIAL PERILSFIRE AND SPECIAL PERILS
3.3. LOSS/DAMAGE DUO TO OVERLOAD TESTS ORLOSS/DAMAGE DUO TO OVERLOAD TESTS OR
EXPERIMENTSEXPERIMENTS
4.4. WASTAGE OF MATERIAL /WEARING OUT OFWASTAGE OF MATERIAL /WEARING OUT OFANY PART DUE TO GRADUALANY PART DUE TO GRADUAL
DETERIORATION /USAGE OR WORKINGDETERIORATION /USAGE OR WORKING
5.5. WAR AND WARLIKE PERILS/NUCLEARWAR AND WARLIKE PERILS/NUCLEAR
PERILS/CONSEQUENTIAL LOSSESPERILS/CONSEQUENTIAL LOSSES
6.6. MANUFACTURING DEFECTSMANUFACTURING DEFECTS
7.7. WILFUL ACT/GROSS NEGLIGENCE OF THEWILFUL ACT/GROSS NEGLIGENCE OF THE
INSUREDINSURED
8.8. DAMAGE TO EXCHANGEABLE PARTS TOOLSDAMAGE TO EXCHANGEABLE PARTS TOOLS
SUCH AS BLADES/CUTTERS /KNIVES etc.SUCH AS BLADES/CUTTERS /KNIVES etc.
8/14/2019 Engineering Ins
20/38
CONTRACTORS PLANT & MACHINERY
(CPM) POLICY
PROPERTY COVERED- CONTRACTORESPLANT AND MACHINERY LIKE PILE
DRIVING EQUIPMENT,
EXCAVATORS,COMPRESSORS,CRANES,
MIXING PLANTS,STONE CRUSHERS,
BULLDOZERS CPM CAN BE INSURED UNDER CAR/EAR
POLICY AS AN ADDITIONAL ITEM IF THESUM INSURED OF CPM IS 5% OF TOTAL
SUM INSURED OF CAR /EAR PROJECT
SUBJECT TO MAXIMUM OF RS.25 LACS
8/14/2019 Engineering Ins
21/38
CONTRACTORS PLANT &
MACHINERY POLICY Contd..
PERILS COVERED
UNFORSEEN AND SUDDEN PHYSICAL
LOSS /DAMAGE FROM ANY CAUSE
INCLUDING -
a) BURGLARY ,THEFT,RIOT & STRIKE ,
MALICIOUS DAMAGE AND TERRORISM
b) FIRE & LIGHTNING, EXTERNAL
EXPLOSION, EARTHQUAKE, FLOOD,
INUNDATION, SUBSIDENCE, LANDSLIDE
AND ROCKSLIDE.
8/14/2019 Engineering Ins
22/38
CONTRACTORS PLANT & MACHINERY
(CPM) POLICY Contd..
PERILS COVEREDcontd
c) STORM,TEMPEST, HURRICANE,
TYPHOON AND TORNADO
d) ACCIDENTAL DAMAGE DUE TO MAN
HANDLING, DROPPING OR FALLING,
COLLAPSE , COLLISION AND IMPACT
SUM INSURED=CURRENT NEW
REPLACEMENT VALUE INCLUDING
TRANSPORTATION COSTS/CUSTOM
DUTY/ERECTION OR INSTALLATION
COSTS
8/14/2019 Engineering Ins
23/38
CONTRACTORS PLANT & MACHINERY
(CPM) POLICY Contd..
SCOPE OF COVER: THE CPM IS
COVERED
A)WHILE IT IS AT WORK OR AT REST
B) WHILE BEING DISMANTLED FORCLEANING OR OVERHAULING OR
C) REASSEMBLING THEREAFTER
THE MACHINERY IS COVERED WHILE
THE SAME IS LYING AT CONTRACTORS
OWN PREMISES OR AT THE VARIOUS
SITES/ LOCATIONS .TRANSIT RISKS FROM
ONE SITE TO ANOTHER ARE NOTCOVERED
8/14/2019 Engineering Ins
24/38
CONT RACT OR S PL ANT & MA CH INERY(CP M) P OLI CYCont d. .a PRINCIPAL EXCLUSIONS-PRINCIPAL EXCLUSIONS-2.2. ELECTRICAL/MECHANICAL BREAKDOWNELECTRICAL/MECHANICAL BREAKDOWN
3.3. WAR AND WARLIKE PERILS/NUCLEAR RISKSWAR AND WARLIKE PERILS/NUCLEAR RISKS
4.4. WILFUL ACT/WILFUL NEGLIGENCE OFWILFUL ACT/WILFUL NEGLIGENCE OF
INSURED/REPRESENTATIVEINSURED/REPRESENTATIVE5.5. OVERLOAD TESTS/EXPERIMENTSOVERLOAD TESTS/EXPERIMENTS
6.6. EXCHANGEABLE PARTS /TOOLSEXCHANGEABLE PARTS /TOOLS
7.7. TOTAL/PARTIAL IMMERSION IN TIDALTOTAL/PARTIAL IMMERSION IN TIDALWATERS OR WHILST WORKINGWATERS OR WHILST WORKING
UNDERGROUNDUNDERGROUND8.8. EXCESSEXCESSa POLICY EXTENTIONSPOLICY EXTENTIONS
10.10. T.P.LIABILITYT.P.LIABILITY
11.11. SURROUNDING PROPERTY/DEBRIS REMOVALSURROUNDING PROPERTY/DEBRIS REMOVAL
12.12. OVERTIME WAGES /EXPRESS FREIGHTOVERTIME WAGES /EXPRESS FREIGHT
BOILER & PRESSURE PLANT POLICY
8/14/2019 Engineering Ins
25/38
BOILER & PRESSURE PLANT POLICY
BOILERS GENERATE STEAM WHICH
IS USED IN VARIOUS PROCESSES IN
INDUSTRIES.STEAM IS ALSO USED INTHERMAL POWER PLANTS TO DRIVE
THE TURBINES.
PROPERTY COVERED-
BOILERS /ECONOMISERS/SUPER HEATERS/
STEAM PIPES/ PRESSURE VESSELS /OTHER
VESSELS UNDER STEAM GAS OR AIR
PRESSURE
BOILER & PRESSURE PLANT
8/14/2019 Engineering Ins
26/38
BOILER & PRESSURE PLANT
POLICYcontd
PERILS COVERED-POLICY COVERSEXPLOSION OR COLLAPSE OF THE
INSURED BOILER/PRESSUER VESSEL
RESULTING IN:
3. DAMAGE TO BOILER/PRESSURE PLANT
4. DAMAGE TO SURROUNDING PROPERTY
OF THE INSURED
5. LIABILITY TO THIRD PARTY
POLICY ALSO COVERS EXPLOSION CAUSED BY IGNITION OF
FLUE GASES
MAJOR SXCLUSIONS-FIRE AND SPECIAL PERILS,WAR ANDNUCEAR PERILS,EXTERNAL EXPLOSION
BOILER & PRESSURE PLANT
8/14/2019 Engineering Ins
27/38
BOILER & PRESSURE PLANT
POLICYcontd
SUM INSURED=CURRENT NEW
REPLACEMENT VALUE INCLUSIVE OF
FREIGHT/CUSTOMS DUTY/ERECTION
COST
DEFINITIONS-
BOILER-ANY FIRED CLOSED VESSEL/COMBINED
CONTAINER PIPING SYSTEM IN WHICH STEAM
IS GENERATED UNDER PRESSURE
PRESSURE PLANT-ANY UNFIRED CLOSED
CONTAINER UNDER STEAM/GAS/FLUID
PRESSURE
MACHINERY LOSS OF PROFIT POLICY(MLOP ) AND
8/14/2019 Engineering Ins
28/38
MACHINERY LOSS OF PROFIT POLICY(MLOP ) AND
BOILER/PRESSURE PLANT LOSS OF PROFIT
(BPPLOP)
POLICY COVERS BUSINESS INTERRUPTION
LOSSES CONSEQUENTIAL UPON MATERIAL
DAMAGE AS DEFINED IN THE RESPECTIVE
POLICIES POLICY PROVIDES INDEMNITY AGAINST-
3. LOSS OF NET PROFIT
4. LOSS OF INSURED STANDING CHARGES
5. INCREASED COST OF WORKING
ON THE LINES OF FIRE LOP.HOWEVER,UNLIKE
FIRE LOP,THE INSURED CAN SELECT THE KEY
ITEMS OF PLANT/ MACHINERY FOR M.D.+LOP
8/14/2019 Engineering Ins
29/38
ADVANCED LOSS OF PROFIT(ALOP)
ALOP IS ALSO KNOWN AS DELAY IN START-UP
SCOPE OF COVER
POLICY COVERS FINANCIAL CONSEQUENCES
OF A PROJECT BEING DELAYED BECAUSE OF
ACCIDENTAL DAMAGE TO THE PROJECT
MATERIAL DURING ERECTION/TESTING STAGES.
IT FOLLOWS IN PRINCIPLE THE
CHARACTERISTICS OF AN ANNUAL
CONSEQUENTIAL LOSS POLICY, BUT IS ISSUED IN
ADVANCE OF THE ACTUAL COMMENCEMENT OF
THE BUSINESS SINCE IT IS A COMPULSION FROM
THE FINANCERS OF THE PROJECT
8/14/2019 Engineering Ins
30/38
ADVANCED LOSS OF PROFIT(ALOP)contd.
OBJECT OF ALOP-
INDEMNIFY THE PRINCIPAL OR THE PROJECT
OWNER FOR THE ACTUAL FINANCIAL LOSS
SUSTAINED DUE TO DELAY IN COMMENCEMENT
OF COMMERCIAL OPERATIONS OF A NEWPROJECT WHICH IS UNDER INSTALLATION/
CONSTRUCTION
DELAY MUST BE CAUSED BY DIRECT PHYSICAL
LOSS OR DAMAGE ADMISSIBLE UNDERMATERIAL DAMAGE CAR/EAR POLICIES
COVERING THE CONTRACT WORKS
SUM INSURED IS COMPUTED ON THE BASIS OF
THE FINANCIAL MODEL OF THE PROJECT
DETERIORATION OF STOCK POLICY
8/14/2019 Engineering Ins
31/38
DETERIORATION OF STOCK POLICY
(DOS)
THE POLICY IS KNOWN AS -
1. DETERIORATION OF STOCK INSURANCE OR
2. STOCK SPOILAGE INSURANCE
SCOPE- THIS IS A FORM OF CONSEQUENTIAL LOSSFOR STOCKS CONTAINED IN LARGE COLD
STORAGES
THE INSURANCE COVER IS AGAINST THE RISK
OF DETERIORATION/PUTREFACTION AND/OR
CONTAMINATION FOLLOWING BREAKDOWN OF
REFRIGERATION PLANT/MACHINERY,A CLAIM
FOR WHICH IS ADMISSIBLE UNDER THE
CONCURRENT MACHINERY INSURANCE POLICY
DETERIORATION OF STOCK POLICY
8/14/2019 Engineering Ins
32/38
DETERIORATION OF STOCK POLICY
contd.
TWO TYPES OF POLICIES-
1. POTATOES IN COLD STORAGE
2. OTHER THAN POTATOES IN COLD STORAGE
Eg. SEA FOODS LIKE FISH /PRAWNS/FROG LEGS ,
DAIRY PRODUCTS LIKE CHEESE/BUTTER,
FRUITS,VEGETABLES AND FOOD ITEMS
INSURANCE COVER APPLIES TO
DETERIORATION OF CONTENTS CAUSED BY A
RISE IN TEMPERATURE DUE TO MATERIAL
DAMAGE TO REFRIGERATION PLANT OR
ACTION OF REFRIGERANT ESCAPING FROM THE
PLANT
POLICY MAY BE EXTENDED TO COVER FOES
ELECTRONIC EQUIPMENT POLICY
8/14/2019 Engineering Ins
33/38
ELECTRONIC EQUIPMENT POLICY
THE POLICY IS SPECIFICALLY DESIGNED FORELECTRONIC EQIUPMENTS LIKE-
COMPUTORS INCLUDING CPU/KEYBOARD/ MONITOR/
PRINTER/STABILIZER/UPS/SERVER/SYSTEMS SOFTWARE
ELECTRONIC DATA PROCESING (EDP) EQUIPMENTELCTRO-MEDICAL EQUIPMENT
EQUIPMENT FOR RESEARCH AND MATERIAL TESTING
TELECOMMUNICATION AND NAVIGATIONAL
EQUIPMENT
COMPUTER SYSTEM FOR PRODUCTION PLANT AND
MACHINERY
SIGNAL AND TRANSMITTING UNITS ETC.
8/14/2019 Engineering Ins
34/38
ELECTRONIC EQUIPMENT POLICYcontd
THE POLICY WILL APPLY ONLY AFTER SUCCESSFULCOMPLETION OF THE PERFORMANCE/ ACCEPTANCE TEST
OF THE INSURED ITEMS AND COVER WILL CONTINUE
WHETHER THEY ARE WORKING,AT REST,DISMANTLED
FOR CLEANING/OVERHAULING,SUBSEQURNT RE-
ERECTION OR BEING SHIFTED WITHIN THE PREMISES.
SCOPE OF COVER
POLICY COMPRISES THREE SECTIONS
SECTION I-- COVERS ANY SUDDEN AND UNFORESEENPHYSICAL LOSS/DAMAGE DUE TO ANY CAUSE(OTHER
THAN THOSE SPCIFICALLY EXCLUDED).THUS,THE COVER
IS ALL RISK AND INCLUDES LOCATION/OPERATIONAL/
AOG/HUMAN ELEMENT RISKS.
SUM INSURED UNDER SECTION I=CNRV
8/14/2019 Engineering Ins
35/38
ELECTRONIC EQUIPMENT POLICYcontd
SPECIAL EXCLUSIONS TO SECTION I-
FAULTS OR DEFECTS EXISTING AT THE TIME OF
COMMENCEMENTS OF THE INSURANCE FAILURE OR INTERRUPTION OF ANY GAS , WATER
OR ELECTRICITY SUPPLY.
LOSS OR DAMAGE FOR WHICH THE
MANUFACTURERS OR SUPPLIERS ARE
RESPONSIBLE BY LAW OR UNDER CONTRACT
LOSS /DAMAGE TO EXCHANGEABLE TOOLS,
BULBS,VALVES, TUBES, RI BBONS, BELT ETC. OR
ANY OPERATING MEDIA (E.G.LUBRICATING OIL
ETC.)UNLESS SUCH LOSS IS CAUSED BY
INDEMNIFIABLE PERILS
8/14/2019 Engineering Ins
36/38
ELECTRONIC EQUIPMENT POLICYcontd
SPECIAL EXCLUSIONS TO SECTION I-contd. THE EXCESS STATED IN THE SCHEDULE.THIS VARIES
ACCORDING TO THE VALUE OF EQUIPMENT.
ANY COST ARISING FROM FALSE PROGRAMMING,
PUNCHING OR INADVERTENT CANCELLING OFINFORMATION ETC.
CONSEQUENTIAL LOSS OF ANY KIND
WEAR AND TEAR,GRADUAL DETERIORATION DUE TO
ATMOSPHERIC CONDITIONS
ELIMINATION OF ROUTINE FUNCTIONAL FAILURES
GENERAL EXCLUSIONS APPLICABLE TO ALL
SECTIONS-
WAR PERILS/NUCLEAR PERILS/WILFUL ACT/NEGLIGENCE etc.
8/14/2019 Engineering Ins
37/38
COVERAGE FOR EXTERNAL DATA MEDIAWILL BE AGAINST THE SAME PERALS
COVERED UNDER SECTION I
SUM INSURED=COST OF RESTORING THE
INSURED EXTERNAL DATA MEDIA BY NEW
MATERIAL AND REPRODUCING LOST
INFORMATIONCOVERAGE UNDER SECTIONS II AND III IS
OPTIONAL
EXTERNAL DATA MEDIA-SECTION II
8/14/2019 Engineering Ins
38/38
THIS SECTION COVERS ADDITIONAL COSTINCURRED DURING INDEMNITY PERIOD IN
ORDER TO AVOID INTERRUPTIONAL DATA
PROCESSING
SUM INSURED INSURED MUST DECLARE
THE INDEMNITY LIMIT PER HOUR AND
ALSO THE TOTAL SUM INSURED.TOTAL SUM
INSURED WILL REPRESENT THE
AGGREGATE LIMIT OF INDEMNITY
PAYABLE FOR ALL EVENTS OCCURING
DURING THE PERIOD OF INSURANCE
INCREASED COST OF WORKING
SECTION III