Engineering Overview Nadine Kurita. Organization Engineering Processes Standards Reviews Specifications/Requirements/ICDs Configuration Management Value Management Reporting Engineering Status Schedule Summary. Engineering Organization. Engineering Organization (2). System Managers - PowerPoint PPT Presentation
35
Nadine Kurita [email protected] u LUSI DOE Review July 23, 2007 Engineering Overview Engineering Overview Nadine Kurita Organization Engineering Processes Standards Reviews Specifications/Requirements/ICDs Configuration Management Value Management Reporting Engineering Status Schedule Summary
Transcript
Page 1: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 1

Engineering OverviewNadine Kurita

Engineering OverviewNadine Kurita

Organization Engineering Processes

StandardsReviewsSpecifications/Requirements/ICDsConfiguration Management

Value ManagementReporting Engineering StatusScheduleSummary

Organization Engineering Processes

StandardsReviewsSpecifications/Requirements/ICDsConfiguration Management

Value ManagementReporting Engineering StatusScheduleSummary

Page 2: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 2

Engineering OrganizationEngineering Organization

LUSIN. Kurita

Chief Engineer

CXI WBS 1.3J.C. Castagna - acting

System Manager

XPP WBS 1.2R. Pope

System Manager

XCS WBS 1.4N. Kurita – acting

TBDSystem Manager

Diagnostics WBS 1.5N. Kurita

System Manager

Design & Document Control

D. ArnettDesign Supervisor

M. KosovskyJ.C. Castagna

SLAC Designer2

D. Arnett J. Defever

SLAC Designer1

D. ArnettMechanical Engineer1

SLAC Design StaffTBDStarts 2009

Database SupportA. Chan (LCLS)

Page 3: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 3

Engineering Organization (2)Engineering Organization (2)

System ManagersReports to Chief EngineerResponsible for all technical aspects of the projectResponsible for reporting cost and schedule (earned value)

Control Account Manager (CAM) Responsible for supervising daily activities of subordinate engineers, design engineers and designersResponsible for keeping management informed on critical issues, delays, etc.Works with upper management to make critical decisions

Design SupervisorResponsible for design standardsChecking, sign off approval and releasing drawings

System ManagersReports to Chief EngineerResponsible for all technical aspects of the projectResponsible for reporting cost and schedule (earned value)

Control Account Manager (CAM) Responsible for supervising daily activities of subordinate engineers, design engineers and designersResponsible for keeping management informed on critical issues, delays, etc.Works with upper management to make critical decisions

Design SupervisorResponsible for design standardsChecking, sign off approval and releasing drawings

Page 4: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 4

Engineering Organization (3)Engineering Organization (3)

2008 Manpower RequirementsMaximum load for engineering per current estimates5 FTE Mechanical Engineers2 - 3 FTE Mechanical Designers

Current Engineering StaffNadine Kurita – Chief Engineer, Mechanical EngineerRodd Pope – System Engineer, Mechanical EngineerJean-Charles Castagna – Mechanical EngineerMichael Kosovsky – Mechanical Design EngineerJim Defever – Mechanical Engineer (Consultant)Donald Arnett – Design Supervisor, Design Engineer

2008 Manpower RequirementsMaximum load for engineering per current estimates5 FTE Mechanical Engineers2 - 3 FTE Mechanical Designers

Current Engineering StaffNadine Kurita – Chief Engineer, Mechanical EngineerRodd Pope – System Engineer, Mechanical EngineerJean-Charles Castagna – Mechanical EngineerMichael Kosovsky – Mechanical Design EngineerJim Defever – Mechanical Engineer (Consultant)Donald Arnett – Design Supervisor, Design Engineer

Page 5: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 5

Engineering Organization (4)Engineering Organization (4)

Staffing ProgressSystem Manager hiring status

Offer received June 26th

Junior Mechanical Engineer requisition open – interviewingDeputy System Manager for diagnostics

2 SLAC Designers in August/SeptemberDesign staff available due to reduction in peak LCLS and HEP personnelAdditional design staff will be available if our needs increase

LCLS will have engineers that could be matrixed if our needs increase

This will fulfill our engineering staff requirement for 2008

Staffing ProgressSystem Manager hiring status

Offer received June 26th

Junior Mechanical Engineer requisition open – interviewingDeputy System Manager for diagnostics

2 SLAC Designers in August/SeptemberDesign staff available due to reduction in peak LCLS and HEP personnelAdditional design staff will be available if our needs increase

LCLS will have engineers that could be matrixed if our needs increase

This will fulfill our engineering staff requirement for 2008

Page 6: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 6

Engineering Processes – StandardsEngineering Processes – Standards

Formalize Design Standards Incorporate SLAC mechanical design standards Developed standard engineering notes

Developed Solid Edge Tool (3D parametric software)

Formalize Manufacturing PracticesLUSI Procedures and Travellers

Produced for critical equipmentConfiguration controlledHistory archived via LUSI sharepoint

Non-Compliance Reports (NCRs), Inspection ReportsHistory archived via LUSI sharepoint

Formalize Design Standards Incorporate SLAC mechanical design standards Developed standard engineering notes

Developed Solid Edge Tool (3D parametric software)

Formalize Manufacturing PracticesLUSI Procedures and Travellers

Produced for critical equipmentConfiguration controlledHistory archived via LUSI sharepoint

Non-Compliance Reports (NCRs), Inspection ReportsHistory archived via LUSI sharepoint

Page 7: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 7

Engineering Processes - ReviewsEngineering Processes - Reviews

Design reviews are milestones in our scheduleEssential to ensure the designs meet their prescribed functionalityValue engineering

Design reviews are milestones in our scheduleEssential to ensure the designs meet their prescribed functionalityValue engineering

Page 8: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 8

Engineering Processes - Reviews (2)Engineering Processes - Reviews (2)

System Concept ReviewGlobal (CXI, XPP, XCS, Controls and Data System)Goal

Approve the objectives and physics requirementsApproval of the conceptual design approach

Presents the followingObjectives and the requirements of the system

Physics Requirements Document complete and ready for sign off

Proposed approach to meet the requirementsMajor system interfacesMajor design alternatives consideredSafety issuesAssessment of risk areas

After closure of action items this approves the baseline design

System Concept ReviewGlobal (CXI, XPP, XCS, Controls and Data System)Goal

Approve the objectives and physics requirementsApproval of the conceptual design approach

Presents the followingObjectives and the requirements of the system

Physics Requirements Document complete and ready for sign off

Proposed approach to meet the requirementsMajor system interfacesMajor design alternatives consideredSafety issuesAssessment of risk areas

After closure of action items this approves the baseline design

Page 9: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 9

Engineering Processes – Reviews (3)Engineering Processes – Reviews (3)

Preliminary Design ReviewsComponent specificFinal design details are not requiredGoal

Approval of the component specifications & preliminary designApproval to complete final designApproval to fabricate test articles

Presents the following:Science/technical objectives, requirements, general specification

Engineering Speciation Document complete and ready for sign offPreliminary design & engineering analyses Design interfacesClosure of actions from previous review/changes since the last reviewControl/software requirements and designQuality control, reliabilitySafetyCost & schedules

After closure of action items preliminary design approved. Move to final design

Preliminary Design ReviewsComponent specificFinal design details are not requiredGoal

Approval of the component specifications & preliminary designApproval to complete final designApproval to fabricate test articles

Presents the following:Science/technical objectives, requirements, general specification

Engineering Speciation Document complete and ready for sign offPreliminary design & engineering analyses Design interfacesClosure of actions from previous review/changes since the last reviewControl/software requirements and designQuality control, reliabilitySafetyCost & schedules

After closure of action items preliminary design approved. Move to final design

Page 10: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 10

Engineering Processes – Reviews (4)Engineering Processes – Reviews (4)

Final Design ReviewsComponent specificGoal

Approval of the final design, cost and scheduleApproval to complete detail drawingsApproval to start procurement & fabrication

Presents the following:Science/technical objectives, requirements & specificationsReview closure of actions from the Preliminary Design ReviewFinal design and analysesTest results and design marginsControl methods for all safety hazardsApproved safety reviews as requiredIdentified problem areas/open issuesCost & schedule

After closure of action items long lead items will be purchased, detail drawings completed and fabrication begins

Final Design ReviewsComponent specificGoal

Approval of the final design, cost and scheduleApproval to complete detail drawingsApproval to start procurement & fabrication

Presents the following:Science/technical objectives, requirements & specificationsReview closure of actions from the Preliminary Design ReviewFinal design and analysesTest results and design marginsControl methods for all safety hazardsApproved safety reviews as requiredIdentified problem areas/open issuesCost & schedule

After closure of action items long lead items will be purchased, detail drawings completed and fabrication begins

Page 11: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 11

Engineering Processes – Reviews (5)Engineering Processes – Reviews (5)

Status ReviewsComponent specific as neededNot a schedule milestoneGoal

Provides status on drawings, procurement and manufacturingPresents the following:

Status of assembly and detail drawingsApproval process per Mechanical Department standards

Procedures, travellers, inspection and testing plansStatus of procurement and manufacturingInstallation plansOperational requirements/procedures

checkout, testing, maintenance

Review closure of action items from the FDRCost and schedule update

Status ReviewsComponent specific as neededNot a schedule milestoneGoal

Provides status on drawings, procurement and manufacturingPresents the following:

Status of assembly and detail drawingsApproval process per Mechanical Department standards

Procedures, travellers, inspection and testing plansStatus of procurement and manufacturingInstallation plansOperational requirements/procedures

checkout, testing, maintenance

Review closure of action items from the FDRCost and schedule update

Page 12: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 12

Engineering Processes – Reviews (6)Engineering Processes – Reviews (6)

Safety ReviewsSafety Overview Committee Review

Completed December 2006 and identified the following committee reviews:

Earthquake ReviewsRadiation Safety ReviewsLaser Safety ReviewsElectrical Safety ReviewsHoisting and Rigging Safety CommitteeFire MarshallHazardous Experimental Equipment Committee

Safety ReviewsSafety Overview Committee Review

Completed December 2006 and identified the following committee reviews:

Earthquake ReviewsRadiation Safety ReviewsLaser Safety ReviewsElectrical Safety ReviewsHoisting and Rigging Safety CommitteeFire MarshallHazardous Experimental Equipment Committee

Page 13: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 13

Engineering Process – RequirementsEngineering Process – RequirementsPhysics Requirements Documents (PRD)

Defines functionality of the componentProvides detailed physics/science requirementsBasis for engineering designRequired for the System Concept ReviewApproved by Science Team Leaders and LUSI Project Director

Engineering Specification Document (ESD)General specifications & engineering specifications to meet the PRD

Covers additional requirements not in the PRDSpace constraints, environment, etc.

Required for the Preliminary Design ReviewApproved by Chief Engineer, Scientist, Project Director

Interface Control Documents (ICD)Describes the boundaries of one system with respect to anotherPhysical interface between the twoResponsibilities Required for the Preliminary Design ReviewApproved by all involved system managers

Physics Requirements Documents (PRD)Defines functionality of the componentProvides detailed physics/science requirementsBasis for engineering designRequired for the System Concept ReviewApproved by Science Team Leaders and LUSI Project Director

Engineering Specification Document (ESD)General specifications & engineering specifications to meet the PRD

Covers additional requirements not in the PRDSpace constraints, environment, etc.

Required for the Preliminary Design ReviewApproved by Chief Engineer, Scientist, Project Director

Interface Control Documents (ICD)Describes the boundaries of one system with respect to anotherPhysical interface between the twoResponsibilities Required for the Preliminary Design ReviewApproved by all involved system managers

Page 14: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 14

Page 15: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 15

Engineering Process – RequirementsEngineering Process – Requirements

Technical Purchase SpecificationsMandates the technical, quality and procurement specifications for a purchased item

Engineering NotesDocuments engineering analysis and other information critical to the design of the component

These documents are all configuration controlled

Technical Purchase SpecificationsMandates the technical, quality and procurement specifications for a purchased item

Engineering NotesDocuments engineering analysis and other information critical to the design of the component

These documents are all configuration controlled

Page 16: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 16

Configuration Management - Document ControlConfiguration Management - Document Control

Document ControlConfiguration control all critical project documents

ManagementPEP, Acquisition Strategy, QIP, Value Management, …

TechnicalPRDs, ESDs, ICDs, Design Reviews, ...

FabricationProcedures, travellers, ...

InstallationProcedures, travellers, ...

Design reviews will be archived

Document ControlConfiguration control all critical project documents

ManagementPEP, Acquisition Strategy, QIP, Value Management, …

TechnicalPRDs, ESDs, ICDs, Design Reviews, ...

FabricationProcedures, travellers, ...

InstallationProcedures, travellers, ...

Design reviews will be archived

Page 17: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 17

Configuration Management – Drawings/SpecificationsConfiguration Management – Drawings/Specifications

Utilize existing SLAC Document Control System and SLAC Sharepoint database3D-models will use SLAC Mechanical Departments Project Management Database for configuration control and archiving

Drawings and specificationsApproved by the list of “approvers”Design review process is not required for approvalOnce the document is signed by all the approvers it is released to SLAC Document Control

Utilize existing SLAC Document Control System and SLAC Sharepoint database3D-models will use SLAC Mechanical Departments Project Management Database for configuration control and archiving

Drawings and specificationsApproved by the list of “approvers”Design review process is not required for approvalOnce the document is signed by all the approvers it is released to SLAC Document Control

Page 18: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 18

Configuration Management - ECOsConfiguration Management - ECOs

Engineering Change OrdersImplementing an engineering change order processKeeps detailed revision historyIncrease efficiency of implementing and documenting design and manufacturing changes

Allows for quick approval of implementing changesHelps to maintains these changes in the supporting design/fabrication documents

Engineering Change OrdersImplementing an engineering change order processKeeps detailed revision historyIncrease efficiency of implementing and documenting design and manufacturing changes

Allows for quick approval of implementing changesHelps to maintains these changes in the supporting design/fabrication documents

Page 19: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 19

Value ManagementValue Management

Consistent with DOE Value Management, DOE order 413.3 and OMB Circular A-131 LUSI Value Management Plan completed, PM-391-000-02 R0Executed LUSI Value Management Plan

Conducted with internal and external reviewers4 alternative solutions identifiedFinal report pending

LUSI Value Management principles are applied to all LUSI engineering tasks

Consistent with DOE Value Management, DOE order 413.3 and OMB Circular A-131 LUSI Value Management Plan completed, PM-391-000-02 R0Executed LUSI Value Management Plan

Conducted with internal and external reviewers4 alternative solutions identifiedFinal report pending

LUSI Value Management principles are applied to all LUSI engineering tasks

Page 20: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 20

LUSI ReportingLUSI Reporting

Monthly Reports to the DOE after achieving CD2aTechnical statusEarned value performance. LUSI Project Management Cost & Schedule system is based on,

B-Factory Project - 2000 Award for the Program and Project ManagementSPEAR3 – 2004 Secretary's Excellence in Acquisition AwardGLASTLCLS60% CAMS participated in PEP-II,SPEAR3, GLAST and/or LCLS

Change Control Log

Monthly Reports to the DOE after achieving CD2aTechnical statusEarned value performance. LUSI Project Management Cost & Schedule system is based on,

B-Factory Project - 2000 Award for the Program and Project ManagementSPEAR3 – 2004 Secretary's Excellence in Acquisition AwardGLASTLCLS60% CAMS participated in PEP-II,SPEAR3, GLAST and/or LCLS

Change Control Log

Page 21: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 21

Engineering StatusEngineering Status

X-ray Pump ProbeOverall layouts developed for both CD4a and CD4bDiffractometer

PRD reviewed and approved by team leaders in May ’07 – CRITICAL PATH ITEM for CD4-aPreliminary concepts of the diffractometer developed. Starting to work with vendors

MonochromatorPreliminary concepts developed

X-ray Pump ProbeOverall layouts developed for both CD4a and CD4bDiffractometer

PRD reviewed and approved by team leaders in May ’07 – CRITICAL PATH ITEM for CD4-aPreliminary concepts of the diffractometer developed. Starting to work with vendors

MonochromatorPreliminary concepts developed

Page 22: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 22

X-ray Pump-Probe Instrument

OffsetMonochromator

Laser System(Fundamental)

X-rayDiffractometerWavelength

Conversion

Small AngleScattering

X-Ray Pump Probe LayoutX-Ray Pump Probe Layout

Page 23: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 23

Engineering Status (2)Engineering Status (2)

Coherent X-Ray Imaging (CXI)Conceptual layouts developed for both CD4a and CD4b Met with team leaders to discuss sample chamber requirements in May 2007

Developed multiple sample chamber approaches. CRITICAL PATH ITEM FOR CD4a

Coherent X-Ray Imaging (CXI)Conceptual layouts developed for both CD4a and CD4b Met with team leaders to discuss sample chamber requirements in May 2007

Developed multiple sample chamber approaches. CRITICAL PATH ITEM FOR CD4a

Page 24: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 24

CXI Sample Chamber Design Approach #1CXI Sample Chamber Design Approach #1

Page 25: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 25

Engineering Status (3)Engineering Status (3)

X-Ray Correlation Spectroscopy (XCS)Conceptual layout completed

DiagnosticsElectro-Optic Timing Device

Draft of the Engineering Specification Document completedPreliminary design near completionPreliminary Design Review in October 2007 ahead of schedule

X-Ray Correlation Spectroscopy (XCS)Conceptual layout completed

DiagnosticsElectro-Optic Timing Device

Draft of the Engineering Specification Document completedPreliminary design near completionPreliminary Design Review in October 2007 ahead of schedule

EO Device

Page 26: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 26

Engineering Status (4)Engineering Status (4)

Position Monitor & Intensity Monitor Pop-inAlternate concepts developed

Hard X-Ray Intensity/Position Monitor Leave-inAlternate concepts developed

Position Monitor & Intensity Monitor Pop-inAlternate concepts developed

Hard X-Ray Intensity/Position Monitor Leave-inAlternate concepts developed

Pop-in Position Monitor

Leave In Monitor

Pop-in Diode Intensity Monitor

Page 27: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 27

XPP Critical PathXPP Critical Path

Diffractometerlong Lead item

Vacuum supportslow risk,occurs last in the designprocess

Page 28: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 28

CXI Critical PathCXI Critical Path

Slit Systemmanpowerlimited, couldbe expedited

Sample Chambercritical design,incorporatesnumerous experiments

Low risk, vacuum system follows aftercritical componentsdesigned.

Page 29: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 29

Major MilestonesMajor Milestones

Jul ’07 CD1 ReviewAug ’07 XPP System Concept ReviewSep ’07 CXI System Concept ReviewOct ’07 Diagnostic System Concept ReviewOct ’07 EO Monitor Final Design ReviewNov ’07 Diffractometer Final Design Review Nov ’07 Be Lenses Preliminary Design ReviewDec ’07 CD2a

Jul ’07 CD1 ReviewAug ’07 XPP System Concept ReviewSep ’07 CXI System Concept ReviewOct ’07 Diagnostic System Concept ReviewOct ’07 EO Monitor Final Design ReviewNov ’07 Diffractometer Final Design Review Nov ’07 Be Lenses Preliminary Design ReviewDec ’07 CD2a

Page 30: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 30

Major Milestones (2)Major Milestones (2)

Jan ’08 Sample Chamber Preliminary Design Review (PDR)Jan’07 Hard X-Ray IO PDRJan ’07Be Lenses Final Design Review (FDR)Feb ’08 CXI Pulse Picker PDRMar ’08 Hard X-Ray Intensity Monitor FDRApr ’08 XPP Diffractometer non-recurring engineering May ’08 CXI Sample Chamber & Pulse Picker FDRMay ’08 Position Monitor & Pop-in IO monitor FDRJul ’08 Slits FDRJul ’08 CD3a

Jan ’08 Sample Chamber Preliminary Design Review (PDR)Jan’07 Hard X-Ray IO PDRJan ’07Be Lenses Final Design Review (FDR)Feb ’08 CXI Pulse Picker PDRMar ’08 Hard X-Ray Intensity Monitor FDRApr ’08 XPP Diffractometer non-recurring engineering May ’08 CXI Sample Chamber & Pulse Picker FDRMay ’08 Position Monitor & Pop-in IO monitor FDRJul ’08 Slits FDRJul ’08 CD3a

Page 31: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 31

Major Milestones (3)Major Milestones (3)

Jul ’08 Start procurement for CXI and XPPJul ’08 Start fabrication of XPP DiffractometerJul ’08 Award Sample ChamberJan ’09 All major CD4a components receivedApr ’09 All major CD4a components ready for installationSep ’09 CD4a installation completeSep ’09 XPP Detector installed Oct ’09 CD2bNov ’09 Particle Injector receivedFeb ’10 CD4aMar ’10 CD3bMar ’12 CD4b

Jul ’08 Start procurement for CXI and XPPJul ’08 Start fabrication of XPP DiffractometerJul ’08 Award Sample ChamberJan ’09 All major CD4a components receivedApr ’09 All major CD4a components ready for installationSep ’09 CD4a installation completeSep ’09 XPP Detector installed Oct ’09 CD2bNov ’09 Particle Injector receivedFeb ’10 CD4aMar ’10 CD3bMar ’12 CD4b

Page 32: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 32

SummarySummary

Engineering/Scientist teams have made significant design progress to date

LUSI has an established conceptual design with a consistent cost estimate. Over 50% of the fabrication estimates came from vendor quotations, catalogs, or previous ordersThe technical scope of LUSI has converged

Preliminary resource loaded schedule for planned CD4a deliverables is established and consistent with the funding profile

Engineering/Scientist teams have made significant design progress to date

LUSI has an established conceptual design with a consistent cost estimate. Over 50% of the fabrication estimates came from vendor quotations, catalogs, or previous ordersThe technical scope of LUSI has converged

Preliminary resource loaded schedule for planned CD4a deliverables is established and consistent with the funding profile

Page 33: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 33

Summary (2)Summary (2)

LUSI engineering staffing is currently at 70% of its peak expected load

Staff consists of experienced SLAC (SSRL, LCLS, HEP) mechanical engineers and design engineersStaff is informed in quality and trained in ES&H issues in their area of expertise

Working organization with well understood processesExcellent communication and interfacing with partner labs, LCLS and sub-systems

LUSI engineering staffing is currently at 70% of its peak expected load

Staff consists of experienced SLAC (SSRL, LCLS, HEP) mechanical engineers and design engineersStaff is informed in quality and trained in ES&H issues in their area of expertise

Working organization with well understood processesExcellent communication and interfacing with partner labs, LCLS and sub-systems

Page 34: Engineering Overview Nadine Kurita

Nadine [email protected]

LUSI DOE Review July 23, 2007Engineering Overview 34

Summary (3)Summary (3)

Future workComplete hiring or matrixing LCLS engineering staffFinalize the details on the design scope and requirementsComplete preliminary designs

Engineering staff is ready to move on to the CD-2 phase of the project!

Future workComplete hiring or matrixing LCLS engineering staffFinalize the details on the design scope and requirementsComplete preliminary designs

Engineering staff is ready to move on to the CD-2 phase of the project!

Page 35: Engineering Overview Nadine Kurita

J. B. [email protected]

LUSI DOE Review Jan 23, 2007Coherent Imaging (WBS 1.3)

End of PresentationEnd of Presentation