+ All Categories
Home > Documents > English report - Local Government Engineering … ·  · 2012-10-31Investment Year 1985- 86,...

English report - Local Government Engineering … ·  · 2012-10-31Investment Year 1985- 86,...

Date post: 26-May-2018
Category:
Upload: dangtram
View: 213 times
Download: 0 times
Share this document with a friend
78
Book Title Personnel Of The United Nations Family Of Agencies In Bangladesh Tesrt RESP (Rural Employment Sector Programme) Infrastructure Development Project (Bangladesh Planning Commission R D P-8) Bangladesh Appraisal Mission On Rural Employment Sector Programe Rural Employment Sector Programme Infrastructure Development Project Plan Of Operation Resp Work Plans 1986/87; CPMU, PEP, IDP Iniensive Rural Works Programme; Discussion Paper On Training In Uk For Assistant Engineers, Bangladesh Constnuetion Industrymission-April 12-26-1985 Aidememoine The Urban Funetions Of Different Levels Of Govt. In BD; Implication For Inter Government Of Ficeal Relation And Cost Recovery For Unban Services.al Women Component Of IRWP. Maintenance Of Rural Infrastrueture In Bangladesh. Canadian Assistance To World Food Programme Assisted Food For Work Schemes In BD. Tecunical Report No-1 Canadian Assistance To WEP Assisted Food For-Work Schnical Report No-5 RESP Draft Prolect Brief; To Be Pnesented At The Joint Job Donor Meeting On 28 February At Sonargaon Hotel. Dhaka Rural Employment Sector Programme Infrastructure Development Project, Plan Of Openation.(Final Draft) Workplan And Budget For 1985/86. Agreed Minutes From The Concluding Meeting Of The Annual Review Mission On The IRWP On June18,1985 Feeder Roads; Preparation Report For Rural Employment Sector Programme Draft Report Engineering And Socio-Economic Survey Of Intensive Rural Works Programme Debiduar Upazila Report Of The Annual Review Mission On The Intensive Rural Works Programme1981/1982 Draft budgel And Work Plan For 1985/86 Field And Laboratory Testing Techniques. World Aid Sunds And Rural Needs. History Of Service Of The Executive Engineers Under The Local Govt. Engineering Bureau. List Of Upazilal Assistant Engineers. List Of Executive Engineers Second Swiss Appraisal Mission Special Publlc Work Programme Bangladesh. Rural Centre And Settlement Planning In Asia And The Pacific; Report Of The International Seminars On Rural Centre And Settlement Planning. Infrastructure Annual Report. Report Of The Jinint Reviev Mission Of The NIRDP/Damida Project.
Transcript

Book Title

Personnel Of The United Nations Family Of Agencies In Bangladesh Tesrt RESP (Rural Employment Sector Programme) Infrastructure Development Project (Bangladesh Planning Commission R D P-8) Bangladesh Appraisal Mission On Rural Employment Sector Programe Rural Employment Sector Programme Infrastructure Development Project Plan Of Operation Resp Work Plans 1986/87; CPMU, PEP, IDP Iniensive Rural Works Programme; Discussion Paper On Training In Uk For Assistant Engineers, Bangladesh Constnuetion Industrymission-April 12-26-1985 Aidememoine The Urban Funetions Of Different Levels Of Govt. In BD; Implication For Inter Government Of Ficeal Relation And Cost Recovery For Unban Services.al Women Component Of IRWP. Maintenance Of Rural Infrastrueture In Bangladesh. Canadian Assistance To World Food Programme Assisted Food For Work Schemes In BD. Tecunical Report No-1 Canadian Assistance To WEP Assisted Food For-Work Schnical Report No-5 RESP Draft Prolect Brief; To Be Pnesented At The Joint Job Donor Meeting On 28 February At Sonargaon Hotel. Dhaka Rural Employment Sector Programme Infrastructure Development Project, Plan Of Openation.(Final Draft) Workplan And Budget For 1985/86. Agreed Minutes From The Concluding Meeting Of The Annual Review Mission On The IRWP On June18,1985 Feeder Roads; Preparation Report For Rural Employment Sector Programme Draft Report Engineering And Socio-Economic Survey Of Intensive Rural Works Programme Debiduar Upazila Report Of The Annual Review Mission On The Intensive Rural Works Programme1981/1982 Draft budgel And Work Plan For 1985/86 Field And Laboratory Testing Techniques. World Aid Sunds And Rural Needs. History Of Service Of The Executive Engineers Under The Local Govt. Engineering Bureau. List Of Upazilal Assistant Engineers. List Of Executive Engineers Second Swiss Appraisal Mission Special Publlc Work Programme Bangladesh. Rural Centre And Settlement Planning In Asia And The Pacific; Report Of The International Seminars On Rural Centre And Settlement Planning. Infrastructure Annual Report. Report Of The Jinint Reviev Mission Of The NIRDP/Damida Project.

Book Title

Some Aspects Of Target Group Involvement In The Rural Works Programme. An Overview Of Caritas Development Institute. Socio Economic And Nitritional Re Survey Of Chilmari Upazilla Phase1, Interin Report 1(Internal Draft Only). Womens Programmes In Bangladesh; A Review Of Several Government Agencies And Non Governmental Organisations Working With And For Women Strategy For Rural Development Projects (A Sectoral Policy Paper). Draft Report On Proposed Head Quarter Complex Of Local Government Engineering Bureau, Report Of Annual Review Mission On The Intensive Rural Works Programme. Report Of The Annual Review Mission On The Intensive Rural Works Programme. Revised Report Of The Working Group On Rural Water Supply And Sanitation Planning Towards The Thiird Five Year Plan. Report Of The Working Group On Municipal Services Sub-Sector Planning To Wards Third Five Year Plan. Landless Labour Participation And Mobilisation In The Intensive Rural Works Programme Bangladesh. Second Swiss Appraisal Mission On Special Public Works Programme Bangladesh. Linkages Between Emergency Aid And Self- Help. Draft Road Structures Manual Part B- Guidelines And Design Criteria. Draft On Road Structures Manual. Draft On Standard Specifications Items Of Works And Schedule Of Rates. Farming Systems Research- Issues And Problems Of Implementation. Training Course On Operation And Maintenance Of Smmall Scale Water Resourees Projects. Report On P P I C. Draft On Standard Specifications Items Of Works And Sefedule Of Ratcs. Report On Project Preparation And Implementation Course,86-87 Report On ToT 86-87 Survey Design And Construction Of Small-Seale Rural Infrastructure. A Hand Book For Upazila Iraining. History Of Services Of The Upazila Engineers Under The Loeal Govt. Engineering Bureau. Modified New Seales Of Pay, 1985 (Govt. Scetor- General) Guidelines For The Appraisal 8 Design Of Upazila And Union Infrastrucerure. Survery Design And Costruction Of Small-Scale Rural Infrastructure. A Hand Book For Upazila Training. Histtory Of Services Of The Upazila Engineers Under The Local Govt. Engineering Bunreau. Lnstruction For Utilization Of The Development Fund Under Intensive Rual Works Programme. Lnstitutional Development For Planining Rural Infrastructure Through Local Bodies In B D(Thesis). Flood Protection And Drainage Of Beels Project Report On Agroeconomic Survey. Report And Recommendations TOT,

Book Title

Landless Labour Participation And Mobilisation In The Intensive Rural Works Programme. Implementation Plan For The Technical Assistance Component Of The Rural Poor Program-Bangladesh. Report On Project Committce Training Course. 14th Wedc. Confncer: Water And Urban Service In Asia And The Pacific Kuala Lumpur. Lnternational Seminar On Decentratization Local Govt. Institutions And Resouree Mobizization. Lnternational Seminar On Decentralization Local Govt Institutions And Resouree Mobilization. Accommodation For Participants In International Seminar At BARD. Manual For Mionor Irrigation Development. Rural Works In Bangladesh A Review Of Organisation And Management Issues With Recommendation. Local Govt. Engineering Bureau Training Policy. Change In Chilmari Part-1: Socio- Economic And Nutritional Resurvey Of Chilmari Upazila Part 11: Developing Baselines For Monitoring IRWP/RESP . Soil Classification Hydrogeological Investigation. An Economic Analysis Of Farms Using Low-Lift Pump Irrigation Water In Jessore District. Agreed Minutes Form The Concluding Meeting Of The Annual Review Review Mission. Rural Poverty In Bangladesh A Report To The Like-Minded Group.(A Summary) I R W P; Guidelines For Rehabilitation And Construction Work. Long Term Strategy And Plan For Training. Study On Prepartion Of IMP Manual With Draft Outline Of The Manual. Report Of The Training Programme On The Practice Of Communication In Management. Consultancy Services For Reconstruction/Rehaeilitation Of IRWP Pucca And Semi-Pucca Schemes. Plan Of Operation. Engineering Review Of Constructed Works Phase-11 Main Report. Work plan Budget For 1985/86. The Kuliarchar Upazila A Planning Study. Bangladesh: Draft Action Plan For Development Of A Nationwide Program For Generation Of Rural Non-Farm Employment. Project Preparation And Implemenation Course 1986/87 Report On The Calibration Of Concrete Testing Facilities Utilised. Project Preparation And Implementation Course 1985/86 Report On Concrete Testing Facilities Utilised. Engineering Standards Review Comparative Study In Faridpur Training Of Tratners Course 1985-86 Practice Of Management Principles. Follow-Up Workshop For L.G. E.B. Participants Who Attended The Course In February 1985. Training Of Trainer's (TOT) 1986-87 ; Course Guide Four Districts Special Pubilc Works Programme (SPWP) Bangladesh Bangladesh Appraisal Mission On Rulal Employment Sector Programme. Report On Pratice Of Management Course Held For L.G.E.B. February 17-20, 1985 At Cerdi, Joydevpur.

Book Title

Second Swiss Apprasal Mission On Special Works Programme Bangladesh. Agreed Minutes From The Concluding Meeting Of The Annual Review Mission On The IRWP On June18, 1985. Report On Mission April ,1983. Draft Irrigation Study Report. Planning And Administration Of Special Public Works Schemes. Provision Of Irrigation Servicese By The Landless An Approach To Agrarian Reform In Bangladesh. Pratice Of Management Principles Ledership And Theambuilding. Feeder Roads Studymm; Rular Employment Sector Programme Bangladesh . Erosion And Sediment Transprot In The Ganger River Basin (INDIA). Growth Centers Study; Rulal Employment Sector Programme -Bangladesh. Plannig Of Rural Roads In Bangladesh: A Case Study At Upazila Level Fuel Consumption And Brick Manufacturing R.E. S. P-BD Intensive Rural Works Programme Bangladesh-Assessment Report- July1981- June1982 I. R. W. P- BD. Investment Year 1985- 86, Mymensingh Fild Office , Engineering Report Sub- Surface Soil Investigation At The Side Of Proposed Char Bagat Sluice Structure At Modhukhali (Faridfur) Sub- Surface Soil Investigation At The Site Of Proposed Char Sriramkandi Sluice Structure At Modhukhali , Faridpur Sub- Surface Soil Investigation At The Site Of Proposed Charbabna(Munshir Char) Sluice Structure At Sherpur Sub- Surface Soil Investigation At The Site Of Proposed Jhukia Beel Sluice Structure At Bhurungamari , Kuridram Sub Surface Soil Investigation At The Site Of Proposed Bogarar Beel Sluice Structure At Hossain Pur , Kishore Gonj Operation, Maintenance And Productive Use Of Flood Control , Drainage And Irrigation Projects Operation And Maintenance Of Small Scale Flood Control And Drainage Schemes Rular Warks In Bangladesh , A Review Of Organisation And Management Issues With Recommendation Consultancy Services For Reconstruction / Of IRWP Pucca And Semi-Pucca Schemes Comprehensive Statements Brahamanbaria Zila Consultancy Services For Reconstruction/ Rehabi Lition Of IWRP Pucca And Semi-Pucca Schemes, Comprehensive Statements Jamalpur And Sherpur Zila Inception Reprt For Zilla Road Maintenance And Improvement Project(Usaid Project No.388-00560 Inception Report For Zilla Road Maintenance And Improvement Project (Usaid Project No. 388-0056) Appropriate Technology For Irrigation In Bangladesh Sosio- Economic TMP/.CT Of Rural Roads-An Interim Report Cida Support To Training In Water Resources Development In Specific Project Areas Standard Designs For Rural Road Bridges, Phase- Revieu

Book Title

Consultancy Services For Reconstruction/Rehabiliation Of IRWP Pucca And Semi-Pucca Schemes; Progress Report For The Endiod 31, August,1985 Consultancy Services For Reconstruction/Rehabilitation Of IRWP Pucca And Semi-Pucca Schemes. Progress Report For The Period Ending 30 June, Engineering Review Of Constructed Reports, Rangpur, Mymensing & Jamalpur Districts. Dacca Metropolitan Area Integrated Urban Development Project Final Report Vol 3. IRWP-BD Investment Year 1985-86 Jamalpur Field Office Engineering Report. IRWP-BD; Progess Report March 1-August 31,1987 Including Assessment Report1986/87 Infrastructure Development Project Engineering Report. IRWP-BD; Investment Year 1985-86 Faridpur Field Office Engineering Report. IRWP-BD; Investment Year 1985-86 Kurigram Fied Office Engineering Report. RESP-BD Final Report On Comparative Study Of Earth Road Maintenance. RESP-BD Final Report On Conmparative Study Of Earth Road Maintenance. I.R.W.P - BD Investment Year 1985-86 Scheme Lists R. E. S. P -BD Progress Report July 1st, 1987 To March 31st,1988 I.R.W.P- BD Kasiani Upazila- Gopalganj District Upgraded Planning Report I.R.W.P-BD Investment Year 1985-86 Mymensingh Field Office (Engineering Report) Reports On Tot, 86-87 I.R.W.P BD, Progress Report Sep1-Feb 28 1985/86 R.E.S.P-BD,Study Report On Bricks And Bricks Manufacture In Bangladesh I.R.W.P-BD, Post Monsoon Rehabilitation Report Of Annual Review Mission On The Intensive Rural Works Programme 1982/1983 Long Term Strategy And Plan For Training R.E.S.P-BD, Progress Report March 1- August 311987 Including Assessment Report 1986/87 Evaluation Of Training Progamme Of LGEB IRWP-BD, Progress Report Sep 1- Feb 28 , 1984/85 IRWP-BD, Progress Report May 1-August 31,1984 IRWP-BD, Progress Report March 1-August 31, 1986 Including Assessment Report 1985/86 IWRP-BD,progress Report March 1-August 31,1986 Including Assessment Report 1985/86 Preliminary Preparation Report For A Rural Employment Sector Project IRWP-BD, Equipment Management Control IWRP-BD, Preparationreport For Rural Employment Sector Progrtamme, Product Development And Marketing Assistance Increased Target Group Participation In Rural Works IRWP-BD, Investment Year 1984-85 Scheam Lists IRWP-BD, Investment Year 1984-85 Brahmanbaria Field Office IRWP-BD, Preparation Report For Rural Employment Sector Programme Feeder Roads IRWP -BD,Project Preparation And Implementation Course 1986/87 Report On The Calibration Of

Book Title

Concrete Testing Facilities Utilised I.W.R.P-BD, Engineering Standards Review Comparative Study In Faridpur IRWP-BD,Project Preparation And Implementation Course 1985/86 Report On Concrete Testing Facilities Utilised IRWP-BD, Investment Year 1984-85 Kurigram Field Office, Engineering Report Study On Preparation Of IMP Manual With Draft Outline Of The Manual IRWP-BD,appraisal Report On Achievement Of Programme Objectives Between 1st July 1980 , 30 June 1984,1. Emplyment 2. Infrastructure Technical Review Of Stractures And Assessment Of Mapping Support IRWP-BD, Assessment Report 1982/1983 IRWP-BD,Evaluation Of Local Government Engineering Bureau Training A Study Of Government Approaches Towards The Rural Poor In Bangladesh Small Scale Water Resources Project Progress Report Small Scale Water Resources Project Faridpur Studies Report On The Study On Target Group Participation And Operation Of Rural Works Engineering & Socio-Economic Study Chilmary Upazila Preliminary Preparation Report For A Rural Emplyment Sector Project First Draft Interim Report On The Evaluation Of The Irrigation Management Programme In The Bangladesh Rural Development - 11 Project And South West RD Orientation Training Course For Works Programme Wing Engineers 2 - 6 September 1984 Evaluation Reand Course Material Proposal For Consultancy Towards Total Responsibility Of Tiral Road Construction In Mymensingh And Faridpur Instructions For Utilisation Of The Investment Fund Of The Infrastructure Development Project Under The RESP Intensive Rural Warks Programme Bangladesh Assessment Report 1983/84 IRWP- BD, Guidlines For Rehabilitation And Reconstruction Wark IRWP -BD, Revised Instructions For Implementation Of Schemes By Project Committee RESP -BD, Work Plans And Budget 1987/88 IRWP -BD, Assessment Report July 1981 - June 1982 Upazila Plan Book Char Rajibpur 1987 - 1992 Early Implementation Project On Flood Control Drainage Improvement And Irrigation Report Of The Advisory Mission 1983, Feildtrip Report On Faridpur Ar Draft Budget And Work Plan For 1985/86 Proposal For Work Of The Accounts Inspection Team (Ait) Of IRWP (100 Thana Project) RESP - BD, Plans & Budget 1988/89 Coastal Embankment Project Operation And Maintenance Manual East Pakistan Water And Power Development Authority

Book Title

Impact Of Feeder Road Benchmark Study Impact Of Feeder Road Monitoring Report : First Cycle The Cyclone Disaster Preparedness Review Committee Infrastructure Development Project (IDP)/RESP Small - Scale Water Resource Schemes , Operation & Maintenance Implementation Study Genaral Guide Lines Infrastructure Development Project (Idp) Resp. Small -Scane Water Resource Schemes . Operation & Manegement Study. O& M Manual For Naldanga F Infrastructure Development Project (IDP) /RESP. Small- Scale Water Resorce Schemes. Operation & Maintenance Implementation Study. O& M Manual For Infrastructure Development Project (IDP) RESP. Small -Scale Water Resourse Schemes. Stage -1 Field Testing Of The Manual For Minor Irrigation Devel SSWR-Schemes Operation & Maintenance Implementation Study O&m Manual For Anantapur FCDI Scheme Ulipur & Chilmari Upazila, Kurigram. SSWR-Schemes Operation & Maintenance Implementation Study O&m Manual For Holokhana FCDI Scheme. Kurigram Sadar Upizila, Kurigram. Bangladesh Rural Development Infour Thanas In Kushtia District. Study On The Rural Poor. Appraisal Of An Experimental Programme. Intensive Rural Works Programme-Bangladesh.progress Report March 1-August 31,1986. Assessment Report 1985/86. Report On Increased Target Group Participation In Rural Works. IRWP-Infrastructure Development Project Feeder Road Component. Position Paper. IRWP-Bangladesh. Report On Increased Target Group Participation In Rural Works. RESP-BD. Investment Year 1986-87 Scheme Lists. RESP- BD. Planes And Budge 1989/90 Semiar On Institutional Cooperation Between Bangladesh And Sweden In The Field Of Physical Planning. RESP-PER Group Assessment Study. RESP-BD; Impact Monitoring, Evaluation And Bench Mark Survey. Methodology. Zila Road Maintenance And Improvement Project (USAID Project No. 388-0056) Progress Report For The Month Of August -1985. IRWD- BD. Progress Report Sep1-Feb28 . 1985/86. RESP- BD; Visit Report On 1985-86. IRWP Schemes In Greater Faridpur. RESP -BD. Progess Report July 1st 1987 To March 31st 1988 RESP-BD Progress Report July 1st-Dec31st,1987. Management Information & data Processing Systems. For Works Programmewing. Final Report On Road Surfacing Trial, Rajbari. Institutional Arrangement For A Rural Employment Sector Programme. (Final Report). Upazila Plan Book Char Rajibpur. 1987-92 Roads And Development ; A Case Study Of Return On Investment In Rural Roads In Bangladesh. Flad Protection And Drainage Of Beels Project Report On Agro - Economic Survey

Book Title

Report And Recommendations Accounts Training Course - 1, 1985 - 86 IRWP - BD,Review Of The Intensive / Rehabilitation Programme Year 1985 - 86 Seminar On Maintenance Of Rural Infrastructure With Emphasis On Roads Comprensive Seminar Documentation Small Catchment Rainfall Runoff Study Report On Field Data Collection & Monitoring Notes For The Guidance Of Site Engineers On Works Report On The Study For The Flood Damage Restoration Project Instruction For Utilization Of The Developmenty Fund Under Intensive Rural Works Programme 1985/86 IRWP - Bd, Project Preparation And Implementation Course 1985/86 Report On Concrete Testing Facilities Utilised Report On Union And Upazila Planning Sirs And Sahibs Group Mobillisation And BRDB?TA Relatios In PEP/RESP Intensive Rural Works Programme Bangladesh Progress Report Report On Soil Survey Of Two Beel Areas In Faridpur District Water Resourse Within LGEB And IRWP (Draft) Management Information & Data Processing System. For Works Programme Wing,ministry Of Local Government, Rural Developement &co-Operatives.(Prelim) Suggestions To The Training Component Of Tangail Infrastucture Development Project.(TIDP). Roving Seminar On Rural Centre Planning In Asia And The Pacific Seoul. Country Monograph For Bangladesh. Report On Practice Of Management Course . Held For L.G.E.B. Feb 17-20, 1985 At Cerdi, Joydevpur. Report On Increased Target Group Participation In Rural Works. Report On Jalchira Labour Contracting Society (LCS) Scheme. Project Write Up For A Rural Employment Sector Programme. Road Surfacing Trial Project. Rajbari, Faridpur. Progress No.2. Cyclone Protection Project -II (Feasibility And Design Studies). Initial Report. Cyclone Protection Project II (Fesibility And Design Studies). Final Inception Report. Rehabilitation Programme Of Rural Infrastructure And Water Supply & Sanitation Damaged By Cyclone Of 29th April, 1991. Development Impact Of Rural Infrastructure In Bangladesh ; Research. Report 83. Development The Upazila Way. Resp; Project Document. Project Area Identification. Four Distc. Gazipur, Manikgong, Munshigong, Narsingdi. Local Level Planning Seminar10 - 11 August, 1981, Bogra Sub Group On Rural Infrastructure Position Papers. Description Of Past Practices And Problems Encountered In Food-For -Work Programme In Bangladeash. Bangladesh Appraisal Mission On Rural Employment Sector Programme. Rangpur Integrated Rural Development Project. Inception Report.

Book Title

A Position Paper On What The Benifit Cost Analysis Metheod Of The IRWP/RESP Should Be. Review Of The Role And Contribution Of The Construction Industry In Human Settlement Programmes And National Economic And Social Developments. Annual Programme Review 1986. Rural Works Implementation Reporting And Monitoring. Discussion Paper On Training Uk For Assistant Engineers. Report On Project Committee Training Course 1984-85. Strengthening The Institutions For Food Assisted Development. (SIFAD) Final Report. Strengthening The Insttitutions For Food Assisted Development. Study On Master Alignment For The Chittagong Port From Patenga To Kalurghat Bridge The Spatial Distribution Of Physical Facilities In Bangladesh A Project Report Accounts Manual. I.R.W.P. Bangladesh Equpement Management Controls. Double Pit And Single Pit Family Latrine Design. Local Level Planning In Raigong. Pratice Of Management Principle Follow Up- Work Shop For LGEB Participants Who Attended The Course In Februry. Socio- Economic Impact Of RESP; Benchmark Studies In 15 Villages. Final Report. Training Manual On . Administrative & Finalcial Management For The Personnel In The Offices Of The Executive And Upazila Engineers Under The Lo Training Manual On Administrative & Finalcial Management For The Personal In The Office Of The Excutive And Upazila Engineering Under The LGEB. Road Surfacing Trial Phase 1 Report Spacification Of Work ; And Materials . Second Roads Surfacing Trial Project Phase. 1. Road Surfacing Trial Project Rajbart, Faridpur ; Monitoring Report. Road Surfacing Trial Project Rajbari. Faridpur .monitoring Report . Road Surfacing Trial Project ,rajbari, Faridpur. Progress Report . No-1. Road Surfacing Trial Project In Faridpur. Tender Document. Road Surfacing Trial Project Rajbari Faridpur ; Progress Report No- 3. Road Surfacing Trail Project Rajbari ,faridpur .progress Report No-4. Road Surfacing Trail Project Rajbari, Faridpur. Progress Repot No-5. Road Surfacing Trail Project Rajbari, Faridpur . Monitoring Report No-4. Road Surfacing Trail 1986 In Rajbari District. Part No-1 (Main Text) & Part-2. (Appendices) Rural Works In Bangladesh Basic Issues And Feasible Improvments. Training Of Trainers Course . 1985-86. Impact Of RESP Monitoring Report First Cycle (Findings Of Survey In 15 Villages. Benchmark Study For Measuring The Impact Of Water Scheme. Secondary Towns Infrastructure And Servises Development Project ; Final Report- June 1990.

Book Title

Secondary Towns Infrastructure And Services Development Project. Final Report. Secondary Towns Infrastructure And Services Development Project; Final Report. RESP Impact Monitoring, Evaluation And Benchmark Stidies. RESP Impact Monitoring, Evaluation And Benchmark Studies. Rural Employment Sector Programme- Bangladesh. RESP Impact Monitoring Evaluation And Bench Mark Survey Monitoring List Of Household Members. RESP Impact Monitoring Evaluation And Benchmark Survey; Sample Survey List Of Household Member. Road Surfacing Trial Phase 1 Report. Impact Of Growth Centre Benchmark Survey Report. Impact Of Growth Centre Monitoring Report; First Cycle. Growth Centres For Bangladesh Rural Growth Centres Of Bangladesh Bangladesh Construction Industry Mission -April 12-26,1985; Aide Memoire. Agreed Minutys From The Concluding Meding Of The Annual Review Mission On The IRWP On June 1985. Review Of Thana Planning Reports For Intensive Rural Works Programme. BIDS-CDR Joint Noakali Development Study Of Two Villages. Agricultural Taxation In Bangladesh.(Taxation Studies Project) Engineering Maps ; Mission Report. Standard Design Of Rural Road Bridges; Report On Phase I I Outline Designs Part B- Outline Drawings. IRWP Bangladesh .preparation Report For Rural Employment Sector. Socio- Economic Evaluation Of Special Public Works Programme In Banmgladesh. Report On Accounts Training Course For IRWP &SPWP 1984 - 85 Report On Accounts Training 1985 - 86 Course - II Suuth - West Rural Development Project (RWP Component) Final Report Tangail Agricultural Development Project Plan Of Operation Implementation Phase I Design Manual For The Construction Of Culverts Small Bridges And Sluices Earthwork Manul Planning Design Construction And Maintenance Of Earth Roads Flood Control Embankments Irrigation Canals Drainage Canals And Derelict T An Upazila Based Approach To Resource Assessment And Employment Creation Draft Social Relation And Rural Infrastructure IRWP In Bangladesh Report On Assigment To Assist IRWP With Development Of Training Skills Of WPW Assistant Engineers Maintenance Of Rural Infractructure In Bangladesh Womens Coponent Of IRWP Women In RESP, Past And Future Women In RESP - II RESP - Bangladesh Job Description Of Kea Staff Appendix 3 To Plan Of Operation For RESP II 1990/91 -

Book Title

1992/93 RESP - Bangladesh , Draft Of Infrastructure Development Project Operation Guidelines Instructions For Utilization Of Investment Fund Appendix 5 To Pla RESP - BD, Draft Of Institutional Support Project Operation Al Guidelines / Instructions For Implementation Of Activities Appendix 6 To Plan Of Operat RESP - BD, l Plans And Budget 1989/90 Rural Employment Sector Programme - Bangladesh Plans And Budget 1990/91 Rural Employment Sector Programme - Bangladesh Progress Report 1st July 1989 - 28th February 1990 Rural Employment Sector Programme - Bangladesh , Annual Progress Report 1st July 1989 - 30th June 1990 Annual Socio Economic Progress Report 1st July 1989 - 30th June 1990 Socio Economic Progress Report 1st July 1989 - 31st December 1989 Study Meeting On Management And Productivity Of Urban Survices To Be Held In Lyon / Paris During 16 - 30 April , 1989 RESP Bangladesh Progress Report July 1st , 1987 To March 31st 1988 RESP - BD Progress Report July 1st 1987 To March 31st 1988 Plan Of Operation For RESP II 1990/91 - 1992/93(Approved Copy) Plans And Budgets 1991/92 Part I (Summary Plans And Budgets) Environmental Issues Especially Related To Physical Planning RESP - Bangladesh,Programme Documentation RESP - Bangladesh Work Plan And Budget 1987/88 IRWP - Bangladesh, Field And Laboratory Testing Techniques Rural Infrastructure Development Project (Rural Development Project No 4), Project Document (Plan Of Operation) Project Proforma For Intensive Rural Works Programme , Investment Project (Revised) 1981/82 To 1985/86 Project Proforma For Rural Development Project - 4 ; Infrastructure , Faridpur ,madaripur, Rajbari And Kurigram Districts Intensive Rural Works Programme Bangladesh Appraisal Report Instuctions For Utilisation Of The Investment Of The Infrastructure Development Project Under The Rural Employment Sector Programme 1986/87 - 1988/89 Sub Surface Soil Investigation At The Site Of Proposed Dabrer Beel Sluice Structure At Baliakandi Sur - Surface Soil Investigation Of The Site Of Proposed Rupatala Sluice Structure At Modhukhali Rehabilitation Manual Of Pucca And Semi - Pucca Road Structures Consultancy Services For Reconstruction /Rehabilitation Of IRWPpucca And Semi Pucca Schemes, Zila Kishorgonj , Jamalpur Rajbari And Netrokona (Progres IRWP - Bangladesh , Project Programme And Implementation Course 1986/87 Report On The Calibration Of Concrete Testing Facilities Utilised Feasibility Study Under IRWP, Phase - III Upazila Kaliganj District Lalmonirhat (Draft Report)

Book Title

Road Structuresmanual, Part A - Standard Designs (Big) Road Structures Manual, Part B - Guid Lines And Design Criteria IRWP Phase III Draft , Final Report On Engineering & Socio Economic Study Of Rajbari Upazila Of Goalondo District A Report On The Workshop Entitled ,, The Sharing Of Experiences Of Landless Contracting Society Reinforced Earth Retaining Walls And Bridge Abutments For Embankments Intensive Rural Works Programme And Womens Participation Transplanted Aman Paddy Cultivation Practices Costs And Returns In Thakurgain Tubewell Project Area 1980 - 81, An Economic Profile Second Rural Inerastructure Development Project T A . 1341 Ban Festibility Study Draft Final Report Second Rural Infrastructure Development Project T A ,1341 Ban Fesibility Study Draft Final Report Second Rural Infrastructure Development Project . T. A. 1341 Ban Phase 1 Report. Second Rural Infrastructure Development Project T. A. 1341 BAN . Fesibility Study Final Report. Second Rural Infrasture Development Project T. A. 1341 BAN Fesibility Study Final Report. Technnology For Construction And Maintenance Of Irrigation And Drainage Works In Egypt : A Preliminary Assessment. Application And Lipgreading Of Indigenous Tecnology ; The Case Of Irrigation Works. Development And Application Of Indigenous Low-Cost Technology To Minimise Water Losses Due To Seepage . Energy Options For Low-Lift Irrigation Pumps In Developing Countries ; The Case Of Bangladesh And Egypt. Training Course /Workshop Land And Water Use Plan. Training Course/Workshop Land And Water Use Plan. Bangladesh Preventive Maintenance Progrrame Report Of The Review Mission April-May 1984. Comparative Study Of Technical Quality . Rural Roads And Structures Water Resources Schemes. Road Construction Training (RCT) 1991-92. Training Course Maintenance Of Rural Infrastructures(MT).1991-92. Report On Maintenance Of Rural Infrastructure . Compiled For Consideration And Review In The Workshop Held In The Dhaka During 17-18 Feb ,1992. Conjuctive Use Of Lined Canals And Underground Pipelines For Water Conveyance Under Gravity Irrigation. Handbook Of Applied Hydraulics. Tangail Agricultural Development Project; Summary Report. Tangail Agriculctural Development Corporation ; Plan Of Operation Implementation Phase- 1. An Evaluation Of The Reclamation Of Derelict Tank Programme In Chittagong Division. 1975-76 And 1976-77. Consultancy Service For Reconstraction Rehabilitation Of IRWP Pucca And Semi-Pucca Schemes ; Report Of The Work Shop On LCS Management Held At Madaripur District Office 8-10 Novebver 1988.

Book Title

Pratice Of Management Principles Leadership And Teambuilding . February 23-27, 1986, Course Report. Census Survey IMES (Tabulations Verified ). Management Information & Data Processing System For Works Programme Wing, Ministry Of LGED & Co- Operatives. Government Of Bangladesh. Evalluation Of The UNDP /ILO Technical Co- Operration Project. BGD /82/028. Joint GOB /LINDA/ILO Evaluation . Report On Pucca Road Construction (Draft Report). Road Maintenance By Destitute Women. Report And Training Proposal On Accounting At Zila And Upazila Level. Report On Fish Pond Trial. Situation Of Labourers In Earth Work Comparison Of Schemes Executed By Project Committee And Contractor. Prolect Committees And Trget Groups. Report On Site-Recording And Monitoring. Draft Report On The Application Of Socio-Economic Criteria For The Identification And Selection Of SPWP Schemes. Four Districts Special Public Works Programme (SPWP) Bangladesh. GOB/UNDP/ILO EVALUATION JOINT GOB/SDC REVIEW. Planning Project Preparation Kawatiki Khal Sylhet. Planning Project Preparation Jaijurong Kual Sylhet. Planning Project Preparation Kawatiki Khal Sylhey. A Study Of The Impact Of Income-Generating Activities Among Poor Rural Women In Bangladesh On Their Income And Employment. Progress Reportfor Zilla Road Maintenance And Improvement Project (Usaid Project No 388-0056 For The Month Of Sep83) Progress Report For Zilla Road Maintenance And Improvement Project. For The Month April.1983. ZRMI Zila Road Maintenace And Improvement Project. Usaid Project Number 388-0056. Zila Road Maintenance And Improvment Project USID P.388-0056. June-84. Zila Roads Maintenace And Improvement Project -388-0056.training Programe. Zila Roads Maintenance And Improvment Project. USID P.n.388-0056. Zila Roads Maintenance And Improvement P.388-0056. Month Of October.1984. Zila Roads Maintenance Improvement Project 388-0056. November-1984. Zila Roads Maintenance Improvement Project USID 388-0056. For The Month Of December. Zila Roads Maintenance And Improvement Project (Usaid Project No - 388 - 0056) Maintenance Management For Zila Roads.(Draft Copy) Inception Report For Zilla Road Maintenance And Improvement Project (USAID Project No. 388 - 0056) Inception Report For Zilla Road Maintenance And Improvement Project (USAID Project (USAID Project No. 388 - 0056) Zila Roads Maintenance And Improvement Project (USAIO Project No. 388 - 0056) Standard

Book Title

Specifications For Road Construction Zila Roads Maintenance And Improvement (ZRMI) Project( USAID Project No. 388 - 0056 Project Interim Report Zila Roads Maintenance And Improvement (ZRMI) Project (USAID Project No. 388 - 0056 ) Project Interim Report - Summary Pre - Qualification Submission To Provide Technical Assistance Services For Zilla Roads Maintenance And Improvement Project For The MLGRD&CO And USAID Road Construction Manual Of Zilla Road Maintenance And Improvement Project(USAID Project Np. 388 - 0056) Proposal Technical Assistance Services For The Zilla Roads Maintenance And Improvement Project Proposal For Technical Assistance Under The Zilla Roads Maintenance And Improvement Project Zilla Roads Maintenance And Improvement Project (US. Agency For International Development Mission To Bangladesh Integrated Agricultural Development Progect In Kushtia , Jessore And Northern Faridpur Districts ; Project Preparation Report(Main Report) Integrated Agricultural Development Project In Kushtia , Jessore And Northern Faridpur Districts Draft Project Preparation Report Annex A - Water Reso Integrated Agricultural Development Project In Kushtia , Jessore And Northern Faridpur Districts Draft Project Preparation Report Annex C - Institutio Integrated Agricultural Development Project In Kushtia, Jessore And Northern Faridpur Districts Draft Project Preparation Report Annex D Engineering Integrated Agricultural Development Project In Kushtia , Jessore And Northern Faridpur Districts Project Preparation Report( Main Report) Integrated Agricultural Development Project In Kushtia , Jessore And Northern Faridpur Districts Project Preparation Report Annex B - Soils And Agricu Integrated Agricultural Development Project In Kushtia , Jessore And Northern Faridpur Districts Project Preparation Report Annex C- In& Credit Integrated Agricultural Development Project In Kushtia, Jessore & Northern Faridpur Districts Project Preparation Report Annex D - Integrated Agricultural Development Project In Kushtia, Jessore & Northern Faridpur Districts Project Preparation Report AnnexE- Economics & Marketing Multipurpose Cyclone Shelter Programme Draft Final Report Multipurpose Cyclone Shelter Programme Draft Final Report Multipurpose Cyclone Shelter Programme Draft Final Report Multipurpose Cyclone Shelter Programme Draft Final Report Bangladesh University Of Engineering & Technology. Bangladesh Institute Of Development Studies. Bangladesh University Of Engineering And Technology & Bangladesh Institute Of Development. Bangladesh University Of Engineering And Technology &bangladesh Institute Of Development Studies. Bangladesh University Of Engineering And Technology & Bangladesh. Institute Of Development Studies.

Book Title

Multipurpose Cyclone Shelter Programme Draft Final Report. Multipurpose Cyclone Shelter Programme Draft Final Report. Multipurpose Cyclone Shelter Progrrme Draft Final Report. Methane Generation From Human, Animal, And Agricultural Wastes. A Chinese Biogas Manual. The 6th UNDP -FAO-China International Biogas Training Course; Teaching Materials No.02. The 6th UNDP-FAO-China International Biogas Training Course-No-O1. The Collection Of Desing For Household Hydraulic . Bio-Gas Achievement And Challennnges. Murp Thesis Upzila As A Basic Unit For Local Level Planning. Metropolitan AREA Integraated Development Project. Guidelines On Enviornmental Issues Related To Physical Planning. Guidelines On Environmental Issues Related To Physical Planning. Guidelines On Environmental Issuses Related To Physical Planning Guidelines On Environmental Issuses Related To Physical Planning. Guidelines On Environmental Issuses Related To Physical Planning. MANUAL On Land And Water Use Planning. Manual On Land And Water Use Planning Manual On Land Water Use Planning . Manual On Land And Water Use Planning. Murp Thesis Location Analysis & Model For Union Welfare Centre In Rural Areas Of Bangladesh Study On Pilot Implementation Of Agricultural Development At Sardoab Scheme Under Kurigram & Kamarpur Scheme Under Faridpur The Role Of Small Towns In Rural Development Murp Thesis Physical Planning Legislation In Bangladesh Murp Thesis Strategy For Integrated Rural Development In Bangladesh Murp Thesis Institutional Development For Planning Rural Infrastructure Through Local Bodies In Bangladesh URP Research Monograph Development Of A Methodology For The Upazila Level Planning Of Rural Roads In Bangladesh Murp Thesis Highway Network Of Bangladsesh A Macro Analysis Murp Thesis Planning Of Rural Roads In Bangladesh A Case Study At Upazila Level U.R.P Research Monograph Highway Network Development In Bangladesh Regional Analysis URP Research Monograph Taxation Policy On Unban House Propety In Bangladesh. Bura Irrigation Settlement Project Bure West Phase 1-Nominated Sub Contract No. 5/2.. Water Control Equipment. Lower Khalis Project Feasibility Report Annex V-Farm Drainage Annex VI-Engineering Works. Report Of The Working Group On Municipal Services Sub -Sector Planning Towards Third Five Year Plan

Book Title

1985-90. Rice Husk Ash Cement -Small Scales Production For Low Cost Housing . Northwest Bangladesh Groundwater Modelling Study Register Of SPWP Training Rural Employment Sector Programme II - Bangladesh Rural Emplyment Sector Programme - Bangladesh Impact Of Growth Centre Monitoring Report :first Cycle Equipment Planning Guide For Vocational And Technical Training & Education Programmes Audiovisual, Draughting , Office , Reproduction & Other Ancilla Road Construction Training (RCT) 1991 - 92 Rural Employment Sector Programme II- Bangladesh West Pakistan Water And Power Development Authority North Rohri Project Planning Report Appendices Abridged Annual Report 1978 -79 Seminar On Maintenance Of Rural Infrastructure With Emohasis On Roads Proposal For Prequalification Of Architectural And Engineering Firms For Technical Consultancy Services For The Construction Of Bridges And Culverts O Lowtransportation Research Record Low - Volume Roads : Seconds International Conference Sewerage And Sanitation System Fom Chittagong Metropolition Area Feasibility Study And Development Plan Final Report. Intensive Rural Works Programme Bangladesh Socio-Economic Impact Of Roads In Rural Areas. Intensive Rural Works Programme Bangladesh Socio-Economic Impact Of Roads In Rural Areas. Report On A Physical Planning Law For Bangladesh. Dicentralization Sector Support 263-K-605. Bangladesh Agricultural Research Project Phase - II. Bangladesh Agricultural Reasearch Project Phase-II. Irrigation Water Production Functions Report On A Training Course. Bangladesh Agricultural Research Project Phase- II. Bangladesh Agricultural Research Project Phase- II. 1985 Internal Evaluation Of The Water Management Programme Area. Bangladesh Agricultural Research Project Phase-II. Irrigation Water Production Functions Report On A Training Course. Bangladesh Agricultural Research Project Research Project Phase- II.irrigation Methods For Upland Crops. Report For Quick Determinatiation Of Baring Capacity Of Shallow Foundation/For Preliminary Design. Upazila Reform-A- New Platform For Development. Upazila Reform A- New- Platform For Development. Review Of Thana Planning Reports For Intensive Rural Works Programme (IRWP)

Book Title

Follow- Up- Workshop On Promotion Of Productive Action Research Study. Integrated Rural Development Programme In Comilla District An Evaluation. Upzila Reform A, New Plat Form For Development Upzila Reform A, New Plat Form Development . Lords Of Poverty The Free Wheeling Liffestyles, Power, Prestige And Corruption Of The Multibillion Dollar Aid Business. Report Of First Road Demonstration Project The Worlds Most Complete Concrete Technical Libray. Appraisal Report On An Intigrated Rural Development Project In Noakhli Bangladesh. Vo:-II. Intensive Rural Works Programme Bangladesh. Building Bridges Among People. Report On A Short- Term Study On. Comunication And Programme Development Project Rural Employment Sector Programme. An Economic Analysis Robe-Crop Cultivation In Bangladesh. Rice Cropping Systems Program Statement Of The Bangladesh Rice Research. Wist Pakistan Water And Power Development Authority. North Rohri, Project Planning Report. An Evaluation Of The Riclamation Of Direct Tank Programme In Chittagong Division. Relif And Rehabilitation Division Ministry Of Food. Consultancy Servise For Feasibility Studies , Design And Cost Istimats Of Individual, Proposal, Bangladesh Ground Water Modelling. Trail Schime On Road Mainten Anee And Roadside Tree Plantation, Draft Report. TECHNICAL REVIEW OF NORTHWEST. Tubewells Project. An Interim Report On The Effectiveness Of Tubewell Reclamation In The Former Punjab Of West Of Area Of West Pakistan. Summary Of Works On Brown Planthopper At The Bangladesh Rice Research Institute. Report Of The Commttee On Introduction Of Gredit Pass Book. The Worlds Most Complete Concrete Technical Libary. Appendix Of Drawings West Pakistan Water And Power Development Authority Khairpur Tubewell Drainage Project Maintenance Manual. Navua Pre-Investment Study. Volume-2 Supporting Report. Development Of The Lower Indus Region. A Summary Of The Lower Indus Report. Financting And Institutionalisation Of Maintenance Work With Emphasis On Road Network. Upzila Reform A- New Plat Form For Development. Report Forquick Determination Of Bearing Capacity Of Shallow Foundation (Forpreliminary Design /Dicision With Resonable Accuracy.) Chittagong Municipal Servises Sub-Project Final Engineering Design. Report For Quick Determination Of Bearing Capacity Of Shallow Fundation. Comparison Of Alternation Design Wheel Barrows For Haulage In Civil Construction Tasks. Increasing Outpuy Of Manual Excavation By Work Re-Organization An Example Of Passing Place

Book Title

Construction On A Mauntaion Road. Comparison Of Different Modes Of Haulage In Earth Works. Effect Of Health And Nutrition State Of Road Construction Works In Northern India On Proudction. Comprarison Of Hand Laid Road Surfact. Comprareson Of Hand Laid And Machine Laid Road Surface. Haulage With Life Of Materials Liftingsand By Repeway Production Rates Earth Moving Machines. Productivity Rates Earth Moving Machines. A System Of Deriving Rental Charge For Construction Equipment. A Leterature Review Of The Ergonomiees Of Labour Intensive Civil Construcion. Haulage By Headaskets, Shoulder Yokes And Other Manual Load Carrying Methods. The Use Of Wheelbarrows In Civil Construction. Hardware Research Summary. Level Cane Compaction Spreading Activies In Civil Construction. Excavation. Loading And Unloding Activiities. A Literature Review Of The Work Output Of Animats With Particular Reference To Their Use In Civil Construction. Haulage Using Arial Roperays. The Use Of Rail Systems In Civil Construction The Use Of Agricultural Tractor/Trailer Combination Aggregate Production The Relationship Of Nutrition And Health To Worker Productivity In Kanya Haulag Using Animals In Civil Construction RESP - Bangladesh Central Planning And Monitoring Unit Women In RESP II Agriculture And Water Proshika Annual Report 1977/78 T. Aman Paddy Costs And Returns Survey For Bangladesh 1977/78 Wheat Costs And Returns Survey For Bangladesh 1978/79 Aus Paddy Costs And Returns Survey For Bangladesh Road Surfacing Trial Project Rajbari, Faridpur, Monitoring Report No-6 RESP/IDP, Report Of The Working Group On LCS Involvement In IDP Scheme Implementation Discussion Paper On IDP Socio-Economic Activities Rural Works Implementation Reporting And Monitoring Central Planning And Monitoring Unit Plan Of Operations . Final

Book Title

Central Planning And Monitoring Unit , Plan Of Operation Final Draft LGEB/R E S P Report On TOT, 86-87 LGEB/RESP Report On TOT 86-87 LGEB/RESP Reports On TOT , 86-87 LGEB/RESP Reports On TOT, 86-87 LGEB/RESP Reports On TOT, 86-87 LGEB/RESP Reports On TOT, 86-87 Rural Employment Sector Programme, Impac Monitoring , Evalution And Benchmark Studies Census Report Portable Bridge NKK Nippon Kokan M/O ,LGRD And Co-Operatives IRWP ,DiscussionPaper On Training In UK For Assistant Engineers Intensive Rural Works Programme And Women,s Participation Final Report On Establishing A Planning And Evaluation Cell Aln Management Inforamation System In The LGRD And Co-Operatives BADC, Integrated Agricultural Development Project In Kushtia, Jessore And Northern Faridpur Districts Progress Report East Pakistan Water And Power Development Authority. Reclamation Of Derelict Tanks Works Programme. Administration Of Agricultural Credit In Bangladesh. 100 Thana Intensive Rural Works Programme (Phash-II) Engineering And Socio-Economic Survey Of Bancharampur Thana Of Comilla District Interim Report. Drainage And Flood Control Projects-II Training Of The Professional Staff Of The Direorate Of Planning (Schemes). Hand Book Of Construction. Irrigation Water Distribution System For Tubewells And Low-Lift Pumps In Bangladesh. Irrigation Water Distribution System For Tube Wells And Low-Lift Pumps In Bangladesh. Project Preparation And Implementation Course 1985-86 5 District Towna Water Supply Project Proposal For Engineering Services Techical Proposal. Development Of Markets Storage Godowns And Management Of Marketing Project Gob/Wb/Fao-Cd Feeder Road And Growth Center Investment Need Assesment In Greater Faridpur. Draft 'LGEB' Staff Development And Training Pollcy. Developmental Impact Of Rural Infrastructure In Bangladesh. LGEB In Planning And Development Of Rural Infrastructure ----- Munshigonj (Sadar) Thana A Case Study. Aide Memoire On Proposed Second Rural Infrastructure Delopment Project. Evaluation Of Training Programme Of L.G.E.B LGEB Training Unit A Presentation. Loan Agreement Special Operations Second Rural Infrastructure Development Project Between Peoples Republic Of Bangladesh.

Book Title

Assessment Of The Institutional Support Project At The Local Government Engineering Bureau In Bangladesh. Management Report For the Year Ended . Audit Report And Accounts For The Year Ended . Audit Report And Accounts For The Year Ended. English Version Of Circular No 5 Of 1980-81 On Different Aspects Of Rural Works Programme. Part- 1,the Rural Works Programme , Its Procedures And Preformance Feasibility Study (Final Report) 1981 Intigrated Rural Development Program In Comilla District An Evaluation Project Preparation Report Rural Development Expansion Programme In Bangladesh Performance Report On Works Programme, 1977-78 Performmance Report On Works Programme 1977-78. Performance Report On Works Programme 1977-78. Bangladesh Medium Foodgran Production. Volume-1:tue Plan. Training Of Trainers Course 1985-86. Droft Report On Proposed Head Quorter. Bangladesh Economic Survey.1980-81. Modifid New Scales Of Pay 1985. Government Sectoral General. History Of Survise Of Upzila Engineers Under The LGEB. Resolution And Memorandam On Reputation Of Government Officeals Dealing With Transfered Subject To Upzila Parisad. Report Of The Martial Law Commetee On Organisation Sit Up.(Enam Com).phase-II. Report Of The Martial Law Commetee On Orgranisation Sit Up (ENAM COM). Phase -II. Report Of The Martial Law Commetee On Organisation Sit Up. (ENAM COM) Basic Democracies At The Grass Roots + Report Of Martial Law Committee On Organisational Set Up Ministry Of Local Government Summary Of Platt Niehoff Report Report Of The Working Group On Municipal Services Sub-Sector This Ordinance May Be Called The Paurashava Ordinance 1977(Part-1) Emportant Circular Instruction Manuals And Type Plans Of Works Programme Circular No Map Catalogue Adrees Private & Confidential Management Report For The Period From 1981-82 1985-86 Privat & Confidential Audit Report & Accountsfor The Priod 1981-82, 1985-86 Private & Confidential Audit Report & Accounts For The Period From 1981-82 85-86 Resolution And Memorandum On Deputation Of Government Officials Dealing With

Book Title

Transfer+++++++++++++++++++++++++++++++++++++++++++++++++++++++ed Chatagong Municipalty Corporation Odienance 1982 Khulna Municipal Corporation Ordinance Rajshahi Minucipal Corporation Ordinance The Dhaka Municipal Corporation Ordinance ;1983 Concrite Repairs A Selection Of Articles Reprinted From The Journal The Somialistion Of Minor Irrigation In Bangladeh The Special Committee Constituted To Recommend The Phases Ofcreation And Set Up Of New Districts An Annual Reviw Manual On Thana Irrigation Programme The East Pakistan Local Councils Service Rules, 1968 Overseas Building Notes , The Design Of Septic Tanks And Aqua-Privies Manuf Acture And Application Of Lightweight Concrete The Manufacture And Use Of Concrete Blocks For Walis Calctum Sllicate Bricks(Including Sand-Lime And Flint-Lime Bricks) Problems Of Concrete Production In Arid Climates Corrugated Metal Pipe, Neppon Stul Metal Products Co.Ltd. Resolution On Reorganistion Of Thana Administration. Local Level Planing Module Project Planning (Infrastructure Planning : Roads, Market) Evaluation Of Ulashi - Tip Schemens An Upozala Based Lapproach To Resource Assessment And Employment Creation Rural Irrigation Works Study U.S Aid Grant Joint Grz/Sida Agricultural Sector Support Programme ASSP The Paurashava Ordinance 1977 Modification Of The Finiancial Advisers Scheme Along With Delegation Of Financial Powers Food For Work Programme A Handbook Of Basic Democracles(Part I) Secondary Towns Infrastructture Development Project A. D. B Loan No 1059(SP) Secondary Towns Infrastructure Development Project A. D. B Loan No 1059(SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059(SP) Secondary Towns Infrastructure Development Project A. D. B Loan No 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No 1059 Ban (SP) Swcondary Towns Infrastructure Development Project A. D. B Loan No.1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No.1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP)

Book Title

Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP) Secondary Towns Infrastructure Development Project Project A. D. B Loan No 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No. 1059 Ban (SP) Secondary Towns Infrastructure Development Project A. D. B Loan No.1059 Ban (SP) Map Catalogue Map Catalogue Private & Confidental Management Report For The Year Ended June 30 1990 Private & Confidential Management Report Private & Confidential Audit Report & Accounts Feasibiliity Study And Development Plan Inception Report Proposal For Consulting Services Rural Roads Study Final Report Volum-2 Appropriate Technology For Water Supply And Sanitation Performonance Report On Works Programme 1973-74to 1976-77 Special Four Districts Rural Works Programme English Version Of Circular No 5 Of 1980-81 On Different Aspects Of Riural Works Prgramme Bangladesh & ILO Co-Opration For Development Contract For Technical Services In Connction With Rural Irrigation Works Study Rural Irrigation Works Study Final Reportappendix - C Design Manual Final Draft Report Volume 2, Economics Socio Economic Impact Envirometal Examination Final Draft Report Volume-2, Econemics Socio-Economic Impact Enviromental Examination Ministry Of Local Government Rural Development And Co-Operative Ministry Of Local Government Rural Development And Coperatives M/O LGED And Co-Opratives Consultancy For Conducting Feasibility Study And Preparation Qualification Document Feasibility Studu And Preparation Of Proposed Municipal Services Project Qualification Document Feasibility Study And Preparation Of Proposed Municipal Services Project Application For Prequalification Techical Assistance Project For Preparation Of Municipal Application For Shortlisting Of Consulting Firms For Conducting Feasibikity Study Municipal Services Project Expression Of Interest February -1993 The Building Construction Act The Pourashava Ordinance The Municipal Corporation Ordinance. Master Plan Mymensingh Pourashava. Mymensingh. LGED Preleminary Report On A Pilot Project For Solid Waste Management In A Word Of Mymensingh Paurshava. Prequalification Document For Municipal Services Project. LGED Priliminary Report On A Pilot Project For Solid Waste Management In A Word Of Mymensign.

Book Title

Minicipal Service Project Prequlification. Municipal Servics Project Pre- Qualification Submission For Consultancy. Local Govt Ingineering Department Implementation Of Minor Irrigation. Training In Feeder road Constuction And Maintenance. Second Rural Infrasture Development Project. Local Goverment Ingineering Department Monthly Report. Feader Road Construction And Maintenance. Local Goverment Engineering Department . Inception Report. Third Flood Rehability (Emergency) Project. Asian Development Bank. Secondary Towrs Infrastructure Development. Project-Il LGED, RESP, IDP- II Briffing Matetials On Rural Development Project - 4(IDP) Bangladesh National Building Code 1993 Preliminary Draft Bangladesh National Building Code 1993 Preliminary Draft Bangladesh National Building Code 1993 Preliminary M/O,LGRD And Co -Operatives Third Flood Rehabilitation(Emergency) Project Asian Development Bank Feeder Road Construction And Maintenance Rural Development Project-13 Asian Development Bank Feeder Road Construction And Maintenance Rural Development Project -13 Asian Development Bank Feeder Road Construction And Maintenance Rural Development Project -13 URC Profile University Research Corporation (Bangladesh) United Nations Development Programme Government Of The People's Republic Of Bangladesh LGED Technical Proposal For Engagement Of Local Consultants For Consultancy Services Education For All National Plan Of Action Management In Theory And Practice M/O, LGRD And Co- Operatives LGED Rural Development Project - 3 Flood Component Of Rural Roads & Markets Improvement & Maintenance Project Under IDA International Development Association Swiss Development Cooperation And Kreditanstalt International Development Association Swiss Development Cooperation International Development Association Swiss Development Cooperation International Develoopment Association Swiss Development Cooperation International Development Association Swiss Development Cooperatiion International Development Association Swiss Development Cooperation International Development Association Swiss Development Cooperation Third Road Construction Trial Project Structural Performance Of Trial Pavement Sections And Subssections Government Circulars / Rules Regarding Thana Plan Book Consultancy Services For Design & Supervission Of Lged Hq Buillding Islamic University Bangladeshkushtia , Master Plane

Book Title

Bangladesh Flood Action Plan. Draft Final Report Flood Response Study Proposal Of Services Lged Hq Building At Agargaon . Dhaka Technical Proposal Bangladesh Flood Plan Draft Final Report Flood Response Study Application For Shortlisting For The Feasibility Study And Preparation Of The Municipal Services Project. Annual Financial And Progress Report For Py-3 (1991-93) Contract For The Supply 8 (Eight) Nos, Garbage Dump Truck Contract No. PMU 92006. Draft Plan Of Operation And Budget. P Y 4 (1992-1993) Revision 1 Seismic Zoning And Earthquake Risk Analysis Of Bangladesh. Techical Propose For Consultancy Service For Design And Supervision Of LGED . Technical Of Local Consultants For Consultancy Servises For Design And Supervision Of Construction Of LGED Head Quarter Building. Project Proposal Quarterty Report No- 14. Local Consultants Report On The Review Of Management Structure And Financial Performance. LGED Berger Internation Inc. Construction Of Cyclone Shelters Under IFAD. Engineering Science Paramount Integated Knitwear Ltd. Rural Employment Sector Programme Il Bangladesh Plans And Budgets 1993/94 Final. M/O, LGRD And Co-Opers LGED Rural Development Project-3. Quarterly Report. M/O, LGED And Co-Opers LGED Rural Development Project -3 .monthly Report. M/O, LGED And Co-Opers LGED Rural Development P-3 . Monthly Report. M/ O LGED And Co-Opes LGED Rural Development P-3 . Qurterly Report. M/O LGRD And Co-Operes LGED Rural Development P-3. Qurterly Report. M/O LGED And Co-Opers . Qurterly Report. M/O LGED And Co-Opers . Monthly Report. Ministry Of Local Government .monthly Report. Third Flood Rehabilitation (Emergency ) Project. Third Flood Rehabilitation (Emergency ) Report. Flood Component Of Rural Roads & Mrkets Improvement & Maintenance Project Under Ida Credit No 1940--Bd Flood Component Of Rural Roads & Markets Improvement & Maintenance Project Under IDA Credit No 1940-BD Report Of The Task Force On Foodgrage And Price Support Project For Medium Small And Marginal Farmers Document For The Short Listing For The Proposed Municipal Servies Project. Physical Planning And Mapping Annual Report. Multipurpose Cyclone Shelter Programme Working Paper For National Semenar.

Book Title

Bangladesh University Of Engineering And Technology. ISP Physical Planning And Mapping Annual Report. Mannual On Lond And Water Use Planning . Upazila Plan Book. Effects And Impact Of Infrastructure Development Project - I (IDP) Implementation Of Minor Irrigation Components Of Ifad Assisted Special Assistance Project For Cyclone Affected Rural Households International Development Association Kreditanstalt Fur Wiederaufbau And Asian Development Bank Senior Level Seminar On National Policies Logal Government Training In South Asia Road Materials And Standards Study Bangladesh Role Of Logal Government Engineering Bureau(LGEB) In Planing And Development Of Rural Infrastruvture --- Munshigonj Support To Comprehensive Disaster Management Secondary Towns Infrastructure Development Project - II Bangladesh Bangladesh Flood Action Plan 17 Technical Document: Alternative Approaches To Assessing The Socio Report On Training Need Assessment Exercise For LGED Contractors. Implementation Of Minor Irrigation Componets Of IFAD Assisted Special Assistance Project For Cyclone Affected. Monthly Report. Contract For The Supply 6 (Six) Nos. Garbage Dump Truck Contract No. PUM 92005. Management Planning In Practice Contract For The Supply Of 10 (Ten) Nos 8-10 Ton Three Wheeled Road Rollers. Resp-Il ISP PPM, Map Catalogue. Application Of Aceessibolity Planning In LGED. Group Work Methods And Suggestions. Woman's Credit Programme (WCP) Annual Report. Briefing Materials On Rural Development Project -4 (IDP). Implementation Of Minor Irrigation Components Of IFAD Assisted Special . Freasibility Report. Water Resources Planning Map. Training In Feeder Road Constraction And Maintenance. Annual Progress Report For U. S. Fiscal Year 1992. Project Performance Evaluation Report. Bangladesh Urban And Approval Process In Bangladesh . Project Planning And Approval Process In Baqngladesh. Fresh Look At Bangladesh A Review Of Swidish Development Cooperation. Building Skills For Development Annual Review. Hans Christian Andersen's FAIRY TABES. Implementation Of Minor Irrigation Components Of IFAD Assisted Special .

Book Title

Second Rural Infrastructure Lone Bangladesh . Capability Statment Twenty First Internationa Training Course In Regional Development Planning Outline Of Anjo City Agricultural Cooperative Tender Document For Construction Of 26m Long Rcc Bridge On Kalia- Jogania Road At Chainage The Procurement Of Construction Equipment For Cyclone Rehabilitation Feeder Road Construction And Maintenance Rural Development Project- 13 Non-Motorized In Asian Cities Secondaty Towns Infrastructure Development Project A.D.B Loan No 1059 Ban(Se) Identification And Screening Reports Of Schemes Capability Stament Roads Technical Reffrences Industrial Development In Bangladesh Application Of Gis And Remote Sensing For Regional Development Planning Materials Testing Catalogue Implementation Of Minor Irrigation Components Of Ifad Assisted Special Assistance Project For Cyclone Affected Rural Households Implementation Of Mionor Irrigation Components Of Ifad Assisted Special Assistance Project For Cyclone Affected Rural Households Resume Bibliographic Information System For Planning.(BISPLAN) Replex. Regional Development Planning Exercise. B-1 Replex. Regional Development Planning Exercise. B-2. List Of The Projects. B-3. Framework Of The Computer Simulattion Model. B-4. Computer Operation Manual . B-5. Form For Descripition Of Plan. B- 6. Reference B-7. Stydy Of Project Benefit Monitoring And Evaluation Of RDP-13. Quarterly Work Plans 92/93-4. Summary Sheet Of Monthly Progress Report Of Rural Infrastructure. Technical Proposal For Consultancy Survice. Technical Proposal For Consultancy Service. RDP-18. Technical Proposal For Disign And Supervision Consultancy Servises. RDP-18.technical Proposal For Design And Supervision Consultancy Servise. RDP-18 .technical Proposal Original Copy. RDP-18 Appendics Consultancy Servise For Second Rural Infrastructure Project.

Book Title

Consultancy Services For Second Rural Infrastructure Project ADB Loan No. 1215 - Ban(SF) Rural Development Project-18 Technical Proposal For Consultancy Services Rural Development Project-18 Technical Preposal For Consultancy Services Rural Development Project-18 Infrastructure Greater Khulna Jessore & Kushtia Districts Rurl Infrastructure Development Project . Technical Proposal For Consulting Services Feder Road Construction And Maintenance Rural Development Project-13. Lone No 908BAN (SF) Status Report On Union Planning Works Shops June-1993 Secondary Towns Infrastructure Development Project - II Bangladesh Secondary Towns Infrastructure Development Project - II Bangladesh Secondary Towns Infrastructure Development Project - II Bangladesh Secondary Towns Infrastructure Development Project - II Bangladesh Secondary Towns Infrastructure Development Project - II Bangladesh Secondary Towns Infrastructure Development Project - II Bangladesh Low Cost Model House Building Materials & Technology Rural Employment Sector Programme - II Institutional Support Project - ISP Small - Scale Water Resources Development Project Small - Scale Waer Resources Development Project Small - Scale Water Resources Dwvwlopment Project Small - Scale Water Resources Development Project Small - Scale Water Resources Development Project Asian Development Bank (No. 1817- Ban ) Final Report Volume III Small - Scale Water Resources Development Project Asian Development Bank (Ta No 1817-Ban) Final Report Volume III Small- Scale Water Resources Development Project Asian Development Bank (Ta No. 1817-Ban) Final Report Volume III Small-Scale Water Resources Development Project Asian Development Bank(Ta No. 1817-Ban) Final Report Volume III Small- Scale Water Resources Development Project Asian Development Project Asian Development Bank(Ta No.1817. Ban) Final Report Volume III Small -Scale Water Resources Development Project Asian Development Bank (Ta No 1817-Ban) Final Report Volume III Small-Scale Water Resources Development Project Asian Development Bank (Ta No. 1817-Ban) Final Report Volume III Small - Scale Water Resources Development Project Asian Development Bank (Ta No. 1817-Ban) Final Report III Small- Scale Water Resources Development Project Asian Development Bank (Ta No. 1817-Ban) Final Report Volume III Small-Scale Water Resources Development Project Asian Development Bank (Ta No. 1817-Ban) Final Report Volume III

Book Title

Implementation Of Minor Irrigation Components Of IFAD Assisted Special Assistance Project For Cyclone Affected Rural Households Multipurpose Cyclone Shelter Programme Summary Final Report Department Of Civil Engineering University Of Strathclydeh Twin Pit Sanitary System For Bangladesh , Research Building - 19 Masakatsn Miyake RDP-18 , Jafar Ali Engineer Masaktan Miyake RDP-18 , Mjafar Ali Engineer LGED Head Quarter Building At Agargaon Dhaka Rural Development Project -7 (RRMIMP) Credit Number 1940 BD/ 1212- Ban Sf Asian Develoment Bank, Feeder Road Construction And Maintenance Rural Deelopment Projet - 13 Loan No. 908- Ban(SF) Manual For Growth Centre Planning Institutional Support Project - ISP Physical Planning And Mapping & Map Catalogue Institutional Support Project - ISP Physical Planning And Mapping, Map Catalogue Rubber Dam Institutional Support Project- ISP Physical Planning And Mapping Small- Scale Water Resources Development Project Asian Development Bank (At No. 1817-Ban) Final Report Volume I Small- Scale Water Resources Development Project Asian Development Bank (At No. 1817- Ban) Final Report Volume II Small - Scale Water Resources Development Project Asian Development Bank (Ta No. 1817- Ban) Final Report Volume III Thana Plan Book Completion Status Report Union Planning Workshop Evaluation Report Standard Specifications For Highway Bridges Highway Capacity Manual Special Report 209 The Functioning Of Local Government In Rural Bangladesh Asian Development Bank , Feeder Road Construction And Maintenance Rural Development Project - 13 Loan No. 908 Ban(SF) ` Sirs' And ` Sahibs' Group Mobillisation And BRDB/TA Relations In PEP/RESP Preparatory Study For IDA/ World Bank Cyclone Shelter Project Soil & Its Testing For Foundation Maninaing National Workshop On Rural Transport Infrastructure Brrpukurrta Coal Development Project Discussion Paper Project Financing Secondary Towns Infrastructure Development Project A. D. B Loan No, 1059 Ban (SF) Rural Infrastructure Development Project (Rural Development Project -13) Disaster Coordination And Monitaring Unit Standing Orders Far Cyclone. Multipurpose Cyclone Shelter Programme Draft Final Report Vol-1.

Book Title

Prequalification Application Far Consultancy Service Project Management Design And Supervision Consultantcy Under The Secondary Towns. Preparatary Study For IDA/Warld Bank Cyclone Shelter Project. International Development Association Swiss Development Cooperation And Kreditanstalt . Application For Prequalification Of Project Management, Design And Supervision. Secondary Towns Infrastructure Development Project Management Design And Supervision . Mauntain Risk Engineering Handbook Mountain Risk Engineering Handbbook Executive Development And Orientation For Newly Recruited Asst Executive Engineers Of Panchayat Raj Rural Development & Relif Department Exwcutive Development And Orientation For Newly Recruted Assst Executive Engineers Of Panchayat Raj Rural Development & Relief Department Executive Development And Orientation Construction Management And Construction Equipment Management (Volum-1) Construction Management And Construction Equipment Management Highland-Lowland Interactions In The Ganges Brahmaputra River Nasin: A Review Of Published Literature Hydrological Aspects Of The Himalayan Region National Seminar On Human Resource Development In Irrigation Management September 1993 Risk Engineeing In The Hindu Kush-Himalata Brief Note On Training And Research Activities Case Study, A Revolution In Low Cost Sanitation : Sulabh International New Delhi Enviromental Sanitation & Community Health Nird, Research Highlights 1994-95 (ADB) Partners In Development Training At Esci Calender Of Trogrammes April 19996-97 (Second Edition) Views Of The Press And People Seminar On Management Of Irrigation Tanks By Farmers In Andhra Pradesh From 1992 Upazila Development Plan Nagarkanda (Faridpur) Upazila Development Plan Pangsha Upazilla Rajbari District 1990-95 Upazila Development Development Plan Faridpur Sador 1990-95 Upazila Development Plan Nageswari Upazila Kurigram 1990-95 Upazila Development Plan Shibchar 1990-95 Upazila Development Plan Alfadanga 1988-93 Land Use / Master Plan. Goshairhat Upazila Shahan Sariatpur Zila. Land Use/Master Plan . Goshairhat Upazili Shahar. Plan Book Madhukhali Upzila. Upazila Development Plan Sonatola.

Book Title

Upzila Plan Book Char- Bhadrasan (1987-92) Feeder Road Construction And Maintenace Rural Development Project-13. Feeder Road Construation Maintence .project-13. Monthly Report- Feb-1994. Feeder Road Construction And Maintenance Rural Development Project-13 Institutional Strengthening Of Paurashavas Project Recommendations February.1994. Bangladesh Action Plan For Fiood Control Compartment Alization. Bangladesg Action Plan For Flood Contral Compartment Alization Pilot. Training In Fecder Road Construction And Maintenance. Second Rural Infrastruction Multipurpose Cyclone Shelter Project , Monthly Progress Report (4) Multipurpose Cyclone Shelter Project, Monthly Progress Report Apriil 1994 Technical Proposal For Consultalting Services For Institutional Support For Training. Small-Scale Water Resources Development Project Secondary Towns Infrastructure Development Project A.D.B Loan No 1059 Ban (SF) Municipal Services Project Feasibbility Report Volume1: Main Report Municipal Services Project Feasibiility Report Volume : 11 Main Report (Part2) Municipal Servises Project. Inception Report Vollume 1: Main Report May 1994 Rural Development Project-18 Institutional Support For Training Rural Development Project -18 Institutional Support For Maintenance Of Rural Infrastructure Consultancy Services Institutional Support For Tra Inning Under Second Rural Infrastructure Development Project Consultancy Services Of Institutional Support For Training Institutional Support For Training Under Second Rural Infrastructure Development Project Multipurpose Cyclone Shelter Project Monthly Progress Report (December1994) Rural Development Project-7 (RRMIMP) The Building Constructionce The Municipal Corporations. Training Course/ Warkshop Physical Planning 1991-1992. Implementation Of Minor Irrigation Components Of Ifad Assisted Special Assistance Rural. Implementation Of Minor Irrigation Components Of Ifab Assisted Special. Plans And Budgets 1995/95. Vol;l.summary. Implementation Of Minor Irrigation Components Of Ifad Assisted Cyclone . Mid-Thrm Evaluation Survey (Cycle-1) Report Of The Benefit Monitoring And Evaluation (BME). Integred Food Assisted Development Project. Global Budget And Workplan (May 1995 To June 1996) Rural Infrastructure Development Project-13 ADB Loan . Draft Action Plan Directions In Management Development Of Lged. MAP Catalogue

Book Title

Brochure Ministry Of Local Government Rural Development And Co- Operatives . Syudy To Formulate A National Policy On Water Supply, Sanitation And Hygiene In Urban Slums And Fringes. Construction Of Cyclone Shelters In Kutubdia, Cox's Bazar Under IFAD Assisted Special Project. Report On Seventh Irf Excutive Conference On Road Management. Management And Financing Of Roads An Agenda Far Reform. Institute Of Child Health Building Construction Project. Socio-Economic Monitoring And Evaluation Study-Rural Transport Study Special Report. Sifad T. A. Project Study A. Indicative Study For Staff Redeplayment Among Thanas. Quarterly Report No-17 First Asian Regional Meeting On Rural Transport & Development. Spn- Khan & Associates. Integrated Protection Plan Proposal For Lives And Properties Exposed To Risk Of Cyclone And Storn Surgein Coastal Areeas Of Bangladesh. Plan Book Madoripur Sadar Upazila. Land And Water Use Planning Manual. Large Bridges And Culverts Project Under PL-480, Title-Ill . Large Bridges And Culverts Project Under Pl-480 Tital-111 Largew Bridge And Culverts Project Under Pl-480 Tital-111 Implementation Of Minor Irrigation Components Of Ifad Assisted Special Assist Project For Cyclone Affected Rural Households 5Implementation Of Minor Irrigation Components Of Ifad Assisted Special Assistanc Project For Cyclone Affected Rural Household The Project For Provision Of Portable Steel Bridges For Rural Roads In The People,s Reppublic Of Bangladesh International Forum For Rural Transport And Development Rd-18 Project- Instutional Support For Maintenance Of Rural Infrastructure Decentralization And The Consequences For Local Authorities: Issu Ssession Iula World Congress 1995 In The Hague Field Testing Of Construction Materials Course Pre- Tendering Training Course Road Construction Course Finalcial Management Course Office Management Course Drawing & Estimating Course-1 Drawing & Estimating Course-2 Drawing & Fstimating Course-2

Book Title

Contrator,s Training Course Maintenance Of Rural Infrastructure Course Constractors Training Course (Pre-Tendering ) Pre-Tendering Training Course Land Survey Course Land Surveying Course Surveying Course -2 (Sur-2) Bangladesh Municipal Finance Management Sector Study Master Plan For Greater Dhaka Protection Project (Study In Dhaka Metropolitan Area) Master Plan For Greater Dhaka Protection Project (Study In Dhaka Metropoltion Area) Master Plan For Greater Dhaka Protection Project (Study In Dhaka Metropolitan Area) Master Plan For Greater Dhaka Protection Project.supporting Report - 1. Directorate Of Relif & Rehabiltation Usaid Financed 1990- 93. Bridges And Culverts Division Final Report. Directorte Of Relif And Rehabilition Usaid Financed Financed Ffw Structure Program. Japan Overseas Consultants. Consultanting Engineers Tokoyo Japan. GIS Database Of Key Indicators Of Sustainable Mounain Sevelopment In Nepal. Highways In China 1979--1989. International Seminar On Rural Transportation New Dethi (INDIA) April 26--28, 1989. Course Catalogue (1993-95) Bangladesh Situation Inalysis Water Supply And Sanitation. The Journal Of Social Studies . The Journal Of Social Studies. Quarterly Report No-8. GEO- CARE Journal . Innovation Technology Transfer. Journal Of The Bangladesh National Geographical Association. Mindanao 2000 Development Framework Plan. Manual Of Proceduces For Participatary Irrigation Projects. Report Of A National Seminaron Mini And Micro- Hydrpower Development In The Hindu Kush. MINI-And Micro- Hydropower In Nepal. A Manual Of Private And Community- Based Mini- And Micro- Hybropower Development In The Hindu Kush -Himalayas. Journal Of The Islamic University Studies. Microhydro Volume & Guidance Manual Of Procedurces For Assessment Of Micro Hydro Potential. Quarterly Journal Of The Federation Internationale De Ia Precontrainte.1997/4. Preparing To Meet The Coastal Challenges Of The 21st Century. Seceondary Towns Infrastructure. Development Project Il .

Book Title

Secondary Towns Infrastructure Development Poject -11 Secondary Towns Infrastructure Development Project And Loan No-1059 (Sf) Technical Proposal For Consultancy Services For Preparation Of Municipal Services Prioject Prequalification Application For Consultancy Services.project Management Design And Secondary Towns Infrastructure Development Project-11 Feeder Road Construction And Maintenance Rural Development Project -13 Secondery Towns Infrastructure Development Project Report Of Annual Review Mission On The Intensive Rural Works Programme 1982-83 Report Of The Annual Review Mission On The Intensive Rural Works Programme 1981-82 Journal Of Electtrical Engeering Journal Of Electtical Engineering The Institution Of Bangladesh. Municipal Services Project Final Feasibility Report Khulna Water Supply Expansion . Bangladesh Centre Far Advanced Studies . Beas Paper Clipings On Environment And Development Issues.may-1998. Indian Highways MANCAPS .management Capability Strengthening Project. Bangladesh Compendium Of Envirpnment Statistics 1997 Proceeding Of The International Seminar On Planning And Implementation Of Rural Infrastructure Development Projects STATEC Maintenance Of Rural Infrastructure Course Fileld Testing Course(FTC) Bangladesh Water Development Board Detailed Engineering Design Construction Supervision Of Secondary Towns Integrated Flood Protection Project Individual Study Report On `` Environtal Impact Assessment System For Rural Road Developments In Bangladesh'' Environmental Policy Making Report On Degradation Of Wetlands In Bangladesh Health And Environment In Sustainable Development Analysis Of Early Clay Brick Pavement Failure In Pakistan And Recommended Inprovements Arcshell Tm User's Guide Version 3.4 D Plus Management Perspectives International MP In Association With Unnayan Shamannay Sanitation & Family Education (SAFE) Pilot Project Sanitation & Family Education (SAFE) Pilot Project Report On The Final Surveys Bangladesh Municipal Finance Management Sector Study May 1997 Urban Drainage Manual Vol- Ill. Quantity Estimates And Costs Far Standard Designs First Edition. Module On Hygiene Behaviour Change Programming. (CDRB) The Firm And Its Organisation. Tangail Infrastructure Development Project (TIDP)

Book Title

Third Urban Development Project. Integrated Water Resources Management In Urces Management In South Asin A Regional Perspective For GWP Action GWP . Geographic Information Systems (GIS) And Their Application Training Manual For Policy Market. Application For Expression Of Interest For Participation In Project Implementation. Project Proposal Assisting And Rehabilitating Form Enterprises In Chittagong Hill Tracts For Sustainable Agriculture And Crop Diversification. The Making Of The Bangabandhu Bridge. The Making Of The Bangabandu Bridge. Analysis Of Early Clay Brick Pavement Failure In Pakistan And Recommended. Country Paper Bangladesh Global Water Partnership. Technical Advisory Committee (Tac) Regional Meeting For South Asia The Secondary Towns Infrastructure Development Project (Stidp) Phase-11 ADB Loan No .1376BAN (SF) Report On The Monitoring And Improvement System Rural Employment Sector Programme Ill Partnership In Development . The World Bank,s Assistance To Bangladesh National Workshop On New Agricultural Extension Policy Implementation Project Report On Improvement Of Maintenance Management System For Rural Road. Report On The Field Visit Of The Hon'ble Malawi Minister For Transport To Tangail & Bogra District And Seminar On Rural Transport On 20th July 1998. Flood Action Plan Northeast Regional Water Management Project. (FAP 6) Global Forum Pn Local Governance . 23-27 September 1996 In Goteborg, Sweden. Consultantcy Services For Beneficiary Participation And Project Management Bangladesh-(TA No 3564 BAN) Quality Control Manual. Beneficiary Participation And Project Management Bangladesh. Beneficiary Participation And Project Management Bangladesh. Bridge Design & Engineering . Issue No. 13. Fourth Quarter 1998. Report 1996-98. International Forum For Rural Transport And Development. The Fourth SAARC Lighting Conference. Lighting For Tomorrow. The Fourth Saarc Lighting Conference Light For Tomorrow Bangladesh Municipal Finance Management Sector Study Government Of The People,s Republlic Of Bangladesh Rural Employment Sector Programme -Bangladesh Food Security Environment And Poverty From Flood To Scarcity Re-Defining The Water Debate In Bangladesh Intensive Rural Works Programme Bangladesh. Small Scale Water Resources Project Progress Report Small And Marginal Frrmers Development Project In Kurigram Nawabgang And Pabna Districts

Book Title

Small And Marginal Farmers Development Project In Kurigram Nawabgonj And Pabna Districts Small And Marginal Farmers Development Project In Kurigram Nawabganj Intensive Rural Works Programme Bangladesh Socio-Economic Of Roads In Rural Areas Bangladesh Rural Development Board. Noakhali Rural Development Project-11(Copy-2) Final Report On Engineering & Socio-Economic Study Of Rajbari Upazila Of Goalondo District First Asian Regional Meeting On Rural Transport & Development Upazila Pan Book Dhobaura 1985-90 Report Of Workshops On Integrated Rural Transport Planning Organised By Lged/Resp-11 /Ilo/Sida Rural Employment Sector Progrtamme-11 Institutional Support Project-Isp Physical Planning And Maping Rural Employment Sectorprogramme-11 Institutional Support Project Physical Planning And Mapping Rural Maintenance Programme Orientation Of Local Government Engineering Department (LGED) Thana Muradnagar 5 Years Plan For Rural Public Works Integreated Agricultural Development Project In Kushtia Jessore And Northern Faridpur Districts Project Preparation Report Annex A Water Resources And Special Public Water Programme Of UNDP/ ILO For Dhaka Division Report. Rural Growth Centres Of Bangladesh Transport Survey Wing Paper No. O1-82. Bangladesh Noakhali Rural Development Il Project Vol-4. The Building Construction ACT The Pourashava Ordinance The Municipal Corporation . Training Course/ Workshop URBAN Planning 1992/93. Programme & Course Materialal. Intensive Rural Works Programme Bangladesh .phulpur Upazila- Mymensingh District Upgraded Planning Report. Secondary Towns Infrastructure Development Project ADB . Inventory On Physical Plan Implementation Instrument An Annotation Bibliography On Land Management And Legislation In Bangladesh. Intensive Rural Works Programme Bangladesh Shaghata Thana Rangpur Distric Upgraded Planning Report. Ground Water Investigation In Chittagong, Chittagong Hill-Tracts, Noakhali, Comilla, Sylhet, Ground Water Investigation In Chittagong . Chittagong Hill Tracts, Noakhali, Syihet. Comilla Ground Water Investigation In Greater Dinajpur, Rangpur, Bogra, Rajshahi, Pabna, -1986. Ground Water Investigation In Greater Dinajpur, Rangpur, Bogra, Rajshahi. -1985. Ground Water Investigation In Greater Dinajpur, Rangpur. -1987 Ground Water Level Data In Rangpur And Dinajpur Districts For The Year 1979-81. Ground Water Investigation In Faridpur ,jessore, Kushtia, Barisal.1979-81. Ground Water Investigation In Chittagong, Chittagong Hill Tracts, 1985. Hydrogeoloical Map Of Greater Rangpur District. Reconnaissance Soil Survey Bogra District And Part Of Dinajpur Sadar Subdivision. Company Profit

Book Title

Work Plan Fpr The Year 1997 - 98 Local Govt. Engineering Department Overseas Road Note 1 Maintenance Management For District Engineers Overseas Road Note A Guide To Surface Dressing In Tropical And Sub - Tropical Countries Transport And Road Research Laboratory Workshop On Preparation Of Degital Thana Base Maps Resp-11 Investment Need For Feeder Road-B And Growth Centree In Study Districts Bangladesh Flood Action Plan . Ministry Of Vlater Resources Flood Plan Coordination Organization (Fpco ) Fap 16 Serrimax Series On Enviroment Maintenance Of Rural Infrastructure (Mt-T) Course The Rural Homeless In Bangladesh Annotated Bibliography Of Brdb Publication Brdb Training Needs As Perceived By Field Functionaties Workshop Report On Training Of Project Implementing Staff Of Brdb Life Stories Case Studies Poverty Alleviation Glacial Lake Outburst Floods And Risk Ingineering In The Himalaya Seabuckthorn A Multipurpse Plant Species For Fragile Mountains Road Construction The Nehemalaya The Experrience From The Lamosangu - Jiri Road Project Menris Case Study Series No. 3 Application Of GIS For Planning Agricultural Development In Gorkha District Risk Engineering In The Hindu Kush - Himalaya Mountain Risk Engineering Handbook Sibject Background: Part I Secondary Towns Infrastructure Development Project - IIbangladesh ADB Loan No. 1376 - Ban (SF) Technical Proposal For Consultancy Services For Preparation Of Mnicipal Services Project Introduction And General Information Integrated Resource Dwvelopment Of The Sundarbans Reserved Forest FAO/ UnDPBGD / 84/056 Technical Proposal For Feasibiity Study To Prepare Municipal Services Project For Rajshahi And Khulna Financial And Human Resources Development Aspects Of Management Of Paurashavas Asian Development Bank Training In Feeder Road Construction And Maintenance Progress Report For Period To Dece 1993 Report On Study Tour To Zimbabwe, Africa. (From 8. To 19 Dec .23 RD 1970. Organisation Study Of Dhaka Distric Council July 20th ---Sept.23 RD.,1970 Rural Ventilated Improved Pit Latrines; A Field Manual For Botswana. Command Area Development For Minor Irrigation Integration Of Organizational. Economic. Agronomic. Internayional Development Co-Operation And Kreditanstalt Fur Wiederaufbau. Consultanting Services For The Municipal Servises Project Feasibility Study And Preliminary Engineering Design Vol-1. Technical Proposal. Progress Report No- 1. Second Rural Infrastructure Development Project. Master Plan .

Book Title

Seventh Joint Meeting For Support To Special Public Works Programme (Geneva, 7-9 May 1985 )draft Report. Rural Development Project 3. Infrastructure , Greater Sylhet. Bituminous Materials And Testschapter-11 Public Works Department Schedule Of Rates Elight Edition First Revision Imlplementation Of Minor Irrigation Components Of Ifad Assisted Special Assistance Project For Cyclone Affected Rural Household National Works On Rural Transport Infrastructure And Its Contribution To The Rural Transport System Bangladesh Water Development Board . Detaited Engineering Design And Construction Supervision Consultijng Sevices For The Municipal Services Project Feasibility Study And Preliminary Engineering Design Assian Development Bank Training In Feeder Road Construction And Maintenance Secondary Towns Infrastructurre Development Project-11 Flood Action Plan Northest Recional Water Management Project Job Descriptions Of Key Staff Brochure Computerised Maintenance Management Practices Project . Statement Of Qualifications. Understanding Einstein,s Theories Of Relativity. Fresh Look At Bangladesh A Review Of Swedish Development Cooperation. Report On Mission Special Public Eorks Programme SPWP-Interim Phase. Operation & Maintenance Of Small Scale Water Resource Schemes. Programme Of Orks In Chuadana District Under Rural Development Project-18. Rural Development Project-18 (RIDP-Il) ADB Loan No-1215-BAN(SE) Follow Up On MP-J-Thoorvaldsson,s Report Infrastructure Development Project (IDP) Rural Development Project (RDP-4). Working Paper Of 16th CCC Meeting Of RRRDP. Prject Proposal Aggregates Chapter- 3. Local Government Division Proposal For Amendment . Agri Development International Profitability And Effect Of Common Income Generating Activities Findings From Rural Poor Projects Of BRDB. A Profile Of The Rural Poor Projects Of BRDP. Comparative Study On Conditions And Interest Rates Of Rural Credit Schemes In Bangladesh. Guidelines on Environmental Issues Related To Physical Planning Upazila Plan Book 1990 - 91 Upto 1994 - 95 Manual On Land And Water Use Planning

Book Title

Manual For Growth Centre Planning An Evaluation Of Amgram Ecological Village Compilation Of The Financial And Accounts Manual For The Local Government Engg Dept Maintenance Of Rural Infrastructure Annual Report 1998/99. User.s Manual For Road,s & Structure Database Management System - Ill Rural Infrastenance CELL. Road Maintenance Management Manual For Road Condition Surveys And Detailed Visual . Guidelines For The Maintance Of Rural Infrastructure (English Version) Renemable Energy Information Network Software Resoure Data Base . School Data Base User Manual And Coding System. Project Maintoring And Evaluation Software User Manual And Coding System. Map Library Map Catalogue. Pourashava Plan Book Study-5 Physical Of Jessore Pourashava With Remote Sensing Techniques Institution . Quality Control Manual. IFFD DGPS Road Survey Training Course Integrated Food For Development Project CARE -Bangladesh. Standard Specification Of Laboratory Equipment Central Testing Laboratary. Quality Of Cement Tested At The LGEB Central Testing Laboratory . Dhaka . Between 1986-91. Standard Data Sheet Of Different Tests For 64 Laborary Of LGED. Testing Of Cement Using Sylhet Sand (Specially Prepared) As An Alternative To Ottawa Sand. (ASTM- C 109). GPS FIELD Guide. Training Manual On Application Of GIS And Tovlocation Planning For Basic Infrastructure And Services (vol-II) Training Manual On Application Of GIS And RS To Location Planning For BASIC . School Mapping Methodology. Technical Assistance For Establishing Local Government Database At The Thana Level. Training Manual On Application Of GIS And RS To Location Planning For Basic .(Vol-IV) Training Manual On Application Of GIS And RS To Location Planning For Basic Infoastrure And Services (Vol-III) Low Cost Model House Building Materials & Technology. Standard Specifications For Feeder Road Type-B& Rural Road Type-R1 .under LGED. Intensive Rural Works Programme Bangladesh Operation And Maintenance Of Small Scale Flood Control And Drainage Schemes Small Scale Water Resource Schemes Design Manual (Copy-2) Manual On Prestressed Concrete Bridges Parts B-Design Criteria And Guidelines Road Pavement Design Manual Road Structures Manual Part B: Standarddesigns Vol-1 Road Structure Manual Part B: Standard Designs Vol-1

Book Title

An Evaluation Of Amgram Ecological Village Drinking Water, Bathing And Sanitation: The Risk To Human Health In Rural Bangladesh. Land Use Change Analysis In A Highway Corridor; AN Application Of Marklon Model Using. Ministry Of Health And Family Welfare , Government Of Bangladesh. Local Government Engineering Department Manual For Growth Centre Planning. Mamual On Land and Water Use Planning. Upzila Plan Book .1990-91. UPTO 1994-95 Environmental Biblography Of Bangladesh. Manual On Land And Water Use Planning. Guidelines On Environmental Issues Related To Physical Planning. Mancaps Management Capability Strenghtening Project Of Local Government Engineering Department Bangladesh . General Education Project (IDA Credit NO-2118 BDI ) Guidelines For Proposal And Enginrring Survey Of Engineering Survey Of Small Water Resource Development. Study Report On Feasibility Of Rubber Dams In Bangladesh Sep. 1994 Introduction Of Rubber Dam Technology In Bangladesh Report On Expert Workshop On Regional Strategy Local Government Training In South Asia Draft LGED Accouints Mannual Land And Water Use Planning Manual Research Findings On Rural Hoouse Building Materials &construction Thana Plane Book Guidelines Report On Admin & Financial Managementcourse-1 Land And Water Use Planning Manual Report On Roard Constructruction Training Consultancy Services For Preparation Of Design Manual On Prestressed Concrete Bridges Report On Road Construction Training - 1 (RCT - 1), 1990 - 91 Report Of Consultants On Assessment Of ISP Report On Survey Training Course - 1 , 1990 / 91 Construction Services For Preparation Of Design Manual On Prestressed Concrete Bridges Guidelines On Environmental Issues Related To Physical Planning Institutional Support Project - ISP Physical Planning And Mapping Training Course / Workshop Physical Planning Study Report On Feasibility Of Rubber Dams In Bangladesh Revised Tender Document For Construction Of 75m Long RCC Bridge On Feni - Kalidha - Lashkar Hat Road At Ch. 3900m Over Revised Tender Document For Construction Of 75m Long Rcc Bridge On Feni - Kalidaha - Lashar Hat Road At Ch. 3900m

Book Title

Large Bridge And Culverts Project Under PL - 480, Title - III Revised Drawings And Bar Bending Schedules Of 75m 10ng RCC Bridge On Feni Kalidaha - Lashkar Hat Road At Ch. Annual Report ( July 1999 - June 2000 Evaluation Of The Infrastructure Development Project (IDP) Compilation Of Internal Audit Manual Local Government Engineering Depatment(LGED) Progress Report Of Rural Infrastructure Development Export Workshop On Quality Management Of The Construction Of Bridges/ Culverts Of LBC Project , LGED Name Of The Project: Large Bridge/ Culverts On Important Feeder & Rural Roads People;s Livelihoods At The Land - Water Interface Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department Asian Development Bank People's Republic Of Bangladesh Local Government Engineering Department. MAP Catalogue. Data Book 1999 (61 Districts) (Urban Water Supply System) Year Book 1998-1999 Rural Water Supply. Asian Development Bank People,s Republic Of Bangladesh. Asian Development Bank People,s Republic Of Bangladesh.LGED. Asian Development Bank People,s Republic Of Bangladesh.LGED. Asian Development Bank People,s Republic Of Bangladesh LGED. Second Small- Scale Water. Asian Development Bank People,s Republic Of Bangladesh. Asian Development Bank Peoples Republic Of Bangladesh. Compartmentalization Pilat Project Tangail Final Report Main Report . Compartmentalization Pilot Project Tangail. Compartmentalization Pilot Project Tangail. Compartmentalization Pilot Project Tangail. Final Report. Annex G- Flood Mitigation Benefits. Compartmentalization Pilot Project Tangail. Final Report. Annex J Monitoring And Evaluation. 48 Research Report . Prediciting Water Availability In Irrigation Tank Casecade Systems: The Cascade Water Balance Model. 50 Research Report . Modeling Scenaios For Water Allocation In The Gediz Basin , Turkey. Charging For Irrigation Water : The Issues And Options, With A Case Study From Iran. Financial And Economic Analysis Of Development Project. Financial And Econimic Analysis Of Development Project. LGED In Development.. 1996--97. 2000--01.

Book Title

Istanbul + 5 UNCHS (Habitat). UN General Assembly Special Sessionon Human Settlements June 2001. Policy Brief On Trasport And Infrastructure CPD Task Force Report. Design, Construction, Quality Control And Inspection Of Bridge / Culvert. Proceedings Of The Memorial Lecture,s Orgsnized On The Occasion Of The Occasion Of 45th Annual Convention. 17-19. Feb 2001, IEB. Khulna. Proceedings Of The Nation Seminer Of IEB On IT For Good Governance. RESP Ill Resuit Anaiysis Centre For Policy Dialoguegue Report On The Development Of The Infrastructure For Integrating Asia,s Land Transport System Centre For Policy Dialogue New Strategies For International Assistance Report. No--21. Centre For Policy Dialogue Strengthening Local Government Recent Experience And Future. Agend Report No. 29. Centre For Policy Dialogue Poverty Alleviation. Maintenance Of Rural Infrastrure Ciurse. Training Manual For LGED CO/SAE. Small -Holder Agricultural Improvement Project LGED . Component Monthly Report Nov-2001. Road & Road Structure (RRS) (Scheme Preparation &Quality Control) Training Of Rural Infrastructure Course. Maintenance Of Rural Infrastructure Course. Field Testing Course (FTC) Ro-8 Rangpur. Field Testing Of Construction Materials Course. Causes And Impacts Of Flood -2000 In The Border Districts Of The South West. Climate Variability And Its Trend In Maldives Master Plan Study For Portable Steel Bridge Construction On Feeder And Rural Roads In Bangladesh Master Plan Study For Portable Steel Bridge Construction On Feeder And Rural Roads In Bangladesh Master Plan Study For Portable Steel Bridge Construction On Feeder And Rural Roads In Bangladesh Implementation Guidelines Local Partnership For Urban Poverty Alleviation Project The Role Of Japan's ODA Toward The Asia - Pacific Region In The New Century Bangladesh - Japan Relations Socio Cultural Perspectives US - Japan Security Treaty System In The Post - Code War Era Asian Development Bank Annual Report 2001 Elections Best Practices Under The Democracy Partnership. Evaluation In The Wake Of A Flagship . Evaluation Ex- Post Impact Study Of The Noakhali Rural Development. Evauation Ex- Post Impact Study Of The Noakhali Rural Development. Project In Bangladesh. Evaluation Ex-Post Impact Study Of The Noakhali Rural Development. Evaluation Ex- Post Impact Study Of The Noakhali Rural Development.

Book Title

Evaluation Ex- Post Impact Study Of The Noakhali Rural Development Project In Bangladesh. Evaluation Ex- Post Impact Study Of The Noakhali Rural Development Project In Bangladesh. Evaluation Ex- Post Impact Study Of The Noakhali Rural Development. Access To Justice : Best Practice Under The Democrary Partnership. Voices Of Woman : A New Era Of Political Leadership. Guide Book For European Investors In Bangladesh Sector Profiles. National Advocacy . A Part To Reform. Background Study Land Use Plan (2001- 20200) Bogra Pourshava.vol- I. Volume- II . Land Use Plan (2001-2020) Bogra Pourashava. Background Study Land Use Plane (2001-2020) Jamalpur Pourshava.vol -I. Vol- II . Land Use Plan (2001-2020) JamalPur Pourshava. Land Use Plan (2001-2020) Model Pourashava Jessore.vol- I. Land Use Plan (2001-2020) . Model Pourshava Jessore . Vol-II. Land Use Plan (2001-2020). Model Pourshava Comilla . Vol-I. Land Use Plan (2001-2020) Model Pourshava Comilla . Vol-II. The Summary Report On The Findings Bench Mark Survey Of 10-Sub Project(Batch- I) The Report On The Survey Findings Of The Sub-Project Banderpara- Chatra Beel WC" (SP -5246). The Report On The Survey Findings Of The Sub- Project .Satkhira. The Report On The Survey Findings Of The Sub-Project. Kurigram. Batch. -I. The Report On The Survey Findings Of The Sub-Project "Akhira-Saidpur Khan Drainage WC" ( SP-5313) In Patnitala Upazila Of District Noagaon. The Report On The Survey Findings Of The Sub-Project . Raufkhali FCD" (SP-5232) In Jiban Nagar Upazila Of Distric Chuadanga. Batch-1. Rajpur- Patilapara FCD" (SP_5345) In Bauphal Upazila Of District Patuakhali. Batch-I. The Report On The Survey Findings Of The Sub-Project .barung River WC" (SP_3062) In Tetulia Upzila Of District Panchgogh Under 10- Sub-Projects Ben. The Report On The Survey Findings Of The Sub- Project "ramkrishnapur Drainage" (SP-5330) In Muksudpur Upazila Of Distric Gopalgong Under 10-Sub-Proj. Rajapur Drainage .jhalokati Under 10-Sub-Batch- 1. Puthia- Falia FCD" (Sp-5239) In Upzilla Of District Serajgong Under 10- Sub -Projects . B-1. The World Health Report 2002 Reducing Risks, Promoting Healthy Life. Bio-Ecological Zones Of Bangladesh. O D A Loan Report 2002 Bangladeh Agricultural Development Corporation Survey And Monitoring Project For Development Of Minor Irrigation Quarterly Economic Update Bangladesh Rural Transport Improvement Project Environmental Assessment Summary Rural Transport Improvement Project . Social Screening And Social Impact Assessment Reports

Book Title

Rural Transport Improvement Project Resettlement Framework Sariakandi Chandanbashia Feeder Road-B Under Rural Transport Improvement Project Environmental Codes Of Practice Enviromental Management Plan For 35 Feeder Road Improvement Sub-Projects Annul Report 2002 Directory 2003 Indian Highways Ministerial Meeting On Water For Food And Agriculture At The Third World Water Forum Jbic Assistance In Bangladesh International Forum For Rural Transport And Development 2nd Asoa Regional Meeting Pavemeent Design Catalogue (Copy-9 ) South Asian Conference On Sanitation Sacosan 2003 Documentation Of The Project Lunching Workshop Of Rural Transport Improvement Project (RTIP) ODA Loan Report 2003 Willingness To Pay For Arsenic-Free ,safe Drinking Water In Bangladesh Patuakhali District Water Resources Assessments Quarterly Economic Update Bangladesh Journal Of Agriculture And Rural Development Government Of The Peoples Republic Of Bangladesh Ministry Of Establishment Survey Report Of Equipments And Facilities For Soil Tests At Laboratories In Lged Final Report Submitted The Local Covernment Engineering Department (LGED) Union Plan Book 1996-97 Report Of Ex-Participants Of Counterpart Training In Japan And Technical Information Exchanging Programe In Cambodia Bids Publications Organization Of The Covernment Of Japan Bangladesh Institute Of Development Studies Directory Of Scientists And Technologists Of Bangladesh Cyclone Track Prediction Experiments With A Quasl-Lagrangian Model Schedule Of Rates Of The People,s Republic Of Bangladesh Local Government Engineering Department Dhaka Region Schedule 0f Rates Government Of The Peoples Republic Of Bangladesh Local Government Engeering Department Faridpur Region Schedule Of Rates Government Of People's Republic Of Bangladesh Local Government Engineering Department Tangail Region (Jamalpur, Sherpur, Tangail) Schedule Of Rates Of People's Republic Of Bangladesh Local Government Engineering Department Mymensingh Region (Mymensingh, Netrokona, Kishoregani) Schedule Of Rates Government Of The People's Of Bangladesh Local Government Engineering

Book Title

Department Chittagong Region (Chittagong, Cox's Bazar) Schedule Of RatesOf The People's Republic Of Bangladesh Local Government Engineering Department Hill Tracts Region (Rangamati, Khagrachari, Bandarban) Schedule Of Rates The People's Republic Of Bangladesh Local Government Fncineering Department Sylhet Region (Sylhet, Moulvibazar, Habiganj, Sunamganj) Schedule Of Rates People's Republic Of Bangladesh Local Government Engineering Department Rangpur Region (Rangpur, Lalmonirhat, Nilphamari, Kurigram ) Schedule Of Rates Of The People's Republic Of Bangladesh Local Government Engineering Department Kushtia Region (Kushtia, Chuadanga, Meherpur) Schedule Of Rates Government of The Pepubli,s Republic Of Bangladesh Local Government Engineering Department Khulna Region (Khulna, Satkhira) Schedule Of Rates Of The People's Republic Of Bangladesh Local Government Engineering Department Bogra Region (Bogra, Joypurhat, Pabna, Sirajganj) Schedule Of Rates Of The People's Of Bangladesh Local Government Engineering Department Rajshahi Region (Rajshahi, Naogaon, Natore, Chapai Nawabganj) Schedule Of Rates Government Of The People's Republic Of Bangladesh Local Government Engineering Department Noakhali Region (Noakhali, Laxmipur) Schedule Of Rates People's Republic Of Bangladesh Local Government Engineering Department Barisal Region (Barisal, Jhalakathi, Patuakhali, Barguna, B) Schedule Of Rates Of The People's Republic Of Bangladesh Local Government Engineering Department Jessore Region (Jessore, Jhenaidah, Magura, Narail) Schedule Of Rates Of The People's Republic Of Bangladesh Local Government Engineering Department Dinajpur Region (Dinajpur, Thakurgaon, Panchagarh) Gis Atlas On Landuse And Enviroment. Palas And Sonargaon Upazillas (Copy-3) Documentation Of Participatory Rural Planning Workshop (Copy-4) Arsenic Scenario Of Bangladesh 1999-2003 National Workshop On Options For Flood Risks And Damage Reduction In Bangladesh Japan Bank For International Cooperation Annual Report 2004 Durability And Impact Assessment Of Submersible Road Annual Post Development Report On Benefit Analysis And Evaluation Annual Report Onpost Development Benefit Monitoring And Evaluation Impact Assessment Report On Woman Market Sections Government Of The People's Republic Of Bangladesh.Technical Specifations For Buildings. Annual Report (July 2003 - June 2004) Water Level Data In Ganges Padma River Basin For Participatory Rural Planning In Shariatpur District Dhaka Transport Coordination Board Spatial Poverty Mapping Of Dhaka Metropolitan Area Bio - Gas From Human Excreta Proceedings Of Participatory Rural Planning Workshop Statistices Of Civil Officers And Staff Of The Government Of The People'sRepublic Of Bangladesh

Book Title

Gaining A Better Understanding Of Official Development Assostance Oda Loan Report 2004 Gender Equality And Decent Work Good Practices At The Workplace Training Course On Suporvision And Quality Control Of Civil Works Maintenance Of Civil Works In Purashava Accounting Software Manual Propsal For Uniform Course Of Action On Community Mobilization In The Pourashava Training Manual For Infrastructure Inventory Database Development & Base Map Preparation Inventory Of LGED Road Network Dhaka Division Rural Infrastrucrure Maintenance Management Unit (RIMMU) Inventory Of LGED Road Network Sylhet Division Riral Infrastructure Maintenance Management Unit (RIMMU) Our Future Our Responsibility Traffic Signs Manual. Volume -1 Traffic Signs Manual . Volume -2 National Water Management Plan Project Guidelines For Environmental Assessment Of Water Management Government Of The Peole;s Republic Of Bangladesh Ministry Of Water Resources Water Resources Planning Organization (WARPO) Government Of The People;s Republic Of Bangladesh Ministrey Of Water Resources Water Resources Planning Organization(WARPO) Inventory Of LGED Road Network Rajshahi Division Rural Infrastructure Maintenance Management Unit (RIMMU) Inventory Of LGED Road Network Khulna Divission Rural Infrastructure Maintenance Management Unit (RIMMU) Inventory Of LGED Road Network Barisal Division Rural Infrastructure Maintenance Management Unit (TIMMU) Inventory Of LGED Road Network Chitagong Division Rural Infrastructure Maintenance Management Unit (RIMMU) Bangladesh Economic Review 2004 National Sanitation Strategy 2005 Final Report Of Jica Expert On Ruralinfrastructure Development Report No .3 Secondary Small Scale Water Resources Development Sector Project National Conservation Strategy (NCS) Impementation Project - 1 Land Cover/Land Use Map Of Barind And Cholon Beel Vol - 1 National Conservation Strategy (NCS) Impementation Project -1 Land Cover/ Land Use Map Of Barind And Chalon Beel Vol - 1 National Conservation Strategy (NCS) Impementation Project - 1 Land Cover/ Land Use Map Of Barind And Chalon Beel Vol - 1 National Conservation Stratery (NCS) Implementation Project - 1 Land Cover / Land Use Map Of

Book Title

Mixsaral Thana Land Cover/ Land Use Map Of Areas South Of Sangu River And Jinjira Corol Island (ST> Martin's Island) National Conservational Strategy (NCS) Land Cover/ Land Use Map Of Tangua Haor (SUNAMGANJ District) Statistical Yearbook Of Bangladesh (1986) Statistical Digest Of Bangladesh Mohthly Statistical Bulletion Of Bangladesh Gender Equity Strategy And Action Plan National Water Management Plan Volume 1 Summary National Water Management Plan Volume- 2 Main Report National Water Management Plan. Volume-3. Investment Portfolio. National Water Management Plan Volume- 4 Regional Plans National Water Management Plan Volume 5 Supporting Information. Proceedings Of `` Seminar On Geographic Information System And Remote Sensing For Development '' Rural Rode And Structure Maintenance Manual. V - AID To LGED Chronological Review On Rural Infrastructure Of Bangladesh Coastal Land Use And Indicative Land Zones User Manual Progress Monitoring System Final Report Of Jica Expert On Rural Infrastructure Development Report No. 3 Survey Report Of Testing Equipment And Facilities In LGED Laboratories, Volume II: Annex Data Book Present Status Of LGED Laboratories Guidelines For Road Safety Audit IMED Reporting Formats & User Guide ( Revised & Approved In 2003) Local Government Engineering Department Survey Report Of Testing Equipment And Facilities In LGED Laboratories Volume II-V: Annex Data Laboratories.( Dhaka Region) Asian Development Bank Annual Report 2004 Survey Report Of Testing Equipment And Facilities In LGED. Laboratories. Volume. 1. Main Text & Core Appendixes. Survey Report Of Testing Equipment And Facilities In LGED Laboratories. Volume-II.iii: Data Book. Present Status Of LGED Laboratories. Comilla Region. Survey Report Of Testing Equipment And Facilities In LGED Laboratories. Volume II.x: Annex Data Book. Present Status Of LGED Laboratories. Rangpur Reg Survey Report Of Testing Equipment And Facilities In LGED Laboratories .volume-II.ix:annex Data Book.present Status Of LGED Laboratories. Rajshahi Reg Survey Report Of Testing Equipment And Facilities In LGED Laboratories.volume II-iv: Annex Data Book. Present Status Of LGED Laboratories Sylhet Regi. Survey Report Of Testing Equipment And Facilities In LGED Laboratories . Chittagong Region.

Book Title

Survey Report Of Testing Equipment And Facilities In LGED Laboratories. Volume II.vi: Annex Data Book. Present Status Of LGED Laboratories. Faridpur R Survey Report Of Testing Equipment And Facilities In LGED Laboratories . Volume II- i: Annex Data Book . Present Status Of LGED Laboratories. Barisal Survey Report Of Testing Equipment And Facilities In LGED Laboratories. Volume II.-Viii: Aqnnex Data Book. Present Status Of LGED Laboratories.khulna. Survey Report Of Testing Equipment And Facilities In LGED Laboratories .volume II-Vii: Annex Data Book. Present Status Of LGED Laboratories. Mymensing Proceeding Of The Workshop On Monitoring And Prediction Of Erosion Held On 18 Septyember, 2004. Monitoring And Prediction Of Bank Erosion Along The Right Bank Of The Jamuna River,2005. Annual Report. July 2003--June 2004. Draft On Standard Specifications Of Items Of Works And Schedule Of Rates.part- 1---5. Draft On Standard Specifications Of Items Of Works And Schedule Of Rates.part-1.copy-2. Draft On Standard Specifications Of Items Of Works And Schedule Of Rates. Part-Ill. Copy-4. SMEC International pty Ltd. Australia In Association With. SMEC International pty Ltd, Australia In Association With. SMEC International Pty Ltd, Australia In Association With And Development Design Consultants Ltd, Bangladesh. SMEC International Pty Ltd.australia In Association With And Development Design Consultants Ltd, Bangladesh. SMEC International Pty Ltd, Australia In Association With Development Design Consulants Ltd. Bangladesh. Road Design Standards Rural Raod . Preparation & Planning Of Project Training Material On Road Roller Driving Training Material On Data Collection Ptocedure Administering The Contract Rural Transport Improvement Project Resettlement Action Plan (First Phase) Training Manual On Infrastracture Inventory Data Base Development & Base Map Preparation Supervision Of Infrastructure Construction (Sic) Course Training Handout On Environmental Laboratory And Water Quality Testing. National Open Tendering Method. The Procedures For Implementation Of The Public Procurement Regulations 2003. Planning And Implementation Methodology For Bridge & Culvert On Rural Roads (BCRR) Under RDP-21. Practical Training On Tube-Well Construction. Training And Evaluation Report Guidelines For Twin Pit Latrine Construction . Report On Workshop For City Corporation And Pourashava Authorities

Book Title

Guidelines For Formation Of Clusters Of CDCs Curriculam On Training Of Trainers Trainers Guide Material For FC Meeting. Small Business. Report Of Workshop On Socio-Economic Development Plan. Field Testing Of Construction Materials. Financial And Accounting Training Manual. Internal Audit Training Manual . Basic Computer Training Course . 2003/04 . Training On Procurement Of Works (Volume-II Of 11) For IDA & GoB Funded RTIP Project . Implementation Guidelines . Rural Transport Improvement Project .(Rural Development Projects -26) Presentations And Handouts Of Environmental Training Part-1. Training Course On Maintenance Of Civil Works In Pourashava. Standard Specifications For Electrical Works . Local Government Engineering Department RRMIMP-2(RDP 11) & MIS CELL . Environmental Management Field Handbook For Rural Road Improvement Projects . Rural Transport Improvement Project(RTIP). Resettlement Frame Work . Mechanical Training On Maintenance Of Equipment And Service Vehicles . Financial Account Management And Audit Training Course Funded By:RIIP(IST)/RDP-25 . Progress Report Of JICA Expert On Rural Infra. Development. No.2. (2-Copy) Canal Digging Programme Guidelines On Operation & Maintenance Of Canal, Embankment & Water Controlstructures. Innovative And Successdul Initiatives In Enterprise Development In Agrarian Redorm Communities. National Workshop On Options For Flood Risks And Damage Reduction In Bangladesh. Recommendations. Construction Of Union Parishad Complex Bhaban And Development Of Connecting Roads Project. Rural Road And Structure Maintenance Manual . Road And Road Structure(RRS).(Schme Preparation Const. & Quality Control). Siets Steps Towards Good Governance Through Icts . Report On Materials Test On Rural Road Pavement . Standard Specifications For Feeder Road Type - B & Rural Road Type-R1 Under LGED. User Manual Progress Monitoring System . Guidelines For Rural Roads And Culverts Maintenance Programme Rural Infrastructure Maintenance Management Unit(RIMMU) . Guidelines For Rural Roads And Culverts Maintenance Programme . Guidelines For Maintenance Of Rural Roads And Culverts. (English Version)

Book Title

Progress Roport Of JICA Expert On Rural Infra. Development No 2 . Government Of The People's Republic Of Bangladesh.Technical Specifications For Bridges On The Upazila And Union Roads . Construction Of Union Parishad Complex Bhaban And Development Of Coneecting Roads Project . Water Resources Laws In The Philippines . Proceedings Of Participatory Rural Planning Workshop . Water Resources Laws In Bangladesh . Road Structures Manual Part - A . Standard Designs.(Big) Manual On Prestressed Concrete Bridges Part - A . Standard Designs.(Big) Manual On Prestressed Concrete Bridges Part - A. Standard Designs. Vol - 1 Of 2.(Big) Manual On Prestressed Concrete Bridges Part -A. Standard Designs.(Big) Standard Designs Catalogue . Vol - II. Hydraulic Structures.(Big) Flood Proofing Project Integrated Food Security Program. Design Manual For Community Structures. Drawings : Vol - II.(Big) Training On Quality Control Of Construction Materials (QCT). Report On Developed For Progress Monitoring System . Report Of Ex- Participants Of Counterpart Training In Japan And Technical Information Exchanging Program In Combodia. Documentation Of Participatory Rural Planning Workshop . Proceedings Of " Seminar On Geographic Information System And Remote Sensing For Development" Report On JICA Technical Information Exchange Program In Srilanka On Strengthening Water Management Cooperative Association. Report On Application Of GIS For Rural Planning . Report On Technical Library . Independence Of Bangladesh In 266 Days History And Documentary Evidence . Mancaps (Organisation Manual Of LGED. Mancaps Management Capability Strengthening Project Of LGED Bangladesh TA-1809-BAN Asian Development Bank Action Plan Update 1998 Directions In Manag. Manual For Growth Centre Planning . Road Pavement Design Manual . Government Of The People's Republic Of Bangladesh Local Government Division LGED Road Pavement Catalogue . Documentation Of " Strategy Workshop On Training Need Assessment-2004" Participatory Rural Planning, 2nd Workshop In Bhedorganj Upazila. Report On Training Needs Assessment Of LGED Staff (2004-2005).Vilume:l: Main Text And Core Annexure Report On Technical Information Exchanging Program, Counterpart Training, And Dissemination Seminar.

Book Title

Water Level Fata In Ganges Padma River Basin Participatory Rural Planning In Shariatpur District . Quality Control Manual. Documentation Of " Integrated Rural Development Seminar 2003" Proceedings Of " Integrated Rural Development Seminar 2003" Survey Report Of Equipments And Facilities For Soil Tests At Laboratories In LGED. Survey Report Of Testing Equipment And Facilities In LGED Laboratories Volume I: Main Text & Core Appendixes. Meteorological Data In Bangladesh Station: Sylhet. Meteorological Data In Bangladesh Station: Rajshahi. Meteorological Data In Bangladesh StationL Chittagong. Meteorological Data In Bangladesh Station : Comilla . Meteorological Data In Bangladesh Station : Cox's Bazar. Report On Training Needs Assessment Of LGED Staff (2004-2005) Volume - III Supplementary Annexure On Analysis. Meteorological Data In Bangladesh Station : Rangpur . Meteorological Data In Bangladesh Station : Dhaka . Meteorological Data In Bangladesh Station : Barisal . Meteorological Data In Bangladesh Station : Faridpur . Meteorological Data In Bangladesh Station : Maijdee . Meteorological Data In Bangladesh Station : Madaripur . Meteorological Data In Bangladesh Station : Jessore . Memoirs . Fourth Post Graduate Course In Remote Sensing And Geographic Information System. Gender Equality And Decent Work . Good Practices At The Workplace . Company Profile Of Engineered Solutions , Vortex Consultants . Proposal For Improving Housing Conditions For Low Income Communities In Dhaka . Towards A Better Life In Dhaka. -50 Miles Formula & Other Aspects . Rural Local Government In Bangladesh. 25 Silver Jubilee 1979-2004 CIRDAP Fighting Poverty Together For Rural Development. Birth Registration A Vehicle For Child Rights Promotion . Waste Management Plan For Berkshire . An Organization Of And By The Disebled Persons For All Annual Report 2001. Maintenance Of Rural Infrastructure Annual Report 1998/99. Documentation Of " Integrated Rural Development Seminar 2003" Approach For The Development Of Agriculture And Rural Roads . An Evaluation Of NGOs' Performance In Selected Activities In STIDP II Pourashavas . 2003 Brief Introduction To Products. Problems On Concrete Bridge Design.

Book Title

Reducing The Cost Of Doing Business In Bangladesh. Annual Report 1995 . Malaysian Roads General Information 1995. Company Brochure. Maps On Microcredit Coverage In Upazilas Of Bangladesh People's Report On Bangladesh Wnvironment 2001 Vol II Database. People's Report On Bangladesh Environment 2001 Volume I Main Report Manual For Growth Centre Planning. Urban Slums In Bangladesh: Reproductive Behavior And Family Planning Situation. Training Calendar - 2003. Maintenance Of Rual Infrastructure (MT -T). Course. Annual Post Development Benefit Evaluation Report. Urban Poverty Reduction Project. Annex - I. Urban Poverty Reduction Project. Annex - Il. Urban Poverty Reduction Project . Annex - Ill. Planning And Implementation. Training Of Trainer,s Course. Maintenance Of Rural Infrastructure. Field Testing Of Construction Materials. Road And Road Structure Course ( RRS) Government Of The Peoples Republic Of Bangladesh Ministry Of Water Resources. Volume - II. Annexes Of The Guidlines. External Evaluation Small- Scale Water Resources Development Sector Project - 1. Market Directory Of Bangladesh 2000. Chittagong Division. International Workshop On Arsenic Mitigation. Work Assistant Course - 2. (Bengali) Work Assistant Course - 3.(Bengali) Master Plan Study For Portable Steel Bridge Construction On Feeder And Rural Roads In Bangladesh . Final Report. Volume 1 Of Vl. Master Plan Study For Portable Sreel Bridge Construction On Feeder And Rural Roads In Bangladesh . Final Report. Volume - IV Of Vl. Master Plan Study For Portable Steel Bridge Construction On Deeder And Rual Roads In Bangladesh . Final Report. Volume III Of Vl. Roughton International In Association With Desh Upodesh Limited. Flood Proofing Pilot Project. CARE - Bangladesh, Madan, Netrokona. The Master Plan Study On Small Scale Water Resources Development For Poverty Alleviation Though Effective Use Of Surface Water In Greater Mymensingh Training Of Trainer,s Course.

Book Title

Contractors Training ( Quality Control & Management ) Course. Road And Road Structure Course ( R R S) Document Of The International Fund For Agricultural Development . Document Of The International Fund For Agricultural Development . Government That Works. Government That Works . Umgram/Uttar Hogla An Ecological Approach To Village Environment In Bangladesh . Amgram/Uttar Hogla An Ecological Approach To Village Environment In Bangladesh. Amgram/Uttar Hogla An Ecological Approach To Village Environment In Bangladesh . International Workshop On Rural Infrastructure . Principles Of Design Of Drainage Sluice . Beneficiary Participation And Project Management . Maintenance Of Rural Infrastructure Course. Design, Supervision & Monitoring Of Second Rural Roads And Markets Improvement And Maintenace Project . Kalni-Kushiyara River Management Project. Short Course On River Training And Management. Designers, Developers, Builders & Traders. Impact Evaluation Study On Participatory Development Processes In ADB Operations In Bangladesh . Beneficiary Participation And Project Management Volume 2 Of: Biodata. Country Strategy And Program Update . Design And Supervision Consultancy Services Under Municipal Services Project . Design And Supervision Consultancy Services Under Municiple Services Project . Fomulation Of Third Rural Infrastructure Development Project. Bangladesh . Formulation Of Third Rural Infrastructure Development Project . Bangladesh Formulation Of Third Rural Infrastructure Development Project Bangladesh Irrigation Water Use In Agriculture In Japan Manual For Rural Roads And Culverts Maintenance Bangladesh Supervision And Inspection For Land Consolidation Work In Japan Questionnaire For The Project Beneficiaries. Road Pavement Catalogue . Structural Guidelines . Research Report 83 Developmental Impact Of Rural Infrastructure In Bangladesh . Beseline Survey Report On Chhaygaon Union Final Report . Training Manual On Biogas Technology. Project On Production And Uses Of Biogas And Organic Fertilzer For Maintaining. The Law Of International Water Resources.

Book Title

Newsletter JICA Bangladesh Office. Volume : 10. Manual On Uniform Financial Management System Software. Welcome To The JICA Experts For Visiting LGED, Mymensingh. Planning And Implementation Guideline. Planning And Implementation Guideline. Land Surveying Department. Stage - 1. Land Surveying Practice. Small Scale Water Resources Development Sector Project. Standard Design Catalogue. ( Vol -!) Manual On Prestressed Concrete Bridges Part - C. Design Examples. Bangladesh Rural Infrastructure Srrategy Study. The Dynamic Physical And Human Environment Of Riverine Charlands. Land Surneying. Volume - 1. Technical Specifations For Buildings. Exercises On Irrigation. The Project Of Haraz Agricultural Human Resources Development Center. Maintenance Guidelines For The Rural Infrastrure Of Integrated Food Security Program. LGED/CARE/USAID. Proceedings Of International Seminar For Sustainable Rural Denelopment. Project Proforma ( PP) For Rural Development Project - 21 : Infrastructure . Introduction To Concrete And Basic Testings. Fundamental Soil Mechanics And Soil Tests For Quality Control. Testing Manual Series Cement , Aggregate And Concrete. Operation & Maintenance Of Water Resource Structures, Guidelines. Manual On Land And Water Use Planning. The Master Plan Study On Small Scale Water Resources Denelopment . In Greater Mymensingh Of Bangladesg . Final Report. ( Main Report). The Master Plan Study On Small Water Resources Development. Greater Mymensingh Of Bangladesh. Final Report ( Annexes) Road Structures Manual Part - A . Design, Criteria, Guidelines And Selection Of Structures. Road Structures Manual. Part - B. Structure Works Manual. Road Structrues Manual. Part -C. Structure Works Version - 1.0. The Road Structure Software. Canal Digging Programme. Guidelines On Operation & Maintenance Of Canal, Embankment & Water Control Structures. Report On Training On Operation & Application Of Total Station. Flood Proofing Project Integrated Food Security Program. Main Report Volume 1 A Profile Of LGED : Commitment Towards Poverty Alleviation. Bangladesh Country Paper. Guidelines On People,s Participatory Process At The Planning, Implementation,management And Maintenance Of '' Hats'' Markets And Ferry Landings. Local Partnerships For Urban Poverty Alleviation Project Progress Report. Jan -2000- Dec - 2002. Report On '' The Study Works On Trainings Needs Assessment (TNA) Of LGED Staff.

Book Title

Road Design Standards. Standard Design And Costing For Zila, Upzila And Union Roads , Bridges And Culverts. Development Project Proposal (DPP) For Chittagong Hill Tracts Rural Development Project. Feasbility Study Report On Greater Chittagong And Noakhali Districts Rural Infrastructure Development Project (CNRIOP). Draft Final Report CIRDAP : A Stragetegic Frame Work For The New Millennium.0 Manual On Training Implementation. Approach To An Original Paper By Testing Equipment. Documention Of " WorkShop On Michinoeki " Final Report On Study Works On Improvement Of Maintenance Management System In LGED For Rural Roads Through The Use Of Dynamic Segmentation. Guidelines For Utilization Of Land And Soil Resources .Vedorganj Upazila. Shariatpur District. Terminal Evaluation Of RDEC Setting Up Project. Progress And Achievement Of RDEC Setting Up Project. Resting Equipment For Concrete Engineers (Part - 1) Basic Stage And (Part -Il) Advanced Stage. Consultancy Services To Support Implemementation Improvent Plan.( LGIP). Final Report. User,s Manual For Road & Structure Database Management System - Ill. Manual On Implementation Of Programmes On Tree Plantation & Conservation And Distribution Of Tree Resiurces Under The Local Government Engineering Dep Report On Training Needs Assesssment Of LGED Staff ( 2004 -2005). Volume - I. Main Text And Core Annexure. Report On Training Needs Assessment Of LGED Staff (2004-2005). Volume - II. Supplementary Annexure On Questionnaire. Gender Atlas Of Babgladesh Manual On Prestressed Concrete Bridges Part - B - Design Criteria And Guidelines. Laws And Ordinances On Water. C-1. Manual For Asphalt Pavement. 1989. Introduction To ArcGIS. Bangladesh Rural Infrastructure Strategy Study. Natural Ressources Plannier Ltd. Company Profile. Quality Control Training For Lab Technicians. Bill Of Quantities Of Michi - No - Eki. Road Maintence Management. Inception Report. Technocal Assistance Services To Support Implentation Of The Institutation Strengthening Action Plan. ISAP- TA. GIS Database For Bhedarganj. Mapping Chittagong Hill Tracts Censur Indicators 2001 And Trends (1981- 2001) (Bangladesh) GOJ-GOB Programme Level Evaluation Japanes Assistance To LGED Ralated Sectors. (Draft Final Report) GOJ- GOB Programme Level Evaluation Japanese Assistance To LGED Related Sectors. Final Report.

Book Title

Agriculture Sector Programme Support Bangladesh. Phase Il - 2006-2011.( Draft Programme Document) Hdm-4 Application And Economics Analysic. Participants Handbook. Participants Handbook Field Testing Of Construction Materials. Training Module On Stand - Pro Software. 11 - 22 Dec - 2005. Trainers Guide. Introduction To Arc GIS. Manual Roughness Counter User's Guide. Road Roughness Survey Manual. Field Testing Of Construction Materials. Project Monitoring Ststem Of LGED. Training Manual. Global Positioning System.(GPS) Training Manual On ArcView GIS With Network & Spatial Analyst. Training On Quality Control Of Construction Works. Training On Quality Control Of Construction Works. (Qct - 2) National Workshop On Options For Flood Risk And Damage Reduction In Bangladesh. Working Papers. Bhederganj Upazila Rural Development Pilot Project. Material For FC. Meeting Feb-24- 25.2004. Training Material On Data Collection Procedure. Report Prepared For Japan Interational Cooperation Agency. Terminal Evaluation Of RDEC Setting Up Project.progress And Achievement Of RDEC Setting Up Project. Report On Workshop For City Corporation And Pourshava Authorities. Quarterly Progress Report - XXll. Welcome To JICA Exparts. Third/ Northern Rural Infrastructure Development Project (RDP-21) Training On Roughiess Survey On Rural Road. Link Model On Rural Development Financial Account Management And Audit Training Course. Maiontenance Of Rural Infrastructure Course. Training On Procurements Of Works. (Volume 1 Of II ) For IDA & GOB. Funded RTIP Project. Unlocking The Potential Nation Strategy For Accelerated Poverty Reduction. The Procedures For Implementation Of The Public Procurement Regulataions - 2003. Auto CAD Training Manual. Study On Land And Land Reforms In Bangladesh. Main Repot Volume - 1. Study On Land And Reforms In Bangladesh. Appendices - Volume -II. Fleid Maintenance Training Course For Mechanical Foremen And Mechanics.

Book Title

Evaluation Of The Intensive Rural Works Programme IRWP In Bangladesh. Training Manual On Biogas Technology. Submission Of Final Report On Development Project Monitoring System. Participatory Rural Planning. 2nd Work. Shop In Bhedorganj Upazila. Report On Training Need Assessment Of LGED Staff.1995 - 96. Supervison Of Infrastructure Construction (SIC) Course. Proposal For Uniform Course Of Action On Community Mobilization In The Pourashava. Manual Of Process Description (PD) Method. Project Completion Report. Practical Training On Tube-Well Construction. A Report On Training For Lgi Representatives On Financial Management,accounting Local Resource Mobilization , Operation And Maintenance Of Markets And Trainingn And Evaluation Report. (Draft) Step-Up - Plan For Rural Development Engineering Centrer. 2005 Annual Report Volume -1. Minor Irrigation Survey Report. 2004 -2005. Actorsof Local Governance Information On Project Approaches And Capacity Building Materials. Scaling - Up Rural Sanitation In South Asia. Unlocking The Potentioal. National Strategy For Accelerated Poverty Reduction. Institution Studies For Legal Framework Of Water Management Organizations. Final Report. Inter - Annual And Intra Seasonal Variability Of Temperature And Precipitation Of Bhutan. Report On Training Needs Assessment Of LGED Staff (2004 - 2005)Volume - I. Main Text And Core Annexure. Water Lifting Devices And Groundwater Management For Irrigation Irrigation / Water Management For Sustainable Agricultural Development Water Resources Laws In Thailand Water Law Of August 8, 1866 Water Resources Laws In The Philipines Rain Water Harvesting Manual Capacity Building In The Field Of Water Resources Engineering And Management In Bangladesh Assessing Performance Of Particepatory Warer Management In Bangladesh Through Field Survey And Pilot Experiment To Propose A Rational Management Pra. Water: Introducing Environmental Flow Assessment In Bangladesh:multidisciplinary Collaborative Research Water: Design Manual For Placed-Block Revetments:wave Protection In Haor Areas Water:Report On Scour Tests And Measurements Report On Flow Field Tests And Measurements Report On Sediment Diversion Teste Pilot Application Water: Prediction For Bank Erosion And Morphological Changes Of The Jamuna River 2006

Book Title

Guidelines For Environmental Assessment Of Water Management (Flood Control, Drainage And Irrigation) Projects Guidelines For Environmental Assessment Of Water Management (Flood Control, Drainage & irrigation) Projects Water: Proceedings Users Conference 2005 And Associated Seminars Guidelines For Environmental Assessmentof Water Management(Flood Control , Drainage & Irrigation ) Projects Municipal Services Project Guound Water Resources & Hydro Geological Investigation In And Around Khulna Citty Municipal Services Project Ground Water Resources & Hydro Geological Investigation In And Around Khulna City (Draft Final Report) Institutional Studies For Legal Framework Of Water Management Organization Final Report Annual Report(July2005-June2006) Water Resources Planning Organization Water: Coastal Development Strategy District Water Resources Assessment Gazipur District Water Resources Assessment Dinajpur Bangladesh Agricultural Development Corporation Ground Water Monitoring Data Book Water: The Summary Report On The Findings Of Benchmark Survey Of 10-Sub-Projects (Batch) Water: The Report On The Survey Findings Of The Sub-Profect " Char Bhurungamari FCD" (Sp- 5262) In Bhurungamari Upazila Of District Kurigram ... Water: The Report On The Survey Findings Of The Sub-Profect " Rajapur Drainage" (SP-5288) In Rajapur Upazila Of District Jhalokati ... Water: The Report On The Survey Findings Of The Sub-Project " Barung River WC " (SP- 3062) In Tetulia Upazila Of District Panchgorh Water: The Report On The Survey Findings Of The Sub-Project"Akhira-Saidpur Khal Drainage WC"(SP-5313) In Patnitala Upazila Of District Noagaon ... Water: The Report On The Survey Finding Of The Sub-Project " Puthia-Falia FCD" (SP-5239) In Ullapara Upazila Of District Serajgonj ... Water: The Report On The Survey Findings Of The Sub-Project "Banderpara-Chatra Beel WC" (SP-5246) In Mithapukur Upazila Of District Rangpur... Water: The Report On The Survey Findings Of The Sub-Project "Raufkhali FCD"(Sp-5232) In Jiban Nagar Upazila Of District Chuadanga... Water: The Report On The Survey Findings Of The Sub-Project " Ramkrishnapur Drainage" (Sp-5330)in Muksudpur Upazila Of District Gopalgonj... Water: The Report On The Survey Finding Of The Sub-Project " Rajapur-Patilapara FCD"(SP-5345) In Bauphal Upazila Of District Patuakhali ... Water: The Report On The Survey Findings Of The Sub-Project " Jetua-Kanaidia FCD"(Sp-5335) Tala Upazila Of District Satkhira Water : State Of The Coast 2006 Overseas Road Note 9 A Design Manual For Small Bridges.

Book Title

Municipal Services Project (MSP) Banderban Pourashava Water Supply Fesibility Study. International Symposium On Mountain Environment And Development. LACI Based Financials & Management Information System (LACI- F& MIS) Report Of The Working Group Harmonization Of SEME/EME/BITE. Comparative Study Of Technical Quality Rural Roads And Structures Component Draft. Guidelines For Particalpatory Water Management. Special Assistance For Project Formation (SAPROF) For Small Scale Water Resources Development Project Special Assistance For Project Formation( SAPROF) For Small Scale Water Resources Development Project Socio Economic Monitoring And Evaluation Study RDP - 7. Final Rural Transport Study Special Report. Guidelines For Users Participation In Planning Design And Implemention Of Structures On Rural Road (SRR). Consultations With Govt And Ricleshaw Operators Organizations. Rickshaw Drivers Knowledge On Traffic Rules And Road Behaviur A Survey In Dhaka City. Refresher Course On Participation For LGED District Sociologists And Community Organizers, RRMIMP-2. Road Pavement Catalogue. Field Testing Of Construction Materials Course. LGED Accounts Manual. DRAFT. Design Manual For The Construction Of Culverts, Small Bridges And Sluices . Road Pavement Course (PAV) Report On Visit To Kenya. Institutional Issues In Participation DRAFT Roads And Railways Division Bangladesh Road Transport Aythority 2002-2004. Briefing Session On Urban Sector Regulatort Frame Work . Urban Governance And Infrastructure Improvement (SECTOR)project(UGIIP) Orientation Course Manual On The Participatory Planning Process For Markets And Ghats. Applications Of Remate Sensing In Asia And Occania Environmental Change Monitoring . Remote Sensing Note Bench-Mark Survey Report Of The In Depth Socio- Economic Impact Study Of Feeder Road Type-B Improvement Rural Development Project-7. Equipment Procurement Management. Bangladesh Public Expenditure Review Incoterms International Commercial Terms 1990. Standard BID Evaluation Form. Procurement Of Goods Ar Works. Standard Bidding Docurement Of Goods. Bangladesh Rural Infrastructure Strategy Study. World Development Report 1996 From Plan To Market.

Book Title

ICC Guide To Documentary Credit Operations For The UCP 500 A Stage - By - Stage Presentation Of The Documentary Credit Process. Overseas Road Note 31 A Guide To The Structural Design Of Bitumin Surfaced Roads In Tropical Countries. Satellite Image Analysis With A Personal Computer. Implementation Completion Report Bangladesh Rural Roads And Markets Improvement And Maintenance Project(Credit 1940-BD) Manual On The Design Construction And Maintenance Of Low Cost Pourfiush Waterseal Latrines In India. A Study On Low Cost Means Of Rural Transport. Guidelines For Users, Participation In Planning, Design And Implementation Of Structures On Rural Road(SRR) Assessment And Planning Workshop On Market & Ghat Management And Maintenance. Socio-Economic Monitoring And Evaluation Repart On Sreepurbarmi Road In Sreepur Thana Of Gazipur District. Phase - Report Executives Summary. Draft Community Participation In Rural Infrastructure Development Bangladesh Rural Employment Sector Programme Study Of The Efficiency And Organisation Of The Infrastructue Development Project. Road Construction In The Nepal Himalaya: The Experience From The Lamoosangu - JIRI Road Project. Proceedings Users Conference 2005 And Associated Seminars. Roads And Highways Department Towards Effective Asset Management Of Roads & Bridges. International Seminor On Geosyntheties. Rural Roads And Markets Improvevment And Maintenance Project (CREDIT No. 1940 BD) Monsoon Forecasting With A Limted Area Numerical Weather Prediction System Environmental And Synoptic Conditions Associated With Norwesters And Tornadoes In Bangladesh... Disaster Response Management A Guid Book For The Field Activist Bangladesh Country Assestance Strategy 2006-2009 Master Plan Study For Portable Steel Bridge Construction On Feeder And Rural Roads In Bangladesh (Final Report) Beneficiary Participation And Project Management Road Roughness Survey Final Report NOAKHALI Road Roughness Survey Final Report Cox's Bazar Road Roughness Survey Final Report SHARIATPUR Road Roughness Survey Final Report KISHORGONJ Road Roughness Survey Finsl Report COMILLA Beel Gobindapur Subproject Faridpur District , Nagarkanda Upazilla (SAPROF) For Small Scale Water Resources Development Project Tekhala-Naodhara-Katajora Khal Subproject Mymensingh District, Muktagacha Upazila (SAPROF) For

Book Title

Small Scale Water Resources Development Project Kalagarh-Datiapara Khal Subproject Sunamganj District, Dhormopasha Upazila(SAPROF) For Small Scale Water Resources Development Project Rouha CAD Subproject Mymensingh District, Gaffargaon Upazila (SAPROF) For Small Scale Water Resources Development Project Rouha CAD Subproject Mymensingh District, Gaffargaon Upazila (SAPROF) For Small Scale Water Resources Development Project International Conference On Water And Flood Management (ICWFM) International Conference On Water And Flood Management(ICWFM-20070) Banderban Pourashava Water Supply Feasibility Study Guidelines For Participatory Water Managements USE Of K-1-60 Bitumen Emulsion In Pavement Construction Schedule And Specification Of Accepted Items. Secondary Towns Infrastructure Development Project-Il Gender Action Plan (2001-2002) Report On Maintenance Of Rural Infrastructure Compiled For Consideration And Review In The Workshop Held In Dhaka During 17-18 Feb.1992. Rural Infrastructure Impact Study With Special Reference To RDP-7 And Other Recent Projects. Socio- Economic Monitoring And Evauation Study RDP-7 DRAFT Rural Transport Study Special Report. Socio Economic Monitoring And Evaluation Study RDP-7 DRAFT Rural Transport Study Special Report. Strategies For Developing Secondary Cities And Towns In Bangladesh. Overseas Road Note 3 A guide To Surface Dressing In Tropical And Sub - Tropical Countries. Overseas Road Note 1 Maintenance Management For District Engineers. Bangladesh National Report Progress Of Implementation Of The Hebital Agenda (1996-2001) Water: Prediction For Bank Erosion And Morphlogical Changes Of The Ganges And The Padma Rivers 2007 Water: Prediction For Band Erosion And Morphological Changea Of The Jamuna River 2007 Facilitator Guide Detection, Management And Surveillance Of Arsenicosis In South-East Asia Region Bangladesh Dhaka: Improving Living Conditions For The Urban Poor Basic Design Study Report On The Project For Improving The Living Standard Of Vulunerable People Of The Haor Areas In The Peoples Republec Of Bangla.. District Water Resources Assessment Cox Bazar District Water Resources Assessment Chapal Nawabganj District Waterresources Assessment Noakhali District Water Resources Assessment Joypurhat District Water Resources Assessment Thakurgaon District Water Resources Assessment Chittagong District Water Resources Assessment Feni District Water Resources Assessment Manikganj

Book Title

District Water Resources Assessment Naogaon Statistical Yearbook Of Bangladesh Paurashavas 2000 - 2002. Paurashava Manual Paurashavas Statistical Yearbook Of Bangladesh - 1998 - 1999. The 1998 Flood: Impact On Environment Of Dhaka City 2004 Floods In Bangladesh Damage And Needs Assessment And Proposed Recovery Program Human Development Report 2005 Bangladesh Goverance Report 2007 Unbunding Governance Flow Of External Resources Into Bangladesh Guidelines For Geometric Design Of Very Low - Volume Local Roads (ADT < 400) 2001. Reinforcement For Concrete.materials And Applications. Concrete Repair Guide. Guide To Sealing Joints In Concrete Structures. Shear Reinforcement For Slabs. Guide To Curing Concrete. Sesmic Analysis And Design Of Concrete Brisge Systems. Suggested Development Splice And Standard Hook Provisions For Deformed Bars In Concrete. Chemical Admixtures For Concrete. Recent Appoaches To Shear Design Of Structural Concrete. Analysis And Design Of Reinforced Concrete Bridge Structures. Design, Manufacture,and Installation Of Concrete Piles. Control Of Deflection In Concrete Structures. Guide For Widening Highway Bridges. Guide For Concrete Inspection. A Guide For The Use Of Waterproofing, Damppoofing, Protective, And Decorative Barrier Systems For Concrete. Testing Aggregates.Section 103.2 Sedimentation Test. Testing Aggregates.Section 105.2 Elongation Index Of Coarse Aggregate. Tests For Mechanical And Physical Properties Of Aggregates. Part 5. Tests For Mechanical And Physical Properties Of Aggregates.part 3. Testing Aggregates Section : 105.1.Flakiness Index. Tests For Mechanical And Physical Properties Of Agregates. Part - 2. Guide For The Design, Construction,and Repair Of Ferrocement. Recommendations For Testing Of Aggregates. Part -1. Routine Maintenance Of Concrete Bridges. Guide For Repair Of Concrete Bridge Superstructures . Tests For General Properties Of Aggregates. Part -5. Common Equipment And Calibration.

Book Title

Testing Aggregates -Part123: Method For Determination Of Alkali - Silica Reactivity - Concrete Prism Method. Pre - Conference Paper Volume Of International Conference On Water And Flood Management.12 -14 March 2007 Dhaka,Bangladesh.Volume - 1. Pre - Conference Paper Volume Of International Conference On Water And Flood Management.12-14, V-2 Rural Road Maintenenance Project In Hill Districts Throug Destitute Women (Second Phase) Planning And Implementation Methodology For WFP Assisted Afforestation Schemes To Be ''Rural Development Programme. Guidelines For Road Safety Audit. May - 2005. Roads And Highways Development Towards Effective Asset Birth Standard Methods Of Test For Soils For Civil Guide For Concretehighway Bridge Devk Construction Guide For Design And Construction Of Concrete Parking Lots Integrated Of Environmental And Quality Management British Standard Testing Aggregates.part-121.method For British Standard Testing Aggregates.part-124.method For Britihs Standard Testing Aggregates.part-102. Method For British Standard Testing Aggregates. Part-101.guide To British Standard Testing Aggregates. Part-103. Method For British Standard Testing Aggregates.part-118. Method For British Standard Testing Aggregates. Part-104. Method For British Standard Testing Aggregates. Part-106. Method For Tests For Mechanical And Physical Properties Of Aggregates. Code Of Practice For Site Investigations. British Standard Testing Aggresive. Part-7 Shear Strength British Standard Methods Of Test For Civil Engineering British Standard Testing Aggregates. Part-3. Chemical And British Standard Testing Aggregates . Part-2. Classification British Standard Testing Aggregates. Part-1. General Method Of Test For Soils For Civil Engineering Purpose. British Standard Testing Aggregates. Part-9. In Situ Tests. British Standard Testing Aggregates. Part-8. Shear Strength British Standard Testing Aggregates . Part-102. Method For British Standard Testing Aggregates. Part-119. Method For British Standard Testing Aggregates. Part-117. Method For Concrete Foundations. Guidelines For Skid Resisteent Pavement Design

Book Title

Bangladesh National Report The Application For Japans Grant AFD For Improvement Of Irrigation Facilities Of Of 5 Blocks In Dinajjpur And Panchaghar Of Bangladesh. List Of Bebchmark. Sep-2005. Traverse Adjustment Reports. August-05 Operational Guidelines.( Detailed Manual ) Mangement Information System In The Bangladesh National Family Planning Program. Service Statistical Annual Report - 2007 River Survey Project Special Report - No 1. No- 2 Water Level Gavging Stations. No- 3. Bathymetnic Surveys Stave Discharge Relationship For The Jamuna At Bahadurabad. No- 5, Qualitative Assessment Of Possible Morphological Impacts Of Fap Implementation No-6, Flood Plain Levels And Bankfull Discharge. No- 7, Geomonphology And Channel Dimesions No-8, Bed Material Sampling In Ganges Padma Old Brahmaputra And Jamuna. No-9, Bedform And Bardynamics In The Main Rivers Of Bangladesh. No-10, Morphology Of Gorai Off - Take No-12, Special Report Optimization Of Sediment Measurement. No-13, Spediment Transport Predictors No-14, Mineralogical And Physical Properties Of River Sediments. No-16, Secondary Currents And Monphological Evolution In A Bifureated Channel. No-17, Spatial Presentation And Analysis Of Hydnaulie And Monphological Data. No-18, Sediment Rating Curves And Balances. No-19, Joint Measurements B W D B/ R S P Hydrology. No-20, Joint Measurement B W D B/ Rsp Hydrology No-21, Guide To R S P Database. Final Report Annex -1 Surveys A-2, Sustainable Survey Techinques. A-4, Sedimentology. River Research Institute. Intensive Rural Works Programme Bangladesh Prediction Of River Bank Erosion Along The Jamuna The Ganga And The Padma Rivers-2008 Rural Bangladesh Socio Economic Profiles Of W F P Operational Areas & Benefiaries. Study Of Household Food Security In Urban Slum Areas Of Bangladesh-2006 Progress Report Of Jica Expert On Rural Infrastrueture Development. No-1 Progress Report Of Jica Expert On Rural Infrastrueture Development.no-2

Book Title

Progress Report Pf Jica Expert On Rural Infrastruegure Development. No-3 Evaluation Of The Infrasturueture Development Project Under Resp-1 1986-90 & 1990-96 Draft Final Report National Budget 2008-2009 Proceedings Fourth Annual Paper Meet.23-25oct.1997 Of Engineers Of Bangladesh Annual Report Of L G E D Activities Financial Year -2005-06 Schedule Of Rates. Dhaka,gazipur,narayangonj,narshindi,munshiganj, July-2006. World Environment Day 5 June-2004 Proceeding Of The Seminar Of Evolution Of A Scientific Sustem Of Flood Forecasting And Warning In The Gangas Application For Prequalification Of Civil Works Under R D P -21 ( Tridp) Pourashava Statistical Yearbook Of Bangladesh. 1997-98 Guidelines For The Disbursement Of Funds Of Financial Cooperation And Comparable Programmes By Kfw Jamuna Bridge Access Roads Project Operating Modalities With Local Government Engineering Department Preparation Of The Rural Infrastrveture Development And Maintenance Project Noakhali Dist. Technical Audit Services For Second Rural Roads & Markets Improvement And Maintenence Project ( Rrmimp-2) Training For Job Creation Within The Community Future Role And Organizational Structure Of Bangladesh Rural Development Board. Bangladesh Rural Infrastructure Strategy Study Irrigation Management Training For Institutional Development. A Case Study From Malaysia. Report On Gender Strategy Workshop Buet-Dvt Linkage Project. Indian Highway May-1999 Special Assistance For Project Formation ( SAPROF) For SSWRDP. Final Report Volume-2 Australian Agency For International Development Small Activities Scheme Draft Completion Report RDP-6. Infrastrcture In Old Dhaka District Manikganj Disteict. Project Completion Report. Cyclone Shelter Preparatory Study. Stage-1.feasibility Phase Revised Main Report. Physical Growth Analysis Of Jessore Pourshava With Remote Sensing Techniques. National Policy For Safe Water Supply & Sanitation -1998 Trainers Manual For Training For Job Creation Within The Community Tender Document For The Procurement Of Modular Pin System Portable Steel Bridges( PSB) LGED`S Annual Report Fiscal Year -2004-2005. LGED Financial Year -2005-06 Maping Chitagong Hill Tracts Census Indicators 2001 & Trends. Bangladesh. National Policy For Safe Water Supply & Sanitation-1998 Project Proforma For Secondary Town Infrastructure Development Project-2

Book Title

Bangladesh Rivers & Water Science June-2005 Rules Of Road Use & Security Road Maintenance Manual . Khagrachari, Rangamati,bandarban. Abbreviation Report Of L G E D Work Cyclone Sidr In Bangladesh. Damage, Loss, And Needs Assessment For Disaster Recovery And Reconstruction Narbo Annual Report Network Of Asian River Basin Organizations-2007 District Water Resources Assesment Moulavibazar Cyclone Shelter Preparatory Study Stage-1 Feastibility Phase Final Report. Revised Supporting Volume.sv.7. Part-A.disaster Management Supporting Volume-1, Part-C . Appendices Strengthening Of Activities In Rural Development Engineering Center ( RDEC) Project Annual Report Of Peoples Republic Of Bangladesh 2006-07. Journal Of The Indian Roads Congress Abridged Version Of G T Z Annual Report-2007 Bangladesh Capacity Development Action Plan For Sustainable Environmental Governance Made By L G E D Mechanized Ferry Establist,management,leasing Systim & Rules Of Income L G E D Ferry Maintenance & Mechanical Manual Training Manual Of Organising Management Construction Work Monitoring & Quality Control For Water Management Committee Construction Work Monitoring & Quality Control For Water Management Committee Training Manual Of Organised Development Training Manual Of Agriculture & Social Management Training Manual Of Participatory Examin Training Manual Of Associate Depelopment Training Manual Of LPSC Training Manual Of Instructor For Training Resources Group Training Manual Of Instructor Agriculture & Social Management Training Manual Of Guidelines & Maintenance Arsenic Screening Of Ground Water From Tubewells Located Within Chittagong City Research Report District Water Resources Assesment NARSINGDI Fpecial Terms & Condition & Technical Specification Of Medical Gas Pipeline System Schedule Of Rates 2208 For Electrical / Mechanical Works Analysis Of Schedule Of Rates 2008 For Electrical / Mechanical Wrks Part- 1 Sub Head - A Analysis Of Schedule Of Rates 2008 For Electrical Mechanical Works Part- II Sub-Head-B-N Bangladesh Country Assistance Strategy 2006-2009 Bangladesh Country Assistance Strategy 2006-2009

Book Title

End Of M E A Quotes Key Essues And Strategic Options For Bangladesh Readymade Garment Industry Bangladesh Country Water Resources Assistance Strategy Comparative Advantages Of Public And Private Health Care Providers In Bangladesh Targeting Resources For The Poor In Bangladesh Revitalizing The Agricultural Technology System In Bangladesh The Bangladesh Integrated Nutrition Project Effectiveness And Lessons Social Safety Nets In Bangladesh An Assesment Econmics And Governance Of Nongovernmental Organizations In Bangladesh Renewable Energy For Poverty Alleviation ISRPA - 99. South-Western Bangladesh Rural Development Project.Draft Final Report. Quarterly Progress Report .6 Beneficiary Participation And Project Management. Institute Of Water Modelling. Training Of Monitoring & Evaluation Under Market Infrastructure Development Project In Charland Regions. National Open Tendering Method. The Public Procurment Regulations 2003 The Public Procurement Regulations 2003. National Environment Management Action Plan. Maintenance Of Rural Infrastructure ( M T-T) Course Annual Report Of LGED Fy 2006-07 J B I C Pllot study For The Small Scale Infrastructure Project Final Report Summary J B I C Pllot Study For The Small Scale Infrastructure Project Final Report Hand Book-2 Public Administration Part-1 Hand Book-3 Public Administration Part-I I Hand Book-4 Public Administration Developmint Economics Course Guidelines Urban Poverty Reduction Project ( A D B-TA2410-Ban) Appendices. Draft Final Report Urban Poverty Reduction Project ( ADB-TA 2410-Ban) Annex- Vol- I Urban Poverty Reduction Project ( ADB-TA 2410-Ban) Annex- V-II Urban Poverty Reduction Project ( ADB-TA 2410-Ban) Annex- V-III Urban Poverty Reduction Project ( ADB-TA 2410-Ban) Annex Main Report Urban Poverty Reduction Project ( ADB-TA 2410-Ban) Annex Draft Interim Report Contract For Consultats Services Training Manual For Policy Makers Long Term Strategy Implementation Scenarios, Dhaka Eastern Bypass Study. Dhaka Eastern Bypass Study . The Final Report (Revised Draft) Volume-1. Dhaka Eastern Bypass Study . The Final Report (Revised Draft) Volume-2.

Book Title

Dhaka Eastern Bypass Study . The Final Report Appendices Vol - 3. LAO- Bangladesh Co - Operation On Development Of Rural Infrastructure. Guidelines For The Maintenance Of Rural Infrastructure. Noakhali Rural Infrastructure Development And Maintenance Project (RDP -- 22) 1998 Flood Damage Assessment Draft Report 1998 Flood Damage Assessment Final Report. TA NO.2816-BAN-Third Urban Development Project Inception Report. Formulation Of Third Rural Infrastructure Development Project Bangladesh . Final Report. Food Security In Bangladesh. Papers Presented In The National Workshop. Lged Workshop Report International Workshop On Development Decentralization In Bangladesh 9-10 Manch-2002 Water Health Internatioal Suite Of Products Rural Working Women Changing Pattern Of Their Role And Status Income Diversification Component Implementation Plan & Operational Guidelines Steel Bridges Impacts Of Irrigation Management Transfer A Review Of The Evidence Research Report-11 Bridge System Alternative Approaches To cost Sharing For Water Service To Agriculture In Egypt Research Report-2 Sanitation & Family Education(SAFE) Pilot Project Capability Document Social Systems Research Health And Family Welfare The New Era Of Water Resources Management From Dry To Wet Water Savings Research Report-1 1998 Flood Damage Assessment For The District Of Sylhet ,Moulavibazar ,Habiganj ,Sunamganj Environmental Management Field Hand Book For Rural Road Improvement Projects Project Proforma For Biodiversity Conservation In The Sundarbans Reserved Forest Capability Document Consultancy In Education Progress Report Nov:1997 Patualkhali And Barguna District, Project Monitoring System RESP Programme-III Quarterly Report 1996/97 Vol- II Appendices Technical Advisory Committee ( Tac ) IDC For Infrastructure Development Agriculture, Foresty, Livestock, Fisheries And Environment In Bangladesh Preparation Of The Rural Infrastruture Development And Maintenance Project Greater Noakhali. 66m Bridge On Badiakhali Jummabari Road. Quarterty Progress Report Report January -March - 1997. Final Feasibility Report MSP And Strengthering Institutional And Financial Management Components. Formulation Of Third Rural Infrastructure Development Project Bangladesh. Urban Poverty Reduction Project (ADB TA 2410 - BAN) Annual Report -2008 Standard Tender Document (STD) For Procurement Of Works (Medium- Above )

Book Title

Standard Tender Document (STD) For Procurement Of Works (Small - Above) Standard Tender Document (STD) For Procurement Of Works (Very Small- Up To Tk 25 Lakh) Standard Request For Proposal (SRFP) For Selection Of Consulting Firm (National) (Complex Lum Sup Above Tk 50 Lakh) Standard Request For Proposal (SRFP) For Selection Of Consulting Firm (Simple Time Based Up To Tk 50 Lakh) Standard Request For Proposal (SRFP) For Selection Of Consulting Firm (Complex Time Based Above Tk 50 Lakh) District Water Resources Assessment Habiganj. District Water Resources Assessment Brahmanbaria. District Water Resources Assessment Chandpur. Standard Request For Proposal (SRFP) For Selection Of Consulting Firm (National)Simple Time Based -Up To Tk.50 Lakh. Standard Tender Document (STD) For Procurement Of Goods(National) For Any Value Above Tk 25 Lakh. Standard Request For Quotation (SRFQ) For Procurement Of Goods (National) Within Bangladesh - For Values To Tk 2 Lakh.foreign Missions - For Values Up Development Project Proposal (DPP) For Integrated Village Infrastructure Development Project Guidelines On Imppest Fund And Statement Of Expenditures Procedures. Impact Evalliation Of Gccr Shhemes 1996/97 Round 1 Study Options For Flood Risk And Damage Reduction In Bangladesh Report Of The Short Term Mechanical Engineering Specialist Vol- I National Policy For Safe Water Supply & Sanitation- 1998 Report On International Workshop On Road Management And Financing Bangladesh Compilation Of The Financial And Accounts Manual For The Local Government Engineering Department LGED`S Annual Report Fiscal Year : 2004-2005 Annual Report Of LGED Activities Financial Year: 2005-2006 First Asian Regional Meeting On Rural Transport & Development 1998 Flood Damage Repair Assessment 167 Pourashava Infrastructures Preliminary Report 1998 Flood Damage Assessment For The District Of Khulna, Bagerhat, Satkhira, Jessore, Narail, Magura, Jhenida,kaliganj, Kushtia, Meherpur. Annex -3 1998 Flood Damage Assissment For The District Of Faridpur, Madaripur, Rajbari, Gopalganj And Sariatpur. Annex-3 1998 Flood Damage Assessment For The Districts Of Dinajpur, Jamalpur, Sherpur, Rongpur, Nilphamari, Lalmonirhat, Mymensingh, Kishoreganj And Netrokona 1998 Flood Damage Assessment For The Districts Of Rajshahi, Natore, Chapai Nawabganj, Naogaon, Pabna, Sirajganj, Dhaka, Manikganj, Munshiganj Etc. Final Survey 1: House Hold Survey Final Survey 2 : Tubewell Area Survey International Seminar On Good Governance 4th To 6th August 1998 Vol- I I International Seminar Of Good Governance 4th To 6th August 1998 Vol-III

Book Title

International Seminar On Good Governance 4th To 6th August 1998 Vol- IV International Seminar On Good Governance 4th To 6th August 1998 Vol- V Plans And Budgets 1999/2000 Draft 2 Cyclone Damage In Bangladesh Final Evaluation Report Of The Monitoring And Evaluation Rural Development Project( RDP)-13 Technical Proposal For Consultancy Services Formulation Of Third Rural Infrastructure Development Project Bangladesh Training Course/Workshop Urban Planning 1992/93 STIDP Phase-I Pourashava Support Unit Final Report On Fap Report On Short Term Assignment On Road Safety. RDP - 25 Project Completion Report On The Rural Infrastructure Development Project RDP-13 Final Completion Report Formulation Of Third Rural Infrastructure Development Project. Inception Report Local Government Engineering Department In House PMS Monthly Progress Report.TRIDP-21 Local Partnerships For Urban Poverty Alleviation Project Seminar On Rural Development Focusing On Flood Proofing Conference On RDE Of Engineering In Poverty Reduction Report On Training In Japan On Participatory Technology And Its Adoption On Rural Infrastructure Development Project-21 Guide Specification For Design Construction Of Segmental Concrete Bridges Stimulating Growth Through Runal Non Farm Activities In Bangladesh Operation And Maintenance Of Small Scale Water Resources Project Training Of Trainers Course Urban Development Directorate Ministry Of Works Land Use/Masterplan Sunamganj Paurashava Sunamganj Zila Capacity Building Plan Draft Guidelines For Efect Monitoring And Evaluation (EME) Of Road And Market Improvement Road And Road Structure Course Housing Sector Institutional Strengtening Project Final Report Appendices National Workshop On Options For Risk And Drainage Reduction In Bangladesh National Training Work Shop Renewable Energy Application For Rural Areas Of Bangladesh Selected Reading Materials Asian Development Out look -1998 America Owes 60 Million Dollars To The People Of Chittagong Hill Tracts Bangladesh Hand Book For The Economic Analysis Of Water Supply Projects Road Maintenance Manual, Rural Road Maintenance By Hill Tracks Poverty Women Khagrachori,Rnagamati,Bandarban District. National Workshop On New Agricultural Extension Policy Implementation. Recommendations And

Book Title

Workshop Proceedings. Back Ground Paper Building Design Briefing Paper Estimating Training Sourse-1, 1992-93 National Woman Development Rule Proposed Of Local Government Infrascture Project Proposlal For The Establishment Of The Centre For Agricultural And Rural Development Map Catalogue Articles And/Or Comments Workshop On post Disaster Shelter Options. Road Safety Problems In Developing Countries. Souveir On Installation Ceremony Of Newly Elected Executive Committee Of Alumni Association For The Year 2006-08 Foundation Pile Diagnostic System Technical Data. Cyclone Sidr In Bangladesh Damage, Loss,and Needs Assessment For Disaster Recovery And Reconstruction. LGED In Development 1996-97-2000-01. Mancaps. Organisation Manual Of LGED. Mancaps . Action Plan Update 1998. Directions In Management Development Off LGED. Country Case Study : Bangladesh. Evaluation Of Citizen's Voice & Accountability. Preleminary Report On Agriculture Census - 2008. The Global Economic Crisis. Challenges For Developing Asia And ADB's Response. Asian Development Outlook -2009. Rebalancing Asia's Growth. Annual Report 2008 .volume - 1. Annual Report 2008 .volume - 2. Financial Report. Micro Hydropower Potention In Bangladesh. Biodiversity And Climate Change In The Himalayas. Sustainable Mountain Development. Multy Criteria Priori Of Storm Water Drain Works For An Urban Area In The Chittagong Hill Tracts. Annual Report -2008. ICIMOD. For Mountains And People. Long Run Socio-Economic Impact Study Of Rural Roads And Markets Improvement & Maintenance Project - Il.(RRMIMP-Il) Annual Report -2008.NGO Forum For Drinking Water Supply & Sanitation. Ther Are Back In Life.NGO Forum For Drinking Water Supply & Sanitation. Benchmark Survey Report Kaloir Shobaitara Subproject. Nachole, Chapi Nawabganj. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Lelung- Kutubchari Kalapania Khal Subproject. Fatikchari,Chittagong. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Shir Shir Chara Subproject. Sylhet Sadar,sylhet Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Nishanbari-Belna Subproject. Keraniganj,Dhaka.Benefit Monitoring &

Book Title

Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Madukhali Subproject. Kalkani, Madaripur. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Peglir Beel Sikderpara Subproject. Ukhia, Cox,s Bazar. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Lelung- Kasimpur Subproject. Godagari, Rajshahi. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Shir Shindur Khal Subproject. Shakhipur Tangail. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Mesoghata Beel Subproject. Baraigram , Natore Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Baliardil Subproject. Bajitpur, Kishoregang. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Fullbaria-Sekhbandha Subproject. Debiganj, Panchagarh. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Mandari-Ganhayapur Khal , Laximpur Sadar,laximpur.Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Khudra Fulkot-Rajarampur Subproject. Shahjahanpur, Bogra.Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Bhurburia Khal Subproject. Shibpur, Narsingdi. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Gomara Beel Subproject. Meherpur Sadar, Meherpur. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Hialer Beel Subproject. Mithapukur, Rangpur Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Khorda Kalna Subproject. Mohadebpur, Naogaon.Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS)Benchmark Survey Report Benchmark Survey Report Balajtala - Kalmadanga Subproject. Tungipara- Gopalgonj. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Mesoghata Beel ubproject. Baraigram , Natore Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Padrishibpur Subproject Bakerganj, Barisal Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Sreerampur subproject. Rupsha, Khulna Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Synthesis Report Selected 30 Subproject SSERDP- Il. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Marua Chara Subproject. Rajnagar, Moulvibazar Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) District Water Resources Assessment Sirajganj.

Book Title

District Water Resources Assessment Kurigram District Water Resources Assessment Jhenaidah District Water Resources Assessment Sunamganj. District Water Resources Assessment Lalmonirhat District Water Resources Assessment Nilphamari District Water Resources Assessment Kushtia District Water Resources Assessment Meherpur District Water Resources Assessment Chuadanga District Water Resources Assessment Rajshahi District Water Resources Assessment Rangpur District Water Resources Assessment Pabna. District Water Resources Assessment Shariatpur District Water Resources Assessment Natore District Water Resources Assessment Panchghar District Water Resources Assessment Gaibanda. District Water Resources Assessment Bogra District Water Resources Assessment Madaripur District Water Resources Assessment Comilla District Water Resources Assessment Barisal. District Water Resources Assessment Gopalgonj Benchmark Survey Report Chayburia-Kuliatil Subproject. Madan, Netrokona. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Ichamoti Subproject. Trishal Mymensing. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Bodh Khanar Beel Subproject. Jhikargacha. Jessore Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Chiratal Beel ubproject. Trisal , Mymensingh. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report kahalia Subproject. Nawabganj, Dhaka. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Dolu- Mohorkhli Beel ubproject. Fatikchari, Chittagonj Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Report Mohismara Beel ubproject. Chandanais, ChittagonjgBenefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Benchmark Survey Reportbagha Beel ubproject. Gopalganj ,Sylet Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Impact Evaluation Study Report Selected 10 Subprojects SSWRDSP -Il. Benefit Monitoring & Evaluation(BME) Study SSWRDP,(BIDS) Multipurpose Use Of Hazir Khal By Making Provision For Community Proposed Flow Control Gate At A

Book Title

Culvert.Thesis By Sarah Binte Faruque. Forecasting Of Seasonal And Monthly Rainfall In Sri Lanka Using Climate Predictability Tool(CPT) SAARC .SMRCNO.24. Composite Characteristics Of Nor'westers Observed By TRMM And Simulated By WRF Model.SAARC.SMRC-25 Analysis Of TRMM Data In Monitoring Rainfall Over Mountainous Regions.SAARC.SMRC No. 27 Drought Diagnosis And Monitoring Over Bangladesh And Nepal.SAARC No.26 Studies Of Tornadic Storms Over Bangladesh Using Radar And WRF Model.SAARC.SMRC No -28 Understanding The Rainfall Climatology And Detection Of Extreme Weather Events In The SAARC Region : Part -Il Utilization Of RCM Data.SAARC.SMRC No29 Long-Term Forecasting Of Rainfall And Temperature In The SAARC Region Using RCM: Part -I Calibration.SAARC SMRC No .30. Proceedings Of SAARC Workshop On Variability Of Southwest Monsoon And Its Hydrological And Preparedness Aspects Over The SAARC Region 27-28 March 2008 Hot Rolled Sheet Piling Of Non Alloy Steels.part-1. Tecnical Delivery Conditions. Training Report On ``Addressing Climate Change In Development Assistance'' Denmark , 15 April-05 May,2009 IWFM Research Bulletin.Volume-6.2008 Report On Commercial Sexual Exploitation Of Childrean Pilot Survey - 2008. Basic Design Study Report On The Model Rural Development Project In The Peoples Republic Of Bangladesh. Basic Report On The Model Rural Development Project In The Peoples Republic Of Bangladesh.Draft The Study For Rural Development Focusing On Flood Profing In The Peoples Republic Of Bagladesh. Final Report.Main The Study For Rural Development Focusing On Flood Profing In The Peoples Republic Of Bagladesh. Final Report.Summary The Study For Rural Development Focusing On Flood Profing In The Peoples Republic Of Bagladesh. Final Report.Annex Paurashava Manual Background Report On Vetting Guidelines For Water Supply And Sanitation Sub-Sector Bangladesh. National Vetting Guidelines For Water Supply And Sanitation Sub-Sector Bangladesh. International Fund For Agricultural Development. The Govt. Of The Netherlands Aide Memoire Joint Appraisal Mission For The Proposed. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-1-1. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-1-2. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-2-1. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-2-2. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-3-1. Toyota Repair Manual .Land Cruiser/Land Cruiser Prado.V-3-2

Book Title

Toyota Repair Manual Supplement..Land Cruiser/Land Cruiser Prado. Toyota Repair Manual Supplement..Land Cruiser/Land Cruiser Prado. Toyota .Land Cruiser/Land Cruiser Prado.Elrctrical Wiring Diagram. Toyota .Land Cruiser/Land Cruiser Prado.Elrctrical Wiring Diagram.Supplement, Toyota Parts Catalog . Toyato Land Cruiser/Land Cruiser Prado. Toyato. 5L- E. Engine. Repair Manual. Institutional Studies For Legal Framework Of Water Management Organization.Draft Final Report Small Scale Water Resources Development Project In Greater Mymensing, Sylhet And Faridpur Aree. Approach To Fisheries Development. Development Of Union Connecting Road & Infrastructure Grater Chittagong & Cox,s Bazar Districts. Infrastructure Development Project Greater Rajshashi District (Rajshashi,Natore, Naogaon & Chapi Nawabganj Districts) Bangladesh Road Transport Authority . Report On Proceedings Of Land Transport Policy Workshop. 51 Special Foundation Training Course For Engineering Of LGED. Technical Assistance Project Proposal (TPP) For Project Preparatory Technical Assistance (PPTA) For Preparing City Region Development Project. Revised Development Project Proforma /Proposal (RDPP) Construction Of Light Traffic Bridge On Rural Roads Project (2`` Revision). Annual Report Of LGED. 2007 -2008. Secondary Town Infrastructure Development Project (STIDP) Phase - Il. Training Course On Land Use Planning .24-29 April 2004. Geographic Information System GIS.Vol-1.Training Manual Professionals. Geographic Information System GIS.Vol- II .Training Manual Professionals. Annual Report 2008-2009 SPARRSO. District Water Resources Assessment Sylhet Report On Engineering Center Management Training In Japan.(27 September 2010 -October 2010 Proceedings Of The 3rd International Conference On Water And Flood Management ICWEM-2011.V-1 Proceedings Of The 3rd International Conference On Water And Flood Management ICWEM-2011.V-2 What Makes The Bangladesh Local Government Engineering Department (LGED) So Effective? No.27. JICA -RI Working Paper. Effectiveness Of Local Sand For Improved Sub Grade. (Thesis) Report Of JICA Technical Information Exchanging Programe In Cambodia Final Report On Road Survey Training Meteorological Data In Bangladesh Station : Mymensingh Training Manual On Construction Planning , Supervision, Qulity Control And Management Technical Viability Study Of Block Road Community Based Resource Management Prpject. Draft Final Report Environmental And Social Management Framework (ESMF)

Book Title

BIDS Biennial Report 2009-2010 The Bangladesh Development Studies. Vol.34. No.1. Road Pavement Catalouge Guidelines on Environmental Issues Related To Physical Planning Government Of The People's Republic Of Bangladesh.Technical Specifications For Bridges On The Upazila And Union Roads . Report On Labortory Test And Quality Control In LGED ( Tri- Axial Comression) Proceedings Of `` Seminar On Geographic Information System And Remote Sensing For Development '' Road Design Standards Rural Raod . User Manual Progress Monitoring System . Proceedings Of Participatory Rural Planning Workshop . Water Resources Laws In Bangladesh . Report On Developed For Progress Monitoring System . Documentation Of Participatory Rural Planning Workshop . Report On Application Of GIS For Rural Planning . Documentation Of " Strategy Workshop On Training Need Assessment-2004" Report On Training Needs Assessment Of LGED Staff (2004-2005).Vilume:l: Main Text And Core Annexure Quality Control Manual. Documentation Of " Integrated Rural Development Seminar 2003" Proceedings Of " Integrated Rural Development Seminar 2003" Survey Report Of Equipments And Facilities For Soil Tests At Laboratories In LGED. Meteorological Data In Bangladesh Station: Sylhet. Meteorological Data In Bangladesh Station: Rajshahi. Meteorological Data In Bangladesh StationL Chittagong. Meteorological Data In Bangladesh Station : Comilla . Meteorological Data In Bangladesh Station : Cox's Bazar. Meteorological Data In Bangladesh Station : Rangpur . Meteorological Data In Bangladesh Station : Dhaka . Meteorological Data In Bangladesh Station : Barisal . Meteorological Data In Bangladesh Station : Faridpur . Meteorological Data In Bangladesh Station : Maijdee . Meteorological Data In Bangladesh Station : Madaripur . Meteorological Data In Bangladesh Station : Jessore . Technical Specifations For Buildings. Meteorological Data In Bangladesh Station : Mymensingh Report On Training Needs Assessment Of LGED Staff (2004-2005).Vilume:l: Main Text And Core

Book Title

Annexure Final Report On Feastibility Study Of Integrated Water Management Project Of Polder 34/2 In Bagerhat District. Mathmetical Modelling Study For Integrated Water Management Project Of Polder 34/2 In Bagerhat District.Final Report Final Report On Feastibility Study Of Integrated Water Management Project Of Gungiajuri Haor Area. Final Report (V-1) Main Report. Mathematical Modelling Study for Integrated Water Management Project Of Gungiajuri Haor Area. Final Report Environmental And Social Impact Assessment (EIA/SIA) Of Integrated Water Management Project Of Gungiajuri Haor Area. Final Report Environmental And Social Impact Assessment (ESIA) Feasibility Study For Integrated Water Manageme Observation Of International Women,s Day 2011 Work Assistant Training Manual. Vol- I (Concrete) (Bangla) Local Government Engineering Department. Manual On Subsoil Investigation .Quality Control Maual. Pourashava Operation & Maintenance (02m) Manual. Environmental Assesment Guidelines For LGED Project. Transport Sector Management Reform. Bangladesh Char Development And Settlement Project (CDSP) Project Detailed Desiga Document Formulation Main Report. Asian Development Bank .Bangladesh Resident Mission. Seminar Of Rural Development Focusing On Flood Proofing. Annual Report - 2010-2011(BANGLA) Recycling Of Demolished Concrete. Development Of Levehood And Pro-Poor Institutions .Training Need Assessment Report,2011 Development Of Levehood And Pro-Poor Institutions .Training Report On Basic Training Course. Short Term Impact Of LCS Performation In MIDPCR. Baseline Survey Report Of LCS Group Member Under MIDPCR Project. Opinion Survey Report Of Market Participants On Physical Facilities Developed The Project. KAP Survey On Beef Fattening IGA. Report On The KAP Training Survey Baseline Survey On Primary Market Baseline Sutvey Report Of Existing Group Members. Short Term Impact Assessment Of Primary Market Development. Study Report Mungbean Value Chain. Training On Quality Control Construction Works,(QCT - 2 ,AE & UE) Training Manual Paurashava Base MAP Preparation Using Auto CAD.

Book Title

A Guideline For Financial & Operational Action Plan (FOAP) For Municiple Management. Training Of Trainers Course Manual Proceeding Of The 4th Annual Paper Meet And 1st Civil Engineering Congress.22-24 December .2011 Report On Training Needs Assessment Of LGED Staff (2004-2005). Volume - II. Supplementary Annexure On Questionnaire. Report On Training Needs Assessment Of LGED Staff (2004-2005) Volume - III Supplementary Annexure On Analysis. Mancaps . Action Plan Update 1998. Directions In Management Development Of LGED. .Mancaps . Action Plan Update 1998. Directions In Management Development Of LGED.Draft Mancaps. Organisation Manual Of LGED. Mancaps. Draft. Organisation Manual Of LGED. Training Report On ``Addressing Climate Change In Development Assistance'' Denmark Report Of The National Wages And Productivity Commision - 2000 Seismic Design And Retrofit Of Piping Systems July -2012 Post Literacy And Continuing Education For Human Development Project -2. Second Monitoring Report - 2010 Celebratioing A Century International Women Day. Budget , Budget Speech, 2009-2010 Beijing IWHR Corporation (BIC) Annual Report 2008-2009. Research Intiatives Bangladesh. Annual Report 2009-2010. Opportunities Unlimited. National 3R Strategy For Waste Management . First Draft Manual On Hydrologic And Hydraulic Design Of Roads And Bridges. Gender And Development Plan Of Action (2008-2009) Moving Ahead.National Strategy For Accelerated Poverty Reduction Il.(Fy- 2009-11) Fy 2008-2009 LGED,s Annual Report. Traininig Calendar 2009-2010. Traininig Calendar 2010-2011. Traininig Calendar 2011-2012. Annual Report 2009 For Health & Beautiful Life. 2020 Safer Journeys. New Zealand`s Road Safety Strategy 2010-2020. Safer Journeys Action Plan 2011-2012 TA 7890-BAN : Strengthening The Resilience Of The Urban Water Supply.drainage,and Sanitation To Climate Change In Coastal Towns Final Inception Report Sector Development Plan ( FY- 2011-2025) Water Supply And Sanitation Sector In Bangladesh. Sector Development Plan ( FY- 2011-2025) Water Supply And Sanitation Sector In Bangladesh.Summary Version Independence Of Bangladesh In 266 Days. History AndDocumentary Evidance.forth Edition

Book Title

UNICEF.Evaluation Of The Urban Basic Services Delivery Project.(UBSDP).Final Report Project Concept Paper.Urban Basic Services Delivery Project. Project Proforma.Urban Basic Services Delivery Project.(PCP Approved By Ecnec On 01-04-1997) Revised Project Proforma For Urban Basic Services Delivery Project.1st Revision. Project Proforma Slum Improvement Project (Phase- ll-Revised)(Four City Corporations And Twenty One Pourshavas) Slum Improvement Project .A Reference Manual. Project Porforma Local Partnerships For Urban Poverty Alleviation Project.(Revised) Constraints In Management And Operation Of Irrigation Of In Bangladesh. Rural Transport.Small Structure For Rural Roads.A Practical Planning ,Design, Construction & Maintenance Guide.Volume-1. Annual Report - 2010-2011.Serial No . 38/10-11 Traininig Calendar 2008-2009. Rural Growth Centres Of Bangladesh Road Structures Manual For Double Lane Bridges.part-C.design Examples Of Bridges,culvarts And Slope Protection Works. Road Structures Manual For Double Lane Bridges.part-B.Standard Drawings.Vol- III.Reinforced Concrete Box Culvert. Road Structures Manual For Double Lane Bridges.part-B.Standard Drawings.Vol- II.Prestressed Concrete Bridges. Road Structures Manual For Double Lane Bridges.part-B.Standard Drawings.Vol- I. Reinforce Concrete Bridges. Road Structures Manual For Double Lane Bridges.part-A.Design Criteria,Guideline And Design Method For RC/PC Bridges,Box Culverts And Slop Protection W


Recommended