Balboa Reservoir Community Advisory Committee October 15, 2018 Environmental Analysis Update
Transcript
Page 1: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir Community Advisory CommitteeOctober 15, 2018

Environmental Analysis Update

Page 2: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA = California Environmental Quality Act

EIR = Environmental Impact Report

NOP = Notice of Preparation of an EIR

DEIR = Draft EIR

COMMON TERMS IN ENVIRONMENTAL REVIEW

Page 3: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

BALBOA RESERVOIR TIMELINE

Page 4: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

To provide a public process in analyzing environmental consequences

To identify a range of potential environmental impacts

To identify measures or additional alternatives that reduce impacts

PURPOSE OF ENVIRONMENTAL REVIEW

Page 5: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA TOPICS

Population and Housing

Cultural Resources

Transportation and Circulation

Noise

Air Quality Greenhouse Gas Emissions

Wind and Shadow

Recreation Utilities and Service Systems

PublicServices

Biological Resources

Geology, Soils, and Seismicity

Hydrology and Water Quality

Hazards and Hazardous Materials

Mineral and Energy

Resources

Agricultural and Forest

Resources

Land Use and Land Use

Planning

Page 6: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA REVIEW DOES NOT

Approve a project

Evaluate the merits or benefits of the project

Analyze social, demographic, and economic impacts

Page 7: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

WHAT IS BEING ANALYZED IN EIR?

5 scenarios (options + variants)

• Studied to understand the impacts before further decisions

• Smaller buildings/more townhomes along the western edge

• 4 acres of open space

• Better access to Sunnyside from North Street

• 50% affordable housing

Developer Proposed Option (previous draft at right)

• Submitted range of units, 800-1300

• EIR will analyze as 1100 units

• Includes public parking garage in addition to residential parking

Page 8: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

Affordable Units

550

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

Public SpaceApproximately 4 acres

Height 25 to 78 feet

Public garage and access

Underground garage (south); Off-site garage at CCSF

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR

Page 9: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

Affordable Units

550

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

Public SpaceApproximately 4 acres

Height 25 to 78 feet

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Developer Proposed Option

DeveloperProposedVariant 1

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

Affordable Units

550 ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

----

Public SpaceApproximately 4 acres

----

Height 25 to 78 feet ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR

Page 10: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

Affordable Units

550

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

Public SpaceApproximately 4 acres

Height 25 to 78 feet

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Developer Proposed Option

DeveloperProposedVariant 1

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

Affordable Units

550 ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

----

Public SpaceApproximately 4 acres

----

Height 25 to 78 feet ----

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Above-grade garage (south);

DeveloperProposed Option

Developer Proposed Variant 1

Developer Proposed Variant 2

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

Affordable Units

550 ---- ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ----

Public SpaceApproximately 4 acres

---- ----

Height 25 to 78 feet ---- ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR

Page 11: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

DeveloperProposedVariant 1

DeveloperProposedVariant 2

Developer Proposed Variant 3

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

No changefrom base

Affordable Units

550 ---- ---- ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ---- ----

Public SpaceApproximately 4 acres

---- ---- ----

Height 25 to 78 feet ---- ---- ----

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Above-grade garage (south);

Underground garage (north); Off-site garage assumed at CCSF;South Street moved South

Assumes no pedestrian or bike access from San Ramon Way

DeveloperProposed Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

Affordable Units

550

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

Public SpaceApproximately 4 acres

Height 25 to 78 feet

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Developer Proposed Option

DeveloperProposedVariant 1

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

Affordable Units

550 ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

----

Public SpaceApproximately 4 acres

----

Height 25 to 78 feet ----

Public garage and access

Underground garage (south); Off-site garage assumed at CCSF

Above-grade garage (south);

DeveloperProposed Option

Developer Proposed Variant 1

Developer Proposed Variant 2

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

Affordable Units

550 ---- ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ----

Public SpaceApproximately 4 acres

---- ----

Height 25 to 78 feet ---- ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR

Page 12: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

DeveloperProposedVariant 1

DeveloperProposedVariant 2

Developer Proposed Variant 3

Additional Housing Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

No changefrom base 1,550

Affordable Units

550 ---- ---- ---- 775

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ---- ----650 residential only

Public SpaceApproximately 4 acres

---- ---- ---- ----

Height 25 to 78 feet ---- ---- ---- 25 to 88 feet

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

Assumes no pedestrian or bike access from San Ramon Way

No public parking garage on site;Off-site garage at CCSF

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR

Page 13: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

WHY ANALYZE AN ADDITIONAL HOUSING OPTION?

Decision makers and Planning Commission asked staff to identify more housing opportunities

With ongoing housing crisis, have to keep the door open to additional housing

Comparable sites around SF are analyzing taller and denser options

Unique opportunity near transit & City College

Smaller projects are “covered” and still possible when a larger project is analyzed

Page 14: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

PUBLIC INPUT ON EIR SCOPE

Comments should focus on the scope of environmental review:

Methods used for environmental analysis

Measures that would avoid or lessen an environmental impact

Information that would help inform environmental impact analysis

Suggestions for alternatives to be evaluated in the Draft EIR

Public scoping period: October 10 – November 12

Page 15: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

OPPORTUNITIES TO COMMENT ON EIR SCOPE

PUBLIC SCOPING MEETINGTuesday, October 30, 2018, 6-8 pm Lick Wilmerding High School - Cafeteria/Ann Maisel Café 755 Ocean Avenue

EMAIL BY NOVEMBER 12, [email protected]

MAIL BY NOVEMBER 12, 2018Jeanie Poling San Francisco Planning Department 1650 Mission Street, Suite 400 San Francisco CA 94103

Public scoping period: October 10 – November 12

Page 16: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

AvalonBay Communities + BRIDGE Housing

Environmental Studies and Draft Master Plan Update

Balboa Reservoir CAC Meeting10/15/18

Mission Housing | Habitat for Humanity | Pacific Union Development Corporation

Page 17: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Tonight’s Agenda

Balboa Reservoir CAC Presentation | 10/15/18

• Environmental Analysis Update

• Draft Master Plan and Building Massing Update

Page 18: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir Community Advisory CommitteeOctober 15, 2018

Environmental Analysis Update

Page 19: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA = California Environmental Quality Act

EIR = Environmental Impact Report

NOP = Notice of Preparation of an EIR

DEIR = Draft EIR

COMMON TERMS IN ENVIRONMENTAL REVIEW

Page 20: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

BALBOA RESERVOIR TIMELINE

Page 21: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

To provide a public process in analyzing environmental consequences

To identify a range of potential environmental impacts

To identify measures or additional alternatives that reduce impacts

PURPOSE OF ENVIRONMENTAL REVIEW

Page 22: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA TOPICS

Population and Housing

Cultural Resources Transportation and Circulation

Noise

Air Quality Greenhouse Gas Emissions

Wind and Shadow Recreation Utilities and Service Systems

PublicServices

Biological Resources

Geology, Soils, and Seismicity

Hydrology and Water Quality

Hazards and Hazardous Materials

Mineral and Energy Resources

Agricultural and Forest Resources

Land Use and Land Use

Planning

Page 23: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

CEQA REVIEW DOES NOT

Approve a project

Evaluate the merits or benefits of the project

Analyze social, demographic, and economic impacts

Page 24: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

WHAT IS BEING ANALYZED IN EIR?5 scenarios (options + variants)• Studied to understand the impacts before further decisions

• Smaller buildings/more townhomes along the western edge

• 4 acres of open space

• Better access to Sunnyside from North Street

• 50% affordable housing

Developer Proposed Option (previous draft at right)

• Submitted range of units, 800-1300

• EIR will analyze as 1100 units

• Includes public parking garage in addition to residential parking

Page 25: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

DeveloperProposed Option

DeveloperProposedVariant 1

DeveloperProposedVariant 2

Developer Proposed Variant 3

Additional Housing Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

No changefrom base 1,550

Affordable Units 550 ---- ---- ---- 775

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ---- ----650 residential only

Public Space Approximately 4 acres

---- ---- ---- ----

Height 25 to 78 feet ---- ---- ---- 25 to 88 feet

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

Assumes no pedestrian or bike access from San Ramon Way

No public parking garage on site; Off-site garage at CCSF

DeveloperProposed Option

DeveloperProposedVariant 1

DeveloperProposedVariant 2

Developer Proposed Variant 3

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

No changefrom base

Affordable Units 550 ---- ---- ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ---- ----

Public Space Approximately 4 acres

---- ---- ----

Height 25 to 78 feet ---- ---- ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

Assumes no pedestrian or bike access from San Ramon Way

DeveloperProposed Option

Developer Proposed Variant 1

Developer Proposed Variant 2

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

No changefrom base

Affordable Units 550 ---- ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

---- ----

Public Space Approximately 4 acres

---- ----

Height 25 to 78 feet ---- ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

Underground garage (north); South Street moved South

Developer Proposed Option

DeveloperProposedVariant 1

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

No changefrom base

Affordable Units 550 ----

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

----

Public Space Approximately 4 acres

----

Height 25 to 78 feet ----

Public garage and access

Underground garage (south); Off-site garage at CCSF

Above-grade garage (south);

VARIANTS & OPTIONS TO BE ANALYZED IN THE EIRDeveloper

Proposed Option

Residential Units

800 - 1,300 unitsEIR to analyze 1,100

Affordable Units 550

Vehicle Parking Spaces

1,300 550 residential + 750 public garage

Public Space Approximately 4 acres

Height 25 to 78 feet

Public garage and access

Underground garage (south); Off-site garage at CCSF

Page 26: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

WHY ANALYZE AN ADDITIONAL HOUSING OPTION?

Decision makers and Planning Commission asked staff to identify more housing opportunities

With ongoing housing crisis, have to keep the door open to additional housing

Comparable sites around SF are analyzing taller and denser options

Unique opportunity near transit & City College

Smaller projects are “covered” and still possible when a larger project is analyzed

Page 27: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

PUBLIC INPUT ON EIR SCOPE

Comments should focus on the scope of environmental

review:

Methods used for environmental analysis

Measures that would avoid or lessen an environmental impact

Information that would help inform environmental impact analysis

Suggestions for alternatives to be evaluated in the Draft EIR

Public scoping period: October 10 – November 12

Page 28: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CACOctober 15, 2018

OPPORTUNITIES TO COMMENT ON EIR SCOPE

PUBLIC SCOPING MEETINGTuesday, October 30, 2018, 6-8 pm Lick Wilmerding High School - Cafeteria/Ann Maisel Café 755 Ocean Avenue

EMAIL BY NOVEMBER 12, [email protected]

MAIL BY NOVEMBER 12, 2018Jeanie Poling San Francisco Planning Department 1650 Mission Street, Suite 400 San Francisco CA 94103

Public scoping period: October 10 – November 12

Page 29: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

19Balboa Reservoir CAC Presentation | 10/15/18

QUESTIONS & COMMENTS

Page 30: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

20Balboa Reservoir CAC Presentation | 10/15/18

DRAFT MASTER PLAN

UPDATES

Page 31: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

(4/9/18 AT CITY COLLEGE MUB)Balboa Reservoir CAC Presentation | 10/15/18

CAC Meeting: Master Plan Update

Page 32: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Open Space Open HouseJune 23rd, 2018

Balboa Reservoir CAC Presentation | 10/15/18

Page 33: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

23Balboa Reservoir CAC Presentation | 10/15/18

Open Space Mock Up

Page 34: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Park DaySep 15th, 2018

Page 35: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Park Orientation

Page 36: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Park Day Community Feedback

Balboa Reservoir CAC Presentation | 10/15/18

Page 37: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

City/Community Feedback

Balboa Reservoir CAC Presentation | 10/15/18

1. Improve Pedestrian Flow Between Sunnyside and Ocean Ave

2. Maximize Wind Protection and Solar Orientation3. Activate the Park with Ground Floor Uses4. Revise Block Configuration5. Refine Relationship to Westwood Park and City

College

Page 38: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

PEDESTRIAN CONNECTION GENERATES OPEN SPACE NETWORKBalboa Reservoir CAC Presentation | 10/15/18

Fundamental Master Plan Concept

Page 39: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

CITY COLLEGE MASTER PLAN EVOLUTION: PAEC LOCATIONBalboa Reservoir CAC Presentation | 10/15/18

Response to Neighborhood Context

Page 40: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

IMPROVE PEDESTRIAN CONNECTION TO SUNNYSIDE & OCEAN AVE

Balboa Reservoir CAC Presentation | 10/15/18

North/South Orientation

Page 41: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Sunnyside Playground Comparison

Page 42: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Sunnyside Playground

Page 43: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

South Park Comparison

Page 44: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

South Park

Page 45: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

OPEN SPACE DRIVES BUILDING FORMBalboa Reservoir CAC Presentation | 10/15/18

Bring It All Together

Page 46: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

High

Wind intensity legend:

Low

Balboa Reservoir CAC Presentation | 10/15/18

Current Plan: North South ParkFormer Plan: East West Park

Wind Studies

NEW ORIENTATION PROVIDES WIND PROTECTION

Page 47: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

FORMER MASTER PLAN

Building Form & Solar Orientation

Page 48: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

UPDATED DRAFT MASTER PLANBalboa Reservoir CAC Presentation | 10/15/18

Building Form & Solar Orientation

Page 49: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Program Example

G

F E

DC

AB

Page 50: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

40Balboa Reservoir CAC Presentation | 10/15/18

Page 51: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

41Balboa Reservoir CAC Presentation | 10/15/18

BUILDING MASSING UPDATES

Page 52: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

UPDATED DRAFT MASTER PLAN DIAGRAMBalboa Reservoir CAC Presentation | 10/15/18

Draft Master Plan

Page 53: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

MASSING MODEL: Shows general height and size of buildings. Rough shapes/Block Diagrams to understand program, number of units etc.

ARCHITECTURAL MODEL: Shows actual building design. Breaks down the massing to create architectural effects, shows materials and architectural style.

MASSING = big and blockyARCHITECTURE = finished product

DESIGN PROCESS:1. Determine approximate massing: Ensure that building program (total size,

proper dimensions) fit within envelope.2. Add articulation: Breaks down the massing to create more defined shapes,

identify important features3. Concept Architecture: Starts to show a stylistic direction and consider

materials, details.

Balboa Reservoir CAC Presentation | 10/15/18

Massing vs. Concept Architecture

Page 54: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Building MassingShows general height and size of buildings to understand what fits

Looks big and bulky at this point

Original Proposal

Page 55: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Add articulationStart to show building design, locations of important features

Building scale is broken down to a finer grain

Original Proposal

Page 56: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Concept ArchitectureShows how the building will look

Stylistic direction, materials, details

Original Proposal

Page 57: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Axonometric View – Building Massing

A

B

Townhouses

E

F

G

C

PAEC

D H4H

CCSF

Riordan High School

Page 58: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Heights – Existing buildings

1-2 stories

55’5 stories

55’3 stories

30’-45’2-3 stories

10’ 85’

City College

Page 59: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Heights – PAEC at City College

1-2 stories

City College 55’5 stories

55’3 stories

30’-45’2-3 stories

PAEC30’-85’

3 stories

10’ 85’

Page 60: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

1-2 stories

CCSF

55’5 stories

55’3 stories

30’-45’2-3 stories

PAEC30’-85’

3 stories

2-3 stories

Heights – Balboa Reservoir (Draft Master Plan)

10’ 85’

Page 61: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

1-2 stories

55’5 stories

55’3 stories

30’-45’2-3 stories

PAEC30’-85’

3 stories

2-3 stories

4-6 stories

Heights – Balboa Reservoir (Draft Master Plan)

10’ 85’

City College

Page 62: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Heights – Balboa Reservoir (Draft Master Plan)

1-2 stories

55’5 stories

55’3 stories

30’-45’2-3 stories

PAEC30’-85’

3 stories

2-3 stories

4-6 stories

6-7 stories

10’ 85’

City College

Page 63: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Cloud Hall

Page 64: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Cloud Hall - Existing

Page 65: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Cloud Hall – PAEC

PAEC

Page 66: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Cloud Hall – PAEC – with Reservoir

PAEC

G

AB

CD

F E

Tow

nhou

ses

Page 67: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Cloud Hall – Proposed

G

AB

CD

F E

Tow

nhou

ses

Page 68: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Unity Plaza

Page 69: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Unity Plaza - Existing

Page 70: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Unity Plaza - PAEC

PAEC

Page 71: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Unity Plaza – PAEC with Reservoir

G

AB

CD

F E

Tow

nhou

ses

PAEC

Page 72: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Lee Ave & Lakeview Ave

Page 73: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Lee Ave & Lakeview Ave - Existing

Page 74: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Lee Ave & Lakeview Ave - Proposed

G

AB

CD

F E

Tow

nhou

ses

PAEC

Page 75: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from San Ramon

Page 76: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from San Ramon - Existing

Page 77: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from San Ramon - Proposed

G

AB

CD

F E

Tow

nhou

ses

Page 78: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Monterey Blvd & Colon Ave

Page 79: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Monterey Blvd & Colon Ave - Existing

Page 80: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Monterey Blvd & Colon Ave - Proposed

G

AB

CD

F E

Tow

nhou

ses

Page 81: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Gennessee St & Mangels Ave

Page 82: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Gennessee St & Mangels Ave - Existing

Page 83: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

View from Gennessee St & Mangels Ave - Proposed

G

AB

CD

F E

Tow

nhou

ses

PAEC

Page 84: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Axonometric View – Building Massing

A

B

Townhouses

E

F

G

C

PAEC

D H4H

CCSF

Riordan High School

Page 85: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

1. Determine approximate massing: Ensure that building program (total size, proper dimensions) fit within envelope.

2. Add articulation: Break down the massing to create more defined shapes, identify important features

3. Concept Architecture: Start to show a stylistic direction and consider materials, details.

Balboa Reservoir CAC Presentation | 10/15/18

Design Process

Page 86: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Neighborhood Character

Page 87: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

Balboa Reservoir CAC Presentation | 10/15/18

Neighborhood Character

Page 88: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

78Balboa Reservoir CAC Presentation | 10/15/18

QUESTIONS & COMMENTS

Page 89: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft

79Balboa Reservoir CAC Presentation | 10/15/18

NEXT STEPS1. EIR “Public Scoping” Meeting

October 30, 6-8pm at Lick-Wilmerding High School

2. Architecture/Sustainability Update and End of Year Festivities December 5, 6-8pm at Ingleside Presbyterian Church

3. Email & Website [email protected]