+ All Categories
Home > Documents > ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste –...

ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste –...

Date post: 13-Dec-2018
Category:
Upload: truongnhan
View: 215 times
Download: 0 times
Share this document with a friend
102
ENVIRONMENTAL COMPANY OF SAO PAULO STATE – CETESB REGIONAL CENTRE OF STOCKHOLM CONVENTION ON POPs FOR LATIN AMERICA AND THE CARIBBEAN REGION V INTERNATIONAL TRAINING PROGRAM ON ENVIRONMENTAL SOUND MANAGEMENT ON CHEMICALS AND WASTES, ESPECIALLY ON PERSISTENT ORGANIC POLLUTANTS (POPs) AND MERCURY (Hg) END-USE TECHNOLOGIES Eng. Sidney Shinke 2016 Sao Paulo – SP – Brazil
Transcript
Page 1: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

ENVIRONMENTAL COMPANY OF SAO PAULO STATE – CETESB

REGIONAL CENTRE OF STOCKHOLM CONVENTION ON POPs FORLATIN AMERICA AND THE CARIBBEAN REGION

V INTERNATIONAL TRAINING PROGRAM ON ENVIRONMENTAL SOUND MANAGEMENT ON CHEMICALS AND WASTES, ESPECIALLY ON PERSISTENT

ORGANIC POLLUTANTS (POPs) AND MERCURY (Hg)

END-USE TECHNOLOGIESEng. Sidney Shinke

2016

Sao Paulo – SP – Brazil

Page 2: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 3: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 4: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 5: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 6: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 7: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LANDFILL - DEFINITION

It is a form of disposing of waste in the ground, which, based onengineering criteria and specific operational standards, ensures asafe confinement in terms of environmental pollution and theprotection of public health (Rocca et al., 1993)

Page 8: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

TECHNICAL STANDARDS

• NBR 8.418/83 - Presentation of landfill designs for hazardous industrial waste• NBR 8.419/92 - Presentation of sanitary landfill designs for municipal solid waste• NBR 10.157/87 - Hazardous waste landfills - Criteria for design, construction and operation• NBR 13.896/97 - Non-hazardous waste landfills - Criteria for design, construction and operation• NBR 15,113/04 - Solid civil construction waste and inert waste -Landfills – Guidelines for design, implantation and operation• NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation, operation and closure

Page 9: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LICENSING

• Environmental Study to prove environmental viability, for obtaining a Preliminary License (LP) • Executive Design with requirements/additions included in the LP, for obtaining an Installation License (LI)• Execution of landfill implantation works in compliance with the approved design with the requirements/ additions included in the LI, for obtaining an Operating License (LO)

Page 10: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

ENVIRONMENTAL STUDY

• Object of licensing• Justification for project• Characterization of project• Preliminary environmental diagnosis of the affected area• Identification of environmental impacts• Mitigating measures• Documentation

Page 11: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

EXECUTIVE DESIGN

• Technical Requirements established in the LP• Technical Responsibility Note (ART) of the party in charge of the project• Design of landfill• Potentiometric map (location of monitoring wells and hydrogeological conditions)• Details and dimensions of lower (foundation) and upper (covering) waterproofing systems• Details and dimensions of rainwater and leachate drainage systems (plans, designs, calculation records, descriptive text)

Page 12: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

EXECUTIVE DESIGN

• Stability study (critical sections studied, hypotheses considered, parameters used (cohesion, specific weight, friction angle), calculation methods, safety factor found, interpretation of results obtained)• Profile of monitoring wells • Landfill management and operation plans (registration and control of waste, segregation of waste, inspection and maintenance, emergency, monitoring of surface and groundwaters, geotechnical monitoring and closure) • Working life, and• Work implantation schedule.

Page 13: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CHOICE OF AREA

The basic premises are, to comply with:

• planning of the economic, social and urban development of the region• fixed guidelines for use and occupation of the soil • protection of public health, and• protection of the environment.

Page 14: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CHOICE OF AREA - REQUIREMENTS

• Minimum distance of 500m from housing units• Minimum distance of 200m from any water collection or watercourse• Slope greater than 1% and less than:

- 20% for class I; and- 30% for class II

• Area not subject to flooding, in recurrence periods of 100 years • Minimum working life of 10 years• Proximity to generating sources and transport routes, and• Area in compliance with local legislation on the use of the land.

Page 15: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CHOICE OF AREA - REQUIREMENTS

• Low potential for aquifer contamination- subsoil with high clay content- unsaturated layer ≥ 1.5m between the landfill base and the highest

level of the water table- subsoil primarily composed of material with permeability

coefficient lower than 5x10-5cm/sec;- low precipitation index, and- high evapotranspiration index.

Page 16: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

HYDROGEOLOGICAL CHARACTERIZATION OF THE AREA

• Definition of the layers constituting the subsoil• Determination of the depth of the water table (in dry season)• Understanding of the dynamics, quality and economic significance of groundwaters• Development of potentiometric maps• Significance of the land in terms of groundwater recharge, and• Assessment of risks of rupture or accentuated erosion of the foundation ground.

Page 17: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

GROUNDWATER - FLOW

Page 18: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

HYDROGEOLOGICAL CONDITIONS OF THE AREAWaste Landfill

Hydrogeological Conditions Unit Hazardous Non-HazardousThickness ofUnsaturated Layer (L)PermeabilityCoefficient (K)

Thickness of Unsaturated Layer(L)PermeabilityCoefficient (K)

Notas:(1) NBR 10157/87 - “Hazardous Waste Landfills – Criteria for

Design, Construction and Operation"(2) NBR 13896/97 - “Non-Hazardous Waste Landfills - Criteria

for Design, Implantation and Operation”

1.5 (1) 1.5 (2)

5x10-5 (2)5x10-5 (1)

3.0 3.0 (2)

10-7 10-6 (2)Desirable

Minimum

m

cm/s

m

cm/s

Page 19: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

TYPES OF LANDFILLS

1. Waste

• Urban/Residential (Sanitary)• Industrial - Non-Hazardous (Class II)• Co-disposal• Industrial - Hazardous (Class I)• Inert• Civil Construction

Page 20: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

2. Constructive System

• Ditch• Trench• Layer• Ditch/Trench and layer

TYPES OF LANDFILLS

Page 21: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Landfills in Ditch

Page 22: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

• Favorable hydrogeological conditions (depth of water level > 1.5 m and permeability coefficient < 5x10-5cm/sec)• Flat terrain• Daily waste disposal up to 10t/day (population of 15,000 to 20,000 inhabitants)• No requirement for waterproofing with geomembrane, drainage of gases and leachates• Operation period 30 days• Width of ditch 3m• Depth of ditch up to 3m• Distance between ditches 1m• Daily coverage 20cm• Final coverage 60cm with a 7% slope from the center to the edges

LANDFILLS IN DITCH

Page 23: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Landfill in Trench

Landfill in Layer

Page 24: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

INFRASTRUCTURE

• concierge, office, bathrooms, laboratory • scale• fence • internal access• lighting• internal and external communication systems• signposting• health protection range• site for storage of waste and construction materials• workshop for equipment maintenance• wheel wash.

Page 25: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Fencing

Page 26: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Plant barrier

Page 27: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Gate

Scale

Page 28: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Guard post

Page 29: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Storage

Page 30: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Wheel wash

Page 31: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

ENVIRONMENTAL PROTECTION ELEMENTS

• Lower waterproofing system (base or foundation)• Leakage detection system via waterproofing• Leachate collection system• Rainwater drainage system• Gas drainage system• Upper waterproofing system - operational and final coverage, and• Monitoring systems (surface and groundwaters, geotechnical).

Page 32: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Environmental protection elements - Landfill for non-hazardous waste

Page 33: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Environmental protection elements - Landfill for hazardous waste

Upper Waterproofing

Leachate Drain

Rainwater DrainFinal Coverage

Waste

Inspection Well

Lower Waterproofing

Sub-surface Drain

Aquifer

Max NA

1.50 m

cm/sec

Page 34: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

WATERPROOFING SYSTEM

• Expected characteristics of a waterproof system in landfills:- Watertightness- Durability- Resistance and mechanical stresses- Resistance to bad weather- Resistance to microorganisms in the ground - Compatibility with the waste to be landfilled

Page 35: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

WATERPROOFING SYSTEM

• The materials commonly employed in landfill waterproofing are:

- Compacted clays, and- Synthetic geomembranes.

• More recently, bentonite has been used ("in natura" permeability , solubility=Class IIA, amount of sodium Na2O >2.0%)

Page 36: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Compound waterproofing

Page 37: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Dual waterproofing

Page 38: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LEAKAGE DETECTION SYSTEMS

• Leakage detection systems, via waterproofing layers, are composed of:

- Sub-surface drains, and - Manholes.

• The sub-surface drains are composed of:- Surface drainage structures (gravel / sand bed) - Linear drainage structures (guide tube).

Page 39: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

WATERPROOFING WITH COMPACTED CLAYS

Technological control with:• Compacted layers of at least 20cm in thickness• Humidity: +/- 2% of the optimum humidity obtained in Proctor compaction testing• Density: minimum of 95% of the density obtained in Proctor compaction testing • Permeability coefficient: lower than 10-7cm/sec.

Page 40: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CONCLUSION REPORT

The technical report proving that the layer of compacted clay meets the specifications of the project, must include:• the results of the tests carried out • the incidents and corrective measures adopted through ought the execution of this layer• details and signature of the responsible technician.

Page 41: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Waterproofing layer with compacted soil - regularization

Waterproofing layer with compacted soil - compaction

Page 42: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

GEOMEMBRANE IN LANDFILLS

The required characteristics of a geomembrane for application in industrial landfills are:• Compatibility with the waste to be landfilled• Resistance to mechanical stresses• Resistance to bad weather, and• Resistance to microorganisms in the ground.

Page 43: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN AND INSTALLATION OF GEOMEMBRANES

The aspects to be observed in the design and installation of geomembranes are:• Geometry of the available area• Optimization of field amendments• Anchoring methods• Laying base• Protection against mechanical stresses, and• Details of interferences and singular points.

Page 44: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN AND INSTALLATION OF GEOMEMBRANES

In the installation and design of geomembranes the following aspects must be considered: • the laying base must be regular and stable• the waterproofing must be designed and implanted by specialized firms, and• the waterproofing must be protected from bad weather and mechanical stresses throughout the landfill operation phase.

Page 45: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CONCLUSION REPORT

The technical monitoring report of the geomembrane implantation must contain:• the results of the tests carried out • the incidents and corrective measures adopted throughout the installation of the geomembrane• details and signature of the responsible technician.

Page 46: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Installation of HDPE geomembrane

Execution of amendment between HDPE geomembranes

Page 47: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Execution of repair to HDPE geomembranes - Hot gas welding

Execution of repair to HDPE geomembranes - Extrusion

welding

Page 48: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Execution of testing of HDPE geomembranes - Spark test

Page 49: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Pressurization test

Page 50: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Vacuum test

Destructive testing (shear stress and detachment)

Page 51: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DAMAGE TO GEOMEMBRANE

Page 52: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Interferences

Source: IGSBrasil Recommendations : IGSBR IGMT 01 2003

Page 53: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

WATERPROOFING WITH BENTONITE GEOCOMPOSITE (GCL)

• Replaces part of the compacted clay layer• Permeability coefficient: lower than 10-9cm/sec• Thickness of around 5mm• Amendments by crossover and placement of bentonite

Page 54: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

INSTALLATION OF BENTONITE GEOCOMPOSITE (GCL)

Page 55: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

SUB-SURFACE WATER (PERCOLATED)

In landfills, all efforts must be invested to prevent the formation of leachates.• Choice of area (dry areas)• Project design (efficient drainage systems):

- for rainwater (prevent)- for leachates (capture)

Page 56: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

COLLECTION AND TREATMENT OF LEACHATES

• The systems for collection and treatment of leachates are composed of:

- Draining or geosynthetic mattress- Gravel drain with guide tube - Accumulation boxes- Pumping station, and- Leachate treatment plant.

Page 57: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

TYPES OF PERCOLATED DRAINNatural TerrainGeotextile Blanket Geotextile Blanket

Blind Drain (without conducting tube)

Blind Drain (with conducting tube)

Page 58: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN OF SUB-SURFACE WATER DRAINAGE SYSTEM (PERCOLATED)

• Description of the draining system• Drainage network in plan form• Slope of the base• Characteristics of the capture and inspection wells, and• Calculation record of the dimensions of the devices, containing:

- design flow- slope of the drain, and- type of drain used (with gravel or geosynthetic, dimensions, with

or without inner tube, diameter of the grit filler, characteristics of the geosynthetic).

Page 59: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN OF SUB-SURFACE WATER DRAINAGE SYSTEM (PERCOLATED)

Q = project flow (m3/sec)c = runoff coefficienti = critical rainfall intensity (m/sec)A = area of contribution basin (m2)

Hydraulics Manual (Azevedo Neto)

Q (l/s) Tube diameter

iQF η

=

Q = c * i * A

Page 60: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LEACHATE DRAINAGE (FISHBONE)

Page 61: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LEACHATE DRAIN

Page 62: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

GAS DRAIN

Page 63: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN OF RAINWATER DRAINAGE SYSTEM

• Contribution basin, in plan form (A)• Type of soil (c)• Type of vegetation (c)• Return period of: 25 years for class I waste, and 5 years for class II waste• Description of the draining system• Drainage network in plan form, and

Page 64: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DESIGN OF RAINWATER DRAINAGE SYSTEM

• Calculation record of the dimensions of the devices, containing:- design flow- average slope of the area and devices- concentration time- critical rain intensity, and- dimensions and description of the devices.

Page 65: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DIMENSIONS OF RAINWATER DRAINAGE SYSTEM

Q = project flow (m3/sec)c = runoff coefficienti = critical rainfall intensity (m/sec)A = area of contribution basin (m2)

Q = c * i * A

Page 66: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DIMENSIONS OF RAINWATER DRAINAGE SYSTEM

tc = concentration time (min)L = maximum thalweg length of the basin (km)I = slope of the thalweg (m/m)H = maximum height of the longitudinal profile

Hydraulics Manual Q (l/s) Channel diameter

iQF η

=

LHI =

i = critical rainfall intensity (mm/min)P(60,10) = precipitation with duration of 60min and return period (T)of 10 years, already occurred, with tabled values (mm)

( ) ( ) ( ) ( )mm/min60.10P*0,50.54t*0,520.21lnTt1i 0,25

cc

−+=

31

c IL5.3t ⎟⎠⎞

⎜⎝⎛=

Page 67: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Concrete channel

Junction box

Page 68: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Descent of water in concrete

Descent of water in gabion

Page 69: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Passage with tube

Water output

Page 70: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Dissipation/ sedimentation basin

Page 71: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

LANDFILL IN DITCH - OPERATION

Page 72: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 73: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

DATA:

Population (P): 10,000 inhabitants;Generation per capita (G): 400 g/inhab.*daySpecific mass of MSW (ρ): ρ=500 kg/m³;Expected working life (v): 10 years. Each ditch must last for 1 monthSection of the ditch: 3 x 3 mArea loss (pa) and Volume loss: 25% + 25%

LANDFILL IN DITCH - DIMENSIONS

Page 74: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CALCULATIONS:• Monthly demand (D):

• Monthly volume (V):

• Length of the ditch (C):

• Total area of the landfill (A):

kgGPD 000,12030*4.0*000,1030** ===

monthmV /³240500

000,120==

m273*3

240C ==

²5.187,1525,1*25,1*10*12*3*27 mA ==

Page 75: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Excavation of ditches

Ditch

Rainwater drain

Fence

Plant barrier

Plant barrier

Fence

Rainwater drain

Opening of ditch

Excavation Earth from new ditch

Page 76: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 77: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Filling of ditches

Ditch in operation

Rainwater drain

Fence

Plant barrier

Plant barrier

Fence

Rainwater drain

Page 78: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Daily coverage of waste

Longitudinal Cut

Rainwater drain

Fence

Plant barrier

Page 79: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Final coverage of ditches

Longitudinal Cut

Rainwater drain

Fence

Plant barrier

Page 80: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 81: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

REGISTRATION AND CONTROL OF DISPOSED WASTE

• Description and quantity of each waste received• Date and site of disposal on the landfill• Registration of incidents• Registration of analyses made on the waste

Page 82: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

WASTE RECEIPT CONTROL

• Timely tests (pH, free liquids, water reactivity, acidic and alkaline medium, "flash point", etc.), and• Complete analyses, carried out at a specific frequency, to check the maintenance of the waste's characteristics.At the cargo receipt control site, a form must be available with with the characterization of the waste ("finger print" - color, odor, physical appearance, reactivity, etc.), approved by CADRI, so that a visual comparison can be made between the residue being received and the approved residue.Nonconformities should be reported to the environmental agency.

Page 83: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

INDUSTRIAL WASTE WHOSE DISPOSAL IS NOT ACCEPTED AT LANDFILLS

It is not permitted to dispose of, at landfills, waste that:• Is inflammable• Is reactive• Is oily • Contains persistent organics • Contains free liquids, and• Organic compounds that may compromise the geomembrane

Page 84: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CELL FORMATION

Cell Formation• Disposal of waste close to the work front• Spreading of waste and upward compaction (5 to 8 tractor treads)• Reduced work fronts• Waste Slope 1(h):2(v)• Berm between the slopes 3m• Daily coverage, with soil, minimum thickness of 0.20m

Page 85: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Landfill in ditch - disposal

Page 86: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Sanitary landfills

Page 87: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Landfill for Civil Construction Waste

Page 88: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Metallic coverage

Sacrificed coverage

Page 89: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

CLOSURE AND POST-CLOSURE

The Closure Plan must include:• Closure works• Future use• Monitoring plans, and• Inspection and maintenance plans

Page 90: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

FINAL COVERAGE

Page 91: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Plant coverage

Organic soil layer

Drainage layer

Final coverage layer

Vertical drainage (biogas and leachates)

Waste

Layer coverage

Base leachate drainage

Mechanical protection of HDPE geomembrane

HDPE Geomembrane

Compacted soil layer

Page 92: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

INSPECTION PLAN

• The facility must be inspected to verify the integrity of its components (drains, dams, pumps, monitoring systems, etc.).

• Identify and correct any issues that may cause accidents to occur.

Page 93: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

ErosionMaintenance

Slipping

Page 94: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

GROUNDWATER MONITORING

The plan must include:• Number of wells• Location• Parameters to be monitored• Sampling frequency • Profile of wells • Procedures for collection and preservation of samples, and• Initial analyses

Page 95: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,
Page 96: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

SURFACE WATER MONITORING

The plan must include:• Location of collection points• Parameters to be monitored• Sampling frequency • Procedures for collection and preservation of samples, and• Initial analyses

Page 97: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Environmental monitoring

SURFACE WATER MONITORING

GROUNDWATER MONITORING

Page 98: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

GEOTECHNICAL MONITORING

The Geotechnical Monitoring Plan must include:• Location of the instruments (superficial landmarks, piezometers, inclinometers, etc.)• Reading frequency • Routine inspections • Corrective and contingency actions, and• Frequency and content of monitoring reports.

Page 99: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Piezometer

PVC TUBE

BENTONITE

CHAMBER

GRAVEL

FINE SANDROUGH SA

ROLLED PE

TOOTHED PVC TUBE

PERFORATED PVC TUB

Page 100: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Superficial landmark

Page 101: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

• Adequate location• Development of careful design:- with implantation of adequate infrastructure, and- with implantation of control works

• The adoption of specific operational rules.

Provide

A safe containment of waste, in terms ofenvironmental pollution control and protection ofpublic health

Page 102: ENVIRONMENTAL COMPANY OF SAO PAULO STATE – … · • NBR 15.849/10 – Municipal solid waste – Small-scale sanitary landfills – Guidelines for location, design, implantation,

Thank you!

Eng. Sidney Shinkeemail: [email protected]: 55 11 3133-3583


Recommended