+ All Categories
Home > Documents > ESIA Albania Annex 8.3 CS03 Noise Study ESIA

ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Date post: 07-Dec-2021
Category:
Upload: others
View: 12 times
Download: 0 times
Share this document with a friend
104
ESIA Albania Annex 8.3 CS03 Noise Study ESIA
Transcript
Page 1: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

ESIA AlbaniaAnnex 8.3 – CS03 Noise Study ESIA

Page 2: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 2 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

TABLE OF CONTENTS

1 INTRODUCTION 3 1.1 General 3 1.2 Scope of study 3 1.3 Noise Immission limits 4 1.3.1 World Bank 4 1.3.2 World Health Organisation 5 1.3.3 Albanian national noise limits 6 1.3.4 Project Specification 7 1.3.5 Summary 7

2 DOCUMENTATION USED 8

3 STANDARDS AND GUIDELINES USED 9

4 SITE DESCRIPTION 10 4.1 Local Situation, Sensitive Receptor Points 10 4.2 Proposed Gas Compression Station 11

5 NOISE MODELLING 12 5.1 Methodology 12 5.2 Meteorological conditions considered 12

6 NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM) 13

7 PREDICTED NOISE LEVELS 19

8 CONCLUSION 20

GLOSSARY OF TERMS 21

ATTACHMENTS 22

Page 3: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 3 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

1 INTRODUCTION 1.1 General

The TAP AG proposes to develop the Trans Adriatic Pipeline to transport natural gas from the Middle East Area via Greece, Albania and across the Adriatic Sea to southern Italy.

The pipeline transport capacity will be initially approx. 10 billion cubic meters / year. In order to provide this gas capacity a gas compressor facility on the Albanian Coast is need among other stations. It is planned to develop the initial transport capacity at a later stage up to an ultimate transport capacity of 20 billion cubic meters / year.

Genest und Partner Ingenieurgesellschaft mbH was commissioned by E.ON New Build & Technology GmbH to undertake a noise modelling study of the proposed gas compressor station ACS03 at district Fier, Albania, near the Albanian coast. The study will form part of an Environmental Assessment Impact of the site and is therefore based on the future ultimate gas transport capacity of 20 BCM/Y.

In this report, all necessary noise control measures for the proposed gas compressor station ACS03 will be specified to comply with various noise limits, which are discussed later in this report under section 1.3.

1.2 Scope of study

According to document CAL00-ENT-000-A-TSA-0001, Rev. 1, the task of this study is to identify noise mitigation options in plant selection and design in order to achieve compliance with the governmental noise level requirements. As a first step a preliminary estimate for the noise emission and the necessary mitigation measures should be prepared.

The following list outlines the major activities undertaken during the course of the noise impact assessment.

• Review of documentation provided by E.ON New Build & Technology GmbH including

Data Site & Utility Data, site plans and topographical data.

• Estimation of noise emission levels (sound power levels) for equipment associated with

the proposed operation.

Page 4: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 4 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

• Development of an acoustic model for the proposed compressor station and the

surrounding area.

• Calculation of noise levels at sensitive receptors using the noise prediction method

described in ISO 9613 ‘Acoustics – Attenuation of sound during propagation outdoors –

Part 2: General method of calculation’ for the meteorological conditions given in

document ACS03-ENT-300-TDX-0003, Rev. 0B.

The acoustic model shall only consider continuous and discontinuous noise sources during normal operation of the plant.

The following noise sources are to be excluded from the modelling and determination of the predicted sound pressure level:

• Construction, pre-commissioning and commissioning noise emissions

• Maintenance activity like vehicle road noise, crane movements etc.

1.3 Noise Immission limits

Currently there are no statutory regulations governing environmental noise immissions in the surrounding area of the proposed compression station. Several criteria are therefore discussed below to provide information of international standards.

1.3.1 World Bank In the ‘Pollution Prevention and Abatement Handbook’ issued by the World Bank Group in

April 1999 (Permanent URL: http://go.worldbank.org/E6G093QFZ1), noise limits for new

installations financed by the World Bank are set out, which are summarized below in Table 1.

Additionally, it is stated in the handbook that an increase of up to 3 dB above the existing

background noise levels at receptors outside the property boundary is considered acceptable.

Table 1: World Bank noise limits, maximum LAeq in dB(A)

Receptor Day

(07:00 – 22:00) Night

(22:00 – 07:00)

Residential, institutional, educational 55 45

Industrial, commercial 70 70

Page 5: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 5 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

1.3.2 World Health Organisation In the WHO document „Guidelines for Community Noise‘, guideline limit values for community

noise in various specific environments are provided. Noise levels below the limits are considered

necessary to minimize any temporary or long-term deterioration in physical, psychological or

social functioning associated with noise exposure. The values form the basis of many

international environmental noise policy limits and are summarized in Table 2 below.

Table 2: WHO Guideline values

Specific Environment Critical Health Effects LAeq

dB(A) LAmax

dB(A)

Outdoor living area Serious annoyance, daytime and evening

Moderate annoyance, daytime and evening 55 50

Inside bedrooms Sleep disturbance, night-time 30 45

Outside bedrroms Sleep disturbance, window open (outdoor

values) 45 60

School, playground outdoor

Annoyance (external source) 55

Industrial, commercial, shopping and traffic areas, indoors and Outdoors

Hearing impairment 70 110

Page 6: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 6 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

1.3.3 Albanian national noise limits

The national noise standards are subject of Instruction No. 8 “Allowed noise norms in the environment”, dated 27.11.2007 (Udhezim Nr. 8, date 27.11.2007, Nivelet kufi te zhurmave ne mjedise te cakturara). The noise limits in this instruction are listed in the table below and correspond with the noise limits set out by the WHO:

Table 3: Guideline values for community noise according to Albanian legislation

Specific Environment Critical Health Effects LAeq

dB(A) Time base

LAmax

dB(A)

Residential area

Serious inconvenience (discomfort), during daytime and evening

55 16 --

Outside housing Moderate inconvenience (discomfort), during daytime and evening

50 --

Inside housing Understanding of conversations and moderate inconvenience (discomfort),, during daytime and evening.

35 16 --

Inside the bedroom Dissolution of sleep at night. 30 8 --

Outside bedroom Dissolution of sleep, open window (outside norms) (5).

45 8 --60

Institutions

Classroom teaching, preschool institutions (inside)

Understanding of conversations, difficulties in terms of information, communication of the message

35 During the

class --

Sleeping rooms in the kindergarten

Dissolution of sleep 30 Sleeping

time --

School yard, school play areas

Inconvenience (discomfort) – external sources

55 Rest time --

Dissolution of sleep at night 30 8 40 Hospital, halls, rooms (inside) Dissolution of sleep during the day and

evening 30 16

Hospital, treatment rooms (inside)

Influence on rest, recuperation (1)

Page 7: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 7 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Areas of social – economic activities

Industrial, commercial zones, traffic (inside and outside)

Hearing impairment 70 24 110

Specific Environment Critical Health Effects LAeq

dB(A) Time base

LAmax

dB(A)

Urban environment

Public environment, inside or outside

Hearing impairment 85 1 110

Ceremonies, festivals and entertainment

Hearing impairment (clients < 5 time/year)

100 4 110

Hearing music through headphones

Hearing impairment 85 (4) 1 110

Hearing impairment (adults) 140 (2) Impulsive sounds – noise of fireworks and firearms Hearing impairment (Children)

120 (2)

Public parks

Public parks and protected areas

Disturbing silence (3)

(1) as low as possible;

(2) peak sound pressure (not LAmax, fast), measured 100 mm from the ear;

(3) existing quiet outdoor areas shall be preserved and the ratio of intruding noise to natural background sound shall be kept low;

(4) under headphones, adapted to free-field values;

(5) The perception of the noise in the bedroom with open windows.

1.3.4 Project Specification

Until further notice, the noise limits within this project will be set to LAeq ≤ 65 dB(A) at the station fence measured as hourly averaged noise level.

1.3.5 Summary

Compliance with the project specification, detailed in Section 1.3.3, will ensure compliance with all other criteria applicable for the nearby residential areas of Gjokallija, Semani (Kavakllia) and Sheq-Marinasi.

Page 8: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 8 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

2 DOCUMENTATION USED

− Specification Noise Survey Document No.: CAL00-ENT-000-A-TSA-0001, Rev.: 01

− Project Manual – Part 12 – Document Control Document No.: CAL00 – ENT-000-B-TPA-0012, Rev.: 0D

− Project Manual – Part 16 – Engineering Manual Document No.: CAL00-ENT-000-B-TPA-0016, Rev.: 0C

− Data Sheet CS03 – Site & Utility data Document No.: ACS03-ENT-300-TDX-0003, Rev.: 0B

− ACS03 Process Flow Diagram Document No.: ACS03-ENT-000-P-DPP-0003, Rev.: 0D, Page 1

− ACS03 - Heat and Material Balance Document No.: ACS03-ENT-000-P-DPP-0003, Rev.: 0D, Page 2

− Geo-referenced topographical Bitmap TopoCS3.tif (GeoTIFF_UTM84-34N)

− Compression Building (Floor plans and sectional drawings) Document No.: GCS01-ENT-951-Z-DQB-001, Rev.: 0A Preliminary 17.05.2011

− CS03 Gas Compression Station Fier – Layout as ACAD-File Document No.: ACS03-ENT-000-Q-DQA-0001_0D_2011.12.19

Page 9: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 9 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

3 STANDARDS AND GUIDELINES USED

DIN EN 12354-4 „Building acoustics – Estimation of acoustic performance of buildings from the performance of products Part 4: Transmission of indoor sound to the outside“, Issue date: 2001-04

VDI 3733 „Noise at pipes“ Issue date: 1996-07

VDI 3734 Part 1

„Characteristic noise emission values of technical sound sources; air coolers“ Issue date: 1981-02

DIN ISO 9613 Part 2

Acoustics - „Attenuation of sound during propagation outdoors, Part 2: General method of calculation“ Issue date: 1999-10

Udhezim Nr. 8 Per nivelet kufi te zhurmave ne mjedise te caktuara Issue date: 27.11.2007

Page 10: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 10 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

4 SITE DESCRIPTION 4.1 Local Situation, Sensitive Receptor Points

The Gas Compression Station is proposed for a site within Fier district, Albania. The local situation can be seen from the aerial image below.

The area is a primarily rural area. The closest residences to the site are the settlements of ‚Semani (Kavakllia)‘, ‚Gjokalljia‘ and ‚Sheq-Marinas‘.

The shortest distance between the proposed compression station and community areas is to ‘Semani’, with a distance of approx. 1540 m.

Picture 1: aerial image with the proposed compression station and nearby communities

Proposed ACS03 Compression Station

Page 11: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 11 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Table 4: Noise sensitive receptors

Sensitive receptor Distance / Direction

Semani (Kavakllia), nearest outskirt of village

approx. 1580 m east

Gjokallija nearest outskirt of village

approx. 2070 m south-east

Sheq-Marinasi nearest outskirt of village

approx. 2030 m south-west

Cemetery

approx.. 750 m south-east

Single dwelling between cemetery and receptor point Gjokallja

approx.. 1150 m south-east

At the station fence approx. 270 m east

At the station fence approx. 380 m south

4.2 Proposed Gas Compression Station

Five 15 MW gas turbines will be installed of which four units will be in operation simultaneously at full load. One compression unit is reserved for standby. Each gas compressor unit comprises one natural gas compressor with a gas turbine driver and will be located within its own compression building.

The compression buildings will be a solid construction (concrete walls or brick walls) with sound proof doors and air ventilation systems. The combustion air intake filter equipment and the exhaust ducts and stacks will be located outside, adjacent to the compression building. It is assumed that the gas turbine driver will be equipped with an additional enclosure.

Two gas coolers, each equipped with 10 low noise fans and one recycle cooler with four fans will be located to the north of the compression buildings. The area between the compression buildings and the gas coolers is reserved for the pipe work. Piping, which is located above ground, must be equipped with a sound proof cladding.

Page 12: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 12 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

5 NOISE MODELLING 5.1 Methodology

In order to determine the extent of noise emission from the proposed site a 3D computer noise model has been developed. The model was developed using the prediction software ‚SoundPLAN, Version 7.1,‘ in conjunction with topographic information supplied in digital form. The significant noise sources were built in the model at the locations obtained from the provided plot plans.

The noise predictions have been performed according to ISO 9613-2 within The method incorporates the influence of geometrical divergence, ground absorption, atmospheric absorption (in accordance with ISO 9613-1), shielding (barrier) attenuation and meteorological conditions.

For the noise assessment of the planned compression station, sound power data from Section 6 was used, assuming the worst-case scenario of all five gas compressions units operating at full capacity.

According to ISO 9613-2, Table 5, the accuracy of the model is within a range of ±3 dB.

5.2 Meteorological conditions considered

According to the Data Sheet CS03 – Site & Utility Data, the noise prediction needs to be carried out for the following meteorological conditions:

Table 5: Meteorological conditions considered in the noise model

Temperature (°C) Relative Humidity (%)

Barometric Pressure (hPa)

Wind Speed and Direction

17 75 1013 10 km/hr ≈ 2,8 m/s towards receptor

Cmet was generally set to zero. No vegetation was considered within the noise model. The ground beneath the noise sources were modelled as fully reflective (ground absorption zero). Outside of the proposed compression station the ground was considered as agriculturally used area with a ground absorption factor 0,85.

Page 13: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 13 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

6 NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM)

The following outlines the source sound power levels to be associated with the major noise emitting equipment at the proposed site:

Table 6: Noise Specifications

Exhaust stack opening per unit, including stack surface LWA ≤ 88 dB(A)

NCM: Exhaust silencer with staggered splitters

Exhaust duct outside compressor building, per unit LWA ≤ 85 dB(A)

NCM: Sound proof cladding

Filter house, combustion air intake, per unit LWA ≤ 78 dB(A)

NCM: Air intake silencer with staggered splitters

Air intake duct outside compressor building, per unit LWA ≤ 78 dB(A)

NCM: Sound proof cladding

Turbine enclosure ventilation inlet, per unit LWA ≤ 76 dB(A)

NCM: Inlet silencer

Turbine enclosure ventilation outlet, per unit LWA ≤ 76 dB(A)

NCM: Outlet silencer

Oil cooler outside compressor building, per unit LWA ≤ 90 dB(A)

NCM: To be guaranteed by the supplier

Oil mist separator outlet, per unit LWA ≤ 78 dB(A)

NCM: To be guaranteed by the supplier

Gas compression unit inside compressor building for one unit LWA ≤ 110 dB(A)

NCM: To be guaranteed by the supplier (enclosed gas turbine package). 100 mm sound proof cladding of gas pipes inside the compressor building. Resulting sound pressure level inside the building, averaged: LpA approx. 94 dB(A)

Page 14: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 14 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Compressor building

Walls R’w ≥ 48 dB

NCM: Concrete or brickwork, m ≥ 280 kg/m²

Roof R’w ≥ 45 dB

NCM: Concrete, m ≥ 210 kg/m², plus thermal insulation

Explosion panel, approx. 8,6 x 18 m, as part of the roof of each compressor building R’w ≥ 16 dB

NCM: To be guaranteed by the supplier

Doors, in situ R’w ≥ 30 dB

NCM: To be guaranteed by the supplier

Building ventilation inlet, per opening (four per building assumed) LWA ≤ 67 dB(A)

NCM: Air inlet silencers with staggered splitters

Building ventilation outlet on roof, per unit (four per building assumed) LWA ≤ 84 dB(A)

NCM: To be guaranteed by the supplier

Gas cooler with 10 fans, per cooler (two coolers considered) LWA ≤ 91 dB(A)

NCM: To be guaranteed by the supplier

One Start-up cooler with 4 fans LWA ≤ 87 dB(A)

NCM: To be guaranteed by the supplier

Gas flow noise within gas coolers, per cooler (identical for the two gas cooler and the start-up cooler) LWA ≤ 91 dB(A)

NCM: To be reviewed during detail engineering.

Gas cooler, vertical pipework, upstream LWA ≤ 77 dB(A) / m

NCM: To be reviewed during detail engineering, probably 100 mm sound proof cladding.

Page 15: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 15 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Gas cooler, vertical pipework, downstream LWA ≤ 74 dB(A) / m

NCM: To be reviewed during detail engineering, probably 100 mm sound proof cladding.

Station inlet filter, per unit (in total four filter assumed) LWA ≤ 75 dB(A)

NCM: To be reviewed during detail engineering, normally no action needed.

Meter run, per unit (in total four parallel trains assumed) LWA ≤ 87 dB(A)

NCM: To be reviewed during detail engineering, probably 100 mm sound proof cladding.

Page 16: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 16 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Compressor piping outdoors, suction side of compressor, per unit LWA ≤ 88 dB(A)

NCM: To be reviewed during detail engineering, probably 150 mm sound proof cladding.

Compressor piping outdoors, discharge side of compressor, per unit LWA ≤ 90 dB(A)

NCM: To be reviewed during detail engineering, probably 150 mm sound proof cladding.

Recycle valve, per unit LWA ≤ 85 dB(A)

NCM: To be reviewed during detail engineering, probably enclosed.

Header, suction side (if above ground) LWA ≤ 76 dB(A) / m

NCM: To be reviewed during detail engineering.

Header, discharge side, above ground (a total length of 185 m is assumed) LWA ≤ 78 dB(A) / m

NCM: To be reviewed during detail engineering, probably 150 mm sound proof cladding.

Air compressor, per unit Air intake Room ventilation outlet

LWA ≤ 65 dB(A) LWA ≤ 66 dB(A)

NCM: Within Utility Building. Silencers at intake and outlet

Boiler room (Heating) Stack Room ventilation, air intake Room ventilation, outlet

LWA ≤ 76 dB(A) LWA ≤ 70 dB(A) LWA ≤ 70 dB(A)

NCM: Within Utility Building. probably silencers at intake and outlet

Page 17: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 17 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Fuel gas skid I and II Building surface (walls, roof, door) Room ventilation, intake Room ventilation, outlet

LWA ≤ 72 dB(A) LWA ≤ 66 dB(A) LWA ≤ 66 dB(A)

NCM: Solid or lightweight construction, walls and roof R’w ≥ 37 dB Door R’w ≥ 30 dB

Power generation I and II Building surface (walls, roof, door) Stack opening Room ventilation, intake Room ventilation, outlet

LWA ≤ 82 dB(A) LWA ≤ 90 dB(A) LWA ≤ 74 dB(A) LWA ≤ 74 dB(A)

NCM: Solid or lightweight construction, walls and roof R’w ≥ 37 dB Door R’w ≥ 30 dB

Administration Building, Electrical Building, Workshop / Stores Building It is assumed, that sound pressure levels inside these buildings are usually not higher than

LpA 85 dB(A)

NCM: Solid or lightweight Building construction, walls and roof R’w ≥ 37 dB Doors R’w ≥ 30 dB Ventilation openings (if necessary) LwA ≤ 75 dB(A)

Air condition units outdoors (6 assumed) LwA ≤ 85 dB(A)

Optional (instead of one turbine driven gas compressor): Combined Cycle - Steam Turbine with gas compressor, installed within a solid building Average sound pressure inside turbine hall Four heat recovery steam generator One condensate Cooler

LpA 96 dB(A)

LWA 94 dB(A) / unit

LWA 93 dB(A)

NCM: Solid or lightweight Building construction, walls and roof R’w ≥ 48 dB Large Door R’w ≥ 30 dB Small Doors R’w ≥ 25 dB Ventilation openings, air intake LwA ≤ 75 dB(A)

Ventilation openings, air outlet LwA ≤ 84 dB(A)

Page 18: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 18 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

Additional remarks:

All specified sound power levels must be free of a tonal noise characteristic. A tonal characteristic may exist if the sound pressure levels of two adjacent 1/3 octave bands differ by 5 dB or more.

Noise with a tonal characteristic may be produced by the gas compressors due to their blade passing frequency. This subject should be reviewed during detail engineering phase for further decisions.

Tonal noise characteristics are especially not acceptable at the Non Return Valves (NRV) or the filter screens.

Impulsive noise is likely not to be considered under normal operation. However, the fuel gas vent system will be activated after shut down of a compression unit, thus the sound power level of this system should not exceed LWA = 100 dB(A).

Due to the highest priority of environmental and safety aspects noise emissions during emergency cases are likely not to be considered within an environmental impact study. Nevertheless, noise emissions of emergency power generators and/or fire extinguisher pumps should be limited for the purpose of routinely necessary test runs. The sound power level of those diesel motor driven equipment should therefore not exceed LWA = 95 dB(A) each.

Page 19: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 19 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

7 PREDICTED NOISE LEVELS

Noise levels in the area surrounding the site have been predicted using SoundPlan 7.1 as described in Section 5.1 above. The prediction software is well recognized and accepted for its accuracy and validity.

The predicted noise levels at each receptor, based on the modelled data outlined in Section 6 are summarized in Table 7 below.

Table 7: Plant operation noise at sensitive receptors (without combined cycle)

Sensitive receptor Noise Level LAeq

Semani (Kavakllia), nearest outskirt of village

29,7 dB(A)

Gjokallija nearest outskirt of village

28,1 dB(A)

Sheq-Marinasi nearest outskirt of village

29,2 dB(A)

Cemetery

37,5 dB(A)

Single dwelling between cemetery and receptor point Gjokallja

33,1 dB(A)

At the station fence East on east side

49,9 dB(A)

At the station fence on south side

49,4 dB(A)

From the table above, it can be seen that noise levels will be clear below the 45 dB(A) criterion suggested by the World Bank, the WHO and the Albanian legislation for outdoor noise levels in residential areas during night time.

Further, the predicted noise levels at the station fence comply with the project specification outlined in Section 1.3.4.

The contribution of each individual noise source to the resulting total sound pressure level at the sensitive receptors can be drawn from the numerical charts in Attachment 3.

The noise contour plot for the scenario modelled is shown in Attachment 4.

Page 20: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 20 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

8 CONCLUSION

It is proposed to develop a gas compression station in the district Fier, near the Albanian coast. The compression station will comprising five gas compressions units along with the necessary auxiliary equipment.

To predict the noise impact in the surrounding area a 3D noise model was developed. The prediction results in this report indicates that noise received at the closest residences at Semani (Kavakllia), Gjokallija, Sheq-Marinasi and a single dwelling (between cemetery and receptor point Gjokallja) from the full capacity operation of the proposed gas compression site ACS03 would be deemed to comply with the guidelines of the World Bank and the WHO at all times.

This will be achieved by noise control treatment to plant equipment as specified in Section 6.

The predicted noise levels at the sensitive receptors will be at least 12 dB(A) below the guideline value of 45 dB(A) which is a sufficient margin for changes in the planning or further extensions of the compression station that are likely to come.

This Study comprises 20 pages and 4 Attachments.

Genest und Partner Ingenieurgesellschaft mbH

Ludwigshafen/Rhein, January 28.2012 Scherer

Page 21: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 21 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

GLOSSARY OF TERMS

Lp / LpA unweighted / A-weighted sound pressure level in dB / dB(A)

Lpi Sound pressure level inside of rooms or enclosures in dB / dB(A)

Leq / LAeq unweighted / A-weighted energy averaged noise from a source, equivalent continuous sound pressure level over a given period in dB / dB(A)

LW / LWA unweighted / A-weighted sound power level in dB / dB(A)

L‘W Sound power level per unit (m or m²)

R‘w Sound transmission loss in dB

De Insertion loss in dB

S Area in m²

s Distance in m

K0 Solid angle index in dB

Adiv Attenuation by geometric divergence

Aatm Attenuation by atmospheric absorption

Agr Attenuation by ground effect

Abar Attenuation by barrier or screening

Amisc Attenuation by miscellaneous effects

Cmet Meteorological correction

dLrefl Increase of noise by reflection

Page 22: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Page 22 of 22

Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP

Document Title: ESIA Albania Annex 8.3 – CS03 Noise Study ESIA ACS03-WGP-000-S-TRS-0002

Rev.: 00

ATTACHMENTS

Attachment 1: Topographical overview

Attachment 2: Station layout

Attachment 3: Detailed noise prediction results

Attachment 4: Noise contour plot

Page 23: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Cemetery

Single dwelling

34367500

34367500

34368000

34368000

34368500

34368500

34369000

34369000

34369500

34369500

34370000

34370000

34370500

34370500

34371000

34371000

34371500

34371500

45

15

00

0

45

15

00

0

45

15

50

0

45

15

50

0

45

16

00

0

45

16

00

0

45

16

50

0

45

16

50

0

45

17

00

0

45

17

00

0

45

17

50

0

45

17

50

0

45

18

00

0

45

18

00

0

45

18

50

0

45

18

50

0

Attachment 1

StudyNo. 227C2 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression StationACS03 at district Fier, AlbaniaESIA Layout

Topographical Overview

Map Source:

Aerial Image Google Earth

-----------------------------------------------------------

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Noise LevelLAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:15000

00 100 200 400 600 800

ACS03-WGP-000-S-TRS-0002_00 Attachment 1

1 of 1

Page 24: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

HUtility Building

Administration Building

Chromatograph

Vent

Scraper Launching Station

Scraper Receiving\PStation

Parking Area (30 cars)

Workshop/Stores Building

Gate House

Filter

Filter

Garage

Second access for fire brigade

Maintenance\PShelter\PPipeline

Oil Cooler

Control Room Building

Condensate\PTank

Oil Cooler

Oil Cooler

Filter

Metering

Unit 1

Unit 3

Transportation Gas Cooler

Extinguishing Water Supply

Wasching Area

Petrol filling station

Container Area

Transportation Gas Cooler

Unit 2

Unit 4

Unit 5

Fuel Gas Skid

Start Up Gas Cooler

Metering Shelter

Power Generation

Sterile area

Fuel Gas Skid

(Small Sewage Works)Waste Water Treatment Plant

Electrical Building

H = 2200

H = 2300

H = 2400

H = 2500

R =

12

00

R =

13

00

R =

14

00

34369000

34369000

34369100

34369100

34369200

34369200

34369300

34369300

34369400

34369400

34369500

34369500

34369600

34369600

45

16

80

0

45

16

80

0

45

16

90

0

45

16

90

0

45

17

00

0

45

17

00

0

45

17

10

0

45

17

10

0

45

17

20

0

45

17

20

0

45

17

30

0

45

17

30

0

Attachment 2

StudyNo. 227C2 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression StationACS03 at district Fier, AlbaniaESIA Layout

Station Layout

Map Source:

1) Aerial Image Goolge Earth2) Drawing file ACS03-ENT-000-Q-DQA-0001_0D_201112.19.dxf

-----------------------------------------------------------

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Elevation point

Elevation line

Noise LevelLAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:2500

00 12,5 25 50 75 100 125m

ACS03-WGP-000-S-TRS-0002_00 Attachment 2

1 of 1

Page 25: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Legende Source No. Number of sourceSource Source nameGroup Group nameLi dB(A) Indoor sound pressure levelR'w dB Transmission lossLw' dB(A) Sound power level per m,m²l or S m,m² Size of source (length or area)Lw dB(A) Sound power level per unitKo dB Correction for non spherical emissions m Distance source - receptor pointAdiv dB Attenuation due to divergenceAgr dB Attenuation due to ground effectsAbar dB Attenuation due to barrierAatm dB Attenuation due to atmospheric absorptiondLrefl dB Increase of noise due to reflectionsCmet Meteorological correctionLr,i dB(A) Assessed sound pressure at receiver

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

1 of 78

Page 26: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Cemetery Ld = 37,6 dB(A) Ln = 37,6 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 1206,9 -72,6 2,3 -9,6 -2,6 1,4 0,0 5,9

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 1205,0 -72,6 2,3 -10,9 -2,5 1,3 0,0 4,6

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 1200,8 -72,6 2,3 -14,4 -2,4 0,0 0,0 -0,1

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 1199,0 -72,6 2,3 -16,3 -2,3 0,0 0,0 -1,8

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1030,1 -71,2 1,0 -4,3 -3,4 0,0 0,0 8,1

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1026,0 -71,2 1,0 -4,3 -3,3 0,0 0,0 8,1

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1037,2 -71,3 1,0 -4,4 -3,4 0,0 0,0 7,9

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1032,7 -71,3 1,0 -4,3 -3,3 0,0 0,0 8,1

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1041,1 -71,3 2,3 -17,1 -0,5 0,0 0,0 -14,6

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1026,0 -71,2 2,3 0,0 -2,7 0,0 0,0 0,4

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1042,3 -71,4 2,3 -13,5 -0,4 0,0 0,0 -10,8

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1032,1 -71,3 2,3 -10,6 -0,4 0,0 0,0 -7,9

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 1041,9 -71,3 1,1 -16,9 -0,8 0,0 0,0 -18,1

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1036,9 -71,3 2,4 -21,5 -2,8 0,0 0,0 -22,1

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 1022,1 -71,2 1,1 0,0 -2,3 0,0 0,0 -2,9

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 1022,3 -71,2 1,2 0,0 -1,4 0,0 0,0 11,7

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 1018,7 -71,2 2,3 0,0 -4,7 0,0 0,0 1,1

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 1022,3 -71,2 3,9 0,0 -0,8 0,0 0,0 12,9

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1017,1 -71,1 2,4 0,0 -4,6 0,0 0,0 -2,4

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 1037,3 -71,3 1,1 -12,5 -1,0 0,0 0,0 -13,2

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1044,7 -71,4 2,4 -19,3 -2,5 0,0 0,0 -19,7

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1029,2 -71,2 2,4 -12,4 -2,9 0,0 0,0 -13,1

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 1036,1 -71,3 3,8 -9,6 -0,2 0,0 0,0 3,8

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 1031,7 -71,3 -0,1 -3,9 -2,0 0,0 0,0 -7,1

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1042,7 -71,4 1,4 -16,1 -0,4 0,0 0,0 -6,4

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1042,4 -71,4 0,8 0,0 -4,8 0,0 0,0 4,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

2 of 78

Page 27: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 1030,7 -71,3 0,3 -4,2 -2,8 0,0 0,0 18,1

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1018,8 -71,2 1,0 -4,3 -3,3 0,0 0,0 8,2

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1014,7 -71,1 0,9 -4,3 -3,3 0,0 0,0 8,3

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1026,1 -71,2 1,0 -4,4 -3,4 2,5 0,0 10,5

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1021,5 -71,2 1,0 -4,3 -3,3 2,5 0,0 10,6

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1009,8 -71,1 2,3 0,0 -2,7 0,0 0,0 0,6

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1020,2 -71,2 2,3 -2,8 -1,9 0,0 0,0 -1,5

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1029,9 -71,2 2,3 -14,1 -0,4 0,0 0,0 -11,3

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1006,6 -71,0 2,3 0,0 -2,7 0,0 0,0 0,6

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 1014,7 -71,1 1,1 -0,4 -2,2 0,0 0,0 -2,0

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1007,3 -71,1 2,4 0,0 -4,6 0,0 0,0 -2,3

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1023,1 -71,2 2,4 0,0 -4,7 0,0 0,0 -2,4

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 1016,0 -71,1 1,5 0,0 -2,2 0,0 0,0 -26,9

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 1029,4 -71,2 1,1 -14,3 -0,9 0,0 0,0 -15,4

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1034,4 -71,3 2,4 -20,4 -2,5 0,0 0,0 -20,7

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 1010,3 -71,1 1,0 0,0 -2,2 0,0 0,0 -2,8

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 1010,4 -71,1 1,2 0,0 -1,3 0,0 0,0 11,8

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 1013,5 -71,1 2,3 0,0 -4,6 0,0 0,0 1,2

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 1010,4 -71,1 3,9 0,0 -0,8 0,0 0,0 13,0

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1015,4 -71,1 2,4 0,0 -4,6 0,0 0,0 -2,4

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 1020,4 -71,2 -0,1 -3,9 -2,0 0,0 0,0 -7,0

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1031,4 -71,3 1,4 -12,7 -0,4 0,2 0,0 -2,9

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1019,5 -71,2 0,8 0,0 -4,7 0,0 0,0 4,9

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 1019,5 -71,2 0,2 -4,2 -2,8 0,9 0,0 19,1

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 989,0 -70,9 0,9 -4,3 -3,3 0,0 0,0 8,4

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 984,7 -70,9 0,9 -4,3 -3,3 0,0 0,0 8,5

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 995,9 -71,0 0,9 -4,3 -3,4 0,0 0,0 8,3

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 990,9 -70,9 0,9 -4,3 -3,3 0,0 0,0 8,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.3 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

3 of 78

Page 28: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1000,1 -71,0 2,3 -17,2 -0,5 0,0 0,0 -14,3

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 983,8 -70,9 2,3 0,0 -2,7 0,0 0,0 0,8

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1000,5 -71,0 2,3 -13,1 -0,4 0,0 0,0 -10,1

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 989,9 -70,9 2,3 -10,2 -0,4 0,0 0,0 -7,2

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 1000,7 -71,0 1,1 -16,6 -0,8 0,0 0,0 -17,4

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 996,2 -71,0 2,4 -21,7 -2,7 0,0 0,0 -21,9

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 980,3 -70,8 1,0 0,0 -2,2 0,0 0,0 -2,4

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 980,5 -70,8 1,2 0,0 -1,3 0,0 0,0 12,1

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 977,1 -70,8 2,3 0,0 -4,5 0,0 0,0 1,6

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 980,5 -70,8 3,9 0,0 -0,8 0,0 0,0 13,3

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 975,7 -70,8 2,4 0,0 -4,5 0,0 0,0 -1,9

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 995,3 -71,0 1,1 -12,2 -1,0 0,0 0,0 -12,5

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1003,1 -71,0 2,4 -18,9 -2,4 0,0 0,0 -18,8

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 987,0 -70,9 2,4 -11,8 -2,9 0,0 0,0 -12,2

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 994,2 -70,9 3,8 -9,2 -0,1 0,0 0,0 4,5

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 990,2 -70,9 -0,2 -3,9 -1,9 0,0 0,0 -6,7

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1001,7 -71,0 1,4 -16,2 -0,4 0,0 0,0 -6,3

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1000,5 -71,0 0,7 0,0 -4,7 0,0 0,0 5,1

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 989,0 -70,9 0,2 -4,2 -2,7 0,0 0,0 18,5

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 978,8 -70,8 0,9 -4,3 -3,3 0,0 0,0 8,6

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 974,5 -70,8 0,9 -4,3 -3,3 0,0 0,0 8,6

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 985,1 -70,9 0,9 -4,3 -3,4 2,4 0,0 10,8

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 980,4 -70,8 0,9 -4,3 -3,3 2,4 0,0 10,9

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 969,7 -70,7 2,3 0,0 -2,7 0,0 0,0 0,9

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 980,5 -70,8 2,3 0,0 -2,7 0,0 0,0 0,9

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 989,9 -70,9 2,3 -14,4 -0,4 0,0 0,0 -11,3

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 966,1 -70,7 2,3 -4,1 -1,1 0,0 0,0 -1,6

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 974,8 -70,8 1,1 -0,3 -2,1 0,0 0,0 -1,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.4 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

4 of 78

Page 29: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 967,1 -70,7 2,4 -3,8 -4,0 0,0 0,0 -5,1

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 983,6 -70,8 2,4 -3,5 -3,9 0,0 0,0 -4,8

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 976,2 -70,8 1,5 0,0 -2,2 0,0 0,0 -26,5

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 989,5 -70,9 1,1 -14,5 -0,8 0,0 0,0 -15,3

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 993,9 -70,9 2,4 -20,4 -2,4 0,0 0,0 -20,3

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 969,5 -70,7 1,0 -1,7 -2,1 0,0 0,0 -4,0

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 969,6 -70,7 1,2 -1,9 -1,0 0,0 0,0 10,6

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 972,4 -70,7 2,3 -2,6 -4,2 0,0 0,0 -0,7

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 969,6 -70,7 3,9 -1,5 -0,4 0,0 0,0 12,3

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 974,1 -70,8 2,4 0,0 -4,5 0,0 0,0 -1,9

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 979,9 -70,8 -0,2 -3,8 -1,9 0,0 0,0 -6,6

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 991,5 -70,9 1,4 -13,2 -0,4 0,2 0,0 -3,0

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 980,0 -70,8 0,7 0,0 -4,6 0,0 0,0 5,3

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 981,0 -70,8 0,2 -4,2 -2,7 0,7 0,0 19,3

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 952,0 -70,6 0,7 -4,2 -3,2 0,0 0,0 8,8

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 947,6 -70,5 0,7 -4,2 -3,2 0,0 0,0 8,8

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 958,3 -70,6 0,8 -4,2 -3,2 0,0 0,0 8,7

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 953,0 -70,6 0,8 -4,3 -3,2 0,0 0,0 8,7

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 963,1 -70,7 2,2 -14,5 -0,4 0,0 0,0 -11,3

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 945,6 -70,5 2,2 0,0 -2,6 0,0 0,0 1,1

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 962,8 -70,7 2,2 -12,4 -0,4 0,0 0,0 -9,2

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 951,8 -70,6 2,2 -9,7 -0,4 0,0 0,0 -6,4

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 948,2 -70,5 0,5 0,0 -2,1 0,0 0,0 -1,4

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 963,7 -70,7 0,8 -14,6 -0,8 0,0 0,0 -15,5

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 959,6 -70,6 2,2 -15,9 -2,4 0,0 0,0 -15,7

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 942,5 -70,5 0,7 0,0 -2,1 0,0 0,0 -2,3

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 942,7 -70,5 1,1 0,0 -1,3 0,0 0,0 12,4

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 939,7 -70,5 2,1 0,0 -4,4 0,0 0,0 1,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.5 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

5 of 78

Page 30: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 942,7 -70,5 3,8 0,0 -0,7 0,0 0,0 13,6

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 938,5 -70,4 2,2 0,0 -4,4 0,0 0,0 -1,6

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 957,4 -70,6 0,9 -11,6 -1,0 0,0 0,0 -11,8

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 965,4 -70,7 2,3 -18,2 -2,3 0,0 0,0 -18,0

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 948,7 -70,5 2,2 -11,1 -2,9 0,0 0,0 -11,3

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 956,2 -70,6 3,7 -8,6 -0,1 0,0 0,0 5,3

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 952,8 -70,6 -0,4 -3,7 -1,8 0,0 0,0 -6,4

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 964,8 -70,7 1,2 -13,4 -0,4 0,0 0,0 -3,3

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 962,7 -70,7 0,6 0,0 -4,5 0,0 0,0 5,4

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 952,5 -70,6 0,0 -4,1 -2,6 0,0 0,0 18,8

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1074,5 -71,6 2,7 0,0 -5,3 0,0 0,0 -18,8

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1083,2 -71,7 2,7 0,0 -5,3 0,0 0,0 -18,9

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1095,9 -71,8 2,7 -8,8 -5,0 0,0 0,0 -26,4

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1089,2 -71,7 2,7 -17,8 -4,2 0,0 0,0 -34,6

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1102,9 -71,8 2,7 -19,3 -4,3 0,0 0,0 -36,0

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 1100,1 -71,8 2,7 -23,1 -4,6 0,0 0,0 -39,3

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1085,1 -71,7 2,7 -10,2 -4,4 0,0 0,0 -26,9

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 1081,5 -71,7 2,7 -8,9 -4,4 0,0 0,0 -25,0

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1073,6 -71,6 2,7 -4,7 -4,7 0,0 0,0 -21,7

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1101,2 -71,8 2,7 -23,0 -4,6 0,0 0,0 -40,2

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1099,8 -71,8 2,7 -21,8 -4,5 0,0 0,0 -39,9

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1091,3 -71,8 2,7 -22,3 -4,5 0,0 0,0 -40,4

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 1089,4 -71,7 2,6 -6,4 -5,0 0,0 0,0 -15,2

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 868,8 -69,8 -0,2 0,0 -4,4 0,0 0,0 2,6

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 858,6 -69,7 -0,2 0,0 -4,4 0,0 0,0 2,7

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 848,5 -69,6 -0,3 0,0 -4,3 0,0 0,0 2,8

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 841,7 -69,5 -0,3 0,0 -4,3 0,0 0,0 2,9

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 983,8 -70,9 1,7 0,0 -3,1 0,0 0,0 -2,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.6 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

6 of 78

Page 31: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 992,1 -70,9 1,7 -15,0 -2,4 0,0 0,0 -20,0

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 980,0 -70,8 2,2 0,0 -5,2 0,0 0,0 -11,5

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 980,1 -70,8 1,7 0,0 -3,1 0,0 0,0 -5,5

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 988,7 -70,9 1,7 -15,1 -2,5 0,0 0,0 -17,2

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 986,9 -70,9 1,1 -4,6 -3,0 0,0 0,0 -11,1

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 987,1 -70,9 -4,7 0,0 -2,5 0,0 0,0 -4,1

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 984,7 -70,9 -4,7 -11,7 -2,5 0,0 0,0 -15,7

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 889,6 -70,0 1,7 0,0 -2,8 0,0 0,0 -1,6

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 898,3 -70,1 1,7 -15,8 -2,2 0,0 0,0 -19,8

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 885,1 -69,9 1,6 0,0 -2,8 0,0 0,0 -4,4

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 893,4 -70,0 1,6 -14,0 -2,3 0,0 0,0 -15,3

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 897,7 -70,1 2,2 -18,3 -3,1 0,0 0,0 -26,9

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 891,6 -70,0 1,0 -4,6 -2,7 0,0 0,0 -10,0

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 894,1 -70,0 -4,7 0,0 -2,3 0,0 0,0 -3,0

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 889,4 -70,0 -4,7 -10,4 -2,3 0,0 0,0 -13,3

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 873,0 -69,8 2,2 0,0 -5,0 0,0 0,0 16,0

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 869,9 -69,8 2,2 0,0 -5,0 0,0 0,0 16,1

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 866,5 -69,7 2,1 0,0 -5,0 0,0 0,0 16,1

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 863,3 -69,7 2,1 0,0 -5,0 0,0 0,0 16,1

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 953,7 -70,6 2,1 0,0 -18,8 0,0 0,0 4,4

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 951,8 -70,6 2,1 0,0 -18,8 0,0 0,0 4,5

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 949,9 -70,5 2,1 0,0 -18,7 0,0 0,0 4,5

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 948,0 -70,5 2,1 0,0 -18,7 0,0 0,0 4,6

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 946,2 -70,5 2,1 0,0 -18,7 0,0 0,0 4,6

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 944,3 -70,5 2,1 0,0 -18,7 0,0 0,0 4,6

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 942,4 -70,5 2,1 0,0 -18,7 0,0 0,0 4,7

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 940,6 -70,5 2,1 0,0 -18,6 0,0 0,0 4,7

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 938,7 -70,4 2,1 0,0 -18,6 0,0 0,0 4,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.7 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

7 of 78

Page 32: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 936,8 -70,4 2,1 0,0 -18,6 0,0 0,0 4,8

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 919,9 -70,3 2,0 0,0 -18,4 0,0 0,0 5,2

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 918,2 -70,3 2,0 0,0 -18,3 0,0 0,0 5,2

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 916,4 -70,2 2,0 0,0 -18,3 0,0 0,0 5,2

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 914,6 -70,2 2,0 0,0 -18,3 0,0 0,0 5,3

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 912,9 -70,2 2,0 0,0 -18,3 0,0 0,0 5,3

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 911,1 -70,2 2,0 0,0 -18,3 0,0 0,0 5,4

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 909,4 -70,2 2,0 0,0 -18,2 0,0 0,0 5,4

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 907,6 -70,2 2,0 0,0 -18,2 0,0 0,0 5,4

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 905,9 -70,1 2,0 0,0 -18,2 0,0 0,0 5,5

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 904,2 -70,1 2,0 0,0 -18,2 0,0 0,0 5,5

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 958,1 -70,6 2,1 -1,5 -4,2 1,6 0,0 30,3

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 966,8 -70,7 2,0 0,0 -4,4 1,1 0,0 30,0

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1055,9 -71,5 2,0 0,0 -2,6 0,0 0,0 7,8

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 1053,2 -71,4 2,0 -0,6 -2,6 0,0 0,0 5,1

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 1053,3 -71,4 2,2 0,0 -3,4 0,0 0,0 1,1

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1062,5 -71,5 2,0 -13,0 -1,8 0,0 0,0 -4,5

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 1073,6 -71,6 1,1 -1,0 -2,4 0,0 0,0 18,1

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 1059,1 -71,5 1,8 -4,7 -2,6 0,0 0,0 3,6

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 1059,0 -71,5 -4,7 -15,9 -2,7 0,0 0,0 -12,8

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 1051,1 -71,4 -4,7 0,0 -2,7 0,0 0,0 3,2

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1068,3 -71,6 2,0 0,0 -2,7 0,0 0,0 7,7

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 1077,8 -71,6 2,0 -12,5 -1,9 0,0 0,0 -6,2

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 1077,6 -71,6 2,2 -14,9 -1,5 0,0 0,0 -11,9

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1074,8 -71,6 2,0 -15,5 -1,7 0,0 0,0 -6,9

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 1070,1 -71,6 1,0 -1,0 -2,4 0,0 0,0 18,1

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 1071,5 -71,6 1,8 -4,7 -2,6 0,0 0,0 3,5

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 1071,2 -71,6 -4,7 -15,6 -2,7 0,0 0,0 -12,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.8 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

8 of 78

Page 33: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 1079,8 -71,7 -4,7 -14,6 -2,8 0,0 0,0 -11,7

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 986,7 -70,9 2,2 0,0 -18,5 1,5 0,0 3,2

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 986,7 -70,9 2,2 0,0 -18,5 1,5 0,0 3,2

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 966,1 -70,7 2,1 0,0 -18,9 0,0 0,0 4,4

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 966,1 -70,7 2,1 0,0 -18,9 0,0 0,0 4,4

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 984,1 -70,9 2,2 0,0 -18,5 1,0 0,0 2,8

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 984,1 -70,9 2,2 0,0 -18,5 1,0 0,0 2,8

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 963,5 -70,7 2,1 0,0 -18,9 0,0 0,0 4,4

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 963,5 -70,7 2,1 0,0 -18,9 0,0 0,0 4,4

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 981,6 -70,8 2,2 0,0 -18,5 0,3 0,0 2,1

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 981,6 -70,8 2,2 0,0 -18,5 0,3 0,0 2,1

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 961,0 -70,6 2,1 0,0 -18,9 0,0 0,0 4,5

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 961,0 -70,6 2,1 0,0 -18,9 0,0 0,0 4,5

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 979,1 -70,8 2,2 0,0 -18,5 0,0 0,0 1,8

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 979,1 -70,8 2,2 0,0 -18,5 0,0 0,0 1,8

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 958,4 -70,6 2,1 0,0 -18,8 0,0 0,0 4,5

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 958,4 -70,6 2,1 0,0 -18,8 0,0 0,0 4,5

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 971,7 -70,7 1,0 0,0 -5,3 0,0 0,0 14,0

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 971,7 -70,7 1,0 0,0 -5,3 0,0 0,0 14,0

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 971,7 -70,7 1,0 0,0 -5,3 0,0 0,0 18,0

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 971,7 -70,7 1,0 0,0 -5,3 0,0 0,0 18,0

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 942,7 -70,5 2,2 0,0 -18,0 0,0 0,0 2,4

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 975,4 -70,8 2,2 0,0 -18,4 0,0 0,0 1,7

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 973,6 -70,8 2,2 0,0 -18,4 0,0 0,0 1,8

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 941,0 -70,5 2,2 0,0 -18,0 0,0 0,0 2,4

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 971,7 -70,7 2,2 0,0 -18,4 0,0 0,0 1,8

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 939,3 -70,4 2,2 0,0 -18,0 0,0 0,0 2,5

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 937,5 -70,4 2,2 0,0 -18,0 0,0 0,0 2,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.9 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

9 of 78

Page 34: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 969,8 -70,7 2,2 0,0 -18,4 0,0 0,0 1,8

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 968,0 -70,7 2,2 0,0 -18,3 0,0 0,0 1,9

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 935,9 -70,4 2,2 0,0 -18,0 0,0 0,0 2,5

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 934,1 -70,4 2,2 0,0 -17,9 0,0 0,0 2,6

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 966,1 -70,7 2,2 0,0 -18,3 0,0 0,0 1,9

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 964,4 -70,7 2,2 0,0 -18,3 0,0 0,0 2,0

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 932,5 -70,4 2,2 0,0 -17,9 0,0 0,0 2,6

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 962,5 -70,7 2,2 0,0 -18,3 0,0 0,0 2,0

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 930,7 -70,4 2,2 0,0 -17,9 0,0 0,0 2,6

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 929,1 -70,4 2,2 0,0 -17,9 0,0 0,0 2,7

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 960,7 -70,6 2,2 0,0 -18,3 0,0 0,0 2,0

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 958,9 -70,6 2,2 0,0 -18,2 0,0 0,0 2,1

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 927,4 -70,3 2,2 0,0 -17,9 0,0 0,0 2,7

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 955,4 -70,6 1,0 0,0 -5,3 0,0 0,0 18,1

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 955,4 -70,6 1,0 0,0 -5,3 0,0 0,0 18,1

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 923,0 -70,3 1,0 0,0 -5,2 0,0 0,0 18,5

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 923,0 -70,3 1,0 0,0 -5,2 0,0 0,0 18,5

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 956,2 -70,6 2,1 0,0 -4,4 0,0 0,0 26,5

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 1015,9 -71,1 -4,7 0,0 -4,5 2,5 0,0 12,1

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 1039,4 -71,3 1,2 -3,1 -2,0 0,0 0,0 15,0

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 1036,9 -71,3 3,1 -8,8 -0,5 0,0 0,0 9,7

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 1045,4 -71,4 2,1 -14,5 -1,5 0,0 0,0 6,7

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 1009,0 -71,1 -4,7 0,0 -2,6 2,4 0,0 17,0

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 1011,8 -71,1 -4,7 0,0 -2,6 2,4 0,0 19,0

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 1004,5 -71,0 -4,7 0,0 -4,5 2,5 0,0 12,2

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 1008,8 -71,1 1,2 -3,1 -1,9 0,0 0,0 15,3

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 1010,8 -71,1 3,1 0,0 -3,4 2,5 0,0 18,3

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 1017,7 -71,1 2,1 0,0 -3,4 2,5 0,0 22,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.10 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

10 of 78

Page 35: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 997,6 -71,0 -4,7 0,0 -2,5 0,9 0,0 15,6

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 1000,3 -71,0 -4,7 0,0 -2,6 1,8 0,0 18,5

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 973,6 -70,8 -4,7 0,0 -4,3 2,5 0,0 12,6

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 997,0 -71,0 1,2 -3,1 -1,9 0,0 0,0 15,4

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 994,7 -70,9 3,1 -8,3 -0,6 0,0 0,0 10,5

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 1003,2 -71,0 2,0 -13,6 -1,5 0,0 0,0 7,9

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 966,7 -70,7 -4,7 0,0 -2,5 2,3 0,0 17,5

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 968,9 -70,7 -4,7 0,0 -2,5 2,3 0,0 19,4

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 964,0 -70,7 -4,7 0,6 -4,3 1,9 0,0 12,8

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 969,2 -70,7 1,1 -3,1 -1,9 0,0 0,0 15,6

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 971,0 -70,7 3,1 0,0 -3,4 0,9 0,0 17,1

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 978,2 -70,8 2,0 0,0 -3,3 2,5 0,0 22,4

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 956,8 -70,6 -4,7 -0,8 -2,4 1,1 0,0 15,6

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 958,7 -70,6 -4,7 0,0 -2,4 2,0 0,0 19,2

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 936,5 -70,4 -4,7 0,0 -4,2 2,5 0,0 13,2

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 958,5 -70,6 1,1 -3,1 -1,9 0,0 0,0 15,7

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 956,5 -70,6 3,0 -7,6 -0,8 0,0 0,0 11,2

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 965,3 -70,7 1,9 -12,3 -1,6 0,0 0,0 9,3

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 929,0 -70,4 -4,7 0,0 -2,4 1,1 0,0 16,6

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 930,3 -70,4 -4,7 0,0 -2,4 2,2 0,0 19,7

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 1129,5 -72,0 -4,7 -2,4 -2,9 0,0 0,0 -9,0

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 1131,1 -72,1 -4,7 -2,1 -2,9 0,0 0,0 -8,8

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 1132,8 -72,1 -4,7 -1,9 -2,9 0,0 0,0 -8,6

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 1169,4 -72,4 -4,6 -0,1 -3,0 0,0 0,0 -9,1

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 1126,5 -72,0 2,2 -8,5 -2,4 2,6 0,0 8,9

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 1125,0 -72,0 2,2 -8,5 -2,4 2,6 0,0 8,9

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 1162,8 -72,3 -4,7 0,0 -3,0 0,0 0,0 -2,0

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 1137,8 -72,1 -4,7 -18,9 -2,9 0,0 0,0 -20,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.11 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

11 of 78

Page 36: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 1134,4 -72,1 -4,6 -0,2 -2,9 0,0 0,0 1,2

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 1146,7 -72,2 2,6 -3,4 -5,1 0,0 0,0 -11,5

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 1172,1 -72,4 2,7 -19,1 -4,6 0,0 0,0 -32,6

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 1129,9 -72,1 2,5 -7,4 -4,9 0,0 0,0 -21,1

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 1155,9 -72,3 2,6 -22,4 -4,8 0,0 0,0 -30,4

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 1151,6 -72,2 2,9 -24,3 -11,4 0,0 0,0 -43,7

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 1149,2 -72,2 2,9 -24,2 -11,3 0,0 0,0 -43,5

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 1145,0 -72,2 2,9 -24,4 -11,5 0,0 0,0 -43,8

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 1137,6 -72,1 2,8 -24,1 -11,2 0,0 0,0 -43,2

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 1150,1 -72,2 2,3 -4,8 -5,6 0,0 0,0 -14,8

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1147,3 -72,2 2,2 0,0 -3,0 0,9 0,0 14,9

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1145,3 -72,2 2,2 0,0 -3,0 0,8 0,0 14,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.12 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

12 of 78

Page 37: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Gjokallija Ld = 28,2 dB(A) Ln = 28,2 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 2356,7 -78,4 2,0 -6,4 -5,2 1,7 0,0 0,6

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 2354,6 -78,4 2,0 -7,5 -5,0 1,6 0,0 -0,3

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 2349,8 -78,4 2,0 -11,5 -4,4 0,0 0,0 -5,4

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 2347,6 -78,4 2,0 -14,2 -4,1 0,0 0,0 -7,8

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2178,9 -77,8 1,3 -4,3 -3,8 0,0 0,0 1,5

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2175,1 -77,7 1,3 -4,3 -3,8 0,0 0,0 1,5

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2187,2 -77,8 1,3 -4,4 -3,9 0,0 0,0 1,3

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2183,1 -77,8 1,3 -4,3 -3,8 0,0 0,0 1,4

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2189,9 -77,8 2,2 -16,0 -0,6 0,0 0,0 -20,1

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2177,1 -77,7 2,2 0,0 -3,0 0,0 0,0 -6,5

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2192,4 -77,8 2,2 -13,7 -0,5 0,0 0,0 -17,7

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2183,1 -77,8 2,2 -10,9 -0,5 0,0 0,0 -15,0

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 2190,7 -77,8 1,2 -15,8 -1,3 0,0 0,0 -23,8

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2184,9 -77,8 2,2 -20,8 -3,8 0,0 0,0 -29,1

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 2172,6 -77,7 1,2 0,0 -4,0 0,0 0,0 -11,0

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 2172,9 -77,7 1,3 0,0 -2,3 0,0 0,0 4,2

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 2168,6 -77,7 2,2 0,0 -8,0 0,0 0,0 -8,9

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 2172,9 -77,7 4,0 0,0 -1,0 0,0 0,0 6,3

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2166,9 -77,7 2,2 0,0 -8,0 0,0 0,0 -12,5

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 2187,9 -77,8 1,2 -12,7 -1,6 0,0 0,0 -20,3

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2194,6 -77,8 2,2 -19,7 -3,6 0,0 0,0 -27,9

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2180,5 -77,8 2,2 -13,2 -4,5 0,0 0,0 -22,3

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 2186,8 -77,8 4,0 -9,9 -0,3 0,0 0,0 -2,9

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 2181,4 -77,8 0,2 -4,0 -3,6 0,0 0,0 -15,0

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 2191,3 -77,8 1,3 -14,8 -0,7 0,0 0,0 -11,9

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 2192,6 -77,8 1,0 0,0 -7,9 0,0 0,0 -4,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.13 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

13 of 78

Page 38: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 2181,2 -77,8 0,5 -4,3 -5,1 0,0 0,0 9,5

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2165,6 -77,7 1,3 -4,3 -3,7 0,0 0,0 1,6

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2161,8 -77,7 1,3 -4,3 -3,7 0,0 0,0 1,6

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2174,1 -77,7 1,3 -4,4 -3,9 2,5 0,0 3,8

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2170,0 -77,7 1,3 -4,3 -3,8 2,5 0,0 3,9

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2156,9 -77,7 2,2 0,0 -3,0 0,0 0,0 -6,4

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2166,2 -77,7 2,2 0,0 -3,0 0,0 0,0 -6,4

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2176,5 -77,7 2,2 -12,8 -0,5 0,0 0,0 -16,8

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2154,4 -77,7 2,2 0,0 -3,0 0,0 0,0 -6,4

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 2161,4 -77,7 1,2 0,0 -4,0 0,0 0,0 -9,9

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2154,7 -77,7 2,2 0,0 -7,9 0,0 0,0 -12,4

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2168,8 -77,7 2,2 0,0 -8,0 0,0 0,0 -12,5

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 2162,5 -77,7 1,5 0,0 -4,0 0,0 0,0 -35,2

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 2176,0 -77,7 1,2 -13,0 -1,5 0,0 0,0 -21,2

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2181,9 -77,8 2,2 -19,8 -3,5 0,0 0,0 -27,9

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 2158,7 -77,7 1,2 0,0 -4,0 0,0 0,0 -11,0

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 2158,9 -77,7 1,3 0,0 -2,3 0,0 0,0 4,3

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 2162,6 -77,7 2,2 0,0 -8,0 0,0 0,0 -8,8

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 2158,9 -77,7 4,0 0,0 -1,0 0,0 0,0 6,4

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2164,8 -77,7 2,2 0,0 -8,0 0,0 0,0 -12,5

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 2168,1 -77,7 0,2 -4,0 -3,5 0,0 0,0 -14,9

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 2177,9 -77,8 1,3 -11,2 -0,8 0,6 0,0 -7,9

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 2165,5 -77,7 1,0 -1,1 -7,2 0,0 0,0 -5,0

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 2167,8 -77,7 0,5 -4,2 -5,1 1,4 0,0 11,0

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2129,1 -77,6 1,2 -4,3 -3,7 0,0 0,0 1,6

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2125,3 -77,5 1,2 -4,3 -3,7 0,0 0,0 1,7

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2137,7 -77,6 1,2 -4,4 -3,8 0,0 0,0 1,5

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2133,1 -77,6 1,2 -4,3 -3,7 0,0 0,0 1,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.14 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

14 of 78

Page 39: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2140,2 -77,6 2,2 -16,1 -0,6 0,0 0,0 -20,0

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2127,0 -77,5 2,2 0,0 -3,0 0,0 0,0 -6,3

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2142,4 -77,6 2,2 -13,6 -0,5 0,0 0,0 -17,4

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2133,0 -77,6 2,2 -10,8 -0,5 0,0 0,0 -14,7

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 2141,0 -77,6 1,1 -15,7 -1,2 0,0 0,0 -23,6

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2135,3 -77,6 2,2 -20,9 -3,8 0,0 0,0 -29,0

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 2122,9 -77,5 1,0 -1,9 -4,1 0,0 0,0 -13,0

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 2122,9 -77,5 1,2 -1,6 -1,8 0,0 0,0 3,3

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 2118,7 -77,5 2,1 -3,8 -6,9 0,0 0,0 -11,4

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 2122,9 -77,5 4,0 -1,3 -0,6 0,0 0,0 5,6

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2117,0 -77,5 2,2 -4,1 -7,2 0,0 0,0 -15,6

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 2137,6 -77,6 1,1 -12,3 -1,6 0,0 0,0 -19,8

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2144,7 -77,6 2,2 -19,6 -3,5 0,0 0,0 -27,6

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2130,4 -77,6 2,2 -13,1 -4,5 0,0 0,0 -21,9

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 2136,8 -77,6 4,0 -9,7 -0,3 0,0 0,0 -2,6

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 2131,8 -77,6 0,1 -3,9 -3,5 0,0 0,0 -14,8

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 2141,7 -77,6 1,3 -14,9 -0,7 0,0 0,0 -11,9

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 2142,4 -77,6 0,9 0,0 -7,8 0,0 0,0 -4,5

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 2132,8 -77,6 0,4 -4,2 -5,0 0,0 0,0 9,7

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2116,3 -77,5 1,1 -4,3 -3,6 0,0 0,0 1,7

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2112,4 -77,5 1,1 -4,3 -3,6 0,0 0,0 1,8

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2124,3 -77,5 1,2 -4,4 -3,8 2,5 0,0 4,0

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2120,1 -77,5 1,2 -4,3 -3,7 2,5 0,0 4,1

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2107,5 -77,5 2,1 0,0 -3,0 0,0 0,0 -6,2

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2117,1 -77,5 2,1 -2,9 -1,7 0,0 0,0 -7,9

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2127,3 -77,5 2,2 -13,0 -0,5 0,0 0,0 -16,8

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2104,9 -77,5 2,1 0,0 -3,0 0,0 0,0 -6,2

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 2112,1 -77,5 1,1 -0,3 -3,8 0,0 0,0 -10,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.15 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

15 of 78

Page 40: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2105,2 -77,5 2,1 0,0 -7,8 0,0 0,0 -12,1

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2119,8 -77,5 2,1 0,0 -7,9 0,0 0,0 -12,2

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 2113,3 -77,5 1,4 0,0 -3,9 0,0 0,0 -35,0

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 2126,7 -77,5 1,1 -13,1 -1,4 0,0 0,0 -21,2

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2132,5 -77,6 2,2 -19,9 -3,5 0,0 0,0 -27,8

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 2109,0 -77,5 1,0 -0,2 -3,8 0,0 0,0 -11,0

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 2109,2 -77,5 1,2 0,0 -2,2 0,0 0,0 4,5

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 2112,8 -77,5 2,1 -2,6 -7,4 0,0 0,0 -10,7

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 2109,2 -77,5 4,0 0,0 -0,9 0,0 0,0 6,6

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2114,9 -77,5 2,2 -3,8 -7,2 0,0 0,0 -15,4

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 2118,6 -77,5 0,0 -3,9 -3,4 0,0 0,0 -14,7

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 2128,8 -77,6 1,3 -11,6 -0,7 0,6 0,0 -8,0

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 2116,5 -77,5 0,8 -1,2 -6,8 0,0 0,0 -4,8

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 2118,4 -77,5 0,3 -4,2 -4,9 1,4 0,0 11,2

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2080,9 -77,4 1,0 -4,2 -3,5 0,0 0,0 1,9

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2077,0 -77,3 1,0 -4,2 -3,5 0,0 0,0 1,9

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2089,2 -77,4 1,0 -4,3 -3,7 0,0 0,0 1,6

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2084,5 -77,4 1,0 -4,3 -3,6 0,0 0,0 1,8

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2091,9 -77,4 2,1 -13,0 -0,5 0,0 0,0 -16,8

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2078,2 -77,3 2,1 0,0 -2,9 0,0 0,0 -6,1

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2093,9 -77,4 2,1 -13,4 -0,5 0,0 0,0 -17,1

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2084,3 -77,4 2,1 -10,6 -0,5 0,0 0,0 -14,4

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 2076,8 -77,3 0,5 0,0 -3,8 0,0 0,0 -9,9

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 2092,7 -77,4 0,7 -13,1 -1,4 0,0 0,0 -21,4

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2087,2 -77,4 2,0 -14,6 -4,0 0,0 0,0 -22,9

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 2074,0 -77,3 0,7 0,0 -3,8 0,0 0,0 -10,9

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 2074,2 -77,3 1,0 0,0 -2,2 0,0 0,0 4,5

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 2070,2 -77,3 2,0 0,0 -7,7 0,0 0,0 -8,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.16 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

16 of 78

Page 41: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 2074,2 -77,3 4,0 0,0 -0,9 0,0 0,0 6,7

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2068,5 -77,3 2,0 0,0 -7,7 0,0 0,0 -12,0

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 2089,2 -77,4 0,8 -12,3 -1,5 0,0 0,0 -19,9

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2096,2 -77,4 2,1 -19,5 -3,5 0,0 0,0 -27,3

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2081,6 -77,4 2,1 -12,9 -4,4 0,0 0,0 -21,6

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 2088,1 -77,4 3,9 -9,6 -0,2 0,0 0,0 -2,3

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 2083,1 -77,4 -0,2 -3,8 -3,3 0,0 0,0 -14,6

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 2093,5 -77,4 1,2 -11,6 -0,7 0,0 0,0 -8,6

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 2093,9 -77,4 0,6 0,0 -7,7 0,0 0,0 -4,5

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 2082,8 -77,4 0,1 -4,1 -4,8 0,0 0,0 9,9

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2208,3 -77,9 2,3 -4,0 -9,3 0,0 0,0 -33,3

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2216,1 -77,9 2,3 -4,3 -9,4 0,0 0,0 -33,8

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2229,4 -78,0 2,3 -9,5 -9,1 0,0 0,0 -37,8

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2222,4 -77,9 2,3 -20,9 -7,7 0,0 0,0 -47,9

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2236,6 -78,0 2,3 -20,8 -7,8 0,0 0,0 -47,6

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 2236,3 -78,0 2,4 -14,6 -8,3 0,0 0,0 -41,1

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2223,1 -77,9 2,4 -3,2 -9,2 0,0 0,0 -31,3

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 2217,8 -77,9 2,3 0,0 -9,7 0,0 0,0 -28,1

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2208,6 -77,9 2,3 -2,2 -9,4 0,0 0,0 -30,5

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2236,1 -78,0 2,3 -21,6 -7,8 0,0 0,0 -48,7

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2237,2 -78,0 2,4 -14,0 -8,2 0,0 0,0 -42,4

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2229,6 -78,0 2,4 -22,0 -7,9 0,0 0,0 -50,0

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 2224,6 -77,9 2,3 -4,1 -9,5 0,0 0,0 -23,8

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 2027,7 -77,1 -0,2 0,0 -7,1 0,0 0,0 -7,4

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 2016,5 -77,1 -0,2 0,0 -7,1 0,0 0,0 -7,3

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 2005,2 -77,0 -0,2 0,0 -7,1 0,0 0,0 -7,3

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 1997,4 -77,0 -0,2 0,0 -7,0 0,0 0,0 -7,2

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 2140,8 -77,6 1,7 0,0 -6,2 0,0 0,0 -12,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.17 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

17 of 78

Page 42: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 2148,8 -77,6 1,7 -13,9 -4,9 0,0 0,0 -28,0

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 2137,2 -77,6 2,1 0,0 -8,9 0,0 0,0 -22,0

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 2137,8 -77,6 1,8 0,0 -6,2 0,0 0,0 -15,4

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 2146,1 -77,6 1,7 -15,6 -4,8 0,0 0,0 -26,8

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 2143,3 -77,6 1,3 -4,6 -6,0 0,0 0,0 -20,7

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 2143,8 -77,6 -4,8 0,0 -5,5 0,0 0,0 -13,8

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 2142,5 -77,6 -4,7 -11,7 -5,5 0,0 0,0 -25,6

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 2029,5 -77,1 1,6 0,0 -6,0 0,0 0,0 -12,0

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 2038,0 -77,2 1,6 -14,3 -4,7 0,0 0,0 -27,9

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 2026,3 -77,1 1,7 0,0 -5,9 0,0 0,0 -14,7

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 2034,7 -77,2 1,6 -14,5 -4,7 0,0 0,0 -25,4

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 2038,3 -77,2 2,0 -19,5 -5,4 0,0 0,0 -37,6

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 2033,0 -77,2 1,1 -4,6 -5,7 0,0 0,0 -20,2

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 2033,4 -77,2 -4,7 0,0 -5,2 0,0 0,0 -13,1

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 2030,9 -77,1 -4,7 -11,4 -5,2 0,0 0,0 -24,4

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 2024,4 -77,1 2,2 0,0 -10,1 0,0 0,0 3,7

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 2021,7 -77,1 2,2 0,0 -10,1 0,0 0,0 3,7

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 2018,6 -77,1 2,2 0,0 -10,0 0,0 0,0 3,7

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 2015,7 -77,1 2,1 0,0 -10,0 0,0 0,0 3,7

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 2108,9 -77,5 2,1 0,0 -26,0 0,0 0,0 -9,7

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 2106,7 -77,5 2,1 0,0 -26,0 0,0 0,0 -9,7

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 2104,6 -77,5 2,1 0,0 -26,0 0,0 0,0 -9,7

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 2102,4 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,7

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 2100,3 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 2098,1 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 2096,0 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 2093,9 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 2091,8 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.18 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

18 of 78

Page 43: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 2089,6 -77,4 2,1 0,0 -26,0 0,0 0,0 -9,6

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 2069,9 -77,3 2,1 0,0 -25,9 0,0 0,0 -9,4

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 2067,8 -77,3 2,1 0,0 -25,9 0,0 0,0 -9,4

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 2065,7 -77,3 2,0 0,0 -25,9 0,0 0,0 -9,4

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 2063,6 -77,3 2,0 0,0 -25,9 0,0 0,0 -9,3

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 2061,5 -77,3 2,0 0,0 -25,9 0,0 0,0 -9,3

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 2059,4 -77,3 2,0 0,0 -25,8 0,0 0,0 -9,3

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 2057,3 -77,3 2,0 0,0 -25,8 0,0 0,0 -9,3

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 2055,2 -77,2 2,0 0,0 -25,8 0,0 0,0 -9,3

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 2053,1 -77,2 2,0 0,0 -25,8 0,0 0,0 -9,3

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 2051,0 -77,2 2,0 0,0 -25,8 0,0 0,0 -9,2

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 2104,6 -77,5 1,9 -0,3 -7,9 1,1 0,0 20,3

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 2115,8 -77,5 1,9 -0,2 -7,9 1,0 0,0 19,3

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 2211,2 -77,9 1,9 0,0 -5,2 0,0 0,0 -1,3

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 2209,3 -77,9 1,8 0,0 -5,2 0,0 0,0 -3,4

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 2209,4 -77,9 2,0 0,0 -5,8 0,0 0,0 -7,8

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 2218,5 -77,9 1,9 -12,6 -3,3 0,0 0,0 -12,1

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 2228,0 -78,0 1,1 -0,9 -3,8 0,0 0,0 10,5

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 2214,9 -77,9 1,8 -4,7 -5,0 0,0 0,0 -5,2

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 2215,3 -77,9 -4,8 -10,6 -5,7 0,0 0,0 -16,9

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 2206,9 -77,9 -4,8 0,0 -5,6 0,0 0,0 -6,2

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 2222,6 -77,9 1,9 0,0 -5,2 0,0 0,0 -1,3

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 2231,9 -78,0 1,9 -11,3 -3,6 0,0 0,0 -13,2

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 2231,7 -78,0 2,1 -13,7 -2,4 0,0 0,0 -18,2

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 2229,9 -78,0 1,9 -14,3 -3,2 0,0 0,0 -13,7

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 2224,8 -77,9 1,1 -0,9 -3,8 0,0 0,0 10,5

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 2226,3 -77,9 1,8 -4,7 -5,1 0,0 0,0 -5,3

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 2226,5 -77,9 -4,8 -14,5 -5,7 0,0 0,0 -20,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.19 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

19 of 78

Page 44: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 2234,2 -78,0 -4,8 -13,1 -5,7 0,0 0,0 -19,5

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2141,5 -77,6 2,2 0,0 -25,8 2,3 0,0 -10,0

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2141,5 -77,6 2,2 0,0 -25,8 2,3 0,0 -10,0

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2122,6 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2122,6 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2138,6 -77,6 2,2 0,0 -25,8 2,3 0,0 -10,0

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2138,6 -77,6 2,2 0,0 -25,8 2,3 0,0 -10,0

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2119,8 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2119,8 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2135,8 -77,6 2,2 0,0 -25,8 0,9 0,0 -11,3

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2135,8 -77,6 2,2 0,0 -25,8 0,9 0,0 -11,3

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2116,9 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2116,9 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2132,9 -77,6 2,2 0,0 -25,8 0,4 0,0 -11,9

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 2132,9 -77,6 2,2 0,0 -25,8 0,4 0,0 -11,9

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2114,0 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 2114,0 -77,5 2,1 0,0 -26,1 0,0 0,0 -9,6

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 2126,7 -77,5 1,2 0,0 -7,4 0,0 0,0 5,3

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 2126,7 -77,5 1,2 0,0 -7,4 0,0 0,0 5,3

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 2126,7 -77,5 1,2 0,0 -7,4 0,0 0,0 9,3

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 2126,7 -77,5 1,2 0,0 -7,4 0,0 0,0 9,3

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2090,4 -77,4 2,1 0,0 -25,6 0,0 0,0 -12,1

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2128,6 -77,6 2,2 0,0 -25,8 0,0 0,0 -12,4

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2126,5 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,4

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2088,4 -77,4 2,1 0,0 -25,6 0,0 0,0 -12,1

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2124,3 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,4

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2086,2 -77,4 2,1 0,0 -25,6 0,0 0,0 -12,0

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2084,2 -77,4 2,1 0,0 -25,6 0,0 0,0 -12,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.20 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

20 of 78

Page 45: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2122,2 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2120,1 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2082,1 -77,4 2,1 0,0 -25,6 0,0 0,0 -12,0

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2080,0 -77,4 2,1 0,0 -25,5 0,0 0,0 -12,0

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2118,0 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2115,9 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2078,0 -77,3 2,1 0,0 -25,5 0,0 0,0 -12,0

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2113,7 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2075,9 -77,3 2,1 0,0 -25,5 0,0 0,0 -12,0

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2073,8 -77,3 2,1 0,0 -25,5 0,0 0,0 -11,9

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2111,7 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,3

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2109,6 -77,5 2,2 0,0 -25,7 0,0 0,0 -12,2

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 2071,8 -77,3 2,1 0,0 -25,5 0,0 0,0 -11,9

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 2107,9 -77,5 1,2 0,0 -7,3 0,0 0,0 9,4

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 2107,9 -77,5 1,2 0,0 -7,3 0,0 0,0 9,4

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 2069,9 -77,3 1,2 0,0 -7,3 0,0 0,0 9,6

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 2069,9 -77,3 1,2 0,0 -7,3 0,0 0,0 9,6

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 2104,1 -77,5 2,0 0,0 -7,9 0,0 0,0 16,0

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 2167,3 -77,7 -4,8 0,0 -9,6 2,5 0,0 0,4

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 2190,7 -77,8 1,7 -3,1 -2,5 0,0 0,0 8,6

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 2188,0 -77,8 3,1 -9,2 -0,4 0,0 0,0 2,9

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 2195,9 -77,8 1,9 -15,4 -2,1 0,0 0,0 -1,4

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 2160,2 -77,7 -4,8 0,0 -5,5 2,5 0,0 7,5

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 2164,3 -77,7 -4,8 0,0 -5,5 2,5 0,0 9,5

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 2154,0 -77,7 -4,8 0,0 -9,6 2,5 0,0 0,5

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 2154,8 -77,7 1,7 -3,0 -2,4 0,0 0,0 8,7

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 2157,3 -77,7 3,1 0,0 -4,0 0,0 0,0 8,7

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 2163,3 -77,7 1,9 0,0 -5,8 2,5 0,0 12,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.21 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

21 of 78

Page 46: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 2146,8 -77,6 -4,8 0,0 -5,5 0,7 0,0 5,8

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 2151,0 -77,6 -4,8 0,0 -5,5 1,5 0,0 8,6

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 2116,9 -77,5 -4,8 0,0 -9,4 2,5 0,0 0,8

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 2140,5 -77,6 1,7 -3,0 -2,4 0,0 0,0 8,8

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 2137,8 -77,6 3,1 -9,0 -0,4 0,0 0,0 3,3

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 2145,4 -77,6 1,9 -15,0 -2,1 0,0 0,0 -0,9

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 2109,8 -77,5 -4,8 0,0 -5,4 2,4 0,0 7,8

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 2113,6 -77,5 -4,8 0,0 -5,4 2,4 0,0 9,8

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 2104,5 -77,5 -4,8 0,8 -9,4 2,2 0,0 1,4

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 2105,5 -77,5 1,6 -3,0 -2,4 0,0 0,0 8,9

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 2108,1 -77,5 3,0 0,0 -3,9 2,5 0,0 11,4

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 2114,2 -77,5 1,8 0,0 -5,7 2,5 0,0 13,1

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 2097,3 -77,4 -4,8 0,0 -5,4 0,8 0,0 6,2

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 2101,0 -77,4 -4,8 0,0 -5,4 1,6 0,0 9,0

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 2068,7 -77,3 -4,8 0,0 -9,2 2,5 0,0 1,2

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 2091,6 -77,4 1,5 -3,0 -2,3 0,0 0,0 9,0

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 2089,0 -77,4 3,0 -8,8 -0,5 0,0 0,0 3,6

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 2097,1 -77,4 1,7 -14,9 -2,1 0,0 0,0 -0,6

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 2061,2 -77,3 -4,8 0,0 -5,3 0,7 0,0 6,4

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 2064,6 -77,3 -4,8 0,0 -5,3 1,5 0,0 9,2

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 2275,9 -78,1 -4,8 0,0 -5,8 0,0 0,0 -15,7

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 2277,4 -78,1 -4,8 0,0 -5,8 0,0 0,0 -15,7

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 2278,9 -78,1 -4,8 0,0 -5,8 0,0 0,0 -15,7

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 2313,0 -78,3 -4,7 -0,1 -5,9 0,0 0,0 -17,9

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 2274,4 -78,1 1,9 -3,9 -5,2 2,0 0,0 3,7

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 2272,6 -78,1 1,9 -3,8 -5,2 2,0 0,0 3,8

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 2306,0 -78,2 -4,8 0,3 -5,9 0,0 0,0 -10,5

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 2285,4 -78,2 -4,7 -17,5 -5,8 0,0 0,0 -28,2

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.22 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

22 of 78

Page 47: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 2281,3 -78,2 -4,7 -0,1 -5,8 0,0 0,0 -7,7

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 2291,9 -78,2 2,4 -0,9 -9,9 0,0 0,0 -20,0

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 2315,4 -78,3 2,4 -20,9 -8,2 0,0 0,0 -44,2

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 2277,2 -78,1 2,4 -3,9 -9,5 0,0 0,0 -28,5

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 2302,1 -78,2 2,4 -19,6 -8,1 0,0 0,0 -37,1

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 2298,0 -78,2 2,6 -23,6 -15,3 0,0 0,0 -53,2

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 2295,7 -78,2 2,6 -23,4 -15,2 0,0 0,0 -52,9

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 2292,0 -78,2 2,6 -24,4 -16,6 0,0 0,0 -55,3

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 2285,3 -78,2 2,5 -24,1 -16,1 0,0 0,0 -54,4

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 2293,6 -78,2 2,2 -4,8 -9,9 0,0 0,0 -25,1

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 2298,5 -78,2 1,9 -3,6 -5,2 1,9 0,0 3,7

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 2296,3 -78,2 1,9 -3,8 -5,2 2,0 0,0 3,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.23 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

23 of 78

Page 48: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Semani (Kavakllia) Ld = 29,8 dB(A) Ln = 29,8 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 1750,9 -75,9 1,9 -2,9 -4,2 0,0 0,0 6,0

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 1747,8 -75,8 1,9 -2,5 -4,2 0,0 0,0 6,3

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 1741,2 -75,8 1,9 -2,1 -4,9 0,0 0,0 6,1

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 1738,1 -75,8 1,9 -4,6 -4,2 0,0 0,0 4,3

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1677,8 -75,5 1,2 -4,3 -3,6 0,0 0,0 3,8

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1679,5 -75,5 1,2 -4,3 -3,6 0,0 0,0 3,7

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1689,6 -75,5 1,2 -4,3 -3,5 0,0 0,0 3,8

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1691,5 -75,6 1,2 -4,4 -3,7 0,0 0,0 3,6

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1680,5 -75,5 2,2 -1,8 -5,1 0,0 0,0 -8,1

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1694,8 -75,6 2,2 -12,5 -0,5 0,0 0,0 -14,3

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1691,7 -75,6 2,2 -13,5 -0,5 0,0 0,0 -15,2

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1695,8 -75,6 2,2 -15,8 -0,5 0,0 0,0 -17,6

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 1681,6 -75,5 1,1 -1,5 -4,0 0,0 0,0 -10,1

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1673,4 -75,5 2,2 0,0 -6,7 0,0 0,0 -8,9

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 1688,5 -75,5 1,1 -13,6 -1,3 0,0 0,0 -19,8

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 1688,9 -75,5 1,2 -11,8 -0,7 0,0 0,0 -3,8

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 1682,9 -75,5 2,2 -21,7 -3,2 0,0 0,0 -23,6

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 1688,9 -75,5 4,0 -9,6 -0,2 0,0 0,0 -0,4

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1680,4 -75,5 2,2 -21,7 -3,2 0,0 0,0 -27,2

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 1693,7 -75,6 1,2 -14,8 -1,2 0,0 0,0 -19,9

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1690,7 -75,6 2,3 -17,1 -3,3 0,0 0,0 -22,7

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1697,0 -75,6 2,3 -20,8 -3,3 0,0 0,0 -26,4

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 1694,1 -75,6 3,9 -13,0 -0,2 0,0 0,0 -3,8

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 1684,5 -75,5 0,0 -3,9 -2,9 0,0 0,0 -12,2

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1680,0 -75,5 1,3 -2,7 -2,6 3,0 0,0 3,4

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1692,3 -75,6 0,9 0,0 -6,7 0,0 0,0 -1,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.24 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

24 of 78

Page 49: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 1684,5 -75,5 0,4 -4,2 -4,2 0,0 0,0 12,6

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1659,1 -75,4 1,1 -4,3 -3,5 2,3 0,0 6,2

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1660,9 -75,4 1,1 -4,3 -3,6 2,3 0,0 6,2

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1670,8 -75,5 1,1 -4,2 -3,5 2,4 0,0 6,4

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1672,7 -75,5 1,1 -4,4 -3,6 2,5 0,0 6,2

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1658,8 -75,4 2,2 -8,5 -0,4 0,0 0,0 -10,1

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1654,5 -75,4 2,2 -1,8 -5,0 0,0 0,0 -7,9

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1661,7 -75,4 2,2 0,0 -2,9 0,0 0,0 -4,0

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1663,0 -75,4 2,2 -16,5 -0,5 0,0 0,0 -18,2

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 1656,7 -75,4 1,1 -2,7 -3,8 0,0 0,0 -10,2

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1659,9 -75,4 2,2 -11,9 -3,3 0,0 0,0 -17,3

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1653,3 -75,4 2,2 -0,8 -7,9 0,0 0,0 -10,9

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 1656,2 -75,4 1,4 -2,0 -4,1 0,0 0,0 -35,1

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 1660,8 -75,4 1,1 0,0 -3,3 0,0 0,0 -7,8

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1669,2 -75,4 2,2 0,0 -6,7 0,0 0,0 -8,9

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 1669,1 -75,4 1,1 -15,8 -1,1 0,0 0,0 -21,7

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 1669,3 -75,4 1,2 -15,3 -0,5 1,1 0,0 -5,9

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 1674,5 -75,5 2,2 -21,2 -2,9 0,0 0,0 -22,7

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 1669,3 -75,4 4,0 -12,6 -0,2 1,0 0,0 -2,3

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1677,6 -75,5 2,2 -21,2 -3,0 0,0 0,0 -26,4

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 1665,8 -75,4 0,0 -3,9 -2,9 0,0 0,0 -12,1

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1661,0 -75,4 1,3 0,0 -1,9 1,6 0,0 5,6

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1654,4 -75,4 0,8 -0,1 -6,7 0,0 0,0 -1,3

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 1665,8 -75,4 0,3 -4,2 -4,1 2,4 0,0 15,1

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1607,6 -75,1 1,0 -4,2 -3,4 0,0 0,0 4,2

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1609,4 -75,1 1,0 -4,2 -3,4 0,0 0,0 4,2

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1619,1 -75,2 1,0 -4,2 -3,4 0,0 0,0 4,2

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1621,2 -75,2 1,0 -4,3 -3,5 1,3 0,0 5,3

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.25 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

25 of 78

Page 50: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1610,0 -75,1 2,1 -1,8 -5,0 0,0 0,0 -7,7

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1624,7 -75,2 2,1 -13,6 -0,4 0,0 0,0 -15,0

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1621,3 -75,2 2,1 -13,4 -0,5 0,0 0,0 -14,8

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1625,6 -75,2 2,1 -15,8 -0,5 0,0 0,0 -17,3

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 1611,1 -75,1 0,9 -1,4 -3,9 0,0 0,0 -9,7

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1603,0 -75,1 2,1 -0,8 -7,7 0,0 0,0 -10,4

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 1618,5 -75,2 0,9 -14,4 -1,0 0,0 0,0 -20,2

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 1618,9 -75,2 1,2 -13,2 -0,5 0,0 0,0 -4,7

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 1612,9 -75,1 2,1 -22,2 -3,6 0,0 0,0 -24,2

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 1618,9 -75,2 3,9 -10,5 -0,2 0,0 0,0 -0,9

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1610,4 -75,1 2,1 -22,2 -3,6 0,0 0,0 -27,8

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 1623,4 -75,2 1,0 -14,7 -1,2 0,0 0,0 -19,5

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1620,2 -75,2 2,1 -17,0 -3,2 0,0 0,0 -22,2

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1626,9 -75,2 2,1 -20,8 -3,2 0,0 0,0 -26,1

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 1623,9 -75,2 3,9 -12,9 -0,2 2,1 0,0 -1,3

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 1614,3 -75,2 -0,2 -3,8 -2,8 0,0 0,0 -11,8

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1609,8 -75,1 1,2 -2,7 -2,5 1,8 0,0 2,7

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1621,6 -75,2 0,7 -0,1 -6,6 0,0 0,0 -1,2

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 1614,3 -75,2 0,1 -4,1 -4,0 0,7 0,0 13,7

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1589,1 -75,0 0,9 -4,2 -3,4 2,3 0,0 6,6

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1590,9 -75,0 0,9 -4,2 -3,4 2,3 0,0 6,6

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1600,8 -75,1 1,0 -4,3 -3,5 2,5 0,0 6,6

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1602,7 -75,1 1,0 -4,3 -3,5 2,5 0,0 6,6

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1588,9 -75,0 2,1 -8,1 -0,5 0,0 0,0 -9,4

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1584,5 -75,0 2,1 0,0 -2,8 0,0 0,0 -3,6

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1591,5 -75,0 2,1 0,0 -2,8 0,0 0,0 -3,7

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1593,2 -75,0 2,1 -15,3 -0,5 0,0 0,0 -16,6

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 1586,7 -75,0 0,8 -0,9 -3,0 0,0 0,0 -7,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.26 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

26 of 78

Page 51: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1590,0 -75,0 2,1 -11,5 -3,3 0,0 0,0 -16,7

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1583,3 -75,0 2,1 0,0 -6,4 0,0 0,0 -8,3

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 1586,2 -75,0 1,3 0,0 -3,2 0,0 0,0 -31,9

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 1590,7 -75,0 0,8 0,0 -3,2 0,0 0,0 -7,5

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1599,0 -75,1 2,1 0,0 -6,5 0,0 0,0 -8,4

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 1599,9 -75,1 0,8 -15,5 -1,0 0,0 0,0 -21,3

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 1599,5 -75,1 1,1 -15,4 -0,5 1,2 0,0 -5,7

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 1604,6 -75,1 2,0 -21,3 -2,9 0,0 0,0 -22,5

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 1599,5 -75,1 3,9 -12,8 -0,2 1,0 0,0 -2,1

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1607,6 -75,1 2,1 -21,3 -2,9 0,0 0,0 -26,2

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 1595,8 -75,1 -0,2 -3,8 -2,8 0,0 0,0 -11,7

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 1591,0 -75,0 1,2 0,0 -1,8 1,6 0,0 5,9

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 1584,4 -75,0 0,6 0,0 -6,3 0,0 0,0 -0,7

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 1595,8 -75,1 0,1 -4,1 -3,9 2,4 0,0 15,5

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1537,7 -74,7 0,8 -4,2 -3,3 0,0 0,0 4,6

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1539,6 -74,7 0,8 -4,1 -3,3 0,0 0,0 4,7

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1549,2 -74,8 0,8 -4,1 -3,3 0,0 0,0 4,6

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1551,4 -74,8 0,8 -4,3 -3,4 1,3 0,0 5,6

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1539,9 -74,7 2,0 0,0 -2,8 0,0 0,0 -3,4

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1555,0 -74,8 2,0 -10,8 -0,4 0,0 0,0 -11,9

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1551,2 -74,8 2,1 -13,3 -0,4 0,0 0,0 -14,4

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1555,8 -74,8 2,1 -14,8 -0,4 0,0 0,0 -16,0

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 1535,3 -74,7 0,3 0,0 -3,0 0,0 0,0 -6,7

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 1541,0 -74,7 0,5 0,0 -3,1 0,0 0,0 -7,5

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1532,9 -74,7 2,0 0,0 -6,3 0,0 0,0 -8,0

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 1548,8 -74,8 0,5 -9,7 -1,6 0,0 0,0 -16,1

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 1549,2 -74,8 0,5 -9,2 -0,7 0,0 0,0 -1,2

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 1543,2 -74,8 1,9 -11,7 -3,9 0,0 0,0 -13,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.27 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

27 of 78

Page 52: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 1549,2 -74,8 3,9 -7,5 -0,2 0,0 0,0 2,4

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1540,8 -74,7 2,0 -8,5 -4,8 0,0 0,0 -15,0

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 1553,6 -74,8 0,5 -13,8 -1,1 0,0 0,0 -18,5

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1550,1 -74,8 2,0 -16,9 -3,1 0,0 0,0 -21,8

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1557,1 -74,8 2,0 -20,1 -2,8 0,0 0,0 -24,7

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 1553,9 -74,8 3,7 -12,1 -0,2 1,8 0,0 -0,6

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 1544,6 -74,8 -0,4 -3,7 -2,6 0,0 0,0 -11,3

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 1539,4 -74,7 1,1 0,0 -1,8 1,6 0,0 6,2

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 1551,6 -74,8 0,5 0,0 -6,3 0,0 0,0 -0,6

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 1544,8 -74,8 -0,1 -4,1 -3,8 0,6 0,0 14,0

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1594,5 -75,0 2,3 -0,4 -7,9 0,0 0,0 -25,6

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1591,5 -75,0 2,3 -0,4 -7,9 0,0 0,0 -25,6

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1598,4 -75,1 2,3 -0,4 -7,9 0,0 0,0 -24,7

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1595,1 -75,0 2,3 -0,4 -7,9 0,0 0,0 -24,7

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1602,0 -75,1 2,3 -0,4 -7,9 0,0 0,0 -24,5

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 1615,9 -75,2 2,3 -6,7 -7,0 0,0 0,0 -29,2

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1622,2 -75,2 2,3 -13,5 -6,2 0,0 0,0 -36,0

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 1610,7 -75,1 2,3 -14,5 -6,3 0,0 0,0 -36,5

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1600,7 -75,1 2,3 -10,5 -6,2 0,0 0,0 -32,9

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1608,5 -75,1 2,3 -14,6 -6,2 0,0 0,0 -37,3

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1623,1 -75,2 2,3 -15,2 -6,3 0,0 0,0 -38,9

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1626,0 -75,2 2,3 -15,2 -6,3 0,0 0,0 -39,0

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 1608,0 -75,1 2,2 -4,8 -7,4 0,0 0,0 -19,6

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 1719,3 -75,7 1,5 -1,0 -7,3 0,0 0,0 -5,4

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 1705,0 -75,6 1,4 -1,0 -7,2 0,0 0,0 -5,3

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 1690,6 -75,6 1,4 -0,9 -7,2 0,0 0,0 -5,2

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 1680,5 -75,5 1,4 -0,9 -7,1 0,0 0,0 -5,2

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 1732,9 -75,8 1,9 -3,3 -4,9 0,0 0,0 -12,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.28 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

28 of 78

Page 53: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1733,9 -75,8 1,9 -3,7 -4,9 0,0 0,0 -15,8

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 1734,8 -75,8 2,2 -3,0 -7,1 0,0 0,0 -21,2

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1739,7 -75,8 1,9 -14,2 -4,3 0,0 0,0 -25,6

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 1740,5 -75,8 1,9 -19,8 -4,2 0,0 0,0 -28,4

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 1736,8 -75,8 1,7 -4,7 -5,1 0,0 0,0 -17,5

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1731,3 -75,8 -4,7 0,4 -4,4 0,0 0,0 -10,5

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1742,5 -75,8 -4,7 -18,3 -4,4 0,0 0,0 -29,3

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 1582,5 -75,0 1,2 -1,5 -5,3 0,0 0,0 -11,0

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1583,1 -75,0 1,3 -1,6 -5,3 0,0 0,0 -13,8

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1589,4 -75,0 1,4 -10,9 -4,0 0,0 0,0 -21,8

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 1590,1 -75,0 1,4 -16,2 -3,7 0,0 0,0 -24,2

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 1588,0 -75,0 2,0 -18,4 -4,6 0,0 0,0 -33,6

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 1586,2 -75,0 0,9 -4,6 -4,6 0,0 0,0 -17,1

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1580,4 -75,0 -4,7 0,0 -4,0 0,0 0,0 -9,7

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1592,0 -75,0 -4,7 -16,7 -4,1 0,0 0,0 -26,5

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 1654,8 -75,4 2,3 -0,3 -9,0 0,0 0,0 6,3

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 1656,8 -75,4 2,3 -0,3 -9,0 0,0 0,0 6,3

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 1658,2 -75,4 2,3 -0,3 -9,0 0,0 0,0 6,3

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 1660,0 -75,4 2,3 -0,3 -9,0 0,0 0,0 6,2

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1706,0 -75,6 2,3 0,0 -24,3 0,6 0,0 -5,3

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1703,2 -75,6 2,3 0,0 -24,3 0,6 0,0 -5,2

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1700,3 -75,6 2,3 0,0 -24,3 0,6 0,0 -5,2

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1697,4 -75,6 2,3 0,0 -24,3 0,6 0,0 -5,2

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1694,6 -75,6 2,3 0,0 -24,2 0,0 0,0 -5,8

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1691,7 -75,6 2,3 0,0 -24,2 0,0 0,0 -5,8

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1688,9 -75,5 2,2 0,0 -24,2 0,0 0,0 -5,8

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1686,1 -75,5 2,2 0,0 -24,2 0,0 0,0 -5,7

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1683,2 -75,5 2,2 0,0 -24,2 0,0 0,0 -5,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.29 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

29 of 78

Page 54: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1680,3 -75,5 2,2 0,0 -24,2 0,0 0,0 -5,7

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1653,8 -75,4 2,1 0,0 -24,4 0,0 0,0 -5,9

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1651,0 -75,3 2,1 0,0 -24,5 0,0 0,0 -6,0

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1648,1 -75,3 2,1 0,0 -24,9 0,0 0,0 -6,4

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1645,3 -75,3 2,1 0,0 -25,0 0,0 0,0 -6,4

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1642,5 -75,3 2,1 0,0 -25,0 0,0 0,0 -6,5

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1639,6 -75,3 2,1 -1,0 -24,6 0,0 0,0 -7,1

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1636,8 -75,3 2,1 -1,1 -24,5 0,0 0,0 -7,1

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1634,0 -75,3 2,1 -1,5 -24,4 0,0 0,0 -7,3

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1631,1 -75,2 2,0 -3,1 -23,5 0,0 0,0 -8,0

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1628,3 -75,2 2,0 -4,6 -22,8 0,0 0,0 -8,8

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 1639,6 -75,3 1,9 -2,2 -6,2 0,0 0,0 21,1

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 1660,1 -75,4 1,9 -2,8 -6,3 0,1 0,0 19,6

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1741,4 -75,8 2,0 -7,0 -3,3 0,0 0,0 -4,3

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 1748,9 -75,8 2,0 -19,2 -2,5 0,0 0,0 -17,9

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 1749,1 -75,8 2,1 -19,5 -2,1 0,0 0,0 -21,5

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1751,3 -75,9 2,0 -17,4 -2,7 0,0 0,0 -14,1

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 1739,8 -75,8 1,1 -1,8 -3,7 0,0 0,0 11,9

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 1746,4 -75,8 1,8 -4,5 -3,7 0,0 0,0 -1,6

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 1752,9 -75,9 -4,7 -16,7 -4,5 0,0 0,0 -19,7

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 1745,8 -75,8 -4,7 -17,0 -4,5 0,0 0,0 -20,1

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1736,2 -75,8 2,0 -2,2 -4,6 0,0 0,0 -0,7

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 1738,7 -75,8 2,0 0,0 -4,2 0,0 0,0 -0,2

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 1738,5 -75,8 2,1 0,0 -5,0 0,0 0,0 -4,8

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1746,2 -75,8 2,0 -12,1 -3,1 0,0 0,0 -9,2

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 1741,4 -75,8 1,1 -1,8 -3,7 0,0 0,0 11,9

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 1741,2 -75,8 1,8 -4,7 -4,1 0,0 0,0 -2,1

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 1747,8 -75,8 -4,8 -11,6 -4,5 0,0 0,0 -14,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.30 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

30 of 78

Page 55: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 1741,9 -75,8 -4,7 0,0 -4,4 0,0 0,0 -3,0

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1713,5 -75,7 2,3 -4,8 -23,3 0,0 0,0 -12,5

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1713,5 -75,7 2,3 -4,8 -23,3 0,0 0,0 -12,5

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1723,4 -75,7 2,3 0,0 -24,4 0,8 0,0 -5,0

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1723,4 -75,7 2,3 0,0 -24,4 0,8 0,0 -5,0

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1709,7 -75,7 2,3 -5,3 -23,0 0,0 0,0 -12,6

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1709,7 -75,7 2,3 -5,3 -23,0 0,0 0,0 -12,6

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1719,6 -75,7 2,3 0,0 -24,4 0,9 0,0 -4,9

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1719,6 -75,7 2,3 0,0 -24,4 0,9 0,0 -4,9

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1705,9 -75,6 2,3 -4,9 -23,2 0,0 0,0 -12,5

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1705,9 -75,6 2,3 -4,9 -23,2 0,0 0,0 -12,5

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1715,7 -75,7 2,3 0,0 -24,3 0,7 0,0 -5,1

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1715,7 -75,7 2,3 0,0 -24,3 0,7 0,0 -5,1

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1702,0 -75,6 2,3 -4,9 -23,1 0,0 0,0 -12,4

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1702,0 -75,6 2,3 -4,9 -23,1 0,0 0,0 -12,4

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1712,0 -75,7 2,3 0,0 -24,3 0,7 0,0 -5,1

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1712,0 -75,7 2,3 0,0 -24,3 0,7 0,0 -5,1

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1711,3 -75,7 1,6 -2,5 -5,7 0,3 0,0 6,9

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1711,3 -75,7 1,6 -2,5 -5,7 0,3 0,0 6,9

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1711,3 -75,7 1,6 -2,5 -5,7 0,3 0,0 10,9

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1711,3 -75,7 1,6 -2,5 -5,7 0,3 0,0 10,9

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1643,7 -75,3 2,1 0,0 -23,4 0,0 0,0 -7,9

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1695,6 -75,6 2,3 -5,0 -23,0 0,0 0,0 -12,4

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1692,7 -75,6 2,3 -5,0 -22,9 0,0 0,0 -12,4

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1640,8 -75,3 2,1 0,0 -23,4 0,0 0,0 -7,9

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1689,8 -75,5 2,3 -5,0 -22,7 0,0 0,0 -12,2

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1638,0 -75,3 2,1 0,0 -23,4 0,0 0,0 -7,8

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1635,2 -75,3 2,1 0,0 -23,4 0,0 0,0 -7,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.31 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

31 of 78

Page 56: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1687,0 -75,5 2,3 -4,9 -22,6 0,0 0,0 -12,1

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1684,2 -75,5 2,3 -4,8 -22,6 0,0 0,0 -11,9

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1632,3 -75,2 2,1 0,0 -23,4 0,0 0,0 -7,8

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1629,5 -75,2 2,1 0,0 -23,4 0,0 0,0 -7,8

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1681,3 -75,5 2,3 -4,5 -22,6 0,0 0,0 -11,6

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1678,4 -75,5 2,2 -4,2 -22,7 0,0 0,0 -11,3

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1626,6 -75,2 2,1 0,0 -23,4 0,0 0,0 -7,8

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1675,5 -75,5 2,2 -3,3 -22,9 0,0 0,0 -10,7

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1623,8 -75,2 2,1 0,0 -23,3 0,0 0,0 -7,7

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1620,9 -75,2 2,0 0,0 -23,3 0,0 0,0 -7,7

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1672,7 -75,5 2,2 -2,6 -23,2 0,0 0,0 -10,3

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1669,8 -75,4 2,2 -1,3 -23,4 0,0 0,0 -9,2

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1618,0 -75,2 2,0 0,0 -23,3 0,0 0,0 -7,7

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1686,6 -75,5 1,4 0,0 -6,7 0,0 0,0 12,2

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1686,6 -75,5 1,4 0,0 -6,7 0,0 0,0 12,2

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1635,0 -75,3 1,1 0,0 -6,6 0,0 0,0 12,2

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1635,0 -75,3 1,1 0,0 -6,6 0,0 0,0 12,2

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 1654,6 -75,4 2,0 -1,7 -6,4 0,0 0,0 18,0

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 1692,7 -75,6 -4,8 -16,0 -7,5 0,0 0,0 -13,9

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 1701,3 -75,6 1,6 -3,0 -2,3 0,0 0,0 10,8

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 1697,5 -75,6 3,1 -13,2 -0,3 0,0 0,0 1,3

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 1695,8 -75,6 1,9 -13,0 -2,2 0,0 0,0 3,1

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 1688,2 -75,5 -4,8 -3,8 -4,3 0,0 0,0 4,6

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 1699,1 -75,6 -4,8 -2,3 -4,3 0,0 0,0 8,1

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 1674,3 -75,5 -4,8 -9,0 -7,4 0,0 0,0 -6,7

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 1651,1 -75,3 1,5 -3,1 -2,2 0,0 0,0 11,0

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 1654,8 -75,4 3,1 -5,2 -1,0 0,1 0,0 8,8

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 1650,3 -75,3 1,9 -1,1 -6,0 2,4 0,0 13,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.32 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

32 of 78

Page 57: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 1669,9 -75,4 -4,8 -8,3 -4,3 0,0 0,0 0,3

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 1680,6 -75,5 -4,8 -5,8 -4,3 0,0 0,0 4,6

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 1622,6 -75,2 -4,8 -16,6 -7,2 0,0 0,0 -13,8

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 1631,0 -75,2 1,4 -3,0 -2,2 0,0 0,0 11,1

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 1627,2 -75,2 3,0 -13,1 -0,3 2,2 0,0 3,8

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 1625,3 -75,2 1,8 -13,1 -2,1 0,0 0,0 3,4

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 1618,3 -75,2 -4,8 -5,5 -4,1 0,0 0,0 3,4

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 1628,9 -75,2 -4,8 -4,3 -4,2 2,1 0,0 8,6

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 1603,1 -75,1 -4,8 -11,2 -7,1 0,0 0,0 -8,2

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 1581,1 -75,0 1,3 -3,0 -2,2 0,0 0,0 11,4

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 1584,8 -75,0 3,0 -4,7 -1,3 3,7 0,0 12,9

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 1580,1 -75,0 1,7 0,0 -4,7 2,3 0,0 16,4

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 1600,5 -75,1 -4,8 -7,9 -4,1 0,0 0,0 1,2

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 1611,1 -75,1 -4,8 -6,1 -4,1 0,0 0,0 4,9

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 1551,4 -74,8 -4,8 0,0 -6,9 0,0 0,0 3,6

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 1561,0 -74,9 1,3 -3,0 -2,1 0,0 0,0 11,5

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 1557,3 -74,8 2,9 -12,5 -0,3 2,8 0,0 5,3

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 1555,1 -74,8 1,7 -12,5 -2,1 0,0 0,0 4,3

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 1548,9 -74,8 -4,8 0,0 -4,0 0,0 0,0 9,5

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 1559,5 -74,9 -4,8 0,0 -4,0 1,0 0,0 12,4

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 1693,7 -75,6 -4,7 0,0 -4,3 0,0 0,0 -11,6

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 1693,1 -75,6 -4,7 0,0 -4,3 0,0 0,0 -11,6

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 1692,5 -75,6 -4,7 0,0 -4,3 0,0 0,0 -11,6

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 1688,1 -75,5 -4,7 -0,1 -4,3 0,0 0,0 -13,6

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 1703,9 -75,6 1,9 -3,2 -4,1 1,3 0,0 7,3

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 1701,3 -75,6 1,9 -3,4 -4,1 1,3 0,0 7,2

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 1682,7 -75,5 -4,7 0,0 -4,3 0,0 0,0 -6,5

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 1705,9 -75,6 -4,7 -17,8 -4,4 0,0 0,0 -24,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.33 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

33 of 78

Page 58: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 1699,4 -75,6 -4,7 -0,1 -4,3 2,4 0,0 -1,3

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 1687,7 -75,5 2,3 -0,4 -8,2 0,0 0,0 -15,2

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 1687,2 -75,5 2,3 -0,4 -8,2 0,0 0,0 -21,1

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 1701,1 -75,6 2,3 -14,5 -6,3 0,0 0,0 -33,4

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 1699,7 -75,6 2,3 -20,6 -6,3 0,0 0,0 -33,6

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 1701,2 -75,6 2,5 -24,5 -14,2 0,0 0,0 -50,4

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 1702,1 -75,6 2,5 -24,5 -14,2 0,0 0,0 -50,4

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 1703,4 -75,6 2,5 -24,5 -14,2 0,0 0,0 -50,4

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 1706,0 -75,6 2,5 -24,3 -13,9 0,0 0,0 -49,9

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 1694,0 -75,6 2,1 -4,8 -7,7 0,0 0,0 -20,5

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1739,1 -75,8 1,9 -5,5 -3,9 0,0 0,0 3,8

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1736,0 -75,8 1,9 -5,9 -3,8 0,0 0,0 3,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.34 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

34 of 78

Page 59: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Sheq-Marinasi Ld = 29,2 dB(A) Ln = 29,2 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 2213,9 -77,9 1,9 0,0 -5,4 1,9 0,0 7,4

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 2213,2 -77,9 1,9 0,0 -5,4 1,9 0,0 7,4

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 2211,4 -77,9 1,9 0,0 -5,4 0,7 0,0 6,3

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 2210,7 -77,9 1,9 -3,0 -5,1 1,2 0,0 4,0

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2059,7 -77,3 1,2 -4,3 -3,7 0,0 0,0 2,0

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2054,8 -77,2 1,2 -4,3 -3,7 0,0 0,0 1,9

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2062,0 -77,3 1,2 -4,3 -3,7 0,0 0,0 2,0

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 2056,5 -77,3 1,2 -4,3 -3,7 0,0 0,0 1,9

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2070,0 -77,3 2,2 -14,6 -0,5 0,0 0,0 -18,2

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2048,2 -77,2 2,1 0,0 -3,0 0,0 0,0 -6,0

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2066,3 -77,3 2,2 -8,2 -0,7 0,0 0,0 -11,9

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 2053,9 -77,2 2,2 -6,8 -1,0 0,0 0,0 -10,9

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 2070,2 -77,3 1,1 -14,8 -1,2 0,0 0,0 -22,4

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2068,7 -77,3 2,2 -21,9 -3,7 0,0 0,0 -29,8

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 2047,0 -77,2 1,0 0,0 -3,8 0,0 0,0 -10,5

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 2047,1 -77,2 1,2 0,0 -2,2 0,0 0,0 4,8

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 2046,0 -77,2 2,1 0,0 -7,7 0,0 0,0 -8,1

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 2047,1 -77,2 4,0 0,0 -0,9 0,0 0,0 6,9

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2045,5 -77,2 2,1 0,0 -7,7 0,0 0,0 -11,7

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 2060,3 -77,3 1,1 -7,5 -2,5 0,0 0,0 -15,6

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2069,2 -77,3 2,2 -12,3 -4,6 0,0 0,0 -21,0

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 2050,5 -77,2 2,1 -6,6 -6,6 0,0 0,0 -17,3

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 2058,9 -77,3 4,0 -5,6 -0,4 0,0 0,0 1,8

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 2058,6 -77,3 0,0 -3,9 -3,4 0,0 0,0 -14,4

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 2071,7 -77,3 1,3 -13,8 -0,6 0,0 0,0 -10,5

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 2066,1 -77,3 0,8 0,0 -7,6 0,0 0,0 -4,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.35 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

35 of 78

Page 60: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 2058,4 -77,3 0,3 -4,2 -4,8 0,0 0,0 10,1

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2056,3 -77,3 1,2 -4,3 -3,7 0,0 0,0 2,0

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2051,4 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2058,7 -77,3 1,2 -4,3 -3,7 0,0 0,0 2,0

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 2053,3 -77,2 1,2 -4,3 -3,7 0,0 0,0 1,9

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2047,3 -77,2 2,2 0,0 -3,0 0,0 0,0 -6,0

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2059,6 -77,3 2,2 0,0 -3,0 0,0 0,0 -6,0

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2066,5 -77,3 2,2 -14,6 -0,5 0,0 0,0 -18,1

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 2042,3 -77,2 2,2 0,0 -3,0 0,0 0,0 -5,9

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 2053,2 -77,2 1,1 0,0 -3,8 0,0 0,0 -9,4

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2044,4 -77,2 2,1 0,0 -7,7 0,0 0,0 -11,7

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2063,1 -77,3 2,2 0,0 -7,7 0,0 0,0 -11,8

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 2054,7 -77,2 1,4 0,0 -3,8 0,0 0,0 -34,7

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 2066,4 -77,3 1,1 -14,4 -1,3 0,0 0,0 -22,1

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2067,9 -77,3 2,2 -19,6 -3,1 0,0 0,0 -26,8

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 2043,4 -77,2 1,0 0,0 -3,8 0,0 0,0 -10,5

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 2043,4 -77,2 1,2 0,0 -2,2 0,0 0,0 4,8

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 2044,4 -77,2 2,1 0,0 -7,7 0,0 0,0 -8,1

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 2043,4 -77,2 4,0 0,0 -0,9 0,0 0,0 6,9

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 2045,0 -77,2 2,1 0,0 -7,7 0,0 0,0 -11,7

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 2055,2 -77,2 0,0 -3,9 -3,4 0,0 0,0 -14,3

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 2068,4 -77,3 1,3 -13,7 -0,6 0,0 0,0 -10,4

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 2058,9 -77,3 0,8 0,0 -7,5 0,0 0,0 -4,0

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 2054,9 -77,2 0,3 -4,2 -4,8 0,0 0,0 10,2

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2047,6 -77,2 1,2 -4,3 -3,6 0,0 0,0 2,0

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2042,7 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2049,9 -77,2 1,2 -4,3 -3,6 0,0 0,0 2,0

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 2044,0 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.36 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

36 of 78

Page 61: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2057,7 -77,3 2,2 -14,6 -0,5 0,0 0,0 -18,1

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2035,6 -77,2 2,1 0,0 -3,0 0,0 0,0 -5,9

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2053,7 -77,2 2,2 -7,7 -0,8 0,0 0,0 -11,5

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 2041,3 -77,2 2,2 -6,5 -1,2 0,0 0,0 -10,7

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 2057,9 -77,3 1,1 -14,8 -1,2 0,0 0,0 -22,4

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2056,6 -77,3 2,2 -21,9 -3,7 0,0 0,0 -29,7

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 2034,6 -77,2 1,0 0,0 -3,8 0,0 0,0 -10,4

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 2034,7 -77,2 1,2 0,0 -2,2 0,0 0,0 4,9

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 2033,8 -77,2 2,1 0,0 -7,6 0,0 0,0 -8,1

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 2034,7 -77,2 4,0 0,0 -0,9 0,0 0,0 6,9

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2033,4 -77,2 2,1 0,0 -7,6 0,0 0,0 -11,6

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 2047,7 -77,2 1,1 -6,9 -2,7 0,0 0,0 -15,1

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2056,6 -77,3 2,2 -11,2 -4,9 0,0 0,0 -20,2

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 2037,8 -77,2 2,1 -6,1 -6,8 0,0 0,0 -16,9

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 2046,2 -77,2 4,0 -5,3 -0,4 0,0 0,0 2,0

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 2046,3 -77,2 0,0 -3,9 -3,3 0,0 0,0 -14,3

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 2059,4 -77,3 1,3 -13,9 -0,6 0,0 0,0 -10,5

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 2053,5 -77,2 0,8 0,0 -7,6 0,0 0,0 -4,0

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 2046,0 -77,2 0,3 -4,2 -4,8 0,0 0,0 10,2

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2044,9 -77,2 1,2 -4,3 -3,6 0,0 0,0 2,0

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2039,9 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2046,5 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 2041,1 -77,2 1,2 -4,3 -3,7 0,0 0,0 2,0

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2036,0 -77,2 2,2 0,0 -3,0 0,0 0,0 -5,9

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2048,4 -77,2 2,2 0,0 -3,0 0,0 0,0 -6,0

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2054,9 -77,2 2,2 -14,6 -0,5 0,0 0,0 -18,1

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 2030,8 -77,1 2,1 0,0 -3,0 0,0 0,0 -5,9

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 2041,9 -77,2 1,1 0,0 -3,8 0,0 0,0 -9,3

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.37 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

37 of 78

Page 62: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2033,0 -77,2 2,1 0,0 -7,6 0,0 0,0 -11,6

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2051,9 -77,2 2,2 0,0 -7,7 0,0 0,0 -11,7

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 2043,4 -77,2 1,4 0,0 -3,8 0,0 0,0 -34,6

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 2054,8 -77,2 1,1 -14,4 -1,3 0,0 0,0 -22,0

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2056,0 -77,3 2,2 -19,4 -3,1 0,0 0,0 -26,6

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 2031,7 -77,1 1,0 0,0 -3,8 0,0 0,0 -10,4

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 2031,7 -77,1 1,2 0,0 -2,2 0,0 0,0 4,9

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 2032,4 -77,2 2,1 0,0 -7,6 0,0 0,0 -8,1

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 2031,7 -77,1 4,0 0,0 -0,9 0,0 0,0 6,9

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 2032,9 -77,2 2,1 0,0 -7,6 0,0 0,0 -11,6

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 2043,5 -77,2 0,0 -3,9 -3,3 0,0 0,0 -14,3

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 2056,7 -77,3 1,3 -13,8 -0,6 0,0 0,0 -10,4

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 2047,8 -77,2 0,8 0,0 -7,5 0,0 0,0 -3,9

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 2043,2 -77,2 0,3 -4,2 -4,8 0,0 0,0 10,2

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2038,2 -77,2 1,2 -4,3 -3,6 0,0 0,0 2,1

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2033,2 -77,2 1,1 -4,3 -3,7 0,0 0,0 2,0

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2040,1 -77,2 1,2 -4,3 -3,6 0,0 0,0 2,1

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 2034,1 -77,2 1,1 -4,3 -3,7 0,0 0,0 2,0

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2048,1 -77,2 2,2 -14,6 -0,5 0,0 0,0 -18,1

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2025,6 -77,1 2,1 0,0 -3,0 0,0 0,0 -5,9

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2043,7 -77,2 2,2 -7,1 -0,9 0,0 0,0 -11,0

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 2031,3 -77,1 2,1 -6,1 -1,5 0,0 0,0 -10,5

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 2035,4 -77,2 1,0 0,0 -3,8 0,0 0,0 -9,2

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 2048,3 -77,2 1,1 -14,4 -1,3 0,0 0,0 -22,0

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2047,3 -77,2 2,2 -17,2 -3,6 0,0 0,0 -24,9

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 2024,9 -77,1 1,0 0,0 -3,8 0,0 0,0 -10,4

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 2025,0 -77,1 1,2 0,0 -2,2 0,0 0,0 4,9

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 2024,3 -77,1 2,1 0,0 -7,6 0,0 0,0 -8,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.38 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

38 of 78

Page 63: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 2025,0 -77,1 4,0 0,0 -0,9 0,0 0,0 6,9

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2024,0 -77,1 2,1 0,0 -7,6 0,0 0,0 -11,6

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 2037,7 -77,2 1,1 -6,2 -2,9 0,0 0,0 -14,6

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2046,7 -77,2 2,2 -9,7 -5,4 0,0 0,0 -19,1

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 2027,8 -77,1 2,1 -5,6 -7,1 0,0 0,0 -16,6

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 2036,2 -77,2 3,9 -5,0 -0,5 0,0 0,0 2,3

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 2036,6 -77,2 0,0 -3,9 -3,3 0,0 0,0 -14,2

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 2050,0 -77,2 1,3 -13,8 -0,6 0,0 0,0 -10,4

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 2043,4 -77,2 0,8 0,0 -7,6 0,0 0,0 -4,0

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 2036,4 -77,2 0,3 -4,2 -4,8 0,0 0,0 10,3

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2138,3 -77,6 2,4 -5,0 -8,7 0,0 0,0 -33,5

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2148,2 -77,6 2,4 -4,5 -8,9 0,0 0,0 -33,1

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2158,6 -77,7 2,4 -10,2 -9,0 0,0 0,0 -38,1

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2153,0 -77,7 2,4 -22,1 -7,6 0,0 0,0 -48,6

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2164,4 -77,7 2,4 -21,9 -7,6 0,0 0,0 -48,2

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 2156,2 -77,7 2,4 -18,2 -7,5 0,0 0,0 -43,7

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2138,5 -77,6 2,4 0,0 -9,4 0,0 0,0 -28,0

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 2139,3 -77,6 2,4 0,0 -9,4 0,0 0,0 -27,4

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 2135,1 -77,6 2,4 -5,2 -8,6 0,0 0,0 -32,4

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 2160,2 -77,7 2,4 -15,7 -8,2 0,0 0,0 -42,8

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2153,2 -77,7 2,4 -10,3 -8,0 0,0 0,0 -38,1

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 2143,4 -77,6 2,4 -7,3 -8,3 0,0 0,0 -35,4

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 2148,5 -77,6 2,3 -4,8 -9,4 0,0 0,0 -24,0

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 1877,7 -76,5 -0,3 0,0 -6,9 0,0 0,0 -6,7

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 1874,9 -76,5 -0,3 0,0 -6,9 0,0 0,0 -6,7

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 1872,2 -76,4 -0,3 0,0 -6,9 0,0 0,0 -6,6

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 1870,5 -76,4 -0,3 0,0 -6,9 0,0 0,0 -6,6

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 1987,3 -77,0 1,6 0,0 -5,8 0,0 0,0 -11,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.39 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

39 of 78

Page 64: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1995,3 -77,0 1,6 -15,5 -4,5 0,0 0,0 -28,7

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 1982,4 -76,9 2,0 0,0 -8,5 0,0 0,0 -21,0

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1980,2 -76,9 1,6 0,0 -5,8 0,0 0,0 -14,5

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 1988,6 -77,0 1,6 -8,8 -5,1 0,0 0,0 -19,8

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 1988,6 -77,0 1,0 -4,6 -5,6 0,0 0,0 -19,9

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1991,5 -77,0 -4,8 0,0 -5,1 0,0 0,0 -12,8

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1983,6 -76,9 -4,7 -6,0 -5,1 0,0 0,0 -18,8

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 1960,7 -76,8 1,6 0,0 -5,8 0,0 0,0 -11,5

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1968,9 -76,9 1,6 -16,4 -4,4 0,0 0,0 -29,5

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1953,6 -76,8 1,5 0,0 -5,8 0,0 0,0 -14,4

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 1961,3 -76,8 1,5 -6,5 -5,3 0,0 0,0 -17,8

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 1966,3 -76,9 2,0 -9,4 -6,4 0,0 0,0 -28,2

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 1961,3 -76,8 1,0 -4,6 -5,6 0,0 0,0 -19,7

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1965,9 -76,9 -4,7 0,0 -5,0 0,0 0,0 -12,6

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1956,6 -76,8 -4,7 -5,0 -5,0 0,0 0,0 -17,6

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 1913,2 -76,6 2,1 0,0 -9,6 0,0 0,0 4,6

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 1909,3 -76,6 2,1 0,0 -9,6 0,0 0,0 4,6

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 1905,3 -76,6 2,1 0,0 -9,6 0,0 0,0 4,6

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 1901,3 -76,6 2,1 0,0 -9,6 0,0 0,0 4,6

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1969,5 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,7

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1968,9 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,7

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1968,3 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,7

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1967,8 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,7

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1967,2 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1966,7 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1966,1 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1965,6 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1965,1 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.40 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

40 of 78

Page 65: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1964,5 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,6

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1959,8 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1959,3 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1958,8 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1958,3 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1957,9 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1957,4 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1956,9 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1956,5 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1956,0 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,6

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1955,6 -76,8 1,9 0,0 -25,4 0,0 0,0 -8,5

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 2003,4 -77,0 1,9 0,0 -7,6 1,6 0,0 21,8

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 2001,8 -77,0 1,9 0,0 -7,6 1,1 0,0 20,3

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 2058,0 -77,3 1,8 0,0 -4,9 0,0 0,0 -0,4

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 2051,6 -77,2 1,8 0,0 -4,8 0,0 0,0 -2,5

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 2051,7 -77,2 1,9 0,0 -5,5 0,0 0,0 -7,0

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 2060,3 -77,3 1,8 -7,7 -3,9 0,0 0,0 -7,2

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 2077,3 -77,3 1,0 -1,8 -4,0 0,0 0,0 9,9

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 2059,2 -77,3 1,7 -4,6 -4,7 0,0 0,0 -4,3

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 2055,9 -77,3 -4,8 -5,9 -5,2 0,0 0,0 -11,1

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 2050,9 -77,2 -4,8 0,0 -5,2 0,0 0,0 -5,2

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 2073,4 -77,3 1,8 0,0 -4,9 0,0 0,0 -0,5

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 2082,1 -77,4 1,8 -13,2 -3,2 0,0 0,0 -14,1

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 2082,1 -77,4 2,0 -15,9 -2,1 0,0 0,0 -19,6

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 2075,7 -77,3 1,8 -11,9 -3,1 0,0 0,0 -10,6

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 2072,8 -77,3 1,0 -1,8 -4,0 0,0 0,0 9,9

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 2074,6 -77,3 1,7 -4,6 -4,8 0,0 0,0 -4,4

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 2071,0 -77,3 -4,8 -10,3 -5,3 0,0 0,0 -15,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.41 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

41 of 78

Page 66: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 2082,8 -77,4 -4,8 -14,1 -5,3 0,0 0,0 -19,5

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1999,5 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1999,5 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1973,7 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1973,7 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1998,7 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1998,7 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1972,9 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1972,9 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1997,9 -77,0 2,0 0,0 -25,2 1,0 0,0 -10,2

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1997,9 -77,0 2,0 0,0 -25,2 1,0 0,0 -10,2

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1972,2 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,5

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1972,2 -76,9 1,9 0,0 -25,5 0,0 0,0 -8,5

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1997,1 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1997,1 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,2

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1971,4 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1971,4 -76,9 2,0 0,0 -25,5 0,0 0,0 -8,5

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1985,1 -76,9 1,0 0,0 -7,2 0,0 0,0 5,9

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1985,1 -76,9 1,0 0,0 -7,2 0,0 0,0 5,9

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1985,1 -76,9 1,0 0,0 -7,2 0,0 0,0 9,9

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1985,1 -76,9 1,0 0,0 -7,2 0,0 0,0 9,9

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1986,8 -77,0 2,0 0,0 -25,1 0,9 0,0 -10,4

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1996,3 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1995,7 -77,0 2,0 0,0 -25,2 0,9 0,0 -10,5

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1986,3 -77,0 2,0 0,0 -25,1 0,4 0,0 -10,9

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1995,1 -77,0 2,0 0,0 -25,2 0,9 0,0 -10,5

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1985,8 -77,0 2,0 0,0 -25,1 0,9 0,0 -10,4

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1985,3 -76,9 2,0 0,0 -25,1 0,9 0,0 -10,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.42 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

42 of 78

Page 67: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1994,6 -77,0 2,0 0,0 -25,2 0,9 0,0 -10,5

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1994,1 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1984,8 -76,9 2,0 0,0 -25,1 0,9 0,0 -10,4

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1984,3 -76,9 2,0 0,0 -25,1 0,9 0,0 -10,4

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1993,5 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1993,0 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1983,9 -76,9 2,0 0,0 -25,1 0,4 0,0 -10,9

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1992,4 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1983,4 -76,9 2,0 0,0 -25,1 0,7 0,0 -10,6

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1983,0 -76,9 2,0 0,0 -25,1 0,9 0,0 -10,3

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1991,9 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,4

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1991,4 -77,0 2,0 0,0 -25,2 0,0 0,0 -11,3

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1982,6 -76,9 2,0 0,0 -25,1 0,9 0,0 -10,3

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1980,1 -76,9 1,0 0,0 -7,1 0,0 0,0 9,9

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1980,1 -76,9 1,0 0,0 -7,1 0,0 0,0 9,9

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1971,0 -76,9 1,0 0,0 -7,1 0,0 0,0 9,9

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1971,0 -76,9 1,0 0,0 -7,1 0,0 0,0 9,9

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 1995,0 -77,0 1,9 0,0 -7,6 1,5 0,0 18,2

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 2038,8 -77,2 -4,8 0,0 -9,1 2,5 0,0 1,5

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 2059,0 -77,3 1,6 -3,0 -2,4 0,0 0,0 9,1

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 2058,2 -77,3 3,0 0,0 -3,9 0,0 0,0 9,1

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 2067,7 -77,3 1,8 0,0 -5,7 0,0 0,0 10,9

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 2033,9 -77,2 -4,8 0,0 -5,2 0,0 0,0 5,9

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 2031,9 -77,2 -4,8 0,0 -5,2 2,4 0,0 10,3

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 2035,3 -77,2 -4,8 0,0 -9,1 2,5 0,0 1,5

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 2049,5 -77,2 1,6 -3,0 -2,4 0,0 0,0 9,2

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 2050,1 -77,2 3,0 0,0 -3,9 0,1 0,0 9,2

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 2059,0 -77,3 1,8 0,0 -5,7 0,0 0,0 11,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.43 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

43 of 78

Page 68: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 2030,3 -77,1 -4,8 0,0 -5,2 2,5 0,0 8,4

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 2028,4 -77,1 -4,8 0,0 -5,2 0,4 0,0 8,4

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 2026,3 -77,1 -4,8 0,0 -9,0 2,5 0,0 1,6

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 2046,1 -77,2 1,6 -3,0 -2,4 0,0 0,0 9,2

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 2045,4 -77,2 3,0 0,0 -3,9 0,0 0,0 9,1

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 2054,7 -77,2 1,8 0,0 -5,6 0,0 0,0 10,9

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 2021,3 -77,1 -4,8 0,0 -5,2 2,5 0,0 8,4

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 2019,1 -77,1 -4,8 0,0 -5,2 2,4 0,0 10,4

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 2024,8 -77,1 -4,8 0,0 -9,0 2,5 0,0 1,6

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 2038,5 -77,2 1,6 -3,0 -2,4 0,0 0,0 9,2

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 2038,9 -77,2 3,0 0,0 -3,9 0,0 0,0 9,2

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 2047,9 -77,2 1,8 0,0 -5,6 0,0 0,0 11,0

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 2018,7 -77,1 -4,8 0,0 -5,2 2,5 0,0 8,5

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 2016,3 -77,1 -4,8 0,0 -5,1 0,4 0,0 8,4

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 2018,1 -77,1 -4,8 0,0 -9,0 2,5 0,0 1,7

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 2035,8 -77,2 1,6 -3,0 -2,4 0,0 0,0 9,2

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 2035,3 -77,2 3,0 0,0 -3,9 0,0 0,0 9,2

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 2044,6 -77,2 1,8 0,0 -5,6 0,0 0,0 11,0

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 2011,9 -77,1 -4,8 0,0 -5,1 2,5 0,0 8,5

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 2009,1 -77,1 -4,8 0,0 -5,1 2,4 0,0 10,5

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 2155,8 -77,7 -4,8 0,0 -5,5 0,0 0,0 -14,9

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 2157,7 -77,7 -4,8 0,0 -5,5 0,0 0,0 -14,9

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 2159,7 -77,7 -4,8 0,0 -5,5 0,0 0,0 -14,9

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 2199,8 -77,8 -4,7 0,0 -5,6 0,0 0,0 -17,2

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 2148,4 -77,6 1,8 0,0 -5,3 2,5 0,0 8,4

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 2147,9 -77,6 1,8 0,0 -5,3 2,5 0,0 8,4

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 2195,1 -77,8 -4,8 0,0 -5,6 0,0 0,0 -10,2

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 2159,4 -77,7 -4,8 -7,1 -5,5 0,0 0,0 -17,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.44 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

44 of 78

Page 69: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 2158,6 -77,7 -4,7 -0,1 -5,5 0,0 0,0 -6,9

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 2176,5 -77,7 2,3 -0,4 -9,4 0,0 0,0 -18,5

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 2203,1 -77,9 2,3 -19,4 -7,8 0,0 0,0 -41,9

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 2153,1 -77,7 2,3 0,0 -9,4 0,0 0,0 -24,1

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 2181,2 -77,8 2,3 -13,2 -8,0 0,0 0,0 -30,2

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 2175,9 -77,7 2,5 -17,7 -13,5 0,0 0,0 -45,1

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 2172,9 -77,7 2,5 -17,2 -13,5 0,0 0,0 -44,6

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 2168,0 -77,7 2,5 -16,2 -13,6 0,0 0,0 -43,6

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 2159,2 -77,7 2,5 -12,6 -14,2 0,0 0,0 -40,6

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 2178,1 -77,8 2,1 -4,8 -9,5 0,0 0,0 -24,4

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 2155,3 -77,7 1,8 -2,7 -5,0 1,7 0,0 5,2

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 2154,5 -77,7 1,8 -3,2 -4,9 1,8 0,0 4,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.45 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

45 of 78

Page 70: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Single Dwelling south of cemetery Ld = 33,2 dB(A) Ln = 33,2 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 1646,2 -75,3 2,1 -8,8 -3,5 1,7 0,0 3,2

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 1644,2 -75,3 2,1 -10,1 -3,4 1,6 0,0 1,9

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 1639,6 -75,3 2,1 -14,1 -3,2 0,0 0,0 -3,4

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 1637,6 -75,3 2,1 -16,5 -3,0 0,0 0,0 -5,7

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1468,5 -74,3 1,2 -4,3 -3,6 0,0 0,0 5,0

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1464,6 -74,3 1,2 -4,3 -3,5 0,0 0,0 5,0

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1476,5 -74,4 1,2 -4,4 -3,6 0,0 0,0 4,8

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 1472,2 -74,4 1,2 -4,3 -3,5 0,0 0,0 5,0

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1479,5 -74,4 2,3 -16,6 -0,5 0,0 0,0 -17,2

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1465,9 -74,3 2,2 0,0 -2,9 0,0 0,0 -2,9

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1481,5 -74,4 2,3 -13,8 -0,4 0,0 0,0 -14,3

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 1471,9 -74,3 2,2 -11,0 -0,4 0,0 0,0 -11,5

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 1480,3 -74,4 1,2 -16,5 -1,0 0,0 0,0 -20,8

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1474,8 -74,4 2,3 -21,1 -3,3 0,0 0,0 -25,4

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 1461,6 -74,3 1,2 0,0 -3,0 0,0 0,0 -6,6

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 1461,9 -74,3 1,3 0,0 -1,8 0,0 0,0 8,2

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 1457,8 -74,3 2,2 0,0 -6,1 0,0 0,0 -3,5

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 1461,9 -74,3 4,0 0,0 -0,8 0,0 0,0 9,8

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1456,1 -74,3 2,3 0,0 -6,1 0,0 0,0 -7,0

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 1476,9 -74,4 1,2 -12,8 -1,3 0,0 0,0 -16,7

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1483,9 -74,4 2,3 -19,7 -3,0 0,0 0,0 -23,8

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 1469,3 -74,3 2,3 -13,0 -3,6 0,0 0,0 -17,6

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 1475,8 -74,4 3,9 -9,9 -0,2 0,0 0,0 0,4

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 1470,7 -74,3 0,1 -3,9 -2,7 0,0 0,0 -10,7

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1480,9 -74,4 1,4 -15,5 -0,5 0,0 0,0 -9,0

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 1481,7 -74,4 0,9 0,0 -6,1 0,0 0,0 0,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.46 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

46 of 78

Page 71: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 1470,5 -74,3 0,4 -4,2 -3,8 0,0 0,0 14,2

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1455,8 -74,3 1,2 -4,3 -3,5 0,0 0,0 5,1

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1452,0 -74,2 1,1 -4,3 -3,5 0,0 0,0 5,1

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1464,0 -74,3 1,2 -4,4 -3,6 2,5 0,0 7,4

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 1459,7 -74,3 1,2 -4,3 -3,5 2,5 0,0 7,5

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1447,0 -74,2 2,2 0,0 -2,9 0,0 0,0 -2,8

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1456,7 -74,3 2,3 -3,1 -1,5 0,0 0,0 -4,6

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1466,9 -74,3 2,3 -13,4 -0,4 0,0 0,0 -13,9

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 1444,3 -74,2 2,2 0,0 -2,8 0,0 0,0 -2,7

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 1451,7 -74,2 1,2 -0,3 -2,9 0,0 0,0 -5,7

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1444,7 -74,2 2,3 0,0 -6,0 0,0 0,0 -6,9

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1459,5 -74,3 2,3 0,0 -6,1 0,0 0,0 -7,0

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 1452,8 -74,2 1,5 0,0 -3,0 0,0 0,0 -30,7

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 1466,3 -74,3 1,2 -13,7 -1,1 0,0 0,0 -18,1

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1471,9 -74,3 2,3 -20,1 -3,0 0,0 0,0 -24,1

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 1448,4 -74,2 1,1 0,0 -3,0 0,0 0,0 -6,5

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 1448,6 -74,2 1,3 0,0 -1,7 0,0 0,0 8,3

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 1452,1 -74,2 2,2 0,0 -6,1 0,0 0,0 -3,4

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 1448,6 -74,2 4,0 0,0 -0,8 0,0 0,0 9,9

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 1454,2 -74,2 2,3 0,0 -6,1 0,0 0,0 -7,0

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 1458,1 -74,3 0,1 -3,9 -2,6 0,0 0,0 -10,6

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1468,3 -74,3 1,4 -11,9 -0,6 0,5 0,0 -5,0

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 1456,0 -74,3 0,9 -1,4 -5,2 0,0 0,0 0,1

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 1457,9 -74,3 0,4 -4,2 -3,7 1,3 0,0 15,5

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1421,6 -74,0 1,1 -4,3 -3,5 0,0 0,0 5,2

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1417,7 -74,0 1,1 -4,3 -3,5 0,0 0,0 5,3

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1429,6 -74,1 1,1 -4,4 -3,6 0,0 0,0 5,1

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 1424,9 -74,1 1,1 -4,3 -3,5 0,0 0,0 5,2

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.47 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

47 of 78

Page 72: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1432,7 -74,1 2,2 -16,7 -0,5 0,0 0,0 -17,0

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1418,4 -74,0 2,2 0,0 -2,8 0,0 0,0 -2,6

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1434,4 -74,1 2,2 -13,6 -0,4 0,0 0,0 -13,8

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 1424,5 -74,1 2,2 -10,8 -0,4 0,0 0,0 -11,0

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 1433,5 -74,1 1,1 -16,4 -1,0 0,0 0,0 -20,6

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1428,2 -74,1 2,3 -21,2 -3,2 0,0 0,0 -25,3

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 1414,3 -74,0 1,1 -0,5 -2,9 0,0 0,0 -6,8

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 1414,6 -74,0 1,3 0,0 -1,7 0,0 0,0 8,5

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 1410,7 -74,0 2,2 -3,4 -5,4 0,0 0,0 -5,9

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 1414,6 -74,0 3,9 0,0 -0,8 0,0 0,0 10,1

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1409,0 -74,0 2,3 -4,1 -5,5 0,0 0,0 -10,2

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 1429,5 -74,1 1,2 -12,6 -1,3 0,0 0,0 -16,2

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1436,7 -74,1 2,3 -19,5 -3,0 0,0 0,0 -23,3

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 1421,7 -74,0 2,3 -12,7 -3,6 0,0 0,0 -17,0

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 1428,4 -74,1 3,9 -9,7 -0,2 0,0 0,0 0,9

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 1423,6 -74,1 0,0 -3,9 -2,6 0,0 0,0 -10,4

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1434,3 -74,1 1,3 -15,6 -0,5 0,0 0,0 -8,9

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 1434,3 -74,1 0,9 0,0 -6,0 0,0 0,0 0,8

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 1423,3 -74,1 0,3 -4,2 -3,7 0,0 0,0 14,5

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1409,7 -74,0 1,0 -4,3 -3,4 0,0 0,0 5,4

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1405,7 -73,9 1,0 -4,3 -3,4 0,0 0,0 5,4

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1417,1 -74,0 1,1 -4,4 -3,5 2,5 0,0 7,7

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 1412,7 -74,0 1,1 -4,3 -3,5 2,5 0,0 7,8

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1400,8 -73,9 2,2 0,0 -2,8 0,0 0,0 -2,5

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1410,8 -74,0 2,2 -3,1 -1,5 0,0 0,0 -4,3

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1420,8 -74,0 2,2 -13,6 -0,4 0,0 0,0 -13,8

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 1397,8 -73,9 2,2 0,0 -2,8 0,0 0,0 -2,5

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 1405,5 -73,9 1,1 -0,3 -2,8 0,0 0,0 -5,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.48 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

48 of 78

Page 73: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1398,4 -73,9 2,2 0,0 -5,9 0,0 0,0 -6,6

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1413,7 -74,0 2,2 0,0 -5,9 0,0 0,0 -6,7

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 1406,8 -74,0 1,4 0,0 -2,9 0,0 0,0 -30,5

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 1420,3 -74,0 1,1 -13,8 -1,1 0,0 0,0 -18,0

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1425,5 -74,1 2,3 -20,2 -2,9 0,0 0,0 -23,9

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 1401,7 -73,9 1,0 -1,1 -2,9 0,0 0,0 -7,4

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 1401,8 -73,9 1,2 -1,3 -1,5 0,0 0,0 7,5

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 1405,2 -73,9 2,2 -3,9 -5,3 0,0 0,0 -6,3

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 1401,8 -73,9 3,9 -1,2 -0,6 0,0 0,0 9,2

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 1407,1 -74,0 2,3 -4,3 -5,4 0,0 0,0 -10,4

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 1411,5 -74,0 -0,1 -3,9 -2,5 0,0 0,0 -10,3

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 1422,3 -74,1 1,3 -12,3 -0,6 0,5 0,0 -5,1

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 1410,2 -74,0 0,7 -1,2 -5,2 0,0 0,0 0,4

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 1411,3 -74,0 0,3 -4,2 -3,6 1,1 0,0 15,7

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1377,3 -73,8 0,8 -4,2 -3,3 0,0 0,0 5,5

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1373,2 -73,7 0,8 -4,2 -3,3 0,0 0,0 5,6

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1384,8 -73,8 0,9 -4,3 -3,4 0,0 0,0 5,3

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 1379,9 -73,8 0,9 -4,2 -3,4 0,0 0,0 5,5

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1388,4 -73,8 2,1 -13,7 -0,4 0,0 0,0 -13,8

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1373,2 -73,7 2,1 0,0 -2,8 0,0 0,0 -2,4

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1389,5 -73,8 2,1 -13,2 -0,4 0,0 0,0 -13,3

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 1379,3 -73,8 2,1 -10,4 -0,4 0,0 0,0 -10,5

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 1373,2 -73,7 0,5 0,0 -2,8 0,0 0,0 -5,3

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 1389,1 -73,8 0,7 -13,9 -1,1 0,0 0,0 -18,2

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1384,1 -73,8 2,1 -15,1 -3,1 0,0 0,0 -18,9

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 1369,4 -73,7 0,7 0,0 -2,8 0,0 0,0 -6,3

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 1369,6 -73,7 1,1 0,0 -1,7 0,0 0,0 8,7

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 1365,9 -73,7 2,0 0,0 -5,8 0,0 0,0 -2,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.49 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

49 of 78

Page 74: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 1369,6 -73,7 3,9 0,0 -0,8 0,0 0,0 10,4

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1364,4 -73,7 2,1 0,0 -5,8 0,0 0,0 -6,4

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 1384,6 -73,8 0,8 -12,2 -1,2 0,0 0,0 -15,9

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1392,0 -73,9 2,1 -19,2 -2,9 0,0 0,0 -22,8

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 1376,5 -73,8 2,1 -12,3 -3,5 0,0 0,0 -16,5

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 1383,4 -73,8 3,8 -9,4 -0,2 0,0 0,0 1,4

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 1378,9 -73,8 -0,3 -3,8 -2,4 0,0 0,0 -10,1

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 1390,0 -73,9 1,2 -12,4 -0,5 0,0 0,0 -5,6

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 1389,5 -73,8 0,6 0,0 -5,8 0,0 0,0 0,9

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 1378,6 -73,8 0,0 -4,1 -3,5 0,0 0,0 14,8

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1503,4 -74,5 2,4 0,0 -7,0 0,0 0,0 -23,7

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1511,5 -74,6 2,4 -3,5 -6,6 0,0 0,0 -26,8

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1524,7 -74,7 2,5 -10,1 -6,8 0,0 0,0 -32,7

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1517,7 -74,6 2,5 -21,9 -5,8 0,0 0,0 -43,4

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1531,8 -74,7 2,5 -22,5 -5,9 0,0 0,0 -44,0

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 1530,6 -74,7 2,5 -19,0 -5,7 0,0 0,0 -39,5

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1516,6 -74,6 2,5 -6,0 -6,3 0,0 0,0 -27,8

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 1511,9 -74,6 2,5 0,0 -7,1 0,0 0,0 -22,0

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 1503,3 -74,5 2,4 0,0 -7,0 0,0 0,0 -22,5

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 1530,9 -74,7 2,5 -18,7 -5,8 0,0 0,0 -40,2

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1531,0 -74,7 2,5 -21,9 -5,8 0,0 0,0 -44,5

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 1523,0 -74,6 2,5 -21,6 -5,8 0,0 0,0 -44,1

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 1519,2 -74,6 2,4 -4,8 -7,0 0,0 0,0 -18,7

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 1314,0 -73,4 -0,2 0,0 -5,6 0,0 0,0 -2,2

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 1303,0 -73,3 -0,2 0,0 -5,6 0,0 0,0 -2,1

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 1292,0 -73,2 -0,2 0,0 -5,6 0,0 0,0 -2,0

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 1284,5 -73,2 -0,2 0,0 -5,5 0,0 0,0 -1,9

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 1427,7 -74,1 1,7 0,0 -4,3 0,0 0,0 -7,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.50 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

50 of 78

Page 75: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1435,8 -74,1 1,8 -14,4 -3,4 0,0 0,0 -23,6

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 1424,0 -74,1 2,1 0,0 -6,8 0,0 0,0 -16,3

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 1424,5 -74,1 1,8 0,0 -4,3 0,0 0,0 -9,9

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 1432,9 -74,1 1,7 -15,1 -3,4 0,0 0,0 -21,5

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 1431,2 -74,1 1,2 -4,6 -4,2 0,0 0,0 -15,4

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1430,8 -74,1 -4,7 0,0 -3,7 0,0 0,0 -8,5

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 1429,2 -74,1 -4,7 -12,0 -3,6 0,0 0,0 -20,4

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 1321,7 -73,4 1,7 0,0 -4,0 0,0 0,0 -6,3

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1330,3 -73,5 1,6 -15,0 -3,2 0,0 0,0 -23,4

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 1318,1 -73,4 1,7 0,0 -4,0 0,0 0,0 -9,0

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 1326,3 -73,4 1,6 -14,8 -3,2 0,0 0,0 -20,5

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 1330,3 -73,5 2,1 -19,2 -4,1 0,0 0,0 -32,3

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 1324,1 -73,4 1,1 -4,6 -3,9 0,0 0,0 -14,6

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1325,8 -73,4 -4,7 0,0 -3,4 0,0 0,0 -7,5

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 1322,6 -73,4 -4,7 -11,3 -3,4 0,0 0,0 -18,8

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 1312,7 -73,4 2,2 0,0 -7,1 0,0 0,0 10,4

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 1309,9 -73,3 2,2 0,0 -7,0 0,0 0,0 10,5

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 1306,6 -73,3 2,2 0,0 -7,0 0,0 0,0 10,5

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 1303,6 -73,3 2,1 0,0 -7,0 0,0 0,0 10,5

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1396,3 -73,9 2,1 0,0 -22,6 0,0 0,0 -2,7

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1394,2 -73,9 2,1 0,0 -22,6 0,0 0,0 -2,7

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1392,1 -73,9 2,1 0,0 -22,6 0,0 0,0 -2,7

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1390,1 -73,9 2,1 0,0 -22,6 0,0 0,0 -2,6

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1388,0 -73,8 2,1 0,0 -22,6 0,0 0,0 -2,6

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1386,0 -73,8 2,1 0,0 -22,6 0,0 0,0 -2,6

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1383,9 -73,8 2,1 0,0 -22,6 0,0 0,0 -2,6

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1381,9 -73,8 2,1 0,0 -22,5 0,0 0,0 -2,5

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1379,8 -73,8 2,1 0,0 -22,5 0,0 0,0 -2,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.51 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

51 of 78

Page 76: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1377,8 -73,8 2,1 0,0 -22,5 0,0 0,0 -2,5

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 1358,9 -73,7 2,1 0,0 -22,4 0,0 0,0 -2,2

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 1356,9 -73,6 2,1 0,0 -22,4 0,0 0,0 -2,2

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 1354,9 -73,6 2,1 0,0 -22,4 0,0 0,0 -2,2

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 1352,9 -73,6 2,1 0,0 -22,4 0,0 0,0 -2,2

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 1350,9 -73,6 2,1 0,0 -22,3 0,0 0,0 -2,1

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 1348,9 -73,6 2,1 0,0 -22,3 0,0 0,0 -2,1

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 1346,9 -73,6 2,0 0,0 -22,3 0,0 0,0 -2,1

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 1345,0 -73,6 2,0 0,0 -22,3 0,0 0,0 -2,1

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 1343,0 -73,6 2,0 0,0 -22,3 0,0 0,0 -2,0

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 1341,0 -73,5 2,0 0,0 -22,3 0,0 0,0 -2,0

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 1394,5 -73,9 2,0 -0,4 -5,8 1,1 0,0 26,0

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 1404,8 -73,9 2,0 -0,3 -5,8 1,1 0,0 25,0

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1498,7 -74,5 1,9 0,0 -3,7 0,0 0,0 3,7

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 1496,5 -74,5 1,9 0,0 -3,7 0,0 0,0 1,6

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 1496,7 -74,5 2,1 0,0 -4,4 0,0 0,0 -3,0

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 1505,8 -74,5 1,9 -13,1 -2,4 0,0 0,0 -8,2

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 1515,8 -74,6 1,1 -0,9 -3,0 0,0 0,0 14,5

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 1502,3 -74,5 1,8 -4,7 -3,6 0,0 0,0 -0,4

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 1502,5 -74,5 -4,7 -11,0 -3,8 0,0 0,0 -12,1

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 1494,2 -74,5 -4,7 0,0 -3,8 0,0 0,0 -1,0

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1510,5 -74,6 2,0 0,0 -3,7 0,0 0,0 3,6

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 1519,8 -74,6 2,0 -11,9 -2,6 0,0 0,0 -9,4

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 1519,6 -74,6 2,2 -14,3 -1,9 0,0 0,0 -14,8

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 1517,5 -74,6 2,0 -15,1 -2,3 0,0 0,0 -10,1

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 1512,5 -74,6 1,1 -0,9 -3,0 0,0 0,0 14,5

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 1514,0 -74,6 1,8 -4,7 -3,6 0,0 0,0 -0,4

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 1514,0 -74,6 -4,7 -15,3 -3,9 0,0 0,0 -16,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.52 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

52 of 78

Page 77: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 1522,0 -74,6 -4,7 -13,9 -3,9 0,0 0,0 -15,2

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1429,0 -74,1 2,2 0,0 -22,2 2,3 0,0 -2,9

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1429,0 -74,1 2,2 0,0 -22,2 2,3 0,0 -2,9

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1409,7 -74,0 2,1 0,0 -22,7 0,0 0,0 -2,7

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1409,7 -74,0 2,1 0,0 -22,7 0,0 0,0 -2,7

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1426,3 -74,1 2,2 0,0 -22,2 1,7 0,0 -3,5

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1426,3 -74,1 2,2 0,0 -22,2 1,6 0,0 -3,5

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1406,9 -74,0 2,1 0,0 -22,7 0,0 0,0 -2,7

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1406,9 -74,0 2,1 0,0 -22,7 0,0 0,0 -2,7

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1423,5 -74,1 2,2 0,0 -22,2 0,8 0,0 -4,3

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1423,5 -74,1 2,2 0,0 -22,2 0,8 0,0 -4,3

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1404,1 -73,9 2,1 0,0 -22,7 0,0 0,0 -2,6

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1404,1 -73,9 2,1 0,0 -22,7 0,0 0,0 -2,6

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1420,8 -74,0 2,2 0,0 -22,2 0,1 0,0 -5,0

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 1420,8 -74,0 2,2 0,0 -22,2 0,1 0,0 -5,0

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1401,3 -73,9 2,1 0,0 -22,7 0,0 0,0 -2,6

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 1401,3 -73,9 2,1 0,0 -22,7 0,0 0,0 -2,6

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1414,1 -74,0 1,2 0,0 -6,2 0,0 0,0 9,9

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 1414,1 -74,0 1,2 0,0 -6,2 0,0 0,0 9,9

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1414,1 -74,0 1,2 0,0 -6,2 0,0 0,0 14,0

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 1414,1 -74,0 1,2 0,0 -6,2 0,0 0,0 14,0

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1380,2 -73,8 2,2 0,0 -21,9 0,0 0,0 -4,8

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1416,6 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,2

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1414,6 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,2

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1378,3 -73,8 2,2 0,0 -21,9 0,0 0,0 -4,7

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1412,5 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,2

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1376,3 -73,8 2,2 0,0 -21,9 0,0 0,0 -4,7

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1374,3 -73,8 2,2 0,0 -21,9 0,0 0,0 -4,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.53 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

53 of 78

Page 78: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1410,5 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,1

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1408,5 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,1

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1372,4 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,7

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1370,4 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,6

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1406,4 -74,0 2,2 0,0 -22,1 0,0 0,0 -5,1

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1404,5 -73,9 2,2 0,0 -22,1 0,0 0,0 -5,1

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1368,5 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,6

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1402,4 -73,9 2,2 0,0 -22,0 0,0 0,0 -5,0

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1366,5 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,6

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1364,6 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,6

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1400,4 -73,9 2,2 0,0 -22,0 0,0 0,0 -5,0

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1398,4 -73,9 2,2 0,0 -22,0 0,0 0,0 -5,0

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 1362,7 -73,7 2,2 0,0 -21,8 0,0 0,0 -4,5

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1396,0 -73,9 1,1 0,0 -6,2 0,0 0,0 14,1

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1396,0 -73,9 1,1 0,0 -6,2 0,0 0,0 14,1

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1359,8 -73,7 1,1 0,0 -6,1 0,0 0,0 14,3

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 1359,8 -73,7 1,1 0,0 -6,1 0,0 0,0 14,3

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 1393,2 -73,9 2,0 0,0 -5,8 0,0 0,0 21,7

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 1456,0 -74,3 -4,8 0,0 -6,5 2,5 0,0 7,0

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 1479,5 -74,4 1,5 -3,1 -2,2 0,0 0,0 12,0

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 1476,8 -74,4 3,1 -9,2 -0,4 0,0 0,0 6,3

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 1485,0 -74,4 2,0 -15,3 -1,8 0,0 0,0 2,5

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 1449,0 -74,2 -4,8 0,0 -3,7 2,4 0,0 12,8

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 1452,7 -74,2 -4,8 0,0 -3,7 2,4 0,0 14,8

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 1443,3 -74,2 -4,8 0,0 -6,4 2,5 0,0 7,1

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 1445,3 -74,2 1,5 -3,1 -2,2 0,0 0,0 12,2

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 1447,7 -74,2 3,1 0,0 -3,8 0,0 0,0 12,4

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 1454,0 -74,2 2,0 0,0 -4,5 2,5 0,0 17,8

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.54 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

54 of 78

Page 79: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 1436,3 -74,1 -4,8 0,0 -3,7 0,7 0,0 11,2

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 1440,0 -74,2 -4,8 0,0 -3,7 1,6 0,0 14,0

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 1408,3 -74,0 -4,8 0,0 -6,3 2,5 0,0 7,5

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 1431,8 -74,1 1,5 -3,0 -2,2 0,0 0,0 12,4

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 1429,3 -74,1 3,1 -8,9 -0,5 0,0 0,0 6,8

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 1437,4 -74,1 2,0 -15,0 -1,8 0,0 0,0 3,1

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 1401,2 -73,9 -4,8 0,0 -3,6 2,4 0,0 13,2

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 1404,6 -73,9 -4,8 0,0 -3,6 2,4 0,0 15,1

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 1396,8 -73,9 -4,8 0,0 -6,2 2,5 0,0 7,6

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 1399,3 -73,9 1,4 -3,1 -2,1 0,0 0,0 12,5

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 1401,6 -73,9 3,0 0,0 -3,7 2,5 0,0 15,2

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 1408,1 -74,0 1,9 0,0 -4,4 2,5 0,0 18,1

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 1389,5 -73,8 -4,8 -0,4 -3,5 1,0 0,0 11,4

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 1392,6 -73,9 -4,8 0,0 -3,6 1,7 0,0 14,5

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 1363,8 -73,7 -4,7 0,0 -6,1 2,5 0,0 8,0

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 1386,5 -73,8 1,3 -3,0 -2,1 0,0 0,0 12,5

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 1384,1 -73,8 3,0 -8,5 -0,5 0,0 0,0 7,3

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 1392,5 -73,9 1,8 -14,3 -1,7 0,0 0,0 3,9

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 1356,2 -73,6 -4,8 0,0 -3,5 0,8 0,0 12,0

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 1358,9 -73,7 -4,8 0,0 -3,5 1,7 0,0 14,9

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 1566,5 -74,9 -4,7 0,4 -4,0 0,0 0,0 -10,2

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 1568,0 -74,9 -4,7 0,7 -4,0 0,0 0,0 -9,9

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 1569,6 -74,9 -4,7 1,0 -4,0 0,0 0,0 -9,6

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 1604,7 -75,1 -4,7 -0,1 -4,1 0,0 0,0 -13,0

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 1564,5 -74,9 2,1 -5,3 -3,5 2,3 0,0 7,6

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 1562,8 -74,9 2,1 -5,2 -3,5 2,3 0,0 7,7

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 1597,8 -75,1 -4,7 0,7 -4,1 0,0 0,0 -5,2

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 1575,6 -74,9 -4,7 -17,9 -4,0 0,0 0,0 -23,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.55 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

55 of 78

Page 80: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 1571,8 -74,9 -4,7 -0,1 -4,0 0,0 0,0 -2,7

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 1583,1 -75,0 2,5 -0,8 -7,3 0,0 0,0 -13,9

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 1607,3 -75,1 2,6 -21,7 -6,2 0,0 0,0 -39,7

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 1567,5 -74,9 2,5 -5,1 -6,8 0,0 0,0 -23,6

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 1593,0 -75,0 2,5 -21,8 -6,1 0,0 0,0 -34,0

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 1588,6 -75,0 2,7 -24,5 -13,9 0,0 0,0 -49,3

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 1586,3 -75,0 2,7 -24,4 -13,8 0,0 0,0 -49,2

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 1582,4 -75,0 2,7 -24,3 -13,7 0,0 0,0 -48,8

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 1575,5 -74,9 2,7 -23,7 -13,0 0,0 0,0 -47,6

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 1584,3 -75,0 2,3 -4,8 -7,3 0,0 0,0 -19,3

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1587,5 -75,0 2,1 -2,9 -3,8 1,6 0,0 9,0

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 1585,3 -75,0 2,1 -3,6 -3,7 1,8 0,0 8,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.56 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

56 of 78

Page 81: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Station Fence East Ld = 50,0 dB(A) Ln = 50,0 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 520,7 -65,3 3,2 -18,5 -1,1 0,0 0,0 5,3

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 517,8 -65,3 3,2 -19,1 -1,1 0,0 0,0 4,7

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 511,5 -65,2 3,2 -20,6 -1,1 0,0 0,0 3,3

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 508,6 -65,1 3,2 -21,4 -1,1 0,0 0,0 2,6

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 364,6 -62,2 0,8 -5,4 -2,0 0,0 0,0 17,2

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 363,4 -62,2 0,8 -5,3 -2,0 0,0 0,0 17,3

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 376,8 -62,5 0,8 -4,8 -2,4 0,0 0,0 17,1

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 375,5 -62,5 0,8 -4,8 -2,4 0,0 0,0 17,2

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 372,7 -62,4 2,9 -18,4 -0,5 0,0 0,0 -6,3

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 373,9 -62,4 2,9 0,0 -2,0 0,0 0,0 10,5

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 380,9 -62,6 2,9 -17,1 -0,4 0,0 0,0 -5,1

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 378,0 -62,5 2,9 -15,1 -0,3 0,0 0,0 -3,0

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 373,7 -62,4 1,2 -18,3 -0,4 0,0 0,0 -10,1

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 365,5 -62,2 3,1 -22,5 -1,4 0,0 0,0 -11,9

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 367,2 -62,3 1,1 0,0 -0,9 0,0 0,0 7,4

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 367,8 -62,3 1,6 0,0 -0,6 0,0 0,0 21,7

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 361,5 -62,2 2,8 0,0 -2,0 0,0 0,0 13,4

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 367,8 -62,3 3,5 0,0 -0,6 0,0 0,0 21,6

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 358,9 -62,1 3,1 0,0 -1,9 0,0 0,0 10,1

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 379,5 -62,6 1,2 -16,4 -0,4 0,0 0,0 -7,6

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 381,6 -62,6 3,2 -22,0 -1,4 0,0 0,0 -11,8

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 377,2 -62,5 3,2 -17,0 -1,2 0,0 0,0 -6,5

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 379,1 -62,6 3,3 -13,9 -0,1 0,0 0,0 7,8

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 370,1 -62,4 -0,1 -4,1 -0,8 0,0 0,0 2,8

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 373,3 -62,4 1,9 -15,1 -0,2 0,0 0,0 4,1

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 381,6 -62,6 0,9 -2,3 -2,9 0,0 0,0 13,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.57 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

57 of 78

Page 82: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 370,1 -62,4 0,3 -5,0 -1,1 0,0 0,0 28,0

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 345,4 -61,8 0,8 -5,3 -2,0 2,2 0,0 19,9

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 344,1 -61,7 0,8 -4,4 -2,6 2,1 0,0 20,1

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 357,5 -62,1 0,8 -9,8 -0,3 3,9 0,0 18,6

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 356,2 -62,0 0,8 -4,4 -2,6 2,3 0,0 20,2

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 339,7 -61,6 2,8 0,0 -1,9 0,0 0,0 11,4

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 342,9 -61,7 2,8 -9,9 -0,2 0,0 0,0 3,1

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 353,5 -62,0 2,8 -17,9 -0,4 0,0 0,0 -5,3

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 340,9 -61,6 2,8 0,0 -1,9 0,0 0,0 11,3

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 341,3 -61,7 1,0 -3,5 -0,8 0,0 0,0 5,7

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 339,0 -61,6 3,0 0,0 -1,9 0,0 0,0 10,6

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 343,8 -61,7 3,1 -16,6 -1,0 0,0 0,0 -5,2

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 341,6 -61,7 1,8 -8,0 -0,5 0,0 0,0 -23,4

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 352,5 -61,9 1,0 -17,4 -0,4 0,0 0,0 -8,9

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 361,2 -62,1 3,1 -22,2 -1,3 0,0 0,0 -11,5

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 347,0 -61,8 0,9 0,0 -0,9 0,0 0,0 7,8

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 347,4 -61,8 1,5 0,0 -0,6 0,0 0,0 22,1

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 352,8 -61,9 2,8 0,0 -1,9 0,0 0,0 13,6

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 347,4 -61,8 3,5 0,0 -0,6 0,0 0,0 22,1

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 356,0 -62,0 3,1 0,0 -1,9 0,0 0,0 10,2

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 350,7 -61,9 -0,1 -4,1 -0,8 0,0 0,0 3,3

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 354,0 -62,0 1,8 -14,6 -0,2 0,0 0,0 5,0

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 342,7 -61,7 0,8 -5,3 -1,3 0,0 0,0 12,5

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 350,7 -61,9 0,3 -4,9 -1,1 2,1 0,0 30,7

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 292,5 -60,3 0,7 -6,2 -1,2 0,0 0,0 19,1

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 291,0 -60,3 0,7 -6,3 -1,2 0,0 0,0 19,0

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 304,5 -60,7 0,8 -5,9 -1,5 1,4 0,0 20,0

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 302,8 -60,6 0,8 -5,4 -1,7 0,0 0,0 19,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.58 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

58 of 78

Page 83: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 300,9 -60,6 2,6 -18,7 -0,4 0,0 0,0 -5,0

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 300,8 -60,6 2,6 0,0 -1,7 0,0 0,0 12,4

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 308,6 -60,8 2,6 -17,2 -0,3 0,0 0,0 -3,6

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 305,1 -60,7 2,6 -14,9 -0,3 0,0 0,0 -1,1

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 301,9 -60,6 0,8 -17,5 -0,3 0,0 0,0 -7,8

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 293,9 -60,4 2,8 -22,7 -1,2 0,0 0,0 -10,4

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 294,2 -60,4 0,7 0,0 -0,7 0,0 0,0 9,1

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 294,8 -60,4 1,1 0,0 -0,5 0,0 0,0 23,2

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 288,6 -60,2 2,4 0,0 -1,6 0,0 0,0 15,3

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 294,8 -60,4 3,2 0,0 -0,5 0,0 0,0 23,3

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 286,0 -60,1 2,7 0,0 -1,6 0,0 0,0 12,0

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 307,0 -60,7 0,8 -16,2 -0,4 0,0 0,0 -5,9

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 309,6 -60,8 2,9 -21,5 -1,1 0,0 0,0 -9,5

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 304,2 -60,7 2,9 -16,8 -1,0 0,0 0,0 -4,6

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 306,5 -60,7 2,9 -13,8 -0,1 0,0 0,0 9,3

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 297,7 -60,5 -0,2 -4,4 -0,6 0,0 0,0 4,5

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 301,8 -60,6 1,5 -15,8 -0,2 0,0 0,0 4,9

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 309,1 -60,8 0,8 -3,9 -2,1 0,0 0,0 14,0

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 297,6 -60,5 0,2 -4,8 -0,9 1,1 0,0 31,2

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 273,7 -59,7 0,7 -5,9 -1,2 2,1 0,0 22,0

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 272,1 -59,7 0,7 -4,5 -2,4 2,0 0,0 22,2

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 285,5 -60,1 0,7 -4,7 -2,4 2,4 0,0 22,0

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 283,8 -60,1 0,7 -4,5 -2,3 2,3 0,0 22,2

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 267,5 -59,5 2,4 0,0 -1,6 0,0 0,0 13,4

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 271,5 -59,7 2,5 -8,1 -0,2 0,0 0,0 6,5

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 282,3 -60,0 2,5 -17,8 -0,3 0,0 0,0 -3,6

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 268,2 -59,6 2,4 0,0 -1,6 0,0 0,0 13,4

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 269,3 -59,6 0,6 -1,4 -0,7 0,0 0,0 9,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.59 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

59 of 78

Page 84: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 266,6 -59,5 2,6 0,0 -1,5 0,0 0,0 12,6

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 272,7 -59,7 2,6 -14,8 -0,8 0,0 0,0 -1,6

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 269,8 -59,6 1,2 -4,8 -0,6 0,0 0,0 -18,8

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 282,3 -60,0 0,7 -18,0 -0,3 0,0 0,0 -7,8

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 289,8 -60,2 2,8 -22,4 -1,1 0,0 0,0 -9,9

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 274,1 -59,8 0,5 0,0 -0,7 0,0 0,0 9,6

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 274,7 -59,8 0,9 0,0 -0,4 0,0 0,0 23,7

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 280,0 -59,9 2,3 0,0 -1,6 0,0 0,0 15,5

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 274,7 -59,8 3,1 0,0 -0,5 0,0 0,0 23,8

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 283,1 -60,0 2,7 0,0 -1,6 0,0 0,0 12,2

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 278,8 -59,9 -0,2 -4,1 -0,6 0,0 0,0 5,3

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 283,1 -60,0 1,4 -15,1 -0,2 0,6 0,0 6,7

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 271,4 -59,7 0,7 -3,9 -1,5 0,0 0,0 15,6

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 278,9 -59,9 0,2 -4,8 -0,8 2,4 0,0 33,1

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 222,1 -57,9 0,6 -4,4 -2,0 0,0 0,0 22,3

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 220,2 -57,8 0,6 -4,6 -2,0 0,0 0,0 22,1

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 233,8 -58,4 0,6 -5,1 -1,8 1,2 0,0 22,5

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 231,6 -58,3 0,6 -5,0 -1,7 0,0 0,0 21,7

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 231,1 -58,3 2,1 -10,9 -0,2 0,0 0,0 4,8

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 228,8 -58,2 2,1 0,0 -1,4 0,0 0,0 14,6

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 238,0 -58,5 2,2 -16,3 -0,2 0,0 0,0 -0,8

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 233,4 -58,4 2,1 -14,4 -0,2 0,0 0,0 1,2

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 217,7 -57,8 0,1 0,0 -0,6 0,0 0,0 12,5

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 232,1 -58,3 0,2 -11,5 -0,3 0,0 0,0 -0,1

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 224,4 -58,0 2,1 -10,9 -0,8 0,0 0,0 3,4

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 222,2 -57,9 0,2 0,0 -0,6 0,0 0,0 11,2

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 222,9 -58,0 0,0 0,0 -0,4 0,0 0,0 24,6

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 216,9 -57,7 1,6 0,0 -1,2 0,0 0,0 17,3

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.60 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

60 of 78

Page 85: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 222,9 -58,0 2,6 0,0 -0,4 0,0 0,0 25,2

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 214,4 -57,6 2,1 0,0 -1,2 0,0 0,0 14,2

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 235,9 -58,4 0,3 -15,2 -0,3 0,0 0,0 -3,1

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 239,2 -58,6 2,3 -21,0 -0,8 0,0 0,0 -7,1

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 232,3 -58,3 2,3 -16,5 -0,8 0,0 0,0 -2,2

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 235,2 -58,4 2,2 -13,0 -0,1 0,0 0,0 11,7

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 226,9 -58,1 -0,4 -3,9 -0,5 0,0 0,0 7,2

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 232,0 -58,3 0,8 -8,1 -0,2 0,0 0,0 14,3

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 238,6 -58,5 0,6 -1,0 -1,8 0,0 0,0 19,2

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 227,4 -58,1 0,0 -4,3 -0,7 0,6 0,0 33,6

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 344,8 -61,7 2,9 0,0 -2,0 0,0 0,0 -5,4

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 350,0 -61,9 2,9 0,0 -2,0 0,0 0,0 -5,5

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 363,2 -62,2 3,0 -6,5 -1,7 0,0 0,0 -11,0

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 356,4 -62,0 2,9 -15,9 -1,5 0,0 0,0 -20,0

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 370,4 -62,4 3,0 -16,2 -1,6 0,0 0,0 -20,5

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 374,9 -62,5 3,1 -20,5 -1,7 0,0 0,0 -24,2

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 367,0 -62,3 3,0 0,0 -2,1 0,0 0,0 -4,7

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 358,3 -62,1 3,0 0,0 -2,1 0,0 0,0 -4,0

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 347,3 -61,8 2,9 0,0 -2,0 0,0 0,0 -4,3

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 372,2 -62,4 3,0 -20,4 -1,7 0,0 0,0 -25,1

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 378,4 -62,6 3,1 -20,0 -1,7 0,0 0,0 -25,7

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 373,6 -62,4 3,1 -18,3 -1,6 0,0 0,0 -23,8

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 362,3 -62,2 2,5 -4,7 -2,1 0,0 0,0 -1,1

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 335,7 -61,5 2,1 0,0 -2,0 0,0 0,0 15,6

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 320,3 -61,1 2,0 0,0 -1,9 0,0 0,0 16,0

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 305,0 -60,7 1,9 0,0 -1,9 0,0 0,0 16,3

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 294,3 -60,4 1,8 0,0 -1,8 0,0 0,0 16,6

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 382,4 -62,6 2,4 -3,5 -1,2 0,0 0,0 4,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.61 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

61 of 78

Page 86: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 386,6 -62,7 2,4 -12,4 -1,0 0,0 0,0 -7,0

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 382,4 -62,6 3,2 -4,0 -2,0 0,0 0,0 -3,0

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 386,3 -62,7 2,4 0,0 -1,3 0,0 0,0 5,1

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 390,5 -62,8 2,4 -19,9 -1,1 0,0 0,0 -11,8

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 386,5 -62,7 1,4 -4,7 -1,2 0,0 0,0 -1,0

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 382,5 -62,6 -4,5 -0,3 -1,0 0,0 0,0 5,6

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 390,4 -62,8 -4,5 -18,1 -1,0 0,0 0,0 -12,4

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 218,7 -57,8 0,9 0,0 -0,7 0,0 0,0 11,8

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 223,1 -58,0 1,3 -5,0 -0,7 0,0 0,0 4,2

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 222,6 -57,9 0,9 0,0 -0,7 0,0 0,0 8,9

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 226,8 -58,1 1,2 -17,9 -0,6 0,0 0,0 -6,1

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 227,0 -58,1 2,3 -21,1 -1,1 0,0 0,0 -15,6

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 222,8 -57,9 0,6 -4,6 -0,7 0,0 0,0 3,6

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 219,0 -57,8 -4,3 0,0 -0,6 0,0 0,0 11,4

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 226,7 -58,1 -4,3 -16,5 -0,6 0,0 0,0 -5,4

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 275,8 -59,8 2,8 0,0 -1,8 0,0 0,0 29,8

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 276,8 -59,8 2,8 0,0 -1,8 0,0 0,0 29,8

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 277,3 -59,9 2,8 0,0 -1,8 0,0 0,0 29,8

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 278,2 -59,9 2,8 0,0 -1,8 0,0 0,0 29,7

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 348,6 -61,8 2,7 0,0 -8,1 0,0 0,0 24,6

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 345,5 -61,8 2,7 0,0 -8,1 0,0 0,0 24,7

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 342,4 -61,7 2,7 0,0 -8,0 0,0 0,0 24,8

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 339,3 -61,6 2,7 0,0 -7,9 0,0 0,0 24,9

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 336,2 -61,5 2,7 0,0 -7,9 0,0 0,0 25,0

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 333,1 -61,4 2,6 0,0 -7,8 0,0 0,0 25,2

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 330,0 -61,4 2,6 0,0 -7,7 0,0 0,0 25,3

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 326,9 -61,3 2,6 0,0 -7,7 0,0 0,0 25,4

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 323,8 -61,2 2,6 0,0 -7,6 0,0 0,0 25,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.62 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

62 of 78

Page 87: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 320,7 -61,1 2,6 0,0 -7,5 0,0 0,0 25,7

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 291,8 -60,3 2,4 0,0 -6,9 0,0 0,0 27,0

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 288,7 -60,2 2,4 0,0 -6,8 0,0 0,0 27,1

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 285,6 -60,1 2,4 0,0 -6,8 0,0 0,0 27,3

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 282,5 -60,0 2,4 0,0 -6,7 0,0 0,0 27,4

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 279,4 -59,9 2,3 0,0 -6,6 0,0 0,0 27,6

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 276,3 -59,8 2,3 0,0 -6,6 0,0 0,0 27,7

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 273,2 -59,7 2,3 0,0 -6,5 0,0 0,0 27,8

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 270,1 -59,6 2,3 0,0 -6,4 0,0 0,0 28,0

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 267,0 -59,5 2,3 0,0 -6,3 0,0 0,0 28,1

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 263,9 -59,4 2,2 0,0 -6,3 0,0 0,0 28,3

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 285,6 -60,1 2,4 0,0 -1,6 0,0 0,0 43,6

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 304,7 -60,7 2,5 -0,2 -1,7 0,0 0,0 41,9

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 422,7 -63,5 2,8 0,0 -1,1 0,0 0,0 18,1

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 426,6 -63,6 2,9 0,0 -1,1 0,0 0,0 15,9

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 426,8 -63,6 3,1 0,0 -1,7 0,0 0,0 11,7

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 433,1 -63,7 2,9 -15,9 -0,8 0,0 0,0 2,4

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 431,1 -63,7 1,4 -8,0 -0,3 0,0 0,0 21,4

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 427,9 -63,6 2,4 -4,7 -1,1 0,0 0,0 13,6

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 432,4 -63,7 -4,6 -15,0 -1,1 0,0 0,0 -2,4

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 423,3 -63,5 -4,6 0,0 -1,1 0,0 0,0 12,8

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 425,8 -63,6 2,9 -10,3 -0,9 0,0 0,0 8,0

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 432,6 -63,7 2,9 -17,4 -0,8 0,0 0,0 -1,3

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 432,4 -63,7 3,1 -17,5 -0,9 0,0 0,0 -5,1

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 436,1 -63,8 2,9 -18,8 -0,8 0,0 0,0 -0,6

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 430,2 -63,7 1,4 -5,5 -0,4 0,0 0,0 23,8

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 431,0 -63,7 2,4 -15,6 -0,8 0,0 0,0 3,0

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 435,2 -63,8 -4,6 -15,2 -1,1 0,0 0,0 -2,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.63 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

63 of 78

Page 88: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 435,9 -63,8 -4,6 -16,6 -1,1 0,0 0,0 -4,1

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 368,4 -62,3 2,9 -3,1 -8,3 0,0 0,0 18,0

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 368,4 -62,3 2,9 -3,1 -8,3 0,0 0,0 18,0

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 367,7 -62,3 2,9 -0,2 -8,6 0,1 0,0 23,9

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 367,7 -62,3 2,9 -0,2 -8,6 0,1 0,0 23,9

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 364,3 -62,2 2,8 -3,1 -8,2 0,0 0,0 18,2

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 364,3 -62,2 2,8 -3,1 -8,2 0,0 0,0 18,2

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 363,6 -62,2 2,8 -0,2 -8,5 0,1 0,0 24,0

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 363,6 -62,2 2,8 -0,2 -8,5 0,1 0,0 24,0

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 360,2 -62,1 2,8 -3,1 -8,1 0,0 0,0 18,4

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 360,2 -62,1 2,8 -3,1 -8,1 0,0 0,0 18,4

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 359,4 -62,1 2,8 -0,2 -8,4 0,1 0,0 24,2

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 359,4 -62,1 2,8 -0,2 -8,4 0,1 0,0 24,2

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 356,0 -62,0 2,8 -3,1 -8,1 0,0 0,0 18,5

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 356,0 -62,0 2,8 -3,1 -8,1 0,0 0,0 18,5

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 355,4 -62,0 2,8 -0,2 -8,3 0,1 0,0 24,4

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 355,4 -62,0 2,8 -0,2 -8,3 0,1 0,0 24,4

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 360,1 -62,1 1,2 -3,7 -2,6 1,3 0,0 23,1

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 360,1 -62,1 1,2 -3,7 -2,6 1,3 0,0 23,1

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 360,1 -62,1 1,2 -3,7 -2,6 1,3 0,0 27,1

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 360,1 -62,1 1,2 -3,7 -2,6 1,3 0,0 27,1

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 293,4 -60,3 2,4 -0,2 -6,8 0,0 0,0 23,8

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 349,4 -61,9 2,7 -2,7 -7,9 0,0 0,0 19,0

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 346,3 -61,8 2,7 -2,7 -7,9 0,0 0,0 19,1

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 290,3 -60,2 2,4 0,0 -6,8 0,0 0,0 24,1

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 343,1 -61,7 2,7 -2,1 -7,8 0,0 0,0 19,8

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 287,1 -60,2 2,4 0,0 -6,7 0,0 0,0 24,3

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 284,1 -60,1 2,4 0,0 -6,6 0,0 0,0 24,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.64 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

64 of 78

Page 89: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 340,1 -61,6 2,7 -2,0 -7,8 0,0 0,0 20,0

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 337,0 -61,5 2,7 -2,0 -7,7 0,0 0,0 20,2

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 281,0 -60,0 2,3 0,0 -6,6 0,0 0,0 24,6

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 278,0 -59,9 2,3 0,0 -6,5 0,0 0,0 24,7

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 333,9 -61,5 2,7 -2,0 -7,7 0,0 0,0 20,3

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 330,8 -61,4 2,6 -0,5 -7,6 0,0 0,0 21,9

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 274,9 -59,8 2,3 0,0 -6,4 0,0 0,0 24,9

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 327,7 -61,3 2,6 -0,4 -7,6 0,0 0,0 22,1

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 271,7 -59,7 2,3 0,0 -6,4 0,0 0,0 25,0

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 268,7 -59,6 2,3 0,0 -6,3 0,0 0,0 25,1

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 324,6 -61,2 2,6 -0,4 -7,5 0,0 0,0 22,2

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 321,6 -61,1 2,6 -0,4 -7,4 0,0 0,0 22,4

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 265,6 -59,5 2,2 0,0 -6,2 0,0 0,0 25,3

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 333,2 -61,4 1,0 -3,6 -2,4 0,4 0,0 27,0

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 333,2 -61,4 1,0 -3,6 -2,4 0,4 0,0 27,0

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 277,0 -59,8 0,7 -4,4 -1,9 0,0 0,0 27,5

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 277,0 -59,8 0,7 -4,4 -1,9 0,0 0,0 27,5

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 305,3 -60,7 2,9 0,0 -1,7 0,0 0,0 39,8

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 367,0 -62,3 -4,6 0,0 -1,6 0,0 0,0 21,5

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 386,1 -62,7 1,1 -3,3 -1,2 0,0 0,0 24,1

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 381,8 -62,6 3,4 -14,2 -0,3 0,0 0,0 13,5

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 385,5 -62,7 2,7 -19,4 -0,8 2,4 0,0 14,3

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 360,2 -62,1 -4,6 0,0 -0,9 0,0 0,0 25,4

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 369,7 -62,3 -4,6 0,0 -0,9 0,3 0,0 27,4

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 347,7 -61,8 -4,6 0,0 -1,5 0,0 0,0 22,1

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 334,2 -61,5 1,1 -3,2 -1,0 0,0 0,0 25,6

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 337,5 -61,6 3,2 -5,1 -1,4 0,0 0,0 22,4

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 338,6 -61,6 2,5 -14,2 -0,6 1,0 0,0 19,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.65 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

65 of 78

Page 90: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 340,9 -61,6 -4,6 0,0 -0,9 0,0 0,0 25,9

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 350,3 -61,9 -4,6 0,0 -0,9 0,3 0,0 28,0

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 293,5 -60,3 -4,5 0,0 -1,3 2,5 0,0 26,3

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 313,4 -60,9 1,1 -3,3 -1,0 0,0 0,0 26,1

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 309,1 -60,8 3,0 -14,0 -0,2 7,7 0,0 22,9

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 313,1 -60,9 2,4 -19,5 -0,6 1,2 0,0 14,5

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 286,6 -60,1 -4,6 0,0 -0,7 0,7 0,0 28,3

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 295,7 -60,4 -4,6 0,0 -0,8 0,4 0,0 29,7

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 273,9 -59,7 -4,5 0,0 -1,2 0,0 0,0 24,5

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 262,3 -59,4 1,0 -3,2 -0,8 0,0 0,0 27,7

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 265,5 -59,5 2,7 0,0 -1,9 2,5 0,0 31,1

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 267,2 -59,5 2,0 -11,8 -0,5 0,7 0,0 22,9

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 268,0 -59,6 -4,5 0,0 -0,7 0,2 0,0 28,4

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 277,0 -59,8 -4,5 0,0 -0,7 0,4 0,0 30,4

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 220,4 -57,9 -4,4 0,0 -1,0 0,0 0,0 26,7

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 241,9 -58,7 0,9 -3,2 -0,8 0,0 0,0 28,5

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 237,6 -58,5 2,4 -13,4 -0,2 0,0 0,0 17,6

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 242,3 -58,7 1,8 -18,9 -0,5 1,1 0,0 16,8

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 214,1 -57,6 -4,5 0,0 -0,5 0,2 0,0 30,6

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 222,6 -57,9 -4,5 0,0 -0,6 0,5 0,0 32,5

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 437,1 -63,8 -4,6 -5,5 -1,1 0,0 0,0 -2,0

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 437,9 -63,8 -4,6 -5,2 -1,1 0,0 0,0 -1,7

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 438,7 -63,8 -4,6 -4,7 -1,1 0,0 0,0 -1,3

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 462,3 -64,3 -4,4 -0,4 -1,2 0,0 0,0 0,8

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 440,9 -63,9 3,1 -8,9 -1,0 0,0 0,0 16,4

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 438,4 -63,8 3,0 -8,9 -0,9 0,0 0,0 16,4

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 454,7 -64,1 -4,6 0,4 -1,2 0,0 0,0 8,5

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 449,5 -64,0 -4,5 -19,3 -1,1 0,0 0,0 -11,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.66 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

66 of 78

Page 91: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 443,6 -63,9 -4,3 -4,2 -1,1 0,0 0,0 7,4

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 445,6 -64,0 2,9 0,0 -2,5 0,0 0,0 3,1

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 463,7 -64,3 3,0 -18,1 -2,0 0,0 0,0 -20,7

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 441,4 -63,9 2,9 -10,6 -1,9 0,0 0,0 -12,7

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 458,6 -64,2 3,0 -23,4 -2,3 0,0 0,0 -20,4

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 456,4 -64,2 3,6 -24,7 -6,8 0,0 0,0 -30,8

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 455,2 -64,2 3,6 -24,7 -6,8 0,0 0,0 -30,7

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 453,1 -64,1 3,6 -24,7 -6,7 0,0 0,0 -30,5

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 449,5 -64,0 3,6 -24,3 -6,5 0,0 0,0 -29,9

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 451,9 -64,1 2,1 -6,7 -2,4 0,0 0,0 -5,6

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 474,6 -64,5 3,1 -10,6 -1,0 0,0 0,0 14,0

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 471,6 -64,5 3,1 -10,6 -1,0 0,0 0,0 14,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.67 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

67 of 78

Page 92: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name Station Fence South Ld = 49,6 dB(A) Ln = 49,6 dB(A)

243 Air condition unit I Administration Building 0,0 0 87,0 87,0 0,0 557,7 -65,9 2,9 -4,0 -1,5 0,5 0,0 19,1

244 Air condition unit II Administration Building 0,0 0 87,0 87,0 0,0 556,6 -65,9 2,9 -4,1 -1,5 0,4 0,0 18,9

245 Air condition unit III Administration Building 0,0 0 87,0 87,0 0,0 554,1 -65,9 2,9 -13,4 -1,2 1,3 0,0 10,8

246 Air condition unit IV Administration Building 0,0 0 87,0 87,0 0,0 553,0 -65,8 2,9 -14,6 -1,2 1,1 0,0 9,4

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 397,2 -63,0 0,7 -4,4 -2,8 0,0 0,0 16,6

9 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 392,3 -62,9 0,7 -4,4 -2,8 0,0 0,0 16,7

11 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 399,7 -63,0 0,7 -4,4 -2,8 0,0 0,0 16,5

12 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,0 0 86,0 86,0 0,0 394,3 -62,9 0,7 -4,4 -2,8 0,0 0,0 16,6

15 Facade N, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 407,3 -63,2 2,7 -15,9 -0,3 0,0 0,0 -4,6

3 Facade S, build. vent. air inlet Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 385,9 -62,7 2,7 0,0 -2,0 0,0 0,0 10,0

20 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 403,9 -63,1 2,7 -9,5 -0,3 0,0 0,0 1,9

21 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,0 38 63,0 4,0 69,1 3,0 391,8 -62,9 2,7 -7,7 -0,5 0,0 0,0 3,7

13 Facade north Compressor Building Unit 1 94,0 48 42,0 304,4 66,8 3,0 407,6 -63,2 1,0 -16,5 -0,4 0,0 0,0 -9,3

14 Facade north, door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 405,9 -63,2 2,9 -22,5 -1,5 0,0 0,0 -13,3

1 Facade south Compressor Building Unit 1 94,0 48 42,0 282,6 66,5 3,0 384,5 -62,7 0,8 0,0 -1,0 0,0 0,0 6,6

4 Facade south, GT air intake Compressor Building Unit 1 0,0 0 74,3 3,8 80,0 3,0 384,5 -62,7 1,3 0,0 -0,6 0,0 0,0 21,0

2 Facade south, large door Compressor Building Unit 1 94,0 30 59,7 15,6 71,7 3,0 383,3 -62,7 2,6 0,0 -2,1 0,0 0,0 12,5

5 Facade south, package ventilation, air i Compressor Building Unit 1 0,0 0 74,0 2,5 78,0 3,0 384,5 -62,7 3,5 0,0 -0,6 0,0 0,0 21,3

6 Facade south, small door Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 382,8 -62,7 2,8 0,0 -2,1 0,0 0,0 9,1

16 Facade west Compressor Building Unit 1 94,0 48 42,0 359,9 67,6 3,0 397,8 -63,0 0,9 -8,6 -0,6 0,0 0,0 -0,8

18 Facade west, door 1 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 406,9 -63,2 2,9 -13,8 -1,3 0,0 0,0 -4,4

17 Facade west, door 2 Compressor Building Unit 1 94,0 25 64,7 2,1 68,0 3,0 388,3 -62,8 2,8 -7,5 -1,7 0,0 0,0 1,9

19 Facade west, package ventilation, air ou Compressor Building Unit 1 0,0 0 78,0 1,0 78,0 3,0 396,6 -63,0 3,3 -6,5 -0,1 0,0 0,0 14,8

7 Roof Compressor Building Unit 1 94,0 45 45,4 297,8 70,1 0,0 395,9 -62,9 -0,4 -3,8 -0,9 0,0 0,0 2,2

23 air intake duct Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 409,0 -63,2 1,7 -15,1 -0,2 0,0 0,0 3,1

22 oil demister Compressor Building Unit 1 0,0 0 80,0 80,0 0,0 404,1 -63,1 0,7 0,0 -2,4 0,0 0,0 15,2

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.68 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

68 of 78

Page 93: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 roof, explosion panel Compressor Building Unit 1 94,0 16 74,2 154,8 96,1 0,0 396,0 -62,9 0,1 -4,2 -1,2 0,0 0,0 27,9

32 Building vent., exhaust 1 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 393,9 -62,9 0,7 -4,3 -2,7 0,0 0,0 16,8

33 Building vent., exhaust 2 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 389,0 -62,8 0,7 -4,4 -2,8 0,0 0,0 16,7

34 Building vent., exhaust 3 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 396,1 -62,9 0,7 -4,4 -2,8 0,0 0,0 16,6

35 Building vent., exhaust 4 on roof Compressor Building Unit 2 0,0 0 86,0 86,0 0,0 390,7 -62,8 0,7 -4,3 -2,7 0,0 0,0 16,9

40 Facade E, build. vent. air inlet I Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 384,8 -62,7 2,7 0,0 -2,0 0,0 0,0 10,1

41 Facade E, build. vent. air inlet II Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 397,2 -63,0 2,7 0,0 -2,0 0,0 0,0 9,8

44 Facade N, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 403,8 -63,1 2,8 -16,0 -0,3 0,0 0,0 -4,6

26 Facade S, build. vent. air inlet Compressor Building Unit 2 94,0 38 63,0 4,0 69,1 3,0 379,7 -62,6 2,7 0,0 -2,0 0,0 0,0 10,2

36 Facade east Compressor Building Unit 2 94,0 48 42,0 359,9 67,6 3,0 390,5 -62,8 0,9 0,0 -1,0 0,0 0,0 7,7

37 Facade east, door 1 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 381,8 -62,6 2,8 0,0 -2,1 0,0 0,0 9,2

38 Facade east, door 2 Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 400,7 -63,0 2,9 0,0 -2,2 0,0 0,0 8,7

39 Facade east, package ventilation outlet Compressor Building Unit 2 94,0 48 42,0 1,0 42,0 3,0 392,2 -62,9 1,6 0,0 -1,0 0,0 0,0 -17,2

42 Facade north Compressor Building Unit 2 94,0 48 42,0 304,4 66,8 3,0 403,8 -63,1 1,0 -16,0 -0,4 0,0 0,0 -8,7

43 Facade north, door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 405,1 -63,1 2,9 -20,2 -1,2 0,0 0,0 -10,6

24 Facade south Compressor Building Unit 2 94,0 48 42,0 282,6 66,5 3,0 380,7 -62,6 0,8 0,0 -1,0 0,0 0,0 6,7

27 Facade south, GT air intake Compressor Building Unit 2 0,0 0 74,3 3,8 80,0 3,0 380,7 -62,6 1,3 0,0 -0,6 0,0 0,0 21,1

25 Facade south, large door Compressor Building Unit 2 94,0 30 59,7 15,6 71,7 3,0 381,6 -62,6 2,6 0,0 -2,1 0,0 0,0 12,5

28 Facade south, package ventilation, air i Compressor Building Unit 2 0,0 0 74,0 2,5 78,0 3,0 380,7 -62,6 3,5 0,0 -0,6 0,0 0,0 21,4

29 Facade south, small door Compressor Building Unit 2 94,0 25 64,7 2,1 68,0 3,0 382,2 -62,6 2,8 0,0 -2,1 0,0 0,0 9,2

30 Roof Compressor Building Unit 2 94,0 45 45,4 297,8 70,1 0,0 392,7 -62,9 -0,3 -3,8 -0,8 0,0 0,0 2,3

46 air intake duct Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 405,7 -63,2 1,7 -15,1 -0,2 0,0 0,0 3,2

45 oil demister Compressor Building Unit 2 0,0 0 80,0 80,0 0,0 396,7 -63,0 0,7 0,0 -2,3 0,0 0,0 15,4

31 roof, explosion panel Compressor Building Unit 2 94,0 16 74,2 154,8 96,1 0,0 392,4 -62,9 0,1 -4,2 -1,2 0,0 0,0 28,0

55 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 389,8 -62,8 0,7 -4,3 -2,7 0,0 0,0 16,9

56 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 384,8 -62,7 0,7 -4,4 -2,7 0,0 0,0 17,0

57 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 390,5 -62,8 0,7 -4,3 -2,7 0,0 0,0 16,9

58 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,0 0 86,0 86,0 0,0 384,5 -62,7 0,7 -4,3 -2,7 0,0 0,0 17,0

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.69 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

69 of 78

Page 94: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade N, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 399,0 -63,0 2,7 -16,8 -0,3 0,0 0,0 -5,3

49 Facade S, build. vent. air inlet Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 375,8 -62,5 2,7 0,0 -1,9 0,0 0,0 10,3

66 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 393,7 -62,9 2,7 -5,7 -1,3 0,0 0,0 4,9

67 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,0 38 63,0 4,0 69,1 3,0 381,2 -62,6 2,7 -5,0 -1,6 0,0 0,0 5,4

59 Facade north Compressor Building Unit 3 94,0 48 42,0 304,4 66,8 3,0 399,0 -63,0 0,9 -16,8 -0,4 0,0 0,0 -9,4

60 Facade north, door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 398,9 -63,0 2,9 -20,1 -1,2 0,0 0,0 -10,4

47 Facade south Compressor Building Unit 3 94,0 48 42,0 282,6 66,5 3,0 375,7 -62,5 0,8 0,0 -0,9 0,0 0,0 6,8

50 Facade south, GT air intake Compressor Building Unit 3 0,0 0 74,3 3,8 80,0 3,0 375,6 -62,5 1,3 0,0 -0,6 0,0 0,0 21,2

48 Facade south, large door Compressor Building Unit 3 94,0 30 59,7 15,6 71,7 3,0 375,6 -62,5 2,5 0,0 -2,0 0,0 0,0 12,7

51 Facade south, package ventilation, air i Compressor Building Unit 3 0,0 0 74,0 2,5 78,0 3,0 375,6 -62,5 3,5 0,0 -0,6 0,0 0,0 21,5

52 Facade south, small door Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 375,6 -62,5 2,8 0,0 -2,0 0,0 0,0 9,3

62 Facade west Compressor Building Unit 3 94,0 48 42,0 359,9 67,6 3,0 387,4 -62,8 0,9 -4,9 -0,9 0,0 0,0 2,9

64 Facade west, door 1 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 396,7 -63,0 2,9 -6,1 -1,9 0,0 0,0 3,0

63 Facade west, door 2 Compressor Building Unit 3 94,0 25 64,7 2,1 68,0 3,0 377,7 -62,5 2,8 -4,8 -2,0 0,0 0,0 4,5

65 Facade west, package ventilation, air ou Compressor Building Unit 3 0,0 0 78,0 1,0 78,0 3,0 386,2 -62,7 3,3 -4,8 -0,4 0,0 0,0 16,4

53 Roof Compressor Building Unit 3 94,0 45 45,4 297,8 70,1 0,0 387,6 -62,8 -0,3 -3,8 -0,8 0,0 0,0 2,4

69 air intake duct Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 400,6 -63,0 1,7 -16,2 -0,2 0,0 0,0 2,2

68 oil demister Compressor Building Unit 3 0,0 0 80,0 80,0 0,0 393,7 -62,9 0,7 0,0 -2,3 0,0 0,0 15,4

54 roof, explosion panel Compressor Building Unit 3 94,0 16 74,2 154,8 96,1 0,0 387,3 -62,8 0,1 -4,2 -1,2 0,0 0,0 28,1

78 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 390,3 -62,8 0,7 -4,3 -2,7 0,0 0,0 16,9

79 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 385,3 -62,7 0,7 -4,3 -2,7 0,0 0,0 17,0

80 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 389,7 -62,8 0,7 -4,3 -2,7 0,0 0,0 16,9

81 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,0 0 86,0 86,0 0,0 384,3 -62,7 0,7 -4,3 -2,7 0,0 0,0 17,0

86 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 381,8 -62,6 2,7 -5,5 -1,3 0,0 0,0 5,3

87 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 394,2 -62,9 2,7 -6,5 -0,9 0,0 0,0 4,6

90 Facade N, build. vent. air inlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 399,1 -63,0 2,8 -16,1 -0,3 0,0 0,0 -4,6

72 Facade S, build. vent. air intlet Compressor Building Unit 4 94,0 38 63,0 4,0 69,1 3,0 376,1 -62,5 2,7 0,0 -1,9 0,0 0,0 10,3

82 Facade east Compressor Building Unit 4 94,0 48 42,0 359,9 67,6 3,0 387,5 -62,8 0,9 -5,4 -0,8 0,0 0,0 2,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.70 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

70 of 78

Page 95: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

83 Facade east, door 1 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 378,8 -62,6 2,8 -5,1 -2,0 0,0 0,0 4,2

84 Facade east, door 2 Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 397,7 -63,0 2,9 -7,4 -1,7 0,0 0,0 1,8

85 Facade east, package ventilation outlet Compressor Building Unit 4 94,0 48 42,0 1,0 42,0 3,0 389,2 -62,8 1,6 -5,7 -0,8 0,0 0,0 -22,7

88 Facade north Compressor Building Unit 4 94,0 48 42,0 304,4 66,8 3,0 399,2 -63,0 1,0 -16,0 -0,4 0,0 0,0 -8,6

89 Facade north, door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 398,9 -63,0 2,9 -17,7 -1,2 0,0 0,0 -8,0

70 Facade south Compressor Building Unit 4 94,0 48 42,0 282,6 66,5 3,0 375,8 -62,5 0,7 0,0 -0,9 0,0 0,0 6,8

73 Facade south, GT air intake Compressor Building Unit 4 0,0 0 74,3 3,8 80,0 3,0 375,8 -62,5 1,3 0,0 -0,6 0,0 0,0 21,2

71 Facade south, large door Compressor Building Unit 4 94,0 30 59,7 15,6 71,7 3,0 375,6 -62,5 2,6 0,0 -2,0 0,0 0,0 12,7

74 Facade south, package ventilation, air i Compressor Building Unit 4 0,0 0 74,0 2,5 78,0 3,0 375,8 -62,5 3,5 0,0 -0,6 0,0 0,0 21,5

75 Facade south, small door Compressor Building Unit 4 94,0 25 64,7 2,1 68,0 3,0 375,5 -62,5 2,8 0,0 -2,0 0,0 0,0 9,3

76 Roof Compressor Building Unit 4 94,0 45 45,4 297,8 70,1 0,0 387,7 -62,8 -0,3 -3,8 -0,8 0,0 0,0 2,4

92 air intake duct Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 400,9 -63,1 1,7 -15,3 -0,2 0,0 0,0 3,1

91 oil demister Compressor Building Unit 4 0,0 0 80,0 80,0 0,0 394,0 -62,9 0,7 0,0 -2,3 0,0 0,0 15,4

77 roof, explosion panel Compressor Building Unit 4 94,0 16 74,2 154,8 96,1 0,0 387,5 -62,8 0,1 -4,2 -1,2 0,0 0,0 28,1

101 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 396,7 -63,0 0,7 -4,4 -2,8 0,0 0,0 16,6

102 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 391,8 -62,9 0,7 -4,4 -2,8 0,0 0,0 16,7

103 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 395,1 -62,9 0,7 -4,3 -2,7 0,0 0,0 16,8

104 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,0 0 86,0 86,0 0,0 389,1 -62,8 0,7 -4,4 -2,8 0,0 0,0 16,7

108 Facade N, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 404,6 -63,1 2,7 -16,0 -0,3 0,0 0,0 -4,6

95 Facade S, build. vent. air inlet Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 380,4 -62,6 2,7 -2,7 -1,0 0,0 0,0 8,4

113 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 397,6 -63,0 2,7 0,0 -2,0 0,0 0,0 9,8

114 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,0 38 63,0 4,0 69,1 3,0 385,2 -62,7 2,7 0,0 -2,0 0,0 0,0 10,1

105 Facade east Compressor Building Unit 5 94,0 48 42,0 373,1 67,7 3,0 394,6 -62,9 0,9 -8,6 -0,6 0,0 0,0 -0,5

106 Facade north Compressor Building Unit 5 94,0 48 42,0 304,4 66,8 3,0 404,5 -63,1 0,9 -16,0 -0,4 0,0 0,0 -8,7

107 Facade north, door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 406,0 -63,2 2,9 -20,3 -1,2 0,0 0,0 -10,7

93 Facade south Compressor Building Unit 5 94,0 48 42,0 282,6 66,5 3,0 381,6 -62,6 0,8 -1,5 -0,9 0,0 0,0 5,2

96 Facade south, GT air intake Compressor Building Unit 5 0,0 0 74,3 3,8 80,0 3,0 381,5 -62,6 1,3 -2,6 -0,4 0,0 0,0 18,7

94 Facade south, large door Compressor Building Unit 5 94,0 30 59,7 15,6 71,7 3,0 382,7 -62,6 2,6 0,0 -2,1 0,0 0,0 12,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.71 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

71 of 78

Page 96: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

97 Facade south, package ventilation, air i Compressor Building Unit 5 0,0 0 74,0 2,5 78,0 3,0 381,5 -62,6 3,5 -1,8 -0,1 0,0 0,0 19,9

98 Facade south, small door Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 383,2 -62,7 2,8 0,0 -2,1 0,0 0,0 9,1

109 Facade west Compressor Building Unit 5 94,0 48 42,0 359,9 67,6 3,0 391,4 -62,8 0,9 0,0 -1,0 0,0 0,0 7,7

111 Facade west, door 1 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 400,5 -63,0 2,9 0,0 -2,2 0,0 0,0 8,7

110 Facade west, door 2 Compressor Building Unit 5 94,0 25 64,7 2,1 68,0 3,0 381,8 -62,6 2,8 0,0 -2,1 0,0 0,0 9,2

112 Facade west, package ventilation, air ou Compressor Building Unit 5 0,0 0 78,0 1,0 78,0 3,0 390,2 -62,8 3,3 0,0 -0,6 0,0 0,0 20,9

99 Roof Compressor Building Unit 5 94,0 45 45,4 297,8 70,1 0,0 393,4 -62,9 -0,3 -3,8 -0,9 0,0 0,0 2,3

116 air intake duct Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 406,4 -63,2 1,7 -15,1 -0,2 0,0 0,0 3,1

115 oil demister Compressor Building Unit 5 0,0 0 80,0 80,0 0,0 397,5 -63,0 0,7 0,0 -2,3 0,0 0,0 15,4

100 roof, explosion panel Compressor Building Unit 5 94,0 16 74,2 154,8 96,1 0,0 393,2 -62,9 0,1 -4,2 -1,2 0,0 0,0 27,9

199 Facade east, sec. 1 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 479,1 -64,6 3,2 -7,3 -2,2 0,0 0,0 -15,5

200 Facade east, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 489,1 -64,8 3,3 -7,5 -2,2 0,0 0,0 -15,8

202 Facade east, sec. 3 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 498,5 -64,9 3,3 -10,9 -2,5 0,0 0,0 -18,6

201 Facade north, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 493,4 -64,9 3,3 -19,0 -2,1 0,0 0,0 -26,3

203 Facade north, sec. 2 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 503,9 -65,0 3,3 -20,2 -2,2 0,0 0,0 -27,5

205 Facade north, sec. 3 Electrical Building 87,4 37 37,3 51,3 54,4 3,0 494,9 -64,9 3,3 -20,2 -2,1 0,0 0,0 -26,6

208 Facade south, sec. 1 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 477,0 -64,6 3,2 0,0 -2,7 0,0 0,0 -7,4

209 Facade south, sec. 2 Electrical Building 87,4 37 37,3 49,0 54,2 3,0 478,5 -64,6 3,2 0,0 -2,7 0,0 0,0 -6,8

210 Facade south, sec. 3 Electrical Building 87,4 37 37,3 43,2 53,6 3,0 475,3 -64,5 3,2 0,0 -2,7 0,0 0,0 -7,3

204 Facade west, sec. 1 Electrical Building 87,4 37 37,3 41,0 53,4 3,0 499,2 -65,0 3,3 -16,9 -2,3 0,0 0,0 -24,5

206 Facade west, sec. 2 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 491,4 -64,8 3,3 -8,6 -2,2 0,0 0,0 -16,9

207 Facade west, sec. 3 Electrical Building 87,4 37 37,3 33,0 52,5 3,0 481,5 -64,6 3,2 -6,2 -2,3 0,0 0,0 -14,5

198 Roof Electrical Building 87,4 37 37,3 661,5 65,5 0,0 487,7 -64,8 2,9 -4,7 -2,7 0,0 0,0 -3,8

117 Filter I Filter 0,0 0 70,3 4,6 77,0 0,0 215,0 -57,6 -0,5 0,0 -1,6 0,0 0,0 17,3

118 Filter II Filter 0,0 0 70,3 4,6 77,0 0,0 212,3 -57,5 -0,5 0,0 -1,6 0,0 0,0 17,4

119 Filter III Filter 0,0 0 70,3 4,6 77,0 0,0 210,6 -57,5 -0,5 0,0 -1,6 0,0 0,0 17,4

120 Filter IV Filter 0,0 0 70,3 4,6 77,0 0,0 210,4 -57,5 -0,5 0,0 -1,6 0,0 0,0 17,4

231 Fuel Gas Skid, facade east Fuel Gas Skid I 87,0 37 45,3 126,1 66,3 3,0 327,4 -61,3 1,5 0,0 -1,1 0,0 0,0 8,5

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.72 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

72 of 78

Page 97: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

227 Fuel Gas Skid, facade north Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 335,8 -61,5 1,6 -16,4 -0,9 0,0 0,0 -10,5

232 Fuel Gas Skid, facade north-east, door Fuel Gas Skid I 87,0 30 52,6 4,8 59,4 3,0 322,8 -61,2 2,4 0,0 -2,3 0,0 0,0 1,3

230 Fuel Gas Skid, facade south Fuel Gas Skid I 87,0 37 45,3 68,4 63,7 3,0 321,2 -61,1 1,4 0,0 -1,1 0,0 0,0 5,8

228 Fuel Gas Skid, facade west Fuel Gas Skid I 87,0 37 45,3 130,9 66,5 3,0 329,8 -61,4 1,6 -12,1 -0,9 0,0 0,0 -3,3

226 Fuel Gas Skid, roof Fuel Gas Skid I 87,0 37 45,3 124,0 66,3 0,0 328,6 -61,3 0,7 -4,6 -1,0 0,0 0,0 0,0

233 Ventilation, intake Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 331,6 -61,4 -4,5 0,0 -0,8 0,0 0,0 7,3

229 Ventilation, outlet Fuel Gas Skid I 0,0 0 68,0 68,0 6,0 325,1 -61,2 -4,5 -8,3 -0,8 0,0 0,0 -0,9

213 Fuel Gas Skid, facade east Fuel Gas Skid II 87,0 37 45,3 130,9 66,5 3,0 315,4 -61,0 1,5 -8,6 -0,9 0,0 0,0 0,6

215 Fuel Gas Skid, facade north Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 322,4 -61,2 1,6 -17,3 -0,8 0,0 0,0 -11,1

212 Fuel Gas Skid, facade south Fuel Gas Skid II 87,0 37 45,3 68,4 63,7 3,0 307,2 -60,7 1,3 0,0 -1,0 0,0 0,0 6,2

216 Fuel Gas Skid, facade west Fuel Gas Skid II 87,0 37 45,3 126,1 66,3 3,0 313,6 -60,9 1,4 0,0 -1,0 0,0 0,0 8,8

217 Fuel Gas Skid, facade west, door Fuel Gas Skid II 87,0 30 52,6 4,8 59,4 3,0 318,7 -61,1 2,4 0,0 -2,3 0,0 0,0 1,5

211 Fuel Gas Skid, roof Fuel Gas Skid II 87,0 37 45,3 124,0 66,3 0,0 314,9 -61,0 0,7 -4,6 -1,0 0,0 0,0 0,4

214 Ventilation, intake Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 320,6 -61,1 -4,5 -9,4 -0,8 0,0 0,0 -1,8

218 Ventilation, outlet Fuel Gas Skid II 0,0 0 68,0 68,0 6,0 309,1 -60,8 -4,4 0,0 -0,8 0,0 0,0 8,0

178 Meter Run I Metering 0,0 0 72,1 45,0 88,7 0,0 254,9 -59,1 2,1 0,0 -1,7 0,0 0,0 30,0

179 Meter Run II Metering 0,0 0 72,1 45,0 88,7 0,0 250,9 -59,0 2,1 0,0 -1,7 0,0 0,0 30,1

180 Meter Run III Metering 0,0 0 72,1 45,1 88,7 0,0 246,9 -58,8 2,1 0,0 -1,7 0,0 0,0 30,2

181 Meter Run IV Metering 0,0 0 72,1 45,1 88,7 0,0 242,9 -58,7 2,0 0,0 -1,6 0,0 0,0 30,3

129 Gas Cooler 1/2, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 307,1 -60,7 2,1 0,0 -7,2 0,0 0,0 25,9

130 Gas Cooler 1/2, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 306,4 -60,7 2,1 0,0 -7,2 0,0 0,0 25,9

131 Gas Cooler 1/2, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 305,7 -60,7 2,1 0,0 -7,2 0,0 0,0 25,9

132 Gas Cooler 1/2, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 305,1 -60,7 2,1 0,0 -7,2 0,0 0,0 26,0

133 Gas Cooler 1/2, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 304,5 -60,7 2,1 0,0 -7,2 0,0 0,0 26,0

134 Gas Cooler 1/2, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 303,9 -60,6 2,1 0,0 -7,2 0,0 0,0 26,0

135 Gas Cooler 1/2, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 303,3 -60,6 2,1 0,0 -7,1 0,0 0,0 26,1

136 Gas Cooler 1/2, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 302,8 -60,6 2,1 0,0 -7,1 0,0 0,0 26,1

137 Gas Cooler 1/2, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 302,4 -60,6 2,1 0,0 -7,1 0,0 0,0 26,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.73 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

73 of 78

Page 98: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Gas Cooler 1/2, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 301,9 -60,6 2,1 0,0 -7,1 0,0 0,0 26,1

139 Gas Cooler 3/4, distrib. pipe 1 Piping 0,0 0 79,0 18,9 91,8 0,0 299,2 -60,5 2,1 0,0 -7,1 0,0 0,0 26,3

140 Gas Cooler 3/4, distrib. pipe 2 Piping 0,0 0 79,0 18,9 91,8 0,0 299,1 -60,5 2,1 0,0 -7,1 0,0 0,0 26,3

141 Gas Cooler 3/4, distrib. pipe 3 Piping 0,0 0 79,0 18,9 91,8 0,0 298,9 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

142 Gas Cooler 3/4, distrib. pipe 4 Piping 0,0 0 79,0 18,9 91,8 0,0 298,9 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

143 Gas Cooler 3/4, distrib. pipe 5 Piping 0,0 0 79,0 18,9 91,8 0,0 298,8 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

144 Gas Cooler 3/4, distrib. pipe 6 Piping 0,0 0 79,0 18,9 91,8 0,0 298,8 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

145 Gas Cooler 3/4, distrib. pipe 7 Piping 0,0 0 79,0 18,9 91,8 0,0 298,9 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

146 Gas Cooler 3/4, distrib. pipe 8 Piping 0,0 0 79,0 18,9 91,8 0,0 298,9 -60,5 2,1 0,0 -7,0 0,0 0,0 26,3

147 Gas Cooler 3/4, distrib. pipe 9 Piping 0,0 0 79,0 18,9 91,8 0,0 299,0 -60,5 2,1 0,0 -7,1 0,0 0,0 26,3

148 Gas Cooler 3/4, distrib. pipe 10 Piping 0,0 0 79,0 18,9 91,8 0,0 299,1 -60,5 2,1 0,0 -7,1 0,0 0,0 26,3

128 Header discharge side Piping 0,0 0 80,0 198,4 103,0 0,0 346,2 -61,8 2,4 -0,5 -1,9 1,3 0,0 42,5

121 Header suction side Piping 0,0 0 78,0 252,2 102,0 0,0 342,1 -61,7 2,3 -0,4 -1,9 1,2 0,0 41,5

219 Facade east Power Generation I 97,0 37 58,5 69,3 76,9 3,0 400,2 -63,0 2,3 -2,7 -1,0 0,0 0,0 15,5

223 Facade south Power Generation I 97,0 37 58,5 42,6 74,8 3,0 395,0 -62,9 2,3 0,0 -1,0 0,0 0,0 16,1

224 Facade south, door Power Generation I 97,0 30 64,0 4,8 70,9 3,0 395,1 -62,9 2,6 0,0 -1,6 0,0 0,0 11,9

221 Facade west Power Generation I 97,0 37 58,5 69,3 76,9 3,0 404,0 -63,1 2,3 -10,9 -0,8 0,0 0,0 7,4

241 Power Generation I, Exhaust Stack Power Generation I 0,0 0 92,0 92,0 0,0 419,5 -63,4 1,1 -1,7 -0,7 0,0 0,0 27,2

220 Roof Power Generation I 97,0 37 58,5 162,5 80,6 0,0 402,2 -63,1 1,8 -4,6 -1,0 0,0 0,0 13,6

222 Room ventilation, intake Power Generation I 0,0 0 76,0 76,0 6,0 399,9 -63,0 -4,6 -8,7 -1,0 0,0 0,0 4,7

225 Room ventilation, outlet Power Generation I 0,0 0 76,0 76,0 6,0 393,8 -62,9 -4,6 0,0 -1,0 0,0 0,0 13,5

237 Facade east Power Generation II 97,0 37 58,5 69,3 76,9 3,0 415,0 -63,4 2,4 -4,3 -0,9 0,0 0,0 13,6

238 Facade north Power Generation II 97,0 37 58,5 42,6 74,8 3,0 424,2 -63,5 2,4 -17,1 -0,8 0,0 0,0 -1,3

239 Facade north, door Power Generation II 97,0 30 64,0 4,8 70,9 3,0 424,1 -63,5 2,7 -19,3 -0,8 0,0 0,0 -7,0

234 Facade west Power Generation II 97,0 37 58,5 69,3 76,9 3,0 418,7 -63,4 2,4 -15,3 -0,7 0,0 0,0 2,8

242 Power Generation II, Exhaust Stack Power Generation II 0,0 0 92,0 92,0 0,0 415,2 -63,4 1,1 -1,5 -0,7 0,0 0,0 27,5

236 Roof Power Generation II 97,0 37 58,5 162,5 80,6 0,0 416,9 -63,4 1,9 -5,0 -1,0 0,0 0,0 13,0

235 Room ventilation, intake Power Generation II 0,0 0 76,0 76,0 6,0 414,3 -63,3 -4,6 -14,1 -1,1 0,0 0,0 -1,1

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.74 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

74 of 78

Page 99: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

240 Room ventilation, outlet Power Generation II 0,0 0 76,0 76,0 6,0 425,3 -63,6 -4,6 -17,1 -1,1 0,0 0,0 -4,4

287 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 337,9 -61,6 2,3 0,0 -7,8 0,6 0,0 22,4

153 Distrib. pipe 1 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 337,9 -61,6 2,3 0,0 -7,8 0,6 0,0 22,4

283 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 312,7 -60,9 2,1 0,0 -7,4 0,0 0,0 25,8

149 Distrib. pipe 1 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 312,7 -60,9 2,1 0,0 -7,4 0,0 0,0 25,8

154 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 336,8 -61,5 2,3 0,0 -7,8 0,4 0,0 22,3

288 Distrib. pipe 2 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 336,8 -61,5 2,3 0,0 -7,8 0,4 0,0 22,3

150 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 311,5 -60,9 2,1 0,0 -7,3 0,0 0,0 25,9

284 Distrib. pipe 2 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 311,5 -60,9 2,1 0,0 -7,3 0,0 0,0 25,9

155 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 335,8 -61,5 2,3 0,0 -7,8 0,6 0,0 22,5

289 Distrib. pipe 3 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 335,8 -61,5 2,3 0,0 -7,8 0,6 0,0 22,5

285 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 310,4 -60,8 2,1 0,0 -7,3 0,0 0,0 25,9

151 Distrib. pipe 3 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 310,4 -60,8 2,1 0,0 -7,3 0,0 0,0 25,9

290 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 334,8 -61,5 2,3 0,0 -7,7 0,0 0,0 22,0

156 Distrib. pipe 4 downstream Start Up Cooler 0,0 0 76,0 19,6 88,9 0,0 334,8 -61,5 2,3 0,0 -7,7 0,0 0,0 22,0

152 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 309,3 -60,8 2,1 0,0 -7,3 0,0 0,0 26,0

286 Distrib. pipe 4 upstream Start Up Cooler 0,0 0 79,0 19,6 91,9 0,0 309,3 -60,8 2,1 0,0 -7,3 0,0 0,0 26,0

281 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 323,4 -61,2 0,6 0,0 -3,2 0,0 0,0 25,2

124 Start Up Cooler Start Up Cooler 0,0 0 65,2 239,2 89,0 0,0 323,4 -61,2 0,6 0,0 -3,2 0,0 0,0 25,2

282 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 323,3 -61,2 0,6 0,0 -3,2 0,0 0,0 29,2

127 Start Up Cooler, gas flow noise Start Up Cooler 0,0 0 69,2 239,2 93,0 0,0 323,3 -61,2 0,6 0,0 -3,2 0,0 0,0 29,2

167 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 326,4 -61,3 2,2 0,0 -7,6 0,5 0,0 22,7

157 Distrib. pipe 1 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 333,7 -61,5 2,2 0,0 -7,7 0,2 0,0 22,0

158 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 333,1 -61,4 2,2 0,0 -7,7 0,5 0,0 22,4

168 Distrib. pipe 2 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 326,1 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

159 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 332,4 -61,4 2,2 0,0 -7,7 0,5 0,0 22,4

169 Distrib. pipe 3 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 326,0 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

170 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 325,9 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.75 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

75 of 78

Page 100: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

160 Distrib. pipe 4 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 331,8 -61,4 2,2 0,0 -7,7 0,5 0,0 22,4

161 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 331,3 -61,4 2,2 0,0 -7,7 0,0 0,0 21,9

171 Distrib. pipe 5 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 325,9 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

172 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 325,8 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

162 Distrib. pipe 6 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 330,7 -61,4 2,2 0,0 -7,6 0,0 0,0 22,0

163 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 330,2 -61,4 2,2 0,0 -7,6 0,0 0,0 22,0

173 Distrib. pipe 7 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 325,9 -61,3 2,2 0,0 -7,5 0,6 0,0 22,8

164 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 329,7 -61,4 2,2 0,0 -7,6 0,0 0,0 22,0

174 Distrib. pipe 8 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 325,9 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

175 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 326,1 -61,3 2,2 0,0 -7,5 0,5 0,0 22,7

165 Distrib. pipe 9 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 329,2 -61,3 2,2 0,0 -7,6 0,0 0,0 22,0

166 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 328,8 -61,3 2,2 0,0 -7,6 0,0 0,0 22,1

176 Distrib. pipe 10 downstream Transportation Gas Cooler 0,0 0 76,0 18,9 88,8 0,0 326,2 -61,3 2,2 0,0 -7,5 0,2 0,0 22,4

122 Gas Cooler 1/2 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 317,4 -61,0 0,6 0,0 -3,1 0,0 0,0 29,4

125 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 317,4 -61,0 0,6 0,0 -3,1 0,0 0,0 29,4

123 Gas Cooler 3/4 Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 312,4 -60,9 0,5 0,0 -3,1 0,0 0,0 29,5

126 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,0 0 66,0 496,0 93,0 0,0 312,4 -60,9 0,5 0,0 -3,1 0,0 0,0 29,5

177 Header discharge side Transportation Gas Cooler 0,0 0 80,0 87,1 99,4 0,0 334,3 -61,5 2,6 0,0 -1,9 1,0 0,0 39,6

256 Control valve (eingehaust) Unit 1 0,0 0 87,0 87,0 3,0 376,4 -62,5 -4,6 0,0 -1,7 2,3 0,0 23,6

252 Exhaust Stack Opening Unit 1 0,0 0 87,2 2,0 90,2 0,0 397,5 -63,0 1,0 -3,1 -1,2 0,0 0,0 23,9

255 Exhaust duct outsde compressor building Unit 1 0,0 0 76,3 12,5 87,2 0,0 396,1 -62,9 3,2 0,0 -2,4 0,0 0,0 25,1

251 Oil Cooler Unit 1 0,0 0 78,1 24,5 92,0 0,0 405,6 -63,2 2,4 0,0 -1,6 0,0 0,0 29,7

253 Piping suction side Unit 1 0,0 0 76,0 24,9 90,0 3,0 370,9 -62,4 -4,6 0,0 -0,9 0,0 0,0 25,1

254 Piping, discharge side Unit 1 0,0 0 76,9 32,4 92,0 3,0 369,0 -62,3 -4,6 0,0 -0,9 2,2 0,0 29,3

262 Control valve (eingehaust) Unit 2 0,0 0 87,0 87,0 3,0 372,5 -62,4 -4,6 0,0 -1,7 2,3 0,0 23,7

258 Exhaust Stack Opening Unit 2 0,0 0 87,2 2,0 90,2 0,0 387,6 -62,8 1,0 -3,2 -1,1 0,0 0,0 24,1

259 Exhaust duct outsde compressor building Unit 2 0,0 0 76,3 12,5 87,2 0,0 387,7 -62,8 3,2 0,0 -2,3 0,3 0,0 25,6

257 Oil Cooler Unit 2 0,0 0 78,1 24,5 92,0 0,0 396,7 -63,0 2,4 0,0 -1,6 0,0 0,0 29,9

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.76 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

76 of 78

Page 101: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

261 Piping suction side Unit 2 0,0 0 76,0 24,9 90,0 3,0 367,2 -62,3 -4,6 0,0 -0,9 2,3 0,0 27,4

260 Piping, discharge side Unit 2 0,0 0 76,9 32,4 92,0 3,0 365,0 -62,2 -4,6 0,0 -0,9 0,4 0,0 27,6

268 Control valve (eingehaust) Unit 3 0,0 0 87,0 87,0 3,0 367,1 -62,3 -4,6 0,0 -1,6 2,3 0,0 23,8

264 Exhaust Stack Opening Unit 3 0,0 0 87,2 2,0 90,2 0,0 385,7 -62,7 1,0 -3,2 -1,1 0,0 0,0 24,1

267 Exhaust duct outsde compressor building Unit 3 0,0 0 76,3 12,5 87,2 0,0 385,0 -62,7 3,2 0,0 -2,3 0,0 0,0 25,3

263 Oil Cooler Unit 3 0,0 0 78,1 24,5 92,0 0,0 394,3 -62,9 2,4 0,0 -1,6 0,0 0,0 29,9

265 Piping suction side Unit 3 0,0 0 76,0 24,9 90,0 3,0 362,5 -62,2 -4,6 0,0 -0,9 2,3 0,0 27,5

266 Piping, discharge side Unit 3 0,0 0 76,9 32,4 92,0 3,0 358,7 -62,1 -4,6 0,0 -0,9 2,2 0,0 29,6

274 Control valve (eingehaust) Unit 4 0,0 0 87,0 87,0 3,0 368,6 -62,3 -4,6 0,0 -1,6 2,4 0,0 23,8

270 Exhaust Stack Opening Unit 4 0,0 0 87,2 2,0 90,2 0,0 386,0 -62,7 1,0 -3,3 -1,2 0,0 0,0 24,1

271 Exhaust duct outsde compressor building Unit 4 0,0 0 76,3 12,5 87,2 0,0 385,3 -62,7 3,2 0,0 -2,3 0,0 0,0 25,3

269 Oil Cooler Unit 4 0,0 0 78,1 24,5 92,0 0,0 394,6 -62,9 2,4 0,0 -1,6 0,0 0,0 29,9

273 Piping suction side Unit 4 0,0 0 76,0 24,9 90,0 3,0 363,0 -62,2 -4,6 0,0 -0,9 2,3 0,0 27,5

272 Piping, discharge side Unit 4 0,0 0 76,9 32,4 92,0 3,0 358,9 -62,1 -4,6 0,0 -0,9 0,3 0,0 27,7

280 Control valve (eingehaust) Unit 5 0,0 0 87,0 87,0 3,0 374,9 -62,5 -4,6 -6,7 -1,7 1,6 0,0 16,2

276 Exhaust Stack Opening Unit 5 0,0 0 87,2 2,0 90,2 0,0 388,2 -62,8 1,0 -3,3 -1,2 0,0 0,0 24,0

279 Exhaust duct outsde compressor building Unit 5 0,0 0 76,3 12,5 87,2 0,0 388,4 -62,8 3,2 0,0 -2,4 0,3 0,0 25,6

275 Oil Cooler Unit 5 0,0 0 78,1 24,5 92,0 0,0 397,4 -63,0 2,4 0,0 -1,6 0,0 0,0 29,9

277 Piping suction side Unit 5 0,0 0 76,0 24,9 90,0 3,0 369,9 -62,4 -4,6 0,0 -0,9 0,7 0,0 25,8

278 Piping, discharge side Unit 5 0,0 0 76,9 32,4 92,0 3,0 364,0 -62,2 -4,6 -5,8 -0,9 5,1 0,0 26,5

194 Air compressor I, air intake Utility Building 0,0 0 67,0 67,0 6,0 494,0 -64,9 -4,6 0,0 -1,3 0,0 0,0 2,2

195 Air compressor II, air intake Utility Building 0,0 0 67,0 67,0 6,0 496,0 -64,9 -4,6 0,0 -1,3 0,0 0,0 2,2

196 Air compressor III, air intake Utility Building 0,0 0 67,0 67,0 6,0 497,9 -64,9 -4,6 0,0 -1,3 0,0 0,0 2,2

184 Air compressor room, ventilation Utility Building 0,0 0 68,0 68,0 3,0 537,9 -65,6 -4,4 -0,3 -1,4 0,0 0,0 -0,7

250 Air condition unit I Utility Building 0,0 0 87,0 87,0 0,0 487,3 -64,7 2,8 0,0 -1,4 2,5 0,0 26,2

249 Air condition unit II Utility Building 0,0 0 87,0 87,0 0,0 486,6 -64,7 2,8 0,0 -1,4 2,5 0,0 26,2

197 Boiler room, ventilation intake Utility Building 0,0 0 72,0 72,0 6,0 532,9 -65,5 -4,6 -3,8 -1,4 0,0 0,0 2,7

191 Boiler room, ventilation outlet Utility Building 0,0 0 72,0 72,0 6,0 498,4 -64,9 -4,6 -8,8 -1,3 0,0 0,0 -1,6

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.77 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

77 of 78

Page 102: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station ACS03 at district Fier, Albania, ESIA Layout

calculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

185 Boiler, stack opening Utility Building 0,0 0 78,0 78,0 3,0 497,2 -64,9 -4,4 -0,4 -1,3 0,0 0,0 10,0

193 Facade east Utility Building 87,4 37 37,3 432,7 63,6 3,0 513,4 -65,2 2,9 0,0 -2,8 0,0 0,0 1,5

182 Facade north Utility Building 87,4 37 37,3 110,9 57,7 3,0 541,1 -65,7 3,0 -20,4 -2,4 0,0 0,0 -24,7

192 Facade south Utility Building 87,4 37 37,3 110,9 57,7 3,0 491,8 -64,8 2,8 0,0 -2,7 0,0 0,0 -4,0

186 Facade west Utility Building 87,4 37 37,3 415,0 63,5 3,0 519,1 -65,3 2,9 -15,2 -2,2 0,0 0,0 -13,3

187 Facade west, door I Utility Building 87,4 30 52,0 4,4 58,4 3,0 514,7 -65,2 3,5 -19,7 -5,6 0,0 0,0 -25,6

188 Facade west, door II Utility Building 87,4 30 52,0 4,4 58,4 3,0 511,8 -65,2 3,5 -19,2 -5,5 0,0 0,0 -25,1

189 Facade west, door III Utility Building 87,4 30 52,0 4,4 58,4 3,0 507,0 -65,1 3,5 -18,3 -5,4 0,0 0,0 -24,0

190 Facade west, door IV Utility Building 87,4 30 52,0 4,4 58,4 3,0 498,3 -64,9 3,5 -14,8 -5,3 0,0 0,0 -20,2

183 Roof Utility Building 87,4 37 37,3 664,3 65,5 0,0 515,2 -65,2 2,2 -11,8 -2,1 0,0 0,0 -11,4

247 Air condition unit I Workshop/Stores Building 0,0 0 87,0 87,0 0,0 497,7 -64,9 2,8 -4,7 -1,2 2,2 0,0 21,2

248 Air condition unit II Workshop/Stores Building 0,0 0 87,0 87,0 0,0 496,6 -64,9 2,8 -4,3 -1,2 2,0 0,0 21,4

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.78 Study 227C2 G1

Rev. 00

SoundPLAN 7.1

ACS03-WGP-000-S-TRS-0002_00 Attachment 3

78 of 78

Page 103: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

25 25

25

25

25

25

25

2525

30

30

30

30

30

3030

30

30

30

30

30

35

35

35

3535

35

35

40

40

40

40

40

45

45

45 50

50

556065

7075

34365500

34365500

34366000

34366000

34366500

34366500

34367000

34367000

34367500

34367500

34368000

34368000

34368500

34368500

34369000

34369000

34369500

34369500

34370000

34370000

34370500

34370500

34371000

34371000

34371500

34371500

34372000

34372000

34372500

34372500

45

13

50

0

45

13

50

0

45

14

00

0

45

14

00

0

45

14

50

0

45

14

50

0

45

15

00

0

45

15

00

0

45

15

50

0

45

15

50

0

45

16

00

0

45

16

00

0

45

16

50

0

45

16

50

0

45

17

00

0

45

17

00

0

45

17

50

0

45

17

50

0

45

18

00

0

45

18

00

0

45

18

50

0

45

18

50

0

45

19

00

0

45

19

00

0

45

19

50

0

45

19

50

0

Attachment 4

StudyNo. 227C2 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression StationACS03 at district Fier, AlbaniaESIA Layout

Noise Contour Map

Temperature 17 °CRelative Humidity 75 %

Map Source:

Google Earth

-----------------------------------------------------------

Noise Propagation Outdooraccording to ISO 9613-2

Calculation Parameter:

T = 17°C, Humidity 75%, Air pressure 1013 mbarCmet = 0 dB

Wind 3 m/s toward receptor

Ground effect on proposed ACS03: fully reflective, G = 0

Ground effect around: Agricultural area, G = 0,85

Limits for attenuation by screening:Single sound screen 20 dB

Multiple sound screens 25 dB

Calculation Grid 25 m

Height of noise contours 2 m above ground

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Noise LevelLAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:25000

00 125 250 500 750 1000 1250m

ACS03-WGP-000-S-TRS-0002_00 Attachment 4

1 of 1

Page 104: ESIA Albania Annex 8.3 CS03 Noise Study ESIA

Trans Adriatic Pipeline AG – Albania (Branch Office)Torre Drin, Rruga Abdi Toptani

Tirana, AlbaniaTel.: + 355 44 306 937Fax: + 355 42 265 685

[email protected]

Date 01/2013

Copyright Reserved: This document may not be copied, shown to or placed at the disposal of third parties without prior consent of TAP AG.The latest version of the document is registered in the TAP Project's Database.


Recommended