ETSU FINE ARTS
CLASSROOM
BUILDING
12.16.2015
ETSU FINE ARTS
CLASSROOM
BUILDING
11.08.2016
ETSU FINE ARTS
CLASSROOM
BUILDING
12.16.2015
ETSU FINE ARTS
CLASSROOM
BUILDING
11.08.2016
AGENDA
1. REVIEW SCHEMATIC REDESIGN
DRAWINGS
2. REVIEW SITE COMMUNICATION
PLAN
3. DISCUSS PROCESS OF COST
ESTIMATING
4. REVIEW PROJECT SCHEDULE
5. DISCUSS HPBR
REVIEW SCHEMATIC
REDESIGN DRAWINGSREDESIGN DRAWINGS
12/18/15
ETSU FINE ARTS CLASSROOM BUILDING SITE PLAN | 1”=60’
East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
34
5.1
6 S
F
1301
MA
IN E
LEC
TRIC
AL
16
7.1
8 S
F
1303
MA
IN I
T
111.33 SF 802
FACILITY OFFICE
111.33 SF 808
THEATER OFFICE
113.91 SF 809
THEATER OFFICE
111.33 SF 810
THEATER OFFICE
250.21 SF 811
MUSIC OFFICE
10
5.0
7 S
F801
CO
PY
/ P
RIN
TER
132.27 SF 812
MUSIC OFFICE
126.41 SF 814
MUSIC
PERCUSSION
OFFICE
MUSIC
PERCUSSION
1,402.08 SF 1302A
MECHANICAL
108.37 SF 410
STORAGE
RIGGING
75
.02
SF
1010B
STO
RA
GE
GEN
ER
AL
2,060.04 SF 601
RECITAL HALL
526.36 SF 602
PERFORMANCE
PLATFORM
319.59 SF 505
DRESSING ROOM
322.02 SF 504
DRESSING ROOM
& MAKEUP
INSTRUCTION
248.24 SF 506
GREEN ROOM
421.28 SF 1002
COSTUME SHOP
STORAGE
162.01 SF 1004
LAUNDRY
1,206.83 SF 1001
COSTUME SHOP
3,296.08 SF 501
STUDIO THEATER
277.9 SF 501C
CHAIR STORAGE
247.11 SF 1006
SCENE SHOP
STORAGE
192.91 SF 503
WARDROBE /
STORAGE
30
5.2
SF
405
DR
ESSIN
G R
OO
M
30
5.2
SF
404
DR
ESSIN
G R
OO
M
30
5.2
SF
403
DR
ESSIN
G R
OO
M
40
2.7
7 S
F412
PIA
NO
STO
RA
GE
33
4.4
2 S
F406
GR
EEN
RO
OM
222.76 SF 413
KITCHENETTE
216.97 SF 604
GREEN ROOM
1008
SCENE SHOP
WELDING
2,307.04 SF 1005
SCENE SHOP
119.75 SF 401
BACK STAGE
RESTROOM MALE
134.06 SF 402
BACK STAGE
RESTROOM
FEMALE
140.16 SF 1009
SCENE SHOP
OFFICE
3,306.67 SF 101
PUBLIC LOBBY
840.32 SF 1202
LOADING DOCK
69
.52
SF
1307
ELE
C
75
.63
SF
1306
IT /
CO
MM
101.96 SF 1305
IT / COMM
83.45 SF 1304
ELEC
180.96 SF 1003
COSTUME SHOP
OFFICE
7,707.99 SF 301
AUDITORIUM
393.11 SF 303
STAGE APRON
3,877.4 SF 302
STAGE AND
WINGS
156.37 SF 1007
SCENE SHOP
PAINTING 180.56 SF 305
ORCHESTRA SHELL
TOWER STORAGE
59
.27
SF
106
TOIL
ET
134.32 SF 109
BOX OFFICE
MANAGER
73
.49
SF
1010A
JA
NIT
OR
17
3.1
1 S
F
1010A
STO
RA
GE
GEN
ER
AL
RIG
GIN
G W
ALL
103.06 SF 107
FOH STORAGE 135.74 SF 603
CONTROL BOOTH
55
.63
SF
103
CO
NC
ESSIO
N
STO
RA
GE
367.73 SF 501F
SLL / CROSSOVER
107.63 SF 1006A
SCENE SHOP
TOOLS
1507
CORRIDOR
1501
CO
RR
IDO
R
1505
CORRIDOR
1505
CORRIDOR
1603
VESTIBULE
105C
VESTIBULE 104C
VESTIBULE 601B
SLL
601A
SLL
601C
SLL
301E
SLL
301G
SSL
301F
SSL
301D
SLL
501A
SLL 501B
SLL
1509
CO
RR
IDO
R
1510
CO
RR
IDO
R
W W D D
106A
JA
NIT
OR
601D
SOUND RACK
ROOM 116.48 SF 501E
STAIR 3
111.93 SF 806
TECH OFFICE
111.33 SF 807
TECH OFFICE
111.33 SF 803
FACILITY OFFICE
55.52 SF 801A
RECEPTION
132.33 SF 407
WARDROBE
126.41 SF 813
OFFICE
1,058.35 SF 901
PERCUSSION
REHEARSAL
1,448.75 SF 903
CHORAL
REHEARSAL
91
.29
SF
902A
PER
C R
EH
EA
RSA
L
92
.68
SF
902B
PER
C R
EH
EA
RSA
L
10
0.0
4 S
F
902C
PER
C R
EH
EA
RSA
L
92
.68
SF
902D
PER
C R
EH
EA
RSA
L
546.78 SF 904
STORAGE
MUSICAL
INSTRUMENT
2,013.21 SF 1201
INSTRUMENTAL
REHEARSAL
436.5 SF 1403
STORAGE
INSTRUMENTAL
286.68 SF 1604
STAIR 2
237.39 SF 1506
VESTIBULE
10
2.5
2 S
F311
SO
UN
D R
AC
K
RO
OM
10
2.5
2 S
F307
CO
NTR
OL B
OO
TH
10
2.5
2 S
F308
SO
UN
D B
OO
TH
108.37 SF 409
STORAGE SOUND
108.37 SF 408
STORAGE
LIGHTING
125.66 SF 904A
STORAGE
MUSICAL
INSTRUMENT
44
6.6
9 S
F
301B
SLL
44
6.6
9 S
F
301C
SLL
26
3.8
2 S
F411
STO
RA
GE M
USIC
GEN
ER
AL
1,179.04 SF 1504
CORRIDOR 126.2 SF 903A
SSL
52.57 SF 901A
SLL
711.23 SF 1503
CORRIDOR
413.4 SF 1511
CORRIDOR
16
6.2
7 S
F
1512
CO
RR
IDO
R
15
8.7
7 S
F
1513
CO
RR
IDO
R
W D
15
6.3
4 S
F
1010C
STO
RA
GE
148.93 SF 108
BOX OFFICE
SALES
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
ETSU FINE ARTS CLASSROOM BUILDING GROUND FLOOR PLAN | 1’-0”=1/32”
GEN
ER
AL
216.78 SF
East Tennessee State University 11/08/2016
12/18/15
69
.52
SF
1308
ELE
C
75
.63
SF
1309
IT /
CO
MM
1310
1302B
196.82 SF 502
CONTROL BOOTH
135.48 SF 507
DIMMER ROOM
3,369.78 SF 301A
AUDITORIUM
BALCONY
1,527.46 SF 101E
LOBBY
31
5.6
9 S
F
1515
CO
RR
IDO
R
1514
161.68 SF 301L
STAIR 5
158.79 SF 301M
STAIR 6
1,032.19 SF 502B
STUDIO TECH
155.12 SF 1412
SUPPORT
1411
1604
704.38 SF 1516
CORRIDOR
72.26 SF 104D
VESTIBULE
75.71 SF 105D
VESTIBULE
ETSU FINE ARTS CLASSROOM BUILDING UPPER FLOOR PLAN | 1’-0” = 1/32”
186.7 SF
ELEC
858.04 SF
MECHANICAL
631.54 SF
CORRIDOR
135.74 SF
STAIR 4
286.68 SF
STAIR 2
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
East Tennessee State University 11/08/2016
12/18/15
SOUTH PLAZA ELEVATION | 1’-0” = 1/32”
EAST ELEVATION | 1’-0” = 1/32”
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY
A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
WEST ELEVATION | 1’-0” - 1/32”
NORTH ELEVATION | 1’-0” = 1/32”
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY
A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
AERIAL PERSPECTIVEETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY
A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
MAIN ENTRY - STREET VIEW FROM EASTETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY
A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
MAIN ENTRY - STREET VIEW FROM WESTETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY
A R C H I T E C T S & I N T E R I O R D E S I G N E R S
12/18/15
2ND FLOOR
16'-0"
1ST FLOOR
0"
HIGH ROOF
32'-0"
HIGH PARAPET
34'-8"
BACKSTAGE PARAPET
79'-4"
AUDITORIUM PARAPET
53'-4"
AUDITORIUM ROOF
50'-0"
BACKSTAGE ROOF
76'-0"
DEEP PIT
-12'-6"
ORCHESTRA PIT
-8'-6"
MAIN STAGE GRIDIRON
63'-0"
FLY GALLERY
39'-0"
LOW PARAPET
18'-8"
302
STAGE AND
WINGS 301
AUDITORIUM
101
PUBLIC LOBBY
306
ORCHESTRA PIT
1507
CO
RR
IDO
R
309
FOLLOW SPOT
12
'-6
"
1,402.08 SF 1302A
MECHANICAL
305.2 SF 405
DRESSING ROOM
69
.2 S
F
405A
BA
TH
RO
OM
CA
C P
RO
SC
HEIG
HT
28
'-0
"
7'-0
"
307
CONTROL BOOTH
301A
AUDITORIUM
BALCONY
50
'-0
"
CA
C S
TA
GE H
EIG
HT T
O G
RID
IRO
N
63
'-0
"
4'-0
" 8'-6
"
SEE "AUDITORIUM EAST - INTERIOR ELEVATION"
LONGITUDINAL BUILDING SECTION THROUGH AUDITORIUM | 1’-0” = 1/32”
2ND FLOOR
16'-0"
1ST FLOOR
0"
HIGH ROOF
32'-0"
HIGH PARAPET
34'-8"
BACKSTAGE PARAPET
79'-4"
AUDITORIUM PARAPET
53'-4"
AUDITORIUM ROOF
50'-0"
BACKSTAGE ROOF
76'-0"
RECITAL ROOF
35'-0"
RECITAL PARAPET
41'-4"
RECITAL TECH.
25'-4"
FLY GALLERY
39'-0"
LOW PARAPET
18'-8"
301
AUDITORIUM
501
STUDIO THEATER 858.04 SF 1302B
MECHANICAL
1509
CO
RR
IDO
R
1515
CO
RR
IDO
R
1501
CO
RR
IDO
R 526.36 SF 602
PERFORMANCE
PLATFORM
SEE "AUDITORIUM NORTH - INTERIOR ELEVATION"
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
TRANSVERSE BUILDING SECTION THROUGH AUDITORIUM | 1’-0” = 1/32”
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016
12/18/15
2ND FLOOR
16'-0"
1ST FLOOR
0"
HORIZONTAL REVEALED WOOD TRIM
WITH PAINTED GYP BD IN BETWEEN
WITH 2' TALL PAINTED GYP BD
WAINSCOT AND PORCELAIN TILE BASE
FEATURE VENUE ENTRY POINTS:
PAINTED GYP BD WITH PAINTED
REVEALS, PAINTED WAINSCOT AND
PORCELAIN TILE BASE GFRP CLAD ROUND COLUMN COVERS
CURTAIN WALL
LOBBY FLOOR - 100% CARPET
ENTRY TO PUBLIC TOILETS
INTERIOR ELEVATION THROUGH LOBBY | 1” = 20’-0”
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016
12/18/15
SKIM COAT OF PLASTER ON CMU TO A HEIGHT OF 12' ABOVE FLOOR WITH PAINTED REVEALS - SEE SIDE ELEVATION
3' DEEP GYP BD (TWO LAYERS) SHELF
PERIMETER CURTAINS
PLATFORM WALL: PAINTED SKIM COAT OF PLASTER ON CMU
CAT WALK TECHNICAL LEVEL -PAINT ALL EXPOSED STRUCTURE AND WALLS FROM CATWALK UP A DRYFALL BLACK
DOUBLE LAYER GYP BD SOUND DIFFUSER CLOUDS
BACK WALL AT RECITAL STAGE TO BE DOUBLE LAYER GYP BD PARTIONS WITH REVEALS
6" WOOD BASE - STAIN GRADE SKIM COAT OF PLASTER ON CMU TO A HEIGHT OF 12' ABOVE FLOOR WITH PAINTED REVEALS
3' DEEP GYP BD (TWO LAYERS) SHELF
PERIMETER CURTAINS
SURFACE MOUNTED LED SCONCES - 3 PER SIDE
CONTROL
SIDE PLATFORM WALL AT RECITAL STAGE TO BE PAINTED SKIM COAT OF PLASTER ON CMU WITH PAINTED REVEALS
CAT WALK TECHNICAL LEVEL - PAINT ALL EXPOSED STRUCTURE AND WALLS FROM CATWALK UP A DRYFALL BLACK
DOUBLE LAYER GYP BD SOUND DIFFUSER CLOUDS
PLATFORM WALL: PAINTED SKIM COAT OF PLASTER ON CMU
BACK WALL AT RECITAL STAGE TO BE DOUBLE LAYER GYP BD PARTIONS WITH REVEALS
6" WOOD BASE
RECITAL HALL NORTH - INTERIOR ELEVATION | 1” = 20’-0” RECITAL HALL EAST - INTERIOR ELEVATION | 1” = 20’-0”
2ND FLOOR
16'-0"
1ST FLOOR
0"
AUDITORIUM PARAPET
53'-4"
AUDITORIUM ROOF
50'-0"
DEEP PIT
-12'-6"
ORCHESTRA PIT
-8'-6"
FLY GALLERY
39'-0"
(TWO LAYERS OF GYP BD) BALCONY AND PARTERRE WALLS WITH WOOD CAP AND PAINTED STEEL HANDRAIL
TWO LAYERS OF GYPBD WITH REVEALS
BLACK DRY-FALL PAINTED STRUCTURE, CATWALKS AND DECK
HORIZONTAL REVEALED WOOD TRIM WITH PAINTED GYP BD IN BETWEEN WITH 2' TALL PAINTED GYP BD WAINSCOT AND PORCELAIN TILE BASE
GLASS CURTAIN WALL
GLASS CURTAIN WALL BEYOND
GFRP CLAD ROUND COLUMN COVERS
PROSCENIUM
MOTORIZED CURTAINS
PAINTED GYP BD CURTAIN BULKHEAD
307
CONTROL BOOTH
309
FOLLOW SPOT
301A
AUDITORIUM
BALCONY
306
ORCHESTRA PIT
SKIM COAT OF PLASTER
1ST FLOOR
0"
AUDITORIUM PARAPET
53'-4"
AUDITORIUM ROOF
50'-0"
ORCHESTRA PIT
-8'-6"
FLY GALLERY
39'-0"
(TWO LAYERS OF GYP BD) BALCONY AND PARTERRE WALLS WITH STAIN GRADE WOOD CAP AND PAINTED STEEL HANDRAIL
TWO LAYERS OF GYPBD WITH REVEALS
BLACK DRY-FALL PAINTED STRUCTURE, CATWALKS AND DECK
ORCHESTRA PIT
SIDE PARTERRE STAGE LEVEL
GYP BD PROSCENIUM PANELS
SIDE PARTERRE
BALCONY BOX
CURTAINS
BALCONY BOX
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
AUDITORIUM NORTH- INTERIOR ELEVATION | 1” = 20’-0” AUDITORIUM EAST - INTERIOR ELEVATION | 1” = 20’-0”
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016
REVIEW SITE
COMMUNICATION PLANCOMMUNICATION PLAN
TELECOMMUNICATIONS FIBER PATHETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S
COST ESTIMATING
DISCUSS PROCESS OF
COST ESTIMATING
4REVIEW PROJECT
SCHEDULE
12/18/15
DATE: November 7, 2016 "DRAFT" ETSU Fine Arts Classroom Facility | Project Schedule
ID Task Name Duration Start
1 Contract Awarded to Designer 0 days Thu 6/4/15
2 Pre-Construction Contract Awarded to CM 0 days Thu 10/8/15
3 Pre-Design / Programming Phase 89 days Mon 7/20/15
4 Schematic Design Phase 104 days Thu 11/19/15
5 Project On Hold 124 days Tue 4/12/16
6 Project Restart 1 day Fri 9/30/16
7 Schematic Design for Larger Project (4 WKs) 21 days Fri 9/30/16
8 Schematic Design Pricing for Larger Project (4 WKs) 22 days Fri 10/28/16
9 Owner Meeting to review SD Cost 1 day Tue 11/29/16
10 SD Pricing Review and Approval (1 WK) 6 days Tue 11/29/16
11 Authorization to DD Phase 1 day Tue 12/6/16
12 Design Development Phase (13 1/2 WKs) 70 days Tue 12/6/16
13 DD Cost Estimate (4 WKs) 21 days Mon 3/13/17
14 Owner Meeting to review DD Cost 1 day Tue 4/11/17
15 DD Cost Review and Approval (2 WKs) 11 days Tue 4/11/17
16 Authorization to CD Phase 1 day Tue 4/25/17
17 Construction Documents Includes Early Packages (28 WKs) 140 days Tue 4/25/17
18 SFMO Review/Approval (6 WKs) 30 days Thu 11/16/17
19 Bidding/Award (8 WKs) 40 days Thu 11/16/17
20 Construction 477 days Tue 7/25/17
21 FFE Move-in / Commissioning 85 days Tue 4/23/19
22 Building Opening 1 day Mon 8/19/19
6/4 6/4 Contract Awarded to Designer
10/8 10/8 Pre-Construction Contract Awarded to CM
7/20 11/19 Pre-Design / Programming Phase
11/19 4/12 Schematic Design Phase
4/12 9/30 Project On Hold
9/30 9/30 Project Restart
9/30 10/28 Schematic Design for Larger Project (4 WKs)
10/28 11/28 Schematic Design Pricing for Larger Project (4 WKs)
11/29 11/29 Owner Meeting to review SD Cost
11/29 12/6 SD Pricing Review and Approval (1 WK)
12/6 12/6 Authorization to DD Phase
12/6 3/13 Design Development Phase (13 1/2 WKs)
3/13 4/10 DD Cost Estimate (4 WKs)
4/11 4/11 Owner Meeting to review DD Cost
4/11 4/25 DD Cost Review and Approval (2 WKs)
4/25 4/25 Authorization to CD Phase
4/25 11/6 Construction Documents Includes Early Packages (28 WKs)
11/16 12/27 SFMO Review/Approval (6 WKs)
11/16 1/10 Bidding/Award (8 WKs)
7/25 5/22 Construction
4/23 8/19 FFE Move-in / Commissioning
8/19 8/19 Building Opening
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct N 2015 2016 2017 2018 2019
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
OVERALL PROJECT SCHEDULEETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016
5DISCUSS HPBR
8/24/2016
3
44 44 43 44
12/18/15
High Performance Building Requirements v1.01 Project Team Representatives Initials
CHECKLIST / TRACKING FORM O - Owner
SBC Number: 166/005-08-2013 Applicable Credit Attempted C - Contractor Yes
Project Name: ETSU Fine Arts Classroom Building Applicable Credit Not Attempted ME - Mechanical Engineer Category A No
Applicable 86 Date: Not Applicable Credit EE - Electrical Engineer Category B
Minimum 43 Project Type: New_Construction CE - Civil Engineer Category C
Not Applicable 18 Project Phase: Schematic Design A - Architect Required
Programming 44 Other - Other Priority 1
SD 4 Priority 2
DD 0 N/A
CD 0
Closeout 0
Checklist Total 16 17 0 0 104 0 0 104 0 0 104 Fee Low Fee High Cost Low Cost. High Fee Low Fee High Cost Low Cost High Fee Low Fee High Cost Low Cost High
22
Points Land Management LM Total: 13 8 1 12 9 1 0 0 22 0 0 22 0 0 22
Possible Points Credit ID
Applicable to
Building/Site
Scope?
Description Level: Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No
Comment: Describe implementation approach for
each pursued credit. If credits are not pursued, provide justification.
Role Initials
1 LM1.1 No Site Selection - Reuse Existing Buildings Priority 2 1 1 1 1 1 O
1 LM1.2 Yes Site Selection - Show preference for building on developed sites: Preserve
farmland/habitat, wetlands, floodplains, public parkland Priority 1 1 0 1 0 1 1 1
MHM / BLS O
1 LM1.3 Yes Site Selection - Brownfield Redevelopment - Remediate and Restore contaminated
sites when possible Priority 2 1 0 1 0 1 1 1
MHM O
1 LM1.4 Yes Site Selection - Urban Development - Locate building within existing infrastructure
Priority 1 1 0 1 0 1 1 1 MHM / BLS
O
1 LM2.1 Yes Site Disturbance - Sediment and Erosion control during construction Required 1 0 1 0 1 1 1 CM / GC: Denark C
1 LM2.2 Yes Site Disturbance - Limit site disturbance during construction to minimum
development footprint Priority 1 1 0 1 0 1 1 1
BLS CE
1 LM3.1 Yes Transportation - Plan for access to public transportation Priority 2 1 0 1 0 1 1 1 BLS O
1 LM3.2 Yes Transportation - Provide bicycle storage for 5% of building occupants and
shower/changing facilities for 0.5% of FTE occupants Priority 2 1 0 1 0 1 1 1
MHM / BLS CE
1 LM3.3 Yes Transportation - Plan site to include preferred parking for carpooling for 5% of all
spaces provided Priority 2 1 0 1 0 1 1 1
Need Owner Input CE
1 LM3.4 Yes Transportation - Plan site to include preferred parking for low-emitting/fuel efficient
vehicles for 5% of all spaces provided Priority 2 1 0 1 0 1 1 1
Need Owner Input CE
1 LM4.1 Yes Landscape Design - Maximize vegetated open space
Priority 2 1 0 1 0 1 1 1 Penland: Likely not achievable. Would require further study.
Other
1 LM4.2 Yes Landscape Design - Native and drought tolerant planting Required 1 0 1 0 1 1 1 Penland: Plants shall be native or naturalized. Other
1 LM5.1 Yes Heat Island Reduction - Non roof surface reflectivity and shading Priority 1 1 0 1 0 1 1 1 MHM / BLS / Penland CE
1 LM5.2 Yes Heat Island Reduction - Reflective roof materials Priority 2 1 0 1 0 1 1 1 MHM A
1 LM6.1 Yes Stormwater Design - Post development discharge rate and volume not to exceed
Pre-development rate Priority 1 1 0 1 0 1 1 1
BLS CE
2 LM6.2 No Stormwater Design - Reduce discharge rate and volume 25% on previously developed sites.
Priority 2 2 0 2 0 2 2 2 BLS
CE
1 LM6.3 Yes Stormwater Design - Design to remove 80% Total Suspended solids from the
average annual rainfall event. Verify local requirements. Priority 1 1 0 1 0 1 1 1
BLS CE
1 LM6.4 Yes Stormwater Design - Design per TDEC BMP References Required 1 0 1 0 1 1 1 BLS CE
REV 1 LM7.1 Yes
Exterior Site Lighting - Design exterior lighting power to be 10% less than is
allowed by ASHRAE 90.1-2010, Section 9.4.3 Priority 2 1 0 1 0 1 1 1
MHM / BLS / FSC (Potential Cost Increase TBD based on layout and fixture type / wattage requirements)
EE
1 LM7.2 Yes Exterior Site Lighting - Locate fixtures to minimize illuminance above the horizontal
plane Priority 1 1 0 1 0 1 1 1
MHM / BLS / FSC (Common practice, but can impact cost depending on layout)
EE
1 LM7.3 Yes
Exterior Site Lighting - Locate exterior fixtures to minimize light trespass at
property lines. Document foot-candle levels at site boundary Priority 1 1 0 1 0 1 1 1
MHM / BLS / FSC: Boundary is not yet defined at SD; safety of egress may dictate fixture locations close to boundary.
EE
6
Points Water Effciency WE Total: 2 1 3 2 1 3 0 0 6 0 0 6 0 0 6
Possible Points Credit ID
Applicable to
Building/Site
Scope?
Description Level: Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No Yes
M
a
y
b
e
No
Comment: Describe implementation approach for
each pursued credit. If credits are not pursued, provide justification.
Role Initials
1 WE1.1 Yes Water Efficient Landscaping, Utilize efficient irrigation technologies and planting
measures Required 1 0 1 0 1 1 1
Penland: fee increase depenant on documentation requirements
ME
1 WE.1.2 Yes
Water Efficient Landscaping, Non potable sources or no irrigation
Priority 1 1 0 1 0 1 1 1
Penland: Irrigations desirible during period of drought, pumping water from Brush Creek not recommended due to high cost of maintenance and negative environmental impact. System cost $12k-$18k FSC: Non-potable system cost $15k-$20k
A 12,000 20,000
1 WE2.1 Yes Wastewater Treatment & Conveyance: On site treatment Priority 2 1 1 1 1 1 BLS: Scope not included in this project - verify ME
1 WE2.2 Yes Wastewater Treatment & Conveyance: Utilize non potable water Priority 2 1 1 1 1 1 FSC - Not currently in project scope ME
1 WE3.1 Yes Water Use Reduction - Fixture flow and flush rates
Required 1 0 1 0 1 1 1 FSC - ETSU Campus Standards; Required by Code
ME
1 WE3.2 Yes Water Use Reduction - Utilize auto-flow / auto-flush valves
Priority 2 1 1 1 1 1 FSC - Does not meet ETSU Campus Standards. Cost increase of $50-$100 per fixture.
ME 3,500 7,000
Required Credit Costs Optional Credit Costs Not Attempted Credit Costs Closeout
Primary Credit
Responsibility
Primary Credit
Responsibility
CD DD
Category from Applicability Tree:
Category A
Point allocation
error
Point allocation
error
New or Revised from SDG
Targeted
Points Phase
Programming SD
(at EE1.2; point total is adjusted to compensate)
42
41
4642 41 46
10/24/2016
McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S
ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016
ETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S
ETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S