ETSU FINE ARTS CLASSROOM BUILDING 12.16.2015 ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016
Transcript
Page 1: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

ETSU FINE ARTS

CLASSROOM

BUILDING

12.16.2015

ETSU FINE ARTS

CLASSROOM

BUILDING

11.08.2016

Page 2: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

ETSU FINE ARTS

CLASSROOM

BUILDING

12.16.2015

ETSU FINE ARTS

CLASSROOM

BUILDING

11.08.2016

AGENDA

1. REVIEW SCHEMATIC REDESIGN

DRAWINGS

2. REVIEW SITE COMMUNICATION

PLAN

3. DISCUSS PROCESS OF COST

ESTIMATING

4. REVIEW PROJECT SCHEDULE

5. DISCUSS HPBR

Page 3: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

REVIEW SCHEMATIC

REDESIGN DRAWINGSREDESIGN DRAWINGS

Page 4: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

ETSU FINE ARTS CLASSROOM BUILDING SITE PLAN | 1”=60’

East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 5: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

34

5.1

6 S

F

1301

MA

IN E

LEC

TRIC

AL

16

7.1

8 S

F

1303

MA

IN I

T

111.33 SF 802

FACILITY OFFICE

111.33 SF 808

THEATER OFFICE

113.91 SF 809

THEATER OFFICE

111.33 SF 810

THEATER OFFICE

250.21 SF 811

MUSIC OFFICE

10

5.0

7 S

F801

CO

PY

/ P

RIN

TER

132.27 SF 812

MUSIC OFFICE

126.41 SF 814

MUSIC

PERCUSSION

OFFICE

MUSIC

PERCUSSION

1,402.08 SF 1302A

MECHANICAL

108.37 SF 410

STORAGE

RIGGING

75

.02

SF

1010B

STO

RA

GE

GEN

ER

AL

2,060.04 SF 601

RECITAL HALL

526.36 SF 602

PERFORMANCE

PLATFORM

319.59 SF 505

DRESSING ROOM

322.02 SF 504

DRESSING ROOM

& MAKEUP

INSTRUCTION

248.24 SF 506

GREEN ROOM

421.28 SF 1002

COSTUME SHOP

STORAGE

162.01 SF 1004

LAUNDRY

1,206.83 SF 1001

COSTUME SHOP

3,296.08 SF 501

STUDIO THEATER

277.9 SF 501C

CHAIR STORAGE

247.11 SF 1006

SCENE SHOP

STORAGE

192.91 SF 503

WARDROBE /

STORAGE

30

5.2

SF

405

DR

ESSIN

G R

OO

M

30

5.2

SF

404

DR

ESSIN

G R

OO

M

30

5.2

SF

403

DR

ESSIN

G R

OO

M

40

2.7

7 S

F412

PIA

NO

STO

RA

GE

33

4.4

2 S

F406

GR

EEN

RO

OM

222.76 SF 413

KITCHENETTE

216.97 SF 604

GREEN ROOM

1008

SCENE SHOP

WELDING

2,307.04 SF 1005

SCENE SHOP

119.75 SF 401

BACK STAGE

RESTROOM MALE

134.06 SF 402

BACK STAGE

RESTROOM

FEMALE

140.16 SF 1009

SCENE SHOP

OFFICE

3,306.67 SF 101

PUBLIC LOBBY

840.32 SF 1202

LOADING DOCK

69

.52

SF

1307

ELE

C

75

.63

SF

1306

IT /

CO

MM

101.96 SF 1305

IT / COMM

83.45 SF 1304

ELEC

180.96 SF 1003

COSTUME SHOP

OFFICE

7,707.99 SF 301

AUDITORIUM

393.11 SF 303

STAGE APRON

3,877.4 SF 302

STAGE AND

WINGS

156.37 SF 1007

SCENE SHOP

PAINTING 180.56 SF 305

ORCHESTRA SHELL

TOWER STORAGE

59

.27

SF

106

TOIL

ET

134.32 SF 109

BOX OFFICE

MANAGER

73

.49

SF

1010A

JA

NIT

OR

17

3.1

1 S

F

1010A

STO

RA

GE

GEN

ER

AL

RIG

GIN

G W

ALL

103.06 SF 107

FOH STORAGE 135.74 SF 603

CONTROL BOOTH

55

.63

SF

103

CO

NC

ESSIO

N

STO

RA

GE

367.73 SF 501F

SLL / CROSSOVER

107.63 SF 1006A

SCENE SHOP

TOOLS

1507

CORRIDOR

1501

CO

RR

IDO

R

1505

CORRIDOR

1505

CORRIDOR

1603

VESTIBULE

105C

VESTIBULE 104C

VESTIBULE 601B

SLL

601A

SLL

601C

SLL

301E

SLL

301G

SSL

301F

SSL

301D

SLL

501A

SLL 501B

SLL

1509

CO

RR

IDO

R

1510

CO

RR

IDO

R

W W D D

106A

JA

NIT

OR

601D

SOUND RACK

ROOM 116.48 SF 501E

STAIR 3

111.93 SF 806

TECH OFFICE

111.33 SF 807

TECH OFFICE

111.33 SF 803

FACILITY OFFICE

55.52 SF 801A

RECEPTION

132.33 SF 407

WARDROBE

126.41 SF 813

OFFICE

1,058.35 SF 901

PERCUSSION

REHEARSAL

1,448.75 SF 903

CHORAL

REHEARSAL

91

.29

SF

902A

PER

C R

EH

EA

RSA

L

92

.68

SF

902B

PER

C R

EH

EA

RSA

L

10

0.0

4 S

F

902C

PER

C R

EH

EA

RSA

L

92

.68

SF

902D

PER

C R

EH

EA

RSA

L

546.78 SF 904

STORAGE

MUSICAL

INSTRUMENT

2,013.21 SF 1201

INSTRUMENTAL

REHEARSAL

436.5 SF 1403

STORAGE

INSTRUMENTAL

286.68 SF 1604

STAIR 2

237.39 SF 1506

VESTIBULE

10

2.5

2 S

F311

SO

UN

D R

AC

K

RO

OM

10

2.5

2 S

F307

CO

NTR

OL B

OO

TH

10

2.5

2 S

F308

SO

UN

D B

OO

TH

108.37 SF 409

STORAGE SOUND

108.37 SF 408

STORAGE

LIGHTING

125.66 SF 904A

STORAGE

MUSICAL

INSTRUMENT

44

6.6

9 S

F

301B

SLL

44

6.6

9 S

F

301C

SLL

26

3.8

2 S

F411

STO

RA

GE M

USIC

GEN

ER

AL

1,179.04 SF 1504

CORRIDOR 126.2 SF 903A

SSL

52.57 SF 901A

SLL

711.23 SF 1503

CORRIDOR

413.4 SF 1511

CORRIDOR

16

6.2

7 S

F

1512

CO

RR

IDO

R

15

8.7

7 S

F

1513

CO

RR

IDO

R

W D

15

6.3

4 S

F

1010C

STO

RA

GE

148.93 SF 108

BOX OFFICE

SALES

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

ETSU FINE ARTS CLASSROOM BUILDING GROUND FLOOR PLAN | 1’-0”=1/32”

GEN

ER

AL

216.78 SF

East Tennessee State University 11/08/2016

Page 6: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

69

.52

SF

1308

ELE

C

75

.63

SF

1309

IT /

CO

MM

1310

1302B

196.82 SF 502

CONTROL BOOTH

135.48 SF 507

DIMMER ROOM

3,369.78 SF 301A

AUDITORIUM

BALCONY

1,527.46 SF 101E

LOBBY

31

5.6

9 S

F

1515

CO

RR

IDO

R

1514

161.68 SF 301L

STAIR 5

158.79 SF 301M

STAIR 6

1,032.19 SF 502B

STUDIO TECH

155.12 SF 1412

SUPPORT

1411

1604

704.38 SF 1516

CORRIDOR

72.26 SF 104D

VESTIBULE

75.71 SF 105D

VESTIBULE

ETSU FINE ARTS CLASSROOM BUILDING UPPER FLOOR PLAN | 1’-0” = 1/32”

186.7 SF

ELEC

858.04 SF

MECHANICAL

631.54 SF

CORRIDOR

135.74 SF

STAIR 4

286.68 SF

STAIR 2

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

East Tennessee State University 11/08/2016

Page 7: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

SOUTH PLAZA ELEVATION | 1’-0” = 1/32”

EAST ELEVATION | 1’-0” = 1/32”

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY

A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 8: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

WEST ELEVATION | 1’-0” - 1/32”

NORTH ELEVATION | 1’-0” = 1/32”

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY

A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 9: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

AERIAL PERSPECTIVEETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY

A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 10: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

MAIN ENTRY - STREET VIEW FROM EASTETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY

A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 11: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

MAIN ENTRY - STREET VIEW FROM WESTETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016 McCARTY HOLSAPLE McCARTY

A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 12: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

2ND FLOOR

16'-0"

1ST FLOOR

0"

HIGH ROOF

32'-0"

HIGH PARAPET

34'-8"

BACKSTAGE PARAPET

79'-4"

AUDITORIUM PARAPET

53'-4"

AUDITORIUM ROOF

50'-0"

BACKSTAGE ROOF

76'-0"

DEEP PIT

-12'-6"

ORCHESTRA PIT

-8'-6"

MAIN STAGE GRIDIRON

63'-0"

FLY GALLERY

39'-0"

LOW PARAPET

18'-8"

302

STAGE AND

WINGS 301

AUDITORIUM

101

PUBLIC LOBBY

306

ORCHESTRA PIT

1507

CO

RR

IDO

R

309

FOLLOW SPOT

12

'-6

"

1,402.08 SF 1302A

MECHANICAL

305.2 SF 405

DRESSING ROOM

69

.2 S

F

405A

BA

TH

RO

OM

CA

C P

RO

SC

HEIG

HT

28

'-0

"

7'-0

"

307

CONTROL BOOTH

301A

AUDITORIUM

BALCONY

50

'-0

"

CA

C S

TA

GE H

EIG

HT T

O G

RID

IRO

N

63

'-0

"

4'-0

" 8'-6

"

SEE "AUDITORIUM EAST - INTERIOR ELEVATION"

LONGITUDINAL BUILDING SECTION THROUGH AUDITORIUM | 1’-0” = 1/32”

2ND FLOOR

16'-0"

1ST FLOOR

0"

HIGH ROOF

32'-0"

HIGH PARAPET

34'-8"

BACKSTAGE PARAPET

79'-4"

AUDITORIUM PARAPET

53'-4"

AUDITORIUM ROOF

50'-0"

BACKSTAGE ROOF

76'-0"

RECITAL ROOF

35'-0"

RECITAL PARAPET

41'-4"

RECITAL TECH.

25'-4"

FLY GALLERY

39'-0"

LOW PARAPET

18'-8"

301

AUDITORIUM

501

STUDIO THEATER 858.04 SF 1302B

MECHANICAL

1509

CO

RR

IDO

R

1515

CO

RR

IDO

R

1501

CO

RR

IDO

R 526.36 SF 602

PERFORMANCE

PLATFORM

SEE "AUDITORIUM NORTH - INTERIOR ELEVATION"

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

TRANSVERSE BUILDING SECTION THROUGH AUDITORIUM | 1’-0” = 1/32”

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016

Page 13: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

2ND FLOOR

16'-0"

1ST FLOOR

0"

HORIZONTAL REVEALED WOOD TRIM

WITH PAINTED GYP BD IN BETWEEN

WITH 2' TALL PAINTED GYP BD

WAINSCOT AND PORCELAIN TILE BASE

FEATURE VENUE ENTRY POINTS:

PAINTED GYP BD WITH PAINTED

REVEALS, PAINTED WAINSCOT AND

PORCELAIN TILE BASE GFRP CLAD ROUND COLUMN COVERS

CURTAIN WALL

LOBBY FLOOR - 100% CARPET

ENTRY TO PUBLIC TOILETS

INTERIOR ELEVATION THROUGH LOBBY | 1” = 20’-0”

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016

Page 14: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

SKIM COAT OF PLASTER ON CMU TO A HEIGHT OF 12' ABOVE FLOOR WITH PAINTED REVEALS - SEE SIDE ELEVATION

3' DEEP GYP BD (TWO LAYERS) SHELF

PERIMETER CURTAINS

PLATFORM WALL: PAINTED SKIM COAT OF PLASTER ON CMU

CAT WALK TECHNICAL LEVEL -PAINT ALL EXPOSED STRUCTURE AND WALLS FROM CATWALK UP A DRYFALL BLACK

DOUBLE LAYER GYP BD SOUND DIFFUSER CLOUDS

BACK WALL AT RECITAL STAGE TO BE DOUBLE LAYER GYP BD PARTIONS WITH REVEALS

6" WOOD BASE - STAIN GRADE SKIM COAT OF PLASTER ON CMU TO A HEIGHT OF 12' ABOVE FLOOR WITH PAINTED REVEALS

3' DEEP GYP BD (TWO LAYERS) SHELF

PERIMETER CURTAINS

SURFACE MOUNTED LED SCONCES - 3 PER SIDE

CONTROL

SIDE PLATFORM WALL AT RECITAL STAGE TO BE PAINTED SKIM COAT OF PLASTER ON CMU WITH PAINTED REVEALS

CAT WALK TECHNICAL LEVEL - PAINT ALL EXPOSED STRUCTURE AND WALLS FROM CATWALK UP A DRYFALL BLACK

DOUBLE LAYER GYP BD SOUND DIFFUSER CLOUDS

PLATFORM WALL: PAINTED SKIM COAT OF PLASTER ON CMU

BACK WALL AT RECITAL STAGE TO BE DOUBLE LAYER GYP BD PARTIONS WITH REVEALS

6" WOOD BASE

RECITAL HALL NORTH - INTERIOR ELEVATION | 1” = 20’-0” RECITAL HALL EAST - INTERIOR ELEVATION | 1” = 20’-0”

2ND FLOOR

16'-0"

1ST FLOOR

0"

AUDITORIUM PARAPET

53'-4"

AUDITORIUM ROOF

50'-0"

DEEP PIT

-12'-6"

ORCHESTRA PIT

-8'-6"

FLY GALLERY

39'-0"

(TWO LAYERS OF GYP BD) BALCONY AND PARTERRE WALLS WITH WOOD CAP AND PAINTED STEEL HANDRAIL

TWO LAYERS OF GYPBD WITH REVEALS

BLACK DRY-FALL PAINTED STRUCTURE, CATWALKS AND DECK

HORIZONTAL REVEALED WOOD TRIM WITH PAINTED GYP BD IN BETWEEN WITH 2' TALL PAINTED GYP BD WAINSCOT AND PORCELAIN TILE BASE

GLASS CURTAIN WALL

GLASS CURTAIN WALL BEYOND

GFRP CLAD ROUND COLUMN COVERS

PROSCENIUM

MOTORIZED CURTAINS

PAINTED GYP BD CURTAIN BULKHEAD

307

CONTROL BOOTH

309

FOLLOW SPOT

301A

AUDITORIUM

BALCONY

306

ORCHESTRA PIT

SKIM COAT OF PLASTER

1ST FLOOR

0"

AUDITORIUM PARAPET

53'-4"

AUDITORIUM ROOF

50'-0"

ORCHESTRA PIT

-8'-6"

FLY GALLERY

39'-0"

(TWO LAYERS OF GYP BD) BALCONY AND PARTERRE WALLS WITH STAIN GRADE WOOD CAP AND PAINTED STEEL HANDRAIL

TWO LAYERS OF GYPBD WITH REVEALS

BLACK DRY-FALL PAINTED STRUCTURE, CATWALKS AND DECK

ORCHESTRA PIT

SIDE PARTERRE STAGE LEVEL

GYP BD PROSCENIUM PANELS

SIDE PARTERRE

BALCONY BOX

CURTAINS

BALCONY BOX

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

AUDITORIUM NORTH- INTERIOR ELEVATION | 1” = 20’-0” AUDITORIUM EAST - INTERIOR ELEVATION | 1” = 20’-0”

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016

Page 15: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

REVIEW SITE

COMMUNICATION PLANCOMMUNICATION PLAN

Page 16: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

TELECOMMUNICATIONS FIBER PATHETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 17: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

COST ESTIMATING

DISCUSS PROCESS OF

COST ESTIMATING

Page 18: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

4REVIEW PROJECT

SCHEDULE

Page 19: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

12/18/15

DATE: November 7, 2016 "DRAFT" ETSU Fine Arts Classroom Facility | Project Schedule

ID Task Name Duration Start

1 Contract Awarded to Designer 0 days Thu 6/4/15

2 Pre-Construction Contract Awarded to CM 0 days Thu 10/8/15

3 Pre-Design / Programming Phase 89 days Mon 7/20/15

4 Schematic Design Phase 104 days Thu 11/19/15

5 Project On Hold 124 days Tue 4/12/16

6 Project Restart 1 day Fri 9/30/16

7 Schematic Design for Larger Project (4 WKs) 21 days Fri 9/30/16

8 Schematic Design Pricing for Larger Project (4 WKs) 22 days Fri 10/28/16

9 Owner Meeting to review SD Cost 1 day Tue 11/29/16

10 SD Pricing Review and Approval (1 WK) 6 days Tue 11/29/16

11 Authorization to DD Phase 1 day Tue 12/6/16

12 Design Development Phase (13 1/2 WKs) 70 days Tue 12/6/16

13 DD Cost Estimate (4 WKs) 21 days Mon 3/13/17

14 Owner Meeting to review DD Cost 1 day Tue 4/11/17

15 DD Cost Review and Approval (2 WKs) 11 days Tue 4/11/17

16 Authorization to CD Phase 1 day Tue 4/25/17

17 Construction Documents Includes Early Packages (28 WKs) 140 days Tue 4/25/17

18 SFMO Review/Approval (6 WKs) 30 days Thu 11/16/17

19 Bidding/Award (8 WKs) 40 days Thu 11/16/17

20 Construction 477 days Tue 7/25/17

21 FFE Move-in / Commissioning 85 days Tue 4/23/19

22 Building Opening 1 day Mon 8/19/19

6/4 6/4 Contract Awarded to Designer

10/8 10/8 Pre-Construction Contract Awarded to CM

7/20 11/19 Pre-Design / Programming Phase

11/19 4/12 Schematic Design Phase

4/12 9/30 Project On Hold

9/30 9/30 Project Restart

9/30 10/28 Schematic Design for Larger Project (4 WKs)

10/28 11/28 Schematic Design Pricing for Larger Project (4 WKs)

11/29 11/29 Owner Meeting to review SD Cost

11/29 12/6 SD Pricing Review and Approval (1 WK)

12/6 12/6 Authorization to DD Phase

12/6 3/13 Design Development Phase (13 1/2 WKs)

3/13 4/10 DD Cost Estimate (4 WKs)

4/11 4/11 Owner Meeting to review DD Cost

4/11 4/25 DD Cost Review and Approval (2 WKs)

4/25 4/25 Authorization to CD Phase

4/25 11/6 Construction Documents Includes Early Packages (28 WKs)

11/16 12/27 SFMO Review/Approval (6 WKs)

11/16 1/10 Bidding/Award (8 WKs)

7/25 5/22 Construction

4/23 8/19 FFE Move-in / Commissioning

8/19 8/19 Building Opening

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct N 2015 2016 2017 2018 2019

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

OVERALL PROJECT SCHEDULEETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016

Page 20: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

5DISCUSS HPBR

Page 21: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

8/24/2016

3

44 44 43 44

12/18/15

High Performance Building Requirements v1.01 Project Team Representatives Initials

CHECKLIST / TRACKING FORM O - Owner

SBC Number: 166/005-08-2013 Applicable Credit Attempted C - Contractor Yes

Project Name: ETSU Fine Arts Classroom Building Applicable Credit Not Attempted ME - Mechanical Engineer Category A No

Applicable 86 Date: Not Applicable Credit EE - Electrical Engineer Category B

Minimum 43 Project Type: New_Construction CE - Civil Engineer Category C

Not Applicable 18 Project Phase: Schematic Design A - Architect Required

Programming 44 Other - Other Priority 1

SD 4 Priority 2

DD 0 N/A

CD 0

Closeout 0

Checklist Total 16 17 0 0 104 0 0 104 0 0 104 Fee Low Fee High Cost Low Cost. High Fee Low Fee High Cost Low Cost High Fee Low Fee High Cost Low Cost High

22

Points Land Management LM Total: 13 8 1 12 9 1 0 0 22 0 0 22 0 0 22

Possible Points Credit ID

Applicable to

Building/Site

Scope?

Description Level: Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No

Comment: Describe implementation approach for

each pursued credit. If credits are not pursued, provide justification.

Role Initials

1 LM1.1 No Site Selection - Reuse Existing Buildings Priority 2 1 1 1 1 1 O

1 LM1.2 Yes Site Selection - Show preference for building on developed sites: Preserve

farmland/habitat, wetlands, floodplains, public parkland Priority 1 1 0 1 0 1 1 1

MHM / BLS O

1 LM1.3 Yes Site Selection - Brownfield Redevelopment - Remediate and Restore contaminated

sites when possible Priority 2 1 0 1 0 1 1 1

MHM O

1 LM1.4 Yes Site Selection - Urban Development - Locate building within existing infrastructure

Priority 1 1 0 1 0 1 1 1 MHM / BLS

O

1 LM2.1 Yes Site Disturbance - Sediment and Erosion control during construction Required 1 0 1 0 1 1 1 CM / GC: Denark C

1 LM2.2 Yes Site Disturbance - Limit site disturbance during construction to minimum

development footprint Priority 1 1 0 1 0 1 1 1

BLS CE

1 LM3.1 Yes Transportation - Plan for access to public transportation Priority 2 1 0 1 0 1 1 1 BLS O

1 LM3.2 Yes Transportation - Provide bicycle storage for 5% of building occupants and

shower/changing facilities for 0.5% of FTE occupants Priority 2 1 0 1 0 1 1 1

MHM / BLS CE

1 LM3.3 Yes Transportation - Plan site to include preferred parking for carpooling for 5% of all

spaces provided Priority 2 1 0 1 0 1 1 1

Need Owner Input CE

1 LM3.4 Yes Transportation - Plan site to include preferred parking for low-emitting/fuel efficient

vehicles for 5% of all spaces provided Priority 2 1 0 1 0 1 1 1

Need Owner Input CE

1 LM4.1 Yes Landscape Design - Maximize vegetated open space

Priority 2 1 0 1 0 1 1 1 Penland: Likely not achievable. Would require further study.

Other

1 LM4.2 Yes Landscape Design - Native and drought tolerant planting Required 1 0 1 0 1 1 1 Penland: Plants shall be native or naturalized. Other

1 LM5.1 Yes Heat Island Reduction - Non roof surface reflectivity and shading Priority 1 1 0 1 0 1 1 1 MHM / BLS / Penland CE

1 LM5.2 Yes Heat Island Reduction - Reflective roof materials Priority 2 1 0 1 0 1 1 1 MHM A

1 LM6.1 Yes Stormwater Design - Post development discharge rate and volume not to exceed

Pre-development rate Priority 1 1 0 1 0 1 1 1

BLS CE

2 LM6.2 No Stormwater Design - Reduce discharge rate and volume 25% on previously developed sites.

Priority 2 2 0 2 0 2 2 2 BLS

CE

1 LM6.3 Yes Stormwater Design - Design to remove 80% Total Suspended solids from the

average annual rainfall event. Verify local requirements. Priority 1 1 0 1 0 1 1 1

BLS CE

1 LM6.4 Yes Stormwater Design - Design per TDEC BMP References Required 1 0 1 0 1 1 1 BLS CE

REV 1 LM7.1 Yes

Exterior Site Lighting - Design exterior lighting power to be 10% less than is

allowed by ASHRAE 90.1-2010, Section 9.4.3 Priority 2 1 0 1 0 1 1 1

MHM / BLS / FSC (Potential Cost Increase TBD based on layout and fixture type / wattage requirements)

EE

1 LM7.2 Yes Exterior Site Lighting - Locate fixtures to minimize illuminance above the horizontal

plane Priority 1 1 0 1 0 1 1 1

MHM / BLS / FSC (Common practice, but can impact cost depending on layout)

EE

1 LM7.3 Yes

Exterior Site Lighting - Locate exterior fixtures to minimize light trespass at

property lines. Document foot-candle levels at site boundary Priority 1 1 0 1 0 1 1 1

MHM / BLS / FSC: Boundary is not yet defined at SD; safety of egress may dictate fixture locations close to boundary.

EE

6

Points Water Effciency WE Total: 2 1 3 2 1 3 0 0 6 0 0 6 0 0 6

Possible Points Credit ID

Applicable to

Building/Site

Scope?

Description Level: Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No Yes

M

a

y

b

e

No

Comment: Describe implementation approach for

each pursued credit. If credits are not pursued, provide justification.

Role Initials

1 WE1.1 Yes Water Efficient Landscaping, Utilize efficient irrigation technologies and planting

measures Required 1 0 1 0 1 1 1

Penland: fee increase depenant on documentation requirements

ME

1 WE.1.2 Yes

Water Efficient Landscaping, Non potable sources or no irrigation

Priority 1 1 0 1 0 1 1 1

Penland: Irrigations desirible during period of drought, pumping water from Brush Creek not recommended due to high cost of maintenance and negative environmental impact. System cost $12k-$18k FSC: Non-potable system cost $15k-$20k

A 12,000 20,000

1 WE2.1 Yes Wastewater Treatment & Conveyance: On site treatment Priority 2 1 1 1 1 1 BLS: Scope not included in this project - verify ME

1 WE2.2 Yes Wastewater Treatment & Conveyance: Utilize non potable water Priority 2 1 1 1 1 1 FSC - Not currently in project scope ME

1 WE3.1 Yes Water Use Reduction - Fixture flow and flush rates

Required 1 0 1 0 1 1 1 FSC - ETSU Campus Standards; Required by Code

ME

1 WE3.2 Yes Water Use Reduction - Utilize auto-flow / auto-flush valves

Priority 2 1 1 1 1 1 FSC - Does not meet ETSU Campus Standards. Cost increase of $50-$100 per fixture.

ME 3,500 7,000

Required Credit Costs Optional Credit Costs Not Attempted Credit Costs Closeout

Primary Credit

Responsibility

Primary Credit

Responsibility

CD DD

Category from Applicability Tree:

Category A

Point allocation

error

Point allocation

error

New or Revised from SDG

Targeted

Points Phase

Programming SD

(at EE1.2; point total is adjusted to compensate)

42

41

4642 41 46

10/24/2016

McCARTY HOLSAPLE McCARTY A R C H I T E C T S & I N T E R I O R D E S I G N E R S

ETSU FINE ARTS CLASSROOM BUILDING East Tennessee State University 11/08/2016

Page 22: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

ETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S

Page 23: ETSU FINE ARTS CLASSROOM BUILDING 11.08.2016 12.16 · gyp bd proscenium panels side balcony box curtains balcony box . mccarty holsaple mccarty . etsu fine arts classroom building

ETSU FINE ARTS CLASSROOM BUILDING McCARTY HOLSAPLE McCARTY East Tennessee State University 12/18/15 11/08/2016 A R C H I T E C T S & I N T E R I O R D E S I G N E R S


Recommended