Event Analysis Program
James MerloAssociate Director, Human Performance, Reliability Risk ManagementFebruary 28, 2013
2 RELIABILITY | ACCOUNTABILITY
Program Background
• Initiated October 2010• Approved by NERC Board of Trustees February 2012• ONLY process with detail of what and why• Event analysis training in demand• Cause coding supports analysis• Feedback to industry critical
3 RELIABILITY | ACCOUNTABILITY
Event Counts
Event Category Count (Total) Count (2013) Comments
CAT 1 169 6
CAT 2 85 3 2- EMS event (2b) 1 LOOP (2d)
CAT 3 9 0
CAT 4 3 0 SW Winter Weather (2011)SW Blackout (2011)Derecho (2012)
CAT 5 1 0 Hurricane Sandy (2012)
Total CAT 1-5 267 9
Non-Qualified Occurrences
reported
1452 58
4 RELIABILITY | ACCOUNTABILITY
5 RELIABILITY | ACCOUNTABILITY
2912%
21388%
Cause-coded Events
To be CC'd
The Cause Coding status of 242 closed (through 15 February 2013)
259%
24291%
Closed Events
Open
The status of 267 Events (through 15 February 2013)
Summary All Time
EA Program beganOctober 2010
6 RELIABILITY | ACCOUNTABILITY
Root Cause Determinations
A2 – Equipment / Material
AN No Causes Found
A5 Communication
A3 Individual Human Performance
A7 Other
A1 Design / Engineering
A2 Equipment / Material
A4 Management / Organization
AZ Information to determine cause LTA
A4 – Management / Organization
AZ – Information to determine Cause LTA
7 RELIABILITY | ACCOUNTABILITY
Deeper Dive into Organizational Issues (Based on Root Cause)
A4B3C
08
A4B5C
04
A4B1C
03
A4B1C
04
A4B1C
05
A4B1C
06
A4B1C
08
A4B1C
09A4B
1
A4B5C
05
A4B5C
03
A4B5C
13A4B
5A4B
4
A4B5C
02
A4B3C
09 A4
A4B2C
07
A4B4C
06
A4B3C
050
1
2
3
4
5
6
7
8 A4 – Management / Organization B3C08 - job scoping did not identify special circumstances
or conditions B5C04 - risks/consequences associated with change not
adequately reviewed B1C03 - direction created insufficient awareness of impact
of actions on safety/reliability B1C04 - follow-up did not identify problems B1C05 - assessment did not determine cause of previ-
ously event or known problem
8 RELIABILITY | ACCOUNTABILITY
All Causes for Management /Organization
A4B1C
05
A4B3C
08
A4B5C
03
A4B5C
04
A4B1C
08
A4B5C
05
A4B1C
04
A4B1C
03
A4B1C
06
A4B2C
08
A4B5C
13A4B
5A4B
4
A4B1C
09A4B
1
A4B3C
09
A4B5C
02
A4B4C
05
A4B3C
11
A4B2C
07
A4B4C
06A4B
2A4B
3
A4B5C
01
A4B5C
09 A4
A4B3C
05
A4B1C
01
A4B1C
07
A4B4C
02
A4B5C
10
A4B4C
010
2
4
6
8
10
12
14
16
A4 – Management / Organization B1C05 - assessment did not determine cause of
previously event or known problem B3C08 - job scoping did not identify special circum-
stances or conditions B5C03 - inadequate vendor support of change B5C04 - risks/consequences associated with
change not adequately reviewed B1C08 - corrective action responses to a known or
repetitive problem was untimely B5C05 - system interactions not considered B1C04 - follow-up did not identify problems
9 RELIABILITY | ACCOUNTABILITY
Questions and Answers
Michael MoonSenior Director of Reliability Risk Management404-446-2567 office | 609-651-9693 [email protected]
Ben McMillanRisk Analysis Engineer, RRM404-446-9729 office | 404-823-1362 [email protected]
James MerloAssociate Director, Human Performance, RRM404-446-2560 office | 404-387-5249 [email protected]