    1/70

    Evolium UTRAN

    Evolium A9112 Micro Node BCommissioning Manual

    Node B Document

    Commissioning Manual

    Release R5

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    2/70

    Status RELEASED

    Short title mnbcom

    All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Evolium.

    BLANK PAGE BREAK

    2 / 703BK 17429 3081 RJZZA Ed.02

    Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    3/70

    Contents

    Contents

    Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

    1.1.1 A9112 Micro Node B Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Weight and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.1.4 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.1.5 Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.1.6 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.1.7 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.1.8 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.2.2 Information Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

    1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161.4 Telecom / Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 191.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    2.1.1 Before Going On-site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222.1.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    2.2 Installing the Micro Node B (MNB) Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.2.1 Open and Remove Front Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242.2.2 Case 1: Installation the MNB Unit With the Manual Lift . . . . . . . . . . . . . . . . . . . . . 262.2.3 Case 2: Installation MNB Unit With the Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

    2.3 Installation and Cabling Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 382.3.1 Cabling in the COBO (Without Remote External Alarms, PCM and Options) . 382.3.2 Jumpers for 75 or 120 Ohm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 392.3.3 Cabling of External Alarms With Options Fan Hat and Cabling SSC . . . . . . . . . 402.3.4 Connect Antenna Jumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

    2.4 Checking Power Supply and Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422.4.1 A9112 Micro Node B Without SSC ( Option 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 432.4.2 A9112 Micro Node B With SSC ( Option 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

    2.5 Commissioning Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 452.5.1 NEM-B and Windows Inventar Software Installation on LMT PC (if not done) . 46

    2.5.2 LMT Connection on A9112 Micro Node B and Software Download . . . . . . . . . . 472.5.3 Hardware Status Check and Update of Remote Inventory . . . . . . . . . . . . . . . . . . 492.6 Initial Parameters Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

    2.6.1 Basic Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 512.6.2 Change Node Bs IP Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 512.6.3 Antenna Port Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 532.6.4 Additional Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

    2.7 Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 552.7.1 Cabling Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 562.7.2 Transmitter Power Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 572.7.3 VSWR Measurement Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 582.7.4 External Alarm Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602.7.5 Iub Loop Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

    2.8 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 3 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    4/70

    Contents

    2.8.1 Check Hardware Modules Alarm and LED Status . . . . . . . . . . . . . . . . . . . . . . . . . . 632.8.2 Site Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 642.8.3 Connection to Network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65

    2.9 Finishing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66Appendix A : Description of MCON and ACCO Boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

    A.1 MCON Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67A.2 ACCO Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

    Appendix B : Example of Inventory File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69

    4 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    5/70

    Preface

    Preface

    Purpose The document describes the procedures to be carried out when performing thecommissioning tests for the Alcatel 9112 Micro Node B, release R5.

    Whats New In Edition 02Description improvement in:

    Additional Settings (Section 2.6.4)

    External Alarm Test (Section 2.7.4)

    In Edition 01Description improvement in:

    Case 1: Installation the MNB Unit With the Manual Lift (Section 2.2.2)

    Case 2: Installation MNB Unit With the Crane (Section 2.2.3) .

    First official release.

    Audience This scenario is intended for:

    Field service technicians

    Site administrators

    Project managers

    Foremen.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 5 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    6/70

    Preface

    Assumed Knowledge The reader must have a general knowledge of:

    For planning purpose:

    Network architecture principles

    Basic knowledge for scheduling.

    For realization purpose:

    Evolium operations and maintenance concepts for RNS

    Commissioning tools

    Personal Computers (PCs) using the and Windows 2000 / XPenvironments.

    Intervention on antenna mast, roof and other dangerous situations isrestricted to trained and authorized people.

    6 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    7/70

    1 Overview

    1 Overview

    This section gives information for presentation to the customer and siteplanning, needed for administrators, project managers and foremen. It includes:

    Presentation

    Scheduling

    Telecom / Supervision outage and operating impact

    Preparation

    Resources.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 7 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    8/70

    1 Overview

    1.1 PresentationThis section include following information about:

    A9112 Micro Node B configuration

    Weight and dimensions

    Initial state

    Final state

    Case

    Option

    Restrictions

    Grouped task sequence.

    1.1.1 A9112 Micro Node B ConfigurationThe Micro Node B is an evolution of the existing EVOLIUM A9100 MBS NodeB. The Micro Node B extends the present product family by a very smallhousing and has the same equipment practice and external physical dimensionas GSM A9110-E Micro BTS (M5M).

    The Micro Node B support following features:

    Two antenna connections. One antenna port ANT A with transmitter/receiver(7,5 W/TRX max. power) and one antenna port ANT B with receiver (RX)only.

    Receive diversity ( no transmitter diversity)

    Up to three carriers (3 * 2,5 W)

    VSWR detection

    Four E1 Transmission lines.

    External interfaces for alarms input.

    8 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    9/70

    1 Overview

    The hardware consists of following modules:

    The Micro Node B Unit = MNB

    MOunting frame (MOFRA) + CO nnection box (COBO) = MOCO

    Optional covers:

    W/o fan hat: MSTC (Micro ST andard Cover)

    With fan hat: MSTC + MFCC (Micro Fan Cover Complete)

    Figure 1: A9112 Micro Node B Hardware

    OMNI/Sector1

    ANT A

    Master

    TRX RX

    ANT B

    Site PowerAC 230V

    PCM

    Alarm

    SiteFigure 2: Example of A9112 Micro Node B

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 9 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    10/70

    1 Overview

    1.1.2 Weight and Dimensions

    A9112 Micro Node B Without cover andfan hat

    MNB + MOCO

    With cover andwithout fan hat

    MNB + MOCO +MSTC

    With cover and fan hat

    MNB + MOCO + MSTC +MFCC

    Dimension (mm)

    Width 384 450 450

    Height 750 818 940

    Depth 160 190 190

    Weight (kg)

    MOCO 5.5 5.5 5.5

    MNB unit 21.5 21.5 21.5

    MSTC 5.5 5.5

    MFCC 2.5

    Maximum 26 31.5 35,5

    10 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    11/70

    1 Overview

    1.1.3 Initial State

    The Micro Node B MOCO is installed according to [ 14 ] EVOLIUM A9112 Micro Node B Installation Manual .

    The Micro Node B unit (MNB) are not plugged into the MOCO.

    Antennas and feeders are installed and tested (including VSWR).

    MNB is provisioned (from UTRAN OMC-R) according to [ 15 ] Add Evolium Node .

    E1 direct connection to RNC is installed and tested, or Data CommunicationNetwork (backbone) is configured, to allow to test the O&M connectionbetween Micro Node B and UTRAN OMC-R.

    For O1 Options (Section 1.1.6) , the Fan hat is installed and connected,according to [ 14 ] EVOLIUM A9112 Micro Node B Installation Manual .

    For O2 Options (Section 1.1.6) , the Site Support Cabinet (SSC) is installedand connected, according to [ 16 ] Site Support Cabinet For A9110/A9110-E Installation Manual .

    1.1.4 Final State

    Micro Node B is installed, powered and an inventory file is done.

    Micro Node B is "disabled" and "locked", without current alarm.

    UMTS modules inside the Micro Node B are "enabled" and "unlocked",without current alarm .

    UTRAN site specific parameters are set.

    Node B communication state is "on line" (ready to be managed by theUTRAN OMC-R).

    Node B is ready for radio network introduction, without another on-siteintervention.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 11 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    12/70

    1 Overview

    Figure 3: Example of A9112 Micro Node B in Indoor Environment (With Cover)

    1.1.5 Case

    The following cases apply :C1 : Installation the MNB unit with the manual lift

    C2 : Installation MNB unit with the crane.

    1.1.6 Options

    The following options apply :

    O1 : Micro Node B with Fan hat

    O2 : Micro Node B with Site Support Cabinet.

    1.1.7 Restrictions

    None.

    12 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    13/70

    1 Overview

    1.1.8 Grouped Task Sequence

    The following figure shows the grouped task sequence for Micro Node Bcommissioning scenario. All tasks are performed on Micro Node B site.

    Initial Checks

    Installing the

    Micro Node B (MNB) Unit

    Installation With the Manual Lift Installation With the Crane

    Installation and Cabling Checks

    Checking

    Power Supply and Power Up

    Commissioning Preparation

    Initial Parameter Settings

    Commissioning Tests

    Final Checks

    Finishing

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 13 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    14/70

    1 Overview

    1.2 PreparationThis section include following information about:

    Prerequisites

    Information required

    External tasks.

    1.2.1 Prerequisites

    The following prerequisites apply:

    The site must be compliant with [ 15 ] General Safety Instructions for Evolium Node B / BTS

    Micro Node B is successfully installed (CCL from installation is available)

    Antennas are installed, tested and connected or ready for connection ( if noantennas are available use loads)

    Micro Node B is successfully provisioned (CCL from provisioning isavailable)

    The [ 5 ] Evolium Node B Service Reference Sheet is available and correctlyfulfilled - refer to the Information Required (Section 1.2.2)

    For O1: Fan hat are installed and connected

    For O2: Site Support Cabinet is installed and connected

    PCM (E1) direct connection to RNC is installed and tested, or Data

    Communication Network (backbone) is configured.

    1.2.2 Information Required

    The following specific information is needed to complete the scenario. Theymust be written on the fulfilled [ 5 ] Evolium Node B Service Reference Sheet :

    Site Arrangement:

    Micro Node B position

    Position of the site power cabinet, and fuse breakers labelingcorresponding to the Micro Node B

    If O2: positionsite Support Cabinet (SSC) and necessary access

    PCM (E1) cables position on DDF or coming from other transmissionsystem (as microwave link), external or internal of the Micro Node B

    External alarms DDF position

    Antenna feeders position.

    14 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    15/70

    1 Overview

    Equipment Configuration:

    Micro Node B hardware configuration

    Mapping tables between sector numbers, MANRU numbers and antennaports

    Sector azimuth and corresponding feeder labeling (for physicalconnection)

    Clock synchronization mode

    If DDF installed: external alarm mapping and position of alarm wireson the DDF side

    If O2: customer external alarm mapping (other than SSC externalalarms).

    Transmission:

    Micro Node B DHCP mode

    Micro Node B logical name, location name and network identityIP address and netmask

    Used E1 ports.

    Test Parameters:

    TX power level (dBm)

    TX frequency (MHz)

    Scrambling code.

    1.2.3 External Tasks

    If other radio transmitting equipment is present on the site (as GSM BTS,Microwave, aso.), this radio transmission must be stopped (leading to a telecomoutage) during A9112 commissioning near the antenna (for safety reason).

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 15 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    16/70

    1 Overview

    1.3 Scheduling

    Time based on technical constraints.The number of resources in following table does not take into account individualcustomer or safety requirements (at least 2 persons onsite).

    Grouped Task / Node B site 1st person 2nd person

    Initial checks 15min 5min

    Installing the Micro Node B (MNB) unit (*)

    Case 1: Installation with the manual lift 10min 10min

    Case 2: Installation with the crane 15min 15min

    Installation and cabling checks 5min Checking power supply and powering up 10min

    Commissioning preparation 13min

    Add 10min if MNB software download.

    Add 10min if software installation onPC LMT.

    Initial Parameters Settings 8min

    Add 29min if external alarm default

    configuration must be changed.

    Commissioning tests 21min

    Add 5min if external alarm connectedto DDF.

    Final checks 12min

    Add 5min if MNB connection to network.

    Finishing 10min

    TOTAL TIME 1hour49min to 2hours48min 30min

    (*) : Tasks where two persons are mandatory

    The time is given in hours (hours), minutes (min) and seconds (sec).

    1.4 Telecom / Supervision Outage and Operating ImpactNone. The commissioned Micro Node B is still not in traffic.

    16 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    17/70

    1 Overview

    1.5 ResourcesThis section include following information about:

    Tools

    Supplies

    Applicable documents.

    1.5.1 Tools

    The following table is used to check, at base, the availability of the necessarytools.

    1.5.1.1 Hardware ToolsSee [ 3 ] Tools Catalogue for content checking.

    Item Part Number Use at ...PC with compact disk drive and cables (crossedEthernet cable for connection to Micro Node B, 230 Vextension reel)

    Refer to [ 3 ] Tools Catalogue

    (3BW 01805 EL for "crossed Ethernet"cable)

    Node Bsite

    2 * 1AD 002150116 (screw M6 X 65) for fix MNB toMOCO

    Part of INSTALLATION KIT:UMBSINSOOJ01

    Node Bsite

    For installation :

    OUT 006 (crane for MNB)

    Wrapping and insertion tool (DDF connection)Tightening tool for antenna jumper

    Cutter or electricians knife

    Screwdrivers (flat head, crossed head and torx)

    Antistatic wristband

    Connector pliers with plastic jaws.

    For testing :

    Voltmeter with measuring cables

    230 V phase tester

    Cable for DDF (loop)

    50 ohms loads for radio test (when no antenna isconnected on some sectors, or if problem duringVSWR measurement).

    Refer to Tools Catalogue [ 3 ] Node Bsite

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 17 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    18/70

    1 Overview

    1.5.1.2 Software ToolsFollowing table show the latest contents of TSIO 3GR5 MRx Edyy.

    Item Part Number Contents Use at ...

    TSIO CD-ROM (including all neededdocuments and ISO image of neededsoftware and files)

    3BK 13106 0337 PCAGA 3GR5MRxEDyy

    Node Bsite

    NEM-B software installed on thePC (LMT) with Authorization key(password: $Evolium) for NEM-B.

    In TSIO CD-ROM NEMBxxxx Node Bsite

    Node B software, copied on the PC(LMT) and ready for downloading .

    In TSIO CD-ROM

    (NB.V2R5H00xx)

    FV_M_R5_OFFICIAL_xxxpackage

    Node Bsite

    Inventory software (INVENTAR)

    installed on the PC (LMT).

    In TSIO CD-ROM Winvent V5.7 Node B

    siteInventory reference files (.CAL and.RAC) applicable to the customer.

    In TSIO CD-ROM galumtxx.cal

    *.RAC

    Node Bsite

    Help: Remember that, within this document, each word in "italic" is referenced (with[ doc index ]) to one section of the Applicable Documents (Section 1.5.3) (allavailable on this same TSIO CD-ROM).

    1.5.1.3 Forms

    Item Part Number Use at ...

    [ 6 ] Completion Check List (CCL) 3BK 17429 0006 QZZZA / Z2EV00007-0031

    Node Bsite

    18 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    19/70

    1 Overview

    1.5.2 Supplies

    This table is use to check, at base, the availability of the necessary supplies.

    Item Part Number Contents Use at ...

    Fulfilled[ 5 ]Z2EV00007-0035 Evolium Node B Service Reference Sheet (SRS-Node B).

    3BK 17429 0005 RJZZA / Z2EV00006-0026

    Fulfilled by the customer,and completed during MicroNode B provisioning.

    Node Bsite

    Floppy disks - Empty (for getting copy ofinventory result).

    Node Bsite

    Rubber splicing tape

    Vinyl electrical tape

    1AC 01595 0001

    1AC 01556 0001

    (from installation basic kit)

    If outdoor MNB, for antennaconnection protection.

    Node Bsite

    3BK 07928AB 1m, N-N, 2x male

    3BK 07928AC 1m, N-7/16, 2x male

    3BK 07928AD 2m, N-7/16, 2x male

    3BK 07928AE 3M, N-7/16, 2x male

    Antenna Jumper (MACC)

    3BK 07928AF 5M, N-7/16, 2x male

    Node Bsite

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 19 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    20/70

    1 Overview

    1.5.3 Applicable Documents

    You need the following documents to complete this scenario:

    [ 1 ] General Wiring Handbook for UMTS 3BK 17429 8099 RJZZA / Z2EV00007-0029

    [ 2 ] Evolium A9112 Micro Node B Hardware Description 3BK 21116 AAAA TQZZA / Z3EV00007-0027

    [ 3 ] Tools Catalogue 3BK 17429 0007 RJZZA / Z2EV00007-0030

    [ 4 ] Evolium Node B NEM-B User Guide 3BK 21114 AAAA PCZZA / Z3EV00007-0019

    [ 5 ] Evolium Node B Service Reference Sheet (SRS-Node B)3BK 17429 0005RJZZA / Z2EV00007-0035

    [ 6 ] Completion Check List (CCL)3BK 17429 0006 QZZZA / Z2EV00007-0031

    [ 7 ] SPP 58 Specification for Evolium A9112 Micro Node B Site Preparation 8BL 00704 0075 DRZZA (for fuse, breaker and differential circuit breakervalue only)

    [ 8 ] SPP 39 Specification for Site Preparation (SSC)8BL 00704 0055 DRZZA (for fuse, breaker, differential circuit breaker value,transmission and alarm connections)

    [ 9 ] RNS Site Inventory 3BK 17429 0008 RJZZA / Z2EV00007-0032

    [ 10 ] UTRAN Network Creation and Modification Principles 3BK 21102 AAAA TQZZA / Z3EV000076-0003 (for Node B name, Id andIP address definition only)

    [ 11 ] Catalogue of Instruction Operation - UMTS 3DF 00305 0000 AAAGA (for some customer specific tasks or values)

    [ 12 ] Reconfigure Evolium Node B 3 BK 17429 0805 RJZZA / Z2EV00007-0059

    [ 13 ] A910 Crane HW description

    3BK 11210 0389 DSZZA[ 14 ] EVOLIUM A9112 Micro Node B Installation Manual 3BK 17424 3085 RJZZA / Z2EV00007-0076

    [ 15 ] General Safety Instructions for Evolium Node B / BTS 3BK 21111 AAAA PCZZA / Z3EV00007-0029

    [ 15 ] Add Evolium Node B 3BK 17429 0843 RJZZA / Z2EV00007-0052

    [ 16 ]Site Support Cabinet For A9110/A9110-E Installation Manual 3BK 17234 0002 RJZZA.

    20 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    21/70

    2 Scenario

    2 Scenario

    This section presents all tasks needed to perform the commissioning:

    Initial checks

    Installing the Micro Node B (MNB) unit

    Installation and cabling checks

    Checking power supply and power up

    Commissioning preparation

    Initial parameter settings

    Commissioning tests

    Final checks

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 21 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    22/70

    2 Scenario

    2.1 Initial ChecksThis section includes following tasks:

    Before going on-site

    Before you start

    2.1.1 Before Going On-site

    Before going on-site, you must check the following information and suppliesare available:

    All Prerequisites (Section 1.2.1) are fulfilled

    The customer has been informed of the:

    Date and time

    Site name and site address

    Purpose of operation.

    Personnel are available and ready for operation; refer to Scheduling ( Section 1.3)

    Information Required (Section 1.2.2) are available and ready for operation

    Tools (Section 1.5.1) are available and ready for operation. Verify thecalibration label when indicated in tool kit list.

    Supplies (Section 1.5.2) are available and ready for operation

    Applicable Documents (Section 1.5.3) are available and ready for operation.

    2.1.2 Before You Start (On Arrival at the Site)

    2.1.2.1 ChecksBefore you start, you must perform the following operations:

    Check that all Prerequisites (Section 1.2.1) are fulfilled

    Check the availability of all necessary Tools (Section 1.5.1) and Supplies ( Section 1.5.2)

    Check safety precautions have been taken according to [ 15 ] General Safety Instructions for Evolium Node B / BTS

    Complete the header field of the [ 6 ] Completion Check List (CCL) . TheCCL is completed as each commissioning instruction is carried out

    Refer to External Tasks (Section 1.2.3) for additional task to be takeninto account

    Check that the resistance of the antistatic wrist strap is greater than 1 M.Connect the antistatic wrist strap to rack earth

    Refer to [ 11 ] Catalogue of Instruction Operation - UMTS for checking ifoperation instructions have to applied

    22 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    23/70

    2 Scenario

    Inform the operator, and ask him if you can start now.

    2.1.2.2 Required KnowledgeYou must be familiar with the following:

    Safety rules and precautions, see [ 15 ] General Safety Instructions for Evolium Node B / BTS

    Grouped Task Sequence (Section 1.1.8)

    Telecom / Supervision Outage and Operating Impact (Section 1.4)

    How to document faults and anomalies, see [ 1 ] General Wiring Handbook for UMTS .

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 23 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    24/70

    2 Scenario

    2.2 Installing the Micro Node B (MNB) UnitThis section shows how to mount the Micro Node B unit with:

    Open and Remove Front Cover

    Case 1: Installation of the MNB with the manual lift

    Case 2: Installation of the MNB with the electrical crane.

    Before the installation of the MNB unit, check the lead seal located at thebottom of housing.If damaged, make a note in the CCL.

    Do not work under power.Open the circuit breakers to be sure that the power supply is disconnected.For an installation with SSC: Check that the " Battery backup " is OFF (red LED

    is lit) !!! (in the case of battery backup there is 288 V DC on the Micro Node Bconnector in the COBO and the crane will be damaged!!!).

    2.2.1 Open and Remove Front Cover

    These section are considered if the Micro Node B is equipped with the cover.

    Purpose These section describe the remove of front cover with or w/o fan hat.

    Procedure 1. Unlock the bottom cover door at the Micro Node B (1) and Lift the bottomcover door up until the magnetic pad hold the bottom cover door (2).

    Figure 4: Open the Bottom Front Cover Door

    24 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    25/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    26/70

    2 Scenario

    2.2.2 Case 1: Installation the MNB Unit With the Manual LiftPurpose To install the MNB unit on the MOCO.

    Install the Threaded Bolt 1. The threaded bolt must be screwed into the M8 thread on top of the MicroNode B unit, down to the internal screw-thread stop (See Figure 7 ).

    2. Do not tighten.3. Arrange the bolt with the flattened sides to the left and right.

    Figure 7: Installation and Arrangement of the Threaded Bolt

    26 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    27/70

    2 Scenario

    Install the Handwheel 1. The handwheel must be screwed down to the threaded bolt stop (SeeFigure 8 ).

    2. Make sure the handwheel and bolt are not damaged.

    Figure 8: Installation of the Handwheel

    Install the BTS-Handle 1. Remove the Micro Node B unit protection cover (BTSP 3BK 08555 ABAA).

    Figure 9: Remove the Protection Cover (BTSP) on Micro Node B Unit

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 27 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    28/70

    2 Scenario

    2. Fix the metal pieces (3) with screws (4 - two at each side) to each side ofthe BTS-Handle (2), and ix the assembly to the hinge flanges, with onescrew (5) at each side.

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8

    12

    34 5Figure 10: Installing the BTS-Handle

    Figure 11: BTS-Handle Fixed on the Module

    28 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    29/70

    2 Scenario

    Install the Gallow 1. Remove the COBO protection cover (COPO 3BK 08586 ABAA).

    Figure 12: Remove the Protection Cover (COPO) on COBO

    2. The gallows are plugged into the Mounting Frame (MOFRA) (See Figure 13 ).

    3. The safety catch (1) keeps the gallows in place.

    Figure 13: Installing the Gallows

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 29 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    30/70

    2 Scenario

    Install the MNB unit inPosition

    1. Two people place the unit in the gallows (See Figure 14 ).

    2. The Micro Node B housing is let down by rotating the handwheel.

    3. Ensure that the housing descends into the right position.

    Figure 14: Putting the Micro Node B in Position

    4. Before releasing the housing completely check the connectors and guidingpins alignment.

    Make sure that the connectors between MOCO and COBO are aligned.

    Pay attention onthe connectors

    Guiding pins

    Lift up the BTS 2030 mmver the COBO surface

    Figure 15: Check Connectors and Guiding Pins Alignment

    Fix the Micro Node B inPosition

    1. Fix the housing on the mounting frame with the two screws on top of housing(See Figure 16 ).

    2. Fix the housing on COBO with the two screws left and right of COBO.

    30 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    31/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    32/70

    2 Scenario

    2.2.3 Case 2: Installation MNB Unit With the CranePurpose To install the MNB unit on the MOCO.

    2.2.3.1 Specific Safety Instructions for Craning

    Do not work under power.Open the circuit breakers to be sure that the power supply is disconnected,except during use of the crane.Before using the crane, you must carefully read the [ 13 ] A910 Crane HW description manual and these instructions .

    It is strictly prohibited to stand under a floating crane load during theoperation.

    Hot surface warning : Dont handle the crane by its motor after use, thetemperature can exceed 45 degrees Celsius (see left, " Hot Surface "label on the crane).

    Check availability of the completed " Security control - check list and report" , enclosed with the crane (see " [ 13 ] A910 Crane HW description manual ") thecheck must be carried out every six months , note the check date in the CCL.

    2.2.3.2 Installation of the Crane on MOFRA

    Procedure 1. Check that the lifting ring and the two screws for fixing to MOFRA areavailable.

    2. Mount the lifting ring onto the top part of the Micro Node B unit. The ringmust be screwed completely.

    Figure 17: Mounting the Lifting Ring

    32 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    33/70

    2 Scenario

    3. Put the crane on top of MOFRA. The small safety blade keeps the crane inplace, and open the COBO door, see Figure 18 ).

    4. Connect the crane power cable to the ACout MNB power connector, seeFigure 19 ).

    MOFRA

    Crane

    Power cable

    Figure 18: Installing the Crane

    Ac out MNB connector is used to power the crane

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 33 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    34/70

    2 Scenario

    5. Hook the cables as shown in the drawings.

    Figure 19: ACout MNB Power Connector of ACCO Board is Used to Power the Crane

    2.2.3.3 Preparation for Craning

    The following checks and precautions must be considered before craning!Depending of the country and customer regulations more tests foroverloading and usage time may be required.To be checked and applied!

    Procedure 1. Check the screws securing the MOCO on the wall.

    2. Define a safety area 2 m around the MOFRA and make sure that nobody will

    enter the area during operations.3. Move the unit under the crane on the floor.

    4. Remove the Micro Node B unit protection cover (BTSP 3BK 08555 ABAA),see Figure 9

    5. Remove the COBO protection cover (COPO 3BK 08586 ABAA), seeFigure 12 .

    6. Close the circuit breakers that power COBO.

    7. Using the switching box on the crane power cable, let down the lifting bandto the MNB level.

    8. Hang the unit on the crane (make sure the belt is not turned on itself).

    9. Lift the unit and suspend it 10 cm above the floor.

    10. Execute a movement up and down with the MNB.

    11. Lay the MNB on the floor.

    12. Check the MOFRA - Crane assembly and fixings.

    34 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    35/70

    2 Scenario

    2.2.3.4 Installing the MNB unit on MOCO

    Take care not to damage the connectors during the operation.Do not lift the MNB unit by hand from the ground, use the crane!

    For installation with SSC: On the SSC, check that the " Battery back-up "is OFF (red LED is lit) !!!

    Procedure 1. Lift the MNB to an appropriate level for mounting.

    Handle

    Figure 20: Lifting and Plugging in the MNB

    2. Remove the bottom protection cover (BTSP) of the MNB (3BK 08555 AB).

    3. Fit the handle on the reel of the crane, on the left side.

    4. Move the MNB nearer to the MOFRA (by pushing the handle) and fit it ontothe guide bolts (there are two guide bolts on MOFRA that must fit intothe back part of the MNB).

    5. Before releasing the housing completely check the connectors and guidingpins alignment.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 35 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    36/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    37/70

    2 Scenario

    11. Unscrew the lifting ring and put it with the crane to avoid losing it.

    Figure 22: Fixing the MNB to MOCO

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 37 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    38/70

    2 Scenario

    2.3 Installation and Cabling ChecksThis section contains following cable installation on Micro Node B:

    Cabling in COBO (generic, without PCM and options)

    Jumpers for 75 or 120 ohm PCM

    Cabling of external alarms including:

    Option 1: Cabling Fan Hat

    Option 2: Cabling SSC

    Connect antenna jumpers.

    Use the antistatic wrist strap when working with the MCON board.

    2.3.1 Cabling in the COBO (Without Remote External Alarms, PCM andOptions)

    Purpose To check earth, power and alarm jumpers.

    Help: For more information about COBO connections, see Description of M CON and ACCO Boards (Section A) .

    Procedure Check according following figure if:

    1. Earth is correct installed2. Mains power is correct installed

    3. Internal COBO and PMS alarm if used, are correct attached with jumpers.

    X202

    OM_TR

    FaultOP

    X102

    E 1

    P 1 / P 2

    X101

    X200

    X106 X107

    X105

    X104

    X103

    PS_OK

    X203

    E1P1

    E 1 P 2

    E 1 P 3

    E 1 P 4

    Ant.Tilt

    R X

    T X

    G N D

    X 31 3 X 32 7

    X 3 1 1

    X 3 1 2

    X 3 1 4

    X 3 1 5

    X 3 1 6

    75Ohm120

    75Ohm120

    UMTSFrame

    Trace

    CLX Cal.

    PMS Ext.Alarm7+8

    Ext.Alarm5+6

    Ext.Alarm3+4

    Ext.Alarm1+2

    MMI

    Link M_OK X204

    E 1 P 3 / P 4

    S 1 0 0

    COBO

    LPE N

    L L

    L

    PE PE

    PE

    N N

    N

    L

    L

    N

    N F a n ACMains in

    ACCO

    Slave2 Slave1

    S 1

    F A N

    T 1

    , 2 5 A

    S 1

    B T S

    T 2

    , 5 A

    L PE N

    BROWN BLUEY/GCrimp

    Lug

    Wire

    X106 X107

    X105

    X104

    X103

    Ext.Alarm 7+8

    Ext.Alarm 5+6

    Ext.Alarm 3+4

    Ext.Alarm 1+2

    X106 X107

    X105

    X104

    X103

    PMS Ext.Alarm 7+8

    Ext.Alarm 5+6

    Ext.Alarm 3+4

    Ext.Alarm 1+2

    COBO

    Initial statusat delivery

    Alarm forCOBO door

    andPMS vertical

    position switch activ

    AC 230 V Mains Power

    Earth

    PMS COBO

    Figure 23: COBO Connections of Earth, Power and External Alarms

    38 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    39/70

    2 Scenario

    2.3.2 Jumpers for 75 or 120 OhmPurpose To check the PCM E1 impedance in the COBO.

    Procedure Check according the next figure the PCM impedance:1. For 75 ohm (1)

    2. For 120 ohm (2).

    2

    Jumpers in 75 Ohm

    75Ohm 120 E 1

    P 1 / P 275

    Ohm 120

    E 1 P 3 / P 4

    E 1 P 1 / P 2

    E 1 P 3 / P 4

    Jumpers in 120 Ohm120Ohm 75

    1 75

    120Ohm

    75Ohm 120

    75Ohm 120

    Figure 24: PCM 75 and 120 Ohm Jumper Setup

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 39 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    40/70

    2 Scenario

    2.3.3 Cabling of External Alarms With Options Fan Hat and Cabling SSCPurpose To check the correct external alarm assignment.

    Procedure Check according the next figure the cabling for:1. Option 1: Cabling fan hat (1)

    2. Remote external alarm cabling for DDF, sensor or Option 2: Cabling SSC(2). A second cable is supplied if more external alarm ports are used.

    X202

    OM_TR

    Fault

    OP

    GND

    X102

    E 1 P 1 / P 2

    X101

    X200

    X106X107

    X105

    X104

    X103

    PS_OK

    X203

    E1P1

    E1 P2

    E1 P3

    E1 P4

    Ant. Tilt

    R X

    T X

    G N D

    X313 X327

    X 3 1 0

    X 3 1 1

    X 3 1 2

    X 3 1 4

    X 3 1 5

    X 3 1 6

    75Ohm120

    75Ohm120

    UMTSFrame

    Trace

    CLXCal.

    PMS Ext.Alarm 7+8

    Ext.Alarm 5+6

    Ext.Alarm 3+4

    Ext.Alarm 1+2

    MMI

    Link M_OKX204

    E 1 P 3 / P 4

    S 1 0 0

    COBO

    LPEN

    L L

    L

    PE PE

    PE

    N N

    N

    L

    L

    N

    N F a n AC Mains in

    ACCO

    Slave2 Slave1

    S 1 F A N

    T 1

    , 2 5 A

    S 1 B T S

    T 2

    , 5 A

    MCON

    G GreyY YellowW WhiteP Purpl eBR BrownBL Blue

    X103Ext.Alarm 3+4

    Ext.Alarm 1+2

    G

    BRPYG

    BLPW

    Rubbersleeve

    QUAD 1Quad 2

    Alarmcable1 X107

    Ext.Alarm 7+8

    W Whit eBR Brown

    BR W

    PMS COBO

    X106

    LPEN

    F a n

    Brown

    Blue

    Yellow

    CablingExternal

    Alarm

    CablingFan hat

    1

    2

    1

    Figure 25: Cabling External Alarm and Fan Hat Inside COBO

    40 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    41/70

    2 Scenario

    2.3.4 Connect Antenna Jumpers

    2.3.4.1 Purpose

    The antenna connectors must be dry before connection.

    2.3.4.2 Materials

    Description Reference Kit

    Vinyl electrical tape 1AC 01556 0001 Supplies (Section 1.5.2)

    Linerless Rubber Splicing Tape 1AC 01595 0001

    Procedure 1. At the Micro Node B side the antenna jumpers must reach the bottom part ofMicro Node B housing and have a provision of 30 cm for connection

    2. Connect the antenna jumpers to antenna feeders as shown in Figure 26 for indoor sites or Figure 27 for outdoor sites.

    3. When using torque wrenches to tighten the RF cables, see [ 3 ] Tools Catalogue . Use the torque values give in the following table:

    Connector Type Torque [Nm]

    N 0.7-1.1

    7/16 25

    Table 1: Torque Values for Different Connectors

    1 2

    1 2

    1 2

    2

    1

    1 : Antenna feeder2 : Antenna jumper cable

    Figure 26: Detailed Connection Between Antenna Jumpers and Antenna Feeders for Indoor Sites

    1 2 3 1 2 3 1 2 1 2 3 4 5 1 2 3

    1 2 3

    1 2 3

    1 2 3 1 1 2 1 2 1 2 1 2 3 4 1 2 1 2 1 2 1 2 3 1 2 1 2 1 2 1 2 1 2 3 4 1 2 3 1 1 2 3 1 2 1 2 3 1 2 1 2 3 1 2 1 2 3

    1 2 3

    1 2

    1 2 1 2 3 1 2 3 1 2 1 2 3 1 1 2 3 1 1 2 3 1 2 3 1 2

    1 2 3 1 2 3

    1 2 3

    1 2

    1 2 1 2 3 1 2 3 1 1 2 3 1 2 1 2 3 1 2 1 2 3

    1 2 3

    1 2 3 4 5

    1 2 3 4 5 1 1 2 1 2 1 2 3 1 2 3 1 2 3 4 5 1 2 3 1 2 1 2 3

    Feeder Jumper2 1

    1 : Tape auto-vulcanisant2 : Tape scotch

    Figure 27: Detailed Connection Between Antenna Jumpers and Antenna Feeders for Outdoor Sites

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 41 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    42/70

    2 Scenario

    2.4 Checking Power Supply and Power UpThis section contains following power checks:

    A9112 Micro Node B without SSC ( Option 2)

    Case 2: A9112 Micro Node B with SSC ( Option 2).

    Before checking the power supply and powering up the Micro Node B, ensurethat the Safety Precautions have been taken according to [ 15 ] General Safety Instructions for Evolium Node B / BTS . It is essential that:

    The protective earth is connected to the equipment earth terminal

    The ACout MNB connectors in the COBO ( Figure 28 ) that feed the MNBunit are disconnected.

    42 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    43/70

    2 Scenario

    2.4.1 A9112 Micro Node B Without SSC ( Option 2)Purpose To check the correct power input for the Micro Node B.

    Procedure 1. Check the site power panel to make sure the breakers are OFF.

    2. Using a multimeter, check at each COBO that there is no voltage between

    L (line) and N (neutral) , N and PE (protective earth), L and PE (seefigure below).

    3. Close the circuit breakers at the site power panel.

    4. Check the voltage (230V AC) between line (L) and neutral (N) on the ACoutMNB connector.

    5. Check that there is no voltage between N and PE.

    6. Power up the unit by plugging in their ACout MNB connectors.

    MNB fuses(T=2.5 A)

    FAN fuses(T=1.5 A)

    L

    N

    L

    N

    SLAVE 1SLAVE 2

    X403X404

    X401

    X402

    X400

    ACoutMNB

    IEC Conn.

    FAN

    ACin, Mains

    L

    L

    LL

    N

    NN

    NPE

    PE PE

    PE

    Figure 28: ACCO Board in Connectionbox (COBO)

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 43 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    44/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    45/70

    2 Scenario

    2.5 Commissioning PreparationThis section contains following preparation steps:

    NEM-B and windows inventar software installation on LMT PC (if not done)

    LMT Connection on A9112 Micro Node B and software download

    Hardware status check and update of remote inventory.

    Check that the Micro Node B is isolated :At the DDF side by disconnecting terminals, from the PCM E1 link comingfrom the network.For installation with SSC, by disconnecting connectors X2, X3 and X4 onthe connection area in the SSC.Use the antistatic wrist strap when working with the MCON board.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 45 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    46/70

    2 Scenario

    2.5.1 NEM-B and Windows Inventar Software Installation on LMT PC(if not done)

    Purpose This section describe how to prepare the LMT PC.

    Note Task Description Site To do Outage

    Node B 5min NoneInput Perform the Install NEM-B Application [ 4 ] onthe LMT PC.

    See Tools (Section 1.5.1) Software Tools forneeded supplies.

    If needed, Upgrade NEM-B Software from CD-ROM [ 4 ].

    Input Install on LMT PC the INVENTAR softwaretool and copy the .RAC and the .CAL files(refer to the Site Inventory [ 9 ] document).

    Node B 5min None

    46 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    47/70

    2 Scenario

    2.5.2 LMT Connection on A9112 Micro Node B and Software DownloadPurpose This section describe how to, get connection to Micro Node B.

    No special characters input are allowed on NEM-B terminal!

    Note Task Description Site To do Outage

    Check, on the DDF, that the Micro NodeB PCM E1 links are not connected to theexternal PCM E1 links.

    Node B 1min None

    Node B 1min NonePower on the LMT PC, then Check IP Address Configuration [ 4 ] in LAN TCP/IP Propertiesfollowing selection:

    Obtain an IP address automatically

    Obtain DNS server address automatically.

    Check PC date and time (settings / controlpanel), and correct them if needed.

    Use a crossed Ethernet cable when Connect the Terminal to the Node B [ 4 ] (locally) onMCON MMI port.

    Check on the MCON that the MMI yellowLED Link is on.

    Node B 1min None

    Node B 1min NoneInput Start NEM-B Application [ 4 ] and type the:

    NEM-B Authorization key $Evolium and

    press [ Continue ]Node B IP address and press [ Connect ].

    Calculate Micro Node B IP Address:

    In NEM-B Startup window, take the LocalMaintenance Terminal displayed IP Addressfor the used Ethernet port of LMT PC.

    If aaa.aaa.aaa.xxx (xxx = 3...10) useaaa.aaa.aaa.1

    If aaa.aaa.aaa.xxx (xxx >16) then divide xxxwith 16, take the integer, multiply it by 16 andadd 1.

    Example:

    Displayed Address: 192.168.0. 55

    55 /16=3,43

    3*16=48

    48+1=49

    Calculated Example Node B IP Address is:192.168.0. 49

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 47 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    48/70

    2 Scenario

    Note Task Description Site To do Outage

    If NEM-B Information: Node B is runningorigin software; only software replacementis possible! comes up, press [ OK ].

    Allocate Configuration Rights [ 4 ] (offline) toallow the commissioning mode.

    Node B 1min None

    Input If Node B software is installed, show theCurrently Running Node B Software [ 4 ]and compare it with the needed software forcommissioning (newer is also allowed).

    Node B 1min None

    Node B (10min) NoneInput If needed (none or too old version), Replace Node B Software [ 4 ] with the needed one forcommissioning. Note: Use NEM-Bs FTP Server and select the

    descriptor file.

    Node B 1min NoneLock the mnb-129 (from the Hardware Modules [ 4 ] view). If Replace Node B Software was done, the mnb-129 is alreadylocked.

    Note: The Micro Node B mnb-129 stays lockeduntil it is added into the network with the OMC-R.

    Unlock all E1 Interfaces (from the Network Interface [ 4 ] view).

    Node B 1min None

    48 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    49/70

    2 Scenario

    2.5.3 Hardware Status Check and Update of Remote InventoryPurpose This section describe how to check and setup the hardware of the Micro Node

    B with Remote Inventory.

    Note Task Description Site To do Outage

    Node B 1min NoneO1 &O2

    Add following hardware in Remote Inventory Data [ 4 ] window (from the Hardware Modules [ 4 ] view) if:

    Options O1: Fan hat (MFCC) is available

    Some specific request of additionalmodules, refer to Table 2.

    Note: Update the remote inventory data, ifneeded, from the Remote Inventory Data [ 4 ]window of the NEM-B.

    Node B 1min NoneSave the inventory data with Write Remote Inventory File [ 4 ] to LMT PC.

    Help: Generated file location and name are

    given on the bottom of the NEM-B screen.If needed, Setup NEM-B Preferences [ 4 ](directory where the remote inventory file issaved).

    Node B 4min NoneInput Perform, with the INVENTAR software tool, the[ 9 ] RNS Site Inventory of the Micro Node B,using the customers CAL file (otherwise, usethe file "galumt3x.cal") and RAC file accordingto the Micro Node B type.

    Check the hardware status of the modulesbefore commissioning if:

    No error occurs (i.e. no C-Err message),see also Example of Inventory File (Section

    B). Note that C-Inf information messagesare normal for modules without serial number(additional modules). Do not take intoaccount the message Error preview (xxerrors found). Only the error lines, beginningwith C-Err, must be taken into account.

    All the additional modules, present in theMicro Node B, are listed in the result file.Refer to following table 2 to check theforeseen additional modules list.

    Note: Update the remote inventory data, ifneeded, from the Remote Inventory Data [ 4 ]window of the NEM-B.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 49 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    50/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    51/70

    2 Scenario

    2.6 Initial Parameters SettingsThis section contains following settings:

    Basic configuration

    Change Node Bs IP settings

    Antenna port assignment

    Additional settings.

    2.6.1 Basic Configuration

    Note Task Description Site To do Outage

    Node B 1min NoneInput Edit Basic Configuration [ 4 ] and enter:

    Logical Name [ 5 ] (i.e. the Node B Id [ 5 ])

    Location Name [ 5 ]

    Network Identity [ 5 ]

    First NTP Servers IP Address [ 5 ]

    Second NTP Servers IP Address [ 5 ]

    Rack usage [ umts-single-standard ]

    OUTC Battery Usage [ ] (not selected).

    Note : For DHCP mode usage the LogicalName and Location Name must be in linewith OMC-R site. Contact the OMC-R team toconfirm it.

    2.6.2 Change Node Bs IP Settings

    Note Task Description Site To do Outage

    Node B 1min NoneInput Edit Change Node Bs IP Settings [ 4 ] andselect the Node Bs DHCP mode:

    Not-used [ 5 ]:

    Enter new local Node B IP Address [ 5 ]i.e. the base address (multiple of 16) + 1

    Enter new Node B Subnet Mask [ 5 ]

    Conditional-usage [ 5 ]

    Imperative-usage [ 5 ].

    Note: For DHCP mode not-used , the newNode Bs IP Address must be in line withOMC-R site. Contact the OMC-R team toconfirm them.

    Refer to the following Node B IP Address Plan for:

    Calculate the needed IP Address

    Get subnet mask.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 51 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    52/70

    2 Scenario

    The Subnet of 64 IP Node B addresses only valid from the new UTRAN RadioNetwork Controller (RNC) EVOLIUM A9140 RNC Evolution .

    Subnet of 16 Node B IPaddresses (255.255.255.240)

    Subnet of 64 IP Node Baddresses (255.255.255.192)

    Use

    Base Node B IP address

    aaa.aaa.aaa.xxx wherexxx is multiple of 16 (xxx=0,16,32,....240).

    Base Node B IP address

    aaa.aaa.aaa.xxx where xxx ismultiple of 64 ( xxx=0,64,128,192).

    Base Node B IP address

    aaa.aaa.aaa.xxx +1 aaa.aaa.aaa.xxx +1 Local Node B IP address (forLMT).

    aaa.aaa.aaa.xxx +2 aaa.aaa.aaa.xxx +2 Remote Node B IP address (forOMC-R-NM).

    aaa.aaa.aaa.xxx +3 toaaa.aaa.aaa.xxx +9

    aaa.aaa.aaa.xxx +3 toaaa.aaa.aaa.xxx +9

    Pool for LMT-PC IP address(MMI-ETH).

    aaa.aaa.aaa.xxx +10 aaa.aaa.aaa.xxx +10 DHCP relay on RNC

    aaa.aaa.aaa.xxx +11

    and

    aaa.aaa.aaa.xxx +11

    to

    DHCP pool

    aaa.aaa.aaa.xxx +12 aaa.aaa.aaa.xxx +60

    aaa.aaa.aaa.xxx +13 aaa.aaa.aaa.xxx +61 External device remote IP address(XRT) / Antenna Device Controller(ADC)

    aaa.aaa.aaa.xxx +14 aaa.aaa.aaa.xxx +62 External device / multistandardSUMA (RS 232)

    aaa.aaa.aaa.xxx +15 aaa.aaa.aaa.xxx +63 IP broadcast.

    Table 3: Node B IP Address Plan

    52 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    53/70

    2 Scenario

    2.6.3 Antenna Port Assignment

    Note Task Description Site To do Outage

    Input Select the Antenna Ports [ 4 ] General view

    and for each used antenna port edit AntennaIdentity with Edit... the antenna label [ 5 ].

    Node B 1min None

    Input Select the Sector [ 4 ] view and edit thecontents:

    Enter the azimuth value Cell Logical Information [ 5 ] (from 0.01 to 360 oromni

    Change the sector state to unlocked .

    Node B 1min None

    2.6.4 Additional Settings

    Note Task Description Site To do Outage

    Node B 1min NoneInput Open the Clock Configuration [ 4 ] window andselect the requested Clock SynchronisationSource [ 5 ].

    Note: Do not change the DAC value (OCXOadjustment).

    Note: Only free-running andE1-synchronized modes are allowed.Others modes are in restriction.

    Input Open the O&M Link Settings [ 4 ] window andenter the settings for:

    VPI [ 5 ]

    TC Adapter [ 5 ].

    Node B 1min None

    Input Select the Network Interface [ 4 ] view andunlock each used "E1 port".

    Node B 1min None

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 53 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    54/70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    55/70

    2 Scenario

    2.7 Commissioning TestsThis section contains following tests:

    Cabling test

    Transmitter power test

    VSWR measurement test

    External alarm test

    Iub loop test.

    If antenna port ANT A on Micro Node B are not connected to antenna, loadmust be installed to avoid MTEU switch off due to a too high VSWR. They couldbe removed after Final Checks (Section 2.8) .

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 55 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    56/70

    2 Scenario

    2.7.1 Cabling Test

    The Micro Node B triggers at each startup or lock/unlock of modules a cablingtest for internal RBI / BTI cabling. For the additional RF cables (MTEU -MANRU) the Cabling Test must be manually executed .

    Cabling Test result is to compare with [ 2 ] Evolium A9112 Micro Node B Hardware Description that MTEU and MANRU linked to correct :

    Trab Connector

    Antenna Identity

    Assigned Sector.The Cabling Test display internal mapping rules and no alarm will appear, ifwrong configuration is used. Alarms are displayed if internal faulty or missingcables is detected.

    Note Task Description Site To do Outage

    Install load on ANT A if antenna not available. Node B 1min None

    Display the Hardware Modules [ 4 ] view andcheck all is correct i.e. status is enabled forall modules (except for the mnb-129 which islocked).

    Node B 1min None

    Node B 2min NoneInput Open the Cabling Information and Test [ 4 ]window, click on Run Cabling Test and thenconfirm with [ OK ] to run test.

    Check the MTEU is linked to its MANRU andantenna port [ 5 ].

    Note : MTEU transmits for some seconds radiopower towards the antennas during cablingtest.

    Use [ 2 ] Evolium A9112 Micro Node B Hardware Description to:

    Define TEU - ANR - antenna mapping

    Get the physical places of the modules

    Get the physical addresses of the modules.

    Click on [ Close ] to leave test.

    56 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    57/70

    2 Scenario

    2.7.2 Transmitter Power Test

    Note Task Description Site To do Outage

    Node B 1min NoneInput Open the Transmitter Power Test [ 4 ] window

    and enter the test parameter:TX power level, in dBm, at antennaconnectors (between 20 and 40 dBm)

    Test frequency (between 2110000 and2170000 kHz) or leave default (2140000kHz)

    Test scrambling code (between 0 and 511)or leave default (0)

    Test duration to 2 minutes.

    Note: Use maximum TX power level for test:40,0 dBm.

    In TEU Selection window part :

    Click on [ >> ] to move all Availiable TEUsto Selected TEUs

    Click on [ Start ] then confirm with [ Yes ]to run test.

    Check in the Test Status field if the OKtest completed message appears afterTest duration is finished (2 minutes).

    Node B 3min None

    Click on [ Close ] to leave test.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 57 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    58/70

    2 Scenario

    2.7.3 VSWR Measurement Test

    Note Task Description Site To do Outage

    Node B 5min NoneInput Open the VSWR Measurement [ 4 ] window

    and enter the test parameter:TX power level, in dBm, at antennaconnectors (between 20 and 40,0 dBm)

    Test requency (between 2110000 and2170000 kHz or leave default 2140000 kHz)

    Enter the VSWR Warning ThresholdMargin (leave default 0,6 dB)

    Enter the VSWR Urgent Threshold (leavedefault 3.0 dB)

    Select in Selectable Antennas theantennas[ A..Z ANT A ]

    Click on [ Start Measurement ], then confirmwith [ OK ] to run test

    After successful test, confirm the newVSWR Warning Threshold with [ YES ] tostore the values in Micro Node B

    Results are displayed on the NEM-Bwindow. Check them with the following Flow Chart for VSWR Result Check (30) .

    Note:

    VSWR measurements only on ANT A outputpossible, to which the MTEU is assigned

    Use maximum TX power level for test: 40,0dBm

    The recommended value for the VSWR testis the maximum TX Power.

    MTEU, MANRU and MBB modules must

    be enabled and the mnb-129 must belocked, to allow the VSWR test.

    Click on [ Close ] to leave test.

    58 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    59/70

    2 Scenario

    Perform VSWR measurementwith antenna connected on the MBS

    result = VSWR1

    Result is correct

    yes

    VSWR1 < 1.5

    no

    MBS equipment is faulty:

    * Check the tightness of connectors

    * Check module status

    * Perform other VSWR measurements

    to locate the faulty module:

    load on MBS antenna output

    load on ANRU output.

    Problem is not blocking:MBS could be used for traffic,

    but inform the operator that VSWR is criticaland problem must be solved a.s.a.p.

    Perform VSWR measurement

    with 50 ohms load

    (connected at the end of the MBS jumper)result = VSWR2

    VSWR2 < 1.3

    no

    yesMBS itself is correct.

    But antenna or feeder are faulty.

    noVSWR1 < 1.7

    yes

    Problem is blocking:MBS must not be used for traffic ,

    so inform the operator that problemmust be solved before.

    Figure 30: Flow Chart for VSWR Result Check

    Note Task Description Site To do Outage

    Node B 1min NoneDisplay the Antenna Ports [ 4 ] VSWR viewand, for each antenna port, modify the VSWRthreshold values in order to have:

    Warning Threshold = "1.8"

    Urgent Threshold = "3.0" .

    Note: Other Threshold values could berequested by customer (refer to [ 11 ] Catalogue of Instruction Operation - UMTS ).

    Help: If the VSWR Measurement Test isnot successful, use this Task for modify theThreshold.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 59 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    60/70

    2 Scenario

    2.7.4 External Alarm Test

    To perform all tasks from this section, you must select for all externalalarm ports standard polarity.

    Help: In the Micro Node B, external alarms are connected to MCON board (inside theCOBO on right side), refer to Installation and Cabling Checks (Section 2.3) toget external alarm port information.

    Note Task Description Site To do Outage

    Node B 1min NoneShow the Alarms [ 4 ] view and check all iscorrect i.e. no active alarm (except Dooralarm for COBO if connected and E1 link andALCAP alarms for not connected PCM links).

    Note : ALCAP alarms only appears after firstRNC connection.

    Show the Alarms [ 4 ] view and check inExternal Alarms that all used ports areconnected (declared).

    Node B 1min None

    Node B 5min NoneO1 &O2

    Show the Alarms [ 4 ] view and for eachconnected external alarm, check this alarmappears (after about 10 seconds) for:

    DDF and external sensors, remove theloop on the DDF and external sensors forthis alarms

    Options O1 Fan alarm, open the MCAC

    jumper cable, running to Fan Hat, see [ 2 ]Options O2 SSC, see [ 8 ]:

    SSC door alarm, open SSC door

    SSC mains power failure, switch OFFS1in SSC and in addition check that theMicro Node B remains powered by thebackup battery

    SSC battery deep discharge alarm, thebattery backup voltage is below 240 V

    DC or open the loop on X12 pin1/2.

    Note : The aim is to check the cabling betweenthe Micro Node B and the DDF or externalsensors.

    60 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    61/70

    2 Scenario

    Note Task Description Site To do Outage

    Node B 1min NoneFor external alarms generated inside the MicroNode B or not connected to DDF, show theAlarms [ 4 ] view and check that the :

    COBO door alarm works properly bypressing the switch (S100) located onMCON

    PMS alarm (vertical disposition switchS101) if connected, by disconnect the cable jumper on PMS terminal block located onMCON

    All other outstanding external alarms byconnect all ports in External Alarms view if

    they are disconnected.

    Note :

    The aim is to check the external alarms,if there are not reach the DDF or locatedinside COBO

    For more information see Description of MCON and ACCO Boards (Section A)

    Undo all changes for external alarm testand check in the Alarms [ 4 ] view for eachconnected external alarm if the external alarmdisappears (after about 10 seconds), exceptCOBO Door Open alarm.

    Node B 1min None

    The following table gives the default external alarm Id for each pin.

    External alarm Port Alarm Id Alarm Description

    1 3301401 MNB Battery Deep Discharge (SSC)

    2 3301402 MNB Mains Power Failure (SSC)

    3 3301403 MNB SSC Door Open Alarm

    4 3301404 MNB COBO Door Open

    5 3301405 MNB: Equipment moved to no vertical position

    6 3301406 Void alarm: Input pin not in use

    7 3301407 Void alarm: Input pin not in use

    8 3301408 MNB optional FAN failed

    Table 4: Default External Alarm Ids for Each Port

    Note: External alarm Id could be changed, on customer request.For each external alarm ports, alarm polarity can be configured by case.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 61 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    62/70

    2 Scenario

    2.7.5 Iub Loop Test

    Note Task Description Site To do Outage

    Node B 4min NoneCheck, on the DDF, that the Micro Node B PCM

    links are not connected to external PCM links.Select the Iub Loop Test [ 4 ] and follow thedisplayed messages. Check result is correct,Use [ 2 ] EVOLIUM NEM-B User Guide to verifythe test result.

    The aim of this test is to check the cablingbetween the MNB and the DDF.

    Note: Some tests are N/A not applicable.

    E14 RX

    E14 TX

    E13 RX

    E13 TX

    E12 RX

    E12 TX

    E11 RX

    E11 TX

    Figure 31: Example of PCM loops (short-cut) on the DDF.

    62 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    63/70

    2 Scenario

    2.8 Final ChecksThis section contains following checks:

    Check hardware modules alarm and LED status

    Site inventory

    A9112 Micro Node B connection to network.

    2.8.1 Check Hardware Modules Alarm and LED Status

    Note Task Description Site To do Outage

    Node B 1min NoneDisplay the Hardware Modules [ 4 ] view andcheck all is correct i.e. status is enabled forall modules (except for mnb-129 which islocked).

    Note : If the MTEU are not connected toantenna, lock them from this Hardware Module

    [ 4 ] view.

    Node B 1min NoneShow the Alarms [ 4 ] view and check all iscorrect i.e. no active alarm (except Door alarmfor Cobo if connected and E1 link and ALCAPalarms for not connected PCM links).

    Note : ALCAP alarms only appears after firstRNC connection.

    Node B 1min NoneCheck LEDs on MCON, LEDs position seefollowing figure :

    PS_OK : lighted

    OM Tr: off

    Fault : off

    OP : blinking (SS), lighted if ALCAP is ok

    E1 P1 ... P4 : blinking E1 nok, lighted E1ok, off E1 disabled.

    Link : lighted, if MMI LMT connection is ok

    M_OK: off, SS: if dataflow on MMI LMT.

    Refer to the Evolium A9112 Micro Node B Hardware Description [ 2 ] for functions of LEDsand more detailed information.

    The different blink modes are denoted by thetimes of on- and off-time:

    On: LED fully lit

    LS: long on, short off

    LL: long on, long off

    SS: short on, short off

    SL: short on, long off.

    X202

    OM_TR

    FaultOP

    GND

    X102

    E 1

    P 1 / P 2

    X101

    X200

    X106 X107

    X105

    X104

    X103

    X203

    Ant. Tilt

    R X

    G N D

    X313 X327

    X 3 1 0

    X 3 1 1

    X 3 1 2

    X 3 1 4

    X 3 1 5

    X 3 1 6

    75Ohm120

    75Ohm120

    UMTSFrame

    Trace

    CLX Cal.

    PMS Ext.Alarm 7+8

    Ext.Alarm 5+6

    Ext.Alarm 3+4

    Ext.Alarm 1+2

    MMI

    X204

    E 1 P 3 / P 4

    S 1 0 0

    COBO

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    1 2 3 4 5 6 7 8 9 0 1 2

    E1 P3E1 P4

    T X

    E1 P1E1 P2

    Link M_OK

    PS_OK

    Figure 32: LEDs position on MCON

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 63 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    64/70

    2 Scenario

    2.8.2 Site Inventory

    Note Task Description Site To do Outage

    Node B 2min NoneDisplay the Remote Inventory Data view (from

    the Hardware Modules [ 4 ] view) and selectSet Commissioning Date for all Modules. Note: It is normal that additional modules haveno commissioning date.

    Node B 1min NoneSave the inventory data with Write Remote Inventory File [ 4 ] to LMT PC.

    Generated file location and name are given onthe bottom of the NEM-B screen. If needed,Setup NEM-B Preferences [ 4 ] (directorywhere the remote inventory file is saved).

    Node B 4min NoneInput Perform, with the INVENTAR software tool,the Site Inventory [ 9 ] of the MNB, using thecustomers CAL file (otherwise, use the file"galumtxx.cal") and RAC file according to theMNB.

    Note:

    Check again no error occurs (i.e. no "C-Err"message). Note that information messages(C-Inf) are normal for modules without serialnumber (additional modules).

    If needed, edit the resulting file with theNotepad software and complete or correctits contents. Refer to Example of Inve ntory File (Section B) for additional information.

    Node B 1min NoneInput Finish the Site Inventory [ 9 ]:

    Complete the header with information (sitename, operator name, ...).

    Save the completed file to a floppy disk.

    64 / 70 3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    65/70

    2 Scenario

    2.8.3 Connection to Network

    Note Task Description Site To do Outage

    Connect the Micro Node B PCM E1 links on

    the DDF, or if Options O2: SSC by connectingconnectors X2, X3 and X4 on the connectionarea in the SSC [ 8 ], to the external PCM links.

    Node B 1min None

    Check LEDs status E1 P1 ... P4 on MCON,refer to Check Hardware Modules Alarm and LED Status (Section 2.8.1) . If used PCM E1link is ok, LEDs are on.

    Node B 1min None

    Node B / OMC-R 5min NoneIf Micro Node B - OMC-R connection is ready,contact the UMTS OMC-R teams and ask themto ping the MNB from NM server (using PCclient).

    Use the Node B IP base address + 2.

    3BK 17429 3081 RJZZA Ed.02Z2EV00007-0072 Ed.02 65 / 70

  • 8/12/2019 Evolium A9112 Micro Node B Commissioning Manual 174293081e02

    66/70

    2 Scenario

    2.9 FinishingThis section describes the final operations before leaving the site.

    Note Task Description Site To do Outage

    On NEM-B Release Configuration Rights [ 4 ](online) to exit the commissioning mode.

    Node B 1min None

    Exit NEM-B Software [ 4 ] and disconnect thecable between PC and COBO.

    Close the COBO door.

    Node B 1min None

    Complete [ 6 ] CCL and the site log book. Node


Recommended