C B KITCHEN / BOH MEZZANINE A B 1 2 3 4 4 - KITCHEN / BOH 50m wide x 15m long area Temporary kitchen facilities (included where quoted) Mezzanine with one client office and crew catering area (approx. 110m² floor area) 3 - MAIN SPACE• 50m wide x 75m long area (3,750m² floor area) Black serge wall linings LED starcloth ceiling 2 - MEZZANINE 700m² floor area Glass balustrading with brushed aluminium handrail Exposed aluminium roof beams Ample cloakroom facility AMENITIES 1 - ATRIUM 30m wide x 10m deep area (300m2 floor area) 4 sets of glass entrance doors Ivory wall panelling Male toilets Wheelchair accessible toilets First Aid Room Wheelchair accessible lift Female toilets B - Client’s Office C - Crew Catering A - Venue Office VENUE LAYOUT Access to Main Space Access to Main Space
Transcript
Page 1: Evolution London Venue Manual · • Glass balustrading with brushed aluminium handrail • Exposed aluminium roof beams Ample cloakroom facility AMENITIES 1 - ATRIUM • 30m wide

C

B

KITCHEN / BOH MEZZANINE

A

B

1 2 3 4

4 - KITCHEN / BOH• 50m wide x 15m long area• Temporary kitchen facilities (included where quoted)• Mezzanine with one client offi ce and crew catering

area (approx. 110m² fl oor area)

3 - MAIN SPACE•• 50m wide x 75m long area (3,750m² fl oor area)• Black serge wall linings• LED starcloth ceiling

2 - MEZZANINE• 700m² fl oor area• Glass balustrading with brushed aluminium handrail• Exposed aluminium roof beams

Ample cloakroom facility

AMENITIES

1 - ATRIUM• 30m wide x 10m deep area (300m2 fl oor area)• 4 sets of glass entrance doors• Ivory wall panelling

Male toilets

Wheelchair accessible toilets

First Aid Room

Wheelchair accessible lift

Female toilets

B - Client’s Offi ce C - Crew CateringA - Venue Offi ce