Project No. INT05S2015
Group #3
Adinna ValentinaGeorgi DimovSven EinarssonVladislav Nedelev
G:\E2015_Semester_5\J\Group 3 Instaarch 2.0\Evaluation
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
We are…
Adinna Valentina
Georgi Dimov Sven Einarsson
Vladislav Nedelev
Goal Vision
Deliver good and professional work to our clients.
To be a leading architecture firm in design of office and commercial buildings
2
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Group time planning
GenieBelt
Go to http://geniebelt.com/ Use this user name and password: USER/Email: [email protected]: #letmeinplease!
3
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Location
Blegdamsvej 4, 2200 København N
4
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Registration cards
20 Building site
18 Miscellaneous
16 Ventilation
19 Private, free areas
16.1 Ventalation front building16.2 Ventilation back house
G:\E2015_Semester_5\J\Blegdamsvej\Registration
20.1 Scaffolding20.2 Crane20.3 Containers for disposal20.4 Site running
18.1 Boxroom18.2 Laundry18.3 Residential rooms
19.1 Pavement19.2 Bicycle and disposal scour
5
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
12 October 2015
Registration challengesREGISTRATION and SURVEY LIST
SFB Code
1. Roof Covering 272. Basement /Foundations 123. Facades / Plinth 214. Windows 31.15. External Doors 31.26. Stairs / Ramps 247. Gateways / Passages 31.38. Floor Divisions 239. Toilets / Bathrooms 59.110. Kitchen 59.211. Heating Installations 5612. Outlets 5813. Sewerage System 5214. Water Installations 5315. Gas Installations 5416. Ventilation 5717. Electricity 6318. Misc. Refurbishment Work 99.119. Private Free Areas 99.220. Building Site 99.3
20%
10%
25%
45%
Statistics
OurDoneEmpty foldersNot complete
OurDone
Empty FoldersNot complete
6
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Procurement strategy
Procurement strategy PDF
Client
Engineering company
Subcontractor Subcontractor Subcontractor
Main contractors
ABR89 ABR89
AB92
AB92
7
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Analyzes of the area
8
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Information
9
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Existing plan, ground floor
10
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Demolition plans, ground floor
11
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Future plans, ground floor
12
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Existing plans, 1st floor
13
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Demolition plans, 1st floor
14
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Future plans, 1st floor
15
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Existing plan, 2nd floor
16
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Demolition plans, 2nd floor
17
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Future plans, 2nd floor
18
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Existing plan, 3rd floor
19
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Demolition plans, 3rd floor
20
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Future plans, 3rd floor
21
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Existing floor plans, roof/4 floor
22
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Demolition floor plans, roof/4 floor
23
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Future plans, roof/4 floor
24
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Section demolishion
25
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Section new construction
26
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Documents
ICT contract
Building permit
Site waste
Eco friendlychecklist list
Contract for consultation
services 27
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Time plan
Demolishing & Construction : 215 Days
28
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Budget
Preliminary Budget and Time frame PDF
24 444 575 DKK
Elemental Cost plan PDF
21 965 00 DKK
+ / - 20% + / - 5%
29
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Structure analysis
E(99)3-01 - Structural E(99)3-02 - Structural E(99)3-03 - Structural
E(99)3-04 - Structural E(99)3-05 - Structural30
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Fire plans
A(99)3.07 Escape routes
A(99)3.08 Fire protection Section
A(99)3.09 Fire protection
31
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Analysis MEP
32
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
MEP
33
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
MEP
(53)3.01 Water supply
(56)3.01 Heating
(57)3.01 Ventilation
Ventilation flow calculations
34
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Energy frame
Building part
M2 W/mK °C (K) W
Facade street 169 0,24 32 1.298
facade (with new insulation) 729 0,14 32 3.266
Facade to the naigboor building 144 0,24 10 346
Roof 304,9 0,13 32 1.268
Ground floor slab 180 0,11 5 99
Windows and doors 298 1,33 32 12.683
18.960
Windows area 16%
heated floor area 1267
14,96
Energy frame.xlsx
35
Registration
Time planning
Information
Section
Elevations
Analysis
MEP
Energy frame
Design Development
We are
Cards
Structural
Concept
Documents
BudgetTime plan
Thank you for your attention!