NEW TAPERED INSULATION SYSTEM
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW TERMINATION BAR
NEW COUNTERFLASHING
EXISTING BRICK
EXISTING CONDITIONSEXISTING CONDITIONS
NEW CLEAT
NEW GRAVEL STOP
EXISTING WOOD BLOCKING
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
EXISTING CONCRETE PANELS
2 6
NEW WOOD BLOCKING
NEW INSULATION
NEW DRAIN SUMP
NEW LEAD FLASHING
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW PRIMARY DRAIN ASSEMBLY
NEW DECKING TO MATCH EXISTING.
NEW FASTENERS
NEW 4-BAND NO-HUB CLAMP
NEW INSULATION
NEW LEAD FLASHING
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW OVERFLOW DRAIN ASSEMBLY
NEW DECKING TO MATCH EXISTING.
NEW FASTENERS
NEW 4-BAND NO-HUB CLAMP
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW COUNTERFLASHING
EXISTING CURB COVER
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
2 10
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW COPING
NEW PVC SHEATHING
NEW WOOD BLOCKING
NEW TAPERED WOOD FIBER
NEW TERMINATION BAR
NEW COUNTERFLASHING
EXISTING CONDITIONSEXISTING CONDITIONS
EXISTING BRICK
NEW FLASHINGS
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW COPING
NEW PVC SHEATHING
NEW TAPERED WOOD FIBER
EXISTING WOOD BLOCKING
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
EXISTING CONCRETE PANELS
EXISTING FASCIA EXTENSION
EXISTING EXPANSION
JOINT COVER
AREA B (N.I.C.)
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
2 8
2
NEW COPING
NEW PVC SHEATHING
NEW CLEAT
NEW FASCIA EXTENSION
WITH BREAK
NEW STUD WALL
NEW PLYWOOD
NEW PLYWOOD
8
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
NEW STUD WALL
NEW TAPERED WOOD FIBER
NEW CLEAT
NEW FASCIA EXTENSION
WITH BREAK
NEW COUNTERFLASHING
EXISTING EIFS
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
2 8
2
NEW COPING
NEW PVC SHEATHING
NEW CLEAT
NEW FASCIA EXTENSION
WITH BREAK
NEW STUD WALL
NEW PLYWOOD
NEW PLYWOOD
8
NEW STUD WALL
NEW TAPERED WOOD FIBER
NEW HVAC UNIT
SEE PLAN
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW VERTICAL INSULATION
NEW COVERBOARD
NEW WOOD BLOCKING
NEW COUNTERFLASHING
NEW HSS STUB COLUMN
NEW MC STEELNEW MC STEEL
EXISTING CONDITIONSEXISTING CONDITIONS
NEW ROOF DECK
5" OF ISOCYANURATE
INSULATION
HVAC & ROOF
EXCHANGE
UPGRADE
1
8 9
54
7
TYP. PARAPET DETAIL - AREA ATYP. PARAPET DETAIL - AREA A
TYP. CURB DETAIL TYP. PRIMARY ROOF DRAIN - AREA A
TYP. GRAVEL STOP DETAIL - AREA A
TYP. OVERFLOW ROOF DRAIN - AREA A
2
6
3
TYP. STUD WALL WITH FASCIA EXTENSION - AREA C
TYP. ROOF TO WALL TRANSITION DETAIL - AREA C
TYP. AREA C AND AREA B JUNCTURE DETAIL
10
TYP. NEW UNIT CURB FLASHING DETAIL
2 8
2 8
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW COPING
NEW PVC SHEATHING
NEW STUD WALL
NEW TAPERED WOOD FIBER
NEW CLEAT
NEW FASCIA EXTENSION
NEW STUD WALL
NEW PLYWOOD
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
EXISTING CONCRETE PANEL
EXISTING DRAIN ASSEMBLY
WITH NEW STATIC EXTENTION
NEW ALUMINUM DOME STRAINER AND
CLAMPING RING
NEW INSULATION
NEW COVERBOARD
NEW LEAD FLASHING
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW 1 INCH/FOOT DRAIN SUMP
EXISTING DRAIN
EXISTING FRAMING
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW BASE FLASHINGS
NEW SEALANT
NEW COUNTERFLASHING
NEW TERMINATION BAR
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
NEW INSULATION
NEW COVERBOARD
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW SCUPPER LINER
NEW PLYWOOD, THICKNESS AS REQUIRED
NEW CONDUCTOR HEAD
NEW STUD WALL BEYOND
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
NEW COVERBOARD
NEW BASE FLASHINGS
NEW COPING
NEW PVC SHEATHING
EXISTING WOOD BLOCKING
NEW TAPERED INSULATION SYSTEM
NEW MODIFIED BITUMEN ROOF SYSTEM
NEW TAPERED WOOD FIBER
EXISTING CONDITIONSEXISTING CONDITIONSEXISTING CONDITIONS
EXISTING CONCRETE PANEL
EXISTING DRAIN ASSEMBLY.
REFER TO SPECIFICATION.
NEW LEAD FLASHING.
REFER TO SPECIFICATION.
NEW MODIFIED BITUMEN
ROOFING SYSTEM.
REFER TO SPECIFICATION.
NEW DRAIN SUMP.
REFER TO SPECIFICATION.
EXISTING DECKING.
HVAC & ROOF
EXCHANGE
UPGRADE
1
TYP. NEW STUD WALL DETAIL - CANOPY A
2
TYP. CHANNEL SCUPPER DETAIL - CANOPIES A & C
3
TYP. ROOF TO WALL TRANSITION DETAIL
4
TYP. DRAIN DETAIL - CANOPY
5
TYP. PARAPET DETAIL
6
TYP. DRAIN DETAIL - AREA C
NEW COPING
NEW
GRAVEL-STOP
REFER TO
SPECIFICATION.
NEW METAL CANT
STRIP CLOSURE.
NEW MEMBRANE
FLASHING.
NEW STUD WALL
EXISTING CONCRETE
WALL PANELS
NEW CONTINUOUS UNDERLAYMENT
NEW SCUPPER LINER
NEW COPING AND CLOSURE
NEW FASCIA
EXTENSION
CONDUCTOR HEAD
NOT SHOWN FOR
CLARITY
FLASHING BENT INSIDE VENT
ALTERNATE TWO PIECE FLASHING
12"
SMACNA ARCHITECTURAL
SHEET METAL MANUAL
SOIL PIPE VENT DETAIL
TWO APPLICATIONS OF
LIQUID FLASHING.
REFER TO SPECIFICATION.
MESH FABRIC BETWEEN TWO
APPLICATIONS LIQUID FLASHING.
REFER TO SPECIFICATION.
NEW ROOFING.
REFER TO SPECIFICATION.
TWO APPLICATIONS OF
LIQUID FLASHING.
REFER TO SPECIFICATION.
NEW DECKING TO MATCH EXISTING
NEW FASTENERS
EXISTING DECKING
EXISTING BEAM OR SUPPORT
NEW DECKING TO MATCH EXISTING
NEW FASTENERS
EXISTING DECKING
EXISTING BEAM OR SUPPORT
NEW 24 GA. GALVANIZED
STEEL W/KYNAR FINISH
COUNTERFLASHING.
REFER TO SPECIFICATION
NEW 0.040" THICK ALUMINUM W/
KYNAR 500 FINISH OR EQUAL
COPING CLOSURE @ JUNCTURE
OF WALL ABOVE ROOF LEVEL.
REFER TO SPECIFICATION
EXISTING PARAPET
COUNTERFLASHING & COPING CLOSURE
INSTALLATION: JUNCTURE OF COPING
AND WALL ABOVE ROOF LEVEL
20 MIL PVC
SHEATHING
SMACNA ARCHITECTURAL
SHEET METAL DETAIL
DRIVE CLEAT DETAIL
SMACNA ARCHITECTURAL SHEET
METAL DETAIL
FORMED METAL COPING DETAIL
NEW STEEL PLATE
EXISTING SUPPORT
NEW FASTENER
EXISTING DECKING
HVAC & ROOF
EXCHANGE
UPGRADE
1
3
4
2
65
CANT STRIP CLOSURE DETAIL
TYP. PIPE FLASHING
TYP. COPING TERMINATION AT WALL DETAIL
TYP. SMALL METAL DECK OPENING CLOSURETYP. LARGE METAL DECK OPENING CLOSURE
CHANNEL SCUPPER FLASHING DETAIL
ZONE NO. 1 ZONE NO. 2 ZONE NO. 3
6"
1' 2' 2'
6"
1'-6"
6" 6" 1'1'-6"
6"
6"
6"
1' 1' 1' 1' 1' 1' 1'6"
6"
1'
1'
1'
6"
ZONE NO. 1 ZONE NO. 2 ZONE NO. 3
1'-6"
1'
1'
2'
1' 2' 1'
6"
6"
6"
6"
6" 6"6"
6"
1' 1' 1' 6"
6"
1'
1'
1'
6"
1'2' 1'6"6"1'-6" 1'
1'
6"
6"
1'
1' 1'
6"
1'
1'
1' 4"
4"
4"
4"
4"
4"
4"
4"1' 6" 6"
4"
1'
4"
6" 4"
4"
4" 4"
1'
4"6"4"
HVAC & ROOF
EXCHANGE
UPGRADE
1
TYP. ADHERED INSULATION
TYP. MECHANICALLY ATTACHED INSULATION
2